WO2016108580A1 - Method and apparatus of receiving downlink channel and/or downlink reference signal - Google Patents

Method and apparatus of receiving downlink channel and/or downlink reference signal Download PDF

Info

Publication number
WO2016108580A1
WO2016108580A1 PCT/KR2015/014411 KR2015014411W WO2016108580A1 WO 2016108580 A1 WO2016108580 A1 WO 2016108580A1 KR 2015014411 W KR2015014411 W KR 2015014411W WO 2016108580 A1 WO2016108580 A1 WO 2016108580A1
Authority
WO
WIPO (PCT)
Prior art keywords
subframe
downlink
ofdm symbol
ofdm symbols
reference signal
Prior art date
Application number
PCT/KR2015/014411
Other languages
French (fr)
Inventor
Jingxing Fu
Yingyang Li
Original Assignee
Samsung Electronics Co., Ltd.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from CN201510284633.4A external-priority patent/CN105743626B/en
Application filed by Samsung Electronics Co., Ltd. filed Critical Samsung Electronics Co., Ltd.
Priority to US15/540,826 priority Critical patent/US10477541B2/en
Priority to EP15875674.2A priority patent/EP3241299B1/en
Priority to KR1020177021409A priority patent/KR102605286B1/en
Publication of WO2016108580A1 publication Critical patent/WO2016108580A1/en
Priority to US16/671,762 priority patent/US11611959B2/en

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/04Wireless resource allocation
    • H04W72/044Wireless resource allocation based on the type of the allocated resource
    • H04W72/0446Resources in time domain, e.g. slots or frames
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L5/00Arrangements affording multiple use of the transmission path
    • H04L5/003Arrangements for allocating sub-channels of the transmission path
    • H04L5/0048Allocation of pilot signals, i.e. of signals known to the receiver
    • H04L5/005Allocation of pilot signals, i.e. of signals known to the receiver of common pilots, i.e. pilots destined for multiple users or terminals
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L5/00Arrangements affording multiple use of the transmission path
    • H04L5/003Arrangements for allocating sub-channels of the transmission path
    • H04L5/0053Allocation of signaling, i.e. of overhead other than pilot signals
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L27/00Modulated-carrier systems
    • H04L27/26Systems using multi-frequency codes
    • H04L27/2601Multicarrier modulation systems
    • H04L27/2602Signal structure
    • H04L27/2605Symbol extensions, e.g. Zero Tail, Unique Word [UW]
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L5/00Arrangements affording multiple use of the transmission path
    • H04L5/0001Arrangements for dividing the transmission path
    • H04L5/0003Two-dimensional division
    • H04L5/0005Time-frequency
    • H04L5/0007Time-frequency the frequencies being orthogonal, e.g. OFDM(A), DMT
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L5/00Arrangements affording multiple use of the transmission path
    • H04L5/003Arrangements for allocating sub-channels of the transmission path
    • H04L5/0048Allocation of pilot signals, i.e. of signals known to the receiver
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L5/00Arrangements affording multiple use of the transmission path
    • H04L5/14Two-way operation using the same type of signal, i.e. duplex
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/20Control channels or signalling for resource management
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/20Control channels or signalling for resource management
    • H04W72/23Control channels or signalling for resource management in the downlink direction of a wireless link, i.e. towards a terminal
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L27/00Modulated-carrier systems
    • H04L27/0006Assessment of spectral gaps suitable for allocating digitally modulated signals, e.g. for carrier allocation in cognitive radio
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L5/00Arrangements affording multiple use of the transmission path
    • H04L5/0001Arrangements for dividing the transmission path
    • H04L5/0003Two-dimensional division
    • H04L5/0005Time-frequency
    • H04L5/0007Time-frequency the frequencies being orthogonal, e.g. OFDM(A), DMT
    • H04L5/001Time-frequency the frequencies being orthogonal, e.g. OFDM(A), DMT the frequencies being arranged in component carriers
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L5/00Arrangements affording multiple use of the transmission path
    • H04L5/14Two-way operation using the same type of signal, i.e. duplex
    • H04L5/1469Two-way operation using the same type of signal, i.e. duplex using time-sharing

