WO2015021598A1 - 前孵化器系统及其应用 - Google Patents

前孵化器系统及其应用 Download PDF

Info

Publication number
WO2015021598A1
WO2015021598A1 PCT/CN2013/081376 CN2013081376W WO2015021598A1 WO 2015021598 A1 WO2015021598 A1 WO 2015021598A1 CN 2013081376 W CN2013081376 W CN 2013081376W WO 2015021598 A1 WO2015021598 A1 WO 2015021598A1
Authority
WO
WIPO (PCT)
Prior art keywords
technical
project
information
person
enterprise
Prior art date
Application number
PCT/CN2013/081376
Other languages
English (en)
French (fr)
Inventor
谭文
Original Assignee
华南理工大学
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 华南理工大学 filed Critical 华南理工大学
Priority to PCT/CN2013/081376 priority Critical patent/WO2015021598A1/zh
Publication of WO2015021598A1 publication Critical patent/WO2015021598A1/zh

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling

Definitions

  • the invention belongs to the technical field of computers, and in particular relates to a pre-incubator system and an application thereof. Background technique
  • biomedicine is a long-term, high-input emerging industry, and the early stages of development of pharmaceutical products are systems engineering that requires both capital and teams. As a result, high-end talent and companies may not be supported in the early stages of their investment.
  • the existing project management method has a low efficiency in project management due to the lack of effective project evaluation methods in project management.
  • the present invention has been made in order to provide a method and system (pre-incubator system) for overcoming the above problems or at least partially solving the above problems, which can be effective Improve the efficiency of project management.
  • a method for project management comprising: obtaining information of a person who meets a predetermined requirement; acquiring information of a technical item related to the person according to the information of the person; Information on the project, analysis of the technical project; and evaluation of the technical feasibility and/or development prospects of the technical project based on the analysis results, and output of the evaluation results.
  • the method further includes: when the evaluation result is mature technology, the main research work of the prompt technical project will enter the business incubator along with the formation of the startup enterprise.
  • a system for project management including: a first acquisition module, configured to acquire information of a person meeting a predetermined requirement; and a second acquisition module, configured to acquire and Information on related technical projects; an analysis module for analyzing technical projects based on information on technical projects; and an output module evaluation module for evaluating technical feasibility and/or development prospects of technical projects based on the analysis results And output the evaluation results.
  • the system further includes: a prompting module, configured to: when the evaluation result is mature technology, the main research work of the prompting technical project will enter the business incubator along with the formation of the startup enterprise.
  • a prompting module configured to: when the evaluation result is mature technology, the main research work of the prompting technical project will enter the business incubator along with the formation of the startup enterprise.
  • the embodiments of the present invention have the following beneficial effects: by analyzing the technical project; then, based on the analysis result, evaluating the technical feasibility and/or development prospect of the technical project, and outputting the evaluation result, by providing The verification method of technical projects can effectively improve the efficiency of project management.
  • FIG. 1 shows a flow diagram of a method 100 of project management in accordance with one embodiment of the present invention.
  • FIG. 2 shows a block diagram of a system 200 for project management in accordance with another embodiment of the present invention. detailed description
  • An embodiment of the present invention provides a method for project management, which first acquires information of a person who meets a predetermined requirement; and then acquires information about a technical item related to the person according to the information of the person; and then, according to the information of the technical item, the technical item Conduct an analysis; finally, based on the analysis results, evaluate the technical feasibility and/or development prospects of the technical project and output the evaluation results.
  • step S110 information of a person who meets the predetermined requirement is obtained.
  • the project management system can obtain information of a person who meets the predetermined requirements through an input device such as a keyboard or a touch screen, wherein the information of the person includes: name, educational background, and professional experience.
  • the predetermined requirements include at least one of the following: outstanding academic achievement, technical innovation awareness, and enterprise experience.
  • outstanding academic achievement For example: Obtaining information on composite high-end personnel with outstanding academic achievements, technological innovation awareness and corporate experience, among which academic achievement can mean that the number of articles published in core journals in the field is higher than the predetermined number.
  • Technological innovation awareness can mean that the number of patents applied exceeds a predetermined number (for example, more than 5); business experience can refer to an entrepreneurial experience or an experience of working in a company. It will of course be understood that the specific content of academic achievement, technological innovation awareness and enterprise experience is not limited in the embodiments of the present invention.
  • step S130 information of the technical item related to the person is obtained based on the information of the person.
  • the above technical project may refer to a technical project adapted to economic transformation and/or an adaptation city.
  • the technical project of field demand in which adaptation to economic transformation refers to the adaptation of the technical project from one economic operation state to another economic operation state; the technology adapted to the market demand means that the technical project meets the needs of the current market.
  • the information of the technical project includes: a domain to which the technical project belongs, a stage in which the technical project is located, and a fund situation of the technical project, wherein the technical project belongs to a stage including: a conceptual and conceptual stage of the technical project, and a technical project The patent formation stage, the complete business plan stage of the technical project, etc.
  • Manner 1 The information of the technical item is included in the information of the person acquired in step S110, so that the information of the technical item contained therein can be obtained by analyzing the information of the person in step S130;
  • Manner 2 The correspondence between the information of the personnel and the information of the technical project is established in advance, and then the information of the technical item related to the personnel is obtained according to the information of the personnel acquired in step S110 and the correspondence between the information of the personnel and the technical item.
  • the correspondence between the name of the person and the information of the technical item can be established in advance. It is of course to be understood that the setting form of the above correspondence is not limited in the embodiment of the present invention.
  • step S150 the technical item is analyzed based on the information of the technical item.
  • the technical project is analyzed based on the information of the technical project, the stage of the technical project, and the technical project's funding, and the analysis results are obtained.
  • the results of the analysis include: a complete technical route and/or preliminary product.
  • step S170 based on the analysis result, the technical feasibility and/or development prospect of the technical project is evaluated, and the evaluation result is output.
  • the technical feasibility and/or development prospects of the project are evaluated based on the analysis results and combined with predetermined indicator parameters, and the evaluation results are output.
