WO2015118379A1 - Structure de plancher en acier-béton résistant au feu - Google Patents

Structure de plancher en acier-béton résistant au feu Download PDF

Info

Publication number
WO2015118379A1
WO2015118379A1 PCT/IB2014/058803 IB2014058803W WO2015118379A1 WO 2015118379 A1 WO2015118379 A1 WO 2015118379A1 IB 2014058803 W IB2014058803 W IB 2014058803W WO 2015118379 A1 WO2015118379 A1 WO 2015118379A1
Authority
WO
WIPO (PCT)
Prior art keywords
concrete
steel
fire
members
tension members
Prior art date
Application number
PCT/IB2014/058803
Other languages
English (en)
Inventor
Louis-Guy Cajot
Marc BRASSEUR
Thibaut HILLY
Jean-Luc BRINGER
Original Assignee
ArcelorMittal Investigación y Desarrollo, S.L.
Soletanche Freyssinet
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ArcelorMittal Investigación y Desarrollo, S.L., Soletanche Freyssinet filed Critical ArcelorMittal Investigación y Desarrollo, S.L.
Priority to PL14705422T priority Critical patent/PL3102753T3/pl
Priority to PCT/IB2014/058803 priority patent/WO2015118379A1/fr
Priority to EP14705422.5A priority patent/EP3102753B1/fr
Publication of WO2015118379A1 publication Critical patent/WO2015118379A1/fr

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/16Load-carrying floor structures wholly or partly cast or similarly formed in situ
    • E04B5/32Floor structures wholly cast in situ with or without form units or reinforcements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/16Load-carrying floor structures wholly or partly cast or similarly formed in situ
    • E04B5/32Floor structures wholly cast in situ with or without form units or reinforcements
    • E04B5/36Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/16Load-carrying floor structures wholly or partly cast or similarly formed in situ
    • E04B5/32Floor structures wholly cast in situ with or without form units or reinforcements
    • E04B5/36Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor
    • E04B5/38Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor with slab-shaped form units acting simultaneously as reinforcement; Form slabs with reinforcements extending laterally outside the element
    • E04B5/40Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor with slab-shaped form units acting simultaneously as reinforcement; Form slabs with reinforcements extending laterally outside the element with metal form-slabs
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/92Protection against other undesired influences or dangers
    • E04B1/94Protection against other undesired influences or dangers against fire
    • E04B1/941Building elements specially adapted therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/29Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures
    • E04C3/293Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures the materials being steel and concrete
    • E04C3/294Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures the materials being steel and concrete of concrete combined with a girder-like structure extending laterally outside the element
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/08Members specially adapted to be used in prestressed constructions
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/08Members specially adapted to be used in prestressed constructions
    • E04C5/10Ducts