Definitions

  • the present disclosure relates to wireless communication systems, and particularly to a method and an apparatus of receiving downlink channel and/or downlink reference signal in LTE data transmission on an unlicensed band.
  • the 5G or pre-5G communication system is also called a 'Beyond 4G Network' or a 'Post LTE System'.
  • the 5G communication system is considered to be implemented in higher frequency (mmWave) bands, e.g., 60GHz bands, so as to accomplish higher data rates.
  • mmWave e.g., 60GHz bands
  • MIMO massive multiple-input multiple-output
  • FD-MIMO Full Dimensional MIMO
  • array antenna an analog beam forming, large scale antenna techniques are discussed in 5G communication systems.
  • RANs Cloud Radio Access Networks
  • D2D device-to-device
  • wireless backhaul moving network
  • cooperative communication Coordinated Multi-Points (CoMP), reception-end interference cancellation and the like.
  • CoMP Coordinated Multi-Points
  • Hybrid FSK and QAM Modulation FQAM
  • SWSC sliding window superposition coding
  • ACM advanced coding modulation
  • FBMC filter bank multi carrier
  • NOMA non-orthogonal multiple access
  • SCMA sparse code multiple access
  • downlink traffic can be scheduled in unit of subframe in the time domain.
  • a downlink subframe having a regular cyclic prefix (CP) includes 14 orthogonal frequency division multiplexing (OFDM) symbols
  • a downlink subframe having an extended CP includes 12 OFDM symbols.
  • the first n OFDM symbols in each downlink sub frame can be used for transmitting downlink control information, n is 0, 1, 2, 3 or 4.
  • Downlink control information includes Physical Downlink Control Channel (PDCCH) and other control information.
  • the other OFDM symbols may be used for transmitting Physical Downlink Shared Channel (PDSCH) or enhanced PDCCH (EPDCCH).
  • PDSCH Physical Downlink Shared Channel
  • EPDCCH enhanced PDCCH
  • a special subframe of a TDD cell includes 3 parts, i.e., a downlink pilot time slot (DwPTS), a guard period (GP) and an uplink pilot time slot (UpPTS).
  • Special subframes with different configurations may have different lengths of DwPTS/GP/UpPTS. Configurations may be as shown in Table 1.
  • PDCCH and EPDCCH respectively include DCI for allocating uplink channel resources (referred to as UL Grant) and DCI for allocating downlink channel resources (referred to as DL Grant).
  • a UE may receive DL Grant and UL Grant in public search space and UE-specific search space.
  • DL Grant and UL Grant in the public search space can be successfully received by all of UEs, but those in the UE-specific search space can only be successfully received by respective UEs.
  • the downlink channel may include signals in downlink physical channels, such as PDSCH, PDCCH, EPDCCH, or the like.
  • Downlink reference signals may include downlink reference symbols for channel state measurement and downlink reference symbols for demodulation.
  • Downlink reference symbols for channel state measurement may include Cell-specific Reference Signal (CRS), Channel State Information Reference Signal (CSI RS), or the like.
  • Downlink reference symbols for demodulation may include CRS, Demodulation Reference Signal (DM RS) or the like.
  • Table 1 shows Configurations of TDD special subframe (length of DwPTS/UpPTS/GP).
  • LTE-advanced LTE-advanced
  • multiple component carriers CC, also referred to as a cell
  • CA carrier aggregation
  • the aggregated carriers constitute downlink and uplink links in the communication system, therefore larger transmission rates can be obtained.
  • Aggregated CCs may adopt the same duplexing manner, i.e., all of the aggregated CCs may be FDD cells or be TDD cells.
  • the aggregated CCs may adopt different duplexing manners, i.e., the aggregated CCs may include both FDD cells and TDD cells.
  • a base station may configure a UE to work in multiple Cells which include a Primary Cell (Pcell) and multiple Secondary Cells (Scell).
  • Pcell Primary Cell
  • Scell Secondary Cells
  • LTE systems need more spectrum resources to meet the requirement of increasing mobile communications services.
  • a possible solution is to deploy LTE systems on unlicensed bands. Unlicensed bands generally have already been allocated for other usages.
  • an LTE base station may check the channel state before transmitting a signal. If the channel is idle, the LTE base station may start transmitting downlink channel and/or downlink reference signal. In order to enable devices of other wireless systems to have the opportunity to occupy the channel, the LTE base station may check the channel state after transmitting downlink channel and/or downlink reference signal for a period of time, and decide whether to transmit downlink channel and/or downlink reference signal according to the obtained channel state.
  • FIG. 1 is a schematic diagram illustrating an LTE FDD frame.
  • the LTE base station may not start transmitting downlink channel and/or downlink reference signal.
  • Various examples provide a method and an apparatus of receiving downlink channel and/or downlink reference signal on an unlicensed band, to receive data properly on an unlicensed band.
  • a method of receiving downlink channel and/or downlink reference signal on an unlicensed band may include:
  • LTE long term evolution
  • UE user equipment
  • receiving the downlink channel and/or downlink reference signal may include:
  • receiving the downlink channel and/or downlink reference signal may include:
  • the remaining portion of the last downlink subframe that exceeds the limited maximum transmission duration is longer than t, stopping, by the UE, reception of the downlink channel and/or downlink reference signal in the last downlink subframe; or, receiving, by the UE, the downlink channel and/or downlink reference signal on a portion or all of OFDM symbols that are within the limited maximum transmission duration in the last downlink subframe, and stop receiving the downlink channel and/or downlink reference signal from remaining of the last downlink subframe after the limited maximum transmission duration is up.
  • receiving the downlink channel and/or downlink reference signal from a portion or all of OFDM symbols in the last downlink subframe may include:
  • M is the maximum number of OFDM symbols in the last downlink subframe before the limited maximum transmission duration
  • n is a number selected from plural candidate numbers of OFDM symbols in DwPTS of TDD special subframes, and the selected number if smaller than or equal to M and is closest to M among the plural candicate numbers, M is larger than N which is a pre-determined natural number; when M is smaller than or equal to N, n is 0.
  • control information includes a start time when the UE starts receiving the downlink channel and/or downlink reference signal; the start time is determined by the UE using start time indication information transmitted in the cell.
  • the start time indication information is transmitted at a fixed position of a downlink subframe within which the start time falls.
  • the start time indication information includes an OFDM symbol within which the start time falls
  • the UE determines a subframe which includes the start time indication information to be the subframe within which the start time falls.
  • a downlink subframe and an OFDM symbol within which the start time falls are determined according to the start time indication information
  • the downlink subframe within which the start time falls is a downlink subframe in which the start time indication information is transmitted or a previous subframe of the downlink subframe in which the start time indication information is transmitted.
  • the start time indication information is specified by DCI information in a downlink subframe in which the start time falls or by DCI information in the next downlink subframe of the downlink subframe in which the start time falls.
  • the DCI information is transmitted in a PDCCH;
  • the PDCCH is a PDCCH in a public search space, or the PDCCH is a PDCCH at a pre-determined fixed position, or the PDCCH is a PDCCH configured by higher layer signaling; or
  • the DCI information is transmitted in an EPDCCH;
  • the EPDCCH is an EPDCCH at a pre-determined fixed position, or the EPDCCH is an EPDCCH configured by higher layer signaling.
  • the start time indication information is transmitted in a downlink subframe in which the start time falls or in the next downlink subframe of the downlink subframe in which the start time falls.
  • the start time indication information includes subframe indication information specifying the downlink subframe in which the start time falls and OFDM symbol indication information specifying the OFDM symbol in which the start time falls; or
  • the start time indication information includes OFDM symbol indication information specifying the downlink subframe and the OFDM symbol in which the start time falls.
  • the OFDM symbol indication information specifies the downlink subframe and the OFDM symbol in which the start time falls in the manner of:
  • the downlink subframe in which the start time falls is the previous downlink subframe of the downlink subframe which includes the start time indication information; otherwise, the downlink subframe in which the start time falls is the downlink subframe which includes the start time indication information; or
  • the downlink subframe in which the start time falls is the downlink subframe which includes the start time indication information; if the symbol specified by the OFDM symbol indication information is one of the second to fourteenth OFDM symbols, the downlink subframe in which the start time falls is the previous downlink subframe of the downlink subframe which includes the start time indication information; or
  • the downlink subframe in which the start time falls is the previous downlink subframe of the downlink subframe which includes the start time indication information; if the symbol specified by the OFDM symbol indication information is the fifteenth OFDM symbol, the downlink subframe in which the start time falls is the downlink subframe which includes the start time indication information, and the OFDM symbol in which the start time falls is the first OFDM symbol.
  • the method may also include: if the number of OFDM symbols allowed to be used for receiving PDSCH in a downlink subframe is larger than or equal to N which is pre-determined or configured by higher layer, scheduling the PDSCH in the downlink subframe individually; if the number of OFDM symbols allowed to be used for receiving PDSCH in a downlink subframe issmaller than N, scheduling the PDSCH in the downlink subframe together with PDSCH in another downlink subframe using a PDCCH/EPDCCH.
  • receiving the downlink channel and/or downlink reference signal may include:
  • the UE may determine the end time is an end boundary of the last OFDM symbol in the last downlink subframe of the channel occupied by the base station on the unlicensed band.
  • the UE determines a first OFDM symbol whose start boundary is the start time in the subframe including the start time, and determines a second OFDM symbol whose end boundary is the end time in the subframe including the end time.
  • the UE determines the first OFDM symbol and the second OFDM symbol using a cell-specific reference signal or indication information of the cell.
  • the UE may determine the end time using the start time.
  • determining the start time of receiving the downlink channel and/or downlink reference signal according to the control information may include: receiving, by the UE, DCI information, and determining the start time according to the DCI information;
  • the DCI information comprises the length or start position of complete OFDM symbols from which the UE receives the downlink channel in the first downlink subframe within the signal transmission duration on the unlicensed band; wherein the complete OFDM symbols from which the UE receives the downlink channel are complete OFDM symbols occupied by all of signals in the first downlink subframe, or are complete OFDM symbols occupied by a specific downlink channel in the first downlink subframe.
  • the UE may determine the end time using the start time by:
  • M' specified by signaling is 14-N'-(n'-1)-1 or 14-N'-(n'-1); or
  • M' is the number of OFDM symbols from which the downlink channel and/or downlink reference signal is received in the last downlink subframe within the signal transmission duration
  • N' is the number of OFDM symbols from which the downlink channel and/or downlink reference signal is received in the first downlink subframe within the signal transmission duration
  • the start boundary of the (n')'th complete OFDM symbol in the first downlink subframe in the signal transmission duration is the start time of the UE receiving the downlink channel and/or downlink reference signal.
  • the UE may determine the end time using the start time by:
  • the duration of complete OFDM symbols for data transmission in the first downlink subframe+t' is the maximum time occupied by complete OFDM symbols occupied by actually transmitted signal in the first downlink subframe
  • the t' is configured by higher layer signaling or pre-determined or determined using the number of complete OFDM symbols for downlink data transmission in the first downlink subframe.
  • I 1 is the earliest start position of transmission of data channel and/or control channel in the first downlink subframe detected by the UE
  • I 2 is the possible earliest start position where the base station starts signal transmission in the first downlink subframe corresponding to I 1
  • I 1 is an element of a start position set ⁇ pre-determined or configured by higher layer
  • Nsym is the number of OFDM symbols in a subframe
  • t_sym' is the number of OFDM symbols corresponding to .
  • I 2 may be determined by:
  • the I 2 is an element adjacent to and prior to the I 1 in the set ⁇ ;
  • determining the duration of complete OFDM symbols for data transmission in the first downlink subframe may include:
  • determining by the UE the earliest start position through blind detection may include: determining the earliest start position by detecting the control channel.
  • the UE may detect the start position of PDCCH/EPDCCH, and determine the start position of PDSCH according to an explicit indication in the PDCCH/EPDCCH;
  • the UE may detect the start position of PDCCH/EPDCCH, and determine the start position of PDSCH according to the one-to-one relation.
  • I 3 is a start position of a pre-determined reference signal detected by the UE in the first downlink subframe
  • I 2 ' is an element in a start position set pre-determined or configured by higher layer
  • I 2 ' is an element that is closest to I 3 and prior to I 3 in the set ⁇
  • t_sym' is the number of OFDM symbols corresponding to t'.
  • determining the duration of complete OFDM symbols for data transmission in the first downlink subframe may include:
  • calculating M' according to the time length l may include:
  • the UE determines, by the UE, the value of M' according to a pre-determined first relation which associates l with M'; or, when l is shorter than the sum of the duration of half a subframe and the duration of the first OFDM symbol of each time slot, determining that ; when l is longer than or equal to the sum of the duration of half a subframe and the duration of the first OFDM symbol of each time slot, determining that ; or, calculating ;
  • the UE determines, by the UE, the value of M’ according to a pre-determined second relation which associates l with M’; or, when l is shorter than the sum of the duration of half a subframe and the duration of the first OFDM symbol of each time slot, determining that ; when l is longer than or equal to the sum of the duration of half a subframe and the duration of the first OFDM symbol of each time slot, determining that ; or, calculating ;
  • p is the difference between the CP length of the first OFDM symbol in each subframe and the CP length of other OFDM symbols
  • L is the duration of an OFDM symbol including a CP other than the first OFDM symbol in each subframe.
  • calculating M’ according to the time length l may include:
  • p is the difference between the CP length of the first OFDM symbol in each subframe and the CP length of other OFDM symbols
  • L is the duration of an OFDM symbol including a CP other than the first OFDM symbol in each subframe.
  • calculating M’ according to the time length l may include:
  • p is the difference between the CP length of the first OFDM symbol in each subframe and the CP length of other OFDM symbols
  • L is the duration of an OFDM symbol including a CP other than the first OFDM symbol in each subframe.
  • the method may also include: selecting a value which is the largest one among those smaller than M’ from the values of the number of OFDM symbols in DwPTS according to TDD special subframe configurations to be modified M’.
  • a system only allows the number of OFDM symbols transmitted in the last incomplete subframe within the signal transmission duration to be within 1 ⁇ Nsym, comparing the M’ obtained and each element in a set of selectable values of the number of OFDM symbols transmitted in the last incomplete subframe, determining no signal is transmitted in the last subframe if the minimum value of elements in the set ⁇ is larger than M’, and selecting an element which is the closest to M’ and smaller than or equal to M’ as the position of the end time.
  • An apparatus of receiving downlink channel and/or downlink reference signal on an unlicensed band may include: a control information receiving unit and a data and reference signal receiving unit; wherein
  • control information receiving unit is to receive control information of a cell operating on the unlicensed band
  • the data and reference signal receiving unit is to receive downlink channel and/or downlink reference signal transmitted in the cell according to the control information.
  • an LTE UE receives control information of a cell operating on an unlicensed band, and receives downlink channel and/or downlink reference signal transmitted in the cell according to the control information.
  • FIG. 1 is a schematic diagram illustrating an LTE FDD frame
  • FIG. 2 is a schematic diagram illustrating an LTE TDD frame
  • FIG. 3 is a flowchart illustrating a method of receiving downlink channel and/or downlink reference signal in accordance with an example of the present disclosure
  • FIG. 4 is a schematic diagram illustrating reception of downlink channel and/or downlink reference signal of method one in accordance with example one of the present disclosure
  • FIG. 5 is a schematic diagram illustrating reception of downlink channel and/or downlink reference signal of method three in accordance with example one of the present disclosure
  • FIG. 6 is a schematic diagram illustrating positions of DM RSs with regular CP corresponding to different TDD special subframe configurations
  • FIG. 7 is a schematic diagram illustrating positions of DM RSs with extended CP corresponding to different TDD special subframe configurations
  • FIG. 8 is a schematic diagram illustrating start time of receiving downlink channel and/or downlink reference signal specified by DCI information in accordance with an example of the present disclosure
  • FIG. 9 is a schematic diagram illustrating start time of receiving downlink channel and/or downlink reference signal specified by DCI information in accordance with an example of the present disclosure
  • FIG. 10 is a schematic diagram illustrating start time of receiving downlink channel and/or downlink reference signal specified by DCI information in accordance with an example of the present disclosure
  • FIG. 11 is a schematic diagram illustrating positions of unmodified CRS resources and positions of modified CRS resources
  • FIG. 12 is a schematic diagram illustrating signal transmission duration of a base station on an unlicensed band
  • FIG. 13 is a schematic diagram illustrating start time and end time of receiving downlink channel and/or downlink reference signal in accordance with example four of the present disclosure
  • FIG. 14 is a schematic diagram illustrating start time and end time of receiving downlink channel and/or downlink reference signal in accordance with example four of the present disclosure
  • FIG. 15 is a schematic diagram illustrating start time and end time of receiving downlink channel and/or downlink reference signal in accordance with example four of the present disclosure
  • FIG. 16 is a schematic diagram illustrating positions of I 1 and I 2 in situation (1) in accordance with example four of the present disclosure
  • FIG. 17 is a schematic diagram illustrating positions of I 1 and I 2 in situation (2) in accordance with example four of the present disclosure
  • FIG. 18 is a schematic diagram illustrating the start position of PDCCH/EPDCCH and PDSCH in the first downlink subframe in accordance with example four of the present disclosure
  • FIG. 19 is a schematic diagram illustrating a start position of PDCCH and PDSCH in the first downlink subframe in accordance with example four of the present disclosure
  • FIG. 20 is a schematic diagram illustrating the start position of EPDCCH and PDSCH in the first downlink subframe in accordance with example four of the present disclosure
  • FIG. 21 is a schematic diagram illustrating a start position of PDCCH/EPDCCH and PDSCH in the first downlink subframe in accordance with example four of the present disclosure
  • FIG. 22 is a schematic diagram illustrating the start positions of PDCCH/EPDCCH and PDSCH in the first downlink subframe in accordance with example four of the present disclosure
  • FIG. 23 is a flowchart illustrating method one in accordance with example five of the present disclosure.
  • FIG. 24 is a schematic diagram illustrating duration time in accordance with example five of the present disclosure.
  • FIG. 25 is a schematic diagram illustrating duration time in accordance with example five of the present disclosure.
  • FIG. 26 is a schematic diagram illustrating duration time in accordance with example five of the present disclosure.
  • FIG. 27 is a schematic diagram illustrating duration time in accordance with example five of the present disclosure.
  • FIG. 28 is a schematic diagram illustrating multiple indications received in accordance with example five of the present disclosure.
  • FIG. 29 is a schematic diagram illustrating received signaling indicating whether a subframe is the last subframe in accordance with example five of the present disclosure
  • FIG. 30 is a schematic diagram illustrating received signaling indicating whether a subframe is the last subframe in accordance with example five of the present disclosure
  • FIG. 31 is a schematic diagram illustrating received signaling indicating whether a subframe is the last subframe in accordance with example five of the present disclosure.
  • FIG. 32 is a schematic diagram illustrating an apparatus of receiving downlink channel and/or downlink reference signal in accordance with an example of the present disclosure.
  • These computer program instructions may also be stored in a non-transitory computer-readable memory that can direct a computer or other programmable data processing apparatus to function in a particular manner, such that the instructions stored in the non-transitory computer-readable memory produce an article of manufacture including instruction means which implement the function/act specified in the flowchart and/or block diagram block or blocks.
  • the computer program instructions may also be loaded onto a computer or other programmable data processing apparatus to cause a series of operations to be performed on the computer or other programmable apparatus to produce a computer implemented process such that the instructions which execute on the computer or other programmable apparatus provide operations for implementing the functions/acts specified in the flowchart and/or block diagram block or blocks.
  • the respective block diagrams may illustrate parts of modules, segments, or codes including one or more executable instructions for performing specific logic function(s).
  • the functions of the blocks may be performed in a different order in several modifications. For example, two successive blocks may be performed substantially at the same time, or may be performed in reverse order according to their functions.
  • a unit means, but is not limited to, a software or hardware component, such as a Field Programmable Gate Array (FPGA) or Application Specific Integrated Circuit (ASIC), which performs certain tasks.
  • a unit may advantageously be configured to reside on a non-transitory addressable storage medium and configured to be executed on one or more processors.
  • a unit may include, by way of example, components, such as software components, object-oriented software components, class components and task components, processes, functions, attributes, procedures, subroutines, segments of program code, drivers, firmware, microcode, circuitry, data, databases, data structures, tables, arrays, and variables.
  • the functionality provided in the components and units may be combined into fewer components and units or further separated into additional components and units.
  • the components and units may be implemented such that they execute one or more Central Processing Units (CPUs) in a device or a secure multimedia card.
  • CPUs Central Processing Units
  • Embodiments of the present disclosure focus on wireless communication systems based on Orthogonal Frequency Division Multiplexing (OFDM), however, the subject matter of the present disclosure may also be applied to other communication systems and services having similar technical backgrounds and channel forms without largely departing from the scope of the present disclosure according to a determination of those of ordinary skill in the art.
  • OFDM Orthogonal Frequency Division Multiplexing
  • FIG. 3 is a flowchart illustrating a method of an LTE user equipment (UE) receiving downlink channel and/or downlink reference signal in accordance with an example of the present disclosure.
  • the method may include the following procedures.
  • an LTE UE may receive control information of a cell operating on an unlicensed band.
  • the LTE UE may receive downlink channel and/or downlink reference signal of the cell on the unlicensed band according to the received control information of the cell.
  • the UE may decide a manner of receiving downlink channel and/or downlink reference signal according to the received control information.
  • An LTE system may adopt a fixed subframe structure, i.e., each subframe lasts 1ms and has fixed start timing and end timing. Since an LTE base station may determine a channel to be available at any time point and the channel occupancy duration of the LTE system is limited so as to enable other devices to have the opportunity of occupying the channel, there may be the situation where LTE transmission is not completed in the last downlink subframe while the limited maximum transmission duration 201 is up, as shown in FIG. 2.
  • FIG. 2 is a schematic diagram illustrating an LTE TDD frame.
  • a solution is needed to solve the problem of receiving downlink channel and/or downlink reference signal.
  • the method of receiving downlink channel and/or downlink reference signal may be as follows.
  • a UE has already known the end time of the channel occupancy duration before receiving the last downlink subframe, i.e., the UE knows the number of complete OFDM symbols included in the last downlink subframe before the end time of the channel occupancy duration.
  • the UE may obtain the number of OFDM symbols in the last downlink subframe from public physical layer signaling of a Pcell.
  • the UE may continue to receive downlink channel and/or downlink reference signal from the remaining portion 401 of the downlink subframe that exceeds the limited maximum transmission duration after reception duration of downlink channel and/or downlink reference signal in the last downlink subframe reaches the limited maximum transmission duration until the end of the last downlink subframe, as shown in FIG. 4.
  • FIG. 4 is a schematic diagram illustrating reception of downlink channel and/or downlink reference signal of method one in accordance with example one of the present disclosure That is, the last downlink subframe is always a complete subframe. This method is easy to implement, and makes less modifications to standards. The method, however, may violate the rule of using unlicensed bands since the base station may continue transmission after the limited maximum transmission duration ends.
  • a UE may not receive downlink channel and/or downlink reference signal in the incomplete last subframe.
  • This method is easy to implement and does not violate the rule of using unlicensed bands.
  • an LTE device needs to check the channel state, and can only use an unlicensed band when the channel is detected to be idle. Since the time when the channel is detected to be idle may be any time point within a downlink subframe, it is highly possible the last downlink subframe is incomplete. In addition, since the maximum channel occupancy duration of a UE may be several or a dozen milliseconds, it is very probable that the last downlink subframe is incomplete. Thus, if the UE does not receive any downlink channel and/or downlink reference signal in the incomplete last downlink subframe, some resources may be wasted.
  • a UE may receive downlink channel and/or downlink reference signal from some or all of OFDM symbols 501 in the last downlink subframe before the limited maximum transmission duration ends, and stop receiving downlink channel and/or downlink reference signal from the remaining 502 of the downlink subframe after the limited maximum transmission duration ends, i.e., the UE may perform reception within a portion of a subframe and not perform reception within another portion of the subframe, as shown in FIG. 5.
  • FIG. 5 is a schematic diagram illustrating reception of downlink channel and/or downlink reference signal of method three in accordance with example one of the present disclosure.
  • the number of downlink OFDM symbols in a TDD special subframe is a portion of the number of OFDM symbols in a downlink subframe.
  • the subframe structure of a TDD special subframe may be reused for an incomplete downlink subframe on an unlicensed band.
  • the position of DM RS in a TDD special subframe is variable according to the number of available OFDM symbols in the downlink subframe.
  • DM RS positions defined in different TDD special subframe configurations may be as shown in FIG. 6.
  • FIG. 6 is a schematic diagram illustrating positions of DM RSs with regular CP corresponding to different TDD special subframe configurations.
  • FIG. 7 is a schematic diagram illustrating positions of DM RSs with extended CP corresponding to different TDD special subframe configurations.
  • the position of CRS does not change with the number of available OFDM symbols in a downlink subframe.
  • the following are examples of a method of processing an incomplete downlink subframe in a cell operating on an unlicensed band when a demodulation reference signal is DM RS and CRS respectively.
  • reception of downlink channel and/or downlink reference signal in the subframe is performed on OFDM symbols in the transmitted portion of the downlink subframe. It may be assumed that reception is performed on the first n OFDM symbols of the last downlink subframe.
  • the number n of the OFDM symbols on which downlink channel and/or downlink reference signal is received may be set to be the number of OFDM symbols in DwPTS defined in one of conventional TDD special subframes (i.e., one of the lengths of DwPTS in Table 1) and the number of OFDM symbols in a regular downlink subframe.
  • the number of OFDM symbols in DwPTS in a TDD special subframe that is smaller or equal to the number M of OFDM symbols in the transmitted portion of the downlink subframe before the transmission ends and that is the closest to M may be selected as the number n of OFDM symbols in downlink channel and/or downlink reference signal to be received.
  • the number of OFDM symbols in downlink channel and/or downlink reference signal to be received may be an arbitrary integer smaller or equal to 14, i.e., the number M of OFDM symbols in the downlink subframe before the transmission ends may be determined to be the number n of OFDM symbols in downlink channel and/or downlink reference signal to be received.
  • This method requires modifications to the structure of the conventional TDD special subframe, but can make full use of resources and reduce waste of resources.
  • a method of receiving downlink channel and/or downlink reference signal may be as follows.
  • the UE may receive PDSCH, EPDCCH and a reference signal in the downlink subframe.
  • N 6
  • N 4.
  • DM RS cannot be obtained unless the position of DM RS is changed.
  • the number of available OFDM symbols is the number of OFDM symbols in DwPTS in one of conventional TDD speccial subframes
  • data reception may be performed according to the structure of the DM RS of DwPTS in the conventional TDD special subframe.
  • a UE-specific reference symbol DMRS
  • the number n of transmitted OFDM symbols is 6 (e.g., conventional TDD special subframe configuration 9), or 11 (e.g., conventional TDD special subframe configurations 3 and 8), or 12 (e.g., conventional TDD special subframe configuration 4)
  • the DM RS adopts the DM RS format of conventional TDD special subframe configurations 3, 4, 8, or 9
  • the UE may receive downlink channel and/or downlink reference signal according to information that the number of OFDM symbols is 6, or 11, or 12; if the number n of transmitted OFDM symbols is 9 (e.g., conventional TDD special subframe configurations 1 and 6), or 10 (e.g., conventional TDD special subframe configurations 2 and 7),
  • Conventional TDD special subframe structures do not include downlink subframe structures in which the number of OFDM symbols is 4, 5, 6, 8, 13.
  • conventional subframe structures may be reused, i.e., by reducing the number of used OFDM symbols until the number of OFDM symbols is identical to the number of downlink OFDM symbols of a conventional TDD special subframe configuration, and data reception is performed according to the DM RS structure of DwPTS in the conventional TDD special subframe configuration.
  • the transmitted portion of the downlink subframe includes 7 or 8 OFDM symbols, i.e., M is 7 or 8
  • the conventional TDD sepcial subframe structure that has the most approximate number of OFDM symbols to 7 or 8 is the TDD speical subframe structure that includes 6 downlink OFDM symbols, i.e., TDD speical subframe configuration 9, the UE may adopt the DM RS structure in TDD special subframe configuration 9 for data reception.
  • the UE may adopt the DM RS structure in TDD special subframe configuration 4 for data reception.
  • a newly defined subframe structure may be adopted to use all of available OFDM symbols if the number M of OFDM symbols in the transmitted portion of the downlink subframe is 4, 5, 7, 8, or 13. If the number M of OFDM symbols is 4 or 5, a newly defined subframe structure that includes 4 or 5 OFDM symbols and uses the DM RS format of TDD special subframe configuration 3, 4, 8, 9, or 1, 2, 6, 7 may be used.
  • the number of available OFDM symbols may be sent to the UE via signaling so that the UE may receive downlink channel and/or downlink reference signal according to the information that the number of OFDM symbols is 4 or 5.
  • the number M of OFDM symbols is 7 or 8
  • a newly defined subframe structure that includes 7 or 8 OFDM symbols and uses the DM RS format of TDD special subframe configuration 1, 2, 6, 7 may be used.
  • the number of available OFDM symbols may be sent to the UE via signaling so that the UE may receive downlink channel and/or downlink reference signal according to the information that the number of OFDM symbols is 7 or 8.
  • the number M of OFDM symbols is 13
  • a newly defined subframe structure that includes 13 OFDM symbols and uses the DM RS format of TDD special subframe configuration 3, 4, 8, 9 may be used.
  • the number of available OFDM symbols may be sent to the UE via signaling so that the UE may receive downlink channel and/or downlink reference signal according to the information that the number of OFDM symbols is 13.
  • some of the situations may re-use a conventional subframe structure, i.e., reducing the number of OFDM symbols used until the number of OFDM symbols is identical to the number of OFDM symbols in a conventional TDD special subframe configuration; the other situations may use a newly defined subframe structure to use all of available OFDM symbols.
  • the conventional subframe structure may be re-used.
  • a newly defined subframe structure may be used.
  • N e.g. 8
  • the number M of OFDM symbols in the transmitted portion of the last downlink subframe is 4 or 5 or 8
  • the number of OFDM symbols that may be wasted is 4 or 5 or 2 if no newly defined subframe structure is adopted.
  • a newly defined subframe structure may be introduced to make use of all available OFDM symbols, so that no resource is wasted.
  • the number M of OFDM symbols in the transmitted portion of the last downlink subframe is 7 or 13
  • a conventional subframe structure may be re-used, and only 1 OFDM symbol is wasted. As such, less resources may be wasted.
  • the following is several examples.
  • a base station may not transmit downlink data in an example.
  • a newly defined subframe structure in which the number of available OFDM symbols is 4 or 5 may be used, and the DM RS format of TDD special subframe configuration 3, 4, 8, 9, or 1, 2, 6, 7 may be used.
  • the number of available OFDM symbols may be sent to a UE via signaling, and the UE may receive downlink channel and/or downlink reference signal according to the received information that the number of OFDM symbols is 4 or 5.
  • the base station may use the structure of TDD speical subframe configuration 9, and inform the UE of the TDD special subframe configuration 9.
  • the UE may receive the PDSCH, EPDCCH and reference signal according to TDD special subframe configuration 9, i.e., regarding the subframe includes 6 available OFDM symbols.
  • the base station may use a newly defined subframe structure in which the number of OFDM symbols is 7 or 8, adopt the DM RS format of TDD special subframe configuration 1, 2, 6, 7, and inform the UE of the number of available OFDM symbols via signaling.
  • the UE may receive downlink channel and/or downlink reference signal according to the received information that the number of OFDM symbols is 7 or 8.
  • the base station may use the structure of TDD speical subframe configuration 4, and inform the UE of the TDD special subframe configuration 4.
  • the UE may receive downlink channel and/or downlink reference signal according to TDD special subframe configuration 4, i.e., regarding the subframe includes 12 available OFDM symbols.
  • the base station may use a newly defined subframe structure in which the number of OFDM symbols is 13, adopt the DM RS format of TDD special subframe configuration 3, 4, 8, 9, and inform the UE of the number of available OFDM symbols via signaling.
  • the UE may receive downlink channel and/or downlink reference signal according to the received information that the number of OFDM symbols is 13.
  • a conventional TDD special subframe structure is adopted in situations where the number of OFDM symbols is 4, 5, 7, 8, 13, processing at the UE is less complex and rate matching may be implemented using a conventional format. In addition, it may save signaling bits for informing the UE of the number of OFDM symbols in the subframe via signaling but may waste resources. For example, if only 6 OFDM symbols are used when there are 8 OFDM symbols, 2 OFDM symbols are wasted. If a newly defined subframe structure is adopted in situations where the number of OFDM symbols is 4, 5, 7, 8, 13, available resources can be fully used and the DM RS structure may re-use the structures defined in one of conventional TDD special subframe configurations, and complexity of the processing at UE is not significantly increased.
  • a conventional TDD special subframe structure is adopted in some of the situations where the number of OFDM symbols is 4, 5, 7, 8, or 13 and newly defined subframe structures are adopted in the other of the situations where the number of OFDM symbols is 4, 5, 7, 8, or 13, signaling bits can be saved, and waste of resources can be greately reduced.
  • reception of downlink channel and/or downlink reference signal in the subframe is performed on some of OFDM symbols in the downlink subframe. It may be assumed that reception is performed on the first n OFDM symbols of the last downlink subframe.
  • the number n of the OFDM symbols on which downlink channel and/or downlink reference signal is received may be the number of OFDM symbols in DwPTS of one of conventional TDD special subframes (i.e., DwPTS lengths in Table 1) and the number of OFDM symbols in a normal downlink subframe, or n may be any integer smaller than or equal to 14.
  • a method of receiving downlink channel and/or downlink reference signal may be as follows.
  • TDD special subframe configurations include 6, 9, 10, 11, or 12 OFDM symbols, i.e., the number of OFDM symbols is 6 (conventional TDD special subframe configuration 9), 11 (conventional TDD spcial subframe configurations 3 and 8), 12 (conventional TDD spcial subframe configuration 4), 9 (conventional TDD spcial subframe configurations 1 and 6), 10 (conventional TDD spcial subframe configurations 2 and 7).
  • a UE may receive the downlink channel and/or downlink reference signal according to CRS which indicates the number of OFDM symbols is 6, 9, 10, 11 or 12.
  • Conventional TDD special subframe structures do not include structures that have 4, 5, 7, 8, or 13 OFDM symbols.
  • a conventional subframe structure may be re-used and the number of used OFDM symbols is reduced to the number of OFDM symbols of DwPTS in the conventional TDD special subframe configuration.
  • the number of available OFDM symbols is 7 or 8
  • the number of actually used OFDM symbols is 6 which is the number of OFDM symbols of DwPTS in TDD special subframe configuration 9.
  • a newly defined subframe structure may be introduced to use all of available OFDM symbols.
  • some of the situations where the number M of OFDM symbols is 4, 5, 7, 8, or 13 may re-use the structure of DwPTS in conventional TDD special subframe configurations, i.e., to reduce the number of used OFDM symbols to the number of OFDM symbols in DwPTD of the conventional TDD special subframe configurations, while the other of the situations may use newly defined subframe structures to use all of the available OFDM symbols.
  • the conventional subframe structure may be re-used.
  • a newly defined subframe structure may be used.
  • N' e.g., 8
  • a newly defined subframe structure may be introduced to use all of available OFDM symbols, while in situations where the M is 7 or 13, one of conventional subframe structures may be re-used, i.e., the number of used OFDM symbols is reduced to the number of OFDM symbols in DwPTS of one of conventional TDD special subframe configurations.
  • a base station may not transmit downlink data in an example.
  • a newly defined subframe structure in which the number of available OFDM symbols is 4 or 5 may be used, and the number of OFDM symbols may be sent to a UE via signaling.
  • the UE may receive downlink channel and/or downlink reference signal according to the received information that the number of OFDM symbols is 4 or 5.
  • the base station may use the structure of TDD speical subframe configuration 9, and inform the UE of the TDD special subframe configuration 9.
  • the UE may receive downlink channel and/or downlink reference signal according to TDD special subframe configuration 9, i.e., regarding the subframe includes 6 available OFDM symbols.
  • the base station may use a newly defined subframe structure in which the number of OFDM symbols is 7 or 8, and inform the UE of the number of available OFDM symbols via signaling.
  • the UE may receive downlink channel and/or downlink reference signal according to the received information that the number of OFDM symbols is 7 or 8.
  • the base station may use the structure of TDD special subframe configuration 4, and inform the UE of the TDD special subframe configuration 4.
  • the UE may receive downlink channel and/or downlink reference signal according to TDD special subframe configuration 4, i.e., regarding the subframe includes 12 available OFDM symbols.
  • the base station may use a newly defined subframe structure in which the number of OFDM symbols is 13, and inform the UE of the number of available OFDM symbols via signaling.
  • the UE may receive downlink channel and/or downlink reference signal according to the received information that the number of OFDM symbols is 13.
  • a conventional TDD special subframe structure is used in situations where the number of OFDM symbols is 4, 5, 7, 8, 13, processing at the UE is less complex and rate matching may be implemented using a conventional format. In addition, it may save signaling bits for informing the UE of the number of OFDM symbols in the subframe via signaling but may waste resources. For example, if only 6 OFDM symbols are used when there are 8 OFDM symbols, 2 OFDM symbols are wasted. If a newly defined subframe structure is used in situations where the number of OFDM symbols is 4, 5, 7, 8, 13, available resources can be fully used and the DM RS structure may re-use the structures defined in one of conventional TDD special subframe configurations, and complexity of the processing at UE is not significantly increased.
  • a UE may continue reception in the last downlink subframe after the limited maximum transmission duration until the end of the downlink subframe. Since the portion exceeding the limited maximum transmission duration is very small, there is little influence on the rule of using unlicensed bands. If the remaining time of the downlink subframe after the limited maximum transmission duration is up is longer than t, the UE may stop receiving the remaining portion of the last downlink subframe that exceeds the limited maximum transmission duration.
  • the method of receiving the PDSCH and the reference signal may be similar to method three. In another example, the UE may not receive any downlink channel and/or downlink reference signal if the remaining time of the downlink subframe after the limited maximum transmission duration is longer than t.
  • the time when an LTE base station starts occupying a channel may be at a boundary of a downlink subframe or not at a boundary of a downlink subframe, the time may be any time.
  • several methods are provided for informing a UE of the start time of receiving downlink channel and/or downlink reference signal.
  • the start time may be sent to the UE via signaling sent in a Pcell, e.g., via a public physical layer signaling in the Pcell.
  • DCI information in PDCCH of format 1C or 1A may be used to inform the UE of the start time of receiving downlink channel and/or downlink reference signal, or inform the UE of the OFDM symbol in a downlink subframe from which the UE may start receiving downlink channel and/or downlink reference signal.
  • the signaling may specify the subframe corresponding to the reception start time, e.g., subframe indication information, and the OFDM symbol in the subframe at which reception of downlink channel and/or downlink reference signal is to be started, i.e., OFDM symbol indication information.
  • the the subframe indication information may use N bits to specify the subframe in which reception of downlink channel and/or downlink reference signal is to be started.
  • N may be a positive integer larger than or equal to 1.
  • the value of N may be defined in a standard or configured by higher layer signaling.
  • N 1 or 2.
  • the 1-bit subframe indication information may specify whether the start time is within the subframe from which the subframe indication information is received or within the previous subframe of the subframe from which the subframe indication information is received. For example, when the subframe indication information is “0”, the start time may be within the subframe from which the subframe indication information is received. When the subframe indication information is “1”, the start time may be within the previous subframe of the subframe from which the subframe indication information is received, as shown in Table 2.
  • Table 2 shows reception start time of downlink channel and/or downlink reference signal.
  • subframe indication information The subframe to start receiving downlink channel and/or downlink reference signal 0
  • 2-bit subframe indication information may be used to specify the subframe within which the start time is among the subframe from which the subframe indication information is received and three subframes preceding the subframe.
  • the start time may be within the subframe from which the subframe indication information is received.
  • the subframe indication information is “01”
  • the start time may be within the subframe which is one subframe prior to the subframe from which the subframe indication information is received.
  • the subframe indication information is “10”
  • the start time may be within a subframe which is two subframes prior to the subframe from which the subframe indication information is received.
  • the subframe indication information is “11”
  • the start time may be within a subframe which is three subframes prior to the subframe from which the subframe indication information is received, as shown in Table 3.
  • Table 3 shows start time of receiving downlink channel and/or downlink reference signal.
  • subframe to start receiving downlink channel and/or downlink reference signal 00
  • the subframe from which the subframe indication information is received 01
  • the subframe which is one subframe prior to the subframe from which the subframe indication information is received 10
  • the subframe which is two subframes prior to the subframe from which the subframe indication information is received 11
  • OFDM symbol indication may use OFDM symbol indication information which includes M bits to specify the OFDM symbol at which reception of downlink channel and/or downlink reference signal is to be started.
  • M is a positive integer larger than or equal to 1.
  • 4-bit OFDM symbol indication information may be used to specify the OFDM symbol at which the reception of downlink channel and/or downlink reference signal may be started.
  • the value of the OFDM symbol indication information is “0000”
  • the start time is the first OFDM symbol of the subframe.
  • the value of the OFDM symbol indication information is “0001”
  • the start time is the second OFDM symbol of the subframe.
  • the value of the OFDM symbol indication information is “1101”
  • the start time is the fourteenth OFDM symbol of the subframe, as shown in Table 4.
  • Table 4 shows Start time of receiving downlink channel and/or downlink reference signal.
  • OFDM symbol indication information The OFDM symbol to start receiving downlink channel and/or downlink reference signal 0000 The first OFDM symbol of the subframe 0001 The second OFDM symbol of the subframe 0010 The third OFDM symbol of the subframe 0011 The fourth OFDM symbol of the subframe 0100 The fifth OFDM symbol of the subframe 0101 The sixth OFDM symbol of the subframe 0110 The seventh OFDM symbol of the subframe 0111 The eighth OFDM symbol of the subframe 1000 The ninth OFDM symbol of the subframe 1001 The tenth OFDM symbol of the subframe 1010 The eleventh OFDM symbol of the subframe 1011 The twelfth OFDM symbol of the subframe 1100 The thirteenth OFDM symbol of the subframe 1101 The fourteenth OFDM symbol of the subframe 1110 ⁇ 11 reserved
  • 3-bit OFDM symbol indication information may specify the OFDM symbol that is the start time of receiving downlink channel and/or downlink reference signal. Since 3-bit information can differentiate 8 situations and can only specify some of the 14 OFDM symbols instead of each of the 14 OFDM symbols. For example, when the OFDM symbol indication information indicates “000”, the start time is the first OFDM symbol in the subframe. When the OFDM symbol indication information indicates “001”, the start time is the second OFDM symbol in the subframe. Likewise, when the OFDM symbol indication information indicates “110”, the start time is the seventh OFDM symbol of the subframe. When the OFDM symbol indication information indicates “111”, the start time is one of the eighth OFDM symbol to the fourteenth OFDM symbol of the subframe, but it is not specified which of the OFDM symbols is the start time, as shown in Table 5.
  • Table 5 shows start time of receiving downlink channel and/or downlink reference signal.
  • OFDM symbol indication information The OFDM symbol to start receiving downlink channel and/or downlink reference signal 000 The first OFDM symbol of the subframe 001 The second OFDM symbol of the subframe 010 The third OFDM symbol of the subframe 011 The fourth OFDM symbol of the subframe 100 The fifth OFDM symbol of the subframe 101 The sixth OFDM symbol of the subframe 110 The seventh OFDM symbol of the subframe 111 One of the eighth to fourteenth OFDM symbol, and the exact OFDM symbol is not specified
  • FIG. 8 is a schematic diagram illustrating start time of receiving downlink channel and/or downlink reference signal specified by DCI information in accordance with an example of the present disclosure.
  • the next subframe of the subframe corresponding to the start time of the UE receiving downlink channel and/or downlink reference signal may be an uplink subframe.
  • the start time may be sent to the UE via DCI information in PDCCH in the first downlink subframe of the Pcell after the uplink subframe (901), as shown in FIG. 9.
  • FIG. 9 is a schematic diagram illustrating start time of receiving downlink channel and/or downlink reference signal specified by DCI information in accordance with an example of the present disclosure. As such, the base station has occupied the channel, but the UE cannot timely obtain information about that, thus the UE cannot properly receive downlink channel and/or downlink reference signal.
  • the start time of a UE receiving downlink channel and/or downlink reference signal may be specified by information transmitted by a cell operating on an unlicensed band.
  • the information is referred to as start time indication information.
  • the start time indication information may be transmitted in DCI information in a downlink subframe where the start time of the UE receiving the downlink channel and/or downlink reference signal falls.
  • FIG. 10 is a schematic diagram illustrating start time of receiving downlink channel and/or downlink reference signal specified by DCI information in accordance with an example of the present disclosure.
  • K may be defined in a standard or configured by higher layer signaling.
  • the value of P may be defined in a standard or configured by higher layer signaling.
  • the PDCCH may be a PDCCH in a public search space composed of resource element groups (REG) and CCEs in the last K OFDM symbols at the end of the downlink subframe corresponding to the start time.
  • REG resource element groups
  • the start time may be specified by a PDCCH located at a fixed position among the last K OFDM symbols at the end of the downlink subframe corresponding to the start time at which the UE can start receiving downlink channel and/or downlink reference signal, i.e., the positions of CCEs and REGs forming the CCEs are fixed, e.g., may be defined in a protocol.
  • the number of CCEs occupied by the PDCCH and positions of REs forming the CCEs may be configured by higher layer signaling, and no blind detection of PDCCH is to be performed.
  • CCEs composing the PDCCH and REGs composing the CCEs are on the first OFDM symbols at the head of the subframe.
  • CCEs composing the PDCCH and REGs composing the CCEs are on the last OFDM symbols at the end of the subframe.
  • PDCCH is demodulated using CRS which is at the end of the subframe.
  • FIG. 11 is a schematic diagram illustrating positions of unmodified CRS resources and positions of modified CRS resources.
  • the UE may receive the CRS from the position of modified CRS resources 1115.
  • the positions of unmodified CRS resources 1110 and positions of modified CRS resources 1115 may be as shown in FIG. 11.
  • methods adopted may be similar to the above.
  • the start position of modified CRS resources 1115 is changed. Unmodified CRS resources 1110 are arranged starting from the head of the subframe towards the end of the subframe, and modified CRS resources 1115 are arranged from the end of the subframe towards the head of the subframe. As such, CRS has a definite start position.
  • the conventional CRS structure i.e., the CRS at the position of the unmodified CRS resources as shown in FIG. 11 may be adopted.
  • the method can timely inform a UE of the start time of receiving a downlink channel and/or downlink reference signal to enable the UE to successfully receive the downlink channel and/or downlink reference signal.
  • the UE can be informed of the start time.
  • control information transmitted in resources having a fixed position in the subframe corresponding to the start time may be used for informing the UE of the start time.
  • the control information is the start time indication information.
  • the resources having a fixed position refers to physical resources block pairs having a fixed position in the frequency domain, or OFDM symbols having fixed position in the time domain, e.g., the last 1 or 2 OFDM symbols in 6 physical resource block pairs at the center of the system bandwidth (or all of physical resource block pairs in the whole system bandwidth).
  • OFDM symbol indication information may use M bits to specify the OFDM symbol at which reception of downlink channel and/or downlink reference signal is to be started.
  • M is a positive integer larger than or equal to 1.
  • the value of M may be defined in a standard or configured by higher layer signaling.
  • M may be 4 or 3.
  • 4-bit OFDM symbol indication information may be used to specify the OFDM symbol corresponding to the start time of receiving downlink channel and/or downlink reference signal.
  • the start time is the first OFDM symbol of the subframe.
  • the start time is the second OFDM symbol of the subframe.
  • the start time is the fourteenth OFDM symbol of the subframe, as shown in Table 4.
  • 3-bit OFDM symbol indication information may specify the OFDM symbol that is the start time of receiving downlink channel and/or downlink reference signal.
  • 3-bit information can only differentiate 8 situations and can only specify situations where the start time is some of the 14 OFDM symbols instead of specifying situations where the start time is each of the 14 OFDM symbols. For example, when the OFDM symbol indication information indicates “000”, the start time is the first OFDM symbol in the subframe. When the OFDM symbol indication information indicates “001”, the start time is the second OFDM symbol in the subframe. Likewise, when the OFDM symbol indication information indicates “110”, the start time is the seventh OFDM symbol of the subframe. When the OFDM symbol indication information indicates “111”, the start time is one of the eighth OFDM symbol to the fourteenth OFDM symbol of the subframe, but it is not specified which of the OFDM symbols is the start time, as shown in Table 5.
  • the start time of a UE receiving downlink channel and/or downlink reference signal may be specified by information transmitted by a cell operating on an unlicensed band.
  • the information is referred to as start time indication information.
  • the indication information of the start time that a UE can start receiving downlink channel and/or downlink reference signal may be transmitted via DCI information in the subframe within which the start time falls or the next subframe of the subframe.
  • the DCI information may be transmitted in a PDCCH.
  • the PDCCH may be a PDCCH within the public search space.
  • the PDCCH may be a PDCCH having a fixed position, i.e., the PDCCH may always occupy the same CCEs that are composed of REGs having fixed positions.
  • the fixed position may be defined in a protocol.
  • the number of CCEs occupied by the PDCCH and positions of REs composing the CCEs may be configured by higher layer signaling, and no blind detection of PDCCH is to be performed.
  • the DCI information may be sent in an EPDCCH having a fixed position, i.e., the EPDCCH may always occupy the same ECCEs that are composed of EREGs having fixed positions.
  • the fixed position may be defined in a protocol.
  • the number of ECCEs occupied by the EPDCCH and positions of REs forming the ECCEs may be configured by higher layer signaling, and no blind detection of the EPDCCH is to be performed.
  • control information transmitted in resources having a fixed position in the subframe in which the start time falls or in the next subframe of the subframe may be used for informing the UE of the start time when the UE may start to receive downlink channel and/or downlink reference signal.
  • the control information is the start time indication information.
  • the resources having the fixed position refers to physical resources block pairs having a fixed position in the frequency domain, or OFDM symbols having a fixed position in the time domain, e.g., the first 1 or 2 OFDM symbols in 6 physical resource block pairs at the center of the system bandwidth (or all of physical resource block pairs in the whole system bandwidth).
  • An OFDM symbol in a subframe may be indicated to the UE as the start time when the UE may start receiving downlink channel and/or downlink reference signal. That is, subframe indication information may be used to indicate whether the start time is in a subframe from which the subframe indication information is received or in the preceding subframe of the subframe, and OFDM symbol indication information may be used to indicate the OFDM symbol from which to start receiving downlink channel and/or downlink reference signal in the subframe.
  • the subframe indication information may use 1 bit to indicate whether the start time is in the subframe from which the subframe indication information is received or in the preceding subframe of the subframe.
  • OFDM symbol indication information may use M bits to specify the OFDM symbol at which reception of downlink channel and/or downlink reference signal is to be started.
  • M is a positive integer larger than or equal to 1.
  • the value of M may be defined in a standard or configured by higher layer signaling. In an example, M may be 4 or 3.
  • 4-bit OFDM symbol indication information may be used to specify the OFDM symbol corresponding to the start time of receiving downlink channel and/or downlink reference signal.
  • the start time is the first OFDM symbol of the subframe.
  • the start time is the second OFDM symbol of the subframe.
  • the start time is the fourteenth OFDM symbol of the subframe, as shown in Table 4.
  • 3-bit OFDM symbol indication information may specify the OFDM symbol that is the start time of receiving downlink channel and/or downlink reference signal. Since 3-bit information can only differentiate 8 situations and can only specify situations where the start time is some of the 14 OFDM symbols instead of specifying situations where the start time is each of the 14 OFDM symbols.
  • the start time is the first OFDM symbol in the subframe.
  • the start time is the second OFDM symbol in the subframe.
  • the start time is the seventh OFDM symbol of the subframe.
  • the start time is one of the eighth OFDM symbol to the fourteenth OFDM symbol of the subframe, but it is not specified which of the OFDM symbols is the start time, as shown in Table 5.
  • OFDM symbol indication information may be used to inform a UE of an OFDM symbol in a subframe as the start time when the UE may start receiving downlink channel and/or downlink reference signal.
  • the value of the OFDM symbol indication information may be used to determine whether the start time falls in the subframe from which the subframe indication information is received or in the preceding subframe of the subframe, i.e., a start time specified by some values of the OFDM symbol indication information is within the subframe from which the OFDM symbol indication information is received, and a start time specified by other values of the OFDM symbol indication information is within the preceding subframe of the subframe.
  • the start time is in the preceding subframe of the subframe from which the OFDM symbol indication information is received; otherwise, the start time is within the subframe from which the OFDM symbol indication information is received.
  • the OFDM symbol indication information specifies the start time is the fifth OFDM symbol and the EPDCCH starts from the third OFDM symbol, i.e., the start time is later than the start time of the EPDCCH from which the OFDM symbol indication information is received, the subframe in which the start time falls cannot be the subframe in which the EPDCCH including the OFDM symbol indication information is transmitted, and the start time is in the preceding subframe of the subframe in which the EPDCCH is transmitted.
  • the OFDM symbol indication information specifies the start time is the first OFDM symbol and the PDCCH occupies the first and second OFDM symbols, i.e., the start time is not later than the start time of the PDCCH from which the OFDM symbol indication information is received, the subframe in which the start time is the subframe in which the PDCCH including the OFDM symbol indication information is transmitted, and the start time is in the subframe in which the PDCCH is transmitted.
  • 4-bit OFDM symbol indication information may be used to specify the OFDM symbol which is the start time of receiving downlink channel and/or downlink reference signal. If the value of the OFDM symbol indication information is “0000”, the start time is the first OFDM symbol in the subframe. If the value of the OFDM symbol indication information is “0001”, the start time is the second OFDM symbol in the subframe. Likewise, if the value of the OFDM symbol indication information is “1101”, the start time is the fourteenth OFDM symbol in the subframe, as shown in Table 4.
  • the value of the OFDM symbol indication information may be used to determine whether the start time falls in the subframe from which the subframe indication information is received or in the preceding subframe of the subframe, i.e., a start time specified by some values of the OFDM symbol indication information is within the subframe from which the OFDM symbol indication information is received, and a start time specified by other values of the OFDM symbol indication information is within the preceding subframe of the subframe.
  • the start time specified by the OFDM symbol indication information in a PDCCH or an EPDCCH is the first OFDM symbol
  • the subframe in which the start time falls is the subframe from which the PDCCH/EPDCCH including the OFDM symbol indication information is received; otherwise, the subframe is the previous subframe of the subframe including the PDCCH/EPDCCH.
  • the OFDM symbol indication information may use M bits to specify the OFDM symbol which is the start time of receiving downlink channel and/or downlink reference signal.
  • M is a positive integer larger than or equal to 1.
  • 4-bit OFDM symbol indication information may specify the OFDM symbol which is the start time of receiving downlink channel and/or downlink reference signal. If the value of the OFDM symbol indication information is “0000”, the start time is the second OFDM symbol of the previous subframe of the subframe from which the PDCCH/EPDCCH including the OFDM symbol indication information is received. If the value of the OFDM symbol indication information is “0001”, the start time is the third OFDM symbol of the previous subframe of the subframe from which the PDCCH/EPDCCH including the OFDM symbol indication information is received.
  • the start time is the fourteenth OFDM symbol of the previous subframe of the subframe from which the PDCCH/EPDCCH including the OFDM symbol indication information is received. If the value of the OFDM symbol indication information is “1101”, the start time is the first OFDM symbol of the subframe from which the PDCCH/EPDCCH including the OFDM symbol indication information is received, as shown in Table 6.
