WO2016109057A1 - A method of balancing resource recovery from a resource bearing formation - Google Patents
A method of balancing resource recovery from a resource bearing formation Download PDFInfo
- Publication number
- WO2016109057A1 WO2016109057A1 PCT/US2015/061908 US2015061908W WO2016109057A1 WO 2016109057 A1 WO2016109057 A1 WO 2016109057A1 US 2015061908 W US2015061908 W US 2015061908W WO 2016109057 A1 WO2016109057 A1 WO 2016109057A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- resource
- sweep pattern
- wells
- bearing formation
- production wells
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
Definitions
- Exemplary embodiments pertain to the art of resource, extraction, recovery and sequestration systems and, more particularly, to a method and apparatus for balancing resource recovery from a resource bearing formation.
- Many hydrocarbon extraction systems employ artificial lift to aid in resource recovery.
- the fluid is extracted from the formation through the use of a mechanical device that may be arranged inside a production well (known as pump or velocity string) or by decreasing the weight of a hydrostatic column by injecting gas into the production fluid.
- Artificial lift is generally employed in wells when there is insufficient reservoir pressure to lift the production fluids uphole.
- fluids and gases are pumped into a formation to provide an artificial means to increase the flow of a production fluid, such as crude oil, and/or water from a production well.
- fluid which may take the form of liquid or gas
- fluid may be introduced into the formation at multiple locations through injector wells and then produced from production wells.
- the result of this movement in the sub-surface is the sweep pattern and sweep efficiency of the paired injection and production wells.
- fluid injection and/or production may be controlled or adjusted to improve the sweep pattern or efficiency to improve hydrocarbon recovery from the reservoir.
- a method of balancing resource recovery from a resource bearing formation includes selectively injecting a fluid into the resource bearing formation through one or more injector wells, extracting a resource from the resource bearing formation through one or more production wells, receiving at a sweep pattern controller, an input from each of the one or more production wells indicating an amount of the resource extracted over a period of time, determining, in the sweep pattern controller, an adjusted sweep pattern for the formation that substantially equalizes production from each of the one or more production wells, and signaling each of the one or more injector wells, from the sweep pattern controller, to selectively inject the fluid to establish the adjusted sweep pattern in the formation.
- a resource recovery system includes one or more production wells fluidically connected to a resource bearing formation.
- the one or more production wells are configured to extract a resource from the resource bearing formation.
- One or more injector wells are fluidically connected to the resource bearing formation.
- the one or more injector wells are configured to selectively inject a fluid into, and increase pressure within, the resource bearing formation.
- a sweep pattern controller is operatively connected to each of the one or more production wells and each of the one or more injector wells.
- the sweep pattern controller is configured and disposed to selectively control one or more of the one or more injector wells to establish a desired sweep pattern, in the resource bearing formation, to substantially equalize resource extraction from each of the one or more production wells.
- FIG. 1 depicts a resource extraction, recovery and/or sequestration system including production wells and injector wells fluidically connected to a resource bearing formation, in accordance with an exemplary embodiment
- FIG. 2 depicts a sweep pattern controller that selectively controls fluid injection into the resource bearing formation through the injector wells to establish a desired sweep pattern
- FIG. 3 depicts a flow diagram illustrating a method of balancing resource recovery from the resource bearing formation, in accordance with an exemplary embodiment.
- a resource extraction, recovery and/or sequestration system in accordance with an exemplary embodiment, is indicated generally at 2, in FIG. 1.
- Resource extraction, recovery and/or sequestration system 2 includes a plurality of production or producing wells 4-6 and a plurality of injector wells 8-10.
- Production wells 4-6 and injector wells 8-10 are fluidically connected to reservoir 12 formed in a resource bearing formation 14.
- Production well 4 includes a platform 16 that supports a surface system 18 operatively connected to a downhole system 20 that extends into reservoir 12.
- Surface system 18 may include pumps 22.
- Downhole system 20 may include a downhole string 24 that is extended into a wellbore 26 formed in formation 14.