Definitions

  • the present invention generally relates to a fire resistant steel-concrete floor structure.
  • Steel-concrete floor structures are well-known in the art. They comprise a concrete slab supported by horizontal structural (i.e. load bearing) steel members, as for example rolled steel beams, welded steel beams, cellular steel beams or steel girders, steel joists or steel trusses.
  • horizontal structural steel members as for example rolled steel beams, welded steel beams, cellular steel beams or steel girders, steel joists or steel trusses.
  • steel beam is used herein as an equivalent for the term "horizontal structural steel member”.
  • a slab portion with a certain width located above the top flange of the steel beam and connected to the latter by means of the shear connectors may be considered as being part of a composite steel-concrete section, wherein the steel beam takes all the tension stresses, but the concrete section takes most of the compression stresses due to the bending moment.
  • US2012/0066990 discloses a fire resistant composite steel-concrete floor structure, in which the steel beams supporting the concrete slab are equipped with fire-resistant tension members.
  • the latter have their ends anchored outside the steel beam in the support structure and are arranged in relation to the steel beam in such a way that, when a steel beam is overheated and yields under its vertical load in case of a fire scenario, the overheated beam rests on the fire-resistant tension members and is vertically supported by the latter.
  • the object underlying the present invention is to propose a steel-concrete floor structure that has an outstanding behaviour in a fire scenario without necessitating any expensive fire protection measures at all.
  • Prescribed fire resistance shall mean the ability of a structure, a part of a structure or a member thereof to fulfil its required function(s) (load bearing function and/or fire separating function) for a specified load level, for a prescribed fire exposure, and for a prescribed period of time (as prescribed in standards, building codes or by local authorities);
  • Prescribed fire scenario shall mean a fire scenario as prescribed in standards, building codes or by local authorities for proving compliance of buildings, engineering works with regard to safety requirements in case of fire.
  • a prescribed fire scenario is generally characterized by a standard temperature time curve as defined e.g. in EN model of a fully developed fire in a compartment and allows, amongst others, to compute the time-dependant temperature evolution in structural members during the fire scenario;
  • - "Fully developed fire” shall mean the state of full involvement of all combustible surfaces;
  • - "Fire compartment” shall mean a space within a building that is enclosed by separating elements such that fire spread beyond the compartment is prevented during the relevant fire exposure;
  • Structural member shall mean a load bearing member of a structure including bracings
  • Primary beam a horizontal structural member directly supported by a vertical load bearing structure and designed as a main load carrying member of a floor structure;
  • “Secondary beam” a horizontal structural member designed as auxiliary load carrying member of a floor structure (generally smaller steel sections arranged between primary beams to provide intermediary support for the slab);
  • Normal operation shall mean the state in absence of a fire, i.e. at ambient temperatures
  • External bearing structure shall mean a bearing structure located outside the fire compartment that is considered to be exposed to a fire scenario
  • Fire resistant bearing structure shall mean a bearing structure having a prescribed fire resistance with regard to its bearing function
  • a steel-concrete floor structure in accordance with the present invention is a steel-concrete floor structure designed for having a prescribed fire resistance when exposed to a prescribed fire scenario in a fire compartment immediately below the steel-concrete floor structure. It comprises horizontally extending structural steel members and a concrete slab. In normal operation, the horizontally extending structural steel members have to take the main part of the tensile stresses generated by the bending moment due to the load for which the steel-concrete floor structure is designed. According to an important aspect of the invention, the floor structure further comprises a plurality of tension members, each of the tension members horizontally extending through the concrete slab between two anchor points.
  • anchor points are arranged in one or more fire resistant bearing structures within the fire compartment, and/or in one or more external bearing structures, so that, when the strength and stiffness of the horizontal structural steel members substantially diminish in the prescribed fire scenario, the tension members extending through the concrete slab, wherein they are heating up more slowly than the structural steel members, are capable of supporting the loaded slab by catenary effect and of limiting the deflection thereof.
  • a steel- concrete floor has an outstanding behaviour in a fire scenario without necessitating any expensive fire protection measures at all.
  • deflections of the slab may be limited to an extent that is sometimes difficult to achieve with horizontal structural steel members protected with a fireproof heat insulation, intumescent paints or coatings or concrete encasements.
  • the steel-concrete floor structure is moreover a composite structure in which the horizontally extending structural steel members and a concrete slab are interconnected by shear connectors, the slab will be able to support the horizontally extending structural steel members, if the latter lose most of their strength and stiffness during the prescribed fire scenario.
  • the tension members extend through horizontal ducts embedded in the concrete slab. This embodiment allows to pre-tension the tension members after casting the concrete slab.
  • the horizontal ducts are preferably arranged in the upper half of the concrete slab, where they are best protected against a rapid temperature rise in a fire scenario.
  • the tension members are advantageously embedded in a material injected into the ducts after pre-tensioning the tension members. This injections provides a more direct interaction between the tension members and the concrete slab surrounding the ducts, protects the tension members against corrosion by water penetrating into the ducts and, in case of a fire scenario, prevents hot combustion gases from penetrating into the ducts.
  • the tension members are tensioned prior to casting the concrete slab and are directly embedded in the cast concrete.