  • the start time is the first OFDM symbol of the subframe from which the PDCCH/EPDCCH including the OFDM symbol indication information is received. If the value of the OFDM symbol indication information is “0001”, the start time is the second OFDM symbol of the previous subframe of the subframe from which the PDCCH/EPDCCH including the OFDM symbol indication information is received. If the value of the OFDM symbol indication information is “0010”, the start time is the third OFDM symbol of the previous subframe of the subframe. Likewise, if the value of the OFDM symbol indication information is “1101”, the start time is the fourteenth OFDM symbol of the previous subframe of the subframe, as shown in Table 7.
  • Table 6 shows start time of receiving downlink channel and/or downlink reference signal.
  • OFDM symbol indication information The OFDM symbol to start receiving downlink channel and/or downlink reference signal 0000 the second OFDM symbol of the previous subframe of the subframe from which the OFDM symbol indication information is received 0001 the third OFDM symbol of the previous subframe of the subframe from which the OFDM symbol indication information is received 0010 the fourth OFDM symbol of the previous subframe of the subframe from which the OFDM symbol indication information is received 0011 the fifth OFDM symbol of the previous subframe of the subframe from which the OFDM symbol indication information is received 0100 the sixth OFDM symbol of the previous subframe of the subframe from which the OFDM symbol indication information is received 0101 the seventh OFDM symbol of the previous subframe of the subframe from which the OFDM symbol indication information is received 0110 the eighth OFDM symbol of the previous subframe of the subframe from which the OFDM symbol indication information is received 0111 the ninth OFDM symbol of the previous subframe of the subframe from which the OFDM symbol indication information is received 1000 the tenth OFDM symbol of the previous subframe of the subframe from which the OFDM
  • Table 7 shows start time of receiving downlink channel and/or downlink reference signal.
  • OFDM symbol indication information The OFDM symbol to start receiving downlink channel and/or downlink reference signal 0000 the first OFDM symbol of the subframe from which the OFDM symbol indication information is received 0001 the second OFDM symbol of the previous subframe of the subframe from which the OFDM symbol indication information is received 0010 the third OFDM symbol of the previous subframe of the subframe from which the OFDM symbol indication information is received 0011 the fourth OFDM symbol of the previous subframe of the subframe from which the OFDM symbol indication information is received 0100 the fifth OFDM symbol of the previous subframe of the subframe from which the OFDM symbol indication information is received 0101 the sixth OFDM symbol of the previous subframe of the subframe from which the OFDM symbol indication information is received 0110 the seventh OFDM symbol of the previous subframe of the subframe from which the OFDM symbol indication information is received 0111 the eighth OFDM symbol of the previous subframe of the subframe from which the OFDM symbol indication information is received 1000 the ninth OFDM symbol of the previous subframe of the subframe from which the OFDM symbol indication information is received 100
  • OFDM symbol indication information may inform a UE of an OFDM symbol in a subframe as the start time when the UE may start receiving downlink channel and/or downlink reference signal.
  • the OFDM symbol indication information may be used to determine whether the start time is in the subframe from which the subframe indication information is received or in the previous subframe of the subframe, i.e., some values of the OFDM symbol indication information may indicate the start time is in the subframe from which the OFDM symbol indication information is received, and other values of the OFDM symbol indication information may indicate the start time is in the previous subframe of the subframe.
  • 4-bit OFDM symbol indication information may specify the OFDM symbol which is the start time of receiving downlink channel and/or downlink reference signal. If the value of the subframe indication information is “0000”, the start time is in the first OFDM symbol in the previous subframe of the subframe from which the OFDM symbol indication information is received. If the value of the OFDM symbol indication information is “0001”, the start time is the second OFDM symbol in the previous subframe of the subframe from which the OFDM symbol indication information is received. Likewise, if the value of the OFDM symbol indication information is “1101”, the start time is the fourteenth OFDM symbol in the previous subframe of the subframe from which the OFDM symbol indication information is received. If the value of the OFDM symbol indication information is “1110”, the start time is the first OFDM symbol in the subframe from which the OFDM symbol indication information is received, as shown in Table 8.
  • Table 8 shows start time of receiving downlink channel and/or downlink reference signal.
  • OFDM symbol indication information The OFDM symbol to start receiving downlink channel and/or downlink reference signal 0000 the first OFDM symbol of the previous subframe of the subframe from which the OFDM symbol indication information is received 0001 the second OFDM symbol of the previous subframe of the subframe from which the OFDM symbol indication information is received 0010 the third OFDM symbol of the previous subframe of the subframe from which the OFDM symbol indication information is received 0011 the fourth OFDM symbol of the previous subframe of the subframe from which the OFDM symbol indication information is received 0100 the fifth OFDM symbol of the previous subframe of the subframe from which the OFDM symbol indication information is received 0101 the sixth OFDM symbol of the previous subframe of the subframe from which the OFDM symbol indication information is received 0110 the seventh OFDM symbol of the previous subframe of the subframe from which the OFDM symbol indication information is received 0111 the eighth OFDM symbol of the previous subframe of the subframe from which the OFDM symbol indication information is received 1000 the ninth OFDM symbol of the previous subframe of the subframe from which the OFDM symbol
  • a UE may start receiving PDSCH from a boundary of a downlink subframe or from any time position of a downlink subframe. In the latter situation, the PDSCH may not be received from all of OFDM symbols of a downlink subframe.
  • the number of OFDM symbols that may be used in receiving PDSCH is larger than or equal to N
  • PDSCH in the downlink subframe may be scheduled individually, i.e., the downlink subframe may transmit an individual transmission block.
  • the N may be a positive integer larger than or equal to 1.
  • N the minimum number of OFDM symbols of a DwPTS defined in conventional TDD special subframe configurations that allow PDSCH transmission
  • PDSCH in downlink subframe n may be scheduled by PDCCH/EPDCCH in downlink subframe n+1, or may be scheduled by PDCCH/EPDCCH in downlink subframe n.
  • the PDSCH in downlink subframe n and the PDSCH in downlink subframe n+1 may be scheduled by different PDCCH/EPDCCH, and may transmit different transmission blocks.
  • PDSCH in downlink subframe n and PDSCH in downlink subframe n-1 may be scheduled by different PDCCH/EPDCCH, and may transmit different transmission blocks.
  • PDSCH in the downlink subframe and PDSCH in other downlink subframes may be scheduled collectively by one PDCCH/EPDCCH, i.e., the downlink subframe and the other subframes may collaboratively transmit one transmission block.
  • the N may be a positive integer larger than or equal to 1.
  • the value of N may be determined according to a protocol, or configured by higher layer signaling.
  • N 6 which is the number of OFDM symbols in the DwPTS of TDD special subframe configuration 9.
  • PDSCH in downlink subframe n may be scheduled by PDCCH/EPDCCH in downlink subframe n+1.
  • the PDSCH in downlink subframe n and the PDSCH in downlink subframe n+1 may be scheduled by the same PDCCH/EPDCCH, and may collaboratively transmit one transmission block.
  • PDSCH in downlink subframe n and PDSCH in downlink subframe n-1 may be scheduled by the same PDCCH/EPDCCH, and may collaboratively transmit one transmission block.
  • a UE may start receiving PDSCH from a boundary of a downlink subframe or from any time position in a downlink subframe.
  • a cell operating on an unlicensed band may avoid non-stop transmission, so that other systems may not be seriously affected.
  • the cell operating on an unlicensed band may perform transmission non-continuously, i.e., the cell may perform transmission for a period and stop to perform channel state detection. If the channel is detected to be idle, transmission may be continued; otherwise, the channel state detection may be performed repeatedly and transmission may not be performed until the channel is detected to be idle.
  • the time when an LTE base station starts to occupy a channel may not be at a boundary of a downlink subframe, the time when the LTE base station stops occupying the channel may not be at a boundary of a downlink subframe. Further, the time when an LTE base station starts to occupy a channel may not be at a boundary of an OFDM symbol, and the time when the LTE base station stops occupying the channel may not be at a boundary of an OFDM symbol. In an example, no matter whether the time when an LTE base station starts to occupy a channel is at a boundary of a subframe or an OFDM symbol, a UE may start receiving downlink channel and/or downlink reference signal at a boundary of an OFDM symbol.
  • the time when a UE may start receiving downlink channel and/or downlink reference signal (including a pilot reference signal identifiable by the UE) in the first downlink subframe within a transmission duration of a cell operating on an unlicensed band may be obtained by checking a cell-specific reference signal of the cell, or obtained from indication information.
  • the method of obtaining the start time from the indication information may be implemented according to the following examples.
  • the start position of OFDM symbols to be received by a UE in the first downlink subframe may be the earliest start position of complete OFDM symbols occupied by signals in the first downlink subframe. For example, if a PDCCH/EPDCCH that includes N 1 complete OFDM symbols and a pilot reference signal (e.g., PSS/SSS) that occupies N 2 complete OFDM symbols before the PDCCH/EPDCCH are transmitted in the first downlink subframe, the first OFDM symbol to be received by the UE in the first downlink subframe may be N 1 + N 2 .
  • the base station may specify N 1 + N 2 or the start position of the pilot reference signal via signaling.
  • the base station may specify N 1 + N 2 or the start position of the pilot reference signal via signaling.
  • the base station may specify N 1 or the start position of the PDCCH/EPDCCH via signaling.
  • the base station may transmit a PDCCH/EPDCCH that includes N 1 complete OFDM symbols in the first downlink subframe and some OFDM symbols for occupying the channel before the PDCCH/EPDCCH in the subframe
  • the first OFDM symbol to be received by the UE in the first downlink subframe may be N 1 .
  • the base station may specify N 1 or the start position of the PDCCH/EPDCCH via signaling.
  • the OFDM symbol from which the UE starts to receive downlink channel in the first downlink subframe may be determined according to the number of complete OFDM symbols in the first downlink subframe.
  • the number of OFDM symbols to be received in the first downlink subframe may be smaller than or equal to the number of complete OFDM symbols in the first downlink subframe, and may be the largest one in n3 OFDM symbol numbers in the first downlink subframe. Since there is limited number of elements in the set of PDCCH/PDSCH start positions, the UE may determine a unique start position of the PDCCH/PDSCH according to the start positions of all signals.
  • the start position of OFDM symbols from which a UE may start to receive downlink channel in the first downlink subframe may be the earliest start position of complete OFDM symbols in the downlink channel in the first downlink subframe, e.g., complete OFDM symbols in the PDCCH/EPDCCH/PDSCH. If the start position is specified by signaling sent by a base station, the signaling may specify the number of complete OFDM symbols occupied by PDCCH/EPDCCH/PDSCH or the start time of the PDCCH/EPDCCH/PDSCH, not specifying a pilot signal.
  • the end time of receiving downlink channel and/or downlink reference signal in the last downlink subframe within the duration may be obtained as follows.
  • the start time of receiving downlink subframe and/or downlink reference signal in the first downlink subframe and end time of receiving downlink subframe and/or downlink reference signal in the last downlink subframe within the transmission duration may both fall at a boundary of an OFDM symbol.
  • the UE may continue to receive the remaining of downlink channel and/or downlink reference signal in the last downlink subframe that exceeds the limited maximum transmission duration after the duration of receiving the downlink channel and/or downlink reference signal in the last downlink subframe reaches the limited maximum transmission duration until the end of the last downlink subframe. That is, the last downlink subframe is always a complete subframe.
  • the end time of a UE receiving downlink channel and/or downlink reference signal is the ending boundary of the last OFDM symbol in the last downlink subframe in the transmission duration.
  • the start time of receiving downlink subframe and/or downlink reference signal in the first downlink subframe and end time of receiving downlink subframe and/or downlink reference signal in the last downlink subframe within the transmission duration may be obtained individually.
  • the start time may be determined to be an OFDM symbol in the first subframe according to a detected reference signal transmitted in a cell operating on an unlicensed band or according to indication information.
  • the end time may be determined to be an OFDM symbol in the last subframe according to indication information.
  • the end time of a UE receiving downlink channel and/or downlink reference signal in the last downlink subframe may be calculated using the reception start time of the UE in the first downlink subframe in the transmission duration.
  • a base station may start occupying a channel from a boundary of an OFDM symbol or from within an OFDM symbol, and the transmission duration 1200 may not be an integral multiple of the duration of an OFDM symbol, as shown in FIG. 12.
  • FIG. 12 is a schematic diagram illustrating signal transmission duration of a base station on an unlicensed band.
  • a UE may start receiving downlink channel and/or downlink reference signal from the start of the n'th complete OFDM symbol in the first downlink subframe within the transmission duration 1300, and end the reception at the end of the last complete OFDM symbol in the last downlink subframe within the transmission duration 1300, as shown in FIG. 13.
  • FIG. 13 is a schematic diagram illustrating start time and end time of receiving downlink channel and/or downlink reference signal in accordance with example four of the present disclosure
  • the n' may be a positive integer larger than 1.
  • N' the number of OFDM symbols of the downlink channel and/or downlink reference signal received by the UE in the first downlink subframe within the transmission duration 1400
  • M' the number of OFDM symbols of the downlink channel and/or downlink reference signal received by the UE in the last downlink subframe within the transmission duration 1400
  • FIG. 14 is a schematic diagram illustrating start time and end time of receiving downlink channel and/or downlink reference signal in accordance with example four of the present disclosure
  • N' may be obtained from detected reference symbols sent by the cell operating on the unlicensed band or from indication information (as in the above two methods using signaling).
  • the UE may determine the value of M' according to the following methods, and thus determine the end time of receiving downlink channel and/or downlink reference signal.
  • the transmission duration is t milliseconds
  • t may be a positive integer, i.e., the transmission duration is an integral multiple of the duration of a subframe, e.g., t may be 10 milliseconds.
  • t may be a decimal, i.e., the transmission duration may not be an integral multiple of the duration of a subframe, and may even not be an integral multiple of the duration of an OFDM symbol.
  • Supposing t is an integral multiple of the duration of a subframe
  • M' may be obtained according to the following methods.
  • a relation between M' and N' may be specified by 1-bit signaling. For example, if the value specified by the signaling is “0”, M' may be 14 -N'-(n'-1)-1; if the value specified by the signaling is “1”, M' may be 14 -N'-(n'-1).
  • Method 2 No matter whether the time when an LTE base station starts to occupy the channel is from a boundary of an OFDM symbol in a downlink subframe or not, it may be prudent to regard the start time is not at a boundary of an OFDM symbol in a downlink subframe, i.e., 14 -N'-(n'-1)-1, thus no addition signaling or UE detection is needed.
  • the UE may continue receiving the downlink subframe and/or downlink reference signal in the remaining of the OFDM symbol that exceeds the limited maximum transmission duration in the last downlink subframe within the transmission duration 1500 until the boundary of the OFDM symbol, as shown in FIG. 15.
  • FIG. 15 is a schematic diagram illustrating start time and end time of receiving downlink channel and/or downlink reference signal in accordance with example four of the present disclosure. According to this method, the UE does not need additional signaling, and does not have to perform detection.
  • Method 4 If the M' obtained according to method 1, 2 or 3 is the number of OFDM symbols in DwPTS defined in one of TDD special subframe configurations, the M' of this method is the M' obtained according to method 1, 2 or 3. If the M' obtained according to method 1, 2 or 3 is not the number of OFDM symbols in DwPTS defined in one of TDD special subframe configurations, the M' of this method may be the number of OFDM symbols in DwPTS defined in one of TDD special subframe configurations, and the number of OFDM symbols in DwPTS defined in the TDD special subframe configuration may be smaller than the M' obtained according to method 1, 2 or 3, and is the largest number of OFDM symbols as defined in the TDD special subframe configurations smaller than the M' obtained according to method 1, 2 or 3.
  • the TDD special subframe configurations may be the TDD special subframe configurations 0, 1, 2, 3, 4, 5, 6, 7, 8, 9 as shown in Table 1, or the TDD special subframe configurations 1, 2, 3, 4, 6, 7, 8, 9 as shown in Table 1.
  • M' may be obtained according to the following examples.
  • M' may be specified by 1-bit signaling.
  • the siginal specifies a pre-determined value (e.g., “0”), it indicates the sum of the duration of an incomplete OFDM symbol in the first downlink subframe within the transmission duration and the duration of an incomplete OFDM symbol in the last downlink subframe within the transmission duration may not exceed the duration of an OFDM symbol.
  • the incomplete OFDM symbol refers to the portion within the transmission duration of an OFDM symbol.
  • M' may be determined according to the following methods.
  • the value of M' may be determined according to a pre-determined first relation which associates the value of l and a value of M'. For example, Table 9 may be searched to obtain the value of M'.
  • the L is the duration of an OFDM symbol other than the first OFDM symbol in the each subframe (including the length of CP).
  • l When l is larger than or equal to 0.571875, .
  • l (t-the duration of complete OFDM symbols in the first downlink subframe)mod 1 may be calculated, and the value of M' may always be no matter what is the value of l .
  • Table 9 shows the number of OFDM symbols in the last downlink subframe.
  • the range of l (t-the duration of complete OFDM symbols in the first downlink subframe)mod 1 (milliseconds)
  • the number of OFDM symbols in the last downlink subframe (M') 71.875 ⁇ l ⁇ 143.23 1 143.23 ⁇ l ⁇ 214.58 2 214.58 ⁇ l ⁇ 285.94 3 285.94 ⁇ l ⁇ 357.29 4 357.29 ⁇ l ⁇ 428.65 5 428.65 ⁇ l ⁇ 500 6 500 ⁇ l ⁇ 571.875 7 571.875 ⁇ l ⁇ 643.23 8 643.23 ⁇ l ⁇ 714.58 9 714.58 ⁇ l ⁇ 785.94 10 785.94 ⁇ l ⁇ 857.29 11 857.29 ⁇ l ⁇ 928.65 12 928.65 ⁇ l ⁇ 1000 13 1000 ⁇ l ⁇ 1071.875 14
  • the signal When the signal specifies another pre-determined value (e.g., “1”), it indicates the sum of the duration of an incomplete OFDM symbol in the first downlink subframe within the transmission duration and the duration of an incomplete OFDM symbol in the last downlink subframe within the transmission duration may exceed the duration of an OFDM symbol.
  • the value of M' may be determined according to a pre-determined second relation which associates the value of l and a value of M'. For example, Table 10 may be searched to obtain the value of M'.
  • the L is the duration of an OFDM symbol other than the first OFDM symbol in the each subframe (including the length of CP).
  • l is larger than or equal to 0.571875, .
  • l (t-the duration of complete OFDM symbols in the first downlink subframe)mod 1 may be calculated, and the value of M' may always be no matter what is the value of l .
  • the range of l (t-the duration of complete OFDM symbols in the first downlink subframe)mod 1 (milliseconds)
  • the number of OFDM symbols in the last downlink subframe (M') 71.875 ⁇ l ⁇ 143.23 0 143.23 ⁇ l ⁇ 214.58 1 214.58 ⁇ l ⁇ 285.94 2 285.94 ⁇ l ⁇ 357.29 3 357.29 ⁇ l ⁇ 428.65 4 428.65 ⁇ l ⁇ 500 5 500 ⁇ l ⁇ 571.875 6 571.875 ⁇ l ⁇ 643.23 7 643.23 ⁇ l ⁇ 714.58 8 714.58 ⁇ l ⁇ 785.94 9 785.94 ⁇ l ⁇ 857.29 10 857.29 ⁇ l ⁇ 928.65 11 928.65 ⁇ l ⁇ 1000 12 1000 ⁇ l ⁇ 1071.875 13
  • the value of M' may be obtained from Table 10
  • the value of M' may be obtained by looking up Table 9.
  • the UE may stop receiving downlink channel and/or downlink reference signal in the portion of the last downlink subframe that exceeds the limited maixmum transmission duration within the transmission duration after the limited maixmum transmission duration ends.
  • the UE may keep on receiving downlink channel and/or downlink reference signal in the portion of the last downlink subframe that exceeds the limited maixmum transmission duration within the transmission duration after the limited maixmum transmission duration ends until the end of the OFDM symbol, as shown in FIG. 15. According to this method, the UE does not need additional indication signaling, and does not have to perform detection.
  • Method 4' If the M' obtained according to method 1', 2' or 3' is the number of OFDM symbols in DwPTS defined in one of TDD special subframe configurations, the M' of this method is the M' obtained according to method 1', 2' or 3'.
  • the M' of this method may be the number of OFDM symbols in DwPTS defined in one of TDD special subframe configurations, and the number of OFDM symbols in DwPTS defined in the TDD special subframe configuration may be smaller than the M' obtained according to method 1', 2' or 3', and is the largest number of OFDM symbols as defined in the TDD special subframe configurations that are smaller than the M' obtained according to method 1', 2' or 3'.
  • the TDD special subframe configurations may be the TDD special subframe configurations 0, 1, 2, 3, 4, 5, 6, 7, 8, 9 as shown in Table 1, or the TDD special subframe configurations 1, 2, 3, 4, 6, 7, 8, 9 as shown in Table 1.
  • the (the duration of complete OFDM symbols in the first downlink subframe +t') is the maximum duration of complete OFDM symbols for transmitting signals by the base station within the first downlink subframe, and may be the maximum duration that may be occupied by the complete OFDM symbols.
  • the signals transmitted by the base station may be all of signals transmitted by the base station within the first downlink subframe after clear channel assessment (CCA), including at least one of PDSCH, PDCCH, EPDCCH, reference signal, UE-identifiable pilot reference signal (e.g., PSS/SSS/CRS/CSI-RS/PRS or other pilot reference signal), UE-unidentifiable pilot downlink signals and newly defined control channels (e.g., control channels that are transmitted together with the pilot reference signal).
  • t' may be configured by higher layer signaling, or defined in a protocol, or may be obtained using the number of complete OFDM symbols for transmitting downlink data in the first downlink subframe.
  • the downlink data may include at least one of PDSCH, PDCCH, EPDCCH, reference signals, UE-identifiable pilot reference signals and newly defined control channels.
  • I 1 and I 2 are both the start position of a complete OFDM symbol.
  • I 1 may be an element in the set ⁇ of start positions which is predefined or configured by higher layer signaling.
  • the set may include one or plural elements.
  • the I 1 may be directly detected, and then I 2 may be determined according to transmitted signals. There may be two situations when determining I 2 .
  • I 1 and I 2 are both elements in the set ⁇ , and are adjacent elements in ⁇ , I 2 is a preceding element of I 1 in time.
  • a base station does not have to transmit UE-identifiable functions for synchronization or preparations for PDSCH/PDCCH/EPDCCH reception before transmitting PDSCH/PDCCH/EPDCCH. But the base station may decide whether to transmit a pilot signal for occupying the channel according to the time when the channel is occupied.
  • the pilot signal for occupying the channel may have other functions, nor restricted that whether the UE is capable of idenfying the signal.
  • the base station may directly transmit PDSCH/PDCCH/EPDCCH from the boundary of the OFDM symbol without transmitting any other signals before transmitting PDSCH/PDCCH/EPDCCH.
  • the baes station may transmit a pilot signal to occupy the channel until an OFDM symbol position corresponding to the closest element in the set ⁇ , and then start to transmit PDSCH/PDCCH/EPDCCH.
  • the pilot signal may be UE-identifiable or not UE-identifiable.
  • PDSCH have n 2 possible start positions within the first downlink subframe, i.e., the 0'th, 4 th , 8 th , 12 th OFDM symbol, the start position set ⁇ may be I 1 and I 2 may be 0 and 12, or 4 and 0, or 8 and 4, or 12 and 8.
  • FIG. 16 is a schematic diagram illustrating positions of I 1 and I 2 in situation (1) in accordance with example four of the present disclosure.
  • the start position of PDCCH in the first downlink subframe may be fixed at the last OFDM symbol 1600.
  • a base station may occupy the channel at the middle 1605 of the 2 nd OFDM symbol and start to transmit signal, and start transmitting PDSCH from the 4 th OFDM symbol 1610.
  • I 1 ' may be first determined, I 1 ' is an element adjacent to I 1 in ⁇ , and I 1 ' is a preceding element of I 1 in time.
  • the Lp is a positive integer.
  • the length Lp of the pilot reference signal is known to UE, e.g., Lp may be pre-determined or configured by higher layer signaling or defined in a pre-defined rule.
  • the pilot reference signal is identifiable by UEs.
  • the start position set ⁇ of PDSCH in the first downlink subframe is The base station may start transmitting signals on OFDM symbols subsequent to I 2 .
  • FIG. 17 is a schematic diagram illustrating positions of I 1 and I 2 in situation (2) in accordance with example four of the present disclosure.
  • the base station may occupy the channel and start transmitting signal from the middle of the OFDM symbol #6, and send a pilot signal occupying 4 OFDM symbols from the OFDM symbols #7 ⁇ #10, and start transmitting PDSCH/PDCCH/EPDCCH from the OFDM symbol #11. It can be seen that the I 2 obtained in the two situations are identical.
  • the method of determining “the duration of complete OFDM symbols for transmitting data in the first downlink subframe” may include: a UE may determine the earliest start time of transmitted data channel and/or control channel in the first downlink subframe by blind detection or by receiving explicit signaling, determine the number of complete OFDM symbols from the start time to the end of the first downlink subframe, and calculate “the duration of complete OFDM symbols for transmitting data in the first downlink subframe”. For example, if PDSCH and PDCCH/EPDCCH have the same start position in the first downlink subframe, the number of complete OFDM symbols from the start time to the end of the first downlink subframe may be determined according to either start position. In another example, as shown in FIG.
  • the number of complete OFDM symbols from the start position of PDCCH/EPDCCH to the end of the first downlink subframe may be determined according to the start position of transmission of PDCCH/EPDCCH in the first downlink subframe.
  • FIG. 18 is a schematic diagram illustrating the start position of PDCCH/EPDCCH and PDSCH in the first downlink subframe in accordance with example four of the present disclosure.
  • the number of complete OFDM symbols from the start position of PDCCH/EPDCCH to the end of the first downlink subframe may be determined according to the start position of transmission of PDSCH in the first downlink subframe.
  • the start position may be determined through UE blind detection of a control channel, e.g., PDCCH/EPDCCH.
  • a UE may perform blind detection of PDCCH/EPDCCH according to n 1 pre-defined or semi-statically configured possible start positions of PDCCH/EPDCCH in the first downlink subframe to determine the start position of PDCCH/EPDCCH, and then determine the start position of PDSCH in the first downlink subframe according to the start position of the PDCCH/EPDCCH.
  • the n 1 may be an integer larger than 1, e.g., 2 or 4.
  • the number of possible start positions of PDSCH in the first downlink subframe may be n 2 .
  • the n 2 may be a positive integer.
  • the n 2 may be a number irrelevant to n 1 .
  • the n 2 may be pre-defined or semi-statically configured.
  • the number of possible start positions of PDCCH/EPDCCH in the first downlink subframe may be different from the number of possible start positions of PDSCH in the first downlink subframe.
  • the number of possible start positions of PDCCH/EPDCCH in the first downlink subframe may be not in a one-to-one relationship with the number of possible start positions of PDSCH in the first downlink subframe.
  • the number of possible start positions of PDCCH/EPDCCH in the first downlink subframe may be 2, one may be the OFDM symbol #0 in the first downlink subframe, and the other may be the OFDM symbol #7 in the first downlink subframe.
  • the four possible start positions may be the OFDM symbol #1, the OFDM symbol #4, the OFDM symbol #8 and the OFDM symbol #12 in the first downlink subframe.
  • the PDCCH/EPDCCH may explicitly specify which one of the 4 possible start positions is the start position of the PDSCH.
  • the UE may detect PDCCH/EPDCCH at the OFDM symbol #0 and the OFDM symbol #7. If the UE detect PDCCH at the OFDM symbol #7, the UE may obtain the start position specified by the PDCCH/EPDCCH.
  • FIG. 19 is a schematic diagram illustrating a start position of PDCCH and PDSCH in the first downlink subframe in accordance with example four of the present disclosure.
  • the start position 1900 of PDCCH detected by the UE is the OFDM symbol #7
  • the start position of the PDSCH specified by the PDCCH is the OFDM symbol #4.
  • the number of complete OFDM symbols from the start position I 1 to the end of the first downlink subframe is 10.
  • the duration of complete OFDM symbols in the first downlink subframe is 714us.
  • EPDCCH and PDSCH may have the same number of start positions, and have the same start position.
  • PDCCH may have the same number of start positions with PDSCH, and the start position of PDSCH is adjacent to the start position of PDCCH.
  • supposing PDCCH has 4 possible start positions, e.g., OFDM symbols #0, #4, #7, #11, possible start positions of PDSCH may be OFDM symbols #1, #5, #8 and #12.
  • PDCCH/EPDCCH does not have to explicitly specify the start position of PDSCH.
  • a UE may perform detection of PDCCH at the 4 possible start positions, and determine the start position of PDSCH according to detected start position of the PDCCH.
  • the start position of PDCCH in the first downlink subframe is prior to the start position of the PDSCH, the number of complete OFDM symbols from the start position to the end of the first downlink subframe may be determined according to the start position of the PDCCH.
  • FIG. 20 is a schematic diagram illustrating the start position of EPDCCH and PDSCH in the first downlink subframe in accordance with example four of the present disclosure.
  • the number of complete OFDM symbols from the start position I 1 to the end of the first downlink subframe is 14.
  • the duration of complete OFDM symbols for transmitting data in the first downlink subframe is 1ms.
  • the UE blind detection may be determined by detecting a pre-defined reference signal. For example, if the OFDM symbol at the start position of PDCCH/EPDCCH and PDSCH includes a pre-defined reference signal, a UE may perform detection of the reference signal at n 1 possible start positions of PDCCH/EPDCCH or n 2 possible start positions of PDSCH to determine the earliest start position of transmitted data channel and/or control channel in the first downlink subframe.
  • the UE blind detection may be determined by detecting a pre-defined reference signal and a pre-defined control channel.
  • the earliest start position of transmitted data channel and/or control channel in the first downlink subframe may be determined by using the method of detecting PDCCH/EPDCCH according to n 1 possible start positions of the PDCCH/EPDCCH and the method of detecting PDSCH according to n 2 possible start positions of the PDSCH.
  • the UE may determine the start position by receiving explicit signaling. For example, (1) the possible start position of PDCCH may be fixed at the last OFDM symbol in the first downlink subframe, and PDSCH may have n 2 possible start positions in the first downlink subframe. PDCCH may explicitly specify one of the n 2 possible start positions of PDSCH. (2) PDCCH/EPDCCH may be transmitted in the next complete subframe immediately adjacent to the first downlink subframe. The method of transmitting the PDCCH/EPDCCH may be the same with a conventional method, but the PDCCH/EPDCCH may include information specifying the start position of the PDSCH in the first downlink subframe.
  • the control signaling may be cell-specific signaling, or UE-specific signaling, or Group-specific signaling.
  • the above provides a method of a UE determining the earliest start position of downlink transmission of data channel and/or control channel and calculating the duration of complete OFDM symbols for transmitting data in the first downlink subframe.
  • the base station may start transmitting other signals, e.g., signals for occupying the channel, before the start position.
  • the duration of the signals may be an integral multiple or a decimal multiple of the duration of an OFDM symbol.
  • the signals may be unknown to the UE, e.g., generation of signals for occupying the channel may be related to design of the base station, and the UE does not know the format of the signals, e.g., sequences.
  • the signals may be indefinite, and the UE may interprete some of the signals.
  • the signals may include signals whose format is unknown to the UE and reference signals identifiable by the UE, e.g., PSS/SSS or CRS.
  • the UE may calculate the duration of complete OFDM symbols for transmitting data in the first downlink subframe according to the earliest start position of the downlink transmission of data channel and/or control channel, and not including the duration of the signals transmitted before the downlink transmission of the data channel and/or control channel into the duration of complete OFDM symbols for transmitting data in the first downlink subframe.
  • the duration of complete OFDM symbols for actually transmitting data in the first downlink subframe may be taken into consideration in calculation of the duration of complete OFDM symbols for actual data transmission in the first downlink subframe.
  • the t' may be obtained according to a method other than using the number of complete OFDM symbols for downlink data transmission in the first downlink subframe.
  • the t' may be determined using a start position I 3 of a pre-determined reference signal detected by the UE in the first downlink subframe and a possible start position I 2 ' of adjacent data channel and/or control channel transmitted earlier than I 3 in the first downlink subframe.
  • the time variable t' may be obtained.
  • t_sym' I 3 -I 2 '.
  • the I 3 and I 2 ' are both a start position of a complete OFDM symbol.
  • the I 2 ' is an element of a set ⁇ of start positions pre-defined or configured by higher layer signaling.
  • the I 2 ' is an element closest to I 3 and is earlier than I 3 in the set ⁇ .
  • a base station has to transmit a pilot reference signal (e.g., PSS/SSS) having a fixed length, e.g., one OFDM symbol, before transmitting PDCCH/EPDCCH and/or PDSCH in the first downlink subframe, and the PDCCH/EPDCCH and/or the PDSCH have n 2 possible start positions in the first downlink subframe, and the start position set ⁇ is
  • the I 3 has an offset of 1 OFDM symbol against each element in the set, i.e., a set corresponding to I 3 is ⁇ 13,3,7,11 ⁇ .
  • I 3 and I 2 ' may be 13 and 12, or 3 and 0, or 7 and 4, or 11 and 8.
  • FIG. 21 is a schematic diagram illustrating a start position of PDCCH/EPDCCH and PDSCH in the first downlink subframe in accordance with example four of the present disclosure.
  • the UE may determine the start position of PDSCH/PDCCH/EPDCCH according to the detected start position of the pilot reference signal and the minimum length Lp.
  • a pilot reference signal occupying an integral multiple of OFDM symbols is a UE-identifiable reference signal, and a pilot reference signal not occupying an integral multiple of OFDM symbols may be unidentifiable by the UE.
  • the method which uses the number of complete OFDM symbols for transmitting downlink data in the first downlink subframe may be as follows.
  • a UE may determine the start position of a pilot reference signal that is UE-identifiable in the first downlink subframe through blind detection or from received explict signaling, and determine the number of complete OFDM symbols from the start position to the end of the first downlink subframe, thus obtain the duration of the complete OFDM symbols for transmitting data in the first downlink subframe.
  • the start position may be obtained in the same manner. For example, the UE may perform blind detection of identifiable pilot signals.
  • the base station may transmit PDSCH or EPDCCH/PDCCH at the next OFDM symbol adjacent to the reference signal.
  • the Lp may be a pre-defined value, or may be determined according to a pre-determined rule, or may be configured semi-statically.
  • the base station may transmit a reference signal (e.g., PSS/SSS/CRS) occupying X complete OFDM symbols to assist the UE in synchronization detection, the base station may transmit PDSCH or EPDCCH/PDCCH at the next OFDM symbol adjacent to the reference signal.
  • the X may be known to the UE.
  • the X may be a pre-defined value, or may be determined according to a pre-determined rule, or may be configured in a semi-static manner.
  • the UE may attempt to detect the reference signal occupying X complete OFDM symbols at the limited number of possible start positions.
  • FIG. 22 is a schematic diagram illustrating the start positions of PDCCH/EPDCCH and PDSCH in the first downlink subframe in accordance with example four of the present disclosure.
  • the UE may receive explicit signaling which indicates the start position or the symbol length of the UE-identifiable pilot reference signal, as described above.
  • the UE may also receive explicit signaling which indicates the earliest start position or signal length of all of signals transmitted by the base station.
  • the base station may transmit a pilot signal starting from the middle of OFDM symbol #1, and transmit PDSCH starting from OFDM #4.
  • the base station may inform the UE that the earliest start position of all signals is OFDM symbol #0, or inform the UE that the length of all of signals transmitted in the first downlink subframe is 14 OFDM symbols.
  • the signaling may specify the start position of all complete OFDM symbols.
  • the base station may start transmitting pilot signal from the middle of OFDM symbol #1, and start transmitting PDSCH from OFDM symbol #4.
  • the above provides a method of a UE determining the start position of a UE-identifiable pilot reference signal transmitted before data channel and/or control channel and calculating the duration of complete OFDM symbols for transmitting data in the first downlink subframe. Since the base station may start transmitting other signals, e.g., signals for occupying the channel, before the start position.
  • the duration of the signals may be an integral multiple or a decimal multiple of the duration of an OFDM symbol.
  • the “other signals” are unidentifiable by the UE, but the UE may perform other operations using the “other signals”, e.g, adjusting AGC.
  • the duration of UE-identifiable downlink pilot reference signal and downlink channel (PDSCH/PDCCH/EPDCCH) but also the maximum possible duration (denoted by t') of the signals transmitted before the US-identifiable signals may be taken into consideration in calculation of the duration of OFDM symbols occupied by data actually transmitted by the base station in the first downlink subframe.
  • the t' may be configured by higher layer or defined in a protocol.
  • the value configured by higher layer or defined in a protocol may also have the time difference between the start position of the UE-detectable portion of the signals and the start position of signals transmitted by the base station after channel occupancy taken into consideration, so that the (duration of complete OFDM symbols for transmitting data in the first downlink subframe + t') may reflect the actual duration of all signals transmitted by the base station in the first downlink subframe.
  • other factors may also be taken into consideration for the value configured by higher layer or defined in a protocol, e.g., system complexity, or the like, such that the value of t' may be determined.
  • the last subframe allows transmission of signals having a length of 0.286ms. Since a base station can only transmit signals in complete OFDM symbols, the time length in the last subframe is 4 OFDM symbols.
  • the number of OFDM symbols may be obtained using l according to the method of methods 1', 2', 3' or 4', e.g., , or according to other methods.
  • the system may support transmitting a limited number of OFDM symbols in the last incomplete subframe, e.g., only supporting conventional DwPTS configurations or only supporting situations passing a pre-determined threshold, or supporting situations which satisfy a pre-determined set.
  • the value of M' may be any value among 1 ⁇ Nsym OFDM symbols.
  • the UE may determine the end position of the OFDM symbol according to the value of l or M', i.e., comparing elements in a set ⁇ of end positions of OFDM symbols in the last incomplete subframe with M', and determining to transmit no signal in the last subframe if the minimum value of elements in the set ⁇ is larger than M'. If there is an element smaller than M' in the set ⁇ , an element which is smaller than or equal to M' and is closest to M' may be selected as the end position of OFDM symbols in the last incomplete subframe.
  • the signals transmitted in the last subframe may occupy 4 OFDM symbols, i.e., OFDM symbols #0 ⁇ #3.
  • the set ⁇ of end positions of OFDM symbols in the last incomplete subframe is ⁇ 6,9,12 ⁇ , and there is no element in the set that is not larger than M', a determination may be made that no signal is transmitted in the last subframe.
  • the system may support joint coding of OFDM symbols in the last incomplete subframe with the previous subframe to form a complete transmission block.
  • the UE may determine the end position of an OFDM symbol using the value of l or M', and perform demodulation using OFDM symbols in the previous subframe according to a scheduling indication.
  • the duration of signal transmission on an unlicensed band may be specified by physical layer signaling, e.g., cell-specific control signal may specify the burst transmission duration of this time, or may be specified by higher layer signaling, e.g., the maximum channel occupancy parameter q signaling may specify the maximum value of the burst transmission duration of this time (i.e., the limited maximum transmission duration), or may be specified in a pre-determined manner.
  • Example five provides a method of signal reception at a UE when the burst transmission duration is specified by a physical layer indication.
  • a UE may start receiving PDSCH from a boundary of a downlink subframe or from any time position in a downlink subframe.
  • a cell operating on an unlicensed band may avoid non-stop transmission, so that other systems may not be seriously affected.
  • the cell operating on an unlicensed band may perform transmission non-continuously, i.e., the cell may perform transmission for a period and stop to perform channel state detection. If the channel is detected to be idle, transmission may be continued; otherwise, the channel state detection may be performed repeatedly and transmission may not be performed until the channel is detected to be idle.
  • the burst transmission duration of an LTE base station may equal the limited maximum transmission duration, or may be a duration shorter than the limited maximum transmission duration according to a scheduling policy, e.g., there is no traffic at that moment, or in order to better co-exist with other devices working on the unlicensed band.
  • the time when an LTE base station starts to occupy a channel may not be at a boundary of a downlink subframe, the time when the LTE base station stops occupying the channel may not be at a boundary of a downlink subframe. Further, the time when an LTE base station starts to occupy a channel may not be at a boundary of an OFDM symbol, and the time when the LTE base station stops occupying the channel may not be at a boundary of an OFDM symbol. In an example, no matter whether the time when an LTE base station starts to occupy a channel is at a boundary of a subframe or an OFDM symbol, a UE may start receiving downlink channel and/or downlink reference signal at a boundary of an OFDM symbol.
  • a base station may transmit a burst transmission duration indication or a start position indication to a UE to enable the UE to quickly determine the end time of the burst transmission duration. Accordingly, this example provides a method of a UE determining an ending OFDM symbol of downlink channel and/or downlink reference signal in a subframe within a burst transmission duration. Two methods are provided as follows.
  • a first method may be as shown in FIG. 23, and may include the following procedures.
  • FIG. 23 is a flowchart illustrating method one in accordance with example five of the present disclosure.
  • a UE may receive a length indication of a burst transmission duration.
  • the length indication of the burst transmission duration may specify the number of subframes occupied by a burst transmission, denoted by N_s1.
  • the length of the burst transmission specified by the signaling is within the limited maximum transmission duration defined in standards.
  • the standards may regulate the maximum transmission duration of a burst transmission is (13/32)*q ms, and the q is an integer within the range of 4 ⁇ 32. Supposing q is 8, the maximum transmission duration may be 3.25(13/4)ms.
  • the duration of actual transmission of the base station may be any value smaller than or equal to the maximum transmission duration.
  • the signaling may use 2 bits for specifying the burst transmission may occupy 1, 2, 3 or 4 subframes. The number of subframes specified by the signaling only indicates the number of subframes occupied, not indicates the base station occupies all of OFDM symbols in the subframes.
  • the length indication of the burst transmission duration may be implemented in the following methods. Other methods may also be used as long as the same effects can be achieved.
  • some subframes may have a portion of OFDM symbols occupied, and other subframes may have all of OFDM symbols occupied.
  • subframes having a portion of OFDM symbols occupied are referred to as partial subframes.
  • a partial subframe may be a subframe from which the burst transmission starts, or a subframe at which the burst transmission ends.
  • Subframes having all of OFDM symbols occupied are referred to as normal subframes.
  • a normal subframe may be a subframe from which the burst transmission starts, or a subframe at which the burst transmission ends, or a subframe between the starting subframe and the ending subframe.
  • the base station may start burst transmission from the 8 th OFDM symbol of subframe #n to subframe #n+2.
  • the subframe #n is a partial subframe
  • subframes #n+1 and #n+2 are normal subframes.
  • n 1 n
  • FIG. 24 is a schematic diagram illustrating duration time in accordance with example five of the present disclosure.
  • burst transmission starts from the 8 th OFDM symbol of subframe #n to the 10 th OFDM symbol of subframe #n+3.
  • FIG. 25 is a schematic diagram illustrating duration time in accordance with example five of the present disclosure.
  • the subframes #n and #n+3 are partial subframes, and subframes #n+1 and #n+2 are normal subframes.
  • Method two the number of subframes specified by the signaling is the result of processing the actual duration of the burst transmission by rounding down a decimal fraction smaller than 0.5 or rounding up a decimal fraction larger than or equal to 0.5.
  • FIG. 26 is a schematic diagram illustrating duration time in accordance with example five of the present disclosure.
  • FIG. 27 is a schematic diagram illustrating duration time in accordance with example five of the present disclosure.
  • information that the indicated duration of the burst transmission equals the maximum transmission time may be indicated by pre-defined bit values, not by specifying the number of subframes of the maximum transmission time.
  • pre-determined bit value “00” or “11” may be used to denote the duration of the burst transmission equals the maximum transmission time.
  • the UE may compare the limited maximum transmission duration with a duration of burst transmission determined using received signaling specifying the burst transmission duration. If the specified duration of the burst transmission is smaller than the maximum transmission time, procedures in block 2303 may be performed. If the specified duration of the burst transmission equals the maximum transmission time, procedures in block 23042 may be performed.
  • the UE may determine the duration of the burst transmission according to the signal specifying the duration of the burst transmission using the methods listed in block 2301 or using other proper methods. Then the UE may determine the relation between the limited maximum transmission duration and the duration of burst transmission according to the received signaling specifying the burst transmission duration. For example, the UE may compare the number of subframes corresponding to the limited maximum transmission duration with the number of subframes specified by the burst transmission duration indication signaling. In another example, the UE may determine the position of the end subframe according to the number of remaining subframes specified by the received burst transmission duration indication signaling, and compare the position of the end subframe with the end subframe determined using the limited maximum transmission duration. The relation may also be determined using other methods, and the method is not limited in the present disclosure.
  • the UE may assume all of subframes for the burst transmission other than the start subframe are complete subframes, i.e., all of OFDM symbols in each of the subframes are occupied. That is, the ending subframe is a complete subframe, and the end OFDM symbol is the last OFDM symbol of the subframe. Whether the start subframe is a complete subframe may be specified explicitly or inexplicitly, as in other examples of the present disclosure, thus is not elaborated herein.
  • the UE may receive downlink signals according to the above assumptions.
  • the UE may assume all of subframes for the burst transmission other than the start subframe and the end subframe are complete subframes, i.e., all of OFDM symbols in each of the subframes are occupied.
  • the end subframe may be a partial subframe, and the number of OFDM symbols actually occupied or the end OFDM symbol of the burst transmission may be determined using the possible first OFDM symbol in the start subframe and the limited maximum transmission duration. The method may be as in example four, thus is not repeated herein.
  • the UE may receive downlink signals according to the above assumptions.
  • the UE may determine the possible end position is the last OFDM symbol within the maximum transmission duration.
  • the actual burst transmission duration is approximately equal to the maximum transmission duration, and the situation may be processed according to “the specified burst transmission duration equals the maximum transmission duration”.
  • the procedure in block 2303 is performed.
  • the UE may assume all of subframes for the burst transmission other than the start subframe are complete subframes, i.e., intermediate subframes and the end subframe are all complete subframes, and the end position of the downlink channel/signal is the boundary of the subframe.
  • the maximum transmission duration is 3.25 ms
  • the base station may start transmission from the 8 th OFDM symbol of subframe #n.
  • the number of subframes determined using the maximum transmission duration is , i.e., the maximum transmission duration of the base station may be from the 8 th OFDM symbol of subframe #n to the 10 th OFDM symbol of subframe #n+3.
  • N_s1 ⁇ N_s indicates the burst transmission of the base station of this time occupies 3 subframes, i.e., the transmission starts from the 8 th OFDM symbol of subframe #n to the last OFDM symbol of subframe #n+2, as shown in FIG. 1.
  • Subframes #n+1 and #n+2 are both complete subframes, i.e., all of OFDM symbols in the subframes are occupied.
  • Subframe #n is a partial subframe.
  • the procedure in block 2304 may be performed.
  • the UE may assume the end position of downlink channel/signal in the last subframe determined by the number of subframes specified by the signaling is determined by the method of example four of the present disclosure, and the end position of downlink channel/signal in an intermediate subframe determined by the number of subframes specified by the signaling is a boundary of the intermediate subframe.
  • the maximum transmission duration is 3.25 ms
  • the base station may start transmission from the 8 th OFDM symbol of subframe #n.
  • the maximum transmission duration of the base station may start from the 8 th OFDM symbol of subframe #n to the 10 th OFDM symbol of subframe #n+3.
  • the UE determine the burst transmission of the base station is approximately equal to the maximum transmission duration according to the burst transmission duration indication signaling.
  • the UE may determine subframes #n+1 and #n+2 are both complete subframes, and subframes #n and #n+3 are partial subframes.
  • subframe #n+3 the end position of downlink channel/signal may be determined using the possible start position in subframe #n and maximum transmission duration. The method may be as in example four, thus is not repeated herein.
  • FIG. 28 is a schematic diagram illustrating multiple indications received in accordance with example five of the present disclosure
  • the last X OFDM symbols in the subframe may be reserved for uplink transmission, e.g., uplink/downlink guard period, or time for uplink CCA.
  • the number of reserved OFDM symbols X may be pre-defined, or may be configured by higher layer signaling.
  • the UE may assume all of subframes for the burst transmission other than the start subframe and the end subframe are complete subframes, i.e., all of OFDM symbols in each of the subframes are occupied. Whether the start subframe is a complete subframe may be specified explicitly or inexplicitly.
  • the UE may receive downlink signals according to the above assumptions.
  • the number of reserved OFDM symbol X 4.
  • the maximum transmission duration is 3.25 ms, and the base station may start transmission from the 8 th OFDM symbol of subframe #n.
  • the number of subframes determined using the maximum transmission duration is , i.e., the maximum transmission duration of the base station may be from the 8 th OFDM symbol of subframe #n to the 10 th OFDM symbol of subframe #n+3.
  • FIG. 29 is a schematic diagram illustrating received signaling indicating whether a subframe is the last subframe in accordance with example five of the present disclosure. As shown in FIG. 29. Subframes #n+1 is a complete subframe, i.e., all of OFDM symbols in the subframes are occupied. Subframes #n and #n+2 are partial subframes.
  • the UE may assume all of subframes for the burst transmission other than the start subframe and the end subframe are complete subframes, i.e., all of OFDM symbols in each of the subframes are occupied.
  • the end subframe may be an incomplete subframe, and the possible position of OFDM symbl or the end OFDM symbol of the burst transmission may be determined by the possible position of the first OFDM symbol in the start subframe and the maximum transmission duration and the number of reserved OFDM symbols X, i.e., min(Y-X,Y1).
  • Y1 may be the number of OFDM symbols determined by the possible position of the first OFDM symbol in the start subframe and the maximum transmission duration or by the end OFDM symbol of the burst transmission.
  • the method may be as in example four, thus is not repeated herein.
  • the UE may receive downlink signals according to the above assumptions.
  • the number of reserved OFDM symbol X 2.
  • the maximum transmission duration is 3.25 ms, and the base station may start transmission from the 8 th OFDM symbol of subframe #n.
  • the maximum transmission duration of the base station may start from the 8 th OFDM symbol of subframe #n to the 10 th OFDM symbol of subframe #n+3.
  • FIG. 30 is a schematic diagram illustrating received signaling indicating whether a subframe is the last subframe in accordance with example five of the present disclosure.
  • FIG. 31 is a schematic diagram illustrating received signaling indicating whether a subframe is the last subframe in accordance with example five of the present disclosure.
  • the UE determine the burst transmission of the base station is approximately equal to the maximum transmission duration according to the burst transmission duration indication signaling.
  • the UE may determine subframes #n+1 and #n+2 are both complete subframes, and subframes #n and #n+3 are partial subframes.
  • the end position of downlink channel/signal may be determined using the possible start position in subframe #n and the maximum transmission duration and the number of reserved OFDM symbol X, i.e., min(Y-X,Y1).
  • Supposing the UE may obtain information that the base station has occupied the channel and performed downlink transmission through a certain method but the UE does not receive burst transmission duration indication signaling, the UE may determine whether the current subframe of the burst transmission is a complete subframe or a partial subframe using the maximum transmission duration before receiving the signaling indicating the burst transmission ends (e.g., UL subframe start indication). That is, the UE may assume all of subframes for the burst transmission other than the start subframe and the end subframe are complete subframes, i.e., all of OFDM symbols in each of the subframes are occupied.
  • the end subframe may be a partial subframe. If the end subframe is a partial subframe, the end position of downlink channel/signal may be determined using the method of example four.
  • the indication signaling sent by the base station may specify whether subframe n is the end subframe of the current burst transmission.
  • the subframe n may be the subframe from which the indication signaling is received or the next subframe of the subframe.
  • the indication signaling may use 1 bit to specify whether the current subframe or the next subframe is the end subframe of the current burst transmission.
  • the indication signaling may be transmitted in PDCCH in the same subframe, or the EPDCCH in the current subframe may specify the next subframe.
  • the indication signaling may also indicate which subframe is the end subframe of the current burst transmission.
  • the indication signaling may be transmitted in a subframe of the burst transmission which may be the start subframe or another subframe of the burst transmission.
  • the subframe may specify a number of subframes between the subframe and the subsequent end subframe of the current burst transmission.
  • the indication signaling may use more than 1 bit to specify whether the current subframe or the next subframe is the end subframe of the current burst transmission. If the indication signaling specifies the end subframe, the indication signaling may also specify the position of the end OFDM symbol. This example discusses a situation where the indication signaling specifies information of a subframe.
  • a UE may receive an indication specifying an end subframe of a burst transmission.
  • the indication specifying the end subframe may specify the position of the end subframe of the current burst transmission.
  • the UE may judge whether subframe n is the end subframe. If subframe n is the end subframe, the procedure in block 203-1 or 203-1a may be performed; otherwise, the procedure in block 203-2 or 203-2a may be performed.
  • the start subframe m and end subframe n of the current burst transmission may be incomplete subframes.
  • Subframes m+1,...n-1 may be complete subframes.
  • the position of the end OFDM symbol in the end subframe n may be determined according to the procedure in block 2304.
  • the UE may receive downlink signals according to the above assumptions.
  • the start subframe m of the current burst transmission may be an incomplete subframe.
  • Subframes m+1,...n may be complete subframes.
  • the UE may receive downlink signals according to the above assumptions.
  • the start subframe m and end subframe n of the current burst transmission may be incomplete subframes.
  • Subframes m+1,...n-1 may be complete subframes.
  • the position of the end OFDM symbol in the end subframe n may be determined according to the procedure in block 2304.
  • the UE may receive downlink signals according to the above assumptions.
  • the start subframe m and end subframe n of the current burst transmission may be incomplete subframes.
  • Subframes m+1,...n-1 may be complete subframes.
  • the position of the end OFDM symbol in the end subframe n may be determined according to the procedure in block 2303.
  • the UE may receive downlink signals according to the above assumptions.
  • Supposing the UE may obtain information that the base station has occupied the channel and performed downlink transmission through a certain method but the UE does not receive end subframe indication signaling, the UE may determine whether the current subframe of the burst transmission is a complete subframe or a partial subframe using the maximum transmission duration before receiving the signaling indicating the burst transmission ends (e.g., UL subframe indication). That is, the UE may assume all of subframes for the burst transmission other than the start subframe and the end subframe are complete subframes, i.e., all of OFDM symbols in each of the subframes are occupied.
  • the end subframe may be a partial subframe. If the end subframe is a partial subframe, the end position of downlink channel/signal may be determined using the method of example four.
  • a base station may transmit burst transmission indication signaling, but does not limit the method through which the base station transmits the burst transmission indication signaling.
  • the indication signaling may be transmitted in any subframe, e.g., the first subframe of the burst transmission, or the first complete subframe of the burst transmission.
  • the indication signaling may be any signaling, e.g., cell public signaling, or UE-specific signaling.
  • the indication signaling may be specified by a single DCI or by an additional bit in the conventional DCI.
  • the above is a method of receiving downlink channel and/or downlink reference signal in accordance with an example of the present disclosure;
  • the present disclosure also provides an apparatus of receiving downlink channel and/or downlink reference signal.
  • the apparatus may implement the above methods.
  • FIG. 32 is a schematic diagram illustrating the overall structure of the apparatus.
  • the apparatus may include: a control information receiving unit 3200 and a data and reference signal receiving unit 3205.
  • the control information receiving unit 3200 may receive control information of a cell operating on an unlicensed band.
  • the data and reference signal receiving unit 3205 may receive downlink channel and/or downlink reference signal in the cell operating on the unlicensed band according to the control information.
  • Various embodiments of the present disclosure may be embodied as computer readable codes on a computer readable recording medium.
  • the computer readable recording medium is any data storage device that can store data, which can be thereafter read by a computer system. Examples of the computer readable recording medium include ROM, RAM, Compact Disc (CD)-ROMs, magnetic tapes, floppy disks, optical data storage devices, carrier waves, and data transmission through the Internet.
  • the computer readable recording medium can also be distributed over network coupled computer systems so that the computer readable code is stored and executed in a distributed fashion. Also, functional programs, codes, and code segments for accomplishing embodiments of the present disclosure can be easily construed by programmers skilled in the art to which the present disclosure pertains.
  • Various embodiments of the present disclosure can be implemented in hardware or a combination of hardware and software.
  • the software can be recorded to a volatile or non-volatile storage device, such as a ROM irrespective of deletable or re-recordable, to a memory such as a RAM, a memory chip, a memory device, or an integrated circuit, or to a storage medium that is optically or magnetically recordable and readable by a machine (e.g. a computer), such as a CD, a Digital Versatile Disc (DVD), a magnetic disk, or a magnetic tape.
  • the storage is an example of a machine-readable storage medium suitable for storing a program or programs including instructions to implement the embodiments of the present disclosure.
  • the present disclosure includes a program including a code for implementing the apparatus or the method as appended in the claims and a machine-readable storage medium that stores the program.
  • the program may be transferred electronically through any medium such as a communication signal transmitted through a wired or wireless connection and the present disclosure covers equivalents thereof.
  • the apparatus may receive a program from a program providing apparatus, which is wire/wirelessly connected thereto, and thereafter store the program.
  • the program providing apparatus may include a memory for storing a program including instructions allowing the apparatus to perform a preset content protection method, information required for a contents protection method, or the like, a communication unit for performing a wired/wireless communication with the apparatus, and a controller for transmitting a corresponding program to a transmitting and receiving apparatus either in response to a request from the apparatus or automatically.

