WO2016014850A3 - Method for providing power to sliding sleeve systems and/or other downhole devices for multi-stage fracturing - Google Patents
Method for providing power to sliding sleeve systems and/or other downhole devices for multi-stage fracturing Download PDFInfo
- Publication number
- WO2016014850A3 WO2016014850A3 PCT/US2015/041826 US2015041826W WO2016014850A3 WO 2016014850 A3 WO2016014850 A3 WO 2016014850A3 US 2015041826 W US2015041826 W US 2015041826W WO 2016014850 A3 WO2016014850 A3 WO 2016014850A3
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- sliding sleeve
- providing power
- downhole devices
- sleeve systems
- stage fracturing
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
- E21B41/0085—Adaptations of electric power generating means for use in boreholes
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Charge And Discharge Circuits For Batteries Or The Like (AREA)
- Connection Of Batteries Or Terminals (AREA)
Abstract
A multi-zone fracturing system includes at least one device having a power terminal, a central battery receptacle in a wellbore (102), a coiled tubing, wireline, and/or pump-down battery pack (106) seated in the central battery receptacle (108), and an electrical connection between the central battery receptacle and the power terminal for transmitting power from the battery pack to the device. Methods of supplying power for multi-zone fracturing systems are also provided.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US201462028011P | 2014-07-23 | 2014-07-23 | |
US62/028,011 | 2014-07-23 |
Publications (2)
Publication Number | Publication Date |
---|---|
WO2016014850A2 WO2016014850A2 (en) | 2016-01-28 |
WO2016014850A3 true WO2016014850A3 (en) | 2016-03-24 |
Family
ID=53765612
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/US2015/041826 WO2016014850A2 (en) | 2014-07-23 | 2015-07-23 | Method for providing power to sliding sleeve systems and/or other downhole devices for multi-stage fracturing |
Country Status (1)
Country | Link |
---|---|
WO (1) | WO2016014850A2 (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA2887402C (en) | 2012-10-16 | 2021-03-30 | Petrowell Limited | Flow control assembly |
CN108756842A (en) * | 2018-04-24 | 2018-11-06 | 中国石油天然气股份有限公司 | A kind of staged fracturing reforming technology improving Oil in Super-low Permeability reservoir horizontal well well yield |
WO2021101769A1 (en) * | 2019-11-20 | 2021-05-27 | Chevron U.S.A. Inc. | Fracturing sleeves and related systems for multi-stage hydraulic fracturing completions operations |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2009042494A2 (en) * | 2007-09-27 | 2009-04-02 | Schlumberger Canada Limited | Modular power source for subsurface systems |
US20110192596A1 (en) * | 2010-02-07 | 2011-08-11 | Schlumberger Technology Corporation | Through tubing intelligent completion system and method with connection |
US20110214883A1 (en) * | 2010-03-04 | 2011-09-08 | Schlumberger Technology Corporation | Large bore completions systems and method |
US20130229142A1 (en) * | 2012-03-01 | 2013-09-05 | Sorin G. Teodorescu | Power source for completion applications |
US20140002089A1 (en) * | 2012-07-02 | 2014-01-02 | Baker Hughes Incorporated | Power generating communication device |
WO2014094160A1 (en) * | 2012-12-17 | 2014-06-26 | Evolution Engineering Inc. | Mud pulse telemetry apparatus with a pressure transducer and method of operating same |
-
2015
- 2015-07-23 WO PCT/US2015/041826 patent/WO2016014850A2/en active Application Filing
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2009042494A2 (en) * | 2007-09-27 | 2009-04-02 | Schlumberger Canada Limited | Modular power source for subsurface systems |
US20110192596A1 (en) * | 2010-02-07 | 2011-08-11 | Schlumberger Technology Corporation | Through tubing intelligent completion system and method with connection |
US20110214883A1 (en) * | 2010-03-04 | 2011-09-08 | Schlumberger Technology Corporation | Large bore completions systems and method |
US20130229142A1 (en) * | 2012-03-01 | 2013-09-05 | Sorin G. Teodorescu | Power source for completion applications |
US20140002089A1 (en) * | 2012-07-02 | 2014-01-02 | Baker Hughes Incorporated | Power generating communication device |
WO2014094160A1 (en) * | 2012-12-17 | 2014-06-26 | Evolution Engineering Inc. | Mud pulse telemetry apparatus with a pressure transducer and method of operating same |
Also Published As
Publication number | Publication date |
---|---|
WO2016014850A2 (en) | 2016-01-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3249778A4 (en) | Charging system, charging method, and power adapter for terminal | |
GB2544420A (en) | Degradable downhole tools comprising magnesium alloys | |
EP3322066A4 (en) | Charging system, charging method, and power adapter for terminal | |
WO2012010835A3 (en) | Monitoring of objects in conjunction with a subterranean well | |
EP3637675A4 (en) | Power sourcing management method, device and system | |
EP3432945A4 (en) | Methods and systems for deployment, charging and retrieval of intracardiac pumps | |
GB2542041A (en) | Multilateral production control methods and systems employing a casing segment with at least one transmission crossover arrangement | |
GB2491763A (en) | Subterranean and marine-submersible electrical transmission for oil and gas wells | |
GB2552756A (en) | Dual-walled coiled tubing deployed pump | |
MX2015015881A (en) | Production logging in multi-lateral wells. | |
GB2537310A (en) | Tubing hanger running tool system and method | |
WO2012166638A3 (en) | Safety valve by-pass system for cable-deployed electric submersible pump | |
SA517381323B1 (en) | Use of real-time pressure data to evaluate fracturing performance | |
WO2015123619A3 (en) | Modular electronics system with interfacing interchangeable components | |
EP3491702A4 (en) | Systems and methods using electrical receptacles for integrated power control, communication and monitoring | |
WO2016014850A3 (en) | Method for providing power to sliding sleeve systems and/or other downhole devices for multi-stage fracturing | |
EP3194720A4 (en) | High bitrate downhole telemetry system using two independent channels on a multi-conductor cable | |
EP3143252A4 (en) | Methods for operating wellbore drilling equipment based on wellbore conditions | |
WO2017213726A3 (en) | Hydro-electric wet mate connector system | |
MX2017002537A (en) | Apparatus and methods for downhole tool deployment for well drilling and other well operations. | |
EP3504931A4 (en) | Electronic device, system, and method for connecting short-range communication | |
NO20210071A1 (en) | Electrical submersible pump (esp) string and esp orientation system | |
MX369876B (en) | Methods and systems for orienting in a wellbore. | |
GB2566620A (en) | Downhole capacitive coupling systems | |
WO2012006093A3 (en) | Fluid sampling tool |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 15745098 Country of ref document: EP Kind code of ref document: A2 |