- Downhole string 24 may include a number of connected downhole tubulars or conduits 28 that deliver a resource (not separately labeled) from reservoir 12 to surface system 18 for delivery to a storage area and/or refinery (not shown).
- Injector wells 8-10 introduce a fluid, which may be a liquid, a gas or a combination thereof, into reservoir 12 causing the resource to flow uphole through production wells 4-6.
- resource extraction, recovery and/or sequestration system 2 includes a sweep pattern controller 40 that determines a desired sweep pattern for reservoir 12 that results in a substantially balanced resource output through each of production wells 4-6.
- sweep pattern controller 40 is operatively connected to each of production wells 4-6 and injector wells 8-10 and includes a central processor unit (CPU) 42, a memory 43, and a sweep pattern simulation module 44. Sweep pattern controller 40 may also be operatively linked with a remote monitoring and control system 49.
- sweep pattern controller 40 receives inputs from each of production wells 4-6 and injector wells 8-10.
- Inputs from production wells 4-6 may include an amount of resource extracted for a given period of time, a rate of extraction for the period of time, an amount of injected fluid extracted, and the like.
- Inputs from injector wells 8-10 may include a pressure of injected fluid and a flow rate of injected fluid.
- Injected fluid may be a liquid such as water or a gas.
- sweep pattern controller 40 determines, or adjusts, a sweep pattern or injected fluid pattern to establish uniformity between production wells 4-6.
- the sweep pattern may be established by controlling one, the other, or both of injected fluid pressure and a rate of injected fluid flow. That is, sweep pattern controller 40 controls pressure and/or rate of injected fluid flow from one or more of injector wells 8-10 to establish a substantially uniform, or substantially balanced, output between production wells 4-6.
- sweep pattern controller 40 communicates with each of production wells 4-6 to determine various production well parameters such as the amount of resource extracted, the rate of resource extraction, and the amount of injected fluid extracted.
- a determination is made in, block 106, whether a connection exists between production well parameters and injected fluid. For example, a connection may be determined by measuring injection fluid mixed with the extracted resource. If little or no connection exists, sweep pattern controller 40 may determine that injection pressure and/or a rate of injection should be increased for one or more of injector wells 8-10, in block 108. If a connection exists, sweep pattern controller 40 determines, in block 112, a percentage of injected fluid mixed with the extracted resource.
- sweep pattern controller 40 may determine that no change in injected fluid pressure and/or a rate of injection is desirable for one or more of injector wells 8-10, in block 114. If, on the other hand, the percentage is above the selected threshold sweep pattern controller 40 may determine that injected fluid pressure and/or a rate of injection should be reduced at one or more of injector wells 8-10, in block 116.
- the specific nature of the selected threshold may vary depending upon field conditions.
- sweep pattern controller 40 communicates an adjusted sweep pattern to each of injector wells 8-10, in block 140. More specifically, sweep pattern controller 40
- sweep pattern simulation module 44 determines whether
- sweep pattern controller 40 will provide further adjustments to pressure and/or rates of injection to sweep pattern simulation module 44 for a new simulation.
- the exemplary embodiments describe a system for establishing uniformity, or balance, in rates of extraction between production wells that rely on artificial lift to move resources uphole.
- the system employs a sweep pattern controller that determines a desired sweep pattern or injection fluid pressure and/or rate of injection fluid flow for each of a plurality of injector wells fluidically coupled to a resource bearing formation.
- the sweep pattern controller may perform one or more sweep pattern simulations to determine whether changes to injection fluid pressure and/or rate of injection fluid flow at one or more of the injector wells leads to uniformity at the production wells.
- the changes may represent an increase or a decrease in one, the other, or both of injection fluid pressure and/or a rate of injection fluid flow. Further, it should be understood that the changes, either as an increase or a decrease, may not be the same in either magnitude or direction for each parameter, e.g., injection fluid pressure and rate of injection fluid flow. Still further, it should be understood that changes may signify no change in either one or the other of the injection fluid pressure and the rate of injection fluid flow.
