WO2016106671A1 - Unlicensed frequency band measurement method and associated device - Google Patents

Unlicensed frequency band measurement method and associated device Download PDF

Info

Publication number
WO2016106671A1
WO2016106671A1 PCT/CN2014/095869 CN2014095869W WO2016106671A1 WO 2016106671 A1 WO2016106671 A1 WO 2016106671A1 CN 2014095869 W CN2014095869 W CN 2014095869W WO 2016106671 A1 WO2016106671 A1 WO 2016106671A1
Authority
WO
WIPO (PCT)
Prior art keywords
user equipment
gap
reference signal
cell
base station
Prior art date
Application number
PCT/CN2014/095869
Other languages
French (fr)
Chinese (zh)
Inventor
李秉肇
杨晓东
胡振兴
权威
苗金华
张戬
Original Assignee
华为技术有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 华为技术有限公司 filed Critical 华为技术有限公司
Priority to CN201480036315.XA priority Critical patent/CN107431938A/en
Priority to PCT/CN2014/095869 priority patent/WO2016106671A1/en
Publication of WO2016106671A1 publication Critical patent/WO2016106671A1/en

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W24/00Supervisory, monitoring or testing arrangements

Definitions

  • the present invention relates to the field of testing, and in particular, to a measurement method and related equipment based on an unlicensed frequency band.
  • the reference signal measurement on the cell refers to the measurement of the CRS (Common Reference Signal) or the cell-specific reference signal of the cell, in order to obtain the appearance position of the reference signal.
  • the user equipment needs to detect the synchronization channel of the cell first, define the frame boundary according to the synchronization channel, and then determine the location (instant domain location and frequency domain location) of the CRS according to the frame boundary and the cell PCI (Physical Cell ID).
  • the UE performs the inter-frequency measurement, if the UE cannot support the signal of the current serving frequency and the signal of the different frequency to be measured, the UE needs to start the measurement gap to measure (GAP) the to-be-frequency.
  • GAP Measure
  • the UE can go.
  • the frequency to be measured is measured and will be interrupted when the UE receives at the current operating frequency.
  • the length and period of measurement of the GAP are configured by the base station to the UE.
  • the reference signal of the cell always appears continuously, and the user equipment can always obtain the reference signal transmitted at the corresponding time according to the measurement during the GAP.
  • the unlicensed frequency band can be allocated to the LTE cell. Since the unlicensed frequency band is a common spectrum resource, any organization or individual can use it. Data can be transmitted on unlicensed bands when the licensed band is idle. According to the characteristics of the unlicensed frequency band, the frequency band cannot be used continuously.
  • the discontinuous occupancy of the unlicensed frequency band may cause the reference signal of the cell to be continuously transmitted.
  • the UE cannot accurately determine the reference signal.
  • the appearance of the location causes the user equipment to be unable to measure the reference signal.
  • the technical problem to be solved by the embodiments of the present invention is to provide a measurement method based on an unlicensed frequency band.
  • the problem that the reference signal caused by the discontinuous use of the unlicensed frequency band in the prior art cannot be measured can be solved.
  • the first aspect of the embodiments of the present invention provides an unlicensed frequency band. Measurement methods, including:
  • the base station sends a reference signal on the first cell, where the frequency band of the first cell is an unlicensed frequency band;
  • the base station sends a measurement reference information notification to the user equipment in the second cell, where the frequency band of the second cell is an authorized frequency band, and the measurement reference information notification is used to notify the user equipment of the first cell.
  • the reference signal is measured.
  • the method before the sending, by the base station, the measurement reference information notification to the user equipment in the second cell, the method further includes:
  • the method further includes:
  • the base station sends configuration information to the user equipment, where the configuration information is used to indicate that the measurement reference information is sent in the second cell, so that the user equipment reads the measurement from the second cell.
  • Reference information notification is used to indicate that the measurement reference information is sent in the second cell, so that the user equipment reads the measurement from the second cell.
  • the measurement reference information notification includes a notification of sending the reference signal.
  • the measurement reference information notification includes a GAP location information, where the GAP location information is used to notify a location of the user equipment GAP.
  • the method before the sending, by the base station, the measurement reference information notification to the user equipment in the second cell, the method further includes:
  • the base station determines that the actual transmission time of the reference signal is not the predetermined transmission time, performing the step of the base station transmitting a measurement reference information notification to the user equipment in the second cell; wherein the predetermined transmission time is The occurrence period of the reference signal is determined, and the reference information is notified to include an offset of the actual transmission timing of the reference signal and the predetermined transmission timing.
  • a second aspect of the embodiments of the present invention provides a measurement method based on an unlicensed frequency band, including:
  • the method further includes:
  • the user equipment receives the configuration information sent by the base station, where the configuration information is used to indicate that the measurement reference information is sent in the second cell.
  • the user equipment determines to read the measurement reference information notification from the second cell according to the configuration information.
  • the measurement reference information notification includes a transmission notification of the reference signal or GAP location information.
  • the measurement reference information notification includes a sending notification of the reference signal, and the user equipment notifying, according to the measurement reference information, that determining a location of the GAP includes:
  • the user equipment determines a sending moment of the reference signal according to the indication information carried in the sending notification, and determines a location of the GAP according to the sending moment of the reference signal.
  • the location of the GAP information includes the GAP indication information
  • the determining, by the user equipment, the location of the GAP according to the measurement reference information includes:
  • the user equipment determines the location of the GAP according to the indication information carried by the GAP indication information.
  • the user equipment adjusts the location of the GAP according to the offset and the GAP occurrence period.
  • a third aspect of the embodiments of the present invention provides a base station, including:
  • An allocating module configured to send a reference signal on the first cell, where the frequency band of the first cell is an unlicensed frequency band;
  • a first sending module configured to send a measurement reference information notification to the user equipment in the second cell, where the frequency band of the second cell is an authorized frequency band, and the measurement reference information notification is used to notify the user equipment of the The reference signal of a cell is measured.
  • the method further includes:
  • the triggering module is configured to: when the triggering message sent by the second base station is received, instruct the first sending module to start working; where the triggering message is used to trigger the base station to send the measurement reference information notification.
  • the method further includes:
  • a configuration module configured to send configuration information to the user equipment, where the configuration information is used to indicate that the measurement reference information is sent in the second cell, so that the user equipment reads from the second cell The measurement reference information is notified.
  • the measurement reference information notification includes a notification of sending the reference signal.
  • the measurement reference information notification includes a GAP location information, where the GAP location information is used to notify a location of the user equipment GAP.
  • the method further includes:
  • a determining module configured to: when it is determined that the actual sending time of the reference signal is not a predetermined sending time, instructing the first sending module to start working; wherein the predetermined sending time is determined by an appearance period of the reference signal, where The reference information notification includes an offset of the actual transmission time and the predetermined transmission time of the reference signal.
  • a fourth aspect of the embodiments of the present invention provides a user equipment, including:
  • a receiving module configured to receive, by the second cell, a measurement reference information notification sent by the associated base station
  • a measuring module configured to notify, according to the measurement reference information, a location of the GAP, and measure the reference signal in the GAP; wherein, after the reference signal is contending by the base station to an unlicensed frequency band, the non- The licensed frequency band is allocated to the associated first cell and sent on the first cell of.
  • the method further includes:
  • a configuration information receiving module configured to receive, by the base station, configuration information, where the configuration information is used to indicate that the measurement reference information is sent in the second cell;
  • a reading module configured to determine, according to the configuration information, that the measurement reference information notification is read from the second cell.
  • the measurement reference information notification includes a sending notification or a GAP location information of the reference signal.
  • the measurement reference information notification includes a sending notification of the reference signal, where the measuring module is configured to:
  • the GAP location information includes GAP indication information
  • the measurement module is configured to:
  • the GAP location information includes an offset
  • the measurement module is configured to:
  • the position of the GAP is adjusted according to the offset and the GAP occurrence period.
  • the unlicensed frequency band is allocated to the first cell, and the reference signal is sent on the first cell, and the second cell informs the user equipment of the reference signal of the reference signal by the second cell of the licensed frequency band to make the user equipment
  • the location of the GAP is determined according to the measurement reference information, and the reference signal is accurately measured in the GAP to avoid the problem that the user equipment cannot measure the reference signal due to the discontinuity of the unlicensed frequency band.
  • FIG. 1 is a schematic flowchart of a method for measuring an unlicensed frequency band according to an embodiment of the present invention
  • FIG. 2 is a schematic diagram of a method for adjusting a position of a GAP according to an embodiment of the present invention
  • FIG. 3 is another schematic flowchart of a method for measuring an unlicensed frequency band according to an embodiment of the present invention.
  • FIG. 4 is a schematic structural diagram of a base station according to an embodiment of the present invention.
  • FIG. 5 is a schematic structural diagram of another base station according to an embodiment of the present disclosure.
  • FIG. 6 is a schematic structural diagram of a user equipment according to an embodiment of the present disclosure.
  • FIG. 7 is another schematic structural diagram of a user equipment according to an embodiment of the present invention.
  • FIG. 8 is a schematic structural diagram of a communication system according to an embodiment of the present invention.
  • FIG. 1 is a schematic flowchart of a method for measuring an unlicensed frequency band according to an embodiment of the present invention.
  • the method includes:
  • the base station sends a reference signal on the first cell, where the frequency band of the first cell is an unlicensed frequency band.
  • the base station intercepts the unlicensed band and triggers the rollback process, that is, the backoff counter is started to generate a random number to implement the rollback process, when the idle time of the unlicensed band reaches one.
  • the backoff counter is decremented by 1.
  • the base station competes for the unlicensed frequency band to obtain the use right of the unlicensed frequency band, and the base station occupies the unlicensed frequency band for a certain period of time according to the need, when the base station is occupying the unlicensed frequency band, Other base stations cannot use this unlicensed band to transmit data.
  • the base station allocates the unlicensed frequency band that is contending to the associated first cell, and transmits the reference signal on the first cell.
  • the reference signal may be sent simultaneously with the service data of the first cell, or only the reference signal may be sent, but the service data is not sent.
  • the base station determines the transmission time period of the reference signal according to the duration of the occupied unlicensed frequency band. The duration from the start time to the end time of the transmission time period indicates the duration of the reference signal, and the duration of the reference signal is a predefined time length.
  • the duration of the reference signal when only the reference signal is transmitted on the first cell, the duration of the reference signal may be 1 ms to 5 ms; when the reference signal and the service data are simultaneously transmitted, the duration of the reference signal may be 1 ms to 15 ms.
  • the base station determines to send the measurement reference information to the UE according to the duration of the reference signal, where the reference signal includes a DRS, a CSI-RS or a CRS.
  • the base station sends a measurement reference information notification to the user equipment in the second cell, where the frequency band of the second cell is an authorized frequency band, so that the user equipment notifies the first cell according to the measurement reference information.
  • the reference signal is measured.
  • the frequency band of the second cell is a licensed frequency band
  • the second cell may be a serving cell of the user equipment or a non-serving cell of the user equipment.
  • the base station sends a measurement reference information notification to the user equipment by using the second cell, and the measurement reference information is used to notify the user equipment of the transmission time period of the reference signal on the first cell, and the user equipment determines to send the reference signal according to the measurement reference information notification.
  • the time period is determined according to the transmission time period of the reference signal, and the user equipment measures the reference signal in the GAP.
  • the base station sends configuration information to the user equipment, where the configuration information is used to indicate that the measurement reference information is sent in the second cell, so that the user equipment reads from the second cell.
  • the measurement reference information is notified.
  • the base station needs to notify the user equipment that the measurement reference information notification for the first cell is sent on the second cell, so that the user equipment receives the sent measurement reference information notification from the second cell.
  • the method further includes:
  • the triggering message triggers the base station to start sending the measurement reference information notification, where the second base station is a base station where the serving cell of the user equipment is located.
  • the trigger message may carry a cell list that needs to send the measurement reference information notification, where the cell list includes at least one cell.
  • the measurement reference information notification includes a notification of sending the reference signal.
  • the reference signal sending notification includes a sending notification of the reference signal
  • the user equipment determines the sending time period of the reference signal according to the sending notification of the reference signal, so that the user equipment starts the GAP according to the sending time period, and performs the reference signal in the GAP. measuring.
  • the user equipment may determine a sending moment of the reference signal according to a sending moment of the sending notification of the reference signal, or determine a sending moment of the reference signal according to the indication information carried in the sending notification.
  • the transmission notification of the reference signal carries a transmission moment of the reference signal, where the transmission time is an absolute time or a relative time relative to a transmission time of the reference signal.
  • the notification of the reference signal is received, and the GAP may not be started; if the user equipment is in a measurement sampling period If sufficient sampling points satisfying the measurement accuracy have not been obtained, a notification of the transmission of the reference signal is received, and the GAP is started for measurement.
  • the duration of the GAP is predefined by the base station configuration or protocol and is a fixed value.
  • the duration of the GAP is ⁇ t.
  • the base station and the user equipment know the duration of the GAP in advance, and the base station sends a notification of the transmission of the reference signal to the user equipment, so that the user equipment determines the transmission moment of the reference signal, and the user equipment determines the reference signal according to the sending time and the ending time of the reference signal.
  • the user equipment selects the GAP with the duration of ⁇ t in the transmission time period, assuming that the start time of the GAP is t, and the duration of the GAP ⁇ t determines that the GAP is: the start time t to the end time t+ ⁇
  • the time period formed by t the user equipment measures the reference signal on the first cell during the time period.
  • the sending moment of the reference signal can be represented by using a subframe, and the sending moment of the reference signal determined by the user equipment is the starting boundary of the subframe N, and the predefined reference signal is sent.
  • the duration of the inter-segment is the length of the M subframes, and the user equipment determines the location of the transmission period of the reference signal according to the start boundary value of the subframe N: the start period of the sub-frame N+M of the subframe N, the user The device starts the GAP during the transmission period and measures the reference signal on the first cell within the GAP.
  • the measurement reference information notification includes the GAP location information
  • the base station sends the GAP location information to the user equipment by using the second cell, where the GAP location information is used by the user equipment to determine the location of the GAP, so that the user equipment is The reference signal is measured within the GAP.
  • the GAP location information includes GAP indication information or GAP offset information.
  • the method further includes:
  • the base station determines that the actual transmission time of the reference signal is not the predetermined transmission time, performing the step of the base station transmitting a measurement reference information notification to the user equipment in the second cell; wherein the predetermined transmission time is The occurrence period of the reference signal is determined, and the reference information is notified to include an offset of the actual transmission timing of the reference signal and the predetermined transmission timing.
  • the base station determines the actual transmission timing of the reference signal and the predetermined transmission timing of the reference signal, and the predetermined transmission timing of the reference signal is determined by the appearance period of the reference signal.
  • the base station calculates an offset between the actual transmission time of the reference signal and the predetermined transmission time,
  • the base station configures the appearance period of the GAP for the user equipment. If the base station competes for the unlicensed frequency band at a specified time and transmits the reference signal at a predetermined time, the user equipment can measure the reference signal within the specified GAP. If the unlicensed frequency band has been busy in the busy state, the base station cannot compete for the unlicensed frequency band at the specified time, and the reference signal cannot be transmitted at the specified time. The actual transmission time of the reference signal will lag behind the predetermined transmission time, and the reference signal cannot be scheduled to be transmitted. At the moment, the base station needs to notify the user equipment to adjust the location of the GAP so that the reference signal on the first cell can be measured within the appropriate GAP.
  • the GAP configuration information of the user equipment specifies a GAP period of 80 ms, and the location of the GAP is: subframe 0-6 of frame number 28.
  • the user equipment adjusts the location of the GAP to : Frame 29 0-6 subframe, UE does not start GAP in subframe 0-6 of frame number 28, but starts GAP in subframe 0-6 of frame number 29.
  • the GAP duration can be a predefined value, such as 6ms, or based on the configuration of the base station.
  • the method further includes:
  • the serving base station of the user equipment sends the GAP period information, where the GAP period information is used by the UE to calculate a predetermined location where the GAP appears according to the GAP period information.
  • the serving base station of the user equipment may be a base station to which the first cell belongs or be different from the base station to which the first cell belongs. If the serving base station of the user equipment is different from the base station to which the first cell belongs, before the base station to which the first cell belongs, send the GAP period information to the serving base station of the first user, And causing the serving base station of the first user to send the GAP period information to the user equipment.