  • This embodiment has the advantage to provide a very direct interaction between the tension members and the concrete slab, to efficiently protect the tension members against corrosion and against direct contact with hot combustion gases in a fire scenario.
  • it has the disadvantage that the tension members must be pretensioned prior to casting the concrete slab, when the fire resistant bearing structures and/or the external bearing structures for the anchor points may not yet be available, which may cause delay of a building project.
  • the tension in a tension member amounts to less than 70%, preferably to less than 60%, of its nominal tensile strength; and is preferably in the range of 20% to 60%, and more preferably in the range of 40% to 60%, of its nominal tensile strength.
  • a minimum pre-tension is recommended in order to warrant that in case of a fire scenario, the tension members rapidly start developing a catenary support function. Indeed, the higher the pre-tension in normal operation, the sooner the tension members will start developing said catenary support function, and the lower the deflection of the slab after a certain time of fire exposure will be.
  • the pre-tension in normal operation shall also be limited upward to a certain percentage of the nominal tensile strength.
  • the tension members must be able to follow the increasing deflection of the horizontally extending structural steel members without plastically deforming. It will in this context be appreciated that— surprisingly— up to 60% or even 70% of the tensile strength of the tensile members may be used for pre- tensioning them, while still warranting their proper operation in a fire scenario. Indeed, as will be explained hereinafter, during a fire scenario, after an initial increase of the tension in the tensile members during the first 20 minutes, this tension diminishes again. [0019]
  • the tension members are advantageously dimensioned so that during the prescribed fire-scenario, the tension in a tension member increases to a maximum that is close to its nominal tensile strength.
  • the tension members are advantageously protected along their whole length on their bottom side by at least 6 cm, preferably at least 9 cm concrete. It is the thickness of the concrete below tension members that is mainly responsible for a slow temperature increase in the tension members during a fire scenario. A thickness of 9 cm usually warrants e.g. that the temperature in the tension members remains— in a fire scenario characterized by a standard temperature-time curve according to EN 1991-1 -2: 2002, section 3.2.1— for at least 90 minutes below 200°C, whereby the temperature induced decrease of Young's modulus and the tensile strength of the tension members, as well as their thermal elongation remain within acceptable ranges.
  • the horizontally extending structural steel members comprise primary beams; and the tension members are arranged parallel to the primary beams and are regrouped in slab bands centred over the primary beams, the slab bands having a width of less than 2 m, preferably of less than 1.6 m.
  • the tension members are indeed most efficient when they are located close to the primary beams, i.e. in or close to the concrete in which, in case of a composite floor structure, the primary beams are connected by means of their shear-connectors.
  • the tension members are advantageously high tensile strength wire- strands.
  • the fire resistant bearing structures for the anchoring points of the tension members normally have a fire resistance at least equal to the fire resistance prescribed for the steel-concrete floor structure and comprise at least one of the following elements: a concrete column; a composite concrete-steel column; a steel column protected with a fireproof heat insulation or an intumescent material; a fire resistant steel bracing; a concrete wall; or a concrete core of a building.
  • the external bearing structures for the anchoring points of the tension members may have a fire resistance lower than the fire resistance prescribed for the steel-concrete floor structure. This is for example the case, if the standards, building codes or local authorities allow to consider that the fire scenario is limited to one fire compartment or that a less severe fire scenario is considered for external bearing structures. In this case it is even possible to have an external bearing structure that has no fire resistance at all, as e.g. an unprotected steel structure. This may also be the case, if the external bearing structure is located outside of the building and may therefore not be affected by a fire scenario inside of the building.
  • the anchor points for tension members are on one side arranged in a central fire resistant core of the building, in particular in central core made of reinforced concrete, and on the other side, arranged in an external bearing structure surrounding the central core, in particular an external bearing structure made of structural steel members.
  • none of the vertical or horizontal structural steel members has to receive a fire protection for warranting its stability in a fire scenario.
  • the fire resistance of such a building is mainly warranted by its central fire resistant core and the tension members in accordance with the present invention.
  • FIG. 1 is a schematic plane view from above of a portion of a steel-concrete floor structure in accordance with the invention, wherein the concrete and reinforcement meshes in the concrete are not shown;
  • FIG. 2 is a schematic vertical sectional view as indicated by arrows 2-2' in FIG. 1 ;
  • FIG. 3 is a schematic vertical sectional view as indicated by arrows 3-3' in FIG. 1 ;
  • FIG. 4 is an enlarged detail of FIG. 3, showing tension members in a duct;
  • FIG. 5 is a schematic vertical sectional view illustrating an anchor point for a tension member in a fire resistant support column
  • FIG. 6 is a schematic plane view as FIG. 1 , wherein anchor points for tension members are, on the left side, arranged in a bearing wall and, on the right side, in a central core of the building;
  • FIG. 7 is a very schematic plane view as FIG. 1 , wherein anchor points for tension members are on one side arranged in a central fire resistant core of the building, and on the other side arranged in a bearing structure surrounding the building;
  • FIG. 8 is a diagram showing the evolution in time of the deflection of the steel- concrete floor structure during a standard fire scenario, wherein:
  • FIG. 9 is a diagram showing the evolution in time of other parameters during a standard fire scenario, wherein:
  • FIG. 1 illustrates a portion of a composite steel-concrete floor structure 10 in accordance with the invention.
