WO2016109057A1 - A method of balancing resource recovery from a resource bearing formation - Google Patents

A method of balancing resource recovery from a resource bearing formation Download PDF

Info

Publication number
WO2016109057A1
WO2016109057A1 PCT/US2015/061908 US2015061908W WO2016109057A1 WO 2016109057 A1 WO2016109057 A1 WO 2016109057A1 US 2015061908 W US2015061908 W US 2015061908W WO 2016109057 A1 WO2016109057 A1 WO 2016109057A1
Authority
WO
WIPO (PCT)
Prior art keywords
resource
sweep pattern
wells
bearing formation
production wells
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/US2015/061908
Other languages
French (fr)
Inventor
Freeman L. Hill
Cameron J. Mcburney
Caleb M. Conrad
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baker Hughes Holdings LLC
Original Assignee
Baker Hughes Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baker Hughes Inc filed Critical Baker Hughes Inc
Publication of WO2016109057A1 publication Critical patent/WO2016109057A1/en
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons

Definitions

  • Exemplary embodiments pertain to the art of resource, extraction, recovery and sequestration systems and, more particularly, to a method and apparatus for balancing resource recovery from a resource bearing formation.
  • Many hydrocarbon extraction systems employ artificial lift to aid in resource recovery.
  • the fluid is extracted from the formation through the use of a mechanical device that may be arranged inside a production well (known as pump or velocity string) or by decreasing the weight of a hydrostatic column by injecting gas into the production fluid.
  • Artificial lift is generally employed in wells when there is insufficient reservoir pressure to lift the production fluids uphole.
  • fluids and gases are pumped into a formation to provide an artificial means to increase the flow of a production fluid, such as crude oil, and/or water from a production well.
  • fluid which may take the form of liquid or gas
  • fluid may be introduced into the formation at multiple locations through injector wells and then produced from production wells.
  • the result of this movement in the sub-surface is the sweep pattern and sweep efficiency of the paired injection and production wells.
  • fluid injection and/or production may be controlled or adjusted to improve the sweep pattern or efficiency to improve hydrocarbon recovery from the reservoir.
  • a method of balancing resource recovery from a resource bearing formation includes selectively injecting a fluid into the resource bearing formation through one or more injector wells, extracting a resource from the resource bearing formation through one or more production wells, receiving at a sweep pattern controller, an input from each of the one or more production wells indicating an amount of the resource extracted over a period of time, determining, in the sweep pattern controller, an adjusted sweep pattern for the formation that substantially equalizes production from each of the one or more production wells, and signaling each of the one or more injector wells, from the sweep pattern controller, to selectively inject the fluid to establish the adjusted sweep pattern in the formation.
  • a resource recovery system includes one or more production wells fluidically connected to a resource bearing formation.
  • the one or more production wells are configured to extract a resource from the resource bearing formation.
  • One or more injector wells are fluidically connected to the resource bearing formation.
  • the one or more injector wells are configured to selectively inject a fluid into, and increase pressure within, the resource bearing formation.
  • a sweep pattern controller is operatively connected to each of the one or more production wells and each of the one or more injector wells.
  • the sweep pattern controller is configured and disposed to selectively control one or more of the one or more injector wells to establish a desired sweep pattern, in the resource bearing formation, to substantially equalize resource extraction from each of the one or more production wells.
  • FIG. 1 depicts a resource extraction, recovery and/or sequestration system including production wells and injector wells fluidically connected to a resource bearing formation, in accordance with an exemplary embodiment
  • FIG. 2 depicts a sweep pattern controller that selectively controls fluid injection into the resource bearing formation through the injector wells to establish a desired sweep pattern
  • FIG. 3 depicts a flow diagram illustrating a method of balancing resource recovery from the resource bearing formation, in accordance with an exemplary embodiment.
  • a resource extraction, recovery and/or sequestration system in accordance with an exemplary embodiment, is indicated generally at 2, in FIG. 1.
  • Resource extraction, recovery and/or sequestration system 2 includes a plurality of production or producing wells 4-6 and a plurality of injector wells 8-10.
  • Production wells 4-6 and injector wells 8-10 are fluidically connected to reservoir 12 formed in a resource bearing formation 14.