Landscapes

  • Engineering & Computer Science (AREA)
  • Signal Processing (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Spectroscopy & Molecular Physics (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The present disclosure relates to a pre-5th-Generation (5G) or 5G communication system to be provided for supporting higher data rates Beyond 4th-Generation (4G) communication system such as Long Term Evolution (LTE). The present disclosure provides a method of receiving downlink channel and/or downlink reference signal on an unlicensed band. An LTE user equipment (UE) receives control information of a cell operating on an unlicensed band, and receives downlink channel and/or downlink reference signal transmitted in the cell according to the control information. According to the present disclosure, data can be properly received on an unlicensed band.

Description

METHOD AND APPARATUS OF RECEIVING DOWNLINK CHANNEL AND/OR DOWNLINK REFERENCE SIGNAL
The present disclosure relates to wireless communication systems, and particularly to a method and an apparatus of receiving downlink channel and/or downlink reference signal in LTE data transmission on an unlicensed band.
To meet the demand for wireless data traffic having increased since deployment of 4G (4th-Generation) communication systems, efforts have been made to develop an improved 5G (5th-Generation) or pre-5G communication system. Therefore, the 5G or pre-5G communication system is also called a 'Beyond 4G Network' or a 'Post LTE System'.
The 5G communication system is considered to be implemented in higher frequency (mmWave) bands, e.g., 60GHz bands, so as to accomplish higher data rates. To decrease propagation loss of the radio waves and increase the transmission distance, the beamforming, massive multiple-input multiple-output (MIMO), Full Dimensional MIMO (FD-MIMO), array antenna, an analog beam forming, large scale antenna techniques are discussed in 5G communication systems.
In addition, in 5G communication systems, development for system network improvement is under way based on advanced small cells, cloud Radio Access Networks (RANs), ultra-dense networks, device-to-device (D2D) communication, wireless backhaul, moving network, cooperative communication, Coordinated Multi-Points (CoMP), reception-end interference cancellation and the like.
In the 5G system, Hybrid FSK and QAM Modulation (FQAM) and sliding window superposition coding (SWSC) as an advanced coding modulation (ACM), and filter bank multi carrier(FBMC), non-orthogonal multiple access(NOMA), and sparse code multiple access (SCMA) as an advanced access technology have been developed.
In long-Term Evolution (LTE) systems, downlink traffic can be scheduled in unit of subframe in the time domain. In a frequency division duplexing (FDD) cell or a time division duplexing (TDD) cell, a downlink subframe having a regular cyclic prefix (CP) includes 14 orthogonal frequency division multiplexing (OFDM) symbols, and a downlink subframe having an extended CP includes 12 OFDM symbols. The first n OFDM symbols in each downlink sub frame can be used for transmitting downlink control information, n is 0, 1, 2, 3 or 4. Downlink control information includes Physical Downlink Control Channel (PDCCH) and other control information. The other OFDM symbols may be used for transmitting Physical Downlink Shared Channel (PDSCH) or enhanced PDCCH (EPDCCH). A special subframe of a TDD cell includes 3 parts, i.e., a downlink pilot time slot (DwPTS), a guard period (GP) and an uplink pilot time slot (UpPTS). Special subframes with different configurations may have different lengths of DwPTS/GP/UpPTS. Configurations may be as shown in Table 1.
In an LTE system, PDCCH and EPDCCH respectively include DCI for allocating uplink channel resources (referred to as UL Grant) and DCI for allocating downlink channel resources (referred to as DL Grant). A UE may receive DL Grant and UL Grant in public search space and UE-specific search space. DL Grant and UL Grant in the public search space can be successfully received by all of UEs, but those in the UE-specific search space can only be successfully received by respective UEs. The downlink channel may include signals in downlink physical channels, such as PDSCH, PDCCH, EPDCCH, or the like. Downlink reference signals may include downlink reference symbols for channel state measurement and downlink reference symbols for demodulation. Downlink reference symbols for channel state measurement may include Cell-specific Reference Signal (CRS), Channel State Information Reference Signal (CSI RS), or the like. Downlink reference symbols for demodulation may include CRS, Demodulation Reference Signal (DM RS) or the like.
Table 1 shows Configurations of TDD special subframe (length of DwPTS/UpPTS/GP).
Figure PCTKR2015014411-appb-T000001
In an LTE-advanced (LTE-A) system, multiple component carriers (CC, also referred to as a cell) are aggregated to obtain larger working bandwidth, i.e., carrier aggregation (CA). The aggregated carriers constitute downlink and uplink links in the communication system, therefore larger transmission rates can be obtained. Aggregated CCs may adopt the same duplexing manner, i.e., all of the aggregated CCs may be FDD cells or be TDD cells. Alternatively, the aggregated CCs may adopt different duplexing manners, i.e., the aggregated CCs may include both FDD cells and TDD cells. A base station may configure a UE to work in multiple Cells which include a Primary Cell (Pcell) and multiple Secondary Cells (Scell).
LTE systems need more spectrum resources to meet the requirement of increasing mobile communications services. A possible solution is to deploy LTE systems on unlicensed bands. Unlicensed bands generally have already been allocated for other usages. In order to avoid interference from other LTE devices or devices of other wireless systems in an unlicensed band, an LTE base station may check the channel state before transmitting a signal. If the channel is idle, the LTE base station may start transmitting downlink channel and/or downlink reference signal. In order to enable devices of other wireless systems to have the opportunity to occupy the channel, the LTE base station may check the channel state after transmitting downlink channel and/or downlink reference signal for a period of time, and decide whether to transmit downlink channel and/or downlink reference signal according to the obtained channel state. The maximum length of time that the base station is allowed to continuously transmit downlink channel and/or downlink reference signal and signal sequence for occupying the channel is referred to as a limited maximum transmission duration 101, and the period between transmission start time 105 and transmission end time 110 is referred to as channel occupancy duration, as shown in FIG. 1. FIG. 1 is a schematic diagram illustrating an LTE FDD frame.
If the channel is not idle, the LTE base station may not start transmitting downlink channel and/or downlink reference signal.
Various examples provide a method and an apparatus of receiving downlink channel and/or downlink reference signal on an unlicensed band, to receive data properly on an unlicensed band.
A method of receiving downlink channel and/or downlink reference signal on an unlicensed band may include:
receiving, by a long term evolution (LTE) user equipment (UE), control information of a cell operating on an unlicensed band; and
receiving downlink channel and/or downlink reference signal transmitted in the cell according to the control information.
In an example, receiving the downlink channel and/or downlink reference signal may include:
determining, by the UE, a duration in which the channel is occupied by the cell according to the control information, receiving the downlink channel and/or downlink reference signal on a portion or all of OFDM symbols that are within a limited maximum transmission duration in the last downlink subframe when the limited maximum transmission duration is up and the end of the last downlink subframe in the channel occupancy does not arrive, and stop receiving the downlink channel and/or downlink reference signal from remaining of the last downlink subframe after the limited maximum transmission duration.
In an example, receiving the downlink channel and/or downlink reference signal may include:
determining, by the UE, a duration in which the channel is occupied by the cell according to the control information; when the limited maximum transmission duration is up and the end of the last downlink subframe in the channel occupancy does not arrive, if a remaining portion of the last downlink subframe that exceeds the limited maximum transmission duration is shorter than or equal to a pre-determined t, receiving the downlink channel and/or downlink reference signal on a remaining portion of the last downlink subframe after the limited maximum transmission duration is up until the end of the last downlink subframe;
if the remaining portion of the last downlink subframe that exceeds the limited maximum transmission duration is longer than t, stopping, by the UE, reception of the downlink channel and/or downlink reference signal in the last downlink subframe; or, receiving, by the UE, the downlink channel and/or downlink reference signal on a portion or all of OFDM symbols that are within the limited maximum transmission duration in the last downlink subframe, and stop receiving the downlink channel and/or downlink reference signal from remaining of the last downlink subframe after the limited maximum transmission duration is up.
In an example, receiving the downlink channel and/or downlink reference signal from a portion or all of OFDM symbols in the last downlink subframe may include:
receiving the downlink channel and/or downlink reference signal from the first n OFDM symbols in the last downlink subframe;
wherein, M is the maximum number of OFDM symbols in the last downlink subframe before the limited maximum transmission duration, the n is a number selected from plural candidate numbers of OFDM symbols in DwPTS of TDD special subframes, and the selected number if smaller than or equal to M and is closest to M among the plural candicate numbers, M is larger than N which is a pre-determined natural number; when M is smaller than or equal to N, n is 0.
In an example, the control information includes a start time when the UE starts receiving the downlink channel and/or downlink reference signal; the start time is determined by the UE using start time indication information transmitted in the cell.
In an example, the start time indication information is transmitted at a fixed position of a downlink subframe within which the start time falls.
In an example, the start time indication information includes an OFDM symbol within which the start time falls;
the UE determines a subframe which includes the start time indication information to be the subframe within which the start time falls.
In an example, a downlink subframe and an OFDM symbol within which the start time falls are determined according to the start time indication information;
the downlink subframe within which the start time falls is a downlink subframe in which the start time indication information is transmitted or a previous subframe of the downlink subframe in which the start time indication information is transmitted.
In an example, the start time indication information is specified by DCI information in a downlink subframe in which the start time falls or by DCI information in the next downlink subframe of the downlink subframe in which the start time falls.
In an example, the DCI information is transmitted in a PDCCH; the PDCCH is a PDCCH in a public search space, or the PDCCH is a PDCCH at a pre-determined fixed position, or the PDCCH is a PDCCH configured by higher layer signaling; or
the DCI information is transmitted in an EPDCCH; the EPDCCH is an EPDCCH at a pre-determined fixed position, or the EPDCCH is an EPDCCH configured by higher layer signaling.
In an example, the start time indication information is transmitted in a downlink subframe in which the start time falls or in the next downlink subframe of the downlink subframe in which the start time falls.
In an example, the start time indication information includes subframe indication information specifying the downlink subframe in which the start time falls and OFDM symbol indication information specifying the OFDM symbol in which the start time falls; or
the start time indication information includes OFDM symbol indication information specifying the downlink subframe and the OFDM symbol in which the start time falls.
In an example, the OFDM symbol indication information specifies the downlink subframe and the OFDM symbol in which the start time falls in the manner of:
if the symbol specified by the OFDM symbol indication information is transmitted later than a start OFDM symbol of PDCCH/EPDCCH or fixed resources which includes the start time indication information, the downlink subframe in which the start time falls is the previous downlink subframe of the downlink subframe which includes the start time indication information; otherwise, the downlink subframe in which the start time falls is the downlink subframe which includes the start time indication information; or
if the symbol specified by the OFDM symbol indication information is the first OFDM symbol, the downlink subframe in which the start time falls is the downlink subframe which includes the start time indication information; if the symbol specified by the OFDM symbol indication information is one of the second to fourteenth OFDM symbols, the downlink subframe in which the start time falls is the previous downlink subframe of the downlink subframe which includes the start time indication information; or
if the symbol specified by the OFDM symbol indication information is one of the first to fourteenth OFDM symbols, the downlink subframe in which the start time falls is the previous downlink subframe of the downlink subframe which includes the start time indication information; if the symbol specified by the OFDM symbol indication information is the fifteenth OFDM symbol, the downlink subframe in which the start time falls is the downlink subframe which includes the start time indication information, and the OFDM symbol in which the start time falls is the first OFDM symbol.
In an example, the method may also include: if the number of OFDM symbols allowed to be used for receiving PDSCH in a downlink subframe is larger than or equal to N which is pre-determined or configured by higher layer, scheduling the PDSCH in the downlink subframe individually; if the number of OFDM symbols allowed to be used for receiving PDSCH in a downlink subframe issmaller than N, scheduling the PDSCH in the downlink subframe together with PDSCH in another downlink subframe using a PDCCH/EPDCCH.
In an example, receiving the downlink channel and/or downlink reference signal may include:
determining a start time and an end time of receiving the downlink channel and/or downlink reference signal according to the control information, wherein the start time and the end time are both at a boundary of an OFDM symbol.
In an example, the UE may determine the end time is an end boundary of the last OFDM symbol in the last downlink subframe of the channel occupied by the base station on the unlicensed band.
In an example, the UE determines a first OFDM symbol whose start boundary is the start time in the subframe including the start time, and determines a second OFDM symbol whose end boundary is the end time in the subframe including the end time.
In an example, the UE determines the first OFDM symbol and the second OFDM symbol using a cell-specific reference signal or indication information of the cell.
In an example, the UE may determine the end time using the start time.
In an example, determining the start time of receiving the downlink channel and/or downlink reference signal according to the control information may include: receiving, by the UE, DCI information, and determining the start time according to the DCI information;
wherein the DCI information comprises the length or start position of complete OFDM symbols from which the UE receives the downlink channel in the first downlink subframe within the signal transmission duration on the unlicensed band; wherein the complete OFDM symbols from which the UE receives the downlink channel are complete OFDM symbols occupied by all of signals in the first downlink subframe, or are complete OFDM symbols occupied by a specific downlink channel in the first downlink subframe.
In an example, when the signal transmission duration of the base station on the unlicensed band is an integral multiple of a subframe, the UE may determine the end time using the start time by:
if the UE determines the start time is not a boundary of an OFDM symbol by detecting a signal transmitted prior to the first complete OFDM symbol in the first downlink subframe within the signal transmission duration, determining that M'=14-N'-(n'-1)-1; if the UE determines the start time is a boundary of an OFDM symbol by detecting a signal transmitted prior to the first complete OFDM symbol in the first downlink subframe within the signal transmission duration, determining that M'=14-N'-(n'-1); or
the value of M' specified by signaling is 14-N'-(n'-1)-1 or 14-N'-(n'-1); or
M'=14-N'-(n'-1)-1; or
M'=14-N'-(n'-1);
wherein M' is the number of OFDM symbols from which the downlink channel and/or downlink reference signal is received in the last downlink subframe within the signal transmission duration, N' is the number of OFDM symbols from which the downlink channel and/or downlink reference signal is received in the first downlink subframe within the signal transmission duration, the start boundary of the (n')'th complete OFDM symbol in the first downlink subframe in the signal transmission duration is the start time of the UE receiving the downlink channel and/or downlink reference signal.
In an example, when the signal transmission duration t of the base station on the unlicensed band is or is not an integral multiple of a subframe, the UE may determine the end time using the start time by:
determining a time length l that can be used for signal transmission in the last subframe within the signal transmission duration using the start time, and determining the number M' of OFDM symbols from which the downlink channel and/or downlink reference signal is received in the last downlink subframe within the signal transmission duration using the time length l.
In an example, calculating the l using the start time may include: l=(t-the duration of complete OFDM symbols in the first downlink subframe)mod 1, or l=(t-(the duration of complete OFDM symbols for data transmission in the first downlink subframe+t'))mod 1;
wherein the (the duration of complete OFDM symbols for data transmission in the first downlink subframe+t') is the maximum time occupied by complete OFDM symbols occupied by actually transmitted signal in the first downlink subframe, the t' is configured by higher layer signaling or pre-determined or determined using the number of complete OFDM symbols for downlink data transmission in the first downlink subframe.
In an example, when l=(t-the duration of complete OFDM symbols for data transmission in the first downlink subframe+t') mod 1, the determining t' according to the number of complete OFDM symbols for transmitting downlink data in the first downlink subframe comprises: when I1-I2>=0, t_sym'= I1-I2; when I1-I2<0, t_sym'= Nsym+(I1-I2); calculating t' according to t_sym';
wherein, I1 is the earliest start position of transmission of data channel and/or control channel in the first downlink subframe detected by the UE, I2 is the possible earliest start position where the base station starts signal transmission in the first downlink subframe corresponding to I1, I1 is an element of a start position set Ψ pre-determined or configured by higher layer, Nsym is the number of OFDM symbols in a subframe, and t_sym' is the number of OFDM symbols corresponding to .
In an example, I2 may be determined by:
when a pilot reference signal having more than 0 OFDM symbols is not necessary to be transmitted before transmission of the data channel and/or control channel in the first downlink subframe, the I2 is an element adjacent to and prior to the I1 in the set Ψ;
when a pilot reference signal having more than or equal to Lp OFDM symbols is necessary to be transmitted before transmission of the data channel and/or control channel in the first downlink subframe, determining I1' to be an element adjacent to I1 and prior to I1 in the set Ψ; when I1'-Lp >=0, determining that I2=(I1'-Lp); when I1'-Lp <0, determining the I2=Nsym+(I1'-Lp).
In an example, determining the duration of complete OFDM symbols for data transmission in the first downlink subframe may include:
determining, by the UE, the earliest start position of transmission of data channel and/or control channel in the first downlink subframe through blind detection or by receiving explicit signaling, determining the number of complete OFDM symbols from the start position to the end of the first downlink subframe, and determining the duration of complete OFDM symbols for data transmission data in the first downlink subframe according to the number of OFDM symbols.
In an example, determining by the UE the earliest start position through blind detection may include: determining the earliest start position by detecting the control channel.
In an example, if the number of possible start positions of the PDCCH/EPDCCH in the first downlink subframe is different from the number of possible start positions of PDSCH in the first downlink subframe, or when the possible start positions of the PDCCH/EPDCCH in the first downlink subframe are not in a one-to-one relation with the possible start positions of PDSCH in the first downlink subframe, the UE may detect the start position of PDCCH/EPDCCH, and determine the start position of PDSCH according to an explicit indication in the PDCCH/EPDCCH;
if the number of possible start positions of the PDCCH/EPDCCH in the first downlink subframe equals the number of possible start positions of PDSCH in the first downlink subframe, or when the possible start positions of the PDCCH/EPDCCH in the first downlink subframe are in a one-to-one relation with the possible start positions of PDSCH in the first downlink subframe, the UE may detect the start position of PDCCH/EPDCCH, and determine the start position of PDSCH according to the one-to-one relation.
In an example, when l=(t-(the duration of complete OFDM symbols for data transmission in the first downlink subframe+t')) mod 1, the determining t' according to the number of complete OFDM symbols for transmitting downlink data in the first downlink subframe may include: determining that t_sym'= I3-I2'; calculating t' according to t_sym';
wherein I3 is a start position of a pre-determined reference signal detected by the UE in the first downlink subframe, I2' is an element in a start position set pre-determined or configured by higher layer, and I2' is an element that is closest to I3 and prior to I3 in the set Ψ, and t_sym' is the number of OFDM symbols corresponding to t'.
In an example, determining the duration of complete OFDM symbols for data transmission in the first downlink subframe may include:
determining, by the UE, the start position of a UE-identifiable pilot reference signal in the first downlink subframe through blind detection or by receiving explicit signaling, determining the number of complete OFDM symbols from the start position to the end of the first downlink subframe, and determining the duration of complete OFDM symbols for data transmission data in the first downlink subframe according to the number of OFDM symbols.
In an example, calculating M' according to the time length l may include:
if the sum of a duration of an incomplete OFDM symbol at the head of the first downlink subframe in the signal transmission duration and the duration of an incomplete OFDM symbol at the end of the first downlink subframe does not exceed the duration of an OFDM symbol, determining, by the UE, the value of M' according to a pre-determined first relation which associates l with M'; or, when l is shorter than the sum of the duration of half a subframe and the duration of the first OFDM symbol of each time slot, determining that
Figure PCTKR2015014411-appb-I000001
; when l is longer than or equal to the sum of the duration of half a subframe and the duration of the first OFDM symbol of each time slot, determining that
Figure PCTKR2015014411-appb-I000002
; or, calculating
Figure PCTKR2015014411-appb-I000003
;
if the sum of a duration of an incomplete OFDM symbol at the head of the first downlink subframe in the signal transmission duration and the duration of an incomplete OFDM symbol at the end of the first downlink subframe exceeds the duration of an OFDM symbol, determining, by the UE, the value of M’ according to a pre-determined second relation which associates l with M’; or, when l is shorter than the sum of the duration of half a subframe and the duration of the first OFDM symbol of each time slot, determining that
Figure PCTKR2015014411-appb-I000004
; when l is longer than or equal to the sum of the duration of half a subframe and the duration of the first OFDM symbol of each time slot, determining that
Figure PCTKR2015014411-appb-I000005
; or, calculating
Figure PCTKR2015014411-appb-I000006
;
wherein, p is the difference between the CP length of the first OFDM symbol in each subframe and the CP length of other OFDM symbols, L is the duration of an OFDM symbol including a CP other than the first OFDM symbol in each subframe.
In an example, calculating M’ according to the time length l may include:
determining the value of M’ according to the pre-determined second relation which associates l with M’; or
when l is shorter than the sum of the duration of half a subframe and the duration of the first OFDM symbol of each time slot, determining that
Figure PCTKR2015014411-appb-I000007
; when l is longer than or equal to the sum of the duration of half a subframe and the duration of the first OFDM symbol of each time slot, determining that
Figure PCTKR2015014411-appb-I000008
; or calculating
Figure PCTKR2015014411-appb-I000009
;
wherein, p is the difference between the CP length of the first OFDM symbol in each subframe and the CP length of other OFDM symbols, L is the duration of an OFDM symbol including a CP other than the first OFDM symbol in each subframe.
In an example, calculating M’ according to the time length l may include:
determining the value of M’ according to the pre-determined first relation which associates l with M’; or
when l is shorter than the sum of the duration of half a subframe and the duration of the first OFDM symbol of each time slot, determining that
Figure PCTKR2015014411-appb-I000010
; when l is longer than or equal to the sum of the duration of half a subframe and the duration of the first OFDM symbol of each time slot, determining that
Figure PCTKR2015014411-appb-I000011
; or calculating
Figure PCTKR2015014411-appb-I000012
;
wherein, p is the difference between the CP length of the first OFDM symbol in each subframe and the CP length of other OFDM symbols, L is the duration of an OFDM symbol including a CP other than the first OFDM symbol in each subframe.
In an example, if M’ is not one of values of the number of OFDM symbols in DwPTS according to TDD special subframe configurations, the method may also include: selecting a value which is the largest one among those smaller than M’ from the values of the number of OFDM symbols in DwPTS according to TDD special subframe configurations to be modified M’.
In an example, if a system only allows the number of OFDM symbols transmitted in the last incomplete subframe within the signal transmission duration to be within 1~Nsym, comparing the M’ obtained and each element in a set of selectable values of the number of OFDM symbols transmitted in the last incomplete subframe, determining no signal is transmitted in the last subframe if the minimum value of elements in the set Ω is larger than M’, and selecting an element which is the closest to M’ and smaller than or equal to M’ as the position of the end time.
An apparatus of receiving downlink channel and/or downlink reference signal on an unlicensed band may include: a control information receiving unit and a data and reference signal receiving unit; wherein
the control information receiving unit is to receive control information of a cell operating on the unlicensed band; and
the data and reference signal receiving unit is to receive downlink channel and/or downlink reference signal transmitted in the cell according to the control information.
It can be seen that, according to various examples, an LTE UE receives control information of a cell operating on an unlicensed band, and receives downlink channel and/or downlink reference signal transmitted in the cell according to the control information.
The above and other aspects, features, and advantages of the present disclosure will be more apparent from the following detailed description when taken in conjunction with the accompanying drawings, in which:
FIG. 1 is a schematic diagram illustrating an LTE FDD frame;
FIG. 2 is a schematic diagram illustrating an LTE TDD frame;
FIG. 3 is a flowchart illustrating a method of receiving downlink channel and/or downlink reference signal in accordance with an example of the present disclosure;
FIG. 4 is a schematic diagram illustrating reception of downlink channel and/or downlink reference signal of method one in accordance with example one of the present disclosure;
FIG. 5 is a schematic diagram illustrating reception of downlink channel and/or downlink reference signal of method three in accordance with example one of the present disclosure;
FIG. 6 is a schematic diagram illustrating positions of DM RSs with regular CP corresponding to different TDD special subframe configurations;
FIG. 7 is a schematic diagram illustrating positions of DM RSs with extended CP corresponding to different TDD special subframe configurations;
FIG. 8 is a schematic diagram illustrating start time of receiving downlink channel and/or downlink reference signal specified by DCI information in accordance with an example of the present disclosure;
FIG. 9 is a schematic diagram illustrating start time of receiving downlink channel and/or downlink reference signal specified by DCI information in accordance with an example of the present disclosure;
FIG. 10 is a schematic diagram illustrating start time of receiving downlink channel and/or downlink reference signal specified by DCI information in accordance with an example of the present disclosure;
FIG. 11 is a schematic diagram illustrating positions of unmodified CRS resources and positions of modified CRS resources;
FIG. 12 is a schematic diagram illustrating signal transmission duration of a base station on an unlicensed band;
FIG. 13 is a schematic diagram illustrating start time and end time of receiving downlink channel and/or downlink reference signal in accordance with example four of the present disclosure;
FIG. 14 is a schematic diagram illustrating start time and end time of receiving downlink channel and/or downlink reference signal in accordance with example four of the present disclosure;
FIG. 15 is a schematic diagram illustrating start time and end time of receiving downlink channel and/or downlink reference signal in accordance with example four of the present disclosure;
FIG. 16 is a schematic diagram illustrating positions of I1 and I2 in situation (1) in accordance with example four of the present disclosure;
FIG. 17 is a schematic diagram illustrating positions of I1 and I2 in situation (2) in accordance with example four of the present disclosure;
FIG. 18 is a schematic diagram illustrating the start position of PDCCH/EPDCCH and PDSCH in the first downlink subframe in accordance with example four of the present disclosure;
FIG. 19 is a schematic diagram illustrating a start position of PDCCH and PDSCH in the first downlink subframe in accordance with example four of the present disclosure;
FIG. 20 is a schematic diagram illustrating the start position of EPDCCH and PDSCH in the first downlink subframe in accordance with example four of the present disclosure;
FIG. 21 is a schematic diagram illustrating a start position of PDCCH/EPDCCH and PDSCH in the first downlink subframe in accordance with example four of the present disclosure;
FIG. 22 is a schematic diagram illustrating the start positions of PDCCH/EPDCCH and PDSCH in the first downlink subframe in accordance with example four of the present disclosure;
FIG. 23 is a flowchart illustrating method one in accordance with example five of the present disclosure;
FIG. 24 is a schematic diagram illustrating duration time in accordance with example five of the present disclosure;
FIG. 25 is a schematic diagram illustrating duration time in accordance with example five of the present disclosure;
FIG. 26 is a schematic diagram illustrating duration time in accordance with example five of the present disclosure;
FIG. 27 is a schematic diagram illustrating duration time in accordance with example five of the present disclosure;
FIG. 28 is a schematic diagram illustrating multiple indications received in accordance with example five of the present disclosure;
FIG. 29 is a schematic diagram illustrating received signaling indicating whether a subframe is the last subframe in accordance with example five of the present disclosure;
FIG. 30 is a schematic diagram illustrating received signaling indicating whether a subframe is the last subframe in accordance with example five of the present disclosure;
FIG. 31 is a schematic diagram illustrating received signaling indicating whether a subframe is the last subframe in accordance with example five of the present disclosure; and
FIG. 32 is a schematic diagram illustrating an apparatus of receiving downlink channel and/or downlink reference signal in accordance with an example of the present disclosure.
Embodiments of the present disclosure are described in detail with reference to the accompanying drawings. The same or similar components may be designated by the same or similar reference numerals although they are illustrated in different drawings. Detailed descriptions of constructions or processes known in the art may be omitted to avoid obscuring the subject matter of the present disclosure.
It is to be noted that some components shown in the drawings are exaggerated, omitted, or schematically illustrated, and the drawn size of each component does not exactly reflect its real size.
It will be understood that each block of the flowchart illustrations and/or block diagrams, and combinations of blocks in the flowchart illustrations and/or block diagrams, can be implemented by computer program instructions. These computer program instructions may be provided to a processor of a general purpose computer, special purpose computer, or other programmable data processing apparatus to produce a machine, such that the instructions, which execute via the processor of the computer or other programmable data processing apparatus, create means for implementing the functions/acts specified in the flowchart and/or block diagram block or blocks. These computer program instructions may also be stored in a non-transitory computer-readable memory that can direct a computer or other programmable data processing apparatus to function in a particular manner, such that the instructions stored in the non-transitory computer-readable memory produce an article of manufacture including instruction means which implement the function/act specified in the flowchart and/or block diagram block or blocks. The computer program instructions may also be loaded onto a computer or other programmable data processing apparatus to cause a series of operations to be performed on the computer or other programmable apparatus to produce a computer implemented process such that the instructions which execute on the computer or other programmable apparatus provide operations for implementing the functions/acts specified in the flowchart and/or block diagram block or blocks.
Furthermore, the respective block diagrams may illustrate parts of modules, segments, or codes including one or more executable instructions for performing specific logic function(s). Moreover, it should be noted that the functions of the blocks may be performed in a different order in several modifications. For example, two successive blocks may be performed substantially at the same time, or may be performed in reverse order according to their functions.
The term “unit”, as used herein, means, but is not limited to, a software or hardware component, such as a Field Programmable Gate Array (FPGA) or Application Specific Integrated Circuit (ASIC), which performs certain tasks. A unit may advantageously be configured to reside on a non-transitory addressable storage medium and configured to be executed on one or more processors. Thus, a unit may include, by way of example, components, such as software components, object-oriented software components, class components and task components, processes, functions, attributes, procedures, subroutines, segments of program code, drivers, firmware, microcode, circuitry, data, databases, data structures, tables, arrays, and variables. The functionality provided in the components and units may be combined into fewer components and units or further separated into additional components and units. In addition, the components and units may be implemented such that they execute one or more Central Processing Units (CPUs) in a device or a secure multimedia card.
Embodiments of the present disclosure focus on wireless communication systems based on Orthogonal Frequency Division Multiplexing (OFDM), however, the subject matter of the present disclosure may also be applied to other communication systems and services having similar technical backgrounds and channel forms without largely departing from the scope of the present disclosure according to a determination of those of ordinary skill in the art.
In order to make the objectives, technical schemes and merits of the present invention clearer, a detailed description of the present invention is hereinafter given with reference to specific embodiments.
FIG. 3 is a flowchart illustrating a method of an LTE user equipment (UE) receiving downlink channel and/or downlink reference signal in accordance with an example of the present disclosure. The method may include the following procedures.
At block 301, an LTE UE may receive control information of a cell operating on an unlicensed band.
At block 302, the LTE UE may receive downlink channel and/or downlink reference signal of the cell on the unlicensed band according to the received control information of the cell.
The UE may decide a manner of receiving downlink channel and/or downlink reference signal according to the received control information. An LTE system may adopt a fixed subframe structure, i.e., each subframe lasts 1ms and has fixed start timing and end timing. Since an LTE base station may determine a channel to be available at any time point and the channel occupancy duration of the LTE system is limited so as to enable other devices to have the opportunity of occupying the channel, there may be the situation where LTE transmission is not completed in the last downlink subframe while the limited maximum transmission duration 201 is up, as shown in FIG. 2. FIG. 2 is a schematic diagram illustrating an LTE TDD frame.
A solution is needed to solve the problem of receiving downlink channel and/or downlink reference signal.
The mechanism of the present disclosure is hereinafter described in detail with reference to the several examples.
Example one
Within each channel occupancy duration, if transmission of the last downlink subframe is not completed when transmission time reaches the limited maximum transmission duration, the method of receiving downlink channel and/or downlink reference signal may be as follows. In this example, it is assumed that a UE has already known the end time of the channel occupancy duration before receiving the last downlink subframe, i.e., the UE knows the number of complete OFDM symbols included in the last downlink subframe before the end time of the channel occupancy duration. For example, the UE may obtain the number of OFDM symbols in the last downlink subframe from public physical layer signaling of a Pcell.
Method one
The UE may continue to receive downlink channel and/or downlink reference signal from the remaining portion 401 of the downlink subframe that exceeds the limited maximum transmission duration after reception duration of downlink channel and/or downlink reference signal in the last downlink subframe reaches the limited maximum transmission duration until the end of the last downlink subframe, as shown in FIG. 4. FIG. 4 is a schematic diagram illustrating reception of downlink channel and/or downlink reference signal of method one in accordance with example one of the present disclosure That is, the last downlink subframe is always a complete subframe. This method is easy to implement, and makes less modifications to standards. The method, however, may violate the rule of using unlicensed bands since the base station may continue transmission after the limited maximum transmission duration ends.
Method two
In this example, a UE may not receive downlink channel and/or downlink reference signal in the incomplete last subframe. This method is easy to implement and does not violate the rule of using unlicensed bands. But an LTE device needs to check the channel state, and can only use an unlicensed band when the channel is detected to be idle. Since the time when the channel is detected to be idle may be any time point within a downlink subframe, it is highly possible the last downlink subframe is incomplete. In addition, since the maximum channel occupancy duration of a UE may be several or a dozen milliseconds, it is very probable that the last downlink subframe is incomplete. Thus, if the UE does not receive any downlink channel and/or downlink reference signal in the incomplete last downlink subframe, some resources may be wasted.
Method three
A UE may receive downlink channel and/or downlink reference signal from some or all of OFDM symbols 501 in the last downlink subframe before the limited maximum transmission duration ends, and stop receiving downlink channel and/or downlink reference signal from the remaining 502 of the downlink subframe after the limited maximum transmission duration ends, i.e., the UE may perform reception within a portion of a subframe and not perform reception within another portion of the subframe, as shown in FIG. 5. FIG. 5 is a schematic diagram illustrating reception of downlink channel and/or downlink reference signal of method three in accordance with example one of the present disclosure.
The number of downlink OFDM symbols in a TDD special subframe is a portion of the number of OFDM symbols in a downlink subframe. The subframe structure of a TDD special subframe may be reused for an incomplete downlink subframe on an unlicensed band. The position of DM RS in a TDD special subframe is variable according to the number of available OFDM symbols in the downlink subframe. In a subframe configured with a regular prefix, DM RS positions defined in different TDD special subframe configurations may be as shown in FIG. 6. FIG. 6 is a schematic diagram illustrating positions of DM RSs with regular CP corresponding to different TDD special subframe configurations.
In a subframe configured with an extended prefix, DM RS positions defined in different TDD special subframe configurations may be as shown in FIG. 7. FIG. 7 is a schematic diagram illustrating positions of DM RSs with extended CP corresponding to different TDD special subframe configurations. The position of CRS does not change with the number of available OFDM symbols in a downlink subframe. The following are examples of a method of processing an incomplete downlink subframe in a cell operating on an unlicensed band when a demodulation reference signal is DM RS and CRS respectively.
a: When the demodulation reference signal is DM RS,
if transmission of the last downlink subframe stops after the limited maximum transmission duration ends and remaining of the downlink subframe that are not transmitted within the limited maximum transmission duration is not transmitted, i.e., reception of downlink channel and/or downlink reference signal in the subframe is performed on OFDM symbols in the transmitted portion of the downlink subframe. It may be assumed that reception is performed on the first n OFDM symbols of the last downlink subframe. The number n of the OFDM symbols on which downlink channel and/or downlink reference signal is received may be set to be the number of OFDM symbols in DwPTS defined in one of conventional TDD special subframes (i.e., one of the lengths of DwPTS in Table 1) and the number of OFDM symbols in a regular downlink subframe. In an example, the number of OFDM symbols in DwPTS in a TDD special subframe that is smaller or equal to the number M of OFDM symbols in the transmitted portion of the downlink subframe before the transmission ends and that is the closest to M may be selected as the number n of OFDM symbols in downlink channel and/or downlink reference signal to be received. This method makes little modifications to standards, does not need to introduce a new downlink subframe, but may cause certain waste of resources. In another example, the number of OFDM symbols in downlink channel and/or downlink reference signal to be received may be an arbitrary integer smaller or equal to 14, i.e., the number M of OFDM symbols in the downlink subframe before the transmission ends may be determined to be the number n of OFDM symbols in downlink channel and/or downlink reference signal to be received. This method requires modifications to the structure of the conventional TDD special subframe, but can make full use of resources and reduce waste of resources.
In an example, a method of receiving downlink channel and/or downlink reference signal may be as follows.