  • This steel-concrete floor structure 10 is designed for having a prescribed fire resistance when exposed to a prescribed fire scenario in a fire compartment immediately below (i.e. in the prescribed fire scenario, the floor structure 10 is heated from below).
  • the prescribed fire resistance may for example be 60 minutes, 90 minutes, 120 minutes. In exceptional cases, the prescribed fire resistance may even be more than 120 minutes, or be lower than 60 minutes, e.g. be only 30 minutes.
  • the composite floor structure 10 comprises a horizontal support structure comprising horizontally extending structural steel members 12, also called “primary beams 12" hereinafter, and a concrete slab 14 arranged above the primary beams 12.
  • this concrete slab 14 is shown as a transparent body for being able to see the support structure located below or within the slab 14.
  • the concrete slab 14 may for example be: a full concrete slab cast in situ, using e.g. removable framework between the primary beams 12; a composite concrete steel deck slab, wherein the slab is cast in situ on a profiled steel deck supported by the primary beams 12 and possibly by secondary beams 28; or a concrete slab cast in situ on precast concrete planks, which are supported by the primary beams 12.
  • the concrete slab 14 may further comprise steel reinforcement (shown in FIG. 2 and 3, but not in FIG. 1 ) under the form of steel meshes 32, 44 or steel bars embedded into the concrete, and/or steel fibres mixed into the concrete before casting it.
  • the object of this steel reinforcement is mainly to prevent cracking of the concrete and to provide reinforcement in the event of fire, relying on the so- called membrane action of the reinforced concrete slab 14 to warrant its integrity in case of major deflections.
  • the primary beams 12 may be rolled steel beams, welded steel beams, cellular steel beams or steel girders, steel joists or steel trusses.
  • the primary beams 12 shown in FIG. 2 and 3 are e.g. I-shaped sections (also called double-T sections), such as e.g. IPE sections, having an upper flange 16, a lower flange 16' and a web 18.
  • I-shaped sections also called double-T sections
  • IPE sections having an upper flange 16, a lower flange 16' and a web 18.
  • the primary beams 12 are supported by vertically extending structural members 20.
  • the vertically extending structural members 20 must either warrant as such the prescribed fire resistance (this may e.g. be the case if these vertically extending structural members 20 are concrete structural members) or must be protected with a fireproof heat insulation or intumescent paints or coatings or provided with a concrete filling or encasement to warrant the prescribed fire resistance.
  • these vertically extending structural members 20 are e.g. H-shaped steel sections with a reinforced concrete filling 22 between the flanges 24, 24' (such vertical structural members are generally called "composite columns" or “partially encased composite columns”).
  • the vertically extending structural members 20 may be steel sections, e.g. H-shaped sections, protected with a fireproof casing made e.g. of silicate or gypsum plates with or without mineral fibre insulations, with spray applied fireproofing materials, intumescent paints or coatings, respectively steel sections completely encased in concrete or closed steel sections completely filled with concrete.
  • the vertically extending structural members 20 may further be steel reinforced concrete columns or wooden columns or they may be replaced by other suitable support elements for the horizontally extending structural steel members 12, as e.g. a concrete wall or a brick wall, which have already an inherent fire resistance.
  • the primary beam 12 is supported between the columns 20, in such a way that it may axially expand when heated in a fire scenario, thereby avoiding that the expanding horizontal beam 12 exerts excessive horizontal forces onto the columns 20.
  • Such a free expansion can easily be implemented by providing interconnection means allowing a free thermal expansion of the horizontal beam 12, when the latter is heated in a fire scenario.
  • interconnection means may e.g. be a double web cleated connection (as identified e.g. with reference number 26 in FIG. 2) or a fin plate connection (not shown) between the web 18 of the steel beam 12 and a flange 24 of the column 20, wherein fixing bolts on the side of the web 18 may e.g.
  • interconnection means 26 need not be fire protected. To the contrary, it may even be of advantage if the interconnection means 26 get less rigid under fire conditions, whereby the deflection of the unprotected primary beam will exert smaller forces onto the protected columns 20.
  • the length "L" of the primary beams 12 is generally greater than the distance "D" between two parallel rows of primary beams 12.
  • the distance "D" would normally be less than 5 m, whereas the length of the primary beams 12 may be bigger than 10 m, wherein a length of 16 m for the primary beams 12 is not unusual.
  • horizontal secondary beams may be arranged transversally to the primary beams 12. In FIG. 1 , a single secondary beam, identified with reference 28, is shown for illustration purposes. Normally, such a secondary beam would be arranged every 2 to 4 m.
  • the distance "D" between two primary beams 12, and the number and spacing of secondary beams 28, will be conditioned by the type of concrete slab 14 to be installed, the procedure for installing it, the design load of the floor structure 10 and space or architectural requirements (e.g. the spacing of the columns 20 and/or free space for technical equipment, e.g. HVAC equipment, within the horizontal support structure of the floor).
  • space or architectural requirements e.g. the spacing of the columns 20 and/or free space for technical equipment, e.g. HVAC equipment, within the horizontal support structure of the floor.
  • secondary beams 28 for supporting profiled steel deck.
  • Such a secondary beams 28 would be arranged between the primary beams 12 and be spaced e.g. between 2 m and 4 m (sometimes even 5 m) from each other.
  • the concrete slab 14 bears on the upper flanges 16 of the horizontally extending structural steel members 12.
  • the floor structure 10 shown in FIG. 3 is conceived as a composite steel-concrete structure, i.e. the concrete slab 14 and the steel beams 12 structurally cooperate to provide the load bearing capacity of the floor structure 10.
  • This structural cooperation is achieved by shear-studs 30 (or equivalent shear connectors) welded onto the upper flange 16 of the steel beams 12.
  • the shear-studs 30 penetrate into the concrete slab 14, wherein they advantageously cooperate with reinforcement steel 32, e.g.