  • Production well 4 includes a platform 16 that supports a surface system 18 operatively connected to a downhole system 20 that extends into reservoir 12.
  • Surface system 18 may include pumps 22.
  • Downhole system 20 may include a downhole string 24 that is extended into a wellbore 26 formed in formation 14.
  • Downhole string 24 may include a number of connected downhole tubulars or conduits 28 that deliver a resource (not separately labeled) from reservoir 12 to surface system 18 for delivery to a storage area and/or refinery (not shown).
  • Injector wells 8-10 introduce a fluid, which may be a liquid, a gas or a combination thereof, into reservoir 12 causing the resource to flow uphole through production wells 4-6.
  • resource extraction, recovery and/or sequestration system 2 includes a sweep pattern controller 40 that determines a desired sweep pattern for reservoir 12 that results in a substantially balanced resource output through each of production wells 4-6.
  • sweep pattern controller 40 is operatively connected to each of production wells 4-6 and injector wells 8-10 and includes a central processor unit (CPU) 42, a memory 43, and a sweep pattern simulation module 44. Sweep pattern controller 40 may also be operatively linked with a remote monitoring and control system 49.
  • sweep pattern controller 40 receives inputs from each of production wells 4-6 and injector wells 8-10.
  • Inputs from production wells 4-6 may include an amount of resource extracted for a given period of time, a rate of extraction for the period of time, an amount of injected fluid extracted, and the like.
  • Inputs from injector wells 8-10 may include a pressure of injected fluid and a flow rate of injected fluid.
  • Injected fluid may be a liquid such as water or a gas.
  • sweep pattern controller 40 determines, or adjusts, a sweep pattern or injected fluid pattern to establish uniformity between production wells 4-6.
  • the sweep pattern may be established by controlling one, the other, or both of injected fluid pressure and a rate of injected fluid flow. That is, sweep pattern controller 40 controls pressure and/or rate of injected fluid flow from one or more of injector wells 8-10 to establish a substantially uniform, or substantially balanced, output between production wells 4-6.
  • sweep pattern controller 40 communicates with each of production wells 4-6 to determine various production well parameters such as the amount of resource extracted, the rate of resource extraction, and the amount of injected fluid extracted.
  • a determination is made in, block 106, whether a connection exists between production well parameters and injected fluid. For example, a connection may be determined by measuring injection fluid mixed with the extracted resource. If little or no connection exists, sweep pattern controller 40 may determine that injection pressure and/or a rate of injection should be increased for one or more of injector wells 8-10, in block 108. If a connection exists, sweep pattern controller 40 determines, in block 112, a percentage of injected fluid mixed with the extracted resource.
  • sweep pattern controller 40 may determine that no change in injected fluid pressure and/or a rate of injection is desirable for one or more of injector wells 8-10, in block 114. If, on the other hand, the percentage is above the selected threshold sweep pattern controller 40 may determine that injected fluid pressure and/or a rate of injection should be reduced at one or more of injector wells 8-10, in block 116.
  • the specific nature of the selected threshold may vary depending upon field conditions.
  • sweep pattern controller 40 communicates an adjusted sweep pattern to each of injector wells 8-10, in block 140. More specifically, sweep pattern controller 40
  • sweep pattern simulation module 44 determines whether
  • sweep pattern controller 40 will provide further adjustments to pressure and/or rates of injection to sweep pattern simulation module 44 for a new simulation.
  • the exemplary embodiments describe a system for establishing uniformity, or balance, in rates of extraction between production wells that rely on artificial lift to move resources uphole.
  • the system employs a sweep pattern controller that determines a desired sweep pattern or injection fluid pressure and/or rate of injection fluid flow for each of a plurality of injector wells fluidically coupled to a resource bearing formation.
  • the sweep pattern controller may perform one or more sweep pattern simulations to determine whether changes to injection fluid pressure and/or rate of injection fluid flow at one or more of the injector wells leads to uniformity at the production wells.
  • the changes may represent an increase or a decrease in one, the other, or both of injection fluid pressure and/or a rate of injection fluid flow. Further, it should be understood that the changes, either as an increase or a decrease, may not be the same in either magnitude or direction for each parameter, e.g., injection fluid pressure and rate of injection fluid flow. Still further, it should be understood that changes may signify no change in either one or the other of the injection fluid pressure and the rate of injection fluid flow.

