WO2015093969A1 - Procédé et équipement pour des opérations dans ou à travers une structure tubulaire - Google Patents

Procédé et équipement pour des opérations dans ou à travers une structure tubulaire Download PDF

Info

Publication number
WO2015093969A1
WO2015093969A1 PCT/NO2014/050232 NO2014050232W WO2015093969A1 WO 2015093969 A1 WO2015093969 A1 WO 2015093969A1 NO 2014050232 W NO2014050232 W NO 2014050232W WO 2015093969 A1 WO2015093969 A1 WO 2015093969A1
Authority
WO
WIPO (PCT)
Prior art keywords
tubular structure
machinery
lifting
grippers
wellhead
Prior art date
Application number
PCT/NO2014/050232
Other languages
English (en)
Inventor
Bård Martin TINNEN
Marco VOLGMANN
Original Assignee
Altus Intervention As
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Altus Intervention As filed Critical Altus Intervention As
Publication of WO2015093969A1 publication Critical patent/WO2015093969A1/fr

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B29/00Cutting or destroying pipes, packers, plugs or wire lines, located in boreholes or wells, e.g. cutting of damaged pipes, of windows; Deforming of pipes in boreholes or wells; Reconditioning of well casings while in the ground

Definitions

  • a method for operations on, in or through a tubular structure More precisely there is provided a method for operations in or through a tubular structure passing through a wellhead.
  • the invention also includes machinery for operations in or through a tubular structure.
  • well completions such as production tubing and/or casing, may have to be removed from the well prior to permanent abandonment.
  • Performing downhole operations, especially related to the removal of tubular structures from a well which are to be permanent plugged and abandoned, a compression force in the tubular structures may be disadvantageous.
  • Prior art downhole cutting tools are generally run on wireline or coiled tubing and are based on several cutting principles using for instance explosives, chemicals, mechanical cutting blades or thermal cutting.
  • the purpose of the invention is to overcome or reduce at least one of the disadvantages of the prior art.
  • a method for operations on, in or through a tubular structure passing through a wellhead wherein the method includes:
  • the method for creating relative vertical movement between a tubular structure and a wellhead and/or other well structures which may be used as reference on or in a well is provided.
  • the method is applicable on onshore as well as offshore well sites. Due to the mass of the tubular structure and/or if it has been attached to, for example, a downhole packer, the relative vertical movement will create a tensile load inside the tubular structure.
  • the method also prevents unintentional relative vertical movement between a tubular structure and the wellhead of onshore or offshore well sites.
  • a gripper design is chosen where the gripper also causes a certain kinematic behaviour, the axial load, applied by the mass of the tubular structure increases the compressive force acting on the tubular structure and thereby the friction between the tubular structure and the gripper.
  • the risk for an unintentional relative vertical movement of the tubular structure is largely overcome.
  • the lifting apparatus may be arranged above or on top of the wellhead.
  • required well barrier elements typical a drilling blowout preventer, have to be placed in between wellhead and the lifting apparatus.
  • pressure control equipment may also be positioned inside or on top of the pulled tubular structure.
  • a known wireline blowout preventer or coiled tubing blowout preventer or a wireline stuffing box or grease injection head, may thus be placed on top of an upper end of the hollow shaft.
  • the method may further include operating the well intervention assembly by using wireline or coiled tubing.
  • the lifting apparatus provides a hollow shaft which allows passing of a wireline or a coiled tubing well intervention assembly.
  • the hollow shaft may also be used to engage tubular structures, for example, tubing hanger or production tubing.
  • tubular structures for example, tubing hanger or production tubing.
  • the hollow shaft together with a downhole pipe and equipment above the hollow shaft constitute the tubular structure.
  • the method may include at least perforating or cutting the tubular structure while keeping the tubular structure in tension.
  • the method may include operating the well intervention assembly separately from the lifting apparatus.
  • the lifting apparatus may be active or inactive while the well intervention assembly is operational.
  • the method may include removing the tubular structure from the well after cutting.
  • the lifting apparatus is typically provided with one or more vertically moving lifting frame(s) positioned above each other in the longitudinal direction of the well. If two lifting frames are present, they may be referenced to as the lower first lifting frame and the upper second lifting frame.
  • the first and second lifting frames are most conveniently provided with at least self-activating or activatable locking means which are designed to engage with the tubular structure.