  • a slab portion with a certain width located above the top flange of the steel beam and connected to the latter by means of the shear-studs 30, may be considered as being part of a composite steel-concrete section, wherein the steel beam 12 usually takes all the tension stresses, but the concrete section takes most of the compression stresses due to the bending moment.
  • the floor structure 10 further comprises a plurality of tension members 34.
  • Each of these tension members 34 horizontally extends through the concrete slab 14 between two anchor points 36.
  • These anchor points 36 are arranged in one or more fire resistant bearing structures 38, so that, when the strength and stiffness of the horizontal structural steel members 12 substantially diminishes in the prescribed fire scenario, the tension members 34 extending through the concrete slab 14 (wherein they heat up more slowly than the unprotected structural steel members 12) are capable of supporting the loaded slab 14 by catenary effect and of limiting the deflection thereof.
  • tension members 34 are normally high tensile strength wire-strands (i.e. wire strands having a tensile strength of at least 1000 MPa, preferably of at least 1500 MPa). They extend through the concrete slab in parallel to the primary beams 12 and are grouped in slab bands 40, which are centred with regard to the primary beams 12 and have a width "W" less than 2 m. If the primary beams 12 are supported by columns 20 aligned with the primary beams 12 (as it is the case in FIG. 1), there are preferably no tension members 34 arranged directly over the primary beams 12, because the columns 20 would have to be pierced for providing a passage for the tension members 34.
  • tension members 34 are arranged centrally over the primary beams 12, without having to pierce bearing columns 20 for providing horizontal passages for the tension members 34, such central arrangement is most often preferred. It will further be noted that no tension members 34 are arranged at a distance of more than 1 m from the vertical central plane of the primary beams 12. Indeed, the tension members 34 are most efficient when they are located close to the upper flange 16 of the primary beam 12, i.e. in or close to the concrete in which, in case of a composite floor structure, the upper flange 16 of the primary beam 12 is anchored by means of its shear-studs 30.
  • the tension members 34 are advantageously pre-tensioned.
  • the tension in a tension member amounts to less than 70%, preferably to less than 60%, of its nominal tensile strength; and is preferably in the range of 20% to 60%, and more preferably in the range of 40% to 60%, of its nominal tensile strength.
  • Pre-tensioning the tension members 34 warrants indeed that, when the strength and stiffness of the horizontal structural steel members diminishes in the prescribed fire scenario, the tension members 34 begin to work more rapidly as a catenary support means for the loaded slab 14 and to limit the deflection thereof.
  • the tension in a tension member in normal operation shall amount to less than 70%, preferably to less than 60%, of its nominal tensile strength, because the initially horizontal tension members 34 must first be able to elastically yield to the initial deflection of the slab 14, in order to develop a catenary type support means, when the strength and stiffness of the primary beams 12 substantially diminishes in the prescribed fire scenario. Without the possibility to elastically yield to the initial deflection of primary beams 12 in a fire scenario, the tension members 34 would risk to plastically deform and even rupture under the initial deflection of the heated primary beams 12.
  • the tension members 34 can be directly embedded in the concrete slab 14. If they are to be pre-tensioned, the pre-tensioning has to be carried out prior to casting the concrete slab 14, i.e. concrete has to be cast over the pre-tensioned tension members 34. As shown in FIG. 3, tension members 34 can also extend through horizontal ducts 42 embedded in the concrete slab 14. In this case, the tension members can be pre-tensioned after the concrete slab 14 has been cast, which is for example required, if the anchor points for the tension members 34 only get available after casting of the slab 14.
  • the tension members 34 are advantageously embedded within the duct 42 in a material 43 (as e.g. a cement-based grout) injected into the duct 42 after pre-tensioning the tension members 34.
  • a material 43 as e.g. a cement-based grout
  • Another advantage of filling the ducts 42 with an injected material is that in case of a fire, when cracks begin to appear in the slab, hot combustion gases may not penetrate into the ducts 42 heat the tension members 34 extending there through.
  • the tension members 34 are over their whole length preferably arranged in the upper half of the section of the concrete slab 14.
  • the tension members 34 are hereby protected on their bottom side by a certain thickness of concrete. This concrete forms, at no extra costs, an excellent and very reliable heat insulation, capable of substantially slowing down a temperature rise in the tensions members 34 during a fire scenario.
  • a thickness of 9 cm concrete below the tension members 34 usually warrants that the temperature in the tension members remains— in a fire scenario characterized by a standard temperature-time curve according to EN 1991 -1 -2: 2002, section 3.2.1— for at least 90 minutes below 200°C, whereby the temperature induced decrease of Young's modulus and the tensile strength of the tension members, as well as their thermal elongation remain within acceptable ranges.
  • the tension members 34 are ideally located just below upper reinforcement steel 44, e.g. under the form of meshes or bars, placed at some centimetres from the upper side of the concrete slab.
  • This reinforcement steel 44 whose task in normal operation is to avoid cracks in the slab 14 and above the tension members 34, assists during a fire scenario the tension members 34 in supporting the loaded slab 14 when the strength and stiffness of the primary beams 12 substantially diminishes.
  • the lower reinforcement steel 32 whose task in normal operation is to transfer shear-stresses from the upper flange 16 of the primary beam 12 onto the concrete slab 14, helps during a fire scenario the concrete slab 14 to support the primary beam 12, when the latter has lost most of its strength and stiffness.
  • the anchor points 36 of the tension members 34 are arranged in the bearing structures 38, which are in this case e.g. bearing walls laterally delimiting the fire compartment of which the floor structure 10 forms the upper floor.
