WO2015013402A2 - Process for subsea deployment of drilling equipment - Google Patents

Process for subsea deployment of drilling equipment Download PDF

Info

Publication number
WO2015013402A2
WO2015013402A2 PCT/US2014/047810 US2014047810W WO2015013402A2 WO 2015013402 A2 WO2015013402 A2 WO 2015013402A2 US 2014047810 W US2014047810 W US 2014047810W WO 2015013402 A2 WO2015013402 A2 WO 2015013402A2
Authority
WO
WIPO (PCT)
Prior art keywords
mlp
lmrp
spu
srd
inline
Prior art date
Application number
PCT/US2014/047810
Other languages
French (fr)
Other versions
WO2015013402A3 (en
Inventor
Kai-tung MA
James David Dowell
David E. Smith
Kenneth L. Smith
Original Assignee
Chevron U.S.A. Inc.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chevron U.S.A. Inc. filed Critical Chevron U.S.A. Inc.
Publication of WO2015013402A2 publication Critical patent/WO2015013402A2/en
Publication of WO2015013402A3 publication Critical patent/WO2015013402A3/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/02Surface sealing or packing
    • E21B33/03Well heads; Setting-up thereof
    • E21B33/035Well heads; Setting-up thereof specially adapted for underwater installations
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • E21B21/001Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor specially adapted for underwater drilling
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • E21B21/12Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor using drilling pipes with plural fluid passages, e.g. closed circulation systems
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/44Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
    • B63B35/4413Floating drilling platforms, e.g. carrying water-oil separating devices
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • E21B21/08Controlling or monitoring pressure or flow of drilling fluid, e.g. automatic filling of boreholes, automatic control of bottom pressure
    • E21B21/082Dual gradient systems, i.e. using two hydrostatic gradients or drilling fluid densities