  • the reference signal includes a DRS or a common reference signal CRS.
  • the base station After the base station competes for the unlicensed frequency band, the base station allocates the unlicensed frequency band to the first cell, and sends a reference signal on the first cell, and the base station notifies the second cell of the licensed frequency band to notify the user equipment of the reference signal measurement.
  • the reference information is notified to enable the user equipment to determine the location of the GAP according to the measurement reference information, and accurately measure the reference signal in the GAP to avoid the problem that the user equipment cannot measure the reference signal due to the discontinuity of the unlicensed frequency band.
  • FIG. 3 is a schematic flowchart of another method for measuring an unlicensed frequency band according to an embodiment of the present invention.
  • the method includes:
  • the user equipment receives the measurement reference information notification sent by the affiliated base station on the second cell.
  • the user equipment determines to measure the first cell, and determines that the measurement reference information notification message of the second cell is sent on the second cell, where the frequency band of the first cell is an unlicensed frequency band, and the frequency band of the second cell is authorized.
  • the second cell may be a serving cell of the user equipment or a non-serving cell of the user equipment.
  • the user equipment receives the measurement reference information notification sent by the base station by using the second cell.
  • the user equipment receives the configuration information of the base station, where the configuration information indicates that the measurement reference information for the first cell is notified that the bearer is on the second cell, and the configuration information of the user equipment is determined to pass the
  • the second cell receives the measurement reference information notification sent by the base station for the first cell.
  • the base station that sends the configuration information may be a base station where the first cell is located, or a second base station different from a base station where the first cell is located, where the second base station is a serving base station of the UE.
  • receiving indication information of a base station where the first cell is located where the indication information indicates that the measurement reference information for the first cell is notified to the bearer. On the second cell.
  • the user equipment notifies the location of the GAP according to the measurement reference information, and measures the reference signal in the GAP.
  • the user equipment notifies the location of the GAP according to the measurement reference information, and measures the reference signal in the GAP. After the reference signal is contending by the base station to the unlicensed frequency band, the unlicensed frequency band is allocated to the associated first cell and sent on the first cell.
  • the measurement reference information notification includes a notification of sending the reference signal.
  • the reference signal information is notified to include a sending notification of the reference signal, and the user equipment determines the sending time period of the reference signal according to the sending notification of the reference signal, so that the user equipment starts the GAP according to the sending time period, and performs the reference signal in the GAP. measuring.
  • the user equipment may determine a sending moment of the reference signal according to a sending moment of the sending notification of the reference signal, or determine a sending moment of the reference signal according to the indication information carried in the sending notification.
  • the sending time of the sending notification of the reference signal is the frame start time of the subframe P
  • P, D are integers greater than or equal to zero.
  • the transmission notification of the reference signal carries a transmission moment of the reference signal, where the transmission time is an absolute time or a relative time relative to a transmission time of the reference signal.
  • the notification of the reference signal is received, and the GAP may not be started; if the user equipment is in a measurement sampling period If sufficient sampling points satisfying the measurement accuracy have not been obtained, a notification of the transmission of the reference signal is received, and the GAP is started for measurement.
  • the duration of the GAP is predefined by the base station configuration or protocol and is a fixed value.
  • the duration of the GAP is ⁇ t.
  • the base station and the user equipment know the duration of the GAP in advance, and the base station sends a notification of the transmission of the reference signal to the user equipment, so that the user equipment determines the transmission moment of the reference signal, and the user equipment determines the reference signal according to the sending time and the ending time of the reference signal.
  • the user equipment selects the GAP with the duration of ⁇ t in the transmission time period, assuming that the start time of the GAP is t, and the duration of the GAP ⁇ t determines that the GAP is: the start time t to the end time t+ ⁇
  • the time period formed by t the user equipment measures the reference signal on the first cell during the time period.
  • the transmission time of the reference signal can be represented by using a subframe
  • the user equipment is The sending time of the fixed reference signal is the starting boundary of the subframe N
  • the duration of the sending time period of the predefined reference signal is the length of the M subframes
  • the location of the sending time period of the determining reference signal by the user equipment is:
  • the start boundary of the subframe N is a time period consisting of the start boundary of the subframe N+M
  • the user equipment starts the GAP in the transmission period, and measures the reference signal on the first cell in the GAP.
  • the measurement reference signal notification includes the GAP location information
  • the user equipment notifying the location of the GAP according to the measurement reference information includes:
  • the user equipment determines the location of the GAP according to the GAP location information.
  • the GAP location information includes a GAP offset
  • the support device determines a location of the GAP according to the GAP offset and the predetermined GAP location.
  • the predetermined GAP location is determined by the GAP period configuration information, where the user equipment receives the GAP period configuration information sent by the serving base station.
  • the GAP configuration information of the user equipment specifies a GAP period of 80 ms, and the location of the GAP is: subframe 0-6 of frame number 28.
  • the user equipment adjusts the location of the GAP to : Frame 29 0-6 subframe, UE does not start GAP in subframe 0-6 of frame number 28, but starts GAP in subframe 0-6 of frame number 29.
  • the GAP duration can be a predefined value, such as 6ms, or based on the configuration of the base station.
  • the GAP location information includes a GAP indication
  • the user equipment determines a location of the GAP according to the GAP indication, and measures the reference signal in the GAP.
  • the user equipment may determine the location of the GAP according to the sending moment indicated by the GAP, or determine the location of the reference GAP according to the indication information carried in the GAP indication.
  • the embodiment of the present invention further provides a scheduling method based on an unlicensed frequency band.
  • the method includes:
  • the user equipment receives a base station configuration, where the configuration includes at least two working cells, at least one first cell uses an unlicensed carrier, and at least one second cell uses an authorized carrier.
  • the user equipment sends the indication information to the base station by using the second cell, so that the base station determines the scheduling of the first cell according to the indication information.
  • the UE determines the indication information according to the reception condition of the first cell reference signal or the interference detection condition of the carrier where the first cell is located, and reports the indication information to the base station.
  • the indication information includes that the scheduling indication cannot be continuously received. Sending the first indication information to the base station when the duration of the reference signal that is not received by the user equipment is greater than the duration threshold, The indication message is used to indicate that the base station stops scheduling the user equipment in the first cell by scheduling the user equipment;
  • the indication information includes a resume receiving scheduling indication. And sending, by the user equipment, the second indication message to the base station, where the second indication message is used to indicate that the base station resumes scheduling the user equipment in the first cell. .
  • the base station since the base station needs to use the unlicensed frequency band in a competitive manner, if the unlicensed frequency band is always in a busy state, the base station cannot obtain the use right of the unlicensed frequency band, and the reference signal cannot be sent on the first cell, and the user equipment exceeds a certain period of time. If the reference signal is not received, the time-frequency tracking fails, and the user equipment sends the first indication information to the base station, where the first indication information is used to indicate that the base station stops scheduling the user equipment in the first cell, if the user equipment receives the reference signal again. The user equipment sends the second indication information to the base station, where the second indication information is used to indicate that the base station resumes scheduling the user equipment in the first cell.
  • the user equipment when receiving the reference signal, the user equipment starts a timer, and the timer is set with a timing duration, and the timing duration is a duration threshold.
  • the timer expires, it is considered that the time-frequency tracking fails, and the user equipment sends the first indication information to the base station, and when the user equipment receives the reference signal again, sends the second indication information to the base station.
  • the setting of the duration threshold may be configured by the user equipment or configured by a network side device such as a base station or a mobility management entity.
  • the indication information includes interference duration information and or interference strength information.
  • the user equipment can determine whether the interference is caused according to the channel environment of the unlicensed frequency band of the first cell.
  • the user equipment detects a signal sent by another base station or the power intensity of the user equipment detected on the channel is higher than a predetermined threshold, the signal is considered as an interference signal, and it is determined that it is interfered.
  • the user equipment may obtain the total duration of the signal from the preamble information in the signals sent by other base stations, and may also read the total duration of the signal from other messages sent by other base stations, and the total duration of the user equipment according to the interference signal.
  • the reporting delay of the user equipment to determine the interference signal Continued time.
  • the duration of the interference signal reported by the user equipment to the base station is 7 ms.
  • the base station adjusts the scheduling priority of the user equipment to the minimum.
  • the user equipment detects the interference signal, and the strength of the interference signal is determined to be an interference signal when the strength of the interference signal is greater than a preset strength threshold, where the strength threshold is predefined by the user equipment or configured by the receiving network side device.
  • the intensity threshold may be set according to the type of the interfering base station, and different types of interfering base stations correspond to different intensities. For example, the strength threshold of the WLAN interfering base station and the strength threshold of the LTE interfering base station are not the same.
  • the user equipment can directly report the interference strength of the interference signal to the base station, and the base station adjusts the scheduling priority of the user equipment with the highest interference intensity to the lowest according to the interference strength of each user equipment in the first cell.
  • a base station is provided.
  • the base station is used to implement an unlicensed frequency band-based measurement method according to Embodiment 1 of the present invention.
  • the base station includes: an allocation module 10 and a first sending module 11.
  • the allocating module 10 is configured to send a reference signal on the first cell, where the frequency band of the first cell is an unlicensed frequency band;
  • the first sending module 11 is configured to send, by using the second cell, a measurement reference information notification to the user equipment, where the frequency band of the second cell is a licensed frequency band, so that the user equipment is notified according to the measurement reference information.
  • the reference signal of the first cell is measured.
  • the base station further includes:
  • the triggering module 12 is configured to: when the trigger message sent by the second base station is received, instruct the first sending module to start working; where the triggering message is used to trigger the base station to send the measurement reference information notification.
  • the base station further includes:
  • the configuration module 13 is configured to send configuration information to the user equipment, where the configuration information is used to refer to The measurement reference information notification is sent at the second cell to enable the user equipment to read the measurement reference information notification from the second cell.
  • the GAP location information includes a notification of sending the reference signal.
  • the measurement reference information notification includes GAP location information, and the GAP location information is used to notify the location of the user equipment GAP.
  • the base station further includes:
  • the determining module 14 is configured to: when the actual sending time of the reference signal is not a predetermined sending time, instruct the first sending module to start working; wherein the predetermined sending time is determined by an appearance period of the reference signal, where The reference information notification includes an offset of the actual transmission time and the predetermined transmission time of the reference signal.
  • FIG. 5 is a schematic diagram of another structure of a base station according to an embodiment of the present invention.
  • the base station is configured to perform an unlicensed frequency band-based measurement method according to the first embodiment, where the base station includes: a processor 61, a memory 62, and The communication interface 63, the number of the processors 61 in the base station may be one or more, and FIG. 5 takes a processor as an example.
  • the processor 61, the memory 62, and the communication interface 63 may be connected by a bus or other means, and the bus connection is taken as an example in FIG.
  • the memory 62 stores a set of program codes
  • the processor 61 is configured to call the program code stored in the memory 62 for performing the following operations:
  • the method further includes:
  • the step of sending the measurement reference information notification to the user equipment by using the second cell is performed; wherein the trigger message is used to trigger the base station to send the measurement reference information notification.
  • processor 61 is further configured to execute:
  • the measurement reference information notification includes a notification of sending the reference signal.
  • the measurement reference information notification includes GAP location information, and the GAP location information is used to notify the location of the user equipment GAP.
  • the method further includes:
  • the determining that the actual transmission time of the reference signal is not the predetermined transmission time performing the step of transmitting the measurement reference information notification to the user equipment in the second cell; wherein the predetermined transmission time is determined by the reference signal The occurrence period is determined, and the reference information notification includes an offset of the actual transmission timing of the reference signal and the predetermined transmission timing.
  • FIG. 6 is a schematic structural diagram of a user equipment, where the user equipment is used to perform an unlicensed frequency band-based measurement method according to an embodiment of the present disclosure, where the user equipment includes: a receiving module 20 and a measurement module. twenty one.
  • the receiving module 20 is configured to receive, by the second cell, a measurement reference information notification sent by the associated base station;
  • the measuring module 21 is configured to notify the location of the GAP according to the measurement reference information, and measure the reference signal in the GAP; wherein, after the reference signal is contending by the base station to the unlicensed frequency band, The unlicensed frequency band is allocated to the associated first cell and sent on the first cell.
  • the user equipment further includes:
  • the configuration information receiving module 22 is configured to receive, by the base station, configuration information, where the configuration information is used to indicate that the measurement reference information is sent in the second cell.
  • the reading module 23 is configured to determine, according to the configuration information, that the measurement reference information notification is read from the second cell.
  • the measurement reference information notification includes a notification of sending the reference signal or GAP location information.
  • the measurement reference information notification includes a notification of sending the reference signal
  • the measurement module 21 is configured to:
  • the GAP location information includes GAP indication information
  • the measurement module 21 is configured to:
  • the measurement reference signal notification includes an offset
  • the measurement module is configured to:
  • the position of the GAP is adjusted according to the offset and the GAP occurrence period.
  • the user equipment further includes: a first scheduling indication module 24, configured to send first indication information to the base station when the duration of the non-received reference signal is greater than a duration threshold, the first indication The message is used to indicate that the base station stops scheduling the user equipment to be scheduled by the user equipment in the first cell;
  • the second indication message is sent to the base station, where the second indication message is used to indicate that the base station resumes scheduling for the user equipment in the first cell.
  • the user equipment further includes: a second scheduling indication module 25, configured to acquire a duration of the interference signal when the interference signal is detected;
  • the interference strength is reported to the base station, so that the base station adjusts the scheduling priority of the user equipment with the highest interference strength in the first cell to the lowest.
  • FIG. 7 is a schematic diagram of another structure of a user equipment according to an embodiment of the present disclosure, which is used to perform the method for measuring an unlicensed frequency band according to the second embodiment.
  • the user equipment includes:
  • the number of processors 71 in the user equipment may be one or more, and FIG. 7 takes a processor as an example.
  • the processor 71, the memory 72, and the communication interface 73 may be connected by a bus or other means, and the bus connection is taken as an example in FIG.
  • the memory 72 stores a set of program codes
  • the processor 71 is configured to call the program code stored in the memory 72 for performing the following operations:
  • processor 71 is further configured to execute:
  • the measurement reference information notification includes a transmission notification of the reference signal or GAP location information.
  • the measurement reference information notification includes a transmission notification of the reference signal
  • the processor 71 performs to determine, according to the measurement reference information, the location of the determined GAP, including:
  • the user equipment determines a sending moment of the reference signal according to the indication information carried in the sending notification, and determines a location of the GAP according to the sending moment of the reference signal.
  • the GAP location information includes the GAP indication information
  • the processor 71 performs the determining, according to the measurement reference information, that determining the location of the GAP includes:
  • the user equipment determines the location of the GAP according to the indication information carried by the GAP indication information.
  • the measurement reference signal notification includes an offset
  • the processor 71 performs, according to the measurement reference information notification, determining the location of the GAP, including:
  • the position of the GAP is adjusted according to the offset and the GAP occurrence period.
  • processor 71 is further configured to execute:
  • the second indication message is sent to the base station, where the second indication message is used to indicate that the base station resumes scheduling for the user equipment in the first cell.
  • processor 71 is further configured to execute:
  • the interference strength is reported to the base station, so that the base station adjusts the scheduling priority of the user equipment with the highest interference strength in the first cell to the lowest.
  • FIG. 8 is a schematic structural diagram of a communication system according to an embodiment of the present invention.
  • a communication system includes a base station and a user equipment, where
  • the base station sends a reference signal on the first cell, where the frequency band of the first cell is an unlicensed frequency band;
  • the user equipment reports the measurement result to the base station.
  • the storage medium may be a magnetic disk, an optical disk, a read-only memory (ROM), or a random access memory (RAM).