  • the anchor points 36 may be arranged in the bearing walls 38 themselves (as shown in FIG. 1) or in an external bearing structure located behind the bearing wall. If the bearing wall is to be considered as a fire wall having a fire resistance at least equal to the prescribed fire resistance for the floor structure, or as an outer wall, one could even dispense with a fire protection for the anchor points 36.
  • the anchor point 36' is arranged in a fire resistant bearing structure 38' within the same fire compartment as the floor structure 10.
  • the fire resistant bearing structure 38' is more particularly an H-shaped steel section with a reinforced concrete filling 22 between the flanges 24, 24', i.e. a composite column as described hereinbefore.
  • this composite column 38' also supports one of the primary beams 12, it must necessarily have a fire resistance at least equal to the floor structure 10 it supports. This means that the fact that an anchor point 36 is arranged in the composite column 38' does generally not required that the composite column 38' receives an additional fire protection.
  • the anchor points 36 are arranged within a bearing wall 38, just as described with reference to FIG. 1.
  • the anchor points 36" are arranged within a central core 38" of the building, housing e.g. the lifts and/or the emergency stairways.
  • Such a central core 38" generally has the highest fire resistance of the whole building and is consequently an ideal bearing structure for arranging anchor points 36" of the tension members 34 therein.
  • the anchor points 36" are arranged within a central core 38" of the building, just as described with reference to FIG. 6.
  • the anchor points 36"' are arranged within a bearing structure 38"' surrounding the building.
  • This bearing structure 38"' is advantageously an external bearing cage constructed with structural steel members.
  • the unprotected primary beams 12 are supported on one side by the central core 38" and on the other side by the bearing structure 38"'.
  • the bearing structure 38"' further supports a curtain-wall facade with internal air space, arranged so that the bearing structure 38"' itself is not to be affected by a fire scenario within the building. Consequently, none of the horizontal or vertical structural steel members of such a building has to receive a fire protection for warranting its stability in a fire scenario.
  • Curve (a) in FIG. 8 shows the computed evolution of the deflection of a composite steel-concrete floor structure comprising unprotected steel beams 12 and no tension members 34 in the slab 14, when this floor structure is exposed to a design fire resulting in an evolution of the temperature of the steel beams as shown in FIG. 9 with curve (e) (this temperature evolution has e.g. been computed using a standard temperature-time curve according to EN 1991 -1-2: 2002, section 3.2.1 ).
  • the steel beam is an unprotected IPE600 section.
  • the slab 14 is a full concrete slab with a thickness of 14 cm, and steel reinforcements under the form of steel meshes arranged as illustrated in FIG. 3 (reinforcing wires with a diameter of 7 mm every 15 cm, i.e. a steel section of 1.4 cm 2 /m).
  • the live load is 2,5 kN/m 2 .
  • the temperature of the steel beam 12 After 10 minutes of fire exposure, the temperature of the steel beam 12 has already reached about 500°C and the deflection is already 0.56 m, i.e. L/30. After 13 minutes of fire exposure, the temperature of the steel beam 12 is above 600°C, and the deflection has increased to 0.84 m, i.e. to L/20.
  • These tension members 34 are high tensile wire strands each having for example a section of 100 mm 2 and a tensile strength of 1860 MPa.
  • Each of the tension members 34 is pre-tensioned so that in normal operation the tension in a tension member 34 is about 58% of the tensile strength of the tension member 34.
  • the tension members 34 extending horizontally through the slab 14 are protected at their underside over their whole length by 9 cm of concrete, so that the temperature in the tension members increases, as shown by curve (g) in FIG. 9, by far more slowly in the tension members 34 than in the unprotected primary beams 12 (after two hours, the temperature in the tension members is still below 200°C, whereas the primary beams 12 have reached already a temperature above 1000°C).
  • curve (c) in FIG. 8 one notices that up to about 5 minutes, the tension members 34 do not produce a significant amelioration of the situation.
  • the deflection increases indeed from 0.05 m (in the cold state) to 0.20 m, which is about the same deflection as for the floor structure without the tension members 34 (see curve (a)).
  • Curve (b) in FIG. 8 shows the computed evolution of the deflection of a composite steel-concrete floor structure as described above for curve (c), with the sole difference that each of the tension members 34 is pre-tensioned so that in normal operation the tension in a tension member 34 is only about 10% of the tensile strength of the tension member 34.
  • a minimum pre-tension is always required in order to warrant that wire- strands extend horizontally through the slab 14.
  • the tendons are tensioned by hydraulic jacks that react against the concrete slab. When the tendons have stretched sufficiently, they are wedged in position and maintain tension after the jacks are removed, transferring pressure to the concrete slab. The duct openings are then grouted to protect the tendons from corrosion. The tension in the tendons compresses the concrete and, in case of a slab, the curved tendons further produce an upward directed load, which reduces the deflection of the slab.
  • the concept of "unbonded post-tensioned concrete" differs from bonded post-tensioning by providing each individual cable permanent freedom of movement relative to the concrete. The transfer of tension to the concrete is solely achieved by the steel cable acting against steel anchors embedded in the perimeter of the slab.
  • a plurality of tension members horizontally extends through the concrete slab between two anchor points, wherein the anchor points are arranged in one or more fire resistant bearing structures within the fire compartment, and/or in one or more external bearing structures, so that when the strength and stiffness of the horizontal structural steel members (which in normal operation are responsible for taking the main part of the tensile stresses generated by the bending moment) substantially diminish in the prescribed fire scenario, the tension members are capable of supporting the loaded slab by catenary effect and of limiting the deflection thereof.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Building Environments (AREA)