Landscapes
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Physical Or Chemical Processes And Apparatus (AREA)
- Geophysics (AREA)
- Remote Sensing (AREA)
- General Engineering & Computer Science (AREA)
- Operations Research (AREA)
Abstract
A method of recovering resources from a resource bearing formation includes selectively injecting a fluid into the resource bearing formation through one or more injector wells, extracting a resource from the resource bearing formation through one or more production wells, receiving at a sweep pattern controller, an input from each of the one or more production wells indicating an amount of the resource extracted over a period of time, determining, in the sweep pattern controller, an adjusted sweep pattern for the formation that substantially equalizes production from each of the one or more production wells, and signaling each of the one or more injector wells, from the sweep pattern controller, to selectively inject the fluid to establish the adjusted sweep pattern in the formation.
Description
A METHOD OF BALANCING RESOURCE RECOVERY FROM A RESOURCE
BEARING FORMATION
CROSS REFERENCE TO RELATED APPLICATIONS
[0001] This application claims the benefit of U.S. Application No. 14/585883, filed on December 30, 2014, which is incorporated herein by reference in its entirety.
BACKGROUND
[0002] Exemplary embodiments pertain to the art of resource, extraction, recovery and sequestration systems and, more particularly, to a method and apparatus for balancing resource recovery from a resource bearing formation.
[0003] Many hydrocarbon extraction systems employ artificial lift to aid in resource recovery. In some instances, the fluid is extracted from the formation through the use of a mechanical device that may be arranged inside a production well (known as pump or velocity string) or by decreasing the weight of a hydrostatic column by injecting gas into the production fluid. Artificial lift is generally employed in wells when there is insufficient reservoir pressure to lift the production fluids uphole. In cases of enhanced oil recovery, fluids and gases are pumped into a formation to provide an artificial means to increase the flow of a production fluid, such as crude oil, and/or water from a production well.
[0004] In some cases, fluid, which may take the form of liquid or gas, may be introduced into the formation at multiple locations through injector wells and then produced from production wells. The result of this movement in the sub-surface is the sweep pattern and sweep efficiency of the paired injection and production wells. In this manner, fluid injection and/or production may be controlled or adjusted to improve the sweep pattern or efficiency to improve hydrocarbon recovery from the reservoir.
SUMMARY
[0005] A method of balancing resource recovery from a resource bearing formation includes selectively injecting a fluid into the resource bearing formation through one or more injector wells, extracting a resource from the resource bearing formation through one or more production wells, receiving at a sweep pattern controller, an input from each of the one or more production wells indicating an amount of the resource extracted over a period of time, determining, in the sweep pattern controller, an adjusted sweep pattern for the formation that substantially equalizes production from each of the one or more production wells, and
signaling each of the one or more injector wells, from the sweep pattern controller, to selectively inject the fluid to establish the adjusted sweep pattern in the formation.
[0006] A resource recovery system includes one or more production wells fluidically connected to a resource bearing formation. The one or more production wells are configured to extract a resource from the resource bearing formation. One or more injector wells are fluidically connected to the resource bearing formation. The one or more injector wells are configured to selectively inject a fluid into, and increase pressure within, the resource bearing formation. A sweep pattern controller is operatively connected to each of the one or more production wells and each of the one or more injector wells. The sweep pattern controller is configured and disposed to selectively control one or more of the one or more injector wells to establish a desired sweep pattern, in the resource bearing formation, to substantially equalize resource extraction from each of the one or more production wells.
BRIEF DESCRIPTION OF THE DRAWINGS
[0007] Referring now to the drawings wherein like elements are numbered alike in the several Figures:
[0008] FIG. 1 depicts a resource extraction, recovery and/or sequestration system including production wells and injector wells fluidically connected to a resource bearing formation, in accordance with an exemplary embodiment;
[0009] FIG. 2 depicts a sweep pattern controller that selectively controls fluid injection into the resource bearing formation through the injector wells to establish a desired sweep pattern; and
[0010] FIG. 3 depicts a flow diagram illustrating a method of balancing resource recovery from the resource bearing formation, in accordance with an exemplary embodiment.