Landscapes

  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Physical Or Chemical Processes And Apparatus (AREA)
  • Geophysics (AREA)
  • Remote Sensing (AREA)
  • General Engineering & Computer Science (AREA)
  • Operations Research (AREA)

Abstract

A method of recovering resources from a resource bearing formation includes selectively injecting a fluid into the resource bearing formation through one or more injector wells, extracting a resource from the resource bearing formation through one or more production wells, receiving at a sweep pattern controller, an input from each of the one or more production wells indicating an amount of the resource extracted over a period of time, determining, in the sweep pattern controller, an adjusted sweep pattern for the formation that substantially equalizes production from each of the one or more production wells, and signaling each of the one or more injector wells, from the sweep pattern controller, to selectively inject the fluid to establish the adjusted sweep pattern in the formation.

Description

A METHOD OF BALANCING RESOURCE RECOVERY FROM A RESOURCE
BEARING FORMATION
CROSS REFERENCE TO RELATED APPLICATIONS
[0001] This application claims the benefit of U.S. Application No. 14/585883, filed on December 30, 2014, which is incorporated herein by reference in its entirety.
BACKGROUND
[0002] Exemplary embodiments pertain to the art of resource, extraction, recovery and sequestration systems and, more particularly, to a method and apparatus for balancing resource recovery from a resource bearing formation.
[0003] Many hydrocarbon extraction systems employ artificial lift to aid in resource recovery. In some instances, the fluid is extracted from the formation through the use of a mechanical device that may be arranged inside a production well (known as pump or velocity string) or by decreasing the weight of a hydrostatic column by injecting gas into the production fluid. Artificial lift is generally employed in wells when there is insufficient reservoir pressure to lift the production fluids uphole. In cases of enhanced oil recovery, fluids and gases are pumped into a formation to provide an artificial means to increase the flow of a production fluid, such as crude oil, and/or water from a production well.
[0004] In some cases, fluid, which may take the form of liquid or gas, may be introduced into the formation at multiple locations through injector wells and then produced from production wells. The result of this movement in the sub-surface is the sweep pattern and sweep efficiency of the paired injection and production wells. In this manner, fluid injection and/or production may be controlled or adjusted to improve the sweep pattern or efficiency to improve hydrocarbon recovery from the reservoir.
SUMMARY
[0005] A method of balancing resource recovery from a resource bearing formation includes selectively injecting a fluid into the resource bearing formation through one or more injector wells, extracting a resource from the resource bearing formation through one or more production wells, receiving at a sweep pattern controller, an input from each of the one or more production wells indicating an amount of the resource extracted over a period of time, determining, in the sweep pattern controller, an adjusted sweep pattern for the formation that substantially equalizes production from each of the one or more production wells, and signaling each of the one or more injector wells, from the sweep pattern controller, to selectively inject the fluid to establish the adjusted sweep pattern in the formation.
[0006] A resource recovery system includes one or more production wells fluidically connected to a resource bearing formation. The one or more production wells are configured to extract a resource from the resource bearing formation. One or more injector wells are fluidically connected to the resource bearing formation. The one or more injector wells are configured to selectively inject a fluid into, and increase pressure within, the resource bearing formation. A sweep pattern controller is operatively connected to each of the one or more production wells and each of the one or more injector wells. The sweep pattern controller is configured and disposed to selectively control one or more of the one or more injector wells to establish a desired sweep pattern, in the resource bearing formation, to substantially equalize resource extraction from each of the one or more production wells.