Definitions

  • the field of the invention is directed to apparatus, systems and methods for deployment of drilling equipment to the ocean floor.
  • Drilling vessels designed for this purpose have one or more openings in the bottom of the ship, which are commonly referred to as "moon pools”. Such ships are outfitted with working hoists mounted above a moon pool designed to suspend and lower heavy equipment through the moon pool into the ocean.
  • BOP blowout preventer
  • LMRP lower marine riser package
  • a BOP designed for subsea operations may be as much as five stories high, and may weigh as much as about 800,000 pounds.
  • the LMRP is the upper section of a two-section subsea BOP/LMRP stack consisting of a hydraulic connector, annular BOP, ball/flex joint, riser adapter, jumper hoses for the choke, kill, and auxiliary lines, and subsea control pods.
  • a BOP/LMRP In conventional drilling operations, it is common to deploy from a drilling vessel a BOP/LMRP in one connected unit.
  • mudlift drilling sometimes called “dual gradient drilling” is designed to employ a mudlift pump (“MLP") in the subsea environment.
  • MLP mudlift pump
  • U.S. Patent No. 6,102,673 to Mott et al (the "Mott patent") reveals such a system.
  • a LMRP 44 is shown as proposed for sitting upon the top of BOP 46.
  • a subsea mudlift pump 102 is integrated with a non-rotating subsea diverter 106.
  • a single stack of a BOP, LMRP, MLP, SPU and SRD cannot be deployed into the ocean with conventional vessels or equipment, for several reasons.
  • Most modern drilling vessels (or drillships, in some instances) have a limited height aboard the vessel between the deck (or equipment holding area) and the top of the hoist aboard.
  • equipment that is to be mechanically linked for deployment from such a hoist has a height maximum dictated by the size of the vessel superstructure, and the geometry of the ship deck and moon pool.
  • Conventional drilling vessels are believed to be unable to accommodate such a tall single stack of equipment for deployment.
  • a significant challenge in the drilling of wells over water is to reduce time, effort and expense required in reliably deploying and properly connecting multiple pieces of large and heavy equipment into the water, and on the ocean floor, ready to conduct drilling operations.
  • This invention is directed to improved techniques, apparatus, systems and methods for deployment of large and heavy drilling equipment to the ocean floor in a configuration that is prepared for drilling operations.
  • MLP means a subsea mudlift pump.
  • LMRP means a lower marine riser package.
  • SPU means a solids processing unit.
  • SRD means a subsea rotating diverter.
  • MLP/LMRP means a subsea mudlift pump mechanically connected to a lower marine riser package.
  • SPU/MLP/LMRP means a solids processing unit mechanically connected to a subsea mudlift pump, with the subsea mudlift pump also being mechanically connected to a lower marine riser package.
  • SRD/SPU means a subsea rotating diverter mechanically connected to a solids processing unit.
  • SRD/SPU component means a device having at least the following in mechanical connection: a subsea rotating diverter mechanically connected to a solids processing unit.
  • BOP means a blowout preventer
  • SRD/SPU/MLP/LMRP means a subsea rotating diverter mechanically connected to a solids processing unit, with the solids processing unit also being connected to a subsea mudlift pump that is mechanically connected to a lower marine riser package.
  • SRD/SPU/MLP/LMRP/BOP means a subsea rotating diverter mechanically connected to a solids processing unit, with the solids processing unit also being mechanically connected to a subsea mudlift pump that is mechanically connected to a lower marine riser package, in which the lower marine riser package further is connected to a blowout preventer.
  • Inline means generally equipment that is connected in series to form a string that is to become part of a riser string for subsea drilling operations.
  • Integrated refers generally to equipment units that have been mechanically linked together.
  • a process for connection and deployment of drilling equipment through a moon pool of a drilling vessel is disclosed. Broadly, a process is disclosed for suspending a first device, then suspending a second device below the first device, connecting the first and second device to form a connected pair, and then suspending the connected pair by holding the first device with a holding mechanism. Later, one or more devices may be connected, and then further connections may optionally be performed prior to deployment to the ocean.
  • the process may comprise several steps, including: (a) suspending a MLP, the MLP having an upper side and a lower side having a first connection mechanism; (b) positioning a LMRP below the MLP, the LMRP having a lower side and an upper side having a second connection mechanism, the second connection mechanism of the LMRP being adapted for mating with the first connection mechanism of the MLP; (c) mating the first connection mechanism with the second connection mechanism to form an inline MLP/LMRP; and (d) suspending the inline MLP/LMRP by a holding mechanism that is fixed to the drilling vessel, the holding mechanism being reversibly attached to the MLP, the inline MLP/LMRP being suspended above the moon pool of the drilling vessel.
  • the process may further comprise the steps of: (e) providing an SPU with a top flange and a bottom flange; (f) connecting the bottom flange of the SPU to the upper side of the MLP to form an inline SPU/MLP/LMRP; and (g) suspending the inline SPU/MLP/LMRP in position for deployment through the moon pool.
  • the process may include the steps of: (e) providing an SPU with a top flange and a bottom flange; (f) providing an SRD with a bottom flange; and (g) connecting the bottom flange of the SRD with the top flange of the SPU to form a SRD/SPU component that comprises at least both an SRD and SPU.
  • the process may include the steps of: (h) connecting the bottom flange of the SRD/SPU to the inline MLP/LMRP to form an inline SRD/SPU/MLP/LMRP; and (i) suspending the inline SRD/SPU/MLP/LMRP upon the drilling vessel in position for deployment through the moon pool.
  • the process may include the steps of: (j) positioning a BOP adjacent the floor of the ocean; (k) lowering the inline SRD/SPU/MLP/LMRP to a position above the BOP; and (I) mating the lower side of the LMRP of the inline SRD/SPU/MLP/LMRP with the BOP to form an inline SRD/SPU/MLP/LMRP/BOP.
  • a method, technique or process for deploying drilling equipment through a moon pool of a drilling vessel into the ocean including: (a) suspending a BOP above the moon pool; (b) lowering the BOP through the moon pool into the ocean; (c) subsequently or simultaneously with step (b), suspending a MLP, the MLP having an upper side and a lower side with a first connection mechanism; (d) positioning a LMRP below the MLP, the LMRP having a lower side and an upper side having a second connection mechanism, the second connection mechanism of the LMRP being adapted for mating with the first connection mechanism of the MLP; (e) mating the first connection mechanism with the second connection mechanism to form an equipment combination comprising at least a MLP and a LMRP; and (f) suspending the equipment combination comprising at least a MLP and a LMRP aboard the drilling vessel by engaging the MLP with a holding mechanism that is fixed to the drilling vessel above or adjacent to the moon pool.
  • the process may further include: (I) lowering the inline SRD/SPU/MLP/LMRP through the moon pool into the ocean.
  • the invention may be practiced by employing the step of: (m) mating the lower side of the LMRP of the inline SRD/SPU/MLP/LMRP with the BOP to form a SRD/SPU/MLP/LMRP/BOP.
  • the process may further comprise the step of: (n) activating an H4 subsea connection to secure the BOP to the inline SRD/SPU/MLP/LMRP.
  • a process for deploying drilling equipment through a moon pool of a drilling vessel into the ocean comprising: (a) suspending a BOP above the moon pool; (b) lowering the BOP through the moon pool into the ocean; (c) suspending a MLP, the MLP having an upper side and a lower side with a first connection mechanism; (d) positioning a LMRP below the MLP, the LMRP having a lower side and an upper side having a second connection mechanism, the second connection mechanism of the LMRP being adapted for mating with the first connection mechanism of the MLP; (e) mating the first connection mechanism with the second connection mechanism to form an equipment combination comprising at least a MLP and a LMRP; (f) suspending the equipment combination comprising at least a MLP and a LMRP aboard the drilling vessel by engaging the MLP with a holding mechanism that is fixed to the drilling vessel above or adjacent to the moon pool; (g) providing an SPU; (h) providing
  • a process that further comprises suspending an equipment combination comprising at least a MLP and a LMRP aboard the drilling vessel by engaging the MLP with a holding mechanism that is fixed to a carriage upon the drilling vessel, wherein the carriage is mounted upon rails, the carriage being adapted for movement along the rails to multiple predetermined positions above the moon pool of the drilling vessel.
  • Figure 1 illustrates an overall schematic of subsea drilling from a drilling vessel showing a subsea riser extending downwards to an installed integrated inline SRD/SPU/MLP/LMRP/BOP positioned in stacked configuration upon the ocean floor;