DETAILED DESCRIPTION
[0011] A resource extraction, recovery and/or sequestration system, in accordance with an exemplary embodiment, is indicated generally at 2, in FIG. 1. Resource extraction, recovery and/or sequestration system 2 includes a plurality of production or producing wells 4-6 and a plurality of injector wells 8-10. Production wells 4-6 and injector wells 8-10 are fluidically connected to reservoir 12 formed in a resource bearing formation 14. Of course it should be understood that the number of production wells and/or injector wells may vary. Production well 4 includes a platform 16 that supports a surface system 18 operatively connected to a downhole system 20 that extends into reservoir 12. Surface system 18 may
include pumps 22. Downhole system 20 may include a downhole string 24 that is extended into a wellbore 26 formed in formation 14. Downhole string 24 may include a number of connected downhole tubulars or conduits 28 that deliver a resource (not separately labeled) from reservoir 12 to surface system 18 for delivery to a storage area and/or refinery (not shown). Injector wells 8-10 introduce a fluid, which may be a liquid, a gas or a combination thereof, into reservoir 12 causing the resource to flow uphole through production wells 4-6.
[0012] In accordance with an exemplary embodiment, resource extraction, recovery and/or sequestration system 2 includes a sweep pattern controller 40 that determines a desired sweep pattern for reservoir 12 that results in a substantially balanced resource output through each of production wells 4-6. As shown in FIG. 2, sweep pattern controller 40 is operatively connected to each of production wells 4-6 and injector wells 8-10 and includes a central processor unit (CPU) 42, a memory 43, and a sweep pattern simulation module 44. Sweep pattern controller 40 may also be operatively linked with a remote monitoring and control system 49.
[0013] As will be detailed below, sweep pattern controller 40 receives inputs from each of production wells 4-6 and injector wells 8-10. Inputs from production wells 4-6 may include an amount of resource extracted for a given period of time, a rate of extraction for the period of time, an amount of injected fluid extracted, and the like. Inputs from injector wells 8-10 may include a pressure of injected fluid and a flow rate of injected fluid. Injected fluid may be a liquid such as water or a gas. Based on one or more of the inputs, sweep pattern controller 40 determines, or adjusts, a sweep pattern or injected fluid pattern to establish uniformity between production wells 4-6. The sweep pattern may be established by controlling one, the other, or both of injected fluid pressure and a rate of injected fluid flow. That is, sweep pattern controller 40 controls pressure and/or rate of injected fluid flow from one or more of injector wells 8-10 to establish a substantially uniform, or substantially balanced, output between production wells 4-6.
[0014] Reference will now follow to FIG. 3 in describing a method 100 of
establishing uniformity, or balance, between production wells 4-6. In block 104, sweep pattern controller 40 communicates with each of production wells 4-6 to determine various production well parameters such as the amount of resource extracted, the rate of resource extraction, and the amount of injected fluid extracted. A determination is made in, block 106, whether a connection exists between production well parameters and injected fluid. For example, a connection may be determined by measuring injection fluid mixed with the extracted resource. If little or no connection exists, sweep pattern controller 40 may
determine that injection pressure and/or a rate of injection should be increased for one or more of injector wells 8-10, in block 108. If a connection exists, sweep pattern controller 40 determines, in block 112, a percentage of injected fluid mixed with the extracted resource.
[0015] If the percentage of fluid is below a selected threshold sweep pattern controller 40 may determine that no change in injected fluid pressure and/or a rate of injection is desirable for one or more of injector wells 8-10, in block 114. If, on the other hand, the percentage is above the selected threshold sweep pattern controller 40 may determine that injected fluid pressure and/or a rate of injection should be reduced at one or more of injector wells 8-10, in block 116. The specific nature of the selected threshold may vary depending upon field conditions. After determining whether a change in pressure and/or rate of injection is indicated, sweep pattern controller 40 directs inputs to sweep pattern simulation module 44 in block 130. Sweep pattern simulation module 44 simulates a response at each production well 4-6 based on proposed changes to each injector well 8-10.