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

Disclosed in the embodiments of the present invention is an unlicensed-frequency-band-based measurement method, comprising: a base station sends a reference signal on a first cell; the frequency band of the first cell is an unlicensed frequency band; within a second cell, the base station sends a measurement reference information notification to a user equipment, the frequency band of said second cell being a licensed frequency band, such that the user equipment measures, according to said measurement reference information notification, the reference signal of the first cell. Also disclosed in the embodiments of the present invention are a user equipment, base station, and communications system. Using the present invention, it is possible to accurately measure the reference signal of an unlicensed frequency band cell.

Description

一种基于非授权频段的测量方法和相关设备Measurement method and related equipment based on unlicensed frequency band 技术领域Technical field
本发明涉及测试领域,尤其涉及一种基于非授权频段的测量方法和相关设备。The present invention relates to the field of testing, and in particular, to a measurement method and related equipment based on an unlicensed frequency band.
背景技术Background technique
目前LTE(Long Term Evolution,长期演进)通信系统中,小区上的参考信号测量是指对小区的CRS(Common Reference Signal,公共参考信号)或者小区特定参考信号的测量,为了获取参考信号的出现位置,用户设备需要先检测小区的同步信道,根据同步信道来界定帧边界,然后根据帧边界和小区PCI(Physical Cell ID,物理小区标识)确定CRS出现的位置(即时域位置和频域位置)。当UE进行异频测量的时候,如果UE不能支持同时处理当前服务频率的信号和待测量的异频率的信号,UE需要启动测量间隙去测量(GAP)该待频率,在GAP期间,UE可以去测量待测量频率,当UE在当前工作频率的接收会被中断。目前测量GAP的长度和周期由基站配置给UE。现有的LTE通信系统中,小区的参考信号总是连续的出现,用户设备根据在GAP期间进行测量总可以获得对应时间上发送的参考信号。依赖于LTE的载波聚合技术,可以将非授权频段分配给LTE小区,由于非授权频段是公共频谱资源,任何组织或者个人都可以使用,使用时要遵循先听后发的规则,只要听到非授权频段为空闲状态时,才能在非授权频段上传输数据。根据非授权频段的特性,频段不能连续使用,这种不能连续使用的特性,会导致LTE小区出现以下问题:非授权频段的不连续占用会导致小区的参考信号不能连续发送UE无法准确判断参考信号的出现位置,造成用户设备无法对参考信号进行测量。In the LTE (Long Term Evolution) communication system, the reference signal measurement on the cell refers to the measurement of the CRS (Common Reference Signal) or the cell-specific reference signal of the cell, in order to obtain the appearance position of the reference signal. The user equipment needs to detect the synchronization channel of the cell first, define the frame boundary according to the synchronization channel, and then determine the location (instant domain location and frequency domain location) of the CRS according to the frame boundary and the cell PCI (Physical Cell ID). When the UE performs the inter-frequency measurement, if the UE cannot support the signal of the current serving frequency and the signal of the different frequency to be measured, the UE needs to start the measurement gap to measure (GAP) the to-be-frequency. During the GAP, the UE can go. The frequency to be measured is measured and will be interrupted when the UE receives at the current operating frequency. Currently, the length and period of measurement of the GAP are configured by the base station to the UE. In the existing LTE communication system, the reference signal of the cell always appears continuously, and the user equipment can always obtain the reference signal transmitted at the corresponding time according to the measurement during the GAP. Depending on the carrier aggregation technology of LTE, the unlicensed frequency band can be allocated to the LTE cell. Since the unlicensed frequency band is a common spectrum resource, any organization or individual can use it. Data can be transmitted on unlicensed bands when the licensed band is idle. According to the characteristics of the unlicensed frequency band, the frequency band cannot be used continuously. This feature that cannot be used continuously may cause the following problems in the LTE cell: the discontinuous occupancy of the unlicensed frequency band may cause the reference signal of the cell to be continuously transmitted. The UE cannot accurately determine the reference signal. The appearance of the location causes the user equipment to be unable to measure the reference signal.
发明内容Summary of the invention
本发明实施例所要解决的技术问题在于,提供一种基于非授权频段的测量方法。可解决现有技术中非授权频段的不连续使用造成的参考信号无法测量的问题。The technical problem to be solved by the embodiments of the present invention is to provide a measurement method based on an unlicensed frequency band. The problem that the reference signal caused by the discontinuous use of the unlicensed frequency band in the prior art cannot be measured can be solved.
为了解决上述技术问题,本发明实施例第一方面提供了一种非授权频段的 测量方法,包括:In order to solve the above technical problem, the first aspect of the embodiments of the present invention provides an unlicensed frequency band. Measurement methods, including:
基站在第一小区上发送参考信号;其中,所述第一小区的频段为非授权频段;The base station sends a reference signal on the first cell, where the frequency band of the first cell is an unlicensed frequency band;
所述基站通过第二小区内向用户设备发送测量参考信息通知,其中,所述第二小区的频段为授权频段,所述测量参考信息通知用于通知所述用户设备对所述第一小区的所述参考信号进行测量。The base station sends a measurement reference information notification to the user equipment in the second cell, where the frequency band of the second cell is an authorized frequency band, and the measurement reference information notification is used to notify the user equipment of the first cell. The reference signal is measured.
结合第一方面,在第一种可能的实现方式中,所述基站通过第二小区内向用户设备发送测量参考信息通知之前,还包括:With reference to the first aspect, in a first possible implementation manner, before the sending, by the base station, the measurement reference information notification to the user equipment in the second cell, the method further includes:
所述基站接收到第二基站发送的触发消息时,执行所述基站通过第二小区向用户设备发送测量参考信息通知的步骤;其中,所述触发消息用于触发所述基站发送所述测量参考信息通知。When the base station receives the trigger message sent by the second base station, the step of transmitting, by the second base station, the measurement reference information to the user equipment by using the second cell, where the trigger message is used to trigger the base station to send the measurement reference Information notification.
结合第一方面或第一种可能的实现方式,在第二种可能的实现方式中,还包括:In combination with the first aspect or the first possible implementation manner, in a second possible implementation manner, the method further includes:
所述基站向所述用户设备发送配置信息,所述配置信息用于指示所述测量参考信息通知在所述第二小区发送,以使所述用户设备从所述第二小区读取所述测量参考信息通知。The base station sends configuration information to the user equipment, where the configuration information is used to indicate that the measurement reference information is sent in the second cell, so that the user equipment reads the measurement from the second cell. Reference information notification.
结合第一方面或第一种可能的实现方式,在第三种可能的实现方式中,所述测量参考信息通知包括所述参考信号的发送通知。In conjunction with the first aspect or the first possible implementation manner, in a third possible implementation manner, the measurement reference information notification includes a notification of sending the reference signal.
结合第一方面或第一种可能的实现方式,在第四种可能的实现方式中,所述测量参考信息通知包括GAP位置信息,所述GAP位置信息用于通知所述用户设备GAP的位置。In conjunction with the first aspect or the first possible implementation manner, in a fourth possible implementation manner, the measurement reference information notification includes a GAP location information, where the GAP location information is used to notify a location of the user equipment GAP.
结合第一方面,在第五种可能的实现方式中,所述基站通过第二小区内向用户设备发送测量参考信息通知之前,还包括:With reference to the first aspect, in a fifth possible implementation manner, before the sending, by the base station, the measurement reference information notification to the user equipment in the second cell, the method further includes:
当所述基站判断所述参考信号的实际发送时刻不为预定发送时刻时,执行所所述基站通过第二小区内向用户设备发送测量参考信息通知的步骤;其中,所述预定发送时刻由所述参考信号的出现周期确定,所述参考信息通知包括所述参考信号的所述实际发送时刻和所述预定发送时刻的偏移量。When the base station determines that the actual transmission time of the reference signal is not the predetermined transmission time, performing the step of the base station transmitting a measurement reference information notification to the user equipment in the second cell; wherein the predetermined transmission time is The occurrence period of the reference signal is determined, and the reference information is notified to include an offset of the actual transmission timing of the reference signal and the predetermined transmission timing.
本发明实施例第二方面提供了一种基于非授权频段的测量方法,包括:A second aspect of the embodiments of the present invention provides a measurement method based on an unlicensed frequency band, including:
用户设备在第二小区上接收所属的基站发送的测量参考信息通知; Receiving, by the user equipment, a measurement reference information notification sent by the associated base station on the second cell;
所述用户设备根据所述测量参考信息通知确定GAP的位置,并在所述GAP内对参考信号进行测量;其中,所述参考信号由所述基站竞争到非授权频段后,将所述非授权频段分配给所属的第一小区,并在所述第一小区上发送的。Determining, by the user equipment, the location of the GAP according to the measurement reference information, and measuring the reference signal in the GAP; wherein, after the reference signal is contending by the base station to the unlicensed frequency band, the non-authorized The frequency band is allocated to the associated first cell and sent on the first cell.
结合第二方面,在第一种可能的实现方式中,还包括:In combination with the second aspect, in the first possible implementation manner, the method further includes:
所述用户设备接收基站发送配置信息,所述配置信息用于指示所述测量参考信息通知在所述第二小区发送;The user equipment receives the configuration information sent by the base station, where the configuration information is used to indicate that the measurement reference information is sent in the second cell.
所述用户设备根据所述配置信息确定从所述第二小区读取所述测量参考信息通知。The user equipment determines to read the measurement reference information notification from the second cell according to the configuration information.
结合第二方面,在第二种可能的实现方式中,所述测量参考信息通知包括所述参考信号的发送通知或者GAP位置信息。With reference to the second aspect, in a second possible implementation manner, the measurement reference information notification includes a transmission notification of the reference signal or GAP location information.
结合第二方面,在第三种可能的实现方式中,所述测量参考信息通知包括所述参考信号的发送通知,所述用户设备根据所述测量参考信息通知确定GAP的位置包括:With reference to the second aspect, in a third possible implementation manner, the measurement reference information notification includes a sending notification of the reference signal, and the user equipment notifying, according to the measurement reference information, that determining a location of the GAP includes:
所述用户设备根据所述参考信号的发送通知的发送时刻确定所述参考信号的发送时刻,并根据所述参考信号的发送时刻确定GAP的位置;或Determining, by the user equipment, a sending moment of the reference signal according to a sending moment of the sending notification of the reference signal, and determining a location of the GAP according to a sending moment of the reference signal; or
所述用户设备根据所述发送通知中携带的指示信息确定所述参考信号的发送时刻,并根据所述参考信号的发送时刻确定GAP的位置。The user equipment determines a sending moment of the reference signal according to the indication information carried in the sending notification, and determines a location of the GAP according to the sending moment of the reference signal.
结合第二方面的第二种可能的实现方式,在第四种可能的实现方式中,所述GAP位置信息包括GAP指示信息,所述用户设备根据所述测量参考信息通知确定GAP的位置包括:With reference to the second possible implementation of the second aspect, in a fourth possible implementation, the location of the GAP information includes the GAP indication information, and the determining, by the user equipment, the location of the GAP according to the measurement reference information includes:
所述用户设备根据所述GAP指示信息的发送时刻确定所述参考信号的发送时刻,并根据所述参考信号的发送时刻确定GAP的位置;或Determining, by the user equipment, a sending moment of the reference signal according to a sending moment of the GAP indication information, and determining a location of the GAP according to a sending moment of the reference signal; or
所述用户设备根据所述GAP指示信息携带的指示信息确定GAP的位置。The user equipment determines the location of the GAP according to the indication information carried by the GAP indication information.
结合第二方面的第二种可能的实现方式,在第五种可能的实现方式中,所述GAP位置信息包括偏移量,所述用户设备根据所述测量参考信息通知确定GAP的位置包括:With reference to the second possible implementation of the second aspect, in a fifth possible implementation, the location, the location, the location, the location, the location,
所述用户设备根据所述偏移量和GAP出现周期调整所述GAP的位置。The user equipment adjusts the location of the GAP according to the offset and the GAP occurrence period.
本发明实施例第三方面提供了一种基站,包括: A third aspect of the embodiments of the present invention provides a base station, including:
分配模块,用于在第一小区上发送参考信号;其中,所述第一小区的频段为非授权频段;An allocating module, configured to send a reference signal on the first cell, where the frequency band of the first cell is an unlicensed frequency band;
第一发送模块,用于通过第二小区内向用户设备发送测量参考信息通知,其中,所述第二小区的频段为授权频段,所述测量参考信息通知用于通知所述用户设备对所述第一小区的所述参考信号进行测量。a first sending module, configured to send a measurement reference information notification to the user equipment in the second cell, where the frequency band of the second cell is an authorized frequency band, and the measurement reference information notification is used to notify the user equipment of the The reference signal of a cell is measured.
结合第三方面,在第一种可能的实现方式中,还包括:In combination with the third aspect, in the first possible implementation manner, the method further includes:
触发模块,用于接收到第二基站发送的触发消息时,指示所述第一发送模块开始工作;其中,所述触发消息用于触发所述基站发送所述测量参考信息通知。The triggering module is configured to: when the triggering message sent by the second base station is received, instruct the first sending module to start working; where the triggering message is used to trigger the base station to send the measurement reference information notification.
结合第三方面或第一种可能的实现方式,在第二种可能的实现方式中,还包括:In combination with the third aspect or the first possible implementation manner, in a second possible implementation manner, the method further includes:
配置模块,用于向所述用户设备发送配置信息,所述配置信息用于指示所述测量参考信息通知在所述第二小区发送,以使所述用户设备从所述第二小区读取所述测量参考信息通知。a configuration module, configured to send configuration information to the user equipment, where the configuration information is used to indicate that the measurement reference information is sent in the second cell, so that the user equipment reads from the second cell The measurement reference information is notified.
结合第三方面或第一种可能的实现方式,在第三种可能的实现方式中,所述测量参考信息通知包括所述参考信号的发送通知。In conjunction with the third aspect or the first possible implementation manner, in a third possible implementation manner, the measurement reference information notification includes a notification of sending the reference signal.
结合第三方面或第一种可能的实现方式,在第四种可能的实现方式中,所述测量参考信息通知包括GAP位置信息,所述GAP位置信息用于通知所述用户设备GAP的位置。In conjunction with the third aspect or the first possible implementation manner, in a fourth possible implementation manner, the measurement reference information notification includes a GAP location information, where the GAP location information is used to notify a location of the user equipment GAP.
结合第三方面,在第五种可能的实现方式中,还包括:In combination with the third aspect, in a fifth possible implementation manner, the method further includes:
判断模块,用于当判断所述参考信号的实际发送时刻不为预定发送时刻时,指示所述第一发送模块开始工作;其中,所述预定发送时刻由所述参考信号的出现周期确定,所述参考信息通知包括所述参考信号的所述实际发送时刻和所述预定发送时刻的偏移量。a determining module, configured to: when it is determined that the actual sending time of the reference signal is not a predetermined sending time, instructing the first sending module to start working; wherein the predetermined sending time is determined by an appearance period of the reference signal, where The reference information notification includes an offset of the actual transmission time and the predetermined transmission time of the reference signal.
本发明实施例第四方面提供了一种用户设备,包括:A fourth aspect of the embodiments of the present invention provides a user equipment, including:
接收模块,用于在第二小区上接收所属的基站发送的测量参考信息通知;a receiving module, configured to receive, by the second cell, a measurement reference information notification sent by the associated base station;
测量模块,用于根据所述测量参考信息通知确定GAP的位置,并在所述GAP内对参考信号进行测量;其中,所述参考信号由所述基站竞争到非授权频段后,将所述非授权频段分配给所属的第一小区,并在所述第一小区上发送 的。a measuring module, configured to notify, according to the measurement reference information, a location of the GAP, and measure the reference signal in the GAP; wherein, after the reference signal is contending by the base station to an unlicensed frequency band, the non- The licensed frequency band is allocated to the associated first cell and sent on the first cell of.
结合第四方面,在第一种可能的实现方式中,还包括:In combination with the fourth aspect, in the first possible implementation manner, the method further includes:
配置信息接收模块,用于接收基站发送配置信息,所述配置信息用于指示所述测量参考信息通知在所述第二小区发送;a configuration information receiving module, configured to receive, by the base station, configuration information, where the configuration information is used to indicate that the measurement reference information is sent in the second cell;
读取模块,用于根据所述配置信息确定从所述第二小区读取所述测量参考信息通知。And a reading module, configured to determine, according to the configuration information, that the measurement reference information notification is read from the second cell.
结合第四方面,在第二种可能的实现方式中,所述测量参考信息通知包括所述参考信号的发送通知或者GAP位置信息。With reference to the fourth aspect, in a second possible implementation manner, the measurement reference information notification includes a sending notification or a GAP location information of the reference signal.
结合第四方面,在第三种可能的实现方式中,所述测量参考信息通知包括所述参考信号的发送通知,所述测量模块用于:With reference to the fourth aspect, in a third possible implementation manner, the measurement reference information notification includes a sending notification of the reference signal, where the measuring module is configured to:
根据所述参考信号的发送通知的发送时刻确定所述参考信号的发送时刻,并根据所述参考信号的发送时刻确定GAP的位置;或Determining a transmission timing of the reference signal according to a transmission timing of the transmission notification of the reference signal, and determining a location of the GAP according to a transmission timing of the reference signal; or
根据所述发送通知中携带的指示信息确定所述参考信号的发送时刻,并根据所述参考信号的发送时刻确定GAP的位置。And determining, according to the indication information carried in the sending notification, a sending moment of the reference signal, and determining a location of the GAP according to the sending moment of the reference signal.
结合第四方面的第二种可能的实现方式,在第四种可能的实现方式中,所述GAP位置信息包括GAP指示信息,所述测量模块用于:With reference to the second possible implementation of the fourth aspect, in a fourth possible implementation, the GAP location information includes GAP indication information, and the measurement module is configured to:
根据所述GAP指示信息的发送时刻确定所述参考信号的发送时刻,并根据所述参考信号的发送时刻确定GAP的位置;或Determining, according to a sending moment of the GAP indication information, a sending moment of the reference signal, and determining a location of the GAP according to a sending moment of the reference signal; or
根据所述GAP指示信息携带的指示信息确定GAP的位置。Determining a location of the GAP according to the indication information carried by the GAP indication information.
结合第四方面的第二种可能的实现方式,在第五种可能的实现方式中,所述GAP位置信息包括偏移量,所述测量模块用于:With reference to the second possible implementation of the fourth aspect, in a fifth possible implementation, the GAP location information includes an offset, and the measurement module is configured to:
根据所述偏移量和GAP出现周期调整所述GAP的位置。The position of the GAP is adjusted according to the offset and the GAP occurrence period.
实施本发明实施例,具有如下有益效果:Embodiments of the present invention have the following beneficial effects:
基站竞争到非授权频段后,将非授权频段分配给第一小区,并在第一小区上发送参考信号,基站通过授权频段的第二小区通知用户设备参考信号的测量参考信息通知,使用户设备根据测量参考信息通知确定GAP的位置,准确的在GAP内对参考信号进行测量,避免非授权频段的不连续造成用户设备无法测量参考信号的问题。 After the base station contends to the unlicensed frequency band, the unlicensed frequency band is allocated to the first cell, and the reference signal is sent on the first cell, and the second cell informs the user equipment of the reference signal of the reference signal by the second cell of the licensed frequency band to make the user equipment The location of the GAP is determined according to the measurement reference information, and the reference signal is accurately measured in the GAP to avoid the problem that the user equipment cannot measure the reference signal due to the discontinuity of the unlicensed frequency band.