  • Figure 2 shows a BOP;
  • Figure 3 illustrates a LMRP;
  • Figure 4 illustrates the flex joint of the LMRP removed from the LMRP to enable viewing of the flex joint
  • Figure 5 shows a MLP designed for subsea mudlift drilling applications
  • Figure 6 illustrates a SPU
  • Figure 7 shows a SRD
  • Figure 8 illustrates a riser pipe joint configured for connection of the subsea riser to the SRD
  • Figure 9 illustrates an integrated inline MLP/LMRP connected by the flex joint of the LMRP
  • Figure 10 shows an integrated inline SRD/SPU/MLP/LMRP connected to a riser pipe joint for deployment into the ocean;
  • Figure 11 illustrates an integrated inline SRD/SPU/MLP/LMRP being deployed into the ocean from a drilling vessel to a position near a BOP positioned adjacent the ocean floor;
  • Figure 12 reveals an installed integrated inline SRD/SPU/MLP/LMRP/BOP
  • Figures 13-36 show, in one embodiment of the invention, a sequence of events that may occur to deploy the equipment in a manner to form the installed integrated inline SRD/SPU/MLP/LMRP/BOP of Figure 12;
  • Figure 13 shows a BOP being held in position upon a carriage on a drilling vessel with a MLP positioned in a storage location upon the vessel;
  • Figure 14 illustrates a drill pipe deployed near the top of the BOP, near the aft section of the moon pool, for connection to the BOP;
  • Figure 15 shows a connected BOP being lifted by the drill pipe upwards; while a carriage is suspended below the BOP;
  • Figure 16 illustrates the BOP being lowered upon the carriage positioned near the forward portion of the moon pool, while the MLP is being engaged by a transport cable for re-positioning
  • Figure 17 shows the release of the BOP by the drill pipe, allowing the BOP to rest upon the carriage in the forward portion of the moon pool, while the MLP is being deployed upwards;
  • Figure 18 shows the BOP being re-engaged in the forward portion of the moon pool, while the MLP is re-positioned;
  • Figure 19 reveals the BOP being suspended by the drill pipe so that the carriage may be deployed out from under the BOP, while the MLP is repositioned;
  • Figure 20 illustrates the BOP being lowered through the moon pool of the drilling vessel
  • Figure 21 shows a subsequent step whereby the LMRP is resting upon the vessel and the MLP is deployed to a position near the top of the LMRP to enable connection of the MLP to the LMRP flex joint;
  • Figure 22 reveals a connected integrated inline MLP/LMRP being raised
  • Figure 23 illustrates lateral movement of the integrated inline MLP/LMRP
  • Figure 24 shows the integrated inline MLP/LMRP being suspended by a connection mechanism from a carriage on board the vessel attaching to the MLP, allowing the
  • Figure 25 reveals the sequence of steps that are conducted in the upper deck of the vessel to position equipment for connection, including the movement of the SPU on a carriage;
  • Figure 26 reveals a lift of the SPU from its carriage for downward deployment through the upper deck of the vessel
  • Figure 27 shows the SPU having been delivered to a position above an integrated inline MLP/LMRP (not shown), with an SRD being deployed laterally upon the upper deck of the vessel;
  • Figure 28 reveals the SRD being lowered upon the SPU for connection to the SPU;
  • Figure 29 shows an integrated SRD/SPU being lowered through the upper deck of the vessel for temporary storage;
  • Figure 30 shows lateral movement of a riser pipe joint on the upper deck of the vessel
  • Figure 31 reveals the suspension of the riser pipe joint to a position above the integrated SRD/SPU to enable connection of the riser pipe joint to the top portion of the SRD;
  • Figure 32 shows the connected string of riser pipe joint, SRD, and SPU being lifted as a single unit
  • Figure 33 illustrates the lowering of the connected string of Figure 32 to mate with the integrated MLP/LMRP being held upon the carriage;
  • Figure 34 shows the integrated inline SRD/SPU/MLP/LMRP being raised from the carriage;
  • Figure 35 illustrates the integrated inline SRD/SPU/MLP/LMRP being lowered from the vessel through the moon pool into the ocean;
  • Figure 36 shows an integrated inline SRD/SPU/MLP/LMRP being lowered down from a drilling vessel into the ocean to mate with a BOP near the ocean floor, to form an installed integrated inline SRD/SPU/MLP/LMRP/BOP upon the ocean floor as shown in Figure 1 and/or Figure 12.
  • DGD dual gradient drilling
  • a drilling technique employing a seawater-filled return line in a portion of the riser.
  • DGD is a drilling technique designed to address the problem of excess downhole pressures in a wellbore. That is, the significant difference between the pressure of the hydrostatic head of drilling mud in a riser and the pressure of the formation at points adjacent to the mudline presents a challenge. This pressure differential may cause operational difficulties that prevent drilling a well to its target depth using conventional riser return drilling methods.
  • Dual gradient drilling employs a riser filled with seawater, which limits the pressure imbalance.
  • This interface may be a fluid-fluid interface, located generally above the wellhead in the riser, or may be implemented by employment of a mechanical device such as a subsea rotating diverter (“SRD”) to provide positive isolation of the two fluids.
  • SRD subsea rotating diverter
  • a multiple trip deployment procedure may be employed in which the BOP is lowered to the seabed through the moon pool opening. Then, a combination stack of MLP/LMRP (with other equipment optionally added) may be deployed to the seabed. In some instances, the BOP may be deployed through a first moon pool opening (or from a first drilling assembly), and the combination stack of MLP/LMRP then may then be deployed in another trip to the seabed.
  • the BOP typically is deployed by drill pipes, using a threaded pipe connection into the top of the BOP.
  • a hydraulic connector at the bottom of the LMRP may be used to latch or mate the LMRP with the BOP stack once the combination stack of LMRP is placed upon the BOP in the subsea environment.
  • the MLP may be placed on top of the LMRP aboard the vessel.
  • a lifting hoist may be purposely designed and permanently installed above the storage station for handling these two components (MLP and LMRP). This hoist may be used to lift the MLP precisely over the LMRP. While the MLP is suspended, connection may be made between the two components.
  • a crane/hoist may lift the combination stack and move it to a moon pool cart or carriage.
  • the MLP may be placed upon the cart or carriage in such a way that the total weight of this combination stack is supported by the carriage, in which the carriage connects to the MLP, with the LMRP being hung from below the MLP, the MLP being secured to the LMRP by the flex joint.
  • the LMRP may be suspended with its flex joint connected to the lower margin of the MLP located above, with only the MLP being mechanically supported on the vessel. This design may assist in avoiding the stability problem of the MLP being unable to be directly stacked or rested upon the LMRP while on board the vessel.
  • carriages may be reconfigured to support one or the other, in the course of the operations.
  • additional equipment may be attached on top of the MLP, which may include a SPU and a SRD. It is feasible to provide an integrated design of common riser flanges to enable engagement of SPU and SRD and a riser pipe joint in an inline configuration, as further discussed herein.
  • an inline configuration may be achieved on the seabed of the following equipment, from bottom (sea floor) to top: BOP, LMRP, MLP, SPU, SRD, and riser pipe joints extending above these pieces of equipment, the riser extending upwards to the drilling vessel.
  • a subsea rotating device or rotating control device may be deployed to divert drilling fluids to establish a dual gradient drilling environment.
  • the subsea rotating device (SRD) that may be employed in the system of the invention may be in some respects analogous to a drilling rotating head. It may be the uppermost piece of equipment in the DGD drilling system. It is typically deployed above the mudlift pump (MLP), but its precise placement depends upon the configuration of the well, and the application.
  • MLP mudlift pump
  • the SRD serves to separate the roughly 8.6 pounds per gallon fluid in the riser from the higher weight density mud in the well, in cases for which dual gradient drilling is to be employed.
  • the SRD assists to prevent gas from entering the riser, and provides a slight pressure on the well (typically less than 50 psi) needed to feed the MLP.
  • a dual gradient drilling (“DGD") system may remove a major constraint to drilling at current depths.
  • DGD dual gradient drilling
  • a solids processing apparatus may be connected to the upper surface of the MLP.
  • the SPU in one embodiment, provides a central cavity, the central cavity being positioned inline with the riser and SRD and adapted for receiving drilled solids into its central cavity.
  • the SPU is configured for reducing the particle size of the drilled solids to form processed solids.
  • the solids processing apparatus in one embodiment of the invention, includes a pressure rating at least as great as the pressure rating of the drilling riser.
  • a SPU similar to that disclosed in US Patent Publication No. 20120080186 A1 to Larry Reed may be employed, although other configurations could be deployed as well.