BRIEF DESCRIPTION OF THE DRAWINGS
[0007] Referring now to the drawings wherein like elements are numbered alike in the several Figures:
[0008] FIG. 1 depicts a resource extraction, recovery and/or sequestration system including production wells and injector wells fluidically connected to a resource bearing formation, in accordance with an exemplary embodiment;
[0009] FIG. 2 depicts a sweep pattern controller that selectively controls fluid injection into the resource bearing formation through the injector wells to establish a desired sweep pattern; and
[0010] FIG. 3 depicts a flow diagram illustrating a method of balancing resource recovery from the resource bearing formation, in accordance with an exemplary embodiment.
DETAILED DESCRIPTION
[0011] A resource extraction, recovery and/or sequestration system, in accordance with an exemplary embodiment, is indicated generally at 2, in FIG. 1. Resource extraction, recovery and/or sequestration system 2 includes a plurality of production or producing wells 4-6 and a plurality of injector wells 8-10. Production wells 4-6 and injector wells 8-10 are fluidically connected to reservoir 12 formed in a resource bearing formation 14. Of course it should be understood that the number of production wells and/or injector wells may vary. Production well 4 includes a platform 16 that supports a surface system 18 operatively connected to a downhole system 20 that extends into reservoir 12. Surface system 18 may include pumps 22. Downhole system 20 may include a downhole string 24 that is extended into a wellbore 26 formed in formation 14. Downhole string 24 may include a number of connected downhole tubulars or conduits 28 that deliver a resource (not separately labeled) from reservoir 12 to surface system 18 for delivery to a storage area and/or refinery (not shown). Injector wells 8-10 introduce a fluid, which may be a liquid, a gas or a combination thereof, into reservoir 12 causing the resource to flow uphole through production wells 4-6.
[0012] In accordance with an exemplary embodiment, resource extraction, recovery and/or sequestration system 2 includes a sweep pattern controller 40 that determines a desired sweep pattern for reservoir 12 that results in a substantially balanced resource output through each of production wells 4-6. As shown in FIG. 2, sweep pattern controller 40 is operatively connected to each of production wells 4-6 and injector wells 8-10 and includes a central processor unit (CPU) 42, a memory 43, and a sweep pattern simulation module 44. Sweep pattern controller 40 may also be operatively linked with a remote monitoring and control system 49.
[0013] As will be detailed below, sweep pattern controller 40 receives inputs from each of production wells 4-6 and injector wells 8-10. Inputs from production wells 4-6 may include an amount of resource extracted for a given period of time, a rate of extraction for the period of time, an amount of injected fluid extracted, and the like. Inputs from injector wells 8-10 may include a pressure of injected fluid and a flow rate of injected fluid. Injected fluid may be a liquid such as water or a gas. Based on one or more of the inputs, sweep pattern controller 40 determines, or adjusts, a sweep pattern or injected fluid pattern to establish uniformity between production wells 4-6. The sweep pattern may be established by controlling one, the other, or both of injected fluid pressure and a rate of injected fluid flow. That is, sweep pattern controller 40 controls pressure and/or rate of injected fluid flow from one or more of injector wells 8-10 to establish a substantially uniform, or substantially balanced, output between production wells 4-6.
[0014] Reference will now follow to FIG. 3 in describing a method 100 of