[0016] If the proposed changes indicate that the proposed changes to pressure and/or rate of injection to each injector well 8-10 leads to uniformity at each production well 4-6, in block 134, sweep pattern controller 40 communicates an adjusted sweep pattern to each of injector wells 8-10, in block 140. More specifically, sweep pattern controller 40
communicates a new pressure and/or rate of injection to each injector well 8-10 to establish the adjusted sweep pattern. If, sweep pattern simulation module 44 indicates that
heterogeneity exists at production wells 4-6, a new simulation may be run employing adjusted input variables. That is, sweep pattern controller 40 will provide further adjustments to pressure and/or rates of injection to sweep pattern simulation module 44 for a new simulation.
[0017] At this point, it should be understood that the exemplary embodiments describe a system for establishing uniformity, or balance, in rates of extraction between production wells that rely on artificial lift to move resources uphole. The system employs a sweep pattern controller that determines a desired sweep pattern or injection fluid pressure and/or rate of injection fluid flow for each of a plurality of injector wells fluidically coupled to a resource bearing formation. The sweep pattern controller may perform one or more sweep pattern simulations to determine whether changes to injection fluid pressure and/or rate of injection fluid flow at one or more of the injector wells leads to uniformity at the production wells.
[0018] It should also be understood that the changes may represent an increase or a decrease in one, the other, or both of injection fluid pressure and/or a rate of injection fluid
flow. Further, it should be understood that the changes, either as an increase or a decrease, may not be the same in either magnitude or direction for each parameter, e.g., injection fluid pressure and rate of injection fluid flow. Still further, it should be understood that changes may signify no change in either one or the other of the injection fluid pressure and the rate of injection fluid flow.
[0019] While one or more embodiments have been shown and described,
modifications and substitutions may be made thereto without departing from the spirit and scope of the invention. Accordingly, it is to be understood that the present invention has been described by way of illustrations and not limitation.
Claims
1. A method (100) of balancing resource recovery from a resource bearing formation (14), the method (100) comprising:
selectively injecting a fluid into the resource bearing formation (14) through one or more injector wells (8-10);
extracting a resource from the resource bearing formation (14) through one or more production wells (4-6);
receiving, at a sweep pattern controller (40), an input from each of the one or more production wells (4-6) indicating an amount of the resource extracted over a period of time; determining, in the sweep pattern controller (40), an adjusted sweep pattern for the formation that substantially equalizes production from each of the one or more production wells (4-6); and
signaling each of the one or more injector wells (8-10), from the sweep pattern controller (40), to selectively inject the fluid to establish the adjusted sweep pattern in the formation.
2. The method (100) of claim 1, wherein determining the sweep pattern includes generating a sweep pattern simulation based on the input from each of the one or more production wells (4-6).
3. The method (100) of claim 1, further comprising: determining a correlation between injecting the fluid into the resource bearing formation (14) and an amount of the resource extracted through each of the one or more production wells (4-6).
4. The method (100) of claim 3, further comprising: adjusting fluid injection into the resource bearing formation (14) based on the correlation between injecting the fluid and the amount of resource extracted.
5. The method (100) of claim 3, wherein determining the correlation between injecting the fluid into the resource bearing formation (14) and an amount of resource extracted through each of the one or more production wells (4-6) includes sensing an amount of the fluid injected into the resource bearing formation (14) passing through each of the one or more production wells (4-6).
6. The method (100) of claim 1, further comprising: performing a sweep pattern simulation of the adjusted sweep pattern to determine that production from each of the one or more production wells (4-6) would be substantially equal.
7. The method (100) of claim 6, further comprising: modifying the adjusted sweep pattern if the sweep pattern simulation indicates that production from each of the one or more production wells (4-6) would not be substantially equal.