If the length of the portion of the last downlink subframe that is transmitted before the limited maximum transmission duration ends is larger than or equal to N OFDM symbols, i.e., the number of available OFDM symbols is not less than N, the UE may receive PDSCH, EPDCCH and a reference signal in the downlink subframe. For example, N=6, the TDD sepcial subframe that has the least OFDM symbols has 6 OFDM symbols, or N=4. When N<4, DM RS cannot be obtained unless the position of DM RS is changed.
If the number of available OFDM symbols is the number of OFDM symbols in DwPTS in one of conventional TDD speccial subframes, data reception may be performed according to the structure of the DM RS of DwPTS in the conventional TDD special subframe. When a UE-specific reference symbol (DMRS) is transmitted, if the number n of transmitted OFDM symbols is 6 (e.g., conventional TDD special subframe configuration 9), or 11 (e.g., conventional TDD special subframe configurations 3 and 8), or 12 (e.g., conventional TDD special subframe configuration 4), and the DM RS adopts the DM RS format of conventional TDD special subframe configurations 3, 4, 8, or 9, the UE may receive downlink channel and/or downlink reference signal according to information that the number of OFDM symbols is 6, or 11, or 12; if the number n of transmitted OFDM symbols is 9 (e.g., conventional TDD special subframe configurations 1 and 6), or 10 (e.g., conventional TDD special subframe configurations 2 and 7), and the DM RS adopts the DM RS format of conventional TDD special subframe configurations 1, 2, 6, 7, the UE may receive downlink channel and/or downlink reference signal according to information that the number of OFDM symbols is 9 or 10.
Conventional TDD special subframe structures do not include downlink subframe structures in which the number of OFDM symbols is 4, 5, 6, 8, 13. When the number M of OFDM symbols in the transmitted portion of the downlink subframe is 4, 5, 6, 8, or 13, conventional subframe structures may be reused, i.e., by reducing the number of used OFDM symbols until the number of OFDM symbols is identical to the number of downlink OFDM symbols of a conventional TDD special subframe configuration, and data reception is performed according to the DM RS structure of DwPTS in the conventional TDD special subframe configuration. If the transmitted portion of the downlink subframe includes 4 or 5 OFDM symbols, i.e., M is 4 or 5, since there is no conventional TDD special subframe structure in which the number of downlink OFDM symbols is less than 6, the UE may not receive downlink channel and/or downlink reference signal, i.e., n=0. If the transmitted portion of the downlink subframe includes 7 or 8 OFDM symbols, i.e., M is 7 or 8, the conventional TDD sepcial subframe structure that has the most approximate number of OFDM symbols to 7 or 8 is the TDD speical subframe structure that includes 6 downlink OFDM symbols, i.e., TDD speical subframe configuration 9, the UE may adopt the DM RS structure in TDD special subframe configuration 9 for data reception. If the portion of the downlink subframe before transmission ends include 13 OFDM symbols, i.e., M is 13, the TDD sepcial subframe structure that has the most approximate number of OFDM symbols to 13 is the TDD speical subframe structure that includes 12 downlink OFDM symbols, i.e., TDD speical subframe configuration 4, the UE may adopt the DM RS structure in TDD special subframe configuration 4 for data reception.
In an example, a newly defined subframe structure may be adopted to use all of available OFDM symbols if the number M of OFDM symbols in the transmitted portion of the downlink subframe is 4, 5, 7, 8, or 13. If the number M of OFDM symbols is 4 or 5, a newly defined subframe structure that includes 4 or 5 OFDM symbols and uses the DM RS format of TDD special subframe configuration 3, 4, 8, 9, or 1, 2, 6, 7 may be used. The number of available OFDM symbols may be sent to the UE via signaling so that the UE may receive downlink channel and/or downlink reference signal according to the information that the number of OFDM symbols is 4 or 5. If the number M of OFDM symbols is 7 or 8, a newly defined subframe structure that includes 7 or 8 OFDM symbols and uses the DM RS format of TDD special subframe configuration 1, 2, 6, 7 may be used. The number of available OFDM symbols may be sent to the UE via signaling so that the UE may receive downlink channel and/or downlink reference signal according to the information that the number of OFDM symbols is 7 or 8. If the number M of OFDM symbols is 13, a newly defined subframe structure that includes 13 OFDM symbols and uses the DM RS format of TDD special subframe configuration 3, 4, 8, 9 may be used. The number of available OFDM symbols may be sent to the UE via signaling so that the UE may receive downlink channel and/or downlink reference signal according to the information that the number of OFDM symbols is 13.
In another example, if the number M of OFDM symbols in the transmitted portion of the downlink subframe is 4, 5, 7, 8, or 13, some of the situations may re-use a conventional subframe structure, i.e., reducing the number of OFDM symbols used until the number of OFDM symbols is identical to the number of OFDM symbols in a conventional TDD special subframe configuration; the other situations may use a newly defined subframe structure to use all of available OFDM symbols. When re-using a conventional subframe structure may not remarkable waste resources, the conventional subframe structure may be re-used. When re-using a conventional subframe structure may remarkable waste resources, a newly defined subframe structure may be used. In an example, the total number of newly defined subframe structures and conventional TDD special subframe structures and normal downlink subframe structures may be smaller than or equal to N (e.g., N=8) which may require less bits for indicating the structure used. For example, if the number M of OFDM symbols in the transmitted portion of the last downlink subframe is 4 or 5 or 8, the number of OFDM symbols that may be wasted is 4 or 5 or 2 if no newly defined subframe structure is adopted. In this case, a newly defined subframe structure may be introduced to make use of all available OFDM symbols, so that no resource is wasted. If the number M of OFDM symbols in the transmitted portion of the last downlink subframe is 7 or 13, a conventional subframe structure may be re-used, and only 1 OFDM symbol is wasted. As such, less resources may be wasted. The following is several examples.
When the number M of OFDM symbols is 4 or 5, if no newly defined subframe structure is used, a base station may not transmit downlink data in an example. In another example, a newly defined subframe structure in which the number of available OFDM symbols is 4 or 5 may be used, and the DM RS format of TDD special subframe configuration 3, 4, 8, 9, or 1, 2, 6, 7 may be used. The number of available OFDM symbols may be sent to a UE via signaling, and the UE may receive downlink channel and/or downlink reference signal according to the received information that the number of OFDM symbols is 4 or 5.
When the number M of OFDM symbols is 7 or 8, the base station may use the structure of TDD speical subframe configuration 9, and inform the UE of the TDD special subframe configuration 9. The UE may receive the PDSCH, EPDCCH and reference signal according to TDD special subframe configuration 9, i.e., regarding the subframe includes 6 available OFDM symbols. In another example, the base station may use a newly defined subframe structure in which the number of OFDM symbols is 7 or 8, adopt the DM RS format of TDD special subframe configuration 1, 2, 6, 7, and inform the UE of the number of available OFDM symbols via signaling. The UE may receive downlink channel and/or downlink reference signal according to the received information that the number of OFDM symbols is 7 or 8.
When the number M of OFDM symbols is 13, the base station may use the structure of TDD speical subframe configuration 4, and inform the UE of the TDD special subframe configuration 4. The UE may receive downlink channel and/or downlink reference signal according to TDD special subframe configuration 4, i.e., regarding the subframe includes 12 available OFDM symbols. In another example, the base station may use a newly defined subframe structure in which the number of OFDM symbols is 13, adopt the DM RS format of TDD special subframe configuration 3, 4, 8, 9, and inform the UE of the number of available OFDM symbols via signaling. The UE may receive downlink channel and/or downlink reference signal according to the received information that the number of OFDM symbols is 13.
If a conventional TDD special subframe structure is adopted in situations where the number of OFDM symbols is 4, 5, 7, 8, 13, processing at the UE is less complex and rate matching may be implemented using a conventional format. In addition, it may save signaling bits for informing the UE of the number of OFDM symbols in the subframe via signaling but may waste resources. For example, if only 6 OFDM symbols are used when there are 8 OFDM symbols, 2 OFDM symbols are wasted. If a newly defined subframe structure is adopted in situations where the number of OFDM symbols is 4, 5, 7, 8, 13, available resources can be fully used and the DM RS structure may re-use the structures defined in one of conventional TDD special subframe configurations, and complexity of the processing at UE is not significantly increased. If a conventional TDD special subframe structure is adopted in some of the situations where the number of OFDM symbols is 4, 5, 7, 8, or 13 and newly defined subframe structures are adopted in the other of the situations where the number of OFDM symbols is 4, 5, 7, 8, or 13, signaling bits can be saved, and waste of resources can be greately reduced. In an example, the total number of newly defined subframe structures and conventional TDD special subframe structures and normal downlink subframe structures may be smaller than or equal to N' (e.g., N'=8) to reduce the number of bits for indicating the subframe structure adopted.
b: When the demodulation reference signal is CRS,
if transmission of the last downlink subframe stops after the limited maximum transmission duration ends and the remaining of the downlink subframe that is not transmitted within the limited maximum transmission duration is not transmitted, reception of downlink channel and/or downlink reference signal in the subframe is performed on some of OFDM symbols in the downlink subframe. It may be assumed that reception is performed on the first n OFDM symbols of the last downlink subframe. The number n of the OFDM symbols on which downlink channel and/or downlink reference signal is received may be the number of OFDM symbols in DwPTS of one of conventional TDD special subframes (i.e., DwPTS lengths in Table 1) and the number of OFDM symbols in a normal downlink subframe, or n may be any integer smaller than or equal to 14. In an example, a method of receiving downlink channel and/or downlink reference signal may be as follows.
If the length of the portion of the last downlink subframe before the limited maximum transmission duration is up is larger than or equal to N OFDM symbols, the UE may receive downlink channel and/or downlink reference signal in the last downlink subframe. For example, N=6, the conventional TDD sepcial subframe that has the least OFDM symbols has 6 OFDM symbols.
Conventional TDD special subframe configurations include 6, 9, 10, 11, or 12 OFDM symbols, i.e., the number of OFDM symbols is 6 (conventional TDD special subframe configuration 9), 11 (conventional TDD spcial subframe configurations 3 and 8), 12 (conventional TDD spcial subframe configuration 4), 9 (conventional TDD spcial subframe configurations 1 and 6), 10 (conventional TDD spcial subframe configurations 2 and 7). A UE may receive the downlink channel and/or downlink reference signal according to CRS which indicates the number of OFDM symbols is 6, 9, 10, 11 or 12.
Conventional TDD special subframe structures do not include structures that have 4, 5, 7, 8, or 13 OFDM symbols. Thus, if the number M of OFDM symbols is 4, 5, 7, 8, or 13, a conventional subframe structure may be re-used and the number of used OFDM symbols is reduced to the number of OFDM symbols of DwPTS in the conventional TDD special subframe configuration. For example, when the number of available OFDM symbols is 7 or 8, the number of actually used OFDM symbols is 6 which is the number of OFDM symbols of DwPTS in TDD special subframe configuration 9. In another example, a newly defined subframe structure may be introduced to use all of available OFDM symbols. In another example, some of the situations where the number M of OFDM symbols is 4, 5, 7, 8, or 13 may re-use the structure of DwPTS in conventional TDD special subframe configurations, i.e., to reduce the number of used OFDM symbols to the number of OFDM symbols in DwPTD of the conventional TDD special subframe configurations, while the other of the situations may use newly defined subframe structures to use all of the available OFDM symbols. When re-using a conventional subframe structure may not remarkable waste resources, the conventional subframe structure may be re-used. When re-using a conventional subframe structure may remarkable waste resources, a newly defined subframe structure may be used. In an example, the total number of newly defined subframe structures and conventional TDD special subframe structures and normal downlink subframe structures may be smaller than or equal to N' (e.g., N'=8). For example, in situations where the number M of OFDM symbols is 4 or 5 or 8, a newly defined subframe structure may be introduced to use all of available OFDM symbols, while in situations where the M is 7 or 13, one of conventional subframe structures may be re-used, i.e., the number of used OFDM symbols is reduced to the number of OFDM symbols in DwPTS of one of conventional TDD special subframe configurations. The following is several examples.
When M is 4 or 5, if no newly defined subframe structure is used, a base station may not transmit downlink data in an example. In another example, a newly defined subframe structure in which the number of available OFDM symbols is 4 or 5 may be used, and the number of OFDM symbols may be sent to a UE via signaling. The UE may receive downlink channel and/or downlink reference signal according to the received information that the number of OFDM symbols is 4 or 5.
When M is 7 or 8, the base station may use the structure of TDD speical subframe configuration 9, and inform the UE of the TDD special subframe configuration 9. The UE may receive downlink channel and/or downlink reference signal according to TDD special subframe configuration 9, i.e., regarding the subframe includes 6 available OFDM symbols. In another example, the base station may use a newly defined subframe structure in which the number of OFDM symbols is 7 or 8, and inform the UE of the number of available OFDM symbols via signaling. The UE may receive downlink channel and/or downlink reference signal according to the received information that the number of OFDM symbols is 7 or 8.
When M is 13, the base station may use the structure of TDD special subframe configuration 4, and inform the UE of the TDD special subframe configuration 4. The UE may receive downlink channel and/or downlink reference signal according to TDD special subframe configuration 4, i.e., regarding the subframe includes 12 available OFDM symbols. In another example, the base station may use a newly defined subframe structure in which the number of OFDM symbols is 13, and inform the UE of the number of available OFDM symbols via signaling. The UE may receive downlink channel and/or downlink reference signal according to the received information that the number of OFDM symbols is 13.
If a conventional TDD special subframe structure is used in situations where the number of OFDM symbols is 4, 5, 7, 8, 13, processing at the UE is less complex and rate matching may be implemented using a conventional format. In addition, it may save signaling bits for informing the UE of the number of OFDM symbols in the subframe via signaling but may waste resources. For example, if only 6 OFDM symbols are used when there are 8 OFDM symbols, 2 OFDM symbols are wasted. If a newly defined subframe structure is used in situations where the number of OFDM symbols is 4, 5, 7, 8, 13, available resources can be fully used and the DM RS structure may re-use the structures defined in one of conventional TDD special subframe configurations, and complexity of the processing at UE is not significantly increased. If a conventional TDD special subframe structure is adopted in some of the situations where M is 4, 5, 7, 8, or 13 and a newly defined subframe structure is adopted in the other of the situations where the number of OFDM symbols is 4, 5, 7, 8, or 13, signaling bits can be saved, and waste of resources can be greately reduced.
Method 4
If the remaining time of the downlink subframe after transmission time reaches the limited maximum transmission duration is shorter than or equal to t (e.g., the value of t may be 20us or the duration of a total of W OFDM symbols, the value of W may be set according to the needs), a UE may continue reception in the last downlink subframe after the limited maximum transmission duration until the end of the downlink subframe. Since the portion exceeding the limited maximum transmission duration is very small, there is little influence on the rule of using unlicensed bands. If the remaining time of the downlink subframe after the limited maximum transmission duration is up is longer than t, the UE may stop receiving the remaining portion of the last downlink subframe that exceeds the limited maximum transmission duration. The method of receiving the PDSCH and the reference signal may be similar to method three. In another example, the UE may not receive any downlink channel and/or downlink reference signal if the remaining time of the downlink subframe after the limited maximum transmission duration is longer than t.
Example two
Since the time when an LTE base station starts occupying a channel may be at a boundary of a downlink subframe or not at a boundary of a downlink subframe, the time may be any time. In order to timely inform a UE of the start time of receiving downlink channel and/or downlink reference signal so that the UE may receive downlink channel and/or downlink reference signal according to the start time, several methods are provided for informing a UE of the start time of receiving downlink channel and/or downlink reference signal.
Method one
In an example, the start time may be sent to the UE via signaling sent in a Pcell, e.g., via a public physical layer signaling in the Pcell. For example, DCI information in PDCCH of format 1C or 1A may be used to inform the UE of the start time of receiving downlink channel and/or downlink reference signal, or inform the UE of the OFDM symbol in a downlink subframe from which the UE may start receiving downlink channel and/or downlink reference signal. That is, the signaling may specify the subframe corresponding to the reception start time, e.g., subframe indication information, and the OFDM symbol in the subframe at which reception of downlink channel and/or downlink reference signal is to be started, i.e., OFDM symbol indication information. The the subframe indication information may use N bits to specify the subframe in which reception of downlink channel and/or downlink reference signal is to be started. N may be a positive integer larger than or equal to 1. The value of N may be defined in a standard or configured by higher layer signaling. In an example, N=1 or 2. For example, when N=1, the 1-bit subframe indication information may specify whether the start time is within the subframe from which the subframe indication information is received or within the previous subframe of the subframe from which the subframe indication information is received. For example, when the subframe indication information is “0”, the start time may be within the subframe from which the subframe indication information is received. When the subframe indication information is “1”, the start time may be within the previous subframe of the subframe from which the subframe indication information is received, as shown in Table 2.
Table 2 shows reception start time of downlink channel and/or downlink reference signal.
Value of subframe indication information The subframe to start receiving downlink channel and/or downlink reference signal
0 The subframe from which the subframe indication information is received
1 The previous subframe of the subframe from which the subframe indication information is received
For example, when N=2, 2-bit subframe indication information may be used to specify the subframe within which the start time is among the subframe from which the subframe indication information is received and three subframes preceding the subframe. When the subframe indication information is “00”, the start time may be within the subframe from which the subframe indication information is received. When the subframe indication information is “01”, the start time may be within the subframe which is one subframe prior to the subframe from which the subframe indication information is received. When the subframe indication information is “10”, the start time may be within a subframe which is two subframes prior to the subframe from which the subframe indication information is received. When the subframe indication information is “11”, the start time may be within a subframe which is three subframes prior to the subframe from which the subframe indication information is received, as shown in Table 3.
Table 3 shows start time of receiving downlink channel and/or downlink reference signal.
Value of subframe indication information The subframe to start receiving downlink channel and/or downlink reference signal
00 The subframe from which the subframe indication information is received
01 The subframe which is one subframe prior to the subframe from which the subframe indication information is received
10 The subframe which is two subframes prior to the subframe from which the subframe indication information is received
11 The subframe which is three subframes prior to the subframe from which the subframe indication information is received
OFDM symbol indication may use OFDM symbol indication information which includes M bits to specify the OFDM symbol at which reception of downlink channel and/or downlink reference signal is to be started. M is a positive integer larger than or equal to 1. The value of M may be defined in a standard or configured by higher layer signaling. In an example, M=4 or 3. For example, 4-bit OFDM symbol indication information may be used to specify the OFDM symbol at which the reception of downlink channel and/or downlink reference signal may be started. When the value of the OFDM symbol indication information is “0000”, the start time is the first OFDM symbol of the subframe. When the value of the OFDM symbol indication information is “0001”, the start time is the second OFDM symbol of the subframe. Likewise, when the value of the OFDM symbol indication information is “1101”, the start time is the fourteenth OFDM symbol of the subframe, as shown in Table 4.
Table 4 shows Start time of receiving downlink channel and/or downlink reference signal.
Value of OFDM symbol indication information The OFDM symbol to start receiving downlink channel and/or downlink reference signal
0000 The first OFDM symbol of the subframe
0001 The second OFDM symbol of the subframe
0010 The third OFDM symbol of the subframe
0011 The fourth OFDM symbol of the subframe
0100 The fifth OFDM symbol of the subframe
0101 The sixth OFDM symbol of the subframe
0110 The seventh OFDM symbol of the subframe
0111 The eighth OFDM symbol of the subframe
1000 The ninth OFDM symbol of the subframe
1001 The tenth OFDM symbol of the subframe
1010 The eleventh OFDM symbol of the subframe
1011 The twelfth OFDM symbol of the subframe
1100 The thirteenth OFDM symbol of the subframe
1101 The fourteenth OFDM symbol of the subframe
1110~1111 reserved
For example, 3-bit OFDM symbol indication information may specify the OFDM symbol that is the start time of receiving downlink channel and/or downlink reference signal. Since 3-bit information can differentiate 8 situations and can only specify some of the 14 OFDM symbols instead of each of the 14 OFDM symbols. For example, when the OFDM symbol indication information indicates “000”, the start time is the first OFDM symbol in the subframe. When the OFDM symbol indication information indicates “001”, the start time is the second OFDM symbol in the subframe. Likewise, when the OFDM symbol indication information indicates “110”, the start time is the seventh OFDM symbol of the subframe. When the OFDM symbol indication information indicates “111”, the start time is one of the eighth OFDM symbol to the fourteenth OFDM symbol of the subframe, but it is not specified which of the OFDM symbols is the start time, as shown in Table 5.
Table 5 shows start time of receiving downlink channel and/or downlink reference signal.
Value of OFDM symbol indication information The OFDM symbol to start receiving downlink channel and/or downlink reference signal
000 The first OFDM symbol of the subframe
001 The second OFDM symbol of the subframe
010 The third OFDM symbol of the subframe
011 The fourth OFDM symbol of the subframe
100 The fifth OFDM symbol of the subframe
101 The sixth OFDM symbol of the subframe
110 The seventh OFDM symbol of the subframe
111 One of the eighth to fourteenth OFDM symbol, and the exact OFDM symbol is not specified
Since PDCCH can only be at the first, second, third or fourth OFDM symbol of a downlink subframe, if the start time of a UE receiving downlink channel and/or downlink reference signal is at an OFDM symbol subsequent to the first, second, third or fourth OFDM symbol, the start time cannot be specified by DCI information in the PDCCH of the Pcell of the current subframe, but be specified by DCI information in PDCCH of the next downlink subframe of the Pcell after the current subframe, and as such, the UE can be informed 801 that the start time 802 of receiving downlink channel and/or downlink reference signal is in a subframe prior to the current subframe, as shown in FIG. 8. FIG. 8 is a schematic diagram illustrating start time of receiving downlink channel and/or downlink reference signal specified by DCI information in accordance with an example of the present disclosure.
If the Pcell is a TDD cell, the next subframe of the subframe corresponding to the start time of the UE receiving downlink channel and/or downlink reference signal may be an uplink subframe. The start time may be sent to the UE via DCI information in PDCCH in the first downlink subframe of the Pcell after the uplink subframe (901), as shown in FIG. 9. FIG. 9 is a schematic diagram illustrating start time of receiving downlink channel and/or downlink reference signal specified by DCI information in accordance with an example of the present disclosure. As such, the base station has occupied the channel, but the UE cannot timely obtain information about that, thus the UE cannot properly receive downlink channel and/or downlink reference signal.
- Method two
In an example, the start time of a UE receiving downlink channel and/or downlink reference signal may be specified by information transmitted by a cell operating on an unlicensed band. The information is referred to as start time indication information. For example, the start time indication information may be transmitted in DCI information in a downlink subframe where the start time of the UE receiving the downlink channel and/or downlink reference signal falls.
FIG. 10 is a schematic diagram illustrating start time of receiving downlink channel and/or downlink reference signal specified by DCI information in accordance with an example of the present disclosure. As shown in FIG. 10, the DCI information may be transmitted on the last K (K=1, 2, 3, 4) OFDM symbols at the end of the downlink subframe corresponding to the start time. The value of K may be defined in a standard or configured by higher layer signaling. The information may be indicated in PDCCH 1001, e.g., a PDCCH including P (P=1, 2, 4, 8) control channel elements (CCE). The value of P may be defined in a standard or configured by higher layer signaling. The PDCCH may be a PDCCH in a public search space composed of resource element groups (REG) and CCEs in the last K OFDM symbols at the end of the downlink subframe corresponding to the start time.
In another example, the start time may be specified by a PDCCH located at a fixed position among the last K OFDM symbols at the end of the downlink subframe corresponding to the start time at which the UE can start receiving downlink channel and/or downlink reference signal, i.e., the positions of CCEs and REGs forming the CCEs are fixed, e.g., may be defined in a protocol.
In another example, the number of CCEs occupied by the PDCCH and positions of REs forming the CCEs may be configured by higher layer signaling, and no blind detection of PDCCH is to be performed. Conventional PDCCH is transmitted on the first K (K=1, 2, 3, 4) OFDM symbols at the head of the subframe. CCEs composing the PDCCH and REGs composing the CCEs are on the first OFDM symbols at the head of the subframe. In this example, CCEs composing the PDCCH and REGs composing the CCEs are on the last OFDM symbols at the end of the subframe. PDCCH is demodulated using CRS which is at the end of the subframe.
FIG. 11 is a schematic diagram illustrating positions of unmodified CRS resources and positions of modified CRS resources. As shown in FIG. 11, when there is only CRS port 0, the UE may receive the CRS from the position of modified CRS resources 1115. The positions of unmodified CRS resources 1110 and positions of modified CRS resources 1115 may be as shown in FIG. 11. When other CRS ports are used, methods adopted may be similar to the above. The start position of modified CRS resources 1115 is changed. Unmodified CRS resources 1110 are arranged starting from the head of the subframe towards the end of the subframe, and modified CRS resources 1115 are arranged from the end of the subframe towards the head of the subframe. As such, CRS has a definite start position.
In an example, the conventional CRS structure, i.e., the CRS at the position of the unmodified CRS resources as shown in FIG. 11 may be adopted. The method can timely inform a UE of the start time of receiving a downlink channel and/or downlink reference signal to enable the UE to successfully receive the downlink channel and/or downlink reference signal. Thus, even if only the last OFDM symbol is complete in the downlink subframe corresponding to the start time of receiving the downlink channel and/or downlink reference signal, the UE can be informed of the start time.
In an example, control information transmitted in resources having a fixed position in the subframe corresponding to the start time may be used for informing the UE of the start time. The control information is the start time indication information. The resources having a fixed position refers to physical resources block pairs having a fixed position in the frequency domain, or OFDM symbols having fixed position in the time domain, e.g., the last 1 or 2 OFDM symbols in 6 physical resource block pairs at the center of the system bandwidth (or all of physical resource block pairs in the whole system bandwidth).
OFDM symbol indication information may use M bits to specify the OFDM symbol at which reception of downlink channel and/or downlink reference signal is to be started. M is a positive integer larger than or equal to 1. The value of M may be defined in a standard or configured by higher layer signaling.
In an example, M may be 4 or 3. For example, 4-bit OFDM symbol indication information may be used to specify the OFDM symbol corresponding to the start time of receiving downlink channel and/or downlink reference signal. When the value of the OFDM symbol indication information is “0000”, the start time is the first OFDM symbol of the subframe. When the value of the OFDM symbol indication information is “0001”, the start time is the second OFDM symbol of the subframe. Likewise, when the value of the OFDM symbol indication information is “1101”, the start time is the fourteenth OFDM symbol of the subframe, as shown in Table 4. For example, 3-bit OFDM symbol indication information may specify the OFDM symbol that is the start time of receiving downlink channel and/or downlink reference signal. Since 3-bit information can only differentiate 8 situations and can only specify situations where the start time is some of the 14 OFDM symbols instead of specifying situations where the start time is each of the 14 OFDM symbols. For example, when the OFDM symbol indication information indicates “000”, the start time is the first OFDM symbol in the subframe. When the OFDM symbol indication information indicates “001”, the start time is the second OFDM symbol in the subframe. Likewise, when the OFDM symbol indication information indicates “110”, the start time is the seventh OFDM symbol of the subframe. When the OFDM symbol indication information indicates “111”, the start time is one of the eighth OFDM symbol to the fourteenth OFDM symbol of the subframe, but it is not specified which of the OFDM symbols is the start time, as shown in Table 5.
- Method three:
In an example, the start time of a UE receiving downlink channel and/or downlink reference signal may be specified by information transmitted by a cell operating on an unlicensed band. The information is referred to as start time indication information. In an example, the indication information of the start time that a UE can start receiving downlink channel and/or downlink reference signal may be transmitted via DCI information in the subframe within which the start time falls or the next subframe of the subframe.
The DCI information may be transmitted in a PDCCH. In an example, the PDCCH may be a PDCCH within the public search space. In an example, the PDCCH may be a PDCCH having a fixed position, i.e., the PDCCH may always occupy the same CCEs that are composed of REGs having fixed positions. The fixed position may be defined in a protocol. In another example, the number of CCEs occupied by the PDCCH and positions of REs composing the CCEs may be configured by higher layer signaling, and no blind detection of PDCCH is to be performed.
The DCI information may be sent in an EPDCCH having a fixed position, i.e., the EPDCCH may always occupy the same ECCEs that are composed of EREGs having fixed positions. The fixed position may be defined in a protocol. In another example, the number of ECCEs occupied by the EPDCCH and positions of REs forming the ECCEs may be configured by higher layer signaling, and no blind detection of the EPDCCH is to be performed.
In an example, control information transmitted in resources having a fixed position in the subframe in which the start time falls or in the next subframe of the subframe may be used for informing the UE of the start time when the UE may start to receive downlink channel and/or downlink reference signal. The control information is the start time indication information. The resources having the fixed position refers to physical resources block pairs having a fixed position in the frequency domain, or OFDM symbols having a fixed position in the time domain, e.g., the first 1 or 2 OFDM symbols in 6 physical resource block pairs at the center of the system bandwidth (or all of physical resource block pairs in the whole system bandwidth). The following are four examples of the method of indicating the start time of receiving downlink channel and/or downlink reference signal.
Method 1: An OFDM symbol in a subframe may be indicated to the UE as the start time when the UE may start receiving downlink channel and/or downlink reference signal. That is, subframe indication information may be used to indicate whether the start time is in a subframe from which the subframe indication information is received or in the preceding subframe of the subframe, and OFDM symbol indication information may be used to indicate the OFDM symbol from which to start receiving downlink channel and/or downlink reference signal in the subframe. The subframe indication information may use 1 bit to indicate whether the start time is in the subframe from which the subframe indication information is received or in the preceding subframe of the subframe.
For example, when the value of the subframe indication information is “0”, the start time is in the subframe from which the subframe indication information is received; when the value of the subframe indication information is “1”, the start time is in the preceding subframe of the subframe from which the subframe indication information is received, as shown in Table 2. OFDM symbol indication information may use M bits to specify the OFDM symbol at which reception of downlink channel and/or downlink reference signal is to be started. M is a positive integer larger than or equal to 1. The value of M may be defined in a standard or configured by higher layer signaling. In an example, M may be 4 or 3.
For example, 4-bit OFDM symbol indication information may be used to specify the OFDM symbol corresponding to the start time of receiving downlink channel and/or downlink reference signal. When the value of the OFDM symbol indication information is “0000”, the start time is the first OFDM symbol of the subframe. When the value of the OFDM symbol indication information is “0001”, the start time is the second OFDM symbol of the subframe. Likewise, when the value of the OFDM symbol indication information is “1101”, the start time is the fourteenth OFDM symbol of the subframe, as shown in Table 4.
For example, 3-bit OFDM symbol indication information may specify the OFDM symbol that is the start time of receiving downlink channel and/or downlink reference signal. Since 3-bit information can only differentiate 8 situations and can only specify situations where the start time is some of the 14 OFDM symbols instead of specifying situations where the start time is each of the 14 OFDM symbols.
For example, when the OFDM symbol indication information indicates “000”, the start time is the first OFDM symbol in the subframe. When the OFDM symbol indication information indicates “001”, the start time is the second OFDM symbol in the subframe. Likewise, when the OFDM symbol indication information indicates “110”, the start time is the seventh OFDM symbol of the subframe. When the OFDM symbol indication information indicates “111”, the start time is one of the eighth OFDM symbol to the fourteenth OFDM symbol of the subframe, but it is not specified which of the OFDM symbols is the start time, as shown in Table 5.
Method 2: OFDM symbol indication information may be used to inform a UE of an OFDM symbol in a subframe as the start time when the UE may start receiving downlink channel and/or downlink reference signal. The value of the OFDM symbol indication information may be used to determine whether the start time falls in the subframe from which the subframe indication information is received or in the preceding subframe of the subframe, i.e., a start time specified by some values of the OFDM symbol indication information is within the subframe from which the OFDM symbol indication information is received, and a start time specified by other values of the OFDM symbol indication information is within the preceding subframe of the subframe.
In an example, if the OFDM symbol specified by the OFDM symbol indication information is transmitted later than the first OFDM symbol of the PDCCH/EPDCCH which includes the OFDM symbol indication information, the start time is in the preceding subframe of the subframe from which the OFDM symbol indication information is received; otherwise, the start time is within the subframe from which the OFDM symbol indication information is received. For example, if the OFDM symbol indication information specifies the start time is the fifth OFDM symbol and the EPDCCH starts from the third OFDM symbol, i.e., the start time is later than the start time of the EPDCCH from which the OFDM symbol indication information is received, the subframe in which the start time falls cannot be the subframe in which the EPDCCH including the OFDM symbol indication information is transmitted, and the start time is in the preceding subframe of the subframe in which the EPDCCH is transmitted.
For example, if the OFDM symbol indication information specifies the start time is the first OFDM symbol and the PDCCH occupies the first and second OFDM symbols, i.e., the start time is not later than the start time of the PDCCH from which the OFDM symbol indication information is received, the subframe in which the start time is the subframe in which the PDCCH including the OFDM symbol indication information is transmitted, and the start time is in the subframe in which the PDCCH is transmitted.
For example, 4-bit OFDM symbol indication information may be used to specify the OFDM symbol which is the start time of receiving downlink channel and/or downlink reference signal. If the value of the OFDM symbol indication information is “0000”, the start time is the first OFDM symbol in the subframe. If the value of the OFDM symbol indication information is “0001”, the start time is the second OFDM symbol in the subframe. Likewise, if the value of the OFDM symbol indication information is “1101”, the start time is the fourteenth OFDM symbol in the subframe, as shown in Table 4.
Method 3: The value of the OFDM symbol indication information may be used to determine whether the start time falls in the subframe from which the subframe indication information is received or in the preceding subframe of the subframe, i.e., a start time specified by some values of the OFDM symbol indication information is within the subframe from which the OFDM symbol indication information is received, and a start time specified by other values of the OFDM symbol indication information is within the preceding subframe of the subframe. If the start time specified by the OFDM symbol indication information in a PDCCH or an EPDCCH is the first OFDM symbol, and the subframe in which the start time falls is the subframe from which the PDCCH/EPDCCH including the OFDM symbol indication information is received; otherwise, the subframe is the previous subframe of the subframe including the PDCCH/EPDCCH.
The OFDM symbol indication information may use M bits to specify the OFDM symbol which is the start time of receiving downlink channel and/or downlink reference signal. M is a positive integer larger than or equal to 1. The value of M may be defined in a protocol or configured by higher layer signaling. For example, M=4.
4-bit OFDM symbol indication information may specify the OFDM symbol which is the start time of receiving downlink channel and/or downlink reference signal. If the value of the OFDM symbol indication information is “0000”, the start time is the second OFDM symbol of the previous subframe of the subframe from which the PDCCH/EPDCCH including the OFDM symbol indication information is received. If the value of the OFDM symbol indication information is “0001”, the start time is the third OFDM symbol of the previous subframe of the subframe from which the PDCCH/EPDCCH including the OFDM symbol indication information is received. Likewise, if the value of the OFDM symbol indication information is “1100”, the start time is the fourteenth OFDM symbol of the previous subframe of the subframe from which the PDCCH/EPDCCH including the OFDM symbol indication information is received. If the value of the OFDM symbol indication information is “1101”, the start time is the first OFDM symbol of the subframe from which the PDCCH/EPDCCH including the OFDM symbol indication information is received, as shown in Table 6.
In another example, if the value of the OFDM symbol indication information is “0000”, the start time is the first OFDM symbol of the subframe from which the PDCCH/EPDCCH including the OFDM symbol indication information is received. If the value of the OFDM symbol indication information is “0001”, the start time is the second OFDM symbol of the previous subframe of the subframe from which the PDCCH/EPDCCH including the OFDM symbol indication information is received. If the value of the OFDM symbol indication information is “0010”, the start time is the third OFDM symbol of the previous subframe of the subframe. Likewise, if the value of the OFDM symbol indication information is “1101”, the start time is the fourteenth OFDM symbol of the previous subframe of the subframe, as shown in Table 7.
Table 6 shows start time of receiving downlink channel and/or downlink reference signal.
Value of OFDM symbol indication information The OFDM symbol to start receiving downlink channel and/or downlink reference signal
0000 the second OFDM symbol of the previous subframe of the subframe from which the OFDM symbol indication information is received
0001 the third OFDM symbol of the previous subframe of the subframe from which the OFDM symbol indication information is received
0010 the fourth OFDM symbol of the previous subframe of the subframe from which the OFDM symbol indication information is received
0011 the fifth OFDM symbol of the previous subframe of the subframe from which the OFDM symbol indication information is received
0100 the sixth OFDM symbol of the previous subframe of the subframe from which the OFDM symbol indication information is received
0101 the seventh OFDM symbol of the previous subframe of the subframe from which the OFDM symbol indication information is received
0110 the eighth OFDM symbol of the previous subframe of the subframe from which the OFDM symbol indication information is received
0111 the ninth OFDM symbol of the previous subframe of the subframe from which the OFDM symbol indication information is received
1000 the tenth OFDM symbol of the previous subframe of the subframe from which the OFDM symbol indication information is received
1001 the eleventh OFDM symbol of the previous subframe of the subframe from which the OFDM symbol indication information is received
1010 the twelfth OFDM symbol of the previous subframe of the subframe from which the OFDM symbol indication information is received