  • Mudlift pumps (MLP) for dual gradient drilling are disclosed, for example, in U.S. Patent No. 6,102,673 (Mott et al.) and U.S. Patent No. 6,325,159 (Peterman et al.). These references disclose positive displacement pumps powered by a fluid drive (such as seawater).
  • the invention disclosed herein may be employed with dual gradient drilling, but the invention is not necessarily limited to use in dual gradient drilling.
  • the deployment process and techniques may be applied to other heavy and bulky equipment that is to be linked and suspended through a moon pool of a drillship to form a stack of equipment upon the floor of a body of water, or on the floor of the ocean.
  • inline refers generally to the positioning of a component within a drill string as a component of the drill string and in line with a subsea riser, as opposed to a position detached (or only remotely connected) to the drill string.
  • an inline SRD/SPU/MLP/LMRP/BOP 72 is shown installed upon the sea floor 30, below and connected to a drilling vessel 21.
  • Riser 22 extends through moon pool 49 (not seen in Figure 1 ) into the ocean below the drilling vessel 21 , and provides a riser pipe joint 23 that is connected to SRD 24.
  • SPU 25 below and connected to the SRD 24 is SPU 25, that is mated to MLP 26.
  • SPU 25 below and connected to the SRD 24
  • MLP 26 Connected to MLP 26 is LMRP 27, resting upon and fluidly connected to BOP 28.
  • BOP 28 rests upon well head 29 at a position that is adjacent to sea floor 30.
  • FIG. 2 reveals a BOP 28, similar to many that are commercially available in the subsea drilling industry.
  • BOP 28 comprises an upper side 31 and a lower side 32 and a well head connector 53.
  • Figure 3 shows LMRP 27 having an upper side 37 and a lower side 38.
  • a connection mechanism 36 extends from the upper side 37
  • a connector 46 extends from the lower side of the LMRP 27.
  • the connector 46 may be of the type that is known in the industry as a hydraulic H4 connector that is adapted for making a connection in a subsea environment, such as, for example, those known in the industry manufactured and distributed by General Electric Hydril of Houston, Texas.
  • Figure 4 shows in greater detail the connection mechanism 36, which in this particular embodiment if a flex joint type of connector that has been removed from LMRP 27 and shown separately for illustrative purposes.
  • FIG. 5 illustrates MLP 26, having an upper side 43 and a lower side 44.
  • Figure 6 shows more detail of SPU 25 having top flange 39 and bottom flange 40, each of which is adapted for making secure and robust connections inline and in fluid communication with riser 22 (shown in Figure 1 ).
  • Figure 7 reveals SRD 24, having top flange 41 and bottom flange 42.
  • Riser pipe joint 23 is shown in Figure 8.
  • Figure 9 illustrates an integrated inline MLP/LMRP 70, in which connection mechanism 35 of the MLP 26 has been mated with connection mechanism 36 of LMRP 27 near the lower side 44 of the MLP 26.
  • Top side 43 of the MLP 26 is seen near the top of Figure 9.
  • LMRP 27 comprises connector 46, shown near the lower portion of Figure 9.
  • Figure 10 illustrates an integrated inline SRD/SPU/MLP/LMRP 71 , as further discussed herein, and comprising: riser pipe joint 23, SRD 24, SPU 25, MLP 26, and LMRP 27 connected in one continuous string of hardware.
  • Connector 46 is positioned near the lower portion of LMRP 27, and is configured for mating with BOP 28 (see Figure 1 ).
  • BOP 28 see Figure 1 .
  • Other subsea configurations of equipment needed to conduct dual gradient drilling are possible, and such other configurations may be contemplated by the spirit and breadth of this disclosure.
  • Figure 11 shows the deployment from drilling vessel 21 of the integrated inline SRD/SPU/MLP/LMRP 71 as disclosed in Figure 10, nearing a position to mate with BOP 28 positioned upon well head 29 adjacent sea floor 30, and as further described herein. Components as described with reference to Figure 10 are seen as well in Figure 11.
  • Figure 12 shows integrated inline SRD/SPU/MLP/LMRP 71 after having been mated with BOP 28 to form inline SRD/SPU/MLP/LMRP/BOP 72, in position for drilling in connection with dual gradient drilling (DGD) operations.
  • DGD dual gradient drilling
  • SRD/SPU/MLP/LMRP/BOP 72 may be evident from review of the disclosure and techniques described herein, and are within the scope of this invention.
  • a BOP may be deployed first into the ocean.
  • BOP 28 may be held aboard vessel 21 by a holding mechanism 59 upon carriage 52 running on rails 50, 51 .
  • MLP 26 may be seen in Figure 13 in a holding area.
  • Figure 14 illustrates a drill pipe 54 extending down from the aft portion of vessel 21 above BOP 28 and also above moon pool 49 (moon pool 49 is below Figure 14 and is not seen in Figure 14).
  • Figure 15 shows a point later in time in which the BOP 28 has been lifted by drill pipe 54, facilitating movement of BOP 28. Also, carriage 52 has moved to a position beneath the BOP 28. [0062] In Figure 16, one can see the BOP 28 rested upon carriage 52 to a forward position above moon pool 49. In Figure 17, drill pipe 58 extends to connect to BOP 28. Then, in Figures 18-20 BOP is deployed with drill pipe 58 to through moon pool 49 to the ocean.
  • FIG. 21 -24 shows one embodiment in which MLP 26 is first mated with LMRP 27 and then suspended in position above moon pool 49.
  • conveyance line(s) 56 move the MLP 26 from its position of storage to a position above LMRP 27.
  • MLP 26 may be manually secured by connection mechanism 36 to LMRP 27.
  • Connection mechanism 36 may comprise a flex joint, as one example, although other means of connection could be employed.
  • One feature of this sequence of steps is that the LMRP 27 is not made to support the full weight of the MLP 26 while on board the ship, which could cause failure of the flex joint and/or instability of components of great weight and bulk.
  • Figure 23 shows a connected and integrated inline MLP/LMRP 70 being moved laterally aboard the ship by conveyance line(s) 56.
  • Figure 24 shows a resting position of the integrated inline MLP/LMRP 70 being held by holding mechanism 59.
  • the MLP 26 is being held and supported by holding mechanism 59 connected to carriage 52, such that LMRP 27 and its flex joint (connection mechanism 36) are not supporting the massive weight of the MLP 26. Instead, the LMRP 27 is suspended by connection mechanism 36 to the MLP 26. MLP 26 is being held in position. Rails 50, 51 and carriage 52 support the massive weight of both the MLP 26 and the LMRP 27 in this manner.
  • Figure 25 shows a holding mechanism 61 mounted upon and through deck 60.
  • the holding mechanism 61 could be mounted on the vessel 21 at a position well above the suspended integrated inline MLP/LMRP 70 shown in Figure 26.
  • SPU 25 may be conveyed upon traveling cart 62 to a position adjacent holding mechanism 61 , and raised by lift 66 to a vertical position for downward entry into holding mechanism 61. Then, SPU 25 may be suspended in holding mechanism 61 for that SRD 24 may likewise be raised from its traveling cart 63 ( Figure 27) by lift 61 and applied to holding mechanism 61 as shown in Figures 27-28.
  • the SRD 24 may be bolted/flanged upon SPU 25, and the assembly lowered for temporary suspension in holding mechanism 61 , as shown in Figures 29-30.
  • riser pipe joint 23 may be raised from traveling cart 64 by lift 66 and flanged to the top of the SRD 24, thus extending the string.
  • Figure 31 illustrates how this procedure may be employed to form a string of riser joint/SRD/SPU that is temporarily suspended in holding mechanism 61 .
  • the riser joint/SRD/SPU 74 may be lowered through holding mechanism 61 , below the deck 60, and applied to the upper side 43 of the MLP 26 as shown in Figure 33.
  • flange connections may be made to connect the riser joint/SRD/SPU 74 to the integrated inline MLP/LMRP 70, thereby forming an integrated inline SRD/SPU/MLP/LMRP 71 that extends from a position below rails 50, 51 above moon pool 49 all the way upwards through deck and through holding mechanism 61 .
  • the integrated inline SRD/SPU/MLP/LMRP 71 may be hoisted/lifted (after disconnect of holding mechanism 59) and deployed through the moon pool 49 of vessel 21 into the waters of the ocean, as seen in Figure 36.
  • the integrated inline SRD/SPU/MLP/LMRP 71 may be mated with a BOP 28 that has been positioned to receive and latch upon integrated inline SRD/SPU/MLP/LMRP 71 , thereby forming upon the sea floor 30 a fully assembled installed inline SRD/SPU/MLP/LMRP/BOP 72.
  • the invention may include a process for connection and deployment of drilling equipment through a moon pool of a drilling vessel.
  • a process is disclosed for suspending a first device, then suspending a second device below the first device, connecting the first and second device to form a connected pair, and then suspending the connected pair by holding the first device with a holding mechanism. Later, one or more devices may be connected, and then further connections may optionally be performed prior to deployment to the ocean.
  • a subsea production manifold could be employed as the first device, in which the manifold is subsequently connected subsea for collecting production from one or more subsea wells and then sending the produced hydrocarbons to another location, such as an FPSO vessel.
  • the process could be used to allow the stacking of a manifold subsea, in which stacking (with adverse gravitational forces upon the equipment) is not required upon the vessel prior to deployment of the connected equipment into the ocean.