8. A resource recovery system (2) comprising:
one or more production wells (4-6) fluidically connected to a resource bearing formation (14), the one or more production wells (4-6) being configured to extract a resource from the resource bearing formation (14);
one or more injector wells (8-10) fluidically connected to the resource bearing formation (14), the one or more injector wells (8-10) being configured to selectively inject a fluid into, and increase pressure within, the resource bearing formation (14); and
a sweep pattern controller (40) operatively connected to each of the one or more production wells (4-6) and each of the one or more injector wells (8-10), the sweep pattern controller (40) being configured and disposed to selectively control one or more of the one or more injector wells (8-10) to establish a desired sweep pattern in the resource bearing formation (14) to substantially equalize resource extraction from each of the one or more production wells (4-6).
9. The resource recovery system (2) according to claim 8, wherein the sweep pattern controller (40) includes a sweep pattern simulation module (44) configured and disposed to generate a sweep pattern simulation to determine a resource extraction balance for the one or more production wells (4-6).
10. The resource recovery system (2) according to claim 9, wherein the sweep pattern controller (40) is configured and disposed to calculate an adjusted sweep pattern based on the sweep pattern simulation.
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US14/585,883 US9650876B2 (en) | 2014-12-30 | 2014-12-30 | Method of balancing resource recovery from a resource bearing formation |
| US14/585,883 | 2014-12-30 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2016109057A1 true WO2016109057A1 (en) | 2016-07-07 |
Family
ID=56163581
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/US2015/061908 Ceased WO2016109057A1 (en) | 2014-12-30 | 2015-11-20 | A method of balancing resource recovery from a resource bearing formation |
Country Status (2)
| Country | Link |
|---|---|
| US (1) | US9650876B2 (en) |
| WO (1) | WO2016109057A1 (en) |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2001024099A1 (en) * | 1999-09-28 | 2001-04-05 | Exxonmobil Upstream Research Company | Method for determining a property of a hydrocarbon-bearing formation |
| US20090276100A1 (en) * | 2008-05-03 | 2009-11-05 | Sauid Arabian Oil Company | System, program product, and related methods for performing automated real-time reservoir pressure estimation enabling optimized injection and production strategies |
| US20110146982A1 (en) * | 2009-12-17 | 2011-06-23 | Kaminsky Robert D | Enhanced Convection For In Situ Pyrolysis of Organic-Rich Rock Formations |
| US20120191432A1 (en) * | 2011-01-26 | 2012-07-26 | Schlumberger Technology Corporation | Visualizing fluid flow in subsurface reservoirs |
| US20120296618A1 (en) * | 2011-05-20 | 2012-11-22 | Baker Hughes Incorporated | Multiscale Geologic Modeling of a Clastic Meander Belt Including Asymmetry Using Multi-Point Statistics |
Family Cites Families (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3380526A (en) * | 1966-06-28 | 1968-04-30 | Texaco Inc | 19-well double hexagon pattern for secondary recovery |
| CA2058255C (en) * | 1991-12-20 | 1997-02-11 | Roland P. Leaute | Recovery and upgrading of hydrocarbons utilizing in situ combustion and horizontal wells |
| US6853921B2 (en) * | 1999-07-20 | 2005-02-08 | Halliburton Energy Services, Inc. | System and method for real time reservoir management |
| GB0524134D0 (en) * | 2005-11-26 | 2006-01-04 | Univ Edinburgh | Improvements in and relating to hydrocarbon recovery from a hydrocarbon reservoir |
| WO2010123566A1 (en) * | 2009-04-22 | 2010-10-28 | Lxdata Inc. | Pressure sensor arrangement using an optical fiber and methodologies for performing an analysis of a subterranean formation |
| CA2850782C (en) * | 2011-10-06 | 2018-05-15 | Landmark Graphics Corporation | Systems and methods for subsurface oil recovery optimization |
| US10718186B2 (en) * | 2014-08-22 | 2020-07-21 | Chevron U.S.A. Inc. | Flooding analysis tool and method thereof |