附图说明DRAWINGS
为了更清楚地说明本发明实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the embodiments or the description of the prior art will be briefly described below. Obviously, the drawings in the following description are only It is a certain embodiment of the present invention, and other drawings can be obtained from those skilled in the art without any creative work.
图1是本发明实施例提供的一种非授权频段的测量方法的流程示意图;1 is a schematic flowchart of a method for measuring an unlicensed frequency band according to an embodiment of the present invention;
图2是本发明实施例提供的一种GAP的位置调整方法的示意图;2 is a schematic diagram of a method for adjusting a position of a GAP according to an embodiment of the present invention;
图3是本发明实施例提供的一种非授权频段的测量方法的另一流程示意图;3 is another schematic flowchart of a method for measuring an unlicensed frequency band according to an embodiment of the present invention;
图4是本发明实施例提供的一种基站的结构示意图;4 is a schematic structural diagram of a base station according to an embodiment of the present invention;
图5是本发明实施例提供的一种基站的另一结构示意图;FIG. 5 is a schematic structural diagram of another base station according to an embodiment of the present disclosure;
图6是本发明实施例提供的一种用户设备的结构示意图;FIG. 6 is a schematic structural diagram of a user equipment according to an embodiment of the present disclosure;
图7是本发明实施例提供的一种用户设备的另一结构示意图;FIG. 7 is another schematic structural diagram of a user equipment according to an embodiment of the present invention;
图8是本发明实施例提供的一种通信系统的结构示意图。FIG. 8 is a schematic structural diagram of a communication system according to an embodiment of the present invention.
具体实施方式detailed description
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The technical solutions in the embodiments of the present invention are clearly and completely described in the following with reference to the accompanying drawings in the embodiments of the present invention. It is obvious that the described embodiments are only a part of the embodiments of the present invention, but not all embodiments. All other embodiments obtained by those skilled in the art based on the embodiments of the present invention without creative efforts are within the scope of the present invention.
参见图1,为本发明实施例提供的一种基于非授权频段的测量方法的流程示意图,在本发明实施例中,所述方法包括:FIG. 1 is a schematic flowchart of a method for measuring an unlicensed frequency band according to an embodiment of the present invention. In the embodiment of the present invention, the method includes:
S101、基站在第一小区上发送参考信号;其中,所述第一小区的频段为非授权频段。S101. The base station sends a reference signal on the first cell, where the frequency band of the first cell is an unlicensed frequency band.
具体的,基站确定需要使用非授权频段后,对非授权频段进行侦听,同时触发回退流程,即启动回退计数器产生随机数实现回退流程,每当非授权频段的空闲时间达一个时隙长度(Time slot)时,则回退计数器减1。当回退计数器产生的随机数减少为0时,基站竞争到非授权频段,获得非授权频段的使用权,基站根据需要将非授权频段占用一定的时长,基站在占用非授权频段时, 其他基站不能使用该非授权频段传输数据。Specifically, after determining that the unlicensed band needs to be used, the base station intercepts the unlicensed band and triggers the rollback process, that is, the backoff counter is started to generate a random number to implement the rollback process, when the idle time of the unlicensed band reaches one. When the slot length (Time slot), the backoff counter is decremented by 1. When the random number generated by the backoff counter is reduced to 0, the base station competes for the unlicensed frequency band to obtain the use right of the unlicensed frequency band, and the base station occupies the unlicensed frequency band for a certain period of time according to the need, when the base station is occupying the unlicensed frequency band, Other base stations cannot use this unlicensed band to transmit data.
基站将竞争到的非授权频段分配给所属的第一小区,并在第一小区上发送参考信号。其中,在第一小区上,所述参考信号可以和第一小区的业务数据同时发送,也可以仅发送参考信号,而不发送业务数据。基站根据占用的非授权频段的时长确定参考信号的发送时间段,发送时间段的起始时刻至终止时刻的时长表示参考信号的持续时间,参考信号的持续时间为预定义的时间长度。例如,在第一小区上仅发送参考信号时,参考信号的持续时间可以为1ms-5ms;参考信号和业务数据同时发送时,参考信号的持续时间可以为1ms-15ms。基站根据参考信号的持续时间确定向UE发送测量参考信息通知其中,参考信号包括DRS,CSI-RS或CRS。The base station allocates the unlicensed frequency band that is contending to the associated first cell, and transmits the reference signal on the first cell. The reference signal may be sent simultaneously with the service data of the first cell, or only the reference signal may be sent, but the service data is not sent. The base station determines the transmission time period of the reference signal according to the duration of the occupied unlicensed frequency band. The duration from the start time to the end time of the transmission time period indicates the duration of the reference signal, and the duration of the reference signal is a predefined time length. For example, when only the reference signal is transmitted on the first cell, the duration of the reference signal may be 1 ms to 5 ms; when the reference signal and the service data are simultaneously transmitted, the duration of the reference signal may be 1 ms to 15 ms. The base station determines to send the measurement reference information to the UE according to the duration of the reference signal, where the reference signal includes a DRS, a CSI-RS or a CRS.
S102、所述基站通过第二小区内向用户设备发送测量参考信息通知,其中,所述第二小区的频段为授权频段,以便于所述用户设备根据所述测量参考信息通知对所述第一小区的所述参考信号进行测量。S102. The base station sends a measurement reference information notification to the user equipment in the second cell, where the frequency band of the second cell is an authorized frequency band, so that the user equipment notifies the first cell according to the measurement reference information. The reference signal is measured.
具体的,第二小区的频段为授权频段,第二小区可以为用户设备的服务小区,或者为用户设备的非服务小区。基站通过二小区向用户设备发送测量参考信息通知,测量参考信息通知用于通知用户设备第一小区上的参考信号的发送时间段,用户设备根据所述测量参考信息通知确定所述参考信号的发送时间段,并根据参考信号的发送时间段确定GAP的位置,用户设备在GAP内对参考信号进行测量。Specifically, the frequency band of the second cell is a licensed frequency band, and the second cell may be a serving cell of the user equipment or a non-serving cell of the user equipment. The base station sends a measurement reference information notification to the user equipment by using the second cell, and the measurement reference information is used to notify the user equipment of the transmission time period of the reference signal on the first cell, and the user equipment determines to send the reference signal according to the measurement reference information notification. The time period is determined according to the transmission time period of the reference signal, and the user equipment measures the reference signal in the GAP.
可选的,基站向所述用户设备发送配置信息,所述配置信息用于指示所述测量参考信息通知在所述第二小区发送,以使所述用户设备从所述第二小区读取所述测量参考信息通知。Optionally, the base station sends configuration information to the user equipment, where the configuration information is used to indicate that the measurement reference information is sent in the second cell, so that the user equipment reads from the second cell. The measurement reference information is notified.
具体的,所述基站需要通知所述用户设备,针对第一小区的所述测量参考信息通知是在第二小区上发送,以便用户设备从第二小区接收发送的测量参考信息通知。Specifically, the base station needs to notify the user equipment that the measurement reference information notification for the first cell is sent on the second cell, so that the user equipment receives the sent measurement reference information notification from the second cell.
进一步的,所述基站通过第二小区内向用户设备发送测量参考信息通知之前,还包括:Further, before the sending, by the base station, the measurement reference information notification to the user equipment in the second cell, the method further includes:
所述基站接收到第二基站发送的触发消息时,执行所述基站通过第二小区向用户设备发送测量参考信息通知的步骤;其中,所述通知消息用于触发所述 基站发送所述测量参考信息通知。When the base station receives the trigger message sent by the second base station, the step of transmitting, by the second base station, the measurement reference information notification to the user equipment by using the second cell, where the notification message is used to trigger the The base station transmits the measurement reference information notification.
具体的,基站接收所述第二基站的触发消息时,所述触发消息触发基站启动所述测量参考信息通知的发送,所述第二基站为所述用户设备的服务小区所在的基站。其中,触发消息可以携带需要发送所述测量参考信息通知的小区列表,所述小区列表至少包括一个小区。Specifically, when the base station receives the trigger message of the second base station, the triggering message triggers the base station to start sending the measurement reference information notification, where the second base station is a base station where the serving cell of the user equipment is located. The trigger message may carry a cell list that needs to send the measurement reference information notification, where the cell list includes at least one cell.
进一步的,所述测量参考信息通知包括所述参考信号的发送通知。Further, the measurement reference information notification includes a notification of sending the reference signal.
具体的,所述参考信号发送通知包括参考信号的发送通知,用户设备根据参考信号的发送通知确定参考信号的发送时间段,以便用户设备根据发送时间段启动GAP,并在GAP内对参考信号进行测量。其中,所述用户设备可以根据所述参考信号的发送通知的发送时刻确定参考信号的发送时刻,或者根据所述发送通知中携带的指示信息确定所述参考信号的发送时刻。Specifically, the reference signal sending notification includes a sending notification of the reference signal, and the user equipment determines the sending time period of the reference signal according to the sending notification of the reference signal, so that the user equipment starts the GAP according to the sending time period, and performs the reference signal in the GAP. measuring. The user equipment may determine a sending moment of the reference signal according to a sending moment of the sending notification of the reference signal, or determine a sending moment of the reference signal according to the indication information carried in the sending notification.
例如:所述参考信号发送通知的发送时刻为子帧P的帧开始时刻,则所述用户设备确定所述参考信号发送时刻为子帧N=P+D的帧开始时刻,其中D为预定的数值,P、D为大于或等于零的整数。或者,所述参考信号的发送通知中携带参考信号的发送时刻,所述发送时刻为绝对时刻或者相对于所述参考信号的发送时刻的相对时刻。For example, if the sending time of the reference signal transmission notification is the frame start time of the subframe P, the user equipment determines that the reference signal transmission time is a frame start time of the subframe N=P+D, where D is a predetermined Values, P, D are integers greater than or equal to zero. Alternatively, the transmission notification of the reference signal carries a transmission moment of the reference signal, where the transmission time is an absolute time or a relative time relative to a transmission time of the reference signal.
可选的,如果所述用户设备在一个测量采样周期已获得足够的满足测量精度的采样点,则收到参考信号的发送通知,也可以不启动GAP;如果所述用户设备在一个测量采样周期尚未获得足够的满足测量精度的采样点,则收到参考信号的发送通知,启动GAP进行测量。Optionally, if the user equipment obtains a sampling point that satisfies the measurement accuracy in a measurement sampling period, the notification of the reference signal is received, and the GAP may not be started; if the user equipment is in a measurement sampling period If sufficient sampling points satisfying the measurement accuracy have not been obtained, a notification of the transmission of the reference signal is received, and the GAP is started for measurement.
GAP的持续时间由基站配置或协议预定义,是一个固定值,设GAP的持续时间为△t。基站和用户设备预先都得知GAP的持续时间,基站将参考信号的发送通知发送给用户设备,以便以用户设备确定参考信号的发送时刻,用户设备根据参考信号的发送时刻和终止时刻确定参考信号的发送时间段,用户设备在发送时间段中选取持续时间为△t的GAP,假设GAP的起始时刻为t,GAP的持续时间△t确定GAP的为:起始时刻t至终止时刻t+△t组成的时间段,用户设备在该时间段内对第一小区上的参考信号进行测量。The duration of the GAP is predefined by the base station configuration or protocol and is a fixed value. The duration of the GAP is Δt. The base station and the user equipment know the duration of the GAP in advance, and the base station sends a notification of the transmission of the reference signal to the user equipment, so that the user equipment determines the transmission moment of the reference signal, and the user equipment determines the reference signal according to the sending time and the ending time of the reference signal. During the transmission time period, the user equipment selects the GAP with the duration of Δt in the transmission time period, assuming that the start time of the GAP is t, and the duration of the GAP Δt determines that the GAP is: the start time t to the end time t+△ The time period formed by t, the user equipment measures the reference signal on the first cell during the time period.
可以理解的是,参考信号的发送时刻可以使用子帧来表示,设用户设备确定的参考信号的发送时刻为子帧N的起始边界,预定义的参考信号的发送时 间段的持续时间为M个子帧的长度,则用户设备根据确定参考信号的发送时间段的位置为:子帧N的起始边界值子帧N+M的起始边界组成的时间段,用户设备在该发送时间段内启动GAP,并在GAP内测量第一小区上的参考信号。It can be understood that the sending moment of the reference signal can be represented by using a subframe, and the sending moment of the reference signal determined by the user equipment is the starting boundary of the subframe N, and the predefined reference signal is sent. The duration of the inter-segment is the length of the M subframes, and the user equipment determines the location of the transmission period of the reference signal according to the start boundary value of the subframe N: the start period of the sub-frame N+M of the subframe N, the user The device starts the GAP during the transmission period and measures the reference signal on the first cell within the GAP.
进一步的,所述测量参考信息通知包括GAP位置信息,所述基站通过第二小区向用户设备发送GAP位置信息,所述GAP位置信息用于用户设备确定GAP的位置,以使所述用户设备在所述GAP内对所述参考信号进行测量。所述GAP位置信息包括GAP指示信息或者GAP偏移信息。Further, the measurement reference information notification includes the GAP location information, and the base station sends the GAP location information to the user equipment by using the second cell, where the GAP location information is used by the user equipment to determine the location of the GAP, so that the user equipment is The reference signal is measured within the GAP. The GAP location information includes GAP indication information or GAP offset information.
进一步的,所述基站通过第二小区内向用户设备发送测量参考信息通知之前,还包括:Further, before the sending, by the base station, the measurement reference information notification to the user equipment in the second cell, the method further includes:
当所述基站判断所述参考信号的实际发送时刻不为预定发送时刻时,执行所所述基站通过第二小区内向用户设备发送测量参考信息通知的步骤;其中,所述预定发送时刻由所述参考信号的出现周期确定,所述参考信息通知包括所述参考信号的所述实际发送时刻和所述预定发送时刻的偏移量。When the base station determines that the actual transmission time of the reference signal is not the predetermined transmission time, performing the step of the base station transmitting a measurement reference information notification to the user equipment in the second cell; wherein the predetermined transmission time is The occurrence period of the reference signal is determined, and the reference information is notified to include an offset of the actual transmission timing of the reference signal and the predetermined transmission timing.
具体的,基站确定参考信号的实际发送时刻,以及参考信号的预定发送时刻,参考信号的预定发送时刻由的参考信号的出现周期确定。基站判断所述参考信号的发送时刻和预定发送时刻不同时,基站计算参考信号的实际发送时刻和预定发送时刻的偏移量,Specifically, the base station determines the actual transmission timing of the reference signal and the predetermined transmission timing of the reference signal, and the predetermined transmission timing of the reference signal is determined by the appearance period of the reference signal. When the base station determines that the transmission time of the reference signal is different from the predetermined transmission time, the base station calculates an offset between the actual transmission time of the reference signal and the predetermined transmission time,
基站为用户设备配置了GAP的出现周期,如果基站在规定的时刻竞争到非授权频段,并在规定的时刻发送参考信号,用户设备就能在规定GAP内对参考信号进行测量。如果非授权频段一直处理忙碌状态,基站无法在规定的时刻竞争到非授权频段,也就不能在规定的时刻发送参考信号,参考信号的实际发送时刻会比预定发送时刻滞后,参考信号不能预定发送时刻发送,此时,所述基站需要通知用户设备调整GAP的位置,以便能在合适的GAP内对第一小区上的参考信号进行测量。The base station configures the appearance period of the GAP for the user equipment. If the base station competes for the unlicensed frequency band at a specified time and transmits the reference signal at a predetermined time, the user equipment can measure the reference signal within the specified GAP. If the unlicensed frequency band has been busy in the busy state, the base station cannot compete for the unlicensed frequency band at the specified time, and the reference signal cannot be transmitted at the specified time. The actual transmission time of the reference signal will lag behind the predetermined transmission time, and the reference signal cannot be scheduled to be transmitted. At the moment, the base station needs to notify the user equipment to adjust the location of the GAP so that the reference signal on the first cell can be measured within the appropriate GAP.
示例性的,用户设备的GAP配置信息指定的GAP的出现周期为80ms,GAP的位置为:帧号为28的子帧0-6,用户设备接收到GAP位置信息后,调整该GAP的位置为:29号帧0-6子帧,则UE在帧号28的子帧0-6不再启动GAP,而是在帧号29的子帧0-6启动GAP。GAP持续时间可以为预定义值,比如6ms,或者是基于基站的配置。 For example, the GAP configuration information of the user equipment specifies a GAP period of 80 ms, and the location of the GAP is: subframe 0-6 of frame number 28. After receiving the GAP location information, the user equipment adjusts the location of the GAP to : Frame 29 0-6 subframe, UE does not start GAP in subframe 0-6 of frame number 28, but starts GAP in subframe 0-6 of frame number 29. The GAP duration can be a predefined value, such as 6ms, or based on the configuration of the base station.
进一步的,所述方法还包括:Further, the method further includes:
所述用户设备的服务基站发送GAP周期信息,所述GAP周期信息用于UE根据所述GAP周期信息计算GAP出现的预定位置。所述用户设备的服务基站可以是第一小区所归属的基站或者是是不同于所述第一小区所归属的基站。如果所述用户设备的服务基站是不同于所述第一小区所归属的基站,则在此之前,所述第一小区所归属的基站向所述第一用户的服务基站发送GAP周期信息,以使得第一用户的服务基站向所述用户设备发送所述GAP周期信息。The serving base station of the user equipment sends the GAP period information, where the GAP period information is used by the UE to calculate a predetermined location where the GAP appears according to the GAP period information. The serving base station of the user equipment may be a base station to which the first cell belongs or be different from the base station to which the first cell belongs. If the serving base station of the user equipment is different from the base station to which the first cell belongs, before the base station to which the first cell belongs, send the GAP period information to the serving base station of the first user, And causing the serving base station of the first user to send the GAP period information to the user equipment.
进一步的,所述参考信号包括DRS或公共参考信号CRS。Further, the reference signal includes a DRS or a common reference signal CRS.
实施本发明的实施例,基站竞争到非授权频段后,将非授权频段分配给第一小区,并在第一小区上发送参考信号,基站通过授权频段的第二小区通知用户设备参考信号的测量参考信息通知,使用户设备根据测量参考信息通知确定GAP的位置,准确的在GAP内对参考信号进行测量,避免非授权频段的不连续造成用户设备无法测量参考信号的问题。After the base station competes for the unlicensed frequency band, the base station allocates the unlicensed frequency band to the first cell, and sends a reference signal on the first cell, and the base station notifies the second cell of the licensed frequency band to notify the user equipment of the reference signal measurement. The reference information is notified to enable the user equipment to determine the location of the GAP according to the measurement reference information, and accurately measure the reference signal in the GAP to avoid the problem that the user equipment cannot measure the reference signal due to the discontinuity of the unlicensed frequency band.
参见图3,为本发明实施例提供的一种基于非授权频段的测量方法的另一流程示意图,在本发明实施例中,所述方法包括:FIG. 3 is a schematic flowchart of another method for measuring an unlicensed frequency band according to an embodiment of the present invention. In the embodiment of the present invention, the method includes:
S201、用户设备在第二小区上接收所属的基站发送的测量参考信息通知。S201. The user equipment receives the measurement reference information notification sent by the affiliated base station on the second cell.