  • the evaluation result is mature technology
  • the main research work of the project can be prompted to enter the business incubator with the formation of the startup.
  • the predetermined indicator parameters include: the market prospect of the product (can be divided into three grades, such as general, medium, and good), the technical level of the product (can be divided into three grades, such as general, medium, and good). .
  • step S170 after step S170 is performed, an end step may be entered.
  • step S190 may also be performed.
  • step S190 In the middle, when the evaluation result is mature technology, the main research work of the technical project will be prompted to enter the business incubator with the formation of the start-up enterprise. It should be understood that the specific content of the prompt is not limited in the embodiment of the present invention, and the content of the prompt may be adjusted according to specific conditions.
  • a system 200 for project management suitable for solving the above technical problems in accordance with one embodiment of the present invention will now be described with reference to FIG.
  • the project management system includes: a first acquisition module 201, a second acquisition module 203, an analysis module 205, and an evaluation module 207, wherein
  • the first obtaining module 201 is configured to obtain information of a person meeting the predetermined requirement, where the information of the person includes: a name, an educational background, and a professional experience.
  • the predetermined requirement includes at least one of the following: information of a composite high-end person with outstanding academic achievement, technological innovation consciousness, and enterprise experience, wherein the outstanding academic achievement may refer to a core at home and abroad in the field.
  • the number of articles published in the journal exceeds the predetermined number (for example, more than 5); the awareness of technological innovation can mean that the number of patents applied exceeds the predetermined number (for example, more than 5), and the enterprise experience can refer to the experience of starting a business or working in a company. It will of course be understood that the specific content of academic achievement, technological innovation awareness, and enterprise experience is not limited in the embodiments of the present invention.
  • the second obtaining module 203 is configured to obtain information about the technical items related to the personnel based on the information of the personnel.
  • the above technical project may refer to a technical project adapted to economic transformation and/or a technical project adapted to market demand, wherein adapting to economic transformation refers to adapting the technical project to an economic operation state to another economic operation state;
  • Technology that adapts to market demand means that the technology project meets the needs of the current market.
  • the information of the technical project includes: a domain to which the technical project belongs, a stage in which the technical project is located, and a fund situation of the technical project, wherein the technical project belongs to a stage including: a conceptual and conceptual stage of the technical project, and a technical project
  • the second obtaining module 203 can obtain information about a technical item related to a person in the following two manners.
  • Manner 1 The information of the personnel acquired by the first obtaining module 201 includes the information of the technical item, so the second obtaining module 203 can obtain the information of the technical item contained therein by parsing the information of the person;
  • Manner 2 pre-establishing the correspondence between the information of the personnel and the information of the technical project, and then according to the information of the personnel acquired by the first obtaining module 201 and the corresponding relationship between the information of the personnel and the technical item, the second obtaining module 203 can obtain and Information on personnel-related technical projects.
  • the correspondence between the name of the person and the information of the technical item can be established in advance. It is of course to be understood that the setting form of the above correspondence is not limited in the embodiment of the present invention.
  • the analysis module 205 is configured to analyze the technical item according to the information of the technical item; for example, the analysis module 205 performs the technical item according to the information of the technical item to which the technical item belongs, the stage of the technical item, and the technical situation of the technical item. Analysis, the analysis results are obtained.
  • the results of the analysis include: a complete technical route and/or preliminary product.
  • the evaluation module 207 is configured to evaluate the technical feasibility and/or development prospect of the technical project based on the analysis result, and output the evaluation result.
  • the evaluation module 207 can evaluate the technical feasibility and/or development prospects of the project according to the analysis result and the predetermined index parameters, and then output the evaluation result.
  • the evaluation result is mature technology
  • the main research work of the project can be entered into the enterprise incubator with the formation of the start-up enterprise, thereby solving the dilemma that the startup park is difficult to find due to the lack of effective verification means for the technical project.
  • the predetermined indicator parameters include: a market prospect of the product (which can be divided into three levels, such as general, medium, and good), and a technical level of the product (which can be divided into three levels, such as general, medium, and good). ) Wait.
  • the system further includes: a prompting module 209, wherein the prompting module 209 is configured to prompt the technical project that the main research work will enter the business incubator along with the formation of the startup enterprise when the evaluation result is mature.
  • the specific content of the prompt is not limited in the embodiment of the present invention, and the content of the prompt may be adjusted according to a specific situation.
  • the embodiments of the present invention have the following beneficial effects: by analyzing technical projects; and then based on the analysis results, technical feasibility and/or development of technical projects. The prospect is evaluated and the evaluation results are output. By providing technical project verification means, the user can find suitable projects and effectively improve the efficiency of project management.
  • modules in the devices of the embodiments can be adaptively changed and placed in one or more devices different from the embodiment.
  • the modules or units or components of the embodiments may be combined into one module or unit or component, and further they may be divided into a plurality of sub-modules or sub-units or sub-components.
  • any combination of the features disclosed in the specification, including the accompanying claims, the abstract and the drawings, and any methods so disclosed, or All processes or units of the device are combined.
  • Each feature disclosed in the specification (including the accompanying claims, the abstract and the drawings) may be replaced by alternative features that provide the same, equivalent or similar purpose, unless stated otherwise.
  • the various component embodiments of the present invention may be implemented in hardware, or in software modules running on one or more processors, or in a combination thereof.
  • a microprocessor or digital signal processor may be used in practice to implement some or all of the functionality of some or all of the components of the project management system in accordance with embodiments of the present invention.
  • the invention can also be implemented as a device or device program (e.g., a computer program and a computer program product) for performing some or all of the methods described herein.
  • a program implementing the invention may be stored on a computer readable medium or may be in the form of one or more signals. Such signals may be downloaded from an Internet website, provided on a carrier signal, or provided in any other form.