establishing uniformity, or balance, between production wells 4-6. In block 104, sweep pattern controller 40 communicates with each of production wells 4-6 to determine various production well parameters such as the amount of resource extracted, the rate of resource extraction, and the amount of injected fluid extracted. A determination is made in, block 106, whether a connection exists between production well parameters and injected fluid. For example, a connection may be determined by measuring injection fluid mixed with the extracted resource. If little or no connection exists, sweep pattern controller 40 may determine that injection pressure and/or a rate of injection should be increased for one or more of injector wells 8-10, in block 108. If a connection exists, sweep pattern controller 40 determines, in block 112, a percentage of injected fluid mixed with the extracted resource.
[0015] If the percentage of fluid is below a selected threshold sweep pattern controller 40 may determine that no change in injected fluid pressure and/or a rate of injection is desirable for one or more of injector wells 8-10, in block 114. If, on the other hand, the percentage is above the selected threshold sweep pattern controller 40 may determine that injected fluid pressure and/or a rate of injection should be reduced at one or more of injector wells 8-10, in block 116. The specific nature of the selected threshold may vary depending upon field conditions. After determining whether a change in pressure and/or rate of injection is indicated, sweep pattern controller 40 directs inputs to sweep pattern simulation module 44 in block 130. Sweep pattern simulation module 44 simulates a response at each production well 4-6 based on proposed changes to each injector well 8-10.
[0016] If the proposed changes indicate that the proposed changes to pressure and/or rate of injection to each injector well 8-10 leads to uniformity at each production well 4-6, in block 134, sweep pattern controller 40 communicates an adjusted sweep pattern to each of injector wells 8-10, in block 140. More specifically, sweep pattern controller 40
communicates a new pressure and/or rate of injection to each injector well 8-10 to establish the adjusted sweep pattern. If, sweep pattern simulation module 44 indicates that
heterogeneity exists at production wells 4-6, a new simulation may be run employing adjusted input variables. That is, sweep pattern controller 40 will provide further adjustments to pressure and/or rates of injection to sweep pattern simulation module 44 for a new simulation.
[0017] At this point, it should be understood that the exemplary embodiments describe a system for establishing uniformity, or balance, in rates of extraction between production wells that rely on artificial lift to move resources uphole. The system employs a sweep pattern controller that determines a desired sweep pattern or injection fluid pressure and/or rate of injection fluid flow for each of a plurality of injector wells fluidically coupled to a resource bearing formation. The sweep pattern controller may perform one or more sweep pattern simulations to determine whether changes to injection fluid pressure and/or rate of injection fluid flow at one or more of the injector wells leads to uniformity at the production wells.
[0018] It should also be understood that the changes may represent an increase or a decrease in one, the other, or both of injection fluid pressure and/or a rate of injection fluid flow. Further, it should be understood that the changes, either as an increase or a decrease, may not be the same in either magnitude or direction for each parameter, e.g., injection fluid pressure and rate of injection fluid flow. Still further, it should be understood that changes may signify no change in either one or the other of the injection fluid pressure and the rate of injection fluid flow.
[0019] While one or more embodiments have been shown and described,
modifications and substitutions may be made thereto without departing from the spirit and scope of the invention. Accordingly, it is to be understood that the present invention has been described by way of illustrations and not limitation.