  • the first and second lifting frames and locking means may be moved simultaneously, separately or in a sequence in order to create a relative vertical movement between the tubular structure and a base of the lifting apparatus.
  • the first and second lifting frames may also simultaneously be moved in opposite directions.
  • the engagement of the locking means with the tubular structure will overlap in time, with the result that the locking means of the first lifting frame engages with the tubular structure before the locking means of the second lifting frame engages with the tubular structure.
  • the locking means of the first lifting frame will disengage from the tubular structure; thereby ensuring that at least one locking means is engaged with the tubular structure at any time.
  • the lifting frames are configured to be controlled in various ways where the lifting frames may be individually movable or they may be controlled by a common control system.
  • the locking means may be activated by different factors such as, for example, where the activation of the locking means is coordinated with the actual movement of the lifting frame. Furthermore, the activation of the locking means may be coordinated with the position of the lifting frame or in relation to the positions of the lifting frame relative to the tubular structure.
  • the looking means may be especially activated simultaneously, whilst all movements of the lifting frames are also locked, to carry out other activities/operations, for example cutting the tubular structure.
  • the locking means may be designed so that the locking means on the first lifting frame may become engaged before the locking means in the second frame are disengaged while the two lifting frames are still moving relative to each other.
  • the locking means are typically provided with a plurality of opposing grippers.
  • the grippers are at least self-activating or activatable, and are designed to engage with the tubular structure.
  • the grippers are also de-activatable.
  • the grippers may be activated or moved simultaneously, separately or in a sequence in order to engage with the tubular structure and prevent an unintentional relative vertical movement between the tubular structure and the wellhead. At least simultaneous activation of the grippers may be utilized for securing and aligning the tubular structure within the plurality of opposing grippers. In some cases the grippers may also be moved simultaneously in opposite directions to balance radial misalignment of tubular structure and ambient structure, for instance a rotary table equipped such locking means.
  • the engagement of the locking mean with the tubular structure will overlap in time with other activities such as disconnecting a top drive from a drill string.
  • Such a locking means may include a plurality of opposing cam lobe-shaped grippers which are independently coupled to one or more actuators.
  • actuators are a combination of springs and hydraulics to actuate and pre-load each cam lobe and to de-active each cam lobe.
  • a de-activation may be necessary to run in hole tubular structures or if the tubular structure has to be released immediately, for instance.
  • the locking means may be activated by different factors such as where activation of the locking means is coordinated with other activities. Such other activities may include the disconnection of a top drive from a drill string.
  • the activated cam lobes have not to be de-activated while pulling tubular structures, for instance a drill pipe or a production tubing, out of the well. Due to shape and kinematic behaviour of the cam lobes, different diameters of tubing and tubing coupling may pass the locking means without manually adjustment.
  • machinery for operations on, in or through a tubular structure passing through a wellhead wherein a lifting apparatus, having an axially through-going opening for the tubular structure, is fixed to the wellhead or to a structure above the wellhead, and where the lifting apparatus includes at least one actuator operated lifting frame having at least one locking means designed for releasably engaging the tubular structure, and where the tubular structure is designed for simultaneously performing well intervention operations.
  • the stroke of the at least one actuator, which actuates a lifting frame may be equal or longer than the length of an individual coupling of the tubular structure. In this way, gripping on the coupling itself may be avoided.
  • At least one actuator which actuates a lifting frame, may be hydraulically, pneumatically, electrically or mechanically driven.
  • the piston may be ring-formed, possibly encircling the tubular structure.
  • the cam lobe-shaped grippers are each hinged about an off- centered placed pivot point that is fixed to a structural frame, such that a simultaneous pivoting movement of the grippers results in a change of an enclosure defined by an innermost edge of each of the plurality of the opposing grippers.
  • the enclosure may be circular shaped. With “innermost edge” is meant the portion of the cam lobe being closest to the centre of the enclosure defined by the plurality of opposing gri ppers.
  • the grippers may be adjusted to the actual tubular outer dimension by the shape of cam lobes, and by use of a connected preload device.