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Educational Administration (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

本发明公开了一种前孵化器系统及其应用,其中方法包括:获取符合预定要求的人员的信息;根据人员的信息,获取与人员相关的技术项目的信息;根据技术项目的信息,对技术项目进行分析;以及根据分析结果,对技术项目的技术可行性和/或发展前景进行评估,并输出评估结果。在本发明的实施例中通过提供技术项目的验证手段,能够有效提高项目管理的工作效率。通过将项目管理方式引入到前孵化器中,前孵化器可作为科技产品和科技型企业的"催生器",可与现有的企业"孵化器"相互衔接并与孵化后阶段的企业"加速器"一起,构成中小微企业育成、扶持和发展的完整链条。

Description

前孵化器系统及其应用 技术领域
本发明属于计算机技术领域, 尤其涉及一种前孵化器系统及其应用。 背景技术
在从早期技术开发、 初创科技型企业和产业化发展的链条中, 传统的 企业 "孵化器" 能发挥的作用非常有限。 另一方面, 虽然从国家到地方均 设立了许多用于人才引进和科技创新的初始扶持基金和各类天使基金, 但 各级政府和基金为了有效利用地方资源、 规避投入风险, 不得不设置较高 准入门槛 他们更倾向于支持那些孵化器内的成熟企业, 要求企业有较 为成熟的技术、 初步的产品和完成的知识产权, 而不具备这些条件的小微 科技企业难以获得支持。
以生物医药为例, 医药高科技企业大多属于中小微型企业, 它们的发 展可能经历 3个时期和 7个阶段: 催生期 (包括构思与设想、 专利形成、 完整的商业计划书) , 孵化器 (包括早期探索性研发、 中期确定性研发、 产品形成和市场准入) 以及加速期 (融资与扩张阶段) 。 但众多的海归高 科技人才和企业处于催生期的 1-3阶段, 或者孵化期第 4阶段。 按照大多 地方政府目前要求, 只有成功完成 1-3或 4阶段后, 才能够进入开发区孵 化器获得政府扶持资金或天使资金。
例如, 生物医药是长周期、 高投入的新兴行业, 医药产品的早期开发 阶段是既需要资金又需要团队的系统工程。 如此一来, 高端人才和企业在 需要投入的早期阶段可能得不到支持。
由此可知, 现有的项目管理的方法在进行项目管理时, 由于缺少有效 的项目评价手段, 导致项目管理的工作效率较低。
^馳
鉴于上述问题, 提出了本发明以便提供一种克服上述问题或者至少部 分地解决上述问题的项目管理的方法及系统 (前孵化器系统) , 能够有效 提高项目管理的工作效率。
依据本发明的一个方面, 提供了一种项目管理的方法, 包括: 获取符 合预定要求的人员的信息; 根据所述人员的信息, 获取与所述人员相关的 技术项目的信息; 根据所述技术项目的信息, 对技术项目进行分析; 以及 根据分析结果, 对技术项目的技术可行性和 /或发展前景进行评估, 并输出 评估结果。
可选地, 该方法还包括: 当评估结果为技术成熟时, 提示技术项目主 要研究工作将随初创企业的形成而进入企业孵化器。
依据本发明的另一个方面, 提供了一种项目管理的系统, 包括: 第一 获取模块, 用于获取符合预定要求的人员的信息; 第二获取模块, 用于根 据人员的信息, 获取与人员相关的技术项目的信息; 分析模块, 用于根据 技术项目的信息, 对技术项目进行分析; 以及输出模块评估模块, 用于根 据分析结果, 对技术项目的技术可行性和 /或发展前景进行评估, 并输出评 估结果。
可选地, 该系统还包括: 提示模块, 用于当评估结果为技术成熟时, 提示技术项目主要研究工作将随初创企业的形成而进入企业孵化器。
由上述技术方案可知, 本发明的实施例具有如下有益效果: 通过对技 术项目进行分析; 然后根据分析结果, 对技术项目的技术可行性和 /或发展 前景进行评估, 并输出评估结果, 通过提供技术项目的验证手段, 能够有 效提高项目管理的工作效率。
上述说明仅是本发明技术方案的概述, 为了能够更清楚了解本发明的 技术手段, 而可依照说明书的内容予以实施, 并且为了让本发明的上述和 其它目的、 特征和优点能够更明显易懂, 以下特举本发明的具体实施方式。 國綱