Claims

CLAIMS:
1. A method (100) of balancing resource recovery from a resource bearing formation (14), the method (100) comprising:
selectively injecting a fluid into the resource bearing formation (14) through one or more injector wells (8-10);
extracting a resource from the resource bearing formation (14) through one or more production wells (4-6);
receiving, at a sweep pattern controller (40), an input from each of the one or more production wells (4-6) indicating an amount of the resource extracted over a period of time; determining, in the sweep pattern controller (40), an adjusted sweep pattern for the formation that substantially equalizes production from each of the one or more production wells (4-6); and
signaling each of the one or more injector wells (8-10), from the sweep pattern controller (40), to selectively inject the fluid to establish the adjusted sweep pattern in the formation.
2. The method (100) of claim 1, wherein determining the sweep pattern includes generating a sweep pattern simulation based on the input from each of the one or more production wells (4-6).
3. The method (100) of claim 1, further comprising: determining a correlation between injecting the fluid into the resource bearing formation (14) and an amount of the resource extracted through each of the one or more production wells (4-6).
4. The method (100) of claim 3, further comprising: adjusting fluid injection into the resource bearing formation (14) based on the correlation between injecting the fluid and the amount of resource extracted.
5. The method (100) of claim 3, wherein determining the correlation between injecting the fluid into the resource bearing formation (14) and an amount of resource extracted through each of the one or more production wells (4-6) includes sensing an amount of the fluid injected into the resource bearing formation (14) passing through each of the one or more production wells (4-6).
6. The method (100) of claim 1, further comprising: performing a sweep pattern simulation of the adjusted sweep pattern to determine that production from each of the one or more production wells (4-6) would be substantially equal.
7. The method (100) of claim 6, further comprising: modifying the adjusted sweep pattern if the sweep pattern simulation indicates that production from each of the one or more production wells (4-6) would not be substantially equal.
8. A resource recovery system (2) comprising:
one or more production wells (4-6) fluidically connected to a resource bearing formation (14), the one or more production wells (4-6) being configured to extract a resource from the resource bearing formation (14);
one or more injector wells (8-10) fluidically connected to the resource bearing formation (14), the one or more injector wells (8-10) being configured to selectively inject a fluid into, and increase pressure within, the resource bearing formation (14); and
a sweep pattern controller (40) operatively connected to each of the one or more production wells (4-6) and each of the one or more injector wells (8-10), the sweep pattern controller (40) being configured and disposed to selectively control one or more of the one or more injector wells (8-10) to establish a desired sweep pattern in the resource bearing formation (14) to substantially equalize resource extraction from each of the one or more production wells (4-6).
9. The resource recovery system (2) according to claim 8, wherein the sweep pattern controller (40) includes a sweep pattern simulation module (44) configured and disposed to generate a sweep pattern simulation to determine a resource extraction balance for the one or more production wells (4-6).
10. The resource recovery system (2) according to claim 9, wherein the sweep pattern controller (40) is configured and disposed to calculate an adjusted sweep pattern based on the sweep pattern simulation.
PCT/US2015/061908 2014-12-30 2015-11-20 A method of balancing resource recovery from a resource bearing formation Ceased WO2016109057A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US14/585,883 US9650876B2 (en) 2014-12-30 2014-12-30 Method of balancing resource recovery from a resource bearing formation
US14/585,883 2014-12-30

Publications (1)

Publication Number Publication Date
WO2016109057A1 true WO2016109057A1 (en) 2016-07-07

Family

ID=56163581

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/US2015/061908 Ceased WO2016109057A1 (en) 2014-12-30 2015-11-20 A method of balancing resource recovery from a resource bearing formation

Country Status (2)

Country Link
US (1) US9650876B2 (en)
WO (1) WO2016109057A1 (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2001024099A1 (en) * 1999-09-28 2001-04-05 Exxonmobil Upstream Research Company Method for determining a property of a hydrocarbon-bearing formation
US20090276100A1 (en) * 2008-05-03 2009-11-05 Sauid Arabian Oil Company System, program product, and related methods for performing automated real-time reservoir pressure estimation enabling optimized injection and production strategies
US20110146982A1 (en) * 2009-12-17 2011-06-23 Kaminsky Robert D Enhanced Convection For In Situ Pyrolysis of Organic-Rich Rock Formations
US20120191432A1 (en) * 2011-01-26 2012-07-26 Schlumberger Technology Corporation Visualizing fluid flow in subsurface reservoirs
US20120296618A1 (en) * 2011-05-20 2012-11-22 Baker Hughes Incorporated Multiscale Geologic Modeling of a Clastic Meander Belt Including Asymmetry Using Multi-Point Statistics