Abstract

An apparatus, system and process for deployment of subsea drilling equipment through a moon pool of a drilling vessel is disclosed. The drilling equipment may include a subsea mudlift pump (MLP) that is configured to be deployed below the surface of the ocean and is adapted for conducting dual gradient drilling (DGD) operations. In the apparatus and process, the MLP may be suspended temporarily aboard the vessel by a holding mechanism. The MLP may be combined first with a lower marine riser package (LMRP) prior to suspension of the MLP and/or MLP/LMRP aboard the drilling vessel. An equipment combination, comprising at least a MLP and a LMRP, may be with a BOP, the mating occurring at a position below the surface of the ocean. In one aspect, the BOP may be separately deployed into the ocean, and then subsequently mated subsea with the LMRP and/or a MLP/LMRP combined equipment package.

Description

PROCESS FOR SUBSEA DEPLOYMENT OF DRILLING EQUIPMENT
CROSS REFERENCE TO RELATED APPLICATIONS
[0001] This application claims priority to U.S. Provisional Patent Application No. 61/858,348, (Chevron file number T-9559-P) filed on July 25, 2013 to Ma et al. entitled "Apparatus, System and Method for Deployment of Subsea Well Drilling Equipment".
FIELD OF THE INVENTION
[0002] The field of the invention is directed to apparatus, systems and methods for deployment of drilling equipment to the ocean floor.
BACKGROUND
[0003] In the drilling of subsea wells, it is common to use a drilling vessel to deploy large and heavy equipment to the floor of the ocean. Drilling vessels designed for this purpose have one or more openings in the bottom of the ship, which are commonly referred to as "moon pools". Such ships are outfitted with working hoists mounted above a moon pool designed to suspend and lower heavy equipment through the moon pool into the ocean.
[0004] In modern subsea drilling, a blowout preventer ("BOP") usually is located on or near the floor of the ocean. Above (and connected) to the BOP is a lower marine riser package, referred to as a LMRP. In conventional drilling operations, a BOP and LMRP may be deployed to a position near the ocean surface by lowering them through the moon pool.
[0005] A BOP designed for subsea operations may be as much as five stories high, and may weigh as much as about 800,000 pounds. The LMRP is the upper section of a two-section subsea BOP/LMRP stack consisting of a hydraulic connector, annular BOP, ball/flex joint, riser adapter, jumper hoses for the choke, kill, and auxiliary lines, and subsea control pods. In conventional drilling operations, it is common to deploy from a drilling vessel a BOP/LMRP in one connected unit. [0006] With the advent new techniques for drilling, even more equipment is required to be positioned upon the ocean floor. For example, subsea mudlift drilling, sometimes called "dual gradient drilling," is designed to employ a mudlift pump ("MLP") in the subsea environment. U.S. Patent No. 6,102,673 to Mott et al (the "Mott patent") reveals such a system. In Figure 2A of the Mott patent, a LMRP 44 is shown as proposed for sitting upon the top of BOP 46. In a separate Figure 2B, a subsea mudlift pump 102 is integrated with a non-rotating subsea diverter 106.
[0007]A single stack of a BOP, LMRP, MLP, SPU and SRD cannot be deployed into the ocean with conventional vessels or equipment, for several reasons. Most modern drilling vessels (or drillships, in some instances) have a limited height aboard the vessel between the deck (or equipment holding area) and the top of the hoist aboard. Thus, equipment that is to be mechanically linked for deployment from such a hoist has a height maximum dictated by the size of the vessel superstructure, and the geometry of the ship deck and moon pool. Conventional drilling vessels are believed to be unable to accommodate such a tall single stack of equipment for deployment. Furthermore, stacking of such massive pieces of equipment, such as an MLP that itself weighs as much as 450,000 pounds, combined with BOP and/or LMRP, cannot easily be accomplished without damage to the equipment or instability during stacking or deployment. A simple stack causes problems, due to gravitational forces upon the equipment aboard a vessel.
[0008]Another challenge in designing such a subsea deployment is that a single stack of a BOP, LMRP, MLP, SPU and SRD cannot easily be deployed as a unit from most conventional drilling vessels because the hook load limit of the hoist on the drillship vessel cannot easily accommodate the immense weight of so many structures stacked into a single deployable unit. Even a stack of only the BOP, LMRP and MLP would exceed both the height limits and the weight/load limits of most conventional drilling vessel hoists.
[0009] Deploying such devices separately, or in series, raises other issues or problems as well. The time required to lower equipment to the seabed is very costly. Rig time for modern drilling vessels may approach as much as one million dollars per day, and as such, each hour spent in deployment is very costly. Furthermore, making connections between separate pieces of equipment only after they have been deployed deep into the ocean presents additional challenges and problems. Some connections are not suitable for being remotely made up at a position that is subsea, but instead, must be made manually by bolting or clamping aboard a vessel prior to deployment.
[0010] A significant challenge in the drilling of wells over water is to reduce time, effort and expense required in reliably deploying and properly connecting multiple pieces of large and heavy equipment into the water, and on the ocean floor, ready to conduct drilling operations. This invention is directed to improved techniques, apparatus, systems and methods for deployment of large and heavy drilling equipment to the ocean floor in a configuration that is prepared for drilling operations.
DEFINITIONS
[001 1] In the description of the components herein, certain specific nomenclature is used, as further defined below.
[0012] MLP means a subsea mudlift pump.
[0013] LMRP means a lower marine riser package.
[0014J SPU means a solids processing unit.
[0015] SRD means a subsea rotating diverter.
[0016] MLP/LMRP means a subsea mudlift pump mechanically connected to a lower marine riser package.
[0017J SPU/MLP/LMRP means a solids processing unit mechanically connected to a subsea mudlift pump, with the subsea mudlift pump also being mechanically connected to a lower marine riser package.
[0018] SRD/SPU means a subsea rotating diverter mechanically connected to a solids processing unit. [0019] SRD/SPU component means a device having at least the following in mechanical connection: a subsea rotating diverter mechanically connected to a solids processing unit.
[0020] BOP means a blowout preventer.
[0021] SRD/SPU/MLP/LMRP means a subsea rotating diverter mechanically connected to a solids processing unit, with the solids processing unit also being connected to a subsea mudlift pump that is mechanically connected to a lower marine riser package.
[0022] SRD/SPU/MLP/LMRP/BOP means a subsea rotating diverter mechanically connected to a solids processing unit, with the solids processing unit also being mechanically connected to a subsea mudlift pump that is mechanically connected to a lower marine riser package, in which the lower marine riser package further is connected to a blowout preventer.
[0023] "Inline" means generally equipment that is connected in series to form a string that is to become part of a riser string for subsea drilling operations.
[0024] "Combination" with reference to equipment means combined elements that are mechanically linked.
[0025] "Integrated" refers generally to equipment units that have been mechanically linked together.
SUMMARY
[0026] A process for connection and deployment of drilling equipment through a moon pool of a drilling vessel is disclosed. Broadly, a process is disclosed for suspending a first device, then suspending a second device below the first device, connecting the first and second device to form a connected pair, and then suspending the connected pair by holding the first device with a holding mechanism. Later, one or more devices may be connected, and then further connections may optionally be performed prior to deployment to the ocean. [0027] In one embodiment, the process may comprise several steps, including: (a) suspending a MLP, the MLP having an upper side and a lower side having a first connection mechanism; (b) positioning a LMRP below the MLP, the LMRP having a lower side and an upper side having a second connection mechanism, the second connection mechanism of the LMRP being adapted for mating with the first connection mechanism of the MLP; (c) mating the first connection mechanism with the second connection mechanism to form an inline MLP/LMRP; and (d) suspending the inline MLP/LMRP by a holding mechanism that is fixed to the drilling vessel, the holding mechanism being reversibly attached to the MLP, the inline MLP/LMRP being suspended above the moon pool of the drilling vessel.
[0028] In other aspects of the invention, the process may further comprise the steps of: (e) providing an SPU with a top flange and a bottom flange; (f) connecting the bottom flange of the SPU to the upper side of the MLP to form an inline SPU/MLP/LMRP; and (g) suspending the inline SPU/MLP/LMRP in position for deployment through the moon pool.
[0029] In another aspect of the invention, the process may include the steps of: (e) providing an SPU with a top flange and a bottom flange; (f) providing an SRD with a bottom flange; and (g) connecting the bottom flange of the SRD with the top flange of the SPU to form a SRD/SPU component that comprises at least both an SRD and SPU.
[0030] In another aspect of the invention, the process may include the steps of: (h) connecting the bottom flange of the SRD/SPU to the inline MLP/LMRP to form an inline SRD/SPU/MLP/LMRP; and (i) suspending the inline SRD/SPU/MLP/LMRP upon the drilling vessel in position for deployment through the moon pool.
[0031] In yet another aspect of the invention, the process may include the steps of: (j) positioning a BOP adjacent the floor of the ocean; (k) lowering the inline SRD/SPU/MLP/LMRP to a position above the BOP; and (I) mating the lower side of the LMRP of the inline SRD/SPU/MLP/LMRP with the BOP to form an inline SRD/SPU/MLP/LMRP/BOP. [0032] In other embodiments, there is disclosed a method, technique or process for deploying drilling equipment through a moon pool of a drilling vessel into the ocean, the process including: (a) suspending a BOP above the moon pool; (b) lowering the BOP through the moon pool into the ocean; (c) subsequently or simultaneously with step (b), suspending a MLP, the MLP having an upper side and a lower side with a first connection mechanism; (d) positioning a LMRP below the MLP, the LMRP having a lower side and an upper side having a second connection mechanism, the second connection mechanism of the LMRP being adapted for mating with the first connection mechanism of the MLP; (e) mating the first connection mechanism with the second connection mechanism to form an equipment combination comprising at least a MLP and a LMRP; and (f) suspending the equipment combination comprising at least a MLP and a LMRP aboard the drilling vessel by engaging the MLP with a holding mechanism that is fixed to the drilling vessel above or adjacent to the moon pool.
[0033] In yet another aspect of the invention, it may be possible to perform the steps of: (g) providing an SPU with a top flange and a bottom flange; (h) providing a SRD with a bottom flange; (i) connecting the bottom flange of the SRD to the top flange of the SPU to form an integrated inline SRD/SPU; and (j) connecting the: (i) bottom flange of the SRD/SPU to the equipment combination comprising at least a MLP and a LMRP to (ii) form an inline SRD/SPU/MLP/LMRP; and (k) suspending the inline SRD/SPU/MLP/LMRP in position for deployment through the moon pool.
[0034] The process may further include: (I) lowering the inline SRD/SPU/MLP/LMRP through the moon pool into the ocean. In other applications, the invention may be practiced by employing the step of: (m) mating the lower side of the LMRP of the inline SRD/SPU/MLP/LMRP with the BOP to form a SRD/SPU/MLP/LMRP/BOP. In some applications, the process may further comprise the step of: (n) activating an H4 subsea connection to secure the BOP to the inline SRD/SPU/MLP/LMRP.