通过阅读下文优选实施方式的详细描述, 各种其他的优点和益处对于 本领域普通技术人员将变得清楚明了。 附图仅用于示出优选实施方式的目 的, 而并不认为是对本发明的限制。 而且在整个附图中, 用相同的参考符 号表示相同的部件。 在附图中:
图 1示出了根据本发明一个实施例的项目管理的方法 100的流程图; 以及
图 2示出了根据本发明另一个实施例的项目管理的系统 200的框图。 具体实施方式
下面将参照附图更详细地描述本公开的示例性实施例。 虽然附图中显 示了本公开的示例性实施例, 然而应当理解, 可以以各种形式实现本公开 而不应被这里阐述的实施例所限制。 相反, 提供这些实施例是为了能够更 透彻地理解本公开, 并且能够将本公开的范围完整的传达给本领域的技术 人员。
本发明的实施例提供了一种项目管理的方法, 首先获取符合预定要求 的人员的信息; 然后根据人员的信息, 获取与人员相关的技术项目的信息; 然后根据技术项目的信息, 对技术项目进行分析; 最后根据分析结果, 对 技术项目的技术可行性和 /或发展前景进行评估, 并输出评估结果。
下面结合图 1 来说明根据本发明一个实施例的、 适于解决上述技术问 题的项目管理的方法 100的流程图。
如图 1所示, 本发明的方法 100始于步骤 S110。在步骤 S110中, 获取 符合预定要求的人员的信息。 例如通过项目管理系统进行项目管理时, 项 目管理系统可以通过键盘、 触摸屏等输入设备获取符合预定要求的人员的 信息, 其中人员的信息包括: 姓名、 教育背景和职业经历等内容。
可选地, 上述预定要求至少包括以下中的至少一种: 具有突出的学术 成就、 具有技术创新意识和具有企业经验。 例如: 获取有突出学术成就、 技术创新意识和企业经验的复合型高端人员的信息, 其中突出学术成就可 以是指在所属领域的国内外核心期刊上发表的文章的数量超过预定数量
(例如超过 5篇); 技术创新意识可以是指所申请的专利的数量超过预定数 量 (例如超过 5件); 企业经验可以是指具有创业的经历或者具有在企业工 作的经历。 当然可以理解的是, 在本发明的实施例中不限定突出学术成就、 技术创新意识和企业经验所指的具体内容。
随后, 在步骤 S130中, 根据人员的信息, 获取与人员相关的技术项目 的信息。
可选地, 上述技术项目可以是指适应经济转型的技术项目和 /或适应市 场需求的技术项目, 其中适应经济转型是指该技术项目适应由一种经济运 行状态转向另一种经济运行状态; 适应市场需求的技术是指该技术项目符 合当前市场的需求。
可选地, 上述技术项目的信息包括: 技术项目所属的领域、 技术项目 所处的阶段、 以及技术项目的资金情况等, 其中技术项目所属的阶段包括: 技术项目的构思与设想阶段、 技术项目的专利形成阶段、 技术项目的完整 的商业计划书阶段等。
在本发明的实施例中, 可通过以下两种方式来获取与人员相关的技术 项目的信息。
方式一: 在步骤 S110中获取的人员的信息中包括技术项目的信息, 因 此在步骤 S130中可通过对人员的信息进行解析, 从而得到其中包含的技术 项目的信息;
方式二: 预先建立人员的信息与技术项目的信息的对应关系, 然后根 据步骤 S110中获取的人员的信息,以及人员的信息与技术项目的对应关系, 获取与人员相关的技术项目的信息。 例如可预先建立人员的姓名与技术项 目的信息的对应关系。 当然可以理解的是, 在本发明的实施例中并不限定 上述对应关系的设置形式。
随后, 在步骤 S150中, 根据技术项目的信息, 对技术项目进行分析。 例如根据技术项目所属的领域、 技术项目所处的阶段、 以及技术项目的资 金情况等技术项目的信息对技术项目进行分析, 得到分析结果。 可选地, 分析结果包括: 完整的技术路线和 /或初步产品。
随后, 在步骤 S170, 根据分析结果, 对技术项目的技术可行性和 /或发 展前景进行评估, 并输出评估结果。
可选地, 根据分析结果, 并结合预定的指标参数对项目的技术可行性 和 /或发展前景进行评估,并输出评估结果。例如当评估结果为技术成熟时, 可提示项目主要研究工作可随初创企业的形成进入企业孵化器。 其中, 预 定的指标参数包括: 产品的市场前景 (可分为三个等级, 例如一般、 中等、 较好) 、 产品的技术水平 (可分为三个等级, 例如一般、 中等、 较好) 等。