具体的,所述用户设备确定测量第一小区,并确定第二小区的测量参考信息通知消息在第二小区上发送,其中,第一小区的频段为非授权频段,第二小区的频段为授权频段,第二小区可以为用户设备的服务小区,或者为用户设备的非服务小区。Specifically, the user equipment determines to measure the first cell, and determines that the measurement reference information notification message of the second cell is sent on the second cell, where the frequency band of the first cell is an unlicensed frequency band, and the frequency band of the second cell is authorized. The second cell may be a serving cell of the user equipment or a non-serving cell of the user equipment.
所述用户设备通过第二小区接收基站发送的测量参考信息通知。The user equipment receives the measurement reference information notification sent by the base station by using the second cell.
进一步的,所述用户设备接收基站的配置信息,所述配置信息指示针对所述第一小区的测量参考信息通知承载在在第二小区上,所述用户设备所述配置信息确定从通过所述第二小区接收基站发送的针对第一小区的测量参考信息通知。发送所述配置信息的基站可以为所述第一小区所在的基站,或者不同于第一小区所在的基站的第二基站,其中第二基站为UE的服务基站。可选的,在所述第二基站向所述用户设备发送所述配置信息之前,接收第一小区所在的基站的指示信息,所述指示信息指示针对所述第一小区的测量参考信息通知承载在在第二小区上。 Further, the user equipment receives the configuration information of the base station, where the configuration information indicates that the measurement reference information for the first cell is notified that the bearer is on the second cell, and the configuration information of the user equipment is determined to pass the The second cell receives the measurement reference information notification sent by the base station for the first cell. The base station that sends the configuration information may be a base station where the first cell is located, or a second base station different from a base station where the first cell is located, where the second base station is a serving base station of the UE. Optionally, before the second base station sends the configuration information to the user equipment, receiving indication information of a base station where the first cell is located, where the indication information indicates that the measurement reference information for the first cell is notified to the bearer. On the second cell.
S202、所述用户设备根据所述测量参考信息通知确定GAP的位置,并在所述GAP内对参考信号进行测量。S202. The user equipment notifies the location of the GAP according to the measurement reference information, and measures the reference signal in the GAP.
具体的,所述用户设备根据所述测量参考信息通知确定GAP的位置,在所述GAP内对参考信号进行测量。其中,所述参考信号由所述基站竞争到非授权频段后,将所述非授权频段分配给所属的第一小区,并在所述第一小区上发送的。Specifically, the user equipment notifies the location of the GAP according to the measurement reference information, and measures the reference signal in the GAP. After the reference signal is contending by the base station to the unlicensed frequency band, the unlicensed frequency band is allocated to the associated first cell and sent on the first cell.
进一步的,所述测量参考信息通知包括所述参考信号的发送通知。Further, the measurement reference information notification includes a notification of sending the reference signal.
具体的,所述参考信号信息通知包括参考信号的发送通知,用户设备根据参考信号的发送通知确定参考信号的发送时间段,以便用户设备根据发送时间段启动GAP,并在GAP内对参考信号进行测量。其中,所述用户设备可以根据所述参考信号的发送通知的发送时刻确定参考信号的发送时刻,或者根据所述发送通知中携带的指示信息确定所述参考信号的发送时刻。Specifically, the reference signal information is notified to include a sending notification of the reference signal, and the user equipment determines the sending time period of the reference signal according to the sending notification of the reference signal, so that the user equipment starts the GAP according to the sending time period, and performs the reference signal in the GAP. measuring. The user equipment may determine a sending moment of the reference signal according to a sending moment of the sending notification of the reference signal, or determine a sending moment of the reference signal according to the indication information carried in the sending notification.
示例性的,所述参考信号的发送通知的发送时刻为子帧P的帧开始时刻,则所述用户设备确定所述参考信号发送时刻为子帧N=P+D的帧开始时刻,其中D为预定的数值,P、D为大于或等于零的整数。或者,所述参考信号的发送通知中携带参考信号的发送时刻,所述发送时刻为绝对时刻或者相对于所述参考信号的发送时刻的相对时刻。For example, the sending time of the sending notification of the reference signal is the frame start time of the subframe P, and the user equipment determines that the reference signal sending time is the frame start time of the subframe N=P+D, where D For a predetermined value, P, D are integers greater than or equal to zero. Alternatively, the transmission notification of the reference signal carries a transmission moment of the reference signal, where the transmission time is an absolute time or a relative time relative to a transmission time of the reference signal.
可选的,如果所述用户设备在一个测量采样周期已获得足够的满足测量精度的采样点,则收到参考信号的发送通知,也可以不启动GAP;如果所述用户设备在一个测量采样周期尚未获得足够的满足测量精度的采样点,则收到参考信号的发送通知,启动GAP进行测量。Optionally, if the user equipment obtains a sampling point that satisfies the measurement accuracy in a measurement sampling period, the notification of the reference signal is received, and the GAP may not be started; if the user equipment is in a measurement sampling period If sufficient sampling points satisfying the measurement accuracy have not been obtained, a notification of the transmission of the reference signal is received, and the GAP is started for measurement.
GAP的持续时间由基站配置或协议预定义,是一个固定值,设GAP的持续时间为△t。基站和用户设备预先都得知GAP的持续时间,基站将参考信号的发送通知发送给用户设备,以便以用户设备确定参考信号的发送时刻,用户设备根据参考信号的发送时刻和终止时刻确定参考信号的发送时间段,用户设备在发送时间段中选取持续时间为△t的GAP,假设GAP的起始时刻为t,GAP的持续时间△t确定GAP的为:起始时刻t至终止时刻t+△t组成的时间段,用户设备在该时间段内对第一小区上的参考信号进行测量。The duration of the GAP is predefined by the base station configuration or protocol and is a fixed value. The duration of the GAP is Δt. The base station and the user equipment know the duration of the GAP in advance, and the base station sends a notification of the transmission of the reference signal to the user equipment, so that the user equipment determines the transmission moment of the reference signal, and the user equipment determines the reference signal according to the sending time and the ending time of the reference signal. During the transmission time period, the user equipment selects the GAP with the duration of Δt in the transmission time period, assuming that the start time of the GAP is t, and the duration of the GAP Δt determines that the GAP is: the start time t to the end time t+△ The time period formed by t, the user equipment measures the reference signal on the first cell during the time period.
可以理解的是,参考信号的发送时刻可以使用子帧来表示,设用户设备确 定的参考信号的发送时刻为子帧N的起始边界,预定义的参考信号的发送时间段的持续时间为M个子帧的长度,则用户设备根据确定参考信号的发送时间段的位置为:子帧N的起始边界值子帧N+M的起始边界组成的时间段,用户设备在该发送时间段内启动GAP,并在GAP内测量第一小区上的参考信号。It can be understood that the transmission time of the reference signal can be represented by using a subframe, and the user equipment is The sending time of the fixed reference signal is the starting boundary of the subframe N, and the duration of the sending time period of the predefined reference signal is the length of the M subframes, and the location of the sending time period of the determining reference signal by the user equipment is: The start boundary of the subframe N is a time period consisting of the start boundary of the subframe N+M, the user equipment starts the GAP in the transmission period, and measures the reference signal on the first cell in the GAP.
进一步的,所述测量参考信号通知包括GAP位置信息,所述用户设备根据所述测量参考信息通知确定GAP的位置包括:Further, the measurement reference signal notification includes the GAP location information, and the user equipment notifying the location of the GAP according to the measurement reference information includes:
所述用户设备根据所述GAP位置信息确定GAP的位置。The user equipment determines the location of the GAP according to the GAP location information.
可选的,所述GAP位置信息包括GAP偏移量,所述拥护设备根据GAP偏移量和预定的GAP位置确定GAP的位置。所述预定的GAP位置由GAP周期配置信息确定,所述GAP周期配置信息为所述用户设备接收服务基站发送的GAP周期配置信息。示例性的,用户设备的GAP配置信息指定的GAP的出现周期为80ms,GAP的位置为:帧号为28的子帧0-6,用户设备接收到GAP位置信息后,调整该GAP的位置为:29号帧0-6子帧,则UE在帧号28的子帧0-6不再启动GAP,而是在帧号29的子帧0-6启动GAP。GAP持续时间可以为预定义值,比如6ms,或者是基于基站的配置。Optionally, the GAP location information includes a GAP offset, and the support device determines a location of the GAP according to the GAP offset and the predetermined GAP location. The predetermined GAP location is determined by the GAP period configuration information, where the user equipment receives the GAP period configuration information sent by the serving base station. For example, the GAP configuration information of the user equipment specifies a GAP period of 80 ms, and the location of the GAP is: subframe 0-6 of frame number 28. After receiving the GAP location information, the user equipment adjusts the location of the GAP to : Frame 29 0-6 subframe, UE does not start GAP in subframe 0-6 of frame number 28, but starts GAP in subframe 0-6 of frame number 29. The GAP duration can be a predefined value, such as 6ms, or based on the configuration of the base station.
可选的,所述GAP位置信息包括GAP指示,所述用户设备根据GAP指示确定GAP的位置,并在GAP内对参考信号进行测量。其中,所述用户设备可以根据所述GAP指示的发送时刻确定GAP的位置,或者根据GAP指示中携带的指示信息确定所述参GAP的位置。Optionally, the GAP location information includes a GAP indication, and the user equipment determines a location of the GAP according to the GAP indication, and measures the reference signal in the GAP. The user equipment may determine the location of the GAP according to the sending moment indicated by the GAP, or determine the location of the reference GAP according to the indication information carried in the GAP indication.
可选的,本发明实施例还公开了一种基于非授权频段的调度方法,在本发明实施例中,所述方法包括:Optionally, the embodiment of the present invention further provides a scheduling method based on an unlicensed frequency band. In the embodiment of the present invention, the method includes:
S301、用户设备接收基站配置,所述配置包含至少两个工作小区,至少一个第一小区采用非授权载波,至少一个第二小区采用授权载波。S301. The user equipment receives a base station configuration, where the configuration includes at least two working cells, at least one first cell uses an unlicensed carrier, and at least one second cell uses an authorized carrier.
S302、用户设备通过第二小区向基站发送指示信息,以便基站根据所述指示信息确定第一小区的调度。S302. The user equipment sends the indication information to the base station by using the second cell, so that the base station determines the scheduling of the first cell according to the indication information.
具体的,UE根据第一小区参考信号的接收情况或者第一小区所在载波的干扰检测情况确定所述指示信息,并向基站上报所述指示信息。Specifically, the UE determines the indication information according to the reception condition of the first cell reference signal or the interference detection condition of the carrier where the first cell is located, and reports the indication information to the base station.
进一步的,所述指示信息包括不能继续接收调度指示。当用户设备持续未接收到所述参考信号的时长大于时长阈值时,向所述基站发送第一指示信息, 所述指示消息用于指示所述基站停止对所述用户设备在所述第一小区内进行调度对所述用户设备的调度;Further, the indication information includes that the scheduling indication cannot be continuously received. Sending the first indication information to the base station when the duration of the reference signal that is not received by the user equipment is greater than the duration threshold, The indication message is used to indicate that the base station stops scheduling the user equipment in the first cell by scheduling the user equipment;
或者,所述指示信息包括恢复接收调度指示。当所述用户设备接收到所述参考信号时,向所述基站发送第二指示消息,所述第二指示消息用于指示所述基站恢复对所述用户设备在所述第一小区内进行调度。Alternatively, the indication information includes a resume receiving scheduling indication. And sending, by the user equipment, the second indication message to the base station, where the second indication message is used to indicate that the base station resumes scheduling the user equipment in the first cell. .
具体的,由于基站需要竞争的方式使用非授权频段,如果非授权频段一直为忙碌状态,基站无法获得非授权频段的使用权,也就无法在第一小区上发送参考信号,用户设备超过一定时长未接收到参考信号会导致时频跟踪失败,用户设备向基站发送第一指示信息,第一指示信息用于指示基站停止对用户设备在第一小区内进行调度,如果用户设备再次接收到参考信号时用户设备向基站发送第二指示信息,第二指示信息用于指示基站恢复对用户设备在第一小区内进行调度。例如,用户设备在收到参考信号时,启动定时器,定时器设置有定时时长,定时时长为时长阈值。当定时器超时,认为时频跟踪失败,用户设备向基站发送第一指示信息,当用户设备再次接收到参考信号时,向基站发送第二指示信息。其中,时长阈值的设置可以由用户设备来配置,或者由基站或移动管理实体等网络侧设备来配置。Specifically, since the base station needs to use the unlicensed frequency band in a competitive manner, if the unlicensed frequency band is always in a busy state, the base station cannot obtain the use right of the unlicensed frequency band, and the reference signal cannot be sent on the first cell, and the user equipment exceeds a certain period of time. If the reference signal is not received, the time-frequency tracking fails, and the user equipment sends the first indication information to the base station, where the first indication information is used to indicate that the base station stops scheduling the user equipment in the first cell, if the user equipment receives the reference signal again. The user equipment sends the second indication information to the base station, where the second indication information is used to indicate that the base station resumes scheduling the user equipment in the first cell. For example, when receiving the reference signal, the user equipment starts a timer, and the timer is set with a timing duration, and the timing duration is a duration threshold. When the timer expires, it is considered that the time-frequency tracking fails, and the user equipment sends the first indication information to the base station, and when the user equipment receives the reference signal again, sends the second indication information to the base station. The setting of the duration threshold may be configured by the user equipment or configured by a network side device such as a base station or a mobility management entity.
进一步的,所述指示信息包括干扰持续时间信息和或干扰强度信息。Further, the indication information includes interference duration information and or interference strength information.
当所述用户设备检测到干扰信号时,获取所述干扰信号的持续时间;将所述持续时间上报至所述基站,以使所述基站在所述持续时间内将所述用户设备在所述第一小区内的调度优先级调整为最低;或者Acquiring the duration of the interference signal when the user equipment detects the interference signal; reporting the duration to the base station, so that the base station is in the duration of the user equipment The scheduling priority in the first cell is adjusted to be the lowest; or
当所述用户设备检测到干扰信号时,获取所述干扰信号的干扰强度;将所述干扰强度上报至所述基站,以使所述基站将所述第一小区内的干扰强度最大的用户设备的调度优先级调整为最低。Acquiring the interference strength of the interference signal when the user equipment detects the interference signal; reporting the interference strength to the base station, so that the base station is the user equipment with the highest interference strength in the first cell The scheduling priority is adjusted to the lowest.
具体的,用户设备可以根据第一小区的非授权频段的信道环境来判断是否受到干扰。当用户设备检测到其他基站发送的信号时或者所述用户设备在所述信道检测的功率强度高于预定门限时,则认为该信号为干扰信号,确定自身受到干扰。用户设备可以从其他基站发送的信号中的前导信息中获取该信号的总持续时间,也可以从其他基站发送的其他消息中读取信号的总持续时间,用户设备根据干扰信号的总持续时间和用户设备的上报时延来确定干扰信号的持 续时间。Specifically, the user equipment can determine whether the interference is caused according to the channel environment of the unlicensed frequency band of the first cell. When the user equipment detects a signal sent by another base station or the power intensity of the user equipment detected on the channel is higher than a predetermined threshold, the signal is considered as an interference signal, and it is determined that it is interfered. The user equipment may obtain the total duration of the signal from the preamble information in the signals sent by other base stations, and may also read the total duration of the signal from other messages sent by other base stations, and the total duration of the user equipment according to the interference signal. The reporting delay of the user equipment to determine the interference signal Continued time.
例如,用户设备接收到其他基站发送的干扰信号,从干扰信号的前导信息中读取到总持续时间为9ms,用户设备延时2ms向基站上报,则干扰信号的持续时间为9ms-2ms=7ms,用户设备向基站上报的干扰信号的持续时间为7ms,基站接收到上报的持续时间后,在该持续时间内将用户设备的调度优先级调整为最低。For example, the user equipment receives the interference signal sent by other base stations, and reads the total duration from the preamble information of the interference signal to 9 ms, and the user equipment delays 2 ms to report to the base station, and the duration of the interference signal is 9 ms-2 ms=7 ms. The duration of the interference signal reported by the user equipment to the base station is 7 ms. After receiving the reported duration, the base station adjusts the scheduling priority of the user equipment to the minimum.
可选的,用户设备检测到干扰信号,且干扰信号的强度大于预设的强度阈值时确定为干扰信号,其中,强度阈值由用户设备预定义的或者接收网络侧设备进行配置。强度阈值可以根据干扰基站的类型进行设置,不同的类型的干扰基站对应不同的强度。例如,WLAN干扰基站的强度阈值和LTE干扰基站的强度阈值不相同。干扰信号的强度大于预设的强度阈值时,用户设备向基站上报的干扰指示。Optionally, the user equipment detects the interference signal, and the strength of the interference signal is determined to be an interference signal when the strength of the interference signal is greater than a preset strength threshold, where the strength threshold is predefined by the user equipment or configured by the receiving network side device. The intensity threshold may be set according to the type of the interfering base station, and different types of interfering base stations correspond to different intensities. For example, the strength threshold of the WLAN interfering base station and the strength threshold of the LTE interfering base station are not the same. The interference indication reported by the user equipment to the base station when the strength of the interference signal is greater than the preset strength threshold.
需要说明的是,用户设备也可以直接向基站上报干扰信号的干扰强度,基站根据第一小区每个用户设备的干扰强度,将干扰强度最大的用户设备的调度优先级调整为最低。It should be noted that the user equipment can directly report the interference strength of the interference signal to the base station, and the base station adjusts the scheduling priority of the user equipment with the highest interference intensity to the lowest according to the interference strength of each user equipment in the first cell.
参见图4,为本发明实施例提供的一种基站,所述基站用于实施本发明实施例一的基于非授权频段的测量方法,所述基站包括:分配模块10和第一发送模块11。Referring to FIG. 4, a base station is provided. The base station is used to implement an unlicensed frequency band-based measurement method according to Embodiment 1 of the present invention. The base station includes: an allocation module 10 and a first sending module 11.
分配模块10,用于在第一小区上发送参考信号;其中,所述第一小区的频段为非授权频段;The allocating module 10 is configured to send a reference signal on the first cell, where the frequency band of the first cell is an unlicensed frequency band;
第一发送模块11,用于通过第二小区内向用户设备发送测量参考信息通知,其中,所述第二小区的频段为授权频段,以便于所述用户设备根据所述测量参考信息通知对所述第一小区的所述参考信号进行测量。The first sending module 11 is configured to send, by using the second cell, a measurement reference information notification to the user equipment, where the frequency band of the second cell is a licensed frequency band, so that the user equipment is notified according to the measurement reference information. The reference signal of the first cell is measured.
进一步的,所述基站还包括:Further, the base station further includes:
触发模块12,用于接收到第二基站发送的触发消息时,指示所述第一发送模块开始工作;其中,所述触发消息用于触发所述基站发送所述测量参考信息通知。The triggering module 12 is configured to: when the trigger message sent by the second base station is received, instruct the first sending module to start working; where the triggering message is used to trigger the base station to send the measurement reference information notification.
所述基站还包括:The base station further includes:
配置模块13,用于向所述用户设备发送配置信息,所述配置信息用于指 示所述测量参考信息通知在所述第二小区发送,以使所述用户设备从所述第二小区读取所述测量参考信息通知。The configuration module 13 is configured to send configuration information to the user equipment, where the configuration information is used to refer to The measurement reference information notification is sent at the second cell to enable the user equipment to read the measurement reference information notification from the second cell.
进一步的,所述GAP位置信息包括所述参考信号的发送通知。Further, the GAP location information includes a notification of sending the reference signal.
进一步的,所述测量参考信息通知包括GAP位置信息,所述GAP位置信息用于通知所述用户设备GAP的位置。Further, the measurement reference information notification includes GAP location information, and the GAP location information is used to notify the location of the user equipment GAP.