Abstract

L'invention concerne une structure de plancher en acier-béton (10) conçue pour avoir une résistance au feu prescrite lorsqu'elle est exposée à un scénario d'incendie prescrit dans un compartiment d'incendie immédiatement en dessous de la structure de plancher en acier-béton (10), qui comprend des éléments en acier de construction s'étendant horizontalement (12) et une dalle de béton (14). En fonctionnement normal, ces éléments en acier de construction (12) doivent supporter la plus grande partie des contraintes de traction générées par le moment de flexion. La structure comprend en outre une pluralité d'éléments de tension (34), chacun de ces éléments de tension (34) s'étendant horizontalement à travers la dalle de béton (14) entre deux points d'ancrage. Ces points d'ancrage (36, 36', 36'', 36''') sont agencés dans une ou plusieurs structures de support résistant au feu (38, 38', 38'') à l'intérieur du compartiment d'incendie, et/ou dans une ou plusieurs structures de support externes (38'''), de sorte que, lorsque la résistance et la rigidité des éléments en acier de construction (12) horizontaux diminuent sensiblement dans le scénario d'incendie prescrit, les éléments de tension (34) s'étendant à travers la dalle de béton (14) sont capables de supporter la dalle chargée (14) par effet de caténaire et de limiter la déviation de celle-ci.
PCT/IB2014/058803 2014-02-05 2014-02-05 Structure de plancher en acier-béton résistant au feu WO2015118379A1 (fr)

Priority Applications (3)

Application Number Priority Date Filing Date Title
PL14705422T PL3102753T3 (pl) 2014-02-05 2014-02-05 Ognioodporna stalowo-betonowa konstrukcja stropowa
PCT/IB2014/058803 WO2015118379A1 (fr) 2014-02-05 2014-02-05 Structure de plancher en acier-béton résistant au feu
EP14705422.5A EP3102753B1 (fr) 2014-02-05 2014-02-05 Construction de dalle en acier-béton ignifuge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/IB2014/058803 WO2015118379A1 (fr) 2014-02-05 2014-02-05 Structure de plancher en acier-béton résistant au feu

Publications (1)

Publication Number Publication Date
WO2015118379A1 true WO2015118379A1 (fr) 2015-08-13

Family

ID=50137966

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/IB2014/058803 WO2015118379A1 (fr) 2014-02-05 2014-02-05 Structure de plancher en acier-béton résistant au feu

Country Status (3)