在本发明的一些实施例中, 在执行完步骤 S170后, 可进入结束步骤。 当然, 可选地, 在执行完步骤 S170后, 也可进入步骤 S190。 在步骤 S190 中, 当评估结果为技术成熟时, 可提示技术项目主要研究工作将随初创企 业的形成而进入企业孵化器。 当然可以理解的是, 在本发明的实施例中并 不限定提示的具体内容, 提示的内容可以根据具体情况进行调整。
需要说明的是, 尽管在图 1中以特定顺序描述了项目管理的方法流程, 但是, 这并非要求或暗示必须按照该特定顺序来执行这些操作, 或是必须 执行全部所示的操作才能实现期望的结果。 相反, 流程图中描绘的步骤可 改变执行顺序。 附加地或备选地, 可以省略某些步骤, 将多个步骤合并为 一个步骤执行, 和 /或将一个步骤分解为多个步骤执行。
下面结合图 2说明根据本发明一个实施例、 适于解决上述技术问题的 一种项目管理的系统 200。
如图 2所示, 项目管理的系统包括: 第一获取模块 201、第二获取模块 203、 分析模块 205、 以及评估模块 207, 其中
第一获取模块 201 用于获取符合预定要求的人员的信息可选地, 其中 人员的信息包括: 姓名、 教育背景和职业经历等内容。 可选地, 预定要求 至少包括以下中的至少一种: 具有突出的学术成就、 具有技术创新意识和 企业经验的复合型高端人员的信息, 其中突出学术成就可以是指在所属领 域的国内外核心期刊上发表文章超过预定数量 (例如超过 5篇) ; 技术创 新意识可以是指所申请的专利超过预定数量 (例如超过 5件) , 企业经验 可以是指具有创业或者在企业工作的经历。 当然可以理解的是, 在本发明 的实施例中不限定突出学术成就、 技术创新意识和企业经验所指的具体内 容。
第二获取模块 203用于根据人员的信息, 获取与人员相关的技术项目 的信息。 可选地, 上述技术项目可以是指适应经济转型的技术项目和 /或适 应市场需求的技术项目, 其中适应经济转型是指该技术项目适应由一种经 济运行状态转向另一种经济运行状态; 适应市场需求的技术是指该技术项 目符合当前市场的需求。
可选地, 上述技术项目的信息包括: 技术项目所属的领域、 技术项目 所处的阶段、 以及技术项目的资金情况等, 其中技术项目所属的阶段包括: 技术项目的构思与设想阶段、 技术项目的专利形成阶段、 技术项目的完整 的商业计划书阶段等。 在本发明的实施例中, 第二获取模块 203可通过以下两种方式来获取 与人员相关的技术项目的信息。
方式一: 第一获取模块 201获取的人员的信息中包括技术项目的信息, 因此第二获取模块 203可通过对人员的信息进行解析, 从而得到其中包含 的技术项目的信息;
方式二: 预先建立人员的信息与技术项目的信息的对应关系, 然后根 据第一获取模块 201 获取的人员的信息, 以及人员的信息与技术项目的上 述对应关系, 第二获取模块 203可获取与人员相关的技术项目的信息。 例 如预先可建立人员的姓名与技术项目的信息的对应关系。 当然可以理解的 是, 在本发明的实施例中并不限定上述对应关系的设置形式。
分析模块 205用于根据技术项目的信息, 对技术项目进行分析; 例如 分析模块 205根据技术项目所属的领域、 技术项目所处的阶段、 以及技术 项目的资金情况等技术项目的信息对技术项目进行分析, 得到分析结果。 可选地, 分析结果包括: 完整的技术路线和 /或初步产品。
评估模块 207用于根据分析结果, 对技术项目的技术可行性和 /或发展 前景进行评估, 并输出评估结果。
可选地, 评估模块 207可根据分析结果, 并结合预定的指标参数对项 目的技术可行性和 /或发展前景进行评估, 然后输出评估结果。 例如当评估 结果为技术成熟时, 可提示项目主要研究工作可随初创企业的形成进入企 业孵化器, 由此解决了创业园区由于缺乏对技术项目有效验证手段, 而面 临项目难找的困局。
可选地, 预定的指标参数包括: 产品的市场前景 (可分为三个等级, 例如一般、 中等、 较好) 、 产品的技术水平 (可分为三个等级, 例如一般、 中等、 较好) 等。