  • the preload device may be in the form of a spring or an actuator.
  • the grippers may be separately movable or movable in groups. Due to the adjustment to the actual tubular outer dimension, for instance, tubing couplings may also pass the locking means without changing or deactivating the grippers.
  • cam lobes may enable camming functionality for one-directional movement.
  • the grippers may be activated and engaged to a tubular structure, which may also be connected to hoisting equipment capable of moving the tubular structure in one direction. Due to the design and kinematic behaviour of the cam lobes, a movement in one certain direction may not energise the compressive force in between the grippers and the tubular structure. Thereby the tubular structure may be moved in this direction by a force overcoming the friction force cause by a preload of the gripper.
  • an upwards oriented relative vertical movement between a tubular structure and a wellhead may be enabled by the activated grippers, thus preventing an unintentional downwards oriented relative vertical movement between a tubular structure and a wellhead.
  • the machinery itself may be designed to meet well barrier acceptance criteria and be provided with a common coupling.
  • the lifting apparatus can be placed directly on top of the wellhead or in any order to complement the pressure control equipment.
  • the method and machinery according to the present invention renders it possible to undertake well intervention operations while keeping the tubular structure, also in the lower parts of the well, in tension. This may be achieved without the heavy lifting equipment associated with a drilling rig.
  • the problems experienced with clamped cutting blades by a collapsing cut or gap during cutting of the tubular structure, are thus largely overcome.
  • the method and machinery according to the present invention renders it possible to undertake operations related to tubular structures while keeping them attached to at least one locking means during an entire operation of pulling a tubular structure such as production tubing.
  • the problems experienced with common slip design are thus largely overcome.
  • FIG. 1 shows schematically machinery according to the invention in position on a platform
  • Fig. 2 shows schematically in a larger scale a lifting apparatus of the machinery in fig. 1 with related components;
  • Fig. 3 shows a principal sketch of a lifting apparatus in its initial position with both a first lifting frame and a second lifting frame in their respective lower positions;
  • Fig. 4 shows substantially the same as in fig. 3, but where the first lifting frame, which locking means are engaged with a tubular structure, has lifted the tubular structure, and where also the locking means of the second lifting frame are engaged to the tubular structure;
  • Fig. 5 shows substantially the same as in fig. 3, but where the second lifting frame, which locking means are engaged with the tubular structure, is lifting the tubular structure, and where the first lifting frame, which locking means remain activated but enabling one-directional movement of the tubular structure, has returned to its initial position;
  • Fig. 6 shows substantially the same as in fig. 3, but where the second lifting frame is extended to its upper position and released from the tubular structure after the locking means of the first lifting frame have been engaged to the tubular structure;
  • Fig. 7 shows in a larger scale a plane view from the downward facing side of a
  • Fig. 8 shows a cross section VII-VII of the locking means in fig. 7;
  • Fig. 9 shows substantially the same as in fig. 8, but with the tubular structure
  • Fig. 10 shows substantially the same as in fig. 2, but in another embodiment.
  • the reference number 1 denotes a platform that is equipped with machinery 2 according to the invention for well intervention.
  • the platform 1 includes a wellhead area 4 where a wellhead 6 of a well 8 is positioned.
  • Surface pressure control equipment 10 in the form of a BOP (blowout preventer) is connected to the wellhead
  • the machinery 2 includes a lifting apparatus 12 that is positioned on a floor structure 14 above the wellhead area 4 of the platform 1.
  • the well 8 is equipped with a well completion.
  • the well completion is reduced to one casing 20 and one additional tubular 18, for instance in the form of a casing or production tubing.
  • a well intervention assembly 24 that includes a down- hole cutting device 26 is moved into the well 8 by the use of a wireline 28.
  • the wireline 28 extends through a wireline surface pressure control equipment 29 and/or a grease injection head 30, both optionally positioned on the upper end portion of the hollow shaft 16, to a winch 32 on the floor structure 14.
  • the machinery 2 includes the lifting apparatus 12 and the wireline 28.
  • a coiled tubing setup may take the place of the wireline 28.
  • the hollow shaft 16, the grease injection head 30 and the tubular 18, for instance in the form of a casing or production tubing, are parts of a tubular structure 34.
  • the lifting apparatus 12 which is connected to the floor structure 14, includes a main frame 36, a first lifting frame 38 and a second lifting frame 40, as shown in figs 2-6.