1011 the thirteenth OFDM symbol of the previous subframe of the subframe from which the OFDM symbol indication information is received
1100 the fourteenth OFDM symbol of the previous subframe of the subframe from which the OFDM symbol indication information is received
1101 the first OFDM symbol of the subframe from which the OFDM symbol indication information is received
1110~1111 reserved
Table 7 shows start time of receiving downlink channel and/or downlink reference signal.
Value of OFDM symbol indication information The OFDM symbol to start receiving downlink channel and/or downlink reference signal
0000 the first OFDM symbol of the subframe from which the OFDM symbol indication information is received
0001 the second OFDM symbol of the previous subframe of the subframe from which the OFDM symbol indication information is received
0010 the third OFDM symbol of the previous subframe of the subframe from which the OFDM symbol indication information is received
0011 the fourth OFDM symbol of the previous subframe of the subframe from which the OFDM symbol indication information is received
0100 the fifth OFDM symbol of the previous subframe of the subframe from which the OFDM symbol indication information is received
0101 the sixth OFDM symbol of the previous subframe of the subframe from which the OFDM symbol indication information is received
0110 the seventh OFDM symbol of the previous subframe of the subframe from which the OFDM symbol indication information is received
0111 the eighth OFDM symbol of the previous subframe of the subframe from which the OFDM symbol indication information is received
1000 the ninth OFDM symbol of the previous subframe of the subframe from which the OFDM symbol indication information is received
1001 the tenth OFDM symbol of the previous subframe of the subframe from which the OFDM symbol indication information is received
1010 the eleventh OFDM symbol of the previous subframe of the subframe from which the OFDM symbol indication information is received
1011 the twelfth OFDM symbol of the previous subframe of the subframe from which the OFDM symbol indication information is received
1100 the thirteenth OFDM symbol of the previous subframe of the subframe from which the OFDM symbol indication information is received
1101 the fourteenth OFDM symbol of the previous subframe of the subframe from which the OFDM symbol indication information is received
1110~1111 reserved
Method 4: OFDM symbol indication information may inform a UE of an OFDM symbol in a subframe as the start time when the UE may start receiving downlink channel and/or downlink reference signal. The OFDM symbol indication information may be used to determine whether the start time is in the subframe from which the subframe indication information is received or in the previous subframe of the subframe, i.e., some values of the OFDM symbol indication information may indicate the start time is in the subframe from which the OFDM symbol indication information is received, and other values of the OFDM symbol indication information may indicate the start time is in the previous subframe of the subframe. The OFDM symbol indication information may use M bits to specify the OFDM symbol which is the start time of receiving downlink channel and/or downlink reference signal. M is a positive integer larger than or equal to 1. The value of M may be defined in a protocol or configured by higher layer signaling. For example, M=4.
For example, 4-bit OFDM symbol indication information may specify the OFDM symbol which is the start time of receiving downlink channel and/or downlink reference signal. If the value of the subframe indication information is “0000”, the start time is in the first OFDM symbol in the previous subframe of the subframe from which the OFDM symbol indication information is received. If the value of the OFDM symbol indication information is “0001”, the start time is the second OFDM symbol in the previous subframe of the subframe from which the OFDM symbol indication information is received. Likewise, if the value of the OFDM symbol indication information is “1101”, the start time is the fourteenth OFDM symbol in the previous subframe of the subframe from which the OFDM symbol indication information is received. If the value of the OFDM symbol indication information is “1110”, the start time is the first OFDM symbol in the subframe from which the OFDM symbol indication information is received, as shown in Table 8.
Table 8 shows start time of receiving downlink channel and/or downlink reference signal.
Value of OFDM symbol indication information The OFDM symbol to start receiving downlink channel and/or downlink reference signal
0000 the first OFDM symbol of the previous subframe of the subframe from which the OFDM symbol indication information is received
0001 the second OFDM symbol of the previous subframe of the subframe from which the OFDM symbol indication information is received
0010 the third OFDM symbol of the previous subframe of the subframe from which the OFDM symbol indication information is received
0011 the fourth OFDM symbol of the previous subframe of the subframe from which the OFDM symbol indication information is received
0100 the fifth OFDM symbol of the previous subframe of the subframe from which the OFDM symbol indication information is received
0101 the sixth OFDM symbol of the previous subframe of the subframe from which the OFDM symbol indication information is received
0110 the seventh OFDM symbol of the previous subframe of the subframe from which the OFDM symbol indication information is received
0111 the eighth OFDM symbol of the previous subframe of the subframe from which the OFDM symbol indication information is received
1000 the ninth OFDM symbol of the previous subframe of the subframe from which the OFDM symbol indication information is received
1001 the tenth OFDM symbol of the previous subframe of the subframe from which the OFDM symbol indication information is received
1010 the eleventh OFDM symbol of the previous subframe of the subframe from which the OFDM symbol indication information is received
1011 the twelfth OFDM symbol of the previous subframe of the subframe from which the OFDM symbol indication information is received
1100 the thirteenth OFDM symbol of the previous subframe of the subframe from which the OFDM symbol indication information is received
1101 the fourteenth OFDM symbol of the previous subframe of the subframe from which the OFDM symbol indication information is received
1110 the first OFDM symbol of the subframe from which the OFDM symbol indication information is received
1111 reserved
Example three
Since the start time when an LTE base station starts to occupy a channel may be at a boundary of a downlink subframe or any time in a downlink subframe, a UE may start receiving PDSCH from a boundary of a downlink subframe or from any time position of a downlink subframe. In the latter situation, the PDSCH may not be received from all of OFDM symbols of a downlink subframe. In order to facilitate reception of PDSCH and make full use of resources, when the number of OFDM symbols that may be used in receiving PDSCH is larger than or equal to N, PDSCH in the downlink subframe may be scheduled individually, i.e., the downlink subframe may transmit an individual transmission block. The N may be a positive integer larger than or equal to 1. In an example, the value of N may be determined according to a protocol, or configured by higher layer signaling. In another example, the value of N may be determined according to the minimum number of OFDM symbols of a DwPTS defined in conventional TDD special subframe configurations that allow PDSCH transmission, i.e., N=6 which is the number of OFDM symbols in the DwPTS of TDD special subframe configuration 9. For example, when a base station starts to occupy a channel from an OFDM symbol in downlink subframe n, PDSCH in downlink subframe n may be scheduled by PDCCH/EPDCCH in downlink subframe n+1, or may be scheduled by PDCCH/EPDCCH in downlink subframe n. The PDSCH in downlink subframe n and the PDSCH in downlink subframe n+1 may be scheduled by different PDCCH/EPDCCH, and may transmit different transmission blocks. In an example, when a base station ends channel occupancy at an OFDM symbol in downlink subframe n, PDSCH in downlink subframe n and PDSCH in downlink subframe n-1 may be scheduled by different PDCCH/EPDCCH, and may transmit different transmission blocks.
When the number of OFDM symbols that may be used in receiving PDSCH is smaller than N, PDSCH in the downlink subframe and PDSCH in other downlink subframes may be scheduled collectively by one PDCCH/EPDCCH, i.e., the downlink subframe and the other subframes may collaboratively transmit one transmission block. The N may be a positive integer larger than or equal to 1. In an example, the value of N may be determined according to a protocol, or configured by higher layer signaling. In another example, the value of N may be determined according to the minimum number of OFDM symbols of a DwPTS defined in conventional TDD special subframe configurations that allow PDSCH transmission, i.e., N=6 which is the number of OFDM symbols in the DwPTS of TDD special subframe configuration 9. For example, when a base station starts to occupy a channel from an OFDM symbol in downlink subframe n, PDSCH in downlink subframe n may be scheduled by PDCCH/EPDCCH in downlink subframe n+1. The PDSCH in downlink subframe n and the PDSCH in downlink subframe n+1 may be scheduled by the same PDCCH/EPDCCH, and may collaboratively transmit one transmission block. For another example, when a base station ends channel occupancy at an OFDM symbol in downlink subframe n, PDSCH in downlink subframe n and PDSCH in downlink subframe n-1 may be scheduled by the same PDCCH/EPDCCH, and may collaboratively transmit one transmission block.
Example four
Since the time when an LTE base station starts to occupy a channel may be at a boundary of a downlink subframe or any position in a downlink subframe, a UE may start receiving PDSCH from a boundary of a downlink subframe or from any time position in a downlink subframe. A cell operating on an unlicensed band may avoid non-stop transmission, so that other systems may not be seriously affected. The cell operating on an unlicensed band may perform transmission non-continuously, i.e., the cell may perform transmission for a period and stop to perform channel state detection. If the channel is detected to be idle, transmission may be continued; otherwise, the channel state detection may be performed repeatedly and transmission may not be performed until the channel is detected to be idle. The limited maximum transmission duration of a cell operating on an unlicensed band may be 1 to 13 milliseconds, and may not be integral multiple of milliseconds. For example, when q=4~13, the limited maximum transmission duration may be (13/32)*q milliseconds; when q=4, the limited maximum transmission duration may be (13/32)*4=1.625 milliseconds.
According to the above, since the time when an LTE base station starts to occupy a channel may not be at a boundary of a downlink subframe, the time when the LTE base station stops occupying the channel may not be at a boundary of a downlink subframe. Further, the time when an LTE base station starts to occupy a channel may not be at a boundary of an OFDM symbol, and the time when the LTE base station stops occupying the channel may not be at a boundary of an OFDM symbol. In an example, no matter whether the time when an LTE base station starts to occupy a channel is at a boundary of a subframe or an OFDM symbol, a UE may start receiving downlink channel and/or downlink reference signal at a boundary of an OFDM symbol. For example, the time when a UE may start receiving downlink channel and/or downlink reference signal (including a pilot reference signal identifiable by the UE) in the first downlink subframe within a transmission duration of a cell operating on an unlicensed band (i.e., within the duration when the unlicensed band is occupied by the LTE base station) may be obtained by checking a cell-specific reference signal of the cell, or obtained from indication information.
The method of obtaining the start time from the indication information may be implemented according to the following examples.
Method one: the start position of OFDM symbols to be received by a UE in the first downlink subframe may be the earliest start position of complete OFDM symbols occupied by signals in the first downlink subframe. For example, if a PDCCH/EPDCCH that includes N1 complete OFDM symbols and a pilot reference signal (e.g., PSS/SSS) that occupies N2 complete OFDM symbols before the PDCCH/EPDCCH are transmitted in the first downlink subframe, the first OFDM symbol to be received by the UE in the first downlink subframe may be N1+ N2. The base station may specify N1+ N2 or the start position of the pilot reference signal via signaling.
In another example, if the base station transmits a PDCCH/EPDCCH that includes N1 complete OFDM symbols, a pilot reference signal (e.g., PSS/SSS) that occupies N2 complete OFDM symbols before the PDCCH/EPDCCH, and some OFDM symbols for occupying the channel, the base station may specify N1+ N2 or the start position of the pilot reference signal via signaling. In another example, if the base station only transmits a PDCCH/EPDCCH that includes N1 complete OFDM symbols in the first downlink subframe and no signal before the PDCCH/EPDCCH in the subframe, the first OFDM symbol to be received by the UE in the first downlink subframe may be N1. The base station may specify N1 or the start position of the PDCCH/EPDCCH via signaling.
In another example, if the base station only transmits a PDCCH/EPDCCH that includes N1 complete OFDM symbols in the first downlink subframe and some OFDM symbols for occupying the channel before the PDCCH/EPDCCH in the subframe, the first OFDM symbol to be received by the UE in the first downlink subframe may be N1. The base station may specify N1 or the start position of the PDCCH/EPDCCH via signaling. When a set Ψ of possible start positions of the PDCCH/EPDCCH in the first downlink subframe includes one or plural elements, e.g., Ψ=As such, the OFDM symbol from which the UE starts to receive downlink channel in the first downlink subframe may be determined according to the number of complete OFDM symbols in the first downlink subframe.
In an example, the number of OFDM symbols to be received in the first downlink subframe may be smaller than or equal to the number of complete OFDM symbols in the first downlink subframe, and may be the largest one in n3 OFDM symbol numbers in the first downlink subframe. Since there is limited number of elements in the set of PDCCH/PDSCH start positions, the UE may determine a unique start position of the PDCCH/PDSCH according to the start positions of all signals.
Method two: the start position of OFDM symbols from which a UE may start to receive downlink channel in the first downlink subframe may be the earliest start position of complete OFDM symbols in the downlink channel in the first downlink subframe, e.g., complete OFDM symbols in the PDCCH/EPDCCH/PDSCH. If the start position is specified by signaling sent by a base station, the signaling may specify the number of complete OFDM symbols occupied by PDCCH/EPDCCH/PDSCH or the start time of the PDCCH/EPDCCH/PDSCH, not specifying a pilot signal.
The end time of receiving downlink channel and/or downlink reference signal in the last downlink subframe within the duration may be obtained as follows. The start time of receiving downlink subframe and/or downlink reference signal in the first downlink subframe and end time of receiving downlink subframe and/or downlink reference signal in the last downlink subframe within the transmission duration may both fall at a boundary of an OFDM symbol.
Method one
The UE may continue to receive the remaining of downlink channel and/or downlink reference signal in the last downlink subframe that exceeds the limited maximum transmission duration after the duration of receiving the downlink channel and/or downlink reference signal in the last downlink subframe reaches the limited maximum transmission duration until the end of the last downlink subframe. That is, the last downlink subframe is always a complete subframe. The end time of a UE receiving downlink channel and/or downlink reference signal is the ending boundary of the last OFDM symbol in the last downlink subframe in the transmission duration. This method is easy in implementation, and requires few modifications to the standards. Since the base station may continue transmission after the limited maximum transmission duration, the method may violate the rule of using unlicensed bands.
Method two
The start time of receiving downlink subframe and/or downlink reference signal in the first downlink subframe and end time of receiving downlink subframe and/or downlink reference signal in the last downlink subframe within the transmission duration may be obtained individually. In an example, the start time may be determined to be an OFDM symbol in the first subframe according to a detected reference signal transmitted in a cell operating on an unlicensed band or according to indication information. The end time may be determined to be an OFDM symbol in the last subframe according to indication information.
Method three
The end time of a UE receiving downlink channel and/or downlink reference signal in the last downlink subframe may be calculated using the reception start time of the UE in the first downlink subframe in the transmission duration. A base station may start occupying a channel from a boundary of an OFDM symbol or from within an OFDM symbol, and the transmission duration 1200 may not be an integral multiple of the duration of an OFDM symbol, as shown in FIG. 12. FIG. 12 is a schematic diagram illustrating signal transmission duration of a base station on an unlicensed band.
In an example, a UE may start receiving downlink channel and/or downlink reference signal from the start of the n'th complete OFDM symbol in the first downlink subframe within the transmission duration 1300, and end the reception at the end of the last complete OFDM symbol in the last downlink subframe within the transmission duration 1300, as shown in FIG. 13. FIG. 13 is a schematic diagram illustrating start time and end time of receiving downlink channel and/or downlink reference signal in accordance with example four of the present disclosure
The n' may be a positive integer larger than 1. The value of n' may be defined in a protocol, e.g., n'=1 or 2. Previous n'-1 OFDM symbols before the n'th OFDM symbol may be for other usage. For example, if n'=1, there is no previous complete OFDM symbol for other usage. It may be assumed that the number of OFDM symbols of the downlink channel and/or downlink reference signal received by the UE in the first downlink subframe within the transmission duration 1400 is N', and the number of OFDM symbols of the downlink channel and/or downlink reference signal received by the UE in the last downlink subframe within the transmission duration 1400 is M', as shown in FIG. 14. FIG. 14 is a schematic diagram illustrating start time and end time of receiving downlink channel and/or downlink reference signal in accordance with example four of the present disclosure
N' may be obtained from detected reference symbols sent by the cell operating on the unlicensed band or from indication information (as in the above two methods using signaling). The UE may determine the value of M' according to the following methods, and thus determine the end time of receiving downlink channel and/or downlink reference signal. It may be assumed that the transmission duration is t milliseconds, t may be a positive integer, i.e., the transmission duration is an integral multiple of the duration of a subframe, e.g., t may be 10 milliseconds. In another example, t may be a decimal, i.e., the transmission duration may not be an integral multiple of the duration of a subframe, and may even not be an integral multiple of the duration of an OFDM symbol.
Supposing t is an integral multiple of the duration of a subframe, M' may be obtained according to the following methods.
Method 1: A UE may determine M' by detecting a signal before the first complete OFDM symbol in the first downlink subframe in the duration. For example, if a signal is detected by the UE before the first complete OFDM symbol in the first downlink subframe, the time when the base station starts occupying the channel may not be at a boundary of an OFDM symbol in a downlink subframe, and M' may be M'=14 -N'-(n'-1)-1. If no signal is detected before the first complete OFDM symbol in the first downlink subframe, the time when the base station starts occupying the channel may be at a boundary of an OFDM symbol in a downlink subframe, and M' may be 14 -N'-(n'-1). In an example, a relation between M' and N' may be specified by 1-bit signaling. For example, if the value specified by the signaling is “0”, M' may be 14 -N'-(n'-1)-1; if the value specified by the signaling is “1”, M' may be 14 -N'-(n'-1).
Method 2: No matter whether the time when an LTE base station starts to occupy the channel is from a boundary of an OFDM symbol in a downlink subframe or not, it may be prudent to regard the start time is not at a boundary of an OFDM symbol in a downlink subframe, i.e., 14 -N'-(n'-1)-1, thus no addition signaling or UE detection is needed.
Method 3: No matter whether the time when an LTE base station starts to occupy the channel is from a boundary of an OFDM symbol in a downlink subframe or not, it may be defined M'=14 -N'-(n'-1), i.e., if the start time of channel occupancy is at a boundary of an OFDM symbol in a downlink subframe, the UE may stop receiving downlink channel and/or downlink reference signal in the last downlink subframe within the transmission duration 1500 after the limited maximum transmission duration ends. If the start time of channel occupancy is not at a boundary of an OFDM symbol in a downlink subframe, the UE may continue receiving the downlink subframe and/or downlink reference signal in the remaining of the OFDM symbol that exceeds the limited maximum transmission duration in the last downlink subframe within the transmission duration 1500 until the boundary of the OFDM symbol, as shown in FIG. 15. FIG. 15 is a schematic diagram illustrating start time and end time of receiving downlink channel and/or downlink reference signal in accordance with example four of the present disclosure. According to this method, the UE does not need additional signaling, and does not have to perform detection.
Method 4: If the M' obtained according to method 1, 2 or 3 is the number of OFDM symbols in DwPTS defined in one of TDD special subframe configurations, the M' of this method is the M' obtained according to method 1, 2 or 3. If the M' obtained according to method 1, 2 or 3 is not the number of OFDM symbols in DwPTS defined in one of TDD special subframe configurations, the M' of this method may be the number of OFDM symbols in DwPTS defined in one of TDD special subframe configurations, and the number of OFDM symbols in DwPTS defined in the TDD special subframe configuration may be smaller than the M' obtained according to method 1, 2 or 3, and is the largest number of OFDM symbols as defined in the TDD special subframe configurations smaller than the M' obtained according to method 1, 2 or 3. The TDD special subframe configurations may be the TDD special subframe configurations 0, 1, 2, 3, 4, 5, 6, 7, 8, 9 as shown in Table 1, or the TDD special subframe configurations 1, 2, 3, 4, 6, 7, 8, 9 as shown in Table 1.
If t is not an integral multiple of the duration of a subframe or t is an integral multiple of the duration of a subframe, M' may be obtained according to the following examples.
Method 1'
M' may be specified by 1-bit signaling. When the siginal specifies a pre-determined value (e.g., “0”), it indicates the sum of the duration of an incomplete OFDM symbol in the first downlink subframe within the transmission duration and the duration of an incomplete OFDM symbol in the last downlink subframe within the transmission duration may not exceed the duration of an OFDM symbol. The incomplete OFDM symbol refers to the portion within the transmission duration of an OFDM symbol. In this case, M' may be determined according to the following methods.
In an example, the sum of the duration of an incomplete OFDM symbol in the first downlink subframe within the transmission duration and the duration of an incomplete OFDM symbol in the last downlink subframe within the transmission duration may be calculated according to l=(t-the duration of complete OFDM symbols in the first downlink subframe)mod 1. The value of M' may be determined according to a pre-determined first relation which associates the value of l and a value of M'. For example, Table 9 may be searched to obtain the value of M'.
In another example, l=(t-the duration of complete OFDM symbols in the first downlink subframe)mod 1 may be calculated. If l is smaller than the sum of a half the duration of a subframe and the duration of the first OFDM symbol in each time slot, i.e., 0.5+(160+2048)/(30.72*10e3)=0.571875,
Figure PCTKR2015014411-appb-I000013
. The p is the difference between the CP length in the first OFDM symbol in each subframe and the CP length in other OFDM symbols, i.e., (160-144)/(30.72*10e3)=0.00052 milliseconds. The L is the duration of an OFDM symbol other than the first OFDM symbol in the each subframe (including the length of CP). The value of L may be (2048+144)/(30.72*10e3)=0.07135. When l is larger than or equal to 0.571875,
Figure PCTKR2015014411-appb-I000014
. In another example, l=(t-the duration of complete OFDM symbols in the first downlink subframe)mod 1 may be calculated, and the value of M' may always be
Figure PCTKR2015014411-appb-I000015
no matter what is the value of l.
Table 9 shows the number of OFDM symbols in the last downlink subframe.
The range of l=(t-the duration of complete OFDM symbols in the first downlink subframe)mod 1 (milliseconds) The number of OFDM symbols in the last downlink subframe (M')
71.875≤l<143.23 1
143.23≤l<214.58 2
214.58≤l<285.94 3
285.94≤l<357.29 4
357.29≤l<428.65 5
428.65≤l<500 6
500≤l<571.875 7
571.875≤l<643.23 8
643.23≤l<714.58 9
714.58≤l<785.94 10
785.94≤l<857.29 11
857.29≤l<928.65 12
928.65≤l<1000 13
1000≤l<1071.875 14
When the signal specifies another pre-determined value (e.g., “1”), it indicates the sum of the duration of an incomplete OFDM symbol in the first downlink subframe within the transmission duration and the duration of an incomplete OFDM symbol in the last downlink subframe within the transmission duration may exceed the duration of an OFDM symbol. In this case, M' may be determined according to the following methods. In an example, the sum of the duration of an incomplete OFDM symbol in the first downlink subframe within the transmission duration and the duration of an incomplete OFDM symbol in the last downlink subframe within the transmission duration may be calculated according to l=(t-the duration of complete OFDM symbols in the first downlink subframe) mod 1. The value of M' may be determined according to a pre-determined second relation which associates the value of l and a value of M'. For example, Table 10 may be searched to obtain the value of M'.
In another example, l=(t-the duration of complete OFDM symbols in the first downlink subframe)mod 1 may be calculated. If l is smaller than the sum of a half of the duration of a subframe and the duration of the first OFDM symbol in each time slot, i.e., 0.5+(160+2048)/(30.72*10e3)=0.571875,
Figure PCTKR2015014411-appb-I000016
. The p is the difference between the CP length in the first OFDM symbol in each subframe and the CP length in other OFDM symbols, i.e., (160-144)/(30.72*10e3)=0.00052 milliseconds. The L is the duration of an OFDM symbol other than the first OFDM symbol in the each subframe (including the length of CP). The value of L may be (2048+144)/(30.72*10e3)=0.07135. When l is larger than or equal to 0.571875,
Figure PCTKR2015014411-appb-I000017
. In another example, l=(t-the duration of complete OFDM symbols in the first downlink subframe)mod 1 may be calculated, and the value of M' may always be
Figure PCTKR2015014411-appb-I000018
no matter what is the value of l.
The range of l=(t-the duration of complete OFDM symbols in the first downlink subframe)mod 1 (milliseconds) The number of OFDM symbols in the last downlink subframe (M')
71.875≤l<143.23 0
143.23≤l<214.58 1
214.58≤l<285.94 2
285.94≤l<357.29 3
357.29≤l<428.65 4
428.65≤l<500 5
500≤l<571.875 6
571.875≤l<643.23 7
643.23≤l<714.58 8
714.58≤l<785.94 9
785.94≤l<857.29 10
857.29≤l<928.65 11
928.65≤l<1000 12
1000≤l<1071.875 13
Method 2': No matter whether the time when an LTE base station starts occupying the channel is at a boundary of an OFDM symbol in a downlink subframe or not, l=(t-the duration of complete OFDM symbols in the first downlink subframe)mod 1 may be calculated, and M' may be determined according to a second relation which associates the value of l with a value of M'. For example, the value of M' may be obtained from Table 10
In another example, the sum of the duration of an incomplete OFDM symbol in the first downlink subframe within the transmission duration and the duration of an incomplete OFDM symbol in the last downlink subframe within the transmission duration is l=(t-the duration of complete OFDM symbols in the first downlink subframe)mod 1. If l is smaller than the sum of a half of the duration of a subframe and the duration of the first OFDM symbol in each time slot, i.e., 0.5+(160+2048)/(30.72*10e3)=0.571875,
Figure PCTKR2015014411-appb-I000019
. The p is the difference between the CP length in the first OFDM symbol in each subframe and the CP length in other OFDM symbols, i.e., (160-144)/(30.72*10e3)=0.00052 milliseconds. The L is the duration of OFDM symbols other than the first OFDM symbol in the each subframe (including the length of CP). The value of L may be (2048+144)/(30.72*10e3)=0.07135. When l is larger than or equal to 0.571875,
Figure PCTKR2015014411-appb-I000020
. If l is larger than or equal to 0.571875,
Figure PCTKR2015014411-appb-I000021
. In another example, l=(t-the duration of complete OFDM symbols in the first downlink subframe)mod 1 may be calculated, and the value of M' may always be
Figure PCTKR2015014411-appb-I000022
no matter what is the value of l.
Method 3': l=(t-the duration of complete OFDM symbols in the first downlink subframe)mod 1 may be calculated, and the value of M' may be determined according a first relation which associates a value of l and a value of M'. For example, the value of M' may be obtained by looking up Table 9. In another example, if l is smaller than the sum of a half of the duration of a subframe and the duration of the first OFDM symbol in each time slot, i.e., 0.5+(160+2048)/(30.72*10e3)=0.571875,
Figure PCTKR2015014411-appb-I000023
. The p is the difference between the CP length in the first OFDM symbol in each subframe and the CP length in other OFDM symbols, i.e., (160-144)/(30.72*10e3)=0.00052 milliseconds. The L is the duration of OFDM symbols other than the first OFDM symbol in the each subframe (including the length of CP). The value of L may be (2048+144)/(30.72*10e3)=0.07135. When l is larger than or equal to 0.571875,
Figure PCTKR2015014411-appb-I000024
. In another example, l=(t-the duration of complete OFDM symbols in the first downlink subframe)mod 1 may be calculated, and the value of M' may always be
Figure PCTKR2015014411-appb-I000025
no matter what is the value of l.
If the sum of the duration of an incomplete OFDM symbol in the first downlink subframe within the transmission duration and the duration of an incomplete OFDM symbol in the last downlink subframe within the transmission duration does not exceed the duration of an OFDM symbol, the UE may stop receiving downlink channel and/or downlink reference signal in the portion of the last downlink subframe that exceeds the limited maixmum transmission duration within the transmission duration after the limited maixmum transmission duration ends. If the sum of the duration of an incomplete OFDM symbol in the first downlink subframe within the transmission duration and the duration of an incomplete OFDM symbol in the last downlink subframe within the transmission duration exceeds the duration of an OFDM symbol, the UE may keep on receiving downlink channel and/or downlink reference signal in the portion of the last downlink subframe that exceeds the limited maixmum transmission duration within the transmission duration after the limited maixmum transmission duration ends until the end of the OFDM symbol, as shown in FIG. 15. According to this method, the UE does not need additional indication signaling, and does not have to perform detection.
Method 4': If the M' obtained according to method 1', 2' or 3' is the number of OFDM symbols in DwPTS defined in one of TDD special subframe configurations, the M' of this method is the M' obtained according to method 1', 2' or 3'. If the M' obtained according to method 1', 2' or 3' is not the number of OFDM symbols in DwPTS defined in one of TDD special subframe configurations, the M' of this method may be the number of OFDM symbols in DwPTS defined in one of TDD special subframe configurations, and the number of OFDM symbols in DwPTS defined in the TDD special subframe configuration may be smaller than the M' obtained according to method 1', 2' or 3', and is the largest number of OFDM symbols as defined in the TDD special subframe configurations that are smaller than the M' obtained according to method 1', 2' or 3'. The TDD special subframe configurations may be the TDD special subframe configurations 0, 1, 2, 3, 4, 5, 6, 7, 8, 9 as shown in Table 1, or the TDD special subframe configurations 1, 2, 3, 4, 6, 7, 8, 9 as shown in Table 1.
Method 5: l=(t-(the duration of complete OFDM symbols in the first downlink subframe +t'))mod 1 may be calculated. The (the duration of complete OFDM symbols in the first downlink subframe +t') is the maximum duration of complete OFDM symbols for transmitting signals by the base station within the first downlink subframe, and may be the maximum duration that may be occupied by the complete OFDM symbols. The signals transmitted by the base station may be all of signals transmitted by the base station within the first downlink subframe after clear channel assessment (CCA), including at least one of PDSCH, PDCCH, EPDCCH, reference signal, UE-identifiable pilot reference signal (e.g., PSS/SSS/CRS/CSI-RS/PRS or other pilot reference signal), UE-unidentifiable pilot downlink signals and newly defined control channels (e.g., control channels that are transmitted together with the pilot reference signal). t' may be configured by higher layer signaling, or defined in a protocol, or may be obtained using the number of complete OFDM symbols for transmitting downlink data in the first downlink subframe. The downlink data may include at least one of PDSCH, PDCCH, EPDCCH, reference signals, UE-identifiable pilot reference signals and newly defined control channels.
When t' is obtained using the number of complete OFDM symbols for transmitting downlink data in the first downlink subframe, t' may be determined according to the earliest start position I1 of data channel and/or control channel in the first downlink subframe detected by the UE and the possible earliest start position I2 of signal transmission of the base station corresponding to the I1 in the first downlink subframe. Supposing t_sym' is the number of OFDM symbols, the time variable t' may be obtained. When (I1-I2)>=0, t_sym'= I1-I2; when (I1-I2)<0, t_sym'= Nsym+(I1-I2). The Nsym is the number of OFDM symbols in a subframe, e.g., Nsym=14 for a regular CP in an LTE system, I1 and I2 are both the start position of a complete OFDM symbol. I1 may be an element in the set Ψ of start positions which is predefined or configured by higher layer signaling. The set may include one or plural elements.
The I1 may be directly detected, and then I2 may be determined according to transmitted signals. There may be two situations when determining I2.
According to situation (1), if it is not required a pilot reference signal occupying more than 0 OFDM symbol to be transmitted before transmission of data channel and/or control channel in the first downlink subframe, I1 and I2 are both elements in the set Ψ, and are adjacent elements in Ψ, I2 is a preceding element of I1 in time. For example, a base station does not have to transmit UE-identifiable functions for synchronization or preparations for PDSCH/PDCCH/EPDCCH reception before transmitting PDSCH/PDCCH/EPDCCH. But the base station may decide whether to transmit a pilot signal for occupying the channel according to the time when the channel is occupied. It is not restricted that the pilot signal for occupying the channel may have other functions, nor restricted that whether the UE is capable of idenfying the signal. For example, if the base station successfully occupies a channel at a boundary of an OFDM symbol, the base station may directly transmit PDSCH/PDCCH/EPDCCH from the boundary of the OFDM symbol without transmitting any other signals before transmitting PDSCH/PDCCH/EPDCCH. In another example, if the base station successfully occupies a channel at the middle of an OFDM symbol, the baes station may transmit a pilot signal to occupy the channel until an OFDM symbol position corresponding to the closest element in the set Ψ, and then start to transmit PDSCH/PDCCH/EPDCCH. The pilot signal may be UE-identifiable or not UE-identifiable. For example, PDSCH have n2 possible start positions within the first downlink subframe, i.e., the 0'th, 4th, 8th, 12th OFDM symbol, the start position set Ψ may be I1 and I2 may be 0 and 12, or 4 and 0, or 8 and 4, or 12 and 8.
FIG. 16 is a schematic diagram illustrating positions of I1 and I2 in situation (1) in accordance with example four of the present disclosure.
For example, as shown in FIG. 16, the start position of PDCCH in the first downlink subframe may be fixed at the last OFDM symbol 1600. A base station may occupy the channel at the middle 1605 of the 2nd OFDM symbol and start to transmit signal, and start transmitting PDSCH from the 4th OFDM symbol 1610.
If the start position of the PDSCH detected by the UE is #4, I1=4, I2=0, and t_sym'= I1 -I2=4. If the start position of the PDSCH detected by the UE is #0, I1=0, I2=12, and t_sym'=14+(I1 -I2)=2. According to situation (2), if a pilot reference signal occupying at least a total of Lp OFDM symbols in the first downlink subframe before transmission of data channel and/or control channel, I1' may be first determined, I1' is an element adjacent to I1 in Ψ, and I1' is a preceding element of I1 in time. When (I1'-Lp)>=0, I2=(I1'-Lp); when (I1'-Lp)<0, I2=Nsym+(I1'-Lp). The Lp is a positive integer. The length Lp of the pilot reference signal is known to UE, e.g., Lp may be pre-determined or configured by higher layer signaling or defined in a pre-defined rule. The pilot reference signal is identifiable by UEs. When (I1-I2)>=0, t_sym'= I1-I2; when (I1-I2)<0, t_sym'= Nsym+(I1-I2). It can be seen that t'= I1-I2 is actually the difference Δ between adjacent elements in the set Ψ + Lp. For example, the start position set Ψ of PDSCH in the first downlink subframe is The base station may start transmitting signals on OFDM symbols subsequent to I2.
FIG. 17 is a schematic diagram illustrating positions of I1 and I2 in situation (2) in accordance with example four of the present disclosure.
As shown in FIG. 17, the base station may occupy the channel and start transmitting signals at the middle 1700 of the third OFDM symbol. Since a pilot signal occupying at least Lp=4 OFDM symbols, 7 OFDM symbols have already been missed, and the base station may have to start transmitting PDSCH/PDCCH/EPDCCH from the OFDM symbol #11. The base station may send the pilot signal occupying 4 OFDM symbols from the OFDM symbols #7~#10, and start transmitting other pilot signals from the moment when occupying the channel until the end of the OFDM symbol #6. The base station may occupy the channel and start transmitting signal from the middle of the OFDM symbol #6, and send a pilot signal occupying 4 OFDM symbols from the OFDM symbols #7~#10, and start transmitting PDSCH/PDCCH/EPDCCH from the OFDM symbol #11. It can be seen that the I2 obtained in the two situations are identical.
The method of determining “the duration of complete OFDM symbols for transmitting data in the first downlink subframe” may include: a UE may determine the earliest start time of transmitted data channel and/or control channel in the first downlink subframe by blind detection or by receiving explicit signaling, determine the number of complete OFDM symbols from the start time to the end of the first downlink subframe, and calculate “the duration of complete OFDM symbols for transmitting data in the first downlink subframe”. For example, if PDSCH and PDCCH/EPDCCH have the same start position in the first downlink subframe, the number of complete OFDM symbols from the start time to the end of the first downlink subframe may be determined according to either start position. In another example, as shown in FIG. 18, if the start position of PDCCH/EPDCCH is earlier than the start position of PDSCH, the number of complete OFDM symbols from the start position of PDCCH/EPDCCH to the end of the first downlink subframe may be determined according to the start position of transmission of PDCCH/EPDCCH in the first downlink subframe.
FIG. 18 is a schematic diagram illustrating the start position of PDCCH/EPDCCH and PDSCH in the first downlink subframe in accordance with example four of the present disclosure.
In another example, as shown in FIG. 18, if the start position 1800 of PDSCH is earlier than the start position of PDCCH/EPDCCH, the number of complete OFDM symbols from the start position of PDCCH/EPDCCH to the end of the first downlink subframe may be determined according to the start position of transmission of PDSCH in the first downlink subframe.
In an example, the start position may be determined through UE blind detection of a control channel, e.g., PDCCH/EPDCCH. In an example, a UE may perform blind detection of PDCCH/EPDCCH according to n1 pre-defined or semi-statically configured possible start positions of PDCCH/EPDCCH in the first downlink subframe to determine the start position of PDCCH/EPDCCH, and then determine the start position of PDSCH in the first downlink subframe according to the start position of the PDCCH/EPDCCH. The n1 may be an integer larger than 1, e.g., 2 or 4. The number of possible start positions of PDSCH in the first downlink subframe may be n2. The n2 may be a positive integer. The n2 may be a number irrelevant to n1. In another example, the n2 may be a number relevant to n1, e.g., n1= n2. The n2 may be pre-defined or semi-statically configured.
(1) The number of possible start positions of PDCCH/EPDCCH in the first downlink subframe may be different from the number of possible start positions of PDSCH in the first downlink subframe. In another example, the number of possible start positions of PDCCH/EPDCCH in the first downlink subframe may be not in a one-to-one relationship with the number of possible start positions of PDSCH in the first downlink subframe. For example, the number of possible start positions of PDCCH/EPDCCH in the first downlink subframe may be 2, one may be the OFDM symbol #0 in the first downlink subframe, and the other may be the OFDM symbol #7 in the first downlink subframe. The number of possible start positions of PDSCH in the first downlink subframe may be n2=4 discrete values. The four possible start positions may be the OFDM symbol #1, the OFDM symbol #4, the OFDM symbol #8 and the OFDM symbol #12 in the first downlink subframe. The PDCCH/EPDCCH may explicitly specify which one of the 4 possible start positions is the start position of the PDSCH. The UE may detect PDCCH/EPDCCH at the OFDM symbol #0 and the OFDM symbol #7. If the UE detect PDCCH at the OFDM symbol #7, the UE may obtain the start position specified by the PDCCH/EPDCCH.
FIG. 19 is a schematic diagram illustrating a start position of PDCCH and PDSCH in the first downlink subframe in accordance with example four of the present disclosure.
As shown in FIG. 19, the start position 1900 of PDCCH detected by the UE is the OFDM symbol #7, the start position of the PDSCH specified by the PDCCH is the OFDM symbol #4. The earliest start position of transmission of the PDCCH/EPDCCH in the first downlink subframe is the start position of the PDSCH, i.e., I1=4. The number of complete OFDM symbols from the start position I1 to the end of the first downlink subframe is 10. Thus, the duration of complete OFDM symbols in the first downlink subframe is 714us.
(2) The number of possible start positions of PDCCH/EPDCCH in the first downlink subframe is identical to the number of possible start positions of PDSCH in the first downlink subframe, i.e., n1= n2, and they are in a one-to-one mapping relationship. For example, EPDCCH and PDSCH may have the same number of start positions, and have the same start position. For another example, PDCCH may have the same number of start positions with PDSCH, and the start position of PDSCH is adjacent to the start position of PDCCH. In an example, supposing PDCCH has 4 possible start positions, e.g., OFDM symbols #0, #4, #7, #11, possible start positions of PDSCH may be OFDM symbols #1, #5, #8 and #12. In this situation, PDCCH/EPDCCH does not have to explicitly specify the start position of PDSCH. A UE may perform detection of PDCCH at the 4 possible start positions, and determine the start position of PDSCH according to detected start position of the PDCCH. In this case, the start position of PDCCH in the first downlink subframe is prior to the start position of the PDSCH, the number of complete OFDM symbols from the start position to the end of the first downlink subframe may be determined according to the start position of the PDCCH.
FIG. 20 is a schematic diagram illustrating the start position of EPDCCH and PDSCH in the first downlink subframe in accordance with example four of the present disclosure.
As shown in FIG. 20, the start positions 2000 of the EPDCCH and the PDSCH detected by the UE is #0, I1=0. The number of complete OFDM symbols from the start position I1 to the end of the first downlink subframe is 14. Thus, the duration of complete OFDM symbols for transmitting data in the first downlink subframe is 1ms.