[0035] In other applications, there may be employed a process for deploying drilling equipment through a moon pool of a drilling vessel into the ocean, the process comprising: (a) suspending a BOP above the moon pool; (b) lowering the BOP through the moon pool into the ocean; (c) suspending a MLP, the MLP having an upper side and a lower side with a first connection mechanism; (d) positioning a LMRP below the MLP, the LMRP having a lower side and an upper side having a second connection mechanism, the second connection mechanism of the LMRP being adapted for mating with the first connection mechanism of the MLP; (e) mating the first connection mechanism with the second connection mechanism to form an equipment combination comprising at least a MLP and a LMRP; (f) suspending the equipment combination comprising at least a MLP and a LMRP aboard the drilling vessel by engaging the MLP with a holding mechanism that is fixed to the drilling vessel above or adjacent to the moon pool; (g) providing an SPU; (h) providing a SRD; forming an inline SRD/SPU/MLP/LMRP combination; (j) suspending the inline SRD/SPU/MLP/LMRP combination in position for deployment through the moon pool; (k) lowering the inline
SRD/SPU/MLP/LMRP through the moon pool into the ocean; and (I) mating the lower side of the LMRP of the inline SRD/SPU/MLP/LMRP with the BOP to form in the ocean a SRD/SPU/MLP/LMRP/BOP.
[0036] In other aspects of the invention, it is feasible to deploy a process that further comprises suspending an equipment combination comprising at least a MLP and a LMRP aboard the drilling vessel by engaging the MLP with a holding mechanism that is fixed to a carriage upon the drilling vessel, wherein the carriage is mounted upon rails, the carriage being adapted for movement along the rails to multiple predetermined positions above the moon pool of the drilling vessel.
BRIEF DESCRIPTION OF THE FIGURES
[0037] The Figures illustrate various aspects of the invention:
Figure 1 illustrates an overall schematic of subsea drilling from a drilling vessel showing a subsea riser extending downwards to an installed integrated inline SRD/SPU/MLP/LMRP/BOP positioned in stacked configuration upon the ocean floor; Figure 2 shows a BOP; Figure 3 illustrates a LMRP;
Figure 4 illustrates the flex joint of the LMRP removed from the LMRP to enable viewing of the flex joint;
Figure 5 shows a MLP designed for subsea mudlift drilling applications;
Figure 6 illustrates a SPU;
Figure 7 shows a SRD;
Figure 8 illustrates a riser pipe joint configured for connection of the subsea riser to the SRD;
Figure 9 illustrates an integrated inline MLP/LMRP connected by the flex joint of the LMRP;
Figure 10 shows an integrated inline SRD/SPU/MLP/LMRP connected to a riser pipe joint for deployment into the ocean;
Figure 11 illustrates an integrated inline SRD/SPU/MLP/LMRP being deployed into the ocean from a drilling vessel to a position near a BOP positioned adjacent the ocean floor;
Figure 12 reveals an installed integrated inline SRD/SPU/MLP/LMRP/BOP;
Figures 13-36 show, in one embodiment of the invention, a sequence of events that may occur to deploy the equipment in a manner to form the installed integrated inline SRD/SPU/MLP/LMRP/BOP of Figure 12;
Figure 13 shows a BOP being held in position upon a carriage on a drilling vessel with a MLP positioned in a storage location upon the vessel;
Figure 14 illustrates a drill pipe deployed near the top of the BOP, near the aft section of the moon pool, for connection to the BOP;
Figure 15 shows a connected BOP being lifted by the drill pipe upwards; while a carriage is suspended below the BOP;
Figure 16 illustrates the BOP being lowered upon the carriage positioned near the forward portion of the moon pool, while the MLP is being engaged by a transport cable for re-positioning;
Figure 17 shows the release of the BOP by the drill pipe, allowing the BOP to rest upon the carriage in the forward portion of the moon pool, while the MLP is being deployed upwards;
Figure 18 shows the BOP being re-engaged in the forward portion of the moon pool, while the MLP is re-positioned; Figure 19 reveals the BOP being suspended by the drill pipe so that the carriage may be deployed out from under the BOP, while the MLP is repositioned;
Figure 20 illustrates the BOP being lowered through the moon pool of the drilling vessel;
Figure 21 shows a subsequent step whereby the LMRP is resting upon the vessel and the MLP is deployed to a position near the top of the LMRP to enable connection of the MLP to the LMRP flex joint;
Figure 22 reveals a connected integrated inline MLP/LMRP being raised;
Figure 23 illustrates lateral movement of the integrated inline MLP/LMRP;
Figure 24 shows the integrated inline MLP/LMRP being suspended by a connection mechanism from a carriage on board the vessel attaching to the MLP, allowing the
LMRP to remain suspended in air by the flex joint attached to the MLP;
Figure 25 reveals the sequence of steps that are conducted in the upper deck of the vessel to position equipment for connection, including the movement of the SPU on a carriage;
Figure 26 reveals a lift of the SPU from its carriage for downward deployment through the upper deck of the vessel;
Figure 27 shows the SPU having been delivered to a position above an integrated inline MLP/LMRP (not shown), with an SRD being deployed laterally upon the upper deck of the vessel;
Figure 28 reveals the SRD being lowered upon the SPU for connection to the SPU; Figure 29 shows an integrated SRD/SPU being lowered through the upper deck of the vessel for temporary storage;
Figure 30 shows lateral movement of a riser pipe joint on the upper deck of the vessel;
Figure 31 reveals the suspension of the riser pipe joint to a position above the integrated SRD/SPU to enable connection of the riser pipe joint to the top portion of the SRD;
Figure 32 shows the connected string of riser pipe joint, SRD, and SPU being lifted as a single unit;
Figure 33 illustrates the lowering of the connected string of Figure 32 to mate with the integrated MLP/LMRP being held upon the carriage; Figure 34 shows the integrated inline SRD/SPU/MLP/LMRP being raised from the carriage;
Figure 35 illustrates the integrated inline SRD/SPU/MLP/LMRP being lowered from the vessel through the moon pool into the ocean; and
Figure 36 shows an integrated inline SRD/SPU/MLP/LMRP being lowered down from a drilling vessel into the ocean to mate with a BOP near the ocean floor, to form an installed integrated inline SRD/SPU/MLP/LMRP/BOP upon the ocean floor as shown in Figure 1 and/or Figure 12.
DETAILED DESCRIPTION
[0038] For purposes of this disclosure, "dual gradient drilling" or "DGD" refers to a drilling technique employing a seawater-filled return line in a portion of the riser. DGD is a drilling technique designed to address the problem of excess downhole pressures in a wellbore. That is, the significant difference between the pressure of the hydrostatic head of drilling mud in a riser and the pressure of the formation at points adjacent to the mudline presents a challenge. This pressure differential may cause operational difficulties that prevent drilling a well to its target depth using conventional riser return drilling methods. Dual gradient drilling employs a riser filled with seawater, which limits the pressure imbalance. To employ DGD techniques, there is a need to create an interface between the drilling mud in the wellbore (or wellhead) and the seawater in the riser. This interface may be a fluid-fluid interface, located generally above the wellhead in the riser, or may be implemented by employment of a mechanical device such as a subsea rotating diverter ("SRD") to provide positive isolation of the two fluids.
[0039] One efficient configuration for conducting dual gradient drilling offshore presents an inline configuration with respect to the subsea riser. In that configuration, the MLP rests on the top of the BOP/LMRP stack. To deploy such a system it has been necessary to devise a system for deploying a MLP with the BOP and LMRP and other attached equipment through the moon pool of a drilling vessel to the well head on the floor of the ocean. However, the combined stack of these three components is very tall and extremely heavy. Such a height makes it extremely difficult, if not impossible, to work a full stack of MLP, BOP, and LMRP using hoists upon most drilling vessels, due to height restrictions. Additionally, the immense weight of such a stack most likely would exceed the hook weight maximum of the hoists/lifting devices presently available on most drilling vessels.
[0040] In the practice of the invention, a deployment procedure and process has been developed to enable the equipment to be secured, connected, and deployed to the wellhead subsea in an efficient manner, without exceeding the weight or height restrictions of the drilling vessel.
[0041]A multiple trip deployment procedure may be employed in which the BOP is lowered to the seabed through the moon pool opening. Then, a combination stack of MLP/LMRP (with other equipment optionally added) may be deployed to the seabed. In some instances, the BOP may be deployed through a first moon pool opening (or from a first drilling assembly), and the combination stack of MLP/LMRP then may then be deployed in another trip to the seabed.
[0042] The BOP typically is deployed by drill pipes, using a threaded pipe connection into the top of the BOP. A hydraulic connector at the bottom of the LMRP may be used to latch or mate the LMRP with the BOP stack once the combination stack of LMRP is placed upon the BOP in the subsea environment.
[0043] In the practice of the invention, using a multiple trip deployment procedure, the MLP may be placed on top of the LMRP aboard the vessel. In conventional operations, for example, it is known to stack a LMRP directly upon a BOP on board a ship before deployment of the combination.
[0044] However, it believed to be not advisable to securely rest the MLP upon the LMRP while on board the vessel. Other methods have been developed in the practice of the invention, as further described herein.
[0045] It is not advisable, when deploying a MLP on most drilling vessels, to place the MLP on top of the LMRP in a conventional manner, due to the tremendous weight of the MLP (i.e. about 450,000 lbs). This is the case, in part, because the flex joint between the MLP and LMRP would result in the MLP leaning over due to the immense weight, which could cause damage to personnel or equipment. [0046] Thus, in the practice of the invention, a lifting hoist may be purposely designed and permanently installed above the storage station for handling these two components (MLP and LMRP). This hoist may be used to lift the MLP precisely over the LMRP. While the MLP is suspended, connection may be made between the two components. Then, a crane/hoist may lift the combination stack and move it to a moon pool cart or carriage. The MLP may be placed upon the cart or carriage in such a way that the total weight of this combination stack is supported by the carriage, in which the carriage connects to the MLP, with the LMRP being hung from below the MLP, the MLP being secured to the LMRP by the flex joint. Thus, the LMRP may be suspended with its flex joint connected to the lower margin of the MLP located above, with only the MLP being mechanically supported on the vessel. This design may assist in avoiding the stability problem of the MLP being unable to be directly stacked or rested upon the LMRP while on board the vessel.
[0047] Additionally, it may be useful to employ two or more carts or carriages, one to support the BOP, and another cart for managing and suspending the MLP/LMRP. Or, carriages may be reconfigured to support one or the other, in the course of the operations. Furthermore, additional equipment may be attached on top of the MLP, which may include a SPU and a SRD. It is feasible to provide an integrated design of common riser flanges to enable engagement of SPU and SRD and a riser pipe joint in an inline configuration, as further discussed herein.
[0048] In one aspect of the invention an inline configuration may be achieved on the seabed of the following equipment, from bottom (sea floor) to top: BOP, LMRP, MLP, SPU, SRD, and riser pipe joints extending above these pieces of equipment, the riser extending upwards to the drilling vessel.
[0049] In one application of the invention, a subsea rotating device or rotating control device ("SRD") may be deployed to divert drilling fluids to establish a dual gradient drilling environment. The subsea rotating device (SRD) that may be employed in the system of the invention may be in some respects analogous to a drilling rotating head. It may be the uppermost piece of equipment in the DGD drilling system. It is typically deployed above the mudlift pump (MLP), but its precise placement depends upon the configuration of the well, and the application. The SRD serves to separate the roughly 8.6 pounds per gallon fluid in the riser from the higher weight density mud in the well, in cases for which dual gradient drilling is to be employed. The SRD assists to prevent gas from entering the riser, and provides a slight pressure on the well (typically less than 50 psi) needed to feed the MLP. By diverting mud returns from the well above the BOP, sizing the cuttings, and pumping to the surface using a specially configured vessel, a dual gradient drilling ("DGD") system may remove a major constraint to drilling at current depths. Such SRD devices are manufactured by various companies in the oil and gas drilling industry, such as Weatherford International and others.
