WO2014201989A1 PCT/CN2014/080041 CN2014080041W WO2014201989A1 WO 2014201989 A1 WO2014201989 A1 WO 2014201989A1 CN 2014080041 W CN2014080041 W CN 2014080041W WO 2014201989 A1 WO2014201989 A1 WO 2014201989A1
Authority
WO
WIPO (PCT)
Prior art keywords
switch
ftu
fault
adjacent
feeder line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/CN2014/080041
Other languages
English (en)
French (fr)
Inventor
李天友
吴文宣
陈彬
徐丙垠
王敬华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University of Technology
Electric Power Research Institute of State Grid Fujian Electric Power Co Ltd
State Grid Fujian Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
Shandong University of Technology
Electric Power Research Institute of State Grid Fujian Electric Power Co Ltd
State Grid Fujian Electric Power Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University of Technology, Electric Power Research Institute of State Grid Fujian Electric Power Co Ltd, State Grid Fujian Electric Power Co Ltd, State Grid Corp of China SGCC filed Critical Shandong University of Technology
Publication of WO2014201989A1 publication Critical patent/WO2014201989A1/zh
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • H02J3/007Arrangements for selectively connecting one or more loads to one or more power sources or power lines
    • H02J3/0073Arrangements for selectively connecting one or more loads to one or more power sources or power lines by providing alternative feeding paths when the main path fails
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote monitoring or remote control of equipment in a power distribution network
    • H02J13/12Monitoring network conditions, e.g. electrical magnitudes or operational status
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote monitoring or remote control of equipment in a power distribution network
    • H02J13/18Circuit arrangements for providing remote monitoring or remote control of equipment in a power distribution network characterised by the remotely-controlled equipment, e.g. converters or transformers
    • H02J13/333Circuit arrangements for providing remote monitoring or remote control of equipment in a power distribution network characterised by the remotely-controlled equipment, e.g. converters or transformers the equipment forming part of substations
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • H02J3/001Arrangements for handling faults or abnormalities, e.g. emergencies or contingencies
    • H02J3/0012Arrangements for handling faults or abnormalities, e.g. emergencies or contingencies characterised by the contingency detection means in AC networks, e.g. using phasor measurement units [PMU], synchrophasors or contingency analysis
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/30State monitoring, e.g. fault, temperature monitoring, insulator monitoring, corona discharge
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
    • Y04S10/52Outage or fault management, e.g. fault detection or location