进一步的,所述基站还包括:Further, the base station further includes:
判断模块14,用于判断所述参考信号的实际发送时刻不为预定发送时刻时,指示所述第一发送模块开始工作;其中,所述预定发送时刻由所述参考信号的出现周期确定,所述参考信息通知包括所述参考信号的所述实际发送时刻和所述预定发送时刻的偏移量。The determining module 14 is configured to: when the actual sending time of the reference signal is not a predetermined sending time, instruct the first sending module to start working; wherein the predetermined sending time is determined by an appearance period of the reference signal, where The reference information notification includes an offset of the actual transmission time and the predetermined transmission time of the reference signal.
本发明实施例和方法实施例一基于同一构思,其带来的技术效果也相同,具体过程请参照方法实施例一的描述,此处不再赘述。The embodiment of the present invention and the method embodiment 1 are based on the same concept, and the technical effects thereof are also the same. For the specific process, refer to the description of the method embodiment 1, and details are not described herein again.
参见图5,为本发明实施例提供的一种基站的另一结构示意图,所述基站用于执行实施例一的基于非授权频段的测量方法,所述基站包括:处理器61、存储器62和通信接口63,基站中的处理器61的数量可以是一个或多个,图5以一个处理器为例。本发明的一些实施例中,处理器61、存储器62和通信接口63可通过总线或其他方式连接,图5中以总线连接为例。FIG. 5 is a schematic diagram of another structure of a base station according to an embodiment of the present invention. The base station is configured to perform an unlicensed frequency band-based measurement method according to the first embodiment, where the base station includes: a processor 61, a memory 62, and The communication interface 63, the number of the processors 61 in the base station may be one or more, and FIG. 5 takes a processor as an example. In some embodiments of the present invention, the processor 61, the memory 62, and the communication interface 63 may be connected by a bus or other means, and the bus connection is taken as an example in FIG.
其中,存储器62中存储一组程序代码,且处理器61用于调用存储器62中存储的程序代码,用于执行以下操作:The memory 62 stores a set of program codes, and the processor 61 is configured to call the program code stored in the memory 62 for performing the following operations:
在第一小区上发送参考信号;其中,所述第一小区的频段为非授权频段;Transmitting a reference signal on the first cell, where the frequency band of the first cell is an unlicensed frequency band;
通过第二小区内向用户设备发送测量参考信息通知,其中,所述第二小区的频段为授权频段,以便于所述用户设备根据所述测量参考信息通知对所述第一小区的所述参考信号进行测量。Sending, by the second cell, a measurement reference information notification to the user equipment, where the frequency band of the second cell is an authorized frequency band, so that the user equipment notifies the reference signal of the first cell according to the measurement reference information. Make measurements.
进一步的,处理器61执行所述通过第二小区内向用户设备发送测量参考信息通知之前,还包括:Further, before the processor 61 performs the sending of the measurement reference information notification to the user equipment in the second cell, the method further includes:
接收到第二基站发送的触发消息时,执行所述通过第二小区向用户设备发送测量参考信息通知的步骤;其中,所述触发消息用于触发所述基站发送所述测量参考信息通知。When the trigger message sent by the second base station is received, the step of sending the measurement reference information notification to the user equipment by using the second cell is performed; wherein the trigger message is used to trigger the base station to send the measurement reference information notification.
进一步的,处理器61还用于执行: Further, the processor 61 is further configured to execute:
向所述用户设备发送配置信息,所述配置信息用于指示所述测量参考信息通知在所述第二小区发送,以使所述用户设备从所述第二小区读取所述测量参考信息通知。Sending configuration information to the user equipment, where the configuration information is used to indicate that the measurement reference information is sent in the second cell, so that the user equipment reads the measurement reference information notification from the second cell. .
进一步的,所述测量参考信息通知包括所述参考信号的发送通知。Further, the measurement reference information notification includes a notification of sending the reference signal.
进一步的,所述测量参考信息通知包括GAP位置信息,所述GAP位置信息用于通知所述用户设备GAP的位置。Further, the measurement reference information notification includes GAP location information, and the GAP location information is used to notify the location of the user equipment GAP.
进一步的,处理器61所述通过第二小区内向用户设备发送测量参考信息通知之前,还包括:Further, before the sending, by the processor 61, the measurement reference information notification to the user equipment in the second cell, the method further includes:
当所述判断所述参考信号的实际发送时刻不为预定发送时刻时,执行所所述通过第二小区内向用户设备发送测量参考信息通知的步骤;其中,所述预定发送时刻由所述参考信号的出现周期确定,所述参考信息通知包括所述参考信号的所述实际发送时刻和所述预定发送时刻的偏移量。When the determining that the actual transmission time of the reference signal is not the predetermined transmission time, performing the step of transmitting the measurement reference information notification to the user equipment in the second cell; wherein the predetermined transmission time is determined by the reference signal The occurrence period is determined, and the reference information notification includes an offset of the actual transmission timing of the reference signal and the predetermined transmission timing.
本发明实施例和方法实施例基于同一构思,其带来的技术效果也相同,具体过程请参照方法实施例一的描述,此处不再赘述。The embodiments of the present invention and the method embodiments are based on the same concept, and the technical effects thereof are also the same. For the specific process, refer to the description of the method embodiment 1, and details are not described herein again.
参见图6,为本发明实施例提供的一种用户设备的结构示意图,所述用户设备用于执行实施例二的基于非授权频段的测量方法,所述用户设备包括:接收模块20和测量模块21。FIG. 6 is a schematic structural diagram of a user equipment, where the user equipment is used to perform an unlicensed frequency band-based measurement method according to an embodiment of the present disclosure, where the user equipment includes: a receiving module 20 and a measurement module. twenty one.
接收模块20,用于在第二小区上接收所属的基站发送的测量参考信息通知;The receiving module 20 is configured to receive, by the second cell, a measurement reference information notification sent by the associated base station;
测量模块21,用于根据所述测量参考信息通知确定GAP的位置,并在所述GAP内对参考信号进行测量;其中,所述参考信号由所述基站竞争到非授权频段后,将所述非授权频段分配给所属的第一小区,并在所述第一小区上发送的。The measuring module 21 is configured to notify the location of the GAP according to the measurement reference information, and measure the reference signal in the GAP; wherein, after the reference signal is contending by the base station to the unlicensed frequency band, The unlicensed frequency band is allocated to the associated first cell and sent on the first cell.
进一步德尔,所述用户设备还包括:Further, the user equipment further includes:
配置信息接收模块22,用于接收基站发送配置信息,所述配置信息用于指示所述测量参考信息通知在所述第二小区发送;The configuration information receiving module 22 is configured to receive, by the base station, configuration information, where the configuration information is used to indicate that the measurement reference information is sent in the second cell.
读取模块23,用于根据所述配置信息确定从所述第二小区读取所述测量参考信息通知。The reading module 23 is configured to determine, according to the configuration information, that the measurement reference information notification is read from the second cell.
进一步的,所述测量参考信息通知包括所述参考信号的发送通知或者 GAP位置信息。Further, the measurement reference information notification includes a notification of sending the reference signal or GAP location information.
进一步的,所述测量参考信息通知包括所述参考信号的发送通知,所述测量模块21用于:Further, the measurement reference information notification includes a notification of sending the reference signal, and the measurement module 21 is configured to:
根据所述参考信号的发送通知的发送时刻确定所述参考信号的发送时刻,并根据所述参考信号的发送时刻确定GAP的位置;或Determining a transmission timing of the reference signal according to a transmission timing of the transmission notification of the reference signal, and determining a location of the GAP according to a transmission timing of the reference signal; or
根据所述发送通知中携带的指示信息确定所述参考信号的发送时刻,并根据所述参考信号的发送时刻确定GAP的位置。And determining, according to the indication information carried in the sending notification, a sending moment of the reference signal, and determining a location of the GAP according to the sending moment of the reference signal.
进一步的,所述GAP位置信息包括GAP指示信息,所述测量模块21用于:Further, the GAP location information includes GAP indication information, and the measurement module 21 is configured to:
根据所述GAP指示信息的发送时刻确定所述参考信号的发送时刻,并根据所述参考信号的发送时刻确定GAP的位置;或Determining, according to a sending moment of the GAP indication information, a sending moment of the reference signal, and determining a location of the GAP according to a sending moment of the reference signal; or
根据所述GAP指示信息携带的指示信息确定GAP的位置。Determining a location of the GAP according to the indication information carried by the GAP indication information.
进一步的,所述测量参考信号通知包括偏移量,所述测量模块用于:Further, the measurement reference signal notification includes an offset, and the measurement module is configured to:
根据所述偏移量和GAP出现周期调整所述GAP的位置。The position of the GAP is adjusted according to the offset and the GAP occurrence period.
进一步的,所述用户设备还包括:第一调度指示模块24,用于当持续未接收到所述参考信号的时长大于时长阈值时,向所述基站发送第一指示信息,所述第一指示消息用于指示所述基站停止对用户设备在所述第一小区内进行调度对所述用户设备的调度;Further, the user equipment further includes: a first scheduling indication module 24, configured to send first indication information to the base station when the duration of the non-received reference signal is greater than a duration threshold, the first indication The message is used to indicate that the base station stops scheduling the user equipment to be scheduled by the user equipment in the first cell;
当接收到所述参考信号时,向所述基站发送第二指示消息,所述第二指示消息用于指示所述基站恢复对用户设备在所述第一小区内进行调度。When the reference signal is received, the second indication message is sent to the base station, where the second indication message is used to indicate that the base station resumes scheduling for the user equipment in the first cell.
进一步的,所述用户设备还包括:第二调度指示模块25,用于当检测到干扰信号时,获取所述干扰信号的持续时间;Further, the user equipment further includes: a second scheduling indication module 25, configured to acquire a duration of the interference signal when the interference signal is detected;
将所述持续时间上报至所述基站,以使所述基站在所述持续时间内将用户设备在所述第一小区内的调度优先级调整为最低;或者And reporting the duration to the base station, so that the base station adjusts a scheduling priority of the user equipment in the first cell to a minimum in the duration; or
当检测到干扰信号时,获取所述干扰信号的干扰强度;Obtaining an interference strength of the interference signal when an interference signal is detected;
将所述干扰强度上报至所述基站,以使所述基站将所述第一小区内的干扰强度最大的用户设备的调度优先级调整为最低。The interference strength is reported to the base station, so that the base station adjusts the scheduling priority of the user equipment with the highest interference strength in the first cell to the lowest.
本发明实施例和方法实施例二基于同一构思,其带来的技术效果也相同,具体过程请参照方法实施例二的描述,此处不再赘述。 The embodiment of the present invention and the method embodiment 2 are based on the same concept, and the technical effects thereof are also the same. For the specific process, refer to the description of the second embodiment of the method, and details are not described herein again.
参见图7,为本发明实施例提供的一种用户设备的另一结构示意图,用于执行实施例二的基于非授权频段的测量方法,在本发明实施例中,所述用户设备包括:处理器71、存储器72和通信接口73,用户设备中的处理器71的数量可以是一个或多个,图7以一个处理器为例。本发明的一些实施例中,处理器71、存储器72和通信接口73可通过总线或其他方式连接,图7中以总线连接为例。FIG. 7 is a schematic diagram of another structure of a user equipment according to an embodiment of the present disclosure, which is used to perform the method for measuring an unlicensed frequency band according to the second embodiment. In the embodiment of the present invention, the user equipment includes: The number of processors 71 in the user equipment may be one or more, and FIG. 7 takes a processor as an example. In some embodiments of the present invention, the processor 71, the memory 72, and the communication interface 73 may be connected by a bus or other means, and the bus connection is taken as an example in FIG.
其中,存储器72中存储一组程序代码,且处理器71用于调用存储器72中存储的程序代码,用于执行以下操作:The memory 72 stores a set of program codes, and the processor 71 is configured to call the program code stored in the memory 72 for performing the following operations:
在第二小区上接收所属的基站发送的测量参考信息通知;Receiving, by the second cell, a measurement reference information notification sent by the associated base station;
根据所述测量参考信息通知确定GAP的位置,并在所述GAP内对参考信号进行测量;其中,所述参考信号由所述基站竞争到非授权频段后,将所述非授权频段分配给所属的第一小区,并在所述第一小区上发送的。Determining a location of the GAP according to the measurement reference information, and measuring the reference signal in the GAP; wherein, after the reference signal is contending by the base station to an unlicensed frequency band, assigning the unlicensed frequency band to the The first cell is transmitted on the first cell.
进一步的,处理器71还用于执行:Further, the processor 71 is further configured to execute:
接收基站发送配置信息,所述配置信息用于指示所述测量参考信息通知在所述第二小区发送;Receiving, by the receiving base station, configuration information, where the configuration information is used to indicate that the measurement reference information is sent in the second cell;
根据所述配置信息确定从所述第二小区读取所述测量参考信息通知。Determining, according to the configuration information, reading the measurement reference information notification from the second cell.
进一步的,所述测量参考信息通知包括所述参考信号的发送通知或者GAP位置信息。Further, the measurement reference information notification includes a transmission notification of the reference signal or GAP location information.
进一步的,所述测量参考信息通知包括所述参考信号的发送通知,处理器71执行根据所述测量参考信息通知确定GAP的位置包括:Further, the measurement reference information notification includes a transmission notification of the reference signal, and the processor 71 performs to determine, according to the measurement reference information, the location of the determined GAP, including:
所述用户设备根据所述参考信号的发送通知的发送时刻确定所述参考信号的发送时刻,并根据所述参考信号的发送时刻确定GAP的位置;或Determining, by the user equipment, a sending moment of the reference signal according to a sending moment of the sending notification of the reference signal, and determining a location of the GAP according to a sending moment of the reference signal; or
所述用户设备根据所述发送通知中携带的指示信息确定所述参考信号的发送时刻,并根据所述参考信号的发送时刻确定GAP的位置。The user equipment determines a sending moment of the reference signal according to the indication information carried in the sending notification, and determines a location of the GAP according to the sending moment of the reference signal.
进一步的,所述GAP位置信息包括GAP指示信息,处理器71执行根据所述测量参考信息通知确定GAP的位置包括:Further, the GAP location information includes the GAP indication information, and the processor 71 performs the determining, according to the measurement reference information, that determining the location of the GAP includes:
所述用户设备根据所述GAP指示信息的发送时刻确定所述参考信号的发送时刻,并根据所述参考信号的发送时刻确定GAP的位置;或Determining, by the user equipment, a sending moment of the reference signal according to a sending moment of the GAP indication information, and determining a location of the GAP according to a sending moment of the reference signal; or
所述用户设备根据所述GAP指示信息携带的指示信息确定GAP的位置。 The user equipment determines the location of the GAP according to the indication information carried by the GAP indication information.
进一步的,所述测量参考信号通知包括偏移量,处理器71执行根据所述测量参考信息通知确定GAP的位置包括:Further, the measurement reference signal notification includes an offset, and the processor 71 performs, according to the measurement reference information notification, determining the location of the GAP, including:
根据所述偏移量和GAP出现周期调整所述GAP的位置。The position of the GAP is adjusted according to the offset and the GAP occurrence period.
进一步的,处理器71还用于执行:Further, the processor 71 is further configured to execute:
当持续未接收到所述参考信号的时长大于时长阈值时,向所述基站发送第一指示信息,所述第一指示消息用于指示所述基站停止对用户设备在所述第一小区内进行调度对所述用户设备的调度;Transmitting the first indication information to the base station, where the first indication message is used to indicate that the base station stops performing the user equipment in the first cell, when the duration of the reference signal is not greater than the duration threshold. Scheduling scheduling of the user equipment;
当接收到所述参考信号时,向所述基站发送第二指示消息,所述第二指示消息用于指示所述基站恢复对用户设备在所述第一小区内进行调度。When the reference signal is received, the second indication message is sent to the base station, where the second indication message is used to indicate that the base station resumes scheduling for the user equipment in the first cell.
进一步的,处理器71还用于执行:Further, the processor 71 is further configured to execute:
当检测到干扰信号时,获取所述干扰信号的持续时间;Obtaining a duration of the interference signal when an interference signal is detected;
将所述持续时间上报至所述基站,以使所述基站在所述持续时间内将所述用户设备在所述第一小区内的调度优先级调整为最低;或者And reporting the duration to the base station, so that the base station adjusts a scheduling priority of the user equipment in the first cell to a minimum in the duration; or
当检测到干扰信号时,获取所述干扰信号的干扰强度;Obtaining an interference strength of the interference signal when an interference signal is detected;
将所述干扰强度上报至所述基站,以使所述基站将所述第一小区内的干扰强度最大的用户设备的调度优先级调整为最低。The interference strength is reported to the base station, so that the base station adjusts the scheduling priority of the user equipment with the highest interference strength in the first cell to the lowest.
本发明实施例和方法实施例二基于同一构思,其带来的技术效果也相同,具体请参照方法实施例二的描述,此处不再赘述。The embodiment of the present invention and the method embodiment 2 are based on the same concept, and the technical effects thereof are also the same. For details, refer to the description of the method embodiment 2, and details are not described herein again.
参见图8,为本发明实施例提供的一种通信系统的结构示意图,在本发明实施例中,通信系统包括基站和用户设备,其中,FIG. 8 is a schematic structural diagram of a communication system according to an embodiment of the present invention. In the embodiment of the present invention, a communication system includes a base station and a user equipment, where
所述基站在第一小区上发送参考信号;其中,所述第一小区的频段为非授权频段;The base station sends a reference signal on the first cell, where the frequency band of the first cell is an unlicensed frequency band;
所述基站通过第二小区内向用户设备发送测量参考信息通知;Sending, by the base station, a measurement reference information notification to the user equipment in the second cell;
所述用户设备在所述第二小区上接收所述基站发送的测量参考信息通知;Receiving, by the user equipment, a measurement reference information notification sent by the base station on the second cell;
所述用户设备根据所述测量参考信息通知确定GAP的位置,并在所述GAP内对参考信号进行测量;Determining, by the user equipment, the location of the GAP according to the measurement reference information, and measuring the reference signal in the GAP;
所述用户设备将测量结果上报至所述基站。The user equipment reports the measurement result to the base station.
本发明实施例和方法实施例一和方法实施例二基于同一构思,具体过程请参照上述实施例,此处不再赘述。 The embodiment of the present invention and the method embodiment 1 and the method embodiment 2 are based on the same concept. For the specific process, refer to the foregoing embodiment, and details are not described herein again.
本领域普通技术人员可以理解实现上述实施例方法中的全部或部分流程,是可以通过计算机程序来指令相关的硬件来完成,所述的程序可存储于一计算机可读取存储介质中,该程序在执行时,可包括如上述各方法的实施例的流程。其中,所述的存储介质可为磁碟、光盘、只读存储记忆体(Read-Only Memory,ROM)或随机存储记忆体(Random Access Memory,RAM)等。One of ordinary skill in the art can understand that all or part of the process of implementing the foregoing embodiments can be completed by a computer program to instruct related hardware, and the program can be stored in a computer readable storage medium. When executed, the flow of an embodiment of the methods as described above may be included. The storage medium may be a magnetic disk, an optical disk, a read-only memory (ROM), or a random access memory (RAM).
以上所揭露的仅为本发明一种较佳实施例而已,当然不能以此来限定本发明之权利范围,本领域普通技术人员可以理解实现上述实施例的全部或部分流程,并依本发明权利要求所作的等同变化,仍属于发明所涵盖的范围。 The above disclosure is only a preferred embodiment of the present invention, and of course, the scope of the present invention is not limited thereto, and those skilled in the art can understand all or part of the process of implementing the above embodiments, and according to the present invention. The equivalent changes required are still within the scope of the invention.