[0050] A solids processing apparatus ("SPU") may be connected to the upper surface of the MLP. The SPU, in one embodiment, provides a central cavity, the central cavity being positioned inline with the riser and SRD and adapted for receiving drilled solids into its central cavity. The SPU is configured for reducing the particle size of the drilled solids to form processed solids. The solids processing apparatus, in one embodiment of the invention, includes a pressure rating at least as great as the pressure rating of the drilling riser. In one embodiment of the invention, a SPU similar to that disclosed in US Patent Publication No. 20120080186 A1 to Larry Reed may be employed, although other configurations could be deployed as well.
[0051] Mudlift pumps (MLP) for dual gradient drilling are disclosed, for example, in U.S. Patent No. 6,102,673 (Mott et al.) and U.S. Patent No. 6,325,159 (Peterman et al.). These references disclose positive displacement pumps powered by a fluid drive (such as seawater).
[0052] It should be noted that the invention disclosed herein may be employed with dual gradient drilling, but the invention is not necessarily limited to use in dual gradient drilling. The deployment process and techniques may be applied to other heavy and bulky equipment that is to be linked and suspended through a moon pool of a drillship to form a stack of equipment upon the floor of a body of water, or on the floor of the ocean.
[0053]As used in this specification, the term "inline" or "in-line" refers generally to the positioning of a component within a drill string as a component of the drill string and in line with a subsea riser, as opposed to a position detached (or only remotely connected) to the drill string.
[0054] Referring to Figure 1 , an inline SRD/SPU/MLP/LMRP/BOP 72 is shown installed upon the sea floor 30, below and connected to a drilling vessel 21. Riser 22 extends through moon pool 49 (not seen in Figure 1 ) into the ocean below the drilling vessel 21 , and provides a riser pipe joint 23 that is connected to SRD 24. Below and connected to the SRD 24 is SPU 25, that is mated to MLP 26. Connected to MLP 26 is LMRP 27, resting upon and fluidly connected to BOP 28. BOP 28 rests upon well head 29 at a position that is adjacent to sea floor 30.
[0055] To build inline SRD/SPU/MLP/LMRP/BOP 72 upon the sea floor 30, many various techniques may be employed, including those described and claimed herein, and other techniques within the spirit and scope of those disclosed herein.
[0056] Figure 2 reveals a BOP 28, similar to many that are commercially available in the subsea drilling industry. BOP 28 comprises an upper side 31 and a lower side 32 and a well head connector 53. Figure 3 shows LMRP 27 having an upper side 37 and a lower side 38. A connection mechanism 36 extends from the upper side 37, and a connector 46 extends from the lower side of the LMRP 27. The connector 46 may be of the type that is known in the industry as a hydraulic H4 connector that is adapted for making a connection in a subsea environment, such as, for example, those known in the industry manufactured and distributed by General Electric Hydril of Houston, Texas. Figure 4 shows in greater detail the connection mechanism 36, which in this particular embodiment if a flex joint type of connector that has been removed from LMRP 27 and shown separately for illustrative purposes.
[0057] Figure 5 illustrates MLP 26, having an upper side 43 and a lower side 44. Figure 6 shows more detail of SPU 25 having top flange 39 and bottom flange 40, each of which is adapted for making secure and robust connections inline and in fluid communication with riser 22 (shown in Figure 1 ). Figure 7 reveals SRD 24, having top flange 41 and bottom flange 42. Riser pipe joint 23 is shown in Figure 8. Figure 9 illustrates an integrated inline MLP/LMRP 70, in which connection mechanism 35 of the MLP 26 has been mated with connection mechanism 36 of LMRP 27 near the lower side 44 of the MLP 26. Top side 43 of the MLP 26 is seen near the top of Figure 9. LMRP 27 comprises connector 46, shown near the lower portion of Figure 9.
[0058] Figure 10 illustrates an integrated inline SRD/SPU/MLP/LMRP 71 , as further discussed herein, and comprising: riser pipe joint 23, SRD 24, SPU 25, MLP 26, and LMRP 27 connected in one continuous string of hardware. Connector 46 is positioned near the lower portion of LMRP 27, and is configured for mating with BOP 28 (see Figure 1 ). Other subsea configurations of equipment needed to conduct dual gradient drilling are possible, and such other configurations may be contemplated by the spirit and breadth of this disclosure. Figure 11 shows the deployment from drilling vessel 21 of the integrated inline SRD/SPU/MLP/LMRP 71 as disclosed in Figure 10, nearing a position to mate with BOP 28 positioned upon well head 29 adjacent sea floor 30, and as further described herein. Components as described with reference to Figure 10 are seen as well in Figure 11. Figure 12 shows integrated inline SRD/SPU/MLP/LMRP 71 after having been mated with BOP 28 to form inline SRD/SPU/MLP/LMRP/BOP 72, in position for drilling in connection with dual gradient drilling (DGD) operations.
[0059] Various steps may be taken to generate upon the ocean floor form inline SRD/SPU/MLP/LMRP/BOP 72. This disclosure illustrates certain techniques that have been discovered as useful and workable for conducting such deployment from drilling vessel 21. However, other means of forming inline
SRD/SPU/MLP/LMRP/BOP 72 may be evident from review of the disclosure and techniques described herein, and are within the scope of this invention.
[0060] In one embodiment, a BOP may be deployed first into the ocean. For example, with reference to Figure 13, BOP 28 may be held aboard vessel 21 by a holding mechanism 59 upon carriage 52 running on rails 50, 51 . MLP 26 may be seen in Figure 13 in a holding area. Figure 14 illustrates a drill pipe 54 extending down from the aft portion of vessel 21 above BOP 28 and also above moon pool 49 (moon pool 49 is below Figure 14 and is not seen in Figure 14).
[0061] Figure 15 shows a point later in time in which the BOP 28 has been lifted by drill pipe 54, facilitating movement of BOP 28. Also, carriage 52 has moved to a position beneath the BOP 28. [0062] In Figure 16, one can see the BOP 28 rested upon carriage 52 to a forward position above moon pool 49. In Figure 17, drill pipe 58 extends to connect to BOP 28. Then, in Figures 18-20 BOP is deployed with drill pipe 58 to through moon pool 49 to the ocean.
[0063] Figures 21 -24 shows one embodiment in which MLP 26 is first mated with LMRP 27 and then suspended in position above moon pool 49. First, conveyance line(s) 56 move the MLP 26 from its position of storage to a position above LMRP 27. Then, while held in position, MLP 26 may be manually secured by connection mechanism 36 to LMRP 27. Connection mechanism 36 may comprise a flex joint, as one example, although other means of connection could be employed. One feature of this sequence of steps is that the LMRP 27 is not made to support the full weight of the MLP 26 while on board the ship, which could cause failure of the flex joint and/or instability of components of great weight and bulk. Figure 23 shows a connected and integrated inline MLP/LMRP 70 being moved laterally aboard the ship by conveyance line(s) 56. Figure 24 shows a resting position of the integrated inline MLP/LMRP 70 being held by holding mechanism 59. In this configuration, the MLP 26 is being held and supported by holding mechanism 59 connected to carriage 52, such that LMRP 27 and its flex joint (connection mechanism 36) are not supporting the massive weight of the MLP 26. Instead, the LMRP 27 is suspended by connection mechanism 36 to the MLP 26. MLP 26 is being held in position. Rails 50, 51 and carriage 52 support the massive weight of both the MLP 26 and the LMRP 27 in this manner.
[0064] Once the integrated inline MLP/LMRP 70 is suspended, there are several options. Numerous methods may be devised for securing the remaining components (riser pipe joint 23, SRD 24, SPU 25) in position and in fluid connection with the riser. For purposes of this disclosure, examples are provided, but the invention herein is not limited to only those examples illustrated herein.
[0065] In one example, it would be possible to make up flanged connections of riser pipe joint 23, SRD 24, SPU 25 at a position aboard drilling vessel 21 and above carriage 52, i.e. above the suspended integrated inline MLP/LMRP 70. This could occur, in one embodiment, on and/or through an upper deck of drilling vessel 21. Figures 26-35 show one example of how such a connection could be accomplished in an efficient manner.
[0066] Figure 25 shows a holding mechanism 61 mounted upon and through deck 60. The holding mechanism 61 , in one embodiment, could be mounted on the vessel 21 at a position well above the suspended integrated inline MLP/LMRP 70 shown in Figure 26. SPU 25 may be conveyed upon traveling cart 62 to a position adjacent holding mechanism 61 , and raised by lift 66 to a vertical position for downward entry into holding mechanism 61. Then, SPU 25 may be suspended in holding mechanism 61 for that SRD 24 may likewise be raised from its traveling cart 63 (Figure 27) by lift 61 and applied to holding mechanism 61 as shown in Figures 27-28. The SRD 24 may be bolted/flanged upon SPU 25, and the assembly lowered for temporary suspension in holding mechanism 61 , as shown in Figures 29-30. In a similar manner, riser pipe joint 23 may be raised from traveling cart 64 by lift 66 and flanged to the top of the SRD 24, thus extending the string. Figure 31 illustrates how this procedure may be employed to form a string of riser joint/SRD/SPU that is temporarily suspended in holding mechanism 61 . Or alternatively, once the string is flanged and ready, the riser joint/SRD/SPU 74 may be lowered through holding mechanism 61 , below the deck 60, and applied to the upper side 43 of the MLP 26 as shown in Figure 33. Then, flange connections may be made to connect the riser joint/SRD/SPU 74 to the integrated inline MLP/LMRP 70, thereby forming an integrated inline SRD/SPU/MLP/LMRP 71 that extends from a position below rails 50, 51 above moon pool 49 all the way upwards through deck and through holding mechanism 61 .
[0067] Once the integrated inline SRD/SPU/MLP/LMRP 71 is fully connected and ready for deployment, it may be hoisted/lifted (after disconnect of holding mechanism 59) and deployed through the moon pool 49 of vessel 21 into the waters of the ocean, as seen in Figure 36. Once delivered to a position near the seabed, the integrated inline SRD/SPU/MLP/LMRP 71 may be mated with a BOP 28 that has been positioned to receive and latch upon integrated inline SRD/SPU/MLP/LMRP 71 , thereby forming upon the sea floor 30 a fully assembled installed inline SRD/SPU/MLP/LMRP/BOP 72. [0068] In its broad application, the invention may include a process for connection and deployment of drilling equipment through a moon pool of a drilling vessel. A process is disclosed for suspending a first device, then suspending a second device below the first device, connecting the first and second device to form a connected pair, and then suspending the connected pair by holding the first device with a holding mechanism. Later, one or more devices may be connected, and then further connections may optionally be performed prior to deployment to the ocean. As one application, a subsea production manifold could be employed as the first device, in which the manifold is subsequently connected subsea for collecting production from one or more subsea wells and then sending the produced hydrocarbons to another location, such as an FPSO vessel. Thus, the process could be used to allow the stacking of a manifold subsea, in which stacking (with adverse gravitational forces upon the equipment) is not required upon the vessel prior to deployment of the connected equipment into the ocean.
[0069] Other examples and embodiments of the invention are contemplated by this disclosure, even if not set forth expressly herein, and the invention is not intended to be limited to only those specific examples and embodiments and techniques shown expressly herein, but also contemplates other similar techniques and processes within the general spirit and scope of the overall disclosure herein.