Definitions

  • the invention relates to a general control method for fault location, isolation and power restoration of a medium voltage distribution network feeder based on a peer-to-peer communication network and a distributed intelligent, in particular to a distributed intelligent feeder automatic control method.
  • Feeder Automation is mainly used to realize fault location, isolation and power restoration of distribution network lines, which can reduce the time of power failure, reduce the power outage range, and improve power supply reliability.
  • FA mainly adopts centralized control mode, relying on the main station to collect and process the fault information sent by the feeder terminal (FTU) for fault location, and the remote segment switch realizes fault isolation and network reconstruction, and the power recovery time of the non-faulty section is reached. Minute level.
  • FTU feeder terminal
  • the FTU installed at the feeder switch exchanges fault information and control information through peer-to-peer communication networks to locate faults, isolate and network. The operation reduces the power outage time of the non-faulty section to the second level.
  • the Intel l iTEAM FA system developed by American S&C Company proposes an overhead line fault recovery and reconstruction scheme based on distributed intelligent control. According to the feeder topology, the segment switches are grouped into several control groups.
  • the control team selects a coach to collect and process the failure information of the team member to achieve fault self-healing control, but due to the segment-by-segment recovery strategy, the power recovery speed is slower.
  • the prior art also proposes to use the wireless communication technology to connect the FTU data to the wireless peer-to-peer communication network through the serial port to realize the distributed intelligent FA, but the entire power restoration process also takes more than 10s.
  • Others there are proposed network-based distribution network protection systems based on CAN bus peer-to-peer communication, and a fast self-healing scheme for high-speed network peer-to-peer communication methods using generic object-oriented substation events (GOOSE), which are for the line
  • GOOSE generic object-oriented substation events
  • An object of the present invention is to provide a distributed intelligent feeder automatic control method that is effective, reliable, and capable of greatly shortening the power supply recovery process according to the deficiencies of the prior art.
  • the distributed intelligent feeder automatic control method the main point is that the following steps are included:
  • a distributed intelligent FA system which has a plurality of feeder terminals FTU, and each feeder terminal FTU is linked and monitored Control one or more switches;
  • Each FTU is numbered and represented by letters, in order of 1, 2, . . . N, N is the number of FTUs on the feeder; a switch configuration information table is created for each FTU, for each FTU monitored The switch is numbered, and then the type of the monitored switch and its adjacent switches are indicated by letters different from the FTU mark.
  • the switch type is divided into M-side power switch, N-side power switch, trunk segment switch, and branch line intermediate switch.
  • the branch end switch and the tie switch are numbered 1-6 in sequence; the information of the adjacent switch includes the FTU number of the adjacent switch, and its number in the FTU;
  • the acquisition FTU monitors the fault according to the feedback of the locally monitored switch and the adjacent switch, and performs fault location, isolation fault and power restoration operation according to the information feedback.
  • the method of the present invention has strong versatility and is suitable for overhead lines, cables and overhead lines/ Cable hybrid line; FTU can complete fault location, isolation and power recovery operation according to the local monitoring of the switch and the measurement information of the adjacent switch.
  • the setting is simple. The field test and application results show that the system can complete the feeder fault location and isolation operation within 600ms after the protection action trips, and realize the power restoration operation of the non-faulty section within 1.5s.
  • 1 is an operation flow diagram for performing switch fault location and isolation by using the distributed intelligent feeder automatic control method
  • FIG. 2 is a flow chart of switching power supply recovery operation using the distributed intelligent feeder automatic control method
  • FIG. 3 is a schematic diagram of an overhead line distributed intelligent FA system based on an intelligent feeder automatic control method
  • FIG. 4 is based on intelligent feeder automation Schematic diagram of distributed intelligent FA system for cable lines of control method
  • FIG. 5 is a schematic diagram of an overhead line/cable hybrid line FA system based on an intelligent feeder automatic control method
  • FIG. 6 is a schematic diagram of a field cable ring network power supply line based on an intelligent feeder automatic control method.
  • the technical solution adopted by the present invention to solve the technical problem is:
  • the FTU controls the monitored switch, completes the fault location, isolation and power restoration operation, and needs to establish a switch configuration information table of the FTU.
  • the FTU switch configuration information table is implemented by the following methods: First, all FTUs on the feeder are numbered, denoted by a, in order, 1, 2, ... N, N is the number of FTUs on the feeder. Each FTU may only monitor one switch (circuit breaker or on-column switch) or it may monitor multiple switches of the same ring network cabinet. Establish a switch configuration information table for each FTU, number all the switches monitored by the FTU, and then indicate the type of the monitored switch (indicated by b) and its adjacent switches.
  • the switch type is divided into M-side power switches, N End power switch, trunk segment switch, branch line intermediate switch, branch line end switch and tie switch, numbered 1-6, as shown in Table 1; the information of the adjacent switch includes the FTU number of the adjacent switch, and its in the FTU The number.
  • the fault information includes the switch overcurrent information, the overcurrent information of the adjacent switch and the loss of voltage information on both sides of the tie switch, as shown in Table 2.
  • the fault switch and its adjacent switch are monitored by the same FTU, all fault information is obtained by local FTU monitoring; when the fault switch and the adjacent switch are monitored by different FTUs, the overcurrent information of the adjacent switch is passed through the peer-to-peer communication network. Obtained in the distance.
  • the switch detects an overcurrent
  • the specific process is: When the switch detects an overcurrent, it determines whether the protection is active.
  • the switch type is 1 (M-side power switch), 2 (N-side power switch) or 6 (contact switch). If yes, further determine whether the reclose lock information is received until the coincidence The gate was successful. If the switch is a b6 joint switch, it is necessary to judge whether each switch is overcurrent or pressurized, and reclose according to the judgment. According to the above method, several different systems can be constructed in practical applications.
  • the FA system was developed in the field trial of the cable ring network power supply line.
  • the line consists of four ring network cabinets, which are respectively Huxi interchange rings.
  • Net cabinet, Huxi Bay #1 ring network cabinet, Huxi sewage ring network cabinet and Binnan sewage ring network cabinet, 901 switch of Huxi interchange ring network cabinet and 901 switch of Binnan sewage ring network cabinet are circuit breakers, the other switches are load
  • the switch, in which the 902 switch of the Huxi sewage ring network cabinet is in the open state during normal operation, is a tie switch.
  • a distributed intelligent terminal FTU is installed at each ring network cabinet on the cable line, and a switch configuration information table is established for each FTU and its monitored switch according to the method of the present invention, as shown in Table 3.
  • FTU1 is marked as al
  • 903 The load switch is the branch end switch b5.
  • FIG. 3 and Table 4 Distributed intelligent FA system for overhead lines. Assuming a permanent fault at point F, the substation exit breaker CB1 trips and fails to coincide, the FTU that detects the overcurrent phenomenon initiates the FA algorithm and exchanges fault detection information with the adjacent FTU. FTU2 at the upstream segment switch of the fault point detects the fault information, and the FTU3 at the downstream segment switch of the fault point does not detect the fault information, so it is determined that the fault is located between FTU2 and FTU3, and FTU2 and FTU3 respectively control S1 and S2 to trip. Isolating the fault, and then issuing a start to restore the power supply signal, FTU1 and FTU4 respectively control the closing of CB1 and S3 to restore the power supply of the non-faulty section.
  • FTU 5 5 S4 1 3 4 1 6 1 As shown in Figure 4 and Table 5: Cable line distributed intelligent FA system.
  • the system configuration is similar to the overhead line distributed intelligent FA system. The difference is that each FTU monitors multiple switches in the ring network cabinet.
  • the feeder fault points may be located between the ring network cabinets, the ring network cabinet bus or the ring network cabinet outlet. on.
  • the FTU control fault line is connected to the RMU1 and RMU2 line switches S12 S21 tripping isolation fault, then close the circuit breaker CB1 RMU3 contact switch S31 to restore RMU1 and RMU2
  • the FTU controls all the switches of the RMU2 (the incoming switch S21 S22 and the outgoing switch S23) to trip to isolate the fault, then close the circuit breaker CB1, restore the RMUl power supply, and the RMU2 is powered off for maintenance; If the F3 point on the RMU2 outgoing line fails, the FTU controls the outgoing switch S23 of the RMU2 to trip to isolate the fault, and then the circuit breaker CB1 is closed to restore the power supply of RMU1 and RMU2.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