Claims (24)

  1. 一种基于非授权频段的测量方法,其特征在于,包括:A measurement method based on an unlicensed frequency band, comprising:
    基站在第一小区上发送参考信号;其中,所述第一小区的频段为非授权频段;The base station sends a reference signal on the first cell, where the frequency band of the first cell is an unlicensed frequency band;
    所述基站通过第二小区内向用户设备发送测量参考信息通知,其中,所述第二小区的频段为授权频段,以便于所述用户设备根据所述测量参考信息通知对所述第一小区的所述参考信号进行测量。The base station sends a measurement reference information notification to the user equipment in the second cell, where the frequency band of the second cell is an authorized frequency band, so that the user equipment notifies the location of the first cell according to the measurement reference information. The reference signal is measured.
  2. 如权利要求1所述的方法,其特征在于,所述基站通过第二小区内向用户设备发送测量参考信息通知之前,还包括:The method according to claim 1, wherein the base station further includes: before sending the measurement reference information notification to the user equipment in the second cell, the method further includes:
    所述基站接收到第二基站发送的触发消息时,执行所述基站通过第二小区向用户设备发送测量参考信息通知的步骤;其中,所述触发消息用于触发所述基站发送所述测量参考信息通知。When the base station receives the trigger message sent by the second base station, the step of transmitting, by the second base station, the measurement reference information to the user equipment by using the second cell, where the trigger message is used to trigger the base station to send the measurement reference Information notification.
  3. 如权利要求1或2所述的方法,其特征在于,还包括:The method of claim 1 or 2, further comprising:
    所述基站向所述用户设备发送配置信息,所述配置信息用于指示所述测量参考信息通知在所述第二小区发送,以使所述用户设备从所述第二小区读取所述测量参考信息通知。The base station sends configuration information to the user equipment, where the configuration information is used to indicate that the measurement reference information is sent in the second cell, so that the user equipment reads the measurement from the second cell. Reference information notification.
  4. 如权利要求1或2所述的方法,其特征在于,所述测量参考信息通知包括所述参考信号的发送通知。The method according to claim 1 or 2, wherein the measurement reference information notification includes a transmission notification of the reference signal.
  5. 如权利要求1或2所述的方法,其特征在于,所述测量参考信息通知包括GAP位置信息,所述GAP位置信息用于通知所述用户设备GAP的位置。The method according to claim 1 or 2, wherein the measurement reference information notification includes GAP location information, and the GAP location information is used to notify a location of the user equipment GAP.
  6. 如权利要求1所述的方法,其特征在于,所述基站通过第二小区内向用户设备发送测量参考信息通知之前,还包括: The method according to claim 1, wherein the base station further includes: before sending the measurement reference information notification to the user equipment in the second cell, the method further includes:
    当所述基站判断所述参考信号的实际发送时刻不为预定发送时刻时,执行所所述基站通过第二小区内向用户设备发送测量参考信息通知的步骤;其中,所述预定发送时刻由所述参考信号的出现周期确定,所述参考信息通知包括所述参考信号的所述实际发送时刻和所述预定发送时刻的偏移量。When the base station determines that the actual transmission time of the reference signal is not the predetermined transmission time, performing the step of the base station transmitting a measurement reference information notification to the user equipment in the second cell; wherein the predetermined transmission time is The occurrence period of the reference signal is determined, and the reference information is notified to include an offset of the actual transmission timing of the reference signal and the predetermined transmission timing.
  7. 一种基于非授权频段的测量方法,其特征在于,包括:A measurement method based on an unlicensed frequency band, comprising:
    用户设备在第二小区上接收所属的基站发送的测量参考信息通知;Receiving, by the user equipment, a measurement reference information notification sent by the associated base station on the second cell;
    所述用户设备根据所述测量参考信息通知确定GAP的位置,并在所述GAP内对参考信号进行测量;其中,所述参考信号由所述基站竞争到非授权频段后,将所述非授权频段分配给所属的第一小区,并在所述第一小区上发送的。Determining, by the user equipment, the location of the GAP according to the measurement reference information, and measuring the reference signal in the GAP; wherein, after the reference signal is contending by the base station to the unlicensed frequency band, the non-authorized The frequency band is allocated to the associated first cell and sent on the first cell.
  8. 如权利要求7所述的方法,其特征在于,还包括:The method of claim 7 further comprising:
    所述用户设备接收基站发送配置信息,所述配置信息用于指示所述测量参考信息通知在所述第二小区发送;The user equipment receives the configuration information sent by the base station, where the configuration information is used to indicate that the measurement reference information is sent in the second cell.
    所述用户设备根据所述配置信息确定从所述第二小区读取所述测量参考信息通知。The user equipment determines to read the measurement reference information notification from the second cell according to the configuration information.
  9. 如权利要求7所述的方法,其特征在于,所述测量参考信息通知包括所述参考信号的发送通知或者GAP位置信息。The method of claim 7, wherein the measurement reference information notification includes a transmission notification of the reference signal or GAP location information.
  10. 如权利要求7所述的方法,其特征在于,所述测量参考信息通知包括所述参考信号的发送通知,所述用户设备根据所述测量参考信息通知确定GAP的位置包括:The method according to claim 7, wherein the measurement reference information notification includes a transmission notification of the reference signal, and the user equipment notifying the location of the GAP according to the measurement reference information includes:
    所述用户设备根据所述参考信号的发送通知的发送时刻确定所述参考信号的发送时刻,并根据所述参考信号的发送时刻确定GAP的位置;或Determining, by the user equipment, a sending moment of the reference signal according to a sending moment of the sending notification of the reference signal, and determining a location of the GAP according to a sending moment of the reference signal; or
    所述用户设备根据所述发送通知中携带的指示信息确定所述参考信号的发送时刻,并根据所述参考信号的发送时刻确定GAP的位置。 The user equipment determines a sending moment of the reference signal according to the indication information carried in the sending notification, and determines a location of the GAP according to the sending moment of the reference signal.
  11. 如权利要求9所述的方法,其特征在于,所述GAP位置信息包括GAP指示信息,所述用户设备根据所述测量参考信息通知确定GAP的位置包括:The method according to claim 9, wherein the location of the GAP includes the GAP indication information, and the user equipment notifying the location of the GAP according to the measurement reference information includes:
    所述用户设备根据所述GAP指示信息的发送时刻确定所述参考信号的发送时刻,并根据所述参考信号的发送时刻确定GAP的位置;或Determining, by the user equipment, a sending moment of the reference signal according to a sending moment of the GAP indication information, and determining a location of the GAP according to a sending moment of the reference signal; or
    所述用户设备根据所述GAP指示信息携带的指示信息确定GAP的位置。The user equipment determines the location of the GAP according to the indication information carried by the GAP indication information.
  12. 如权利要求9所述的方法,其特征在于,所述GAP位置信息包括偏移量,所述用户设备根据所述测量参考信息通知确定GAP的位置包括:The method according to claim 9, wherein the location of the GAP includes an offset, and the user equipment notifying the location of the GAP according to the measurement reference information includes:
    所述用户设备根据所述偏移量和GAP出现周期调整所述GAP的位置。The user equipment adjusts the location of the GAP according to the offset and the GAP occurrence period.
  13. 一种基站,其特征在于,包括:A base station, comprising:
    分配模块,用于在第一小区上发送参考信号;其中,所述第一小区的频段为非授权频段;An allocating module, configured to send a reference signal on the first cell, where the frequency band of the first cell is an unlicensed frequency band;
    第一发送模块,用于通过第二小区内向用户设备发送测量参考信息通知,其中,所述第二小区的频段为授权频段,以便于所述用户设备根据所述测量参考信息通知对所述第一小区的所述参考信号进行测量。a first sending module, configured to send a measurement reference information notification to the user equipment in the second cell, where the frequency band of the second cell is a licensed frequency band, so that the user equipment is notified according to the measurement reference information The reference signal of a cell is measured.
  14. 如权利要求13所述的基站,其特征在于,还包括:The base station according to claim 13, further comprising:
    触发模块,用于接收到第二基站发送的触发消息时,指示所述第一发送模块开始工作;其中,所述触发消息用于触发所述基站发送所述测量参考信息通知。The triggering module is configured to: when the triggering message sent by the second base station is received, instruct the first sending module to start working; where the triggering message is used to trigger the base station to send the measurement reference information notification.
  15. 如权利要求13或14所述的基站,其特征在于,还包括:The base station according to claim 13 or 14, further comprising:
    配置模块,用于向所述用户设备发送配置信息,所述配置信息用于指示所述测量参考信息通知在所述第二小区发送,以使所述用户设备从所述第二小区读取所述测量参考信息通知。a configuration module, configured to send configuration information to the user equipment, where the configuration information is used to indicate that the measurement reference information is sent in the second cell, so that the user equipment reads from the second cell The measurement reference information is notified.
  16. 如权利要求13或14所述的基站,其特征在于,所述测量参考信息通知包括所述参考信号的发送通知。 The base station according to claim 13 or 14, wherein said measurement reference information notification includes a transmission notification of said reference signal.
  17. 如权利要求13或14所述的基站,其特征在于,所述测量参考信息通知包括GAP位置信息,所述GAP位置信息用于通知所述用户设备GAP的位置。The base station according to claim 13 or 14, wherein the measurement reference information notification includes GAP location information, and the GAP location information is used to notify a location of the user equipment GAP.
  18. 如权利要求13所述的基站,其特征在于,还包括:The base station according to claim 13, further comprising:
    判断模块,用于当判断所述参考信号的实际发送时刻不为预定发送时刻时,指示所述第一发送模块开始工作;其中,所述预定发送时刻由所述参考信号的出现周期确定,所述参考信息通知包括所述参考信号的所述实际发送时刻和所述预定发送时刻的偏移量。a determining module, configured to: when it is determined that the actual sending time of the reference signal is not a predetermined sending time, instructing the first sending module to start working; wherein the predetermined sending time is determined by an appearance period of the reference signal, where The reference information notification includes an offset of the actual transmission time and the predetermined transmission time of the reference signal.
  19. 一种用户设备,其特征在于,包括:A user equipment, comprising:
    接收模块,用于在第二小区上接收所属的基站发送的测量参考信息通知;a receiving module, configured to receive, by the second cell, a measurement reference information notification sent by the associated base station;
    测量模块,用于根据所述测量参考信息通知确定GAP的位置,并在所述GAP内对参考信号进行测量;其中,所述参考信号由所述基站竞争到非授权频段后,将所述非授权频段分配给所属的第一小区,并在所述第一小区上发送的。a measuring module, configured to notify, according to the measurement reference information, a location of the GAP, and measure the reference signal in the GAP; wherein, after the reference signal is contending by the base station to an unlicensed frequency band, the non- The licensed frequency band is allocated to the associated first cell and sent on the first cell.
  20. 如权利要求19所述的用户设备,其特征在于,还包括:The user equipment of claim 19, further comprising:
    配置信息接收模块,用于接收基站发送配置信息,所述配置信息用于指示所述测量参考信息通知在所述第二小区发送;a configuration information receiving module, configured to receive, by the base station, configuration information, where the configuration information is used to indicate that the measurement reference information is sent in the second cell;
    读取模块,用于根据所述配置信息确定从所述第二小区读取所述测量参考信息通知。And a reading module, configured to determine, according to the configuration information, that the measurement reference information notification is read from the second cell.
  21. 如权利要求19所述的用户设备,其特征在于,所述测量参考信息通知包括所述参考信号的发送通知或者GAP位置信息。The user equipment according to claim 19, wherein the measurement reference information notification includes a transmission notification of the reference signal or GAP location information.
  22. 如权利要求19所述的方法,其特征在于,所述测量参考信息通知包括所述参考信号的发送通知,所述测量模块用于: The method according to claim 19, wherein the measurement reference information notification includes a transmission notification of the reference signal, and the measurement module is configured to:
    根据所述参考信号的发送通知的发送时刻确定所述参考信号的发送时刻,并根据所述参考信号的发送时刻确定GAP的位置;或Determining a transmission timing of the reference signal according to a transmission timing of the transmission notification of the reference signal, and determining a location of the GAP according to a transmission timing of the reference signal; or
    根据所述发送通知中携带的指示信息确定所述参考信号的发送时刻,并根据所述参考信号的发送时刻确定GAP的位置。And determining, according to the indication information carried in the sending notification, a sending moment of the reference signal, and determining a location of the GAP according to the sending moment of the reference signal.
  23. 如权利要求21所述的用户设备,其特征在于,所述GAP位置信息包括GAP指示信息,所述测量模块用于:The user equipment of claim 21, wherein the GAP location information comprises GAP indication information, and the measurement module is configured to:
    根据所述GAP指示信息的发送时刻确定所述参考信号的发送时刻,并根据所述参考信号的发送时刻确定GAP的位置;或Determining, according to a sending moment of the GAP indication information, a sending moment of the reference signal, and determining a location of the GAP according to a sending moment of the reference signal; or
    根据所述GAP指示信息携带的指示信息确定GAP的位置。Determining a location of the GAP according to the indication information carried by the GAP indication information.
  24. 如权利要求21所述的用户设备,其特征在于,所述GAP位置信息包括偏移量,所述测量模块用于:The user equipment according to claim 21, wherein the GAP location information includes an offset, and the measurement module is configured to:
    根据所述偏移量和GAP出现周期调整所述GAP的位置。 The position of the GAP is adjusted according to the offset and the GAP occurrence period.
PCT/CN2014/095869 2014-12-31 2014-12-31 Unlicensed frequency band measurement method and associated device WO2016106671A1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201480036315.XA CN107431938A (en) 2014-12-31 2014-12-31 A kind of measuring method and relevant device based on unauthorized frequency range
PCT/CN2014/095869 WO2016106671A1 (en) 2014-12-31 2014-12-31 Unlicensed frequency band measurement method and associated device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/CN2014/095869 WO2016106671A1 (en) 2014-12-31 2014-12-31 Unlicensed frequency band measurement method and associated device