In an example, the UE blind detection may be determined by detecting a pre-defined reference signal. For example, if the OFDM symbol at the start position of PDCCH/EPDCCH and PDSCH includes a pre-defined reference signal, a UE may perform detection of the reference signal at n1 possible start positions of PDCCH/EPDCCH or n2 possible start positions of PDSCH to determine the earliest start position of transmitted data channel and/or control channel in the first downlink subframe.
In an example, the UE blind detection may be determined by detecting a pre-defined reference signal and a pre-defined control channel. For example, the earliest start position of transmitted data channel and/or control channel in the first downlink subframe may be determined by using the method of detecting PDCCH/EPDCCH according to n1 possible start positions of the PDCCH/EPDCCH and the method of detecting PDSCH according to n2 possible start positions of the PDSCH.
In an example, the UE may determine the start position by receiving explicit signaling. For example, (1) the possible start position of PDCCH may be fixed at the last OFDM symbol in the first downlink subframe, and PDSCH may have n2 possible start positions in the first downlink subframe. PDCCH may explicitly specify one of the n2 possible start positions of PDSCH. (2) PDCCH/EPDCCH may be transmitted in the next complete subframe immediately adjacent to the first downlink subframe. The method of transmitting the PDCCH/EPDCCH may be the same with a conventional method, but the PDCCH/EPDCCH may include information specifying the start position of the PDSCH in the first downlink subframe.
The control signaling may be cell-specific signaling, or UE-specific signaling, or Group-specific signaling.
The above provides a method of a UE determining the earliest start position of downlink transmission of data channel and/or control channel and calculating the duration of complete OFDM symbols for transmitting data in the first downlink subframe. Since the base station may start transmitting other signals, e.g., signals for occupying the channel, before the start position. The duration of the signals may be an integral multiple or a decimal multiple of the duration of an OFDM symbol. Further, the signals may be unknown to the UE, e.g., generation of signals for occupying the channel may be related to design of the base station, and the UE does not know the format of the signals, e.g., sequences. In another example, the signals may be indefinite, and the UE may interprete some of the signals. For example, the signals may include signals whose format is unknown to the UE and reference signals identifiable by the UE, e.g., PSS/SSS or CRS. The UE may calculate the duration of complete OFDM symbols for transmitting data in the first downlink subframe according to the earliest start position of the downlink transmission of data channel and/or control channel, and not including the duration of the signals transmitted before the downlink transmission of the data channel and/or control channel into the duration of complete OFDM symbols for transmitting data in the first downlink subframe. Therefore, not only the the duration of complete OFDM symbols for actually transmitting data in the first downlink subframe but also the maximum possible duration (denoted by t') of the signals transmitted before the downlink transmission of the data channel and/or control channel may be taken into consideration in calculation of the duration of complete OFDM symbols for actual data transmission in the first downlink subframe.
The t' may be obtained according to a method other than using the number of complete OFDM symbols for downlink data transmission in the first downlink subframe. According to the method, the t' may be determined using a start position I3 of a pre-determined reference signal detected by the UE in the first downlink subframe and a possible start position I2' of adjacent data channel and/or control channel transmitted earlier than I3 in the first downlink subframe. In an example, assuming t_sym' is the number of OFDM symbols, the time variable t' may be obtained. t_sym'= I3 -I2'. The I3 and I2' are both a start position of a complete OFDM symbol. The I2' is an element of a set Ψ of start positions pre-defined or configured by higher layer signaling. The I2' is an element closest to I3 and is earlier than I3 in the set Ψ. For example, if a base station has to transmit a pilot reference signal (e.g., PSS/SSS) having a fixed length, e.g., one OFDM symbol, before transmitting PDCCH/EPDCCH and/or PDSCH in the first downlink subframe, and the PDCCH/EPDCCH and/or the PDSCH have n2 possible start positions in the first downlink subframe, and the start position set Ψ is The I3 has an offset of 1 OFDM symbol against each element in the set, i.e., a set corresponding to I3 is {13,3,7,11}. I3 and I2' may be 13 and 12, or 3 and 0, or 7 and 4, or 11 and 8. For example, when the UE detects the start position of PSS/SSS is the OFDM symbol #7, the UE may determine the earliest start position of PDSCH and/or PDCCH/EPDCCH is OFDM symbol #8, I2'=4, and t_sym'= I3 -I2'=3.
FIG. 21 is a schematic diagram illustrating a start position of PDCCH/EPDCCH and PDSCH in the first downlink subframe in accordance with example four of the present disclosure.
In the example shown in FIG. 21, if the base station has to transmit a pilot reference signal occupying 6 OFDM symbols before transmitting PDCCH/EPDCCH and/or PDSCH in the first downlink subframe, and the set Ψ of possible start positions of PDCCH/EPDCCH and/or PDSCH in the first downlink subframe is If the start position of the pilot reference signal detected by the UE is I3=2, I2'=0.
In another example, if the base station has to transmit a pilot reference signal with a minimum length of Lp before transmitting PDCCH/EPDCCH and/or PDSCH in the first downlink subframe, and the actual length X is changeable, X satisfies X>=Lp, the Lp is pre-determined and is known to the UE. The UE may determine the start position of PDSCH/PDCCH/EPDCCH according to the detected start position of the pilot reference signal and the minimum length Lp. For example, Lp=1, and the base station may occupy the channel and start transmitting signals at the middle of OFDM symbol #5, transmit PSS/SSS occupying 2 OFDM symbols (i.e., X=2) from OFDM symbol #6, and transmit PDSCH/PDCCH/EPDCCH from OFDM symbol #8. When the UE detects the start position of PSS/SSS is the OFDM symbol #6 (i.e., I3=6), the UE may determine the earliest start position of PDSCH and/or PDCCH/EPDCCH is OFDM symbol #8, I2=4, and t_sym'= I3 -I2'=2.
If the base station transmitted a pilot reference signal before the start position of PDSCH/PDCCH/EPDCCH, a pilot reference signal occupying an integral multiple of OFDM symbols is a UE-identifiable reference signal, and a pilot reference signal not occupying an integral multiple of OFDM symbols may be unidentifiable by the UE. The calculations of t_sym' may be further simplified, i.e., t_sym'= 1.
The method which uses the number of complete OFDM symbols for transmitting downlink data in the first downlink subframe may be as follows. A UE may determine the start position of a pilot reference signal that is UE-identifiable in the first downlink subframe through blind detection or from received explict signaling, and determine the number of complete OFDM symbols from the start position to the end of the first downlink subframe, thus obtain the duration of the complete OFDM symbols for transmitting data in the first downlink subframe. In the method, if a newly defined control channel is transmitted together with the pilot reference signal, the start position may be obtained in the same manner. For example, the UE may perform blind detection of identifiable pilot signals. If the base station transmitted a UE-identifiable pilot reference signal before transmitting the downlink channel, e.g., (1) the base station transmitted a UE-identifiable pilot reference signal (e.g., PSS/SSS) which occupies at least Lp complete OFDM symbols to assist the UE in synchronization detection, the base station may transmit PDSCH or EPDCCH/PDCCH at the next OFDM symbol adjacent to the reference signal. The base station may transmit a UE-identifiable pilot reference signal which occupies X complete OFDM symbols, and X>=Lp. X is unknown, but Lp is known to the UE. The Lp may be a pre-defined value, or may be determined according to a pre-determined rule, or may be configured semi-statically. In another example, (2) the base station may transmit a reference signal (e.g., PSS/SSS/CRS) occupying X complete OFDM symbols to assist the UE in synchronization detection, the base station may transmit PDSCH or EPDCCH/PDCCH at the next OFDM symbol adjacent to the reference signal. The X may be known to the UE. The X may be a pre-defined value, or may be determined according to a pre-determined rule, or may be configured in a semi-static manner. The UE may attempt to detect the reference signal occupying X complete OFDM symbols at the limited number of possible start positions.
FIG. 22 is a schematic diagram illustrating the start positions of PDCCH/EPDCCH and PDSCH in the first downlink subframe in accordance with example four of the present disclosure.
As shown in FIG. 22, supposing the set of possible start positions of PDSCH or EPDCCH/PDCCH is The set I3 of possible start positions of the reference signal may have an offset of X=1 OFDM symbol against each element in the set, i.e., the set corresponding to I3 is {13,3,7,11}. As shown in the figure, the base station may transmit a PSS/SSS occupying 1 OFDM symbol at OFDM symbol #7 of the first downlink subframe, transmit a PDSCH on adjacent 5 OFDM symbols, and transmit a PDCCH occupying 1 OFDM symbol, i.e., I3=7. The start position of the PDSCH or EPDCCH/PDCCH immediately after that is OFDM symbol #8, i.e., I1=8. Therefore, the number of complete OFDM symbols from the start position I3 to the end of the first downlink subframe is 7, and the duration of the complete OFDM symbols for transmitting data in the first downlink subframe is 0.5ms.
The UE may receive explicit signaling which indicates the start position or the symbol length of the UE-identifiable pilot reference signal, as described above. The UE may also receive explicit signaling which indicates the earliest start position or signal length of all of signals transmitted by the base station. For example, the base station may transmit a pilot signal starting from the middle of OFDM symbol #1, and transmit PDSCH starting from OFDM #4. The base station may inform the UE that the earliest start position of all signals is OFDM symbol #0, or inform the UE that the length of all of signals transmitted in the first downlink subframe is 14 OFDM symbols. The calculations of t_sym' may be further simplified, i.e., t_sym'= 0. In another example, the signaling may specify the start position of all complete OFDM symbols. For example, the base station may start transmitting pilot signal from the middle of OFDM symbol #1, and start transmitting PDSCH from OFDM symbol #4. The base station may inform the UE of the earliest start position of all of signals is OFDM symbol #1, thus t_sym'= 1.
The above provides a method of a UE determining the start position of a UE-identifiable pilot reference signal transmitted before data channel and/or control channel and calculating the duration of complete OFDM symbols for transmitting data in the first downlink subframe. Since the base station may start transmitting other signals, e.g., signals for occupying the channel, before the start position. The duration of the signals may be an integral multiple or a decimal multiple of the duration of an OFDM symbol. The “other signals” are unidentifiable by the UE, but the UE may perform other operations using the “other signals”, e.g, adjusting AGC. Therefore, not only the the duration of UE-identifiable downlink pilot reference signal and downlink channel (PDSCH/PDCCH/EPDCCH) but also the maximum possible duration (denoted by t') of the signals transmitted before the US-identifiable signals may be taken into consideration in calculation of the duration of OFDM symbols occupied by data actually transmitted by the base station in the first downlink subframe.
The t' may be configured by higher layer or defined in a protocol. In an example, the value configured by higher layer or defined in a protocol may also have the time difference between the start position of the UE-detectable portion of the signals and the start position of signals transmitted by the base station after channel occupancy taken into consideration, so that the (duration of complete OFDM symbols for transmitting data in the first downlink subframe + t') may reflect the actual duration of all signals transmitted by the base station in the first downlink subframe. In other examples, other factors may also be taken into consideration for the value configured by higher layer or defined in a protocol, e.g., system complexity, or the like, such that the value of t' may be determined.
The value of l calculated according to the above method is the time in the last subframe in which the base station may transmit signals in each channel occupancy time of the base station. For example, assuming the maximum channel occupancy time of the current transmission of the base station is 4ms (t=4), the base station may transmit no pilot signal before transmitting PDSCH/PDCCH/EPDCCH. The only situation where the base station may transmit pilot signal for occupying the channel until the nearest start position for transmitting PDSCH is when the base station starts occupying the channel at the middle of an OFDM symbol. Supposing a start position set is According to situation (1) of the first method of this example, the duration of complete OFDM symbols for transmitting data in the first downlink subframe is 0.5ms, t_sym'=3, t'=0.214ms, and the following equation.
Figure PCTKR2015014411-appb-I000026
Thus, the last subframe allows transmission of signals having a length of 0.286ms. Since a base station can only transmit signals in complete OFDM symbols, the time length in the last subframe is 4 OFDM symbols. The number of OFDM symbols may be obtained using l according to the method of methods 1', 2', 3' or 4', e.g.,
Figure PCTKR2015014411-appb-I000027
, or according to other methods.
Considering complexity of the standards or the system, the system may support transmitting a limited number of OFDM symbols in the last incomplete subframe, e.g., only supporting conventional DwPTS configurations or only supporting situations passing a pre-determined threshold, or supporting situations which satisfy a pre-determined set. In another example, the value of M' may be any value among 1~Nsym OFDM symbols.
If the end position of OFDM symbols in the last incomplete subframe are some values in 1~Nsym, the UE may determine the end position of the OFDM symbol according to the value of l or M', i.e., comparing elements in a set Ω of end positions of OFDM symbols in the last incomplete subframe with M', and determining to transmit no signal in the last subframe if the minimum value of elements in the set Ω is larger than M'. If there is an element smaller than M' in the set Ω, an element which is smaller than or equal to M' and is closest to M' may be selected as the end position of OFDM symbols in the last incomplete subframe.
For example, if the set Ω of end positions of OFDM symbols in the last incomplete subframe is {3,6,9,12}, when l=0.286ms, M'=4, and the element in the set Ω which is the closest to M' and not larger than M' is 3. Thus, the signals transmitted in the last subframe may occupy 4 OFDM symbols, i.e., OFDM symbols #0~#3. In another example, if the set Ω of end positions of OFDM symbols in the last incomplete subframe is {6,9,12}, and there is no element in the set that is not larger than M', a determination may be made that no signal is transmitted in the last subframe. In yet another example, in order to make full use of each OFDM symbol, the system may support joint coding of OFDM symbols in the last incomplete subframe with the previous subframe to form a complete transmission block. In this example, the UE may determine the end position of an OFDM symbol using the value of l or M', and perform demodulation using OFDM symbols in the previous subframe according to a scheduling indication.
According to examples one to four, the duration of signal transmission on an unlicensed band (simply referred to as burst transmission duration) may be specified by physical layer signaling, e.g., cell-specific control signal may specify the burst transmission duration of this time, or may be specified by higher layer signaling, e.g., the maximum channel occupancy parameter q signaling may specify the maximum value of the burst transmission duration of this time (i.e., the limited maximum transmission duration), or may be specified in a pre-determined manner. Example five provides a method of signal reception at a UE when the burst transmission duration is specified by a physical layer indication.
Example five
Since the time when an LTE base station starts to occupy a channel may be at a boundary of a downlink subframe or any position in a downlink subframe, a UE may start receiving PDSCH from a boundary of a downlink subframe or from any time position in a downlink subframe. A cell operating on an unlicensed band may avoid non-stop transmission, so that other systems may not be seriously affected. The cell operating on an unlicensed band may perform transmission non-continuously, i.e., the cell may perform transmission for a period and stop to perform channel state detection. If the channel is detected to be idle, transmission may be continued; otherwise, the channel state detection may be performed repeatedly and transmission may not be performed until the channel is detected to be idle. The limited maximum transmission duration of a cell operating on an unlicensed band may be 1 to 13 milliseconds, and may not be integral multiple of milliseconds. For example, when q=4~13, the limited maximum transmission duration may be (13/32)*q milliseconds; when q=4, the limited maximum transmission duration may be (13/32)*4=1.625 milliseconds. The burst transmission duration of an LTE base station may equal the limited maximum transmission duration, or may be a duration shorter than the limited maximum transmission duration according to a scheduling policy, e.g., there is no traffic at that moment, or in order to better co-exist with other devices working on the unlicensed band.
According to the above, since the time when an LTE base station starts to occupy a channel may not be at a boundary of a downlink subframe, the time when the LTE base station stops occupying the channel may not be at a boundary of a downlink subframe. Further, the time when an LTE base station starts to occupy a channel may not be at a boundary of an OFDM symbol, and the time when the LTE base station stops occupying the channel may not be at a boundary of an OFDM symbol. In an example, no matter whether the time when an LTE base station starts to occupy a channel is at a boundary of a subframe or an OFDM symbol, a UE may start receiving downlink channel and/or downlink reference signal at a boundary of an OFDM symbol.
In order to support flexible burst transmission duration, a base station may transmit a burst transmission duration indication or a start position indication to a UE to enable the UE to quickly determine the end time of the burst transmission duration. Accordingly, this example provides a method of a UE determining an ending OFDM symbol of downlink channel and/or downlink reference signal in a subframe within a burst transmission duration. Two methods are provided as follows.
A first method may be as shown in FIG. 23, and may include the following procedures.
FIG. 23 is a flowchart illustrating method one in accordance with example five of the present disclosure.
At block 2301, a UE may receive a length indication of a burst transmission duration. The length indication of the burst transmission duration may specify the number of subframes occupied by a burst transmission, denoted by N_s1. The length of the burst transmission specified by the signaling is within the limited maximum transmission duration defined in standards.
For example, the standards may regulate the maximum transmission duration of a burst transmission is (13/32)*q ms, and the q is an integer within the range of 4~32. Supposing q is 8, the maximum transmission duration may be 3.25(13/4)ms. The duration of actual transmission of the base station may be any value smaller than or equal to the maximum transmission duration. For example, the signaling may use 2 bits for specifying the burst transmission may occupy 1, 2, 3 or 4 subframes. The number of subframes specified by the signaling only indicates the number of subframes occupied, not indicates the base station occupies all of OFDM symbols in the subframes.
The length indication of the burst transmission duration may be implemented in the following methods. Other methods may also be used as long as the same effects can be achieved.
Method one: The signaling specifies the number of subframes is the sum of subframes from subframe n1 which includes the start position of the burst transmission to subframe n2 which includes the end position of the burst transmission, i.e., N_s1=n2-n1+1. In the subframes, some subframes may have a portion of OFDM symbols occupied, and other subframes may have all of OFDM symbols occupied. As used herein, subframes having a portion of OFDM symbols occupied are referred to as partial subframes. A partial subframe may be a subframe from which the burst transmission starts, or a subframe at which the burst transmission ends. Subframes having all of OFDM symbols occupied are referred to as normal subframes. A normal subframe may be a subframe from which the burst transmission starts, or a subframe at which the burst transmission ends, or a subframe between the starting subframe and the ending subframe.
For example, the base station may start burst transmission from the 8th OFDM symbol of subframe #n to subframe #n+2. The subframe #n is a partial subframe, and subframes #n+1 and #n+2 are normal subframes. Thus n1=n, n2=n+2, and the number of subframes specified by the signaling 2400 is N_s1=n2- n1+1=3, as shown in FIG. 24. FIG. 24 is a schematic diagram illustrating duration time in accordance with example five of the present disclosure.
In another example, burst transmission starts from the 8th OFDM symbol of subframe #n to the 10th OFDM symbol of subframe #n+3. The duration of the burst transmission is approximately equal to the maximum occupancy time 3.25ms, i.e., N_s=4, as shown in FIG. 25. FIG. 25 is a schematic diagram illustrating duration time in accordance with example five of the present disclosure. The subframes #n and #n+3 are partial subframes, and subframes #n+1 and #n+2 are normal subframes. Thus n1=n, n2=n+3, and the number of subframes specified by the signaling 2500 is N_s1=n2-n1+1=4.
Method two: the number of subframes specified by the signaling is the result of processing the actual duration of the burst transmission by rounding down a decimal fraction smaller than 0.5 or rounding up a decimal fraction larger than or equal to 0.5.
For example, the base station may start burst transmission from the 8th OFDM symbol of subframe #n to subframe #n+2, and the actual duration of the burst transmission is 2.5ms. If the signaling indication 2600 uses a rounding up method, N_s1=3ms, as shown in FIG. 26. FIG. 26 is a schematic diagram illustrating duration time in accordance with example five of the present disclosure.
Method three: The number of subframe indicated by the signaling is the sum of subframes from subframe n3 from which the signaling indication is received to subfame n2 in which the burst transmission ends, i.e., N_s1=n2-n3+1.
For example, the base station may perform burst transmission from the 8th OFDM symbol of subframe #n to the 10th OFDM symbol of subframe #n+3, and the duration of the burst transmission is approximately equal to the maximum occupancy time 3.25 ms, i.e., N_s=4. The UE may receive the signaling indication 2700 from subframe #n+2, i.e., n3=n+2, and the length of subframes specified is N_s1=2, representing the burst transmission ends in subframe n2=n+3, as shown in FIG. 27. FIG. 27 is a schematic diagram illustrating duration time in accordance with example five of the present disclosure.
According to the above method, information that the indicated duration of the burst transmission equals the maximum transmission time may be indicated by pre-defined bit values, not by specifying the number of subframes of the maximum transmission time. For example, pre-determined bit value “00” or “11” may be used to denote the duration of the burst transmission equals the maximum transmission time.
At block 2302, the UE may compare the limited maximum transmission duration with a duration of burst transmission determined using received signaling specifying the burst transmission duration. If the specified duration of the burst transmission is smaller than the maximum transmission time, procedures in block 2303 may be performed. If the specified duration of the burst transmission equals the maximum transmission time, procedures in block 23042 may be performed.
The UE may determine the duration of the burst transmission according to the signal specifying the duration of the burst transmission using the methods listed in block 2301 or using other proper methods. Then the UE may determine the relation between the limited maximum transmission duration and the duration of burst transmission according to the received signaling specifying the burst transmission duration. For example, the UE may compare the number of subframes corresponding to the limited maximum transmission duration with the number of subframes specified by the burst transmission duration indication signaling. In another example, the UE may determine the position of the end subframe according to the number of remaining subframes specified by the received burst transmission duration indication signaling, and compare the position of the end subframe with the end subframe determined using the limited maximum transmission duration. The relation may also be determined using other methods, and the method is not limited in the present disclosure.
At block 2303, the UE may assume all of subframes for the burst transmission other than the start subframe are complete subframes, i.e., all of OFDM symbols in each of the subframes are occupied. That is, the ending subframe is a complete subframe, and the end OFDM symbol is the last OFDM symbol of the subframe. Whether the start subframe is a complete subframe may be specified explicitly or inexplicitly, as in other examples of the present disclosure, thus is not elaborated herein. The UE may receive downlink signals according to the above assumptions.
At block 2304, the UE may assume all of subframes for the burst transmission other than the start subframe and the end subframe are complete subframes, i.e., all of OFDM symbols in each of the subframes are occupied. The end subframe may be a partial subframe, and the number of OFDM symbols actually occupied or the end OFDM symbol of the burst transmission may be determined using the possible first OFDM symbol in the start subframe and the limited maximum transmission duration. The method may be as in example four, thus is not repeated herein. The UE may receive downlink signals according to the above assumptions.
If the maximum transmission duration makes the end position of the burst transmission is not a boundary of an OFDM symbol, the UE may determine the possible end position is the last OFDM symbol within the maximum transmission duration. In this situation, the actual burst transmission duration is approximately equal to the maximum transmission duration, and the situation may be processed according to “the specified burst transmission duration equals the maximum transmission duration”.
In an example, in the blocks 2302, 2303 and 2304,
if the number of subframes N_s1 specified by the received burst transmission duration indication signaling is smaller than the number of subframes N_s determined using the maximum transmission duration, the procedure in block 2303 is performed. The UE may assume all of subframes for the burst transmission other than the start subframe are complete subframes, i.e., intermediate subframes and the end subframe are all complete subframes, and the end position of the downlink channel/signal is the boundary of the subframe.
For example, the maximum transmission duration is 3.25 ms, and the base station may start transmission from the 8th OFDM symbol of subframe #n. According to method one of block 1, the number of subframes determined using the maximum transmission duration is , i.e., the maximum transmission duration of the base station may be from the 8th OFDM symbol of subframe #n to the 10th OFDM symbol of subframe #n+3. The number of subframes specified by the burst transmission duration is N_s1=3. N_s1<N_s indicates the burst transmission of the base station of this time occupies 3 subframes, i.e., the transmission starts from the 8th OFDM symbol of subframe #n to the last OFDM symbol of subframe #n+2, as shown in FIG. 1. Subframes #n+1 and #n+2 are both complete subframes, i.e., all of OFDM symbols in the subframes are occupied. Subframe #n is a partial subframe.
If the number of subframes specified by the burst transmission duration indication signaling equals the number of subframes determined by the maximum transmission duration, or the duration of the burst transmission specified by the signaling equals the maximum transmission duration, the procedure in block 2304 may be performed. The UE may assume the end position of downlink channel/signal in the last subframe determined by the number of subframes specified by the signaling is determined by the method of example four of the present disclosure, and the end position of downlink channel/signal in an intermediate subframe determined by the number of subframes specified by the signaling is a boundary of the intermediate subframe.
For example, the maximum transmission duration is 3.25 ms, and the base station may start transmission from the 8th OFDM symbol of subframe #n. The maximum transmission duration of the base station may start from the 8th OFDM symbol of subframe #n to the 10th OFDM symbol of subframe #n+3. According to method one of block 1, the number of subframes determined by the maximum transmission duration is N_s=4. The number of subframes specified by the burst transmission duration indication signaling is N_s1=4. N_s1=N_s indicates the burst transmission of the base station of this time occupies 4 subframes, i.e., the transmission starts from the 8th OFDM symbol of subframe #n to the 10th OFDM symbol of subframe #n+3, as shown in FIG. 2. The UE determine the burst transmission of the base station is approximately equal to the maximum transmission duration according to the burst transmission duration indication signaling. Thus, the UE may determine subframes #n+1 and #n+2 are both complete subframes, and subframes #n and #n+3 are partial subframes. In subframe #n+3, the end position of downlink channel/signal may be determined using the possible start position in subframe #n and maximum transmission duration. The method may be as in example four, thus is not repeated herein.
In addition, if the UE receives a new burst transmission duration indication 2800 during a burst transmission, the procedure in block 2302 may be performed according to the new burst transmission duration indication, as shown in FIG. 28. FIG. 28 is a schematic diagram illustrating multiple indications received in accordance with example five of the present disclosure
In another example, when the actual burst transmission duration of the baes station is smaller than the maximum transmission duration, all OFDM symbols in the last subframe of the burst transmission may not be occupied. For example, the last X OFDM symbols in the subframe may be reserved for uplink transmission, e.g., uplink/downlink guard period, or time for uplink CCA. In this example, the number of reserved OFDM symbols X may be pre-defined, or may be configured by higher layer signaling. The procedures 2303 and 2304 may be as follows.
At block 2303, the UE may assume all of subframes for the burst transmission other than the start subframe and the end subframe are complete subframes, i.e., all of OFDM symbols in each of the subframes are occupied. Whether the start subframe is a complete subframe may be specified explicitly or inexplicitly. The end subframe may be an incomplete subframe, the possible position of an OFDM symbol or an end OFDM symbol of the burst transmission may be determined by min(Y-X,Y)=Y-X. The Y is the number of OFDM symbols of a complete subframe, e.g., Y=14 corresponding to a normal CP; Y=12 corresponding to a long CP. The UE may receive downlink signals according to the above assumptions.
For example, the number of reserved OFDM symbol X=4. Supposing the subframe has a normal CP, Y=14. For example, the maximum transmission duration is 3.25 ms, and the base station may start transmission from the 8th OFDM symbol of subframe #n. According to method one of block 1, the number of subframes determined using the maximum transmission duration is , i.e., the maximum transmission duration of the base station may be from the 8th OFDM symbol of subframe #n to the 10th OFDM symbol of subframe #n+3. The number of subframes specified by the burst transmission duration is N_s1=3. N_s1<N_s indicates the burst transmission of the base station of this time occupies 3 subframes, i.e., the transmission starts from the 8th OFDM symbol of subframe #n to the Z'th OFDM symbol of subframe #n+2, and Z=min(Y-X,Y)=10.
FIG. 29 is a schematic diagram illustrating received signaling indicating whether a subframe is the last subframe in accordance with example five of the present disclosure. As shown in FIG. 29. Subframes #n+1 is a complete subframe, i.e., all of OFDM symbols in the subframes are occupied. Subframes #n and #n+2 are partial subframes.
At block 2304, the UE may assume all of subframes for the burst transmission other than the start subframe and the end subframe are complete subframes, i.e., all of OFDM symbols in each of the subframes are occupied. The end subframe may be an incomplete subframe, and the possible position of OFDM symbl or the end OFDM symbol of the burst transmission may be determined by the possible position of the first OFDM symbol in the start subframe and the maximum transmission duration and the number of reserved OFDM symbols X, i.e., min(Y-X,Y1). Y1 may be the number of OFDM symbols determined by the possible position of the first OFDM symbol in the start subframe and the maximum transmission duration or by the end OFDM symbol of the burst transmission. The method may be as in example four, thus is not repeated herein. The UE may receive downlink signals according to the above assumptions.
For example, the number of reserved OFDM symbol X=2. Supposing the subframe has a normal CP, Y=14. For example, the maximum transmission duration is 3.25 ms, and the base station may start transmission from the 8th OFDM symbol of subframe #n. The maximum transmission duration of the base station may start from the 8th OFDM symbol of subframe #n to the 10th OFDM symbol of subframe #n+3. According to method one of block 1, the number of subframes determined by the maximum transmission duration is N_s=4. The number of subframes specified by the burst transmission duration indication signaling is N_s1=4. N_s1=N_s indicates the burst transmission of the base station of this time occupies 4 subframes, i.e., the transmission starts from the 8th OFDM symbol of subframe #n to the Z'th OFDM symbol of subframe #n+3, as shown in FIG. 30.
FIG. 30 is a schematic diagram illustrating received signaling indicating whether a subframe is the last subframe in accordance with example five of the present disclosure.
FIG. 31 is a schematic diagram illustrating received signaling indicating whether a subframe is the last subframe in accordance with example five of the present disclosure.
The UE determine the burst transmission of the base station is approximately equal to the maximum transmission duration according to the burst transmission duration indication signaling. Thus, the UE may determine subframes #n+1 and #n+2 are both complete subframes, and subframes #n and #n+3 are partial subframes. In subframe #n+3, the end position of downlink channel/signal may be determined using the possible start position in subframe #n and the maximum transmission duration and the number of reserved OFDM symbol X, i.e., min(Y-X,Y1). Y1 may be obtained according to the method of example four, Y1=10, and the end OFDM symbol is the Z'th OFDM symbol, Z=min(12,10)=10. If the number of reserved OFDM symbol X=8, Z=min(6,10)=6.
Supposing the UE may obtain information that the base station has occupied the channel and performed downlink transmission through a certain method but the UE does not receive burst transmission duration indication signaling, the UE may determine whether the current subframe of the burst transmission is a complete subframe or a partial subframe using the maximum transmission duration before receiving the signaling indicating the burst transmission ends (e.g., UL subframe start indication). That is, the UE may assume all of subframes for the burst transmission other than the start subframe and the end subframe are complete subframes, i.e., all of OFDM symbols in each of the subframes are occupied. The end subframe may be a partial subframe. If the end subframe is a partial subframe, the end position of downlink channel/signal may be determined using the method of example four.
The following is another method of determining the end OFDM symbol. The indication signaling sent by the base station may specify whether subframe n is the end subframe of the current burst transmission. The subframe n may be the subframe from which the indication signaling is received or the next subframe of the subframe. For example, the indication signaling may use 1 bit to specify whether the current subframe or the next subframe is the end subframe of the current burst transmission. For example, the indication signaling may be transmitted in PDCCH in the same subframe, or the EPDCCH in the current subframe may specify the next subframe.
The indication signaling may also indicate which subframe is the end subframe of the current burst transmission. For example, the indication signaling may be transmitted in a subframe of the burst transmission which may be the start subframe or another subframe of the burst transmission. The subframe may specify a number of subframes between the subframe and the subsequent end subframe of the current burst transmission. The indication signaling may use more than 1 bit to specify whether the current subframe or the next subframe is the end subframe of the current burst transmission. If the indication signaling specifies the end subframe, the indication signaling may also specify the position of the end OFDM symbol. This example discusses a situation where the indication signaling specifies information of a subframe.
At block 201, a UE may receive an indication specifying an end subframe of a burst transmission. The indication specifying the end subframe may specify the position of the end subframe of the current burst transmission.
At block 202, the UE may judge whether subframe n is the end subframe. If subframe n is the end subframe, the procedure in block 203-1 or 203-1a may be performed; otherwise, the procedure in block 203-2 or 203-2a may be performed.
At block 203-1, the start subframe m and end subframe n of the current burst transmission may be incomplete subframes. Subframes m+1,…n-1 may be complete subframes. The position of the end OFDM symbol in the end subframe n may be determined according to the procedure in block 2304. The UE may receive downlink signals according to the above assumptions.
At block 203-2, the start subframe m of the current burst transmission may be an incomplete subframe. Subframes m+1,…n may be complete subframes. The UE may receive downlink signals according to the above assumptions.
At block 203-1a, the start subframe m and end subframe n of the current burst transmission may be incomplete subframes. Subframes m+1,…n-1 may be complete subframes. The position of the end OFDM symbol in the end subframe n may be determined according to the procedure in block 2304. The UE may receive downlink signals according to the above assumptions.
At block 203-2a, the start subframe m and end subframe n of the current burst transmission may be incomplete subframes. Subframes m+1,…n-1 may be complete subframes. The position of the end OFDM symbol in the end subframe n may be determined according to the procedure in block 2303. The UE may receive downlink signals according to the above assumptions.
Supposing the UE may obtain information that the base station has occupied the channel and performed downlink transmission through a certain method but the UE does not receive end subframe indication signaling, the UE may determine whether the current subframe of the burst transmission is a complete subframe or a partial subframe using the maximum transmission duration before receiving the signaling indicating the burst transmission ends (e.g., UL subframe indication). That is, the UE may assume all of subframes for the burst transmission other than the start subframe and the end subframe are complete subframes, i.e., all of OFDM symbols in each of the subframes are occupied. The end subframe may be a partial subframe. If the end subframe is a partial subframe, the end position of downlink channel/signal may be determined using the method of example four.
The present disclosure assumes a base station may transmit burst transmission indication signaling, but does not limit the method through which the base station transmits the burst transmission indication signaling. For example, the indication signaling may be transmitted in any subframe, e.g., the first subframe of the burst transmission, or the first complete subframe of the burst transmission. The indication signaling may be any signaling, e.g., cell public signaling, or UE-specific signaling. The indication signaling may be specified by a single DCI or by an additional bit in the conventional DCI.
The above is a method of receiving downlink channel and/or downlink reference signal in accordance with an example of the present disclosure; The present disclosure also provides an apparatus of receiving downlink channel and/or downlink reference signal. The apparatus may implement the above methods.
FIG. 32 is a schematic diagram illustrating the overall structure of the apparatus. As shown in FIG. 32, the apparatus may include: a control information receiving unit 3200 and a data and reference signal receiving unit 3205. The control information receiving unit 3200 may receive control information of a cell operating on an unlicensed band. The data and reference signal receiving unit 3205 may receive downlink channel and/or downlink reference signal in the cell operating on the unlicensed band according to the control information.
Various embodiments of the present disclosure may be embodied as computer readable codes on a computer readable recording medium. The computer readable recording medium is any data storage device that can store data, which can be thereafter read by a computer system. Examples of the computer readable recording medium include ROM, RAM, Compact Disc (CD)-ROMs, magnetic tapes, floppy disks, optical data storage devices, carrier waves, and data transmission through the Internet. The computer readable recording medium can also be distributed over network coupled computer systems so that the computer readable code is stored and executed in a distributed fashion. Also, functional programs, codes, and code segments for accomplishing embodiments of the present disclosure can be easily construed by programmers skilled in the art to which the present disclosure pertains.
Various embodiments of the present disclosure can be implemented in hardware or a combination of hardware and software. The software can be recorded to a volatile or non-volatile storage device, such as a ROM irrespective of deletable or re-recordable, to a memory such as a RAM, a memory chip, a memory device, or an integrated circuit, or to a storage medium that is optically or magnetically recordable and readable by a machine (e.g. a computer), such as a CD, a Digital Versatile Disc (DVD), a magnetic disk, or a magnetic tape. The storage is an example of a machine-readable storage medium suitable for storing a program or programs including instructions to implement the embodiments of the present disclosure.
Accordingly, the present disclosure includes a program including a code for implementing the apparatus or the method as appended in the claims and a machine-readable storage medium that stores the program. The program may be transferred electronically through any medium such as a communication signal transmitted through a wired or wireless connection and the present disclosure covers equivalents thereof.
The apparatus, according to various embodiments of the present disclosure, may receive a program from a program providing apparatus, which is wire/wirelessly connected thereto, and thereafter store the program. The program providing apparatus may include a memory for storing a program including instructions allowing the apparatus to perform a preset content protection method, information required for a contents protection method, or the like, a communication unit for performing a wired/wireless communication with the apparatus, and a controller for transmitting a corresponding program to a transmitting and receiving apparatus either in response to a request from the apparatus or automatically.
The foregoing are only preferred examples of the present disclosure and are not for use in limiting the protection scope thereof. All modifications, equivalent replacements or improvements in accordance with the scopes and principles of the present disclosure shall be included in the protection scope of the present disclosure.