-
2014
- 2014-12-30 US US14/585,883 patent/US9650876B2/en active Active
-
2015
- 2015-11-20 WO PCT/US2015/061908 patent/WO2016109057A1/en not_active Ceased
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2001024099A1 (en) * | 1999-09-28 | 2001-04-05 | Exxonmobil Upstream Research Company | Method for determining a property of a hydrocarbon-bearing formation |
| US20090276100A1 (en) * | 2008-05-03 | 2009-11-05 | Sauid Arabian Oil Company | System, program product, and related methods for performing automated real-time reservoir pressure estimation enabling optimized injection and production strategies |
| US20110146982A1 (en) * | 2009-12-17 | 2011-06-23 | Kaminsky Robert D | Enhanced Convection For In Situ Pyrolysis of Organic-Rich Rock Formations |
| US20120191432A1 (en) * | 2011-01-26 | 2012-07-26 | Schlumberger Technology Corporation | Visualizing fluid flow in subsurface reservoirs |
| US20120296618A1 (en) * | 2011-05-20 | 2012-11-22 | Baker Hughes Incorporated | Multiscale Geologic Modeling of a Clastic Meander Belt Including Asymmetry Using Multi-Point Statistics |
Also Published As
| Publication number | Publication date |
|---|---|
| US9650876B2 (en) | 2017-05-16 |
| US20160186539A1 (en) | 2016-06-30 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US11028679B1 (en) | Systems and methods for controlling fracturing operations using monitor well pressure | |
| US20140216732A1 (en) | Hydrocarbon recovery control system and method | |
| US20220403724A1 (en) | Systems and methods for controlling fracturing operations using monitor well pressure | |
| Furui et al. | A Comprehensive Model of High-Rate Matrix-Acid Stimulation for Long Horizontal Wells in Carbonate Reservoirs: Part II—Wellbore/Reservoir Coupled-Flow Modeling and Field Application | |
| US11859490B2 (en) | Systems and methods for monitoring fracturing operations using monitor well flow | |
| US12104481B2 (en) | Automatic real time screen-out mitigation | |
| WO2018084871A1 (en) | Real-time model for diverter drop decision using das and step down analysis | |
| US9194220B2 (en) | Apparatus and method for determining fluid interface proximate an electrical submersible pump and operating the same in response thereto | |
| RU2331761C1 (en) | Low-permeable oil reservoir development method | |
| WO2009142798A2 (en) | Methods for regulating flow in multi-zone intervals | |
| WO2019095054A1 (en) | Enhancing hydrocarbon recovery or water disposal in multi-well configurations using downhole real-time flow modulation | |
| CN115935843A (en) | Water injection induced dynamic fracture seepage numerical simulation method considering seepage mechanism | |
| AU2014241404B2 (en) | Enhanced oil production using control of well casing gas pressure | |
| CA2902085C (en) | Hydraulically unitary well system and recovery process | |
| US11965400B2 (en) | System and method to maintain minimum wellbore lift conditions through injection gas regulation | |
| CN104594854A (en) | Bottom water reservoir horizontal well variable-parameter perforation water-controlled completion method and device | |
| US20150247391A1 (en) | Automated subcool control | |
| NO20181583A1 (en) | Method and system for managed pressure drilling | |
| WO2018170004A1 (en) | Method of controlling a gas vent system for horizontal wells | |
| US9650876B2 (en) | Method of balancing resource recovery from a resource bearing formation | |
| RU2453689C1 (en) | Oil deposit development method | |
| CN109726450A (en) | Determine the method and apparatus on shale gas reservoir horizontal well refracturing opportunity | |
| US10526879B2 (en) | Injection rate tuning for oilfield operations | |
| US20150316048A1 (en) | Method and system for delivering fluids into a formation to promote formation breakdown | |
| Okoro et al. | Production Optimisation in the Niger Delta Basin by Continuous Gas Lift–A Case Study of Iduo-Well-A06 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 15875891 Country of ref document: EP Kind code of ref document: A1 |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 15875891 Country of ref document: EP Kind code of ref document: A1 |