在本发明的另一个实施例中, 系统还包括: 提示模块 209, 该提示模块 209用于当评估结果为技术成熟时,提示技术项目主要研究工作将随初创企 业的形成而进入企业孵化器。 当然可以理解的是, 在本发明的实施例中并 不限定提示的具体内容, 提示的内容可以根据具体情况进行调整。
由上述技术方案可知, 本发明的实施例具有如下有益效果: 通过对技 术项目进行分析; 然后根据分析结果, 对技术项目的技术可行性和 /或发展 前景进行评估, 并输出评估结果, 通过提供技术项目的验证手段, 使得用 户可以发现合适的项目, 有效提高项目管理的工作效率。
在此提供的算法和显示不与任何特定计算机、 虚拟系统或者其它设备 固有相关。 各种通用系统也可以与基于在此的示教一起使用。 根据上面的 描述, 构造这类系统所要求的结构是显而易见的。 此外, 本发明也不针对 任何特定编程语言。 应当明白, 可以利用各种编程语言实现在此描述的本 发明的内容, 并且上面对特定语言所做的描述是为了披露本发明的最佳实 施方式。
在此处所提供的说明书中, 说明了大量具体细节。 然而, 能够理解, 本发明的实施例可以在没有这些具体细节的情况下实践。 在一些实例中, 并未详细示出公知的方法、 结构和技术, 以便不模糊对本说明书的理解。
类似地, 应当理解, 为了精简本公开并帮助理解各个发明方面中的一 个或多个, 在上面对本发明的示例性实施例的描述中, 本发明的各个特征 有时被一起分组到单个实施例、 图、 或者对其的描述中。 然而, 并不应将 该公开的方法解释成反映如下意图: 即所要求保护的本发明要求比在每个 权利要求中所明确记载的特征更多的特征。 更确切地说, 如下面的权利要 求书所反映的那样, 发明方面在于少于前面公开的单个实施例的所有特征。 因此, 遵循具体实施方式的权利要求书由此明确地并入该具体实施方式, 其中每个权利要求本身都作为本发明的单独实施例。
本领域那些技术人员可以理解, 可以对实施例中的设备中的模块进行 自适应性地改变并且把它们设置在与该实施例不同的一个或多个设备中。 可以把实施例中的模块或单元或组件组合成一个模块或单元或组件, 以及 此外可以把它们分成多个子模块或子单元或子组件。 除了这样的特征和 /或 过程或者单元中的至少一些是相互排斥之外, 可以采用任何组合对本说明 书 (包括伴随的权利要求、 摘要和附图) 中公开的所有特征以及如此公开 的任何方法或者设备的所有过程或单元进行组合。 除非另外明确陈述, 本 说明书 (包括伴随的权利要求、 摘要和附图) 中公开的每个特征可以由提 供相同、 等同或相似目的的替代特征来代替。
此外, 本领域的技术人员能够理解, 尽管在此所述的一些实施例包括 其它实施例中所包括的某些特征而不是其它特征, 但是不同实施例的特征 的组合意味着处于本发明的范围之内并且形成不同的实施例。 例如, 在下 面的权利要求书中, 所要求保护的实施例的任意之一都可以以任意的组合 方式来使用。
本发明的各个部件实施例可以以硬件实现, 或者以在一个或者多个处 理器上运行的软件模块实现, 或者以它们的组合实现。 本领域的技术人员 应当理解, 可以在实践中使用微处理器或者数字信号处理器 (DSP) 来实现 根据本发明实施例的项目管理的系统中的一些或者全部部件的一些或者全 部功能。 本发明还可以实现为用于执行这里所描述的方法的一部分或者全 部的设备或者装置程序 (例如, 计算机程序和计算机程序产品) 。 这样的 实现本发明的程序可以存储在计算机可读介质上, 或者可以具有一个或者 多个信号的形式。 这样的信号可以从因特网网站上下载得到, 或者在载体 信号上提供, 或者以任何其他形式提供。
应该注意的是上述实施例对本发明进行说明而不是对本发明进行限 制, 并且本领域技术人员在不脱离所附权利要求的范围的情况下可设计出 替换实施例。 在权利要求中, 不应将位于括号之间的任何参考符号构造成 对权利要求的限制。 单词 "包含"不排除存在未列在权利要求中的元件或 步骤。 位于元件之前的单词 "一"或 "一个"不排除存在多个这样的元件。 本发明可以借助于包括有若干不同元件的硬件以及借助于适当编程的计算 机来实现。 在列举了若干装置的单元权利要求中, 这些装置中的若干个可 以是通过同一个硬件项来具体体现。 单词第一、 第二、 以及第三等的使用 不表示任何顺序。 可将这些单词解释为名称。