Claims (22)

  1. A method of receiving downlink channel and/or downlink reference signal on an unlicensed band, comprising:
    receiving, by a long term evolution (LTE) user equipment (UE), control information of a cell operating on an unlicensed band; and
    receiving downlink channel and/or downlink reference signal transmitted in the cell according to the control information.
  2. The method of claim 1, wherein receiving the downlink channel and/or downlink reference signal comprises:
    determining, by the UE, a duration in which the channel is occupied by the cell according to the control information, receiving the downlink channel and/or downlink reference signal on a portion or all of OFDM symbols that are within a limited maximum transmission duration in the last downlink subframe when the limited maximum transmission duration is up and the end of the last downlink subframe in the channel occupancy does not arrive, and stop receiving the downlink channel and/or downlink reference signal from remaining of the last downlink subframe after the limited maximum transmission duration.
  3. The method of claim 2, wherein receiving the downlink channel and/or downlink reference signal from the portion or all of OFDM symbols in the last downlink subframe comprises:
    receiving the downlink channel and/or downlink reference signal from the first n OFDM symbols in the last downlink subframe;
    wherein, M is the maximum number of OFDM symbols in the last downlink subframe before the limited maximum transmission duration, the n is a number selected from plural candidate numbers of OFDM symbols in DwPTS of TDD special subframes, and the selected number if smaller than or equal to M and is closest to M among the plural candicate numbers, M is larger than N which is a pre-determined natural number; when M is smaller than or equal to N, n is 0.
  4. The method of claim 1, wherein the control information comprises a start time when the UE starts receiving the downlink channel and/or downlink reference signal; the start time is determined by the UE using start time indication information transmitted in the cell.
  5. The method of claim 4, wherein the start time indication information specifies a downlink subframe and an OFDM symbol within which the start time falls;
    the downlink subframe within which the start time falls is a downlink subframe in which the start time indication information is transmitted or a previous subframe of the downlink subframe in which the start time indication information is transmitted.
  6. The method of claim 5, wherein the start time indication information is specified by DCI information in a downlink subframe in which the start time falls or by DCI information in the next downlink subframe of the downlink subframe in which the start time falls.
  7. The method of claim 1, further comprising: if the number of OFDM symbols allowed to be used for receiving PDSCH in a downlink subframe is larger than or equal to N which is pre-determined or configured by higher layer, scheduling the PDSCH in the downlink subframe individually; if the number of OFDM symbols allowed to be used for receiving PDSCH in a downlink subframe is smaller than N, scheduling the PDSCH in the downlink subframe together with PDSCH in another downlink subframe using a PDCCH/EPDCCH.
  8. The method of claim 1, wherein receiving the downlink channel and/or downlink reference signal comprises:
    determining a start time and an end time of receiving the downlink channel and/or downlink reference signal according to the control information, wherein the start time and the end time are both at a boundary of an OFDM symbol.
  9. The method of claim 8, wherein the UE determines a first OFDM symbol at whose start boundary the start time falls, and a second OFDM symbol at whose end boundary the end time falls.
  10. The method of claim 9, wherein the UE determines the first OFDM symbol and the second OFDM symbol using a cell-specific reference signal or indication information of the cell.
  11. The method of claim 8, wherein the UE determines the end time using the start time.
  12. The method of claim 8, wherein determining by the UE the end time comprises: determining an end OFDM symbol of the downlink channel and/or downlink reference signal in the subframe within a signal transmission duration on the unlicensed band according to signaling sent by a base station, determining an end boundary of the end OFDM symbol to be the end time.
  13. The method of claim 12, wherein determining the end OFDM symbol comprises:
    receiving, by the UE, duration indication sent by the base station, and determining the signal transmission duration on the unlicensed band according to the duration indication;
    comparing the signaling transmission duration with the limited maximum transmission duration;
    determining, by the UE, the end OFDM symbol is the last OFDM symbol in the subframe if the signal transmission duration is shorter than the limited maximum transmission duration; determining the end time using the start time if the the signal transmission duration equals the limited maximum transmission duration; or, determining, by the UE, the end OFDM symbol is the (Y-X)'thOFDM symbol in the subframe if the signal transmission duration is shorter than the limited maximum transmission duration; determining, by the UE, the end time and OFDM symbol Y1 corresponding to the end time in the subframe and determining the end OFDM symbol is the (min(Y-X,Y1))'th OFDM symbol if the signal transmission duration equals the limited maximum transmission duration;
    wherein the Y is the total number of OFDM symbols in the subframe, the X is the number of reserved OFDM symbols predetermined or configured by higher layer signaling.
  14. The method of claim 12, wherein determining the end OFDM symbol comprises:
    receiving end subframe indication signaling sent by the base station which specifies whether subframe n is the end subframe within the signaling transmission duration, wherein subframe n is the subframe from which the signaling is received or the next subframe of the subframe;
    determining, by the UE, the end OFDM symbol to be the last OFDM symbol in the subframe if subframe n is not the end subframe; determining the end time using the start time if subframe n is the end subframe; or, determining, by the UE, the end OFDM symbol to be the (Y-X)'th OFDM symbol in the subframe if subframe n is not the end subframe; determining, by the UE, the end time and an OFDM symbol Y1 corresponding to the end time using the start time and determining the end OFDM symbol is the (min(Y-X,Y1))'th OFDM symbol if subframe n is the end subframe;
    wherein the Y is the total number of OFDM symbols in the subframe, the X is the number of reserved OFDM symbols predetermined or configured by higher layer signaling.
  15. The method of claim 8, wherein determining the start time according to the control information comprises: receiving, by the UE, DCI information, and determining the start time according to the DCI information;
    wherein the DCI information comprises the length or start position of complete OFDM symbols from which the UE receives the downlink channel in the first downlink subframe within the signal transmission duration on the unlicensed band; wherein the complete OFDM symbols from which the UE receives the downlink channel are complete OFDM symbols occupied by all of signals in the first downlink subframe, or are complete OFDM symbols occupied by a specific downlink channel in the first downlink subframe.
  16. The method of claim 11, 13 or 14, wherein determining by the UE the end time using the start time comprises: when the signal transmission duration t is not an integral multiple or an integral multiple,
    determining a time length l that can be used for signal transmission in the last subframe within the signal transmission duration using the start time, and determining the number M' of OFDM symbols from which the downlink channel and/or downlink reference signal is received in the last downlink subframe within the signal transmission duration using the time length l.
  17. The method of claim 16, wherein determining the l using the start time comprises: l=(t-the duration of complete OFDM symbols in the first downlink subframe)mod 1, or l=(t-(the duration of complete OFDM symbols for data transmission in the first downlink subframe+t'))mod 1;
    wherein the (the duration of complete OFDM symbols for data transmission in the first downlink subframe+t') is the maximum time occupied by complete OFDM symbols occupied by actually transmitted signal in the first downlink subframe, the t' is configured by higher layer signaling or pre-determined or determined using the number of complete OFDM symbols for downlink data transmission in the first downlink subframe.
  18. The method of claim 17, wherein when l=(t-(the duration of complete OFDM symbols for data transmission in the first downlink subframe+t')) mod 1, the determining t' according to the number of complete OFDM symbols for transmitting downlink data in the first downlink subframe comprises: when I1-I2>=0, t_sym'= I1-I2; when I1-I2<0, t_sym'= Nsym+(I1-I2); calculating t' according to t_sym';
    wherein, I1 is the earliest start position of transmission of data channel and/or control channel in the first downlink subframe detected by the UE, I2 is the possible earliest start position where the base station starts signal transmission in the first downlink subframe corresponding to I1, I1 is an element of a start position set Ψ pre-determined or configured by higher layer, Nsym is the number of OFDM symbols in a subframe, and t_sym' is the number of OFDM symbols corresponding to .
  19. The method of claim 18, wherein determining the I2 comprises:
    when a pilot reference signal having more than 0 OFDM symbols is not necessary to be transmitted before transmission of the data channel and/or control channel in the first downlink subframe, determining I2 to be an element adjacent to I1 and prior to I1 in the set Ψ;
    when a pilot reference signal having more than or equal to Lp OFDM symbols is necessary to be transmitted before transmission of the data channel and/or control channel in the first downlink subframe, determining I1' to be an element adjacent to I1 and prior to I1 in the set Ψ; when I1'-Lp >=0, determining that I2=(I1'-Lp); when I1'-Lp <0, determining the I2=Nsym+(I1'-Lp).
  20. The method of claim 17, wherein when l=(t-(the duration of complete OFDM symbols for data transmission in the first downlink subframe+t')) mod 1, the determining t' according to the number of complete OFDM symbols for transmitting downlink data in the first downlink subframe comprises: calculating t_sym'= I3-I2'; calculating t' according to t_sym';
    wherein I3 is a start position of a pre-determined reference signal detected by the UE in the first downlink subframe, I2' is an element in a start position set pre-determined or configured by higher layer, and I2' is an element that is closest to I3 and prior to I3 in the set Ψ, and t_sym' is the number of OFDM symbols corresponding to t'.
  21. The method of any of claims 11 to 20, further comprising: if a system only allows the number of OFDM symbols transmitted in the last incomplete subframe within the signal transmission duration to be within 1~Nsym, comparing the M' obtained and each element in a set of selectable values of the number of OFDM symbols transmitted in the last incomplete subframe, determining no signal is transmitted in the last subframe if the minimum value of elements in the set Ω is larger than M', and selecting an element which is the closest to M' and smaller than or equal to M' as the position of the end time.
  22. An apparatus of receiving downlink channel and/or downlink reference signal on an unlicensed band, comprising: a control information receiving unit and a data and reference signal receiving unit; wherein
    the control information receiving unit is to receive control information of a cell operating on the unlicensed band; and
    the data and reference signal receiving unit is to receive downlink channel and/or downlink reference signal transmitted in the cell according to the control information.
PCT/KR2015/014411 2014-12-30 2015-12-29 Method and apparatus of receiving downlink channel and/or downlink reference signal WO2016108580A1 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
US15/540,826 US10477541B2 (en) 2014-12-30 2015-12-29 Method and apparatus of receiving downlink channel and/or downlink reference signal
EP15875674.2A EP3241299B1 (en) 2014-12-30 2015-12-29 Method and apparatus of receiving downlink signals
KR1020177021409A KR102605286B1 (en) 2014-12-30 2015-12-29 Method and device for receiving downlink channel and/or downlink reference signal
US16/671,762 US11611959B2 (en) 2014-12-30 2019-11-01 Method and apparatus of receiving downlink channel and/or downlink reference signal

Applications Claiming Priority (10)

Application Number Priority Date Filing Date Title
CN201410841641.X 2014-12-30
CN201410841641 2014-12-30
CN201510101185.X 2015-03-06
CN201510101185 2015-03-06
CN201510142839.3 2015-03-27
CN201510142839 2015-03-27
CN201510207990 2015-04-28
CN201510207990.0 2015-04-28
CN201510284633.4A CN105743626B (en) 2014-12-30 2015-05-28 Method and equipment for receiving downlink channel and/or downlink reference signal
CN201510284633.4 2015-05-28

Related Child Applications (2)

Application Number Title Priority Date Filing Date
US15/540,826 A-371-Of-International US10477541B2 (en) 2014-12-30 2015-12-29 Method and apparatus of receiving downlink channel and/or downlink reference signal
US16/671,762 Continuation US11611959B2 (en) 2014-12-30 2019-11-01 Method and apparatus of receiving downlink channel and/or downlink reference signal

Publications (1)

Publication Number Publication Date
WO2016108580A1 true WO2016108580A1 (en) 2016-07-07

Family

ID=56284637

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR2015/014411 WO2016108580A1 (en) 2014-12-30 2015-12-29 Method and apparatus of receiving downlink channel and/or downlink reference signal

Country Status (2)

Country Link
CN (1) CN111970103B (en)
WO (1) WO2016108580A1 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018056696A1 (en) * 2016-09-20 2018-03-29 엘지전자(주) Method for transmitting/receiving data in wireless communication system and device therefor
WO2019192616A1 (en) * 2018-04-06 2019-10-10 Mediatek Inc. Detection of beginning of transmission session in new radio unlicensed spectrum
US10506662B2 (en) 2016-05-10 2019-12-10 Qualcomm Incorporated Internet-of-Things design for unlicensed spectrum
US11460584B2 (en) 2019-08-09 2022-10-04 Orolia Usa Inc. Methods for correcting for one or more errors when using mobile network communication signals to augment navigation and devices thereof
US11540264B2 (en) 2018-06-29 2022-12-27 Guangdong Oppo Mobile Telecommunications Corp., Ltd. Method for configuring PDCCH detection and related device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130163543A1 (en) * 2011-12-22 2013-06-27 Interdigital Patent Holdings, Inc. Control signaling in lte carrier aggregation
US20140036853A1 (en) * 2011-04-18 2014-02-06 Lg Electronics Inc. Signal transmission method and device in a wireless communication system
US20140112289A1 (en) 2011-07-07 2014-04-24 Lg Electronics Inc. Method and apparatus for transmitting a signal in a wireless communication system
US20140133371A1 (en) 2011-08-11 2014-05-15 Lg Electronics Inc. Apparatus for transmitting and receiving downlink control information in a wireless access system and method thereof

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100502282C (en) * 2007-03-28 2009-06-17 中兴通讯股份有限公司 Transmission method of synchronization signal of time-division duplex system
CN103404047B (en) * 2011-02-10 2016-10-19 Lg电子株式会社 The method and apparatus of scheduling in carrier aggregation system
KR102088021B1 (en) * 2011-03-11 2020-03-11 엘지전자 주식회사 Method and device for terminal to transmit/receive signal in wireless communication system having carrier aggregation technique applied thereto
CN103503335B (en) * 2011-05-03 2017-05-24 Lg电子株式会社 Method for terminal to transmit/receive signal to/from base station in wireless communication system and device therefor
EP2706687B1 (en) * 2011-05-03 2018-12-19 LG Electronics Inc. Method and apparatus for receiving control information in wireless communication system
WO2012164531A1 (en) * 2011-06-02 2012-12-06 Renesas Mobile Corporation Frequency hopping in license-exempt/shared bands
CN103765824B (en) * 2011-07-14 2017-03-22 美国博通公司 Methods and apparatuses for provision of a flexible time sharing scheme on an unlicensed band of a system
US9049708B2 (en) * 2012-02-03 2015-06-02 Interdigital Patent Holdings, Inc. Method and apparatus for coexistence among wireless transmit/receive units (WTRUs) operating in the same spectrum
CN103686987A (en) * 2012-09-26 2014-03-26 北京三星通信技术研究有限公司 Methods for transmitting synchronization channel and broadcast channel, methods for receiving synchronization channel and broadcast channel and apparatus
WO2014110759A1 (en) * 2013-01-17 2014-07-24 Broadcom Corporation Flexible usage of special subframe for long term evolution time division duplex downlink-uplink

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140036853A1 (en) * 2011-04-18 2014-02-06 Lg Electronics Inc. Signal transmission method and device in a wireless communication system
US20140112289A1 (en) 2011-07-07 2014-04-24 Lg Electronics Inc. Method and apparatus for transmitting a signal in a wireless communication system
US20140133371A1 (en) 2011-08-11 2014-05-15 Lg Electronics Inc. Apparatus for transmitting and receiving downlink control information in a wireless access system and method thereof
US20130163543A1 (en) * 2011-12-22 2013-06-27 Interdigital Patent Holdings, Inc. Control signaling in lte carrier aggregation

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
CATT: "Data and control signaling transmissions for LAA", R1-144627, 3GPP TSG RAN WG1 MEETING #79, 8 November 2014 (2014-11-08), San Francisco, USA, XP050885330 *
CMCC: "Discussion on possible solutions for LAA", R1-144940, 3GPP TSG RAN WG1 MEETING #79, 8 November 2014 (2014-11-08), San Francisco, USA, XP050885599 *
FUJITSU: "DL data and CRS transmission for LAA", R1-144785, 3GPP TSG RAN WG1 MEETING #79, 8 November 2014 (2014-11-08), San Francisco, USA, XP050885463 *
See also references of EP3241299A4

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10506662B2 (en) 2016-05-10 2019-12-10 Qualcomm Incorporated Internet-of-Things design for unlicensed spectrum
US10973084B2 (en) 2016-05-10 2021-04-06 Qualcomm Incorporated Internet-of-Things design for unlicensed spectrum
WO2018056696A1 (en) * 2016-09-20 2018-03-29 엘지전자(주) Method for transmitting/receiving data in wireless communication system and device therefor
WO2019192616A1 (en) * 2018-04-06 2019-10-10 Mediatek Inc. Detection of beginning of transmission session in new radio unlicensed spectrum
TWI730313B (en) * 2018-04-06 2021-06-11 聯發科技股份有限公司 Method of detection of beginning of a transmission session in new radio unlicensed spectrum
US11039475B2 (en) 2018-04-06 2021-06-15 Mediatek Inc. Detection of beginning of a transmission session in new radio unlicensed spectrum
US11540264B2 (en) 2018-06-29 2022-12-27 Guangdong Oppo Mobile Telecommunications Corp., Ltd. Method for configuring PDCCH detection and related device
US11460584B2 (en) 2019-08-09 2022-10-04 Orolia Usa Inc. Methods for correcting for one or more errors when using mobile network communication signals to augment navigation and devices thereof

Also Published As

Publication number Publication date
CN111970103B (en) 2023-07-11
CN111970103A (en) 2020-11-20

Similar Documents

Publication Publication Date Title
EP3241299A1 (en) Method and apparatus of receiving downlink channel and/or downlink reference signal
WO2018203690A1 (en) Method and apparatus for transmitting remaining minimum system information in multibeam-based system
WO2018225927A1 (en) Method for transmitting/receiving reference signal in wireless communication system, and device therefor
WO2018079969A1 (en) Method for performing beam management in wireless communication system and apparatus therefor
WO2019093823A1 (en) Method for transmitting/receiving data in wireless communication system, and apparatus therefor
WO2018182256A1 (en) Method for reporting channel state information in wireless communication system and apparatus therefor
WO2017155305A1 (en) Method for transmitting and receiving uplink signal in wireless communication system supporting unlicensed band, and apparatus supporting same
EP3251452A1 (en) Uplink control information transmitting method and apparatus
WO2017135674A1 (en) Method for communicating in network supporting licensed and unlicensed bands
WO2017023146A1 (en) Apparatus and method for transmitting uplink control information through a physical uplink control channel
WO2018182150A1 (en) Method for transmitting and receiving reference signal in wireless communication system and device therefor
WO2018174649A1 (en) Method for transmitting or receiving data in wireless communication system, and device therefor
WO2016018125A1 (en) Method and device for configuring transmission opportunity period in wireless access system supporting unlicensed band
WO2011099811A2 (en) Method for indicating a dm-rs antenna port in a wireless communication system
WO2011122852A2 (en) Method and apparatus for monitoring control channel in wireless communication system
WO2017026754A1 (en) Method and apparatus for transmitting and receiving signal in communication network
WO2019117693A1 (en) Method and apparatus for transmitting and receiving control information and data information in wireless communication system
WO2016117974A1 (en) Carrier aggregation method performed by terminal in wireless communication system and terminal using same method
WO2013066136A1 (en) Method for transmitting harq-ack feedback information
WO2019088676A1 (en) Method for determining resource area to be allocated to bandwidth part in wireless communication system, and apparatus therefor
WO2018045678A1 (en) Communication method and communication apparatus
WO2017126907A1 (en) Method for transmitting or receiving sounding reference signal in wireless communication system supporting unlicensed band, and device for supporting same
WO2016048099A2 (en) Communication method using carrier aggregation and device for same
WO2016105129A1 (en) Method for transceiving shortened physical downlink shared channel in wireless access system supporting unlicensed band, and device supporting same
WO2016108580A1 (en) Method and apparatus of receiving downlink channel and/or downlink reference signal

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 15875674

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 15540826

Country of ref document: US

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 20177021409

Country of ref document: KR

Kind code of ref document: A

REEP Request for entry into the european phase

Ref document number: 2015875674

Country of ref document: EP