  • the lifting apparatus 12 has a through going opening 41 for the tubular structure 34.
  • At least one first actuator 42 herein shown in the form of a hydraulic ram, is fixed to the main frame 36 and designed to move the first lifting frame 38 in the longitudinal direction of the hollow shaft 16.
  • a locking means 44 is designed to releas- ably engage with the hollow shaft 16 and thus connecting the first lifting frame 38 to the hollow shaft 16.
  • At least one second actuator 46 is fixed to the main frame 36 and designed to move the second lifting frame 40 in the longitudinal direction of the hollow shaft 16.
  • the second lifting frame 40 is also equipped with a locking means 44.
  • the lifting apparatus 12 is directly connected to the surface pressure control equipment 10 or by a riser 48 that may be a high pressure riser.
  • FIG. 7 An example of a locking means 44 is shown in figs. 7 to 9.
  • a plurality of opposing grippers 50 (six are shown in the embodiment of fig. 7) with the shape of cam lobes are distributed around a centre axis 52 in a structural frame 54 of the locking means 44.
  • a plurality of grippers preferably three or more distributed (preferably evenly) along the circumference of the structural frame.
  • Each gripper 50 has a curved gripping surface 56, and is hinged about a pin 58 that is fixed to the structural frame 54.
  • the structural frame 54 is connected to the first and second lifting frame 38, 40 respectively.
  • the locking means 44 of the invention is conveniently suitable for a range of diameters of the tubular structure 16.
  • the gripping surface 56 is provided with friction increasing means.
  • the friction increasing means is shown as a toothed surface.
  • any known means that will increase the friction between the gripping surface and the tubular structure may be utilized.
  • a preloaded device 60 for instance in the form of a spring 59 or an actuator 61 may be used for the individual or joint operation of the cam lobe formed grippers 50.
  • the same actuators 61 may be utilized as a release device 63, see figs. 8 and 9.
  • the lifting apparatus 12 When, for instance the tubular structure 18, more precisely the tubing 18 is to be cut by utilizing the cutting device 26, the lifting apparatus 12 is engaged to the tubular structure 34 in order to apply tension to the tubular 18 at the position of cutting.
  • a sequence of lifting and thus stretching the tubular structure 34 while running the wireline 28 through the lifting apparatus 12, is shown in figs. 3 to 6.
  • both lifting frames 38, 40 are at their lower position and the locking means 44 of the first lifting frame 38 is engaged to the hollow shaft 16.
  • the first lifting frame 38 has been lifted to its upper position bringing the hollow shaft 16 with it. Some additional tension is thus induced to the tubing 18.
  • the locking means 44 of the second lifting frame 40 engages the hollow shaft 16 prior to the release of the locking means 44 of the first lifting frame 38.
  • the release of the locking means 44 of the first lifting frame 40 may be automatic as a downward movement of the first lifting frame will release it.
  • the second lifting frame 40 is lifting the hollow shaft 16, while the first lifting frame 38 has returned to its lower position.
  • the procedure is repeated in order to further stretch the tubular structure 18.
  • the procedure may also be repeated by engaging the tubing 18 itself, instead of the hollow shaft 16. Therefore the hollow shaft 16 has to be coupled to an appropriate fishing device, for instance a fishing spear or an overshot fishing tool not shown.
  • the lifting apparatus 12 may be positioned on a floor structure 14 above the wellhead and an additional locking means not shown may be located on top of the surface pressure control equipment 10. This additional locking means may provide an axially through-going opening for the tubing hanger 22 and secure the tubing 18 after the tubing hanger 22 has been lifted to a position above this locking means.
  • lifting apparatus 12 can be rigged down to disassemble tubing hanger 22 and tubing 18, while tubing 18 is secured . After disassembling the tubing hanger 22 the lifting apparatus 12 may be rigged up again and the procedure, described in fig. 3 to fig. 5 repeated.
  • the tubular 18 may be lowered by a similar sequence, then in the opposite direction.
  • actuators 42 and 46 in the principal sketches are shown as single hydraulic rams, there may be more than one actuator at each lifting frame 38, 40 and the actuators 42, 46 may for instance be pneumatically, electrically or mechanically operated.
  • the wireline 28 may be replaced by a coiled tubing 62.
  • the machinery 2 itself is designed to meet well barrier acceptance criteria and is provided with common couplings incl uding seal ing 64 and 65 at top and bottom end to be connected to any standard surface pressure control equipment or wellhead.
  • the lifting apparatus 12 can be placed directly on top of the wellhead 6 or in any order to complement pressure control equipment.
  • the wireline surface pressure control equipment 29 i connected to lifting apparatus 12 by a riser 49.