Claims

禾 J ^
1. 一种项目管理的方法, 其中, 包括:
获取符合预定要求的人员的信息;
根据所述人员的信息, 获取与所述人员相关的技术项目的信息; 根据所述技术项目的信息, 对技术项目进行分析; 以及
根据分析结果, 对技术项目的技术可行性和 /或发展前景进行评估, 并 输出评估结果。
2. 根据权利要求 1所述的方法, 其特征在于, 所述方法还包括: 当所述评估结果为技术成熟时, 提示技术项目主要研究工作将随初创 企业的形成而进入企业孵化器。
3. 根据权利要求 1所述的方法, 其特征在于, 所述分析结果包括: 完 整的技术路线和 /或初步产品。
4. 根据权利要求 1所述的方法, 其特征在于, 所述预定要求至少包括 以下中的至少一种: 具有突出的学术成就、 具有技术创新意识和具有企业 经验。
5. 根据权利要求 1所述的方法, 其特征在于, 所述技术项目是指适应 经济转型和 /或市场需求的技术项目。
6. 一种项目管理的系统, 其中, 包括:
第一获取模块, 用于获取符合预定要求的人员的信息;
第二获取模块, 用于根据所述人员的信息, 获取与所述人员相关的技 术项目的信息;
分析模块, 用于根据所述技术项目的信息, 对技术项目进行分析; 评估模块, 用于根据分析结果, 对技术项目的技术可行性和 /或发展前 景进行评估, 并输出评估结果。
7. 根据权利要求 6所述的系统, 其特征在于, 所述系统还包括: 提示模块, 用于当所述评估结果为技术成熟时, 提示技术项目主要研 究工作将随初创企业的形成而进入企业孵化器。
8. 根据权利要求 6所述的系统, 其特征在于, 所述分析结果包括: 完 整的技术路线和 /或初步产品。
9. 根据权利要求 6所述的系统, 其特征在于, 所述预定要求至少包括 以下中的至少一种: 具有突出的学术成就、 具有技术创新意识和具有企业 经验。
10. 根据权利要求 6所述的系统, 其特征在于, 所述技术项目是指适 应经济转型和 /或市场需求的技术项目。
PCT/CN2013/081376 2013-08-13 2013-08-13 前孵化器系统及其应用 WO2015021598A1 (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PCT/CN2013/081376 WO2015021598A1 (zh) 2013-08-13 2013-08-13 前孵化器系统及其应用