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3380526A (en) * 1966-06-28 1968-04-30 Texaco Inc 19-well double hexagon pattern for secondary recovery
CA2058255C (en) * 1991-12-20 1997-02-11 Roland P. Leaute Recovery and upgrading of hydrocarbons utilizing in situ combustion and horizontal wells
US6853921B2 (en) * 1999-07-20 2005-02-08 Halliburton Energy Services, Inc. System and method for real time reservoir management
GB0524134D0 (en) * 2005-11-26 2006-01-04 Univ Edinburgh Improvements in and relating to hydrocarbon recovery from a hydrocarbon reservoir
WO2010123566A1 (en) * 2009-04-22 2010-10-28 Lxdata Inc. Pressure sensor arrangement using an optical fiber and methodologies for performing an analysis of a subterranean formation
CA2850782C (en) * 2011-10-06 2018-05-15 Landmark Graphics Corporation Systems and methods for subsurface oil recovery optimization
US10718186B2 (en) * 2014-08-22 2020-07-21 Chevron U.S.A. Inc. Flooding analysis tool and method thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2001024099A1 (en) * 1999-09-28 2001-04-05 Exxonmobil Upstream Research Company Method for determining a property of a hydrocarbon-bearing formation
US20090276100A1 (en) * 2008-05-03 2009-11-05 Sauid Arabian Oil Company System, program product, and related methods for performing automated real-time reservoir pressure estimation enabling optimized injection and production strategies
US20110146982A1 (en) * 2009-12-17 2011-06-23 Kaminsky Robert D Enhanced Convection For In Situ Pyrolysis of Organic-Rich Rock Formations
US20120191432A1 (en) * 2011-01-26 2012-07-26 Schlumberger Technology Corporation Visualizing fluid flow in subsurface reservoirs
US20120296618A1 (en) * 2011-05-20 2012-11-22 Baker Hughes Incorporated Multiscale Geologic Modeling of a Clastic Meander Belt Including Asymmetry Using Multi-Point Statistics

Also Published As

Publication number Publication date
US9650876B2 (en) 2017-05-16
US20160186539A1 (en) 2016-06-30

Similar Documents

Publication Publication Date Title
US11028679B1 (en) Systems and methods for controlling fracturing operations using monitor well pressure
US20140216732A1 (en) Hydrocarbon recovery control system and method
US20220403724A1 (en) Systems and methods for controlling fracturing operations using monitor well pressure
Furui et al. A Comprehensive Model of High-Rate Matrix-Acid Stimulation for Long Horizontal Wells in Carbonate Reservoirs: Part II—Wellbore/Reservoir Coupled-Flow Modeling and Field Application
US11859490B2 (en) Systems and methods for monitoring fracturing operations using monitor well flow
US12104481B2 (en) Automatic real time screen-out mitigation
WO2018084871A1 (en) Real-time model for diverter drop decision using das and step down analysis
US9194220B2 (en) Apparatus and method for determining fluid interface proximate an electrical submersible pump and operating the same in response thereto
RU2331761C1 (en) Low-permeable oil reservoir development method
WO2009142798A2 (en) Methods for regulating flow in multi-zone intervals
WO2019095054A1 (en) Enhancing hydrocarbon recovery or water disposal in multi-well configurations using downhole real-time flow modulation
CN115935843A (en) Water injection induced dynamic fracture seepage numerical simulation method considering seepage mechanism
AU2014241404B2 (en) Enhanced oil production using control of well casing gas pressure
CA2902085C (en) Hydraulically unitary well system and recovery process
US11965400B2 (en) System and method to maintain minimum wellbore lift conditions through injection gas regulation
CN104594854A (en) Bottom water reservoir horizontal well variable-parameter perforation water-controlled completion method and device
US20150247391A1 (en) Automated subcool control
NO20181583A1 (en) Method and system for managed pressure drilling
WO2018170004A1 (en) Method of controlling a gas vent system for horizontal wells
US9650876B2 (en) Method of balancing resource recovery from a resource bearing formation
RU2453689C1 (en) Oil deposit development method
CN109726450A (en) Determine the method and apparatus on shale gas reservoir horizontal well refracturing opportunity
US10526879B2 (en) Injection rate tuning for oilfield operations
US20150316048A1 (en) Method and system for delivering fluids into a formation to promote formation breakdown
Okoro et al. Production Optimisation in the Niger Delta Basin by Continuous Gas Lift–A Case Study of Iduo-Well-A06

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 15875891

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 15875891

Country of ref document: EP

Kind code of ref document: A1