Landscapes

  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Physics & Mathematics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Mechanical Engineering (AREA)
  • Earth Drilling (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
  • Load-Engaging Elements For Cranes (AREA)
  • Rigid Pipes And Flexible Pipes (AREA)

Abstract

Procédé et équipement (2) pour des opérations sur, dans ou à travers une structure tubulaire (34) traversant une tête de puits (6), le procédé comprenant les étapes consistant à positionner un appareil de levage creux (12) sur la tête de puits (6) ou sur une structure (12) disposée au-dessus de la tête de puits (6), engager un cadre de levage (38, 40) libérable de l'appareil de levage (12) dans la structure tubulaire (34), et lever la structure tubulaire (34) afin d'appliquer une tension dans la structure tubulaire (18) tout en actionnant un ensemble (24) d'intervention pour puits dans ou à travers la structure tubulaire (18).
PCT/NO2014/050232 2013-12-16 2014-12-11 Procédé et équipement pour des opérations dans ou à travers une structure tubulaire WO2015093969A1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
NO20131685 2013-12-16
NO20131685A NO20131685A1 (no) 2013-12-16 2013-12-16 Fremgangsmåte og maskineri for operasjoner på, i eller gjennom en rørstruktur

Publications (1)

Publication Number Publication Date
WO2015093969A1 true WO2015093969A1 (fr) 2015-06-25

Family

ID=53403177

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/NO2014/050232 WO2015093969A1 (fr) 2013-12-16 2014-12-11 Procédé et équipement pour des opérations dans ou à travers une structure tubulaire

Country Status (2)

Country Link
NO (1) NO20131685A1 (fr)
WO (1) WO2015093969A1 (fr)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10995563B2 (en) 2017-01-18 2021-05-04 Minex Crc Ltd Rotary drill head for coiled tubing drilling apparatus

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1058577A (en) * 1912-04-27 1913-04-08 Charles L Gardner Well-pipe clamp.
WO2011089443A2 (fr) * 2010-01-25 2011-07-28 Geoprober Drilling Limited Appareil et procédé d'abandon d'un puits

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1058577A (en) * 1912-04-27 1913-04-08 Charles L Gardner Well-pipe clamp.
WO2011089443A2 (fr) * 2010-01-25 2011-07-28 Geoprober Drilling Limited Appareil et procédé d'abandon d'un puits

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10995563B2 (en) 2017-01-18 2021-05-04 Minex Crc Ltd Rotary drill head for coiled tubing drilling apparatus
US11136837B2 (en) 2017-01-18 2021-10-05 Minex Crc Ltd Mobile coiled tubing drilling apparatus

Also Published As

Publication number Publication date
NO20131685A1 (no) 2015-06-17

Similar Documents

Publication Publication Date Title
US8127854B2 (en) System and method for rigging up well workover equipment
US10113375B2 (en) Thread compensation apparatus
EP2662526B1 (fr) Procédés et appareil pour l'intervention dans des puits sous-marins et retrait de tête de puits sous-marin
US8757269B2 (en) Clamp for a well tubular
US8316929B2 (en) Tubular guiding and gripping apparatus and method
US9284806B2 (en) Systems and methods for pulling subsea structures
WO2011031164A1 (fr) Outil de forage et procédé de sectionnement et de retrait d'une section de tube d'un train de tiges dans un puits
US9260931B2 (en) Riser breakaway connection and intervention coupling device
AU2013356776B2 (en) Radial clamping/sealing system and drilling system provided therewith for (semi)-continuous drilling a borehole, drilling rig comprising such system, and method there for
US20120298372A1 (en) Apparatus and method for abandoning a well
CA2985725C (fr) Systeme de connecteur
US8146668B2 (en) Downhole tubular lifter and method of using the same
WO2015093969A1 (fr) Procédé et équipement pour des opérations dans ou à travers une structure tubulaire
AU2013361315B2 (en) Hydrostatic tubular lifting system
EP2564015B1 (fr) Appareil de guidage et de saisie tubulaire et procédé
RU2802883C2 (ru) Усовершенствованный способ резки труб на буровой площадке и инструмент для его осуществления

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 14873046

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 14873046

Country of ref document: EP

Kind code of ref document: A1