Claims

CLAIMS We claim:
1 . A process for deployment of drilling equipment through a moon pool of a drilling vessel, the process comprising:
(a) suspending a MLP, the MLP having an upper side and a lower side having a first connection mechanism;
(b) positioning a LMRP below the MLP, the LMRP having a lower side and an upper side having a second connection mechanism, the second connection mechanism of the LMRP being adapted for mating with the first connection mechanism of the MLP;
(c) mating the first connection mechanism with the second connection mechanism to form an inline MLP/LMRP; and
(d) suspending the inline MLP/LMRP by a holding mechanism that is fixed to the drilling vessel, the holding mechanism being reversibly attached to the MLP, the inline MLP/LMRP being suspended above the moon pool of the drilling vessel.
2. The process of claim 1 further comprising the steps of:
(e) providing an SPU with a top flange and a bottom flange;
(f) connecting the bottom flange of the SPU to the upper side of the MLP to form an inline SPU/MLP/LMRP; and
(g) suspending the inline SPU/MLP/LMRP in position for deployment through the moon pool.
3. The process of claim 1 further comprising the steps of:
(e) providing an SPU with a top flange and a bottom flange;
(f) providing an SRD with a bottom flange; and
(g) connecting the bottom flange of the SRD with the top flange of the SPU to form a SRD/SPU component that comprises at least both an SRD and SPU.
4. The process of claim 3, further comprising the steps of: (h) connecting the bottom flange of the SRD/SPU to the inline MLP/LMRP to form an inline SRD/SPU/MLP/LMRP; and
(i) suspending the inline SRD/SPU/MLP/LMRP upon the drilling vessel in position for deployment through the moon pool.
5. The process of claim 4 further comprising the step of:
(j) positioning a BOP adjacent the floor of the ocean;
(k) lowering the inline SRD/SPU/MLP/LMRP to a position above the BOP; and (I) mating the lower side of the LMRP of the inline SRD/SPU/MLP/LMRP with the BOP to form an inline SRD/SPU/MLP/LMRP/BOP.
6. A process for deploying drilling equipment through a moon pool of a drilling vessel into the ocean, the process comprising:
(a) suspending a BOP above the moon pool;
(b) lowering the BOP through the moon pool into the ocean;
(c) subsequently or simultaneously with step (b), suspending a MLP, the MLP having an upper side and a lower side with a first connection mechanism;
(d) positioning a LMRP below the MLP, the LMRP having a lower side and an upper side having a second connection mechanism, the second connection mechanism of the LMRP being adapted for mating with the first connection mechanism of the MLP;
(e) mating the first connection mechanism with the second connection mechanism to form an equipment combination comprising at least a MLP and a LMRP; and
(f) suspending the equipment combination comprising at least a MLP and a LMRP aboard the drilling vessel by engaging the MLP with a holding mechanism that is fixed to the drilling vessel above or adjacent to the moon pool.
7. The process of claim 6 further comprising the steps of:
(g) providing an SPU with a top flange and a bottom flange;
(h) providing a SRD with a bottom flange;
(i) connecting the bottom flange of the SRD to the top flange of the SPU to form an integrated inline SRD/SPU; and
(j) connecting the:
(k) bottom flange of the SRD/SPU to the equipment combination comprising at least a MLP and a LMRP to
(I) form an inline SRD/SPU/MLP/LMRP; and
(m) suspending the inline SRD/SPU/MLP/LMRP in position for deployment through the moon pool.
8. The process of claim 7 further comprising the step of:
(I) lowering the inline SRD/SPU/MLP/LMRP through the moon pool into the ocean.
9. The process of claim 8 further comprising the step of:
(m) mating the lower side of the LMRP of the inline SRD/SPU/MLP/LMRP with the BOP to form a SRD/SPU/MLP/LMRP/BOP.
10. The process of claim 8 further comprising the step of:
(n) activating an H4 subsea connection to secure the BOP to the inline SRD/SPU/MLP/LMRP.
1 1 . A process for deploying drilling equipment through a moon pool of a drilling vessel into the ocean, the process comprising:
(g) suspending a BOP above the moon pool;
(h) lowering the BOP through the moon pool into the ocean;
(i) suspending a MLP, the MLP having an upper side and a lower side with a first connection mechanism;
(j) positioning a LMRP below the MLP, the LMRP having a lower side and an upper side having a second connection mechanism, the second connection mechanism of the LMRP being adapted for mating with the first connection mechanism of the MLP;
(k) mating the first connection mechanism with the second connection mechanism to form an equipment combination comprising at least a MLP and a LMRP;
(I) suspending the equipment combination comprising at least a MLP and a LMRP aboard the drilling vessel by engaging the MLP with a holding mechanism that is fixed to the drilling vessel above or adjacent to the moon pool;
(m) providing an SPU;
(n) providing a SRD;
(o) forming an inline SRD/SPU/MLP/LMRP combination; and
(p) suspending the inline SRD/SPU/MLP/LMRP combination in position for deployment through the moon pool;
(q) lowering the inline SRD/SPU/MLP/LMRP through the moon pool into the ocean; and
(r) mating the lower side of the LMRP of the inline SRD/SPU/MLP/LMRP with the BOP to form in the ocean a SRD/SPU/MLP/LMRP/BOP.
12. The process of claim 1 1 wherein step (f) further comprises suspending the equipment combination comprising at least a MLP and a LMRP aboard the drilling vessel by engaging the MLP with a holding mechanism that is fixed to a carriage upon the drilling vessel, wherein the carriage is mounted upon rails, the carriage being adapted for movement along the rails to multiple predetermined positions above the moon pool of the drilling vessel.
13. A process for deployment of drilling equipment through a moon pool of a drilling vessel, the process comprising:
suspending a first device above a moon pool;
suspending a second device below the first device;
connecting the first device to the second device to form a connected pair; and suspending the connected pair with a holding mechanism attached to the first device.
PCT/US2014/047810 2013-07-25 2014-07-23 Process for subsea deployment of drilling equipment WO2015013402A2 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US201361858348P 2013-07-25 2013-07-25
US61/858,348 2013-07-25

Publications (2)

Publication Number Publication Date
WO2015013402A2 true WO2015013402A2 (en) 2015-01-29
WO2015013402A3 WO2015013402A3 (en) 2015-05-14

Family

ID=51355628

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/US2014/047810 WO2015013402A2 (en) 2013-07-25 2014-07-23 Process for subsea deployment of drilling equipment

Country Status (2)

Country Link
US (1) US20150027717A1 (en)
WO (1) WO2015013402A2 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL2012349B1 (en) * 2014-03-03 2015-10-27 Itrec Bv Method for riser string handling and an offshore drilling vessel.
GB2556551B (en) * 2015-09-02 2021-07-07 Halliburton Energy Services Inc Software simulation method for estimating fluid positions and pressures in the wellbore for a dual gradient cementing system
WO2017044101A1 (en) 2015-09-10 2017-03-16 Halliburton Energy Services, Inc. Integrated rotating control device and gas handling system for a marine drilling system
US10662729B2 (en) * 2018-08-31 2020-05-26 Hydril USA Distribution LLC Sliding subsea electronics module chassis
CN110641632B (en) * 2019-11-08 2023-11-17 四川宏华石油设备有限公司 Floating type drilling underwater equipment arrangement system suitable for drilling ship and operation method
US11927066B2 (en) 2020-03-31 2024-03-12 Conocophillips Company High pressure riser connection to wellhead

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6102673A (en) 1998-03-27 2000-08-15 Hydril Company Subsea mud pump with reduced pulsation
US6325159B1 (en) 1998-03-27 2001-12-04 Hydril Company Offshore drilling system
US20120080186A1 (en) 2010-10-05 2012-04-05 Chevron U.S.A. Inc. Apparatus and system for processing solids in subsea drilling or excavation

Family Cites Families (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2114377A5 (en) * 1971-10-21 1972-06-30 Subsea Equipment Ass Ltd
US4108318A (en) * 1974-06-07 1978-08-22 Sedco, Inc. Of Dallas, Texas Apparatus for offshore handling and running of a BOP stack
US4063650A (en) * 1976-02-02 1977-12-20 Exxon Production Research Company Equipment handling system
US4081163A (en) * 1976-10-04 1978-03-28 Guinn David C Blow out preventer handling system
US4230190A (en) * 1978-10-13 1980-10-28 Guinn David C Blow out preventer handling system
US4367796A (en) * 1980-11-21 1983-01-11 Global Marine, Inc. Blowout preventer and guideline handling
US4668126A (en) * 1986-02-24 1987-05-26 Hydril Company Floating drilling rig apparatus and method
US5875848A (en) * 1997-04-10 1999-03-02 Reading & Bates Development Co. Weight management system and method for marine drilling riser
US6230824B1 (en) * 1998-03-27 2001-05-15 Hydril Company Rotating subsea diverter
US6474422B2 (en) * 2000-12-06 2002-11-05 Texas A&M University System Method for controlling a well in a subsea mudlift drilling system
SE531718C2 (en) * 2006-10-19 2009-07-21 Gva Consultants Ab Integrated drill deck and blowout fuse management
US8573308B2 (en) * 2008-09-09 2013-11-05 Bp Corporation North America Inc. Riser centralizer system (RCS)
US8746348B2 (en) * 2010-02-18 2014-06-10 Chevron U.S.A. Inc. Apparatus, system and method for releasing fluids from a subsea riser
US9428975B2 (en) * 2011-08-18 2016-08-30 Enhanced Drilling A.S. Drilling fluid pump module coupled to specially configured riser segment and method for coupling the pump module to the riser
US9109404B2 (en) * 2011-10-17 2015-08-18 Cameron International Corporation Riser string hang-off assembly
US20130168102A1 (en) * 2011-12-28 2013-07-04 Vetco Gray Inc. Drilling riser adapter with emergency functionality

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6102673A (en) 1998-03-27 2000-08-15 Hydril Company Subsea mud pump with reduced pulsation
US6325159B1 (en) 1998-03-27 2001-12-04 Hydril Company Offshore drilling system
US20120080186A1 (en) 2010-10-05 2012-04-05 Chevron U.S.A. Inc. Apparatus and system for processing solids in subsea drilling or excavation

Also Published As

Publication number Publication date
WO2015013402A3 (en) 2015-05-14
US20150027717A1 (en) 2015-01-29

Similar Documents

Publication Publication Date Title
US20150027717A1 (en) Process For Subsea Deployment of Drilling Equipment
US8640775B2 (en) Multi-deployable subsea stack system
US9567041B2 (en) Docking and drilling stations for running self-standing risers and conducting drilling, production and storage operations
JP6927977B2 (en) Submarine methane hydrate production
US9068398B2 (en) Deepwater completion installation and intervention system
US9428975B2 (en) Drilling fluid pump module coupled to specially configured riser segment and method for coupling the pump module to the riser
US20110127040A1 (en) Assembly and method for subsea well drilling and intervention
US10450802B2 (en) Mobile offshore drilling unit, a method of using such a unit and a system comprising such a unit
WO2007093787A1 (en) Big assembly with movable rig floor units
US20120318530A1 (en) Device for a Tower for Well Operations and Use of Same
WO2004063519A2 (en) Blow out preventer handling system
US11299939B2 (en) System and method for supporting a riser
US20130075102A1 (en) Mobile offshore drilling unit
US9988856B2 (en) Method for riser string handling and an offshore drilling vessel
US11560683B2 (en) Offshore drilling unit
Childers et al. Submerged System for Offshore Oil and Gas Production

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 14752472

Country of ref document: EP

Kind code of ref document: A2

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 14752472

Country of ref document: EP

Kind code of ref document: A2