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/CN2013/081376 WO2015021598A1 (zh) 2013-08-13 2013-08-13 前孵化器系统及其应用

Publications (1)

Publication Number Publication Date
WO2015021598A1 true WO2015021598A1 (zh) 2015-02-19

Family

ID=52467918

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2013/081376 WO2015021598A1 (zh) 2013-08-13 2013-08-13 前孵化器系统及其应用

Country Status (1)

Country Link
WO (1) WO2015021598A1 (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113592452A (zh) * 2021-07-30 2021-11-02 贵州电网有限责任公司 一种基于调度运行生产的职创孵化器的方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102163314A (zh) * 2010-02-24 2011-08-24 苏州铭星软件科技有限公司 一种财务评估融资方案优化方法
CN102402732A (zh) * 2010-09-14 2012-04-04 中国船舶工业综合技术经济研究院 科研项目评估方法及系统
CN103226743A (zh) * 2012-09-12 2013-07-31 中国人民解放军92728部队 基于trl的航空装备技术成熟度评估信息处理方法
CN103226751A (zh) * 2013-03-29 2013-07-31 广西电网公司电力科学研究院 一种电网企业科技项目后评估方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102163314A (zh) * 2010-02-24 2011-08-24 苏州铭星软件科技有限公司 一种财务评估融资方案优化方法
CN102402732A (zh) * 2010-09-14 2012-04-04 中国船舶工业综合技术经济研究院 科研项目评估方法及系统
CN103226743A (zh) * 2012-09-12 2013-07-31 中国人民解放军92728部队 基于trl的航空装备技术成熟度评估信息处理方法
CN103226751A (zh) * 2013-03-29 2013-07-31 广西电网公司电力科学研究院 一种电网企业科技项目后评估方法

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113592452A (zh) * 2021-07-30 2021-11-02 贵州电网有限责任公司 一种基于调度运行生产的职创孵化器的方法

Similar Documents

Publication Publication Date Title
CN103065221A (zh) 基于bpel的多学科协同优化流程建模与调度的方法和系统
Berditchevskaia et al. The changing face of expertise and the need for knowledge transfer
WO2015021598A1 (zh) 前孵化器系统及其应用
Cheng et al. Application and popularization of BIM technology in project management
Peng et al. Automatic generation of API documentations for open-source projects
Keele et al. Time spent in Federal Court: US forest service land management litigation 1989–2008
Meng et al. Political space in the achievement of collective labour rights: Interaction between regional government and workers' protest
Le et al. Study on influencing factors of BIM adoption in China’s construction industry based on FA-SEM model
Chaiwchan et al. The Development of Online-Class Scheduling Management System Conducted by the Case Study of Department of Social Science: Faculty of Humanities and Social Sciences Suan Sunandha Rajabhat University
Mazzei et al. Using numerical simulations to study the ICM metallicity fields in clusters and groups
Kaur et al. Socio-economic factors that may contribute to etiology of orofacial clefts.
Ridwan et al. Optimization of Information Systems Academic Schedule Based on Mobile Application Using WEB Service Bridge
Yi et al. Research and implementation of conference and Exhibition agile management process automation
Liu et al. SysML-based model driven discrete-event simulation
Liu A Study on the Promotion Strategy of Digital Literacy Education from the Perspective of Ecology of Higher Education
Alice et al. Indicators and Scenarios for Sustainable Development at the Local Level
Scheibe et al. Community Data-Model Integration Infrastructure: An Orchestration-Based Scientific Computing Workflow Platform for Multiscale Model Coupling and Data Integration at a Scientific User Facility
Drakopoulou Dodd et al. Re-sourcing the city through radical institutional enterprise entwining and embedding the rural in urban peripheries
Liang et al. Curriculum programme of career-oriented java specialty guided by principles of software engineering
Tannahill et al. The climate uncertainty quantification project at Lawrence Livermore National Laboratory: I. Initial analysis of the sensitivities and uncertainties in the Community Atmosphere Model
CN113935192A (zh) 一种数学建模教学学习系统
Yu The Connotation and Value of the Popularization of Contemporary Chinese Marxism
von Storch et al. Is the Eddy-driven Velocity Different for Different Tracers?
Liu et al. Analysis of the Value of Tourism Resources of Intangible Cultural Heritage
Manyo-Plange Is Community-Based Natural Resource Management Really Community-Based? Contrasting Perspectives on the Roles of External Actors in CBNRM

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 13891395

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 13891395

Country of ref document: EP

Kind code of ref document: A1