Publications (1)

Publication Number Publication Date
WO2016106671A1 true WO2016106671A1 (en) 2016-07-07

Family

ID=56283945

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2014/095869 WO2016106671A1 (en) 2014-12-31 2014-12-31 Unlicensed frequency band measurement method and associated device

Country Status (2)

Country Link
CN (1) CN107431938A (en)
WO (1) WO2016106671A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018227569A1 (en) * 2017-06-16 2018-12-20 北京小米移动软件有限公司 Method and device for transmitting information

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111294825B (en) * 2019-01-29 2022-09-27 展讯通信(上海)有限公司 Signal measurement control method and device, storage medium and terminal

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101321363A (en) * 2007-06-07 2008-12-10 华为技术有限公司 Method, network apparatus and equipment for measuring neighbour community signal and confirming gap
CN101730129A (en) * 2008-11-03 2010-06-09 大唐移动通信设备有限公司 Method, device and system for measuring Inter-RAT system
WO2013059999A1 (en) * 2011-10-26 2013-05-02 Renesas Mobile Corporation Flexible measurements in unlicensed band

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101534518B (en) * 2008-03-10 2012-08-08 华为技术有限公司 Method for reporting measurement information, system and device thereof
US8078111B2 (en) * 2008-07-29 2011-12-13 Qualcomm Incorporated Methods and apparatus for using multiple frequency bands for communication
CN101610538B (en) * 2009-07-21 2011-06-01 北京天碁科技有限公司 Measurement scheduling method and device of terminal in long term evolution system
US8559967B2 (en) * 2010-08-27 2013-10-15 Tektronix, Inc. System and method for managing subscriber bandwidth based on cell congestion analysis
CN102595450B (en) * 2011-01-10 2014-12-24 华为技术有限公司 Confirmation of measuring gap and communication device
US8675605B2 (en) * 2011-06-02 2014-03-18 Broadcom Corporation Frequency hopping in license-exempt/shared bands

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101321363A (en) * 2007-06-07 2008-12-10 华为技术有限公司 Method, network apparatus and equipment for measuring neighbour community signal and confirming gap
CN101730129A (en) * 2008-11-03 2010-06-09 大唐移动通信设备有限公司 Method, device and system for measuring Inter-RAT system
WO2013059999A1 (en) * 2011-10-26 2013-05-02 Renesas Mobile Corporation Flexible measurements in unlicensed band

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018227569A1 (en) * 2017-06-16 2018-12-20 北京小米移动软件有限公司 Method and device for transmitting information
US11405920B2 (en) 2017-06-16 2022-08-02 Beijing Xiaomi Mobile Software Co., Ltd. Method and device for transmitting information

Also Published As

Publication number Publication date
CN107431938A (en) 2017-12-01

Similar Documents

Publication Publication Date Title
US11864041B2 (en) Multi-beam random access procedure in handover execution
EP3195688B1 (en) Drx cycle configuration in dual connectivity
US10045986B2 (en) Method, device, and system for radio resource management measurement
US10638440B2 (en) Method for determining measurement gap length and network device
EP3353940B1 (en) Communication terminal, system node and methods therein
US20190223216A1 (en) Systems and methods for controlling ue inter-frequency measurements in gaps in presence of lbt
EP3091778A1 (en) Measurement method, configuration method, related device and system
CN102595440A (en) Discontinuous reception method, user equipment (UE) and base station
CN111030791B (en) Channel Quality Indicator (CQI) estimation method and device
WO2014183509A1 (en) Communication terminal management method and communication system
WO2016119761A1 (en) Channel quality indicator (cqi) estimation method and device
WO2014027603A1 (en) Mobile communication method, radio base station and user equipment
JP2016541170A (en) Mobility management method, apparatus and system
WO2016106563A1 (en) Measurement method and device
CN110545547B (en) Measuring method, device, terminal, network side equipment and storage medium
WO2016106671A1 (en) Unlicensed frequency band measurement method and associated device
WO2014139439A1 (en) Method and device for handling communication during inter-base station measurement
WO2014180203A1 (en) Communications terminal management method and communications system
CN106171030B (en) Reference signal measurement method and device
EP2894899A1 (en) Method, system and device for measuring new carrier
US9723587B2 (en) Movement information processing method and system, user equipment, and access network device

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 14909480

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 14909480

Country of ref document: EP

Kind code of ref document: A1