Country Link
EP (1) EP3102753B1 (fr)
PL (1) PL3102753T3 (fr)
WO (1) WO2015118379A1 (fr)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108088736A (zh) * 2018-01-16 2018-05-29 中国地震局工程力学研究所 子结构试验加载装置
RU2670239C1 (ru) * 2017-11-16 2018-10-19 федеральное государственное бюджетное образовательное учреждение высшего образования "Самарский государственный технический университет" Способ выявления сопротивления растяжению арматуры железобетонного элемента в условиях пожара
CN111734034A (zh) * 2020-07-24 2020-10-02 华侨大学 一种内置钢板的板柱结构节点

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS605943A (ja) * 1983-06-15 1985-01-12 株式会社竹中工務店 プレストレストコンクリ−トスラブ
FR2564871A1 (fr) * 1984-05-25 1985-11-29 Travaux Publics Indl Entrepris Poutre a membrures de beton precontraint et ame d'acier
US20120066990A1 (en) 2009-05-04 2012-03-22 Arcelormittal Investigacion Y Desarrollo S.L. Fire Resistant Steel Structure

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS605943A (ja) * 1983-06-15 1985-01-12 株式会社竹中工務店 プレストレストコンクリ−トスラブ
FR2564871A1 (fr) * 1984-05-25 1985-11-29 Travaux Publics Indl Entrepris Poutre a membrures de beton precontraint et ame d'acier
US20120066990A1 (en) 2009-05-04 2012-03-22 Arcelormittal Investigacion Y Desarrollo S.L. Fire Resistant Steel Structure

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2670239C1 (ru) * 2017-11-16 2018-10-19 федеральное государственное бюджетное образовательное учреждение высшего образования "Самарский государственный технический университет" Способ выявления сопротивления растяжению арматуры железобетонного элемента в условиях пожара
CN108088736A (zh) * 2018-01-16 2018-05-29 中国地震局工程力学研究所 子结构试验加载装置
CN108088736B (zh) * 2018-01-16 2024-04-30 中国地震局工程力学研究所 子结构试验加载装置
CN111734034A (zh) * 2020-07-24 2020-10-02 华侨大学 一种内置钢板的板柱结构节点

Also Published As

Publication number Publication date
EP3102753A1 (fr) 2016-12-14
EP3102753B1 (fr) 2018-06-06
PL3102753T3 (pl) 2019-03-29

Similar Documents

Publication Publication Date Title
CA1085642A (fr) Armatures pour ameliorer la resistance au cisaillement de dalles de beton
KR101286557B1 (ko) 층고절감형 강합성보 및 이를 구비한 바닥판 구조
US20080263978A1 (en) Reinforcing Assemblies and Reinforced Concrete Structures
EP2427604B1 (fr) Structure d'acier résistant au feu
EP3102753B1 (fr) Construction de dalle en acier-béton ignifuge
Gales et al. Structural fire performance of contemporary post-tensioned concrete construction
Dar et al. Comparison of various shear connectors for improved structural performance in CFS concrete composite slabs
Choe et al. Experimental study on fire resistance of a full-scale composite floor assembly in a two-story steel framed building
US7874110B2 (en) Reinforced or pre-stressed concrete part which is subjected to a transverse force
Noel et al. Experimental investigation of connection details for precast deck panels on concrete girders in composite deck construction
Choe et al. Behavior of Composite Floor Assemblies Subject to Fire: Influence of Slab Reinforcement
Ramesh et al. Structural integrity of composite floors in fire: A comparison of two large-scale experiments with varying slab reinforcement
CA2491226C (fr) Panneaux de parois isoles postcontraints
Ramesh et al. Fire resilience of steel-concrete composite floor systems
UA61869C2 (en) The combined ceiling-roofing structure with double pre-stressing with flat lower surface of the ceiling plate for large-bearer industrial buildings
KR101151773B1 (ko) 양단부에 프리스트레스미도입부를 설치한 프리스트레스트강합성거더와 이의 제작방법
RU2388883C1 (ru) Способ усиления железобетонных панелей перекрытия
Lim et al. Cyclic Testing of Bolted Steel Coupling Beams in Fast-Track Precast Concrete Construction
Ong et al. Shear-bond capacity of composite slabs made with profiled sheeting
ROBERT et al. Fire resistance assessment of concrete structures
Hicks Composite slabs
RU2298617C2 (ru) Перекрытие зданий и сооружений
US1798925A (en) Floor construction
Sichko et al. Evaluation of Retrofit Methods for Reinforced Concrete Beams
Abdelrahman Slab Strengthening

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 14705422

Country of ref document: EP

Kind code of ref document: A1

DPE1 Request for preliminary examination filed after expiration of 19th month from priority date (pct application filed from 20040101)
REEP Request for entry into the european phase

Ref document number: 2014705422

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 2014705422

Country of ref document: EP

NENP Non-entry into the national phase

Ref country code: DE