一种基于对等通信网络与分布式智能的中压配电网馈线故障定位、隔离与供电恢复的通用控制方法,其根据馈线终端及其监控的开关进行分类处理并建立开关配置信息表,然后针对不同类型的馈线开关,设计其分布式智能馈线自动化控制方法,并开发出相应的分布式智能馈线自动化系统。

Description

分布式智能馈线自动化控制方法 技术领域
本发明涉及一种基于对等通信网络与分布式智能的中压配电网馈线故障定位、 隔离与供 电恢复的通用控制方法, 特别是一种分布式智能馈线自动化控制方法。
背景技术
馈线自动化 (FA) 主要用于实现配网线路的故障定位、 隔离与供电恢复, 可以减少故障 停电时间, 缩小停电范围, 提高供电可靠性。 目前 FA 主要采用集中控制方式, 依靠主站采 集并处理馈线终端(FTU)送上来的故障信息进行故障定位, 遥控分段开关实现故障隔离与网 络重构, 其非故障区段的供电恢复时间达到分钟级。 随着通信与计算机控制技术的发展, 目 前已开发出基于分布式智能的 FA系统, 安装在馈线开关处的 FTU通过对等通信网络相互交换 故障信息与控制信息, 进行故障定位、 隔离与网络重构操作, 使非故障区段的停电时间缩短 至秒级。 现有技术中, 美国 S&C公司开发的 Intel l iTEAM FA系统, 提出了基于分布式智能控 制的架空线路故障恢复重构方案,根据馈线拓扑结构, 将分段开关分组成若干个控制小组
( team), 控制小组中选择一个 coach负责收集并处理小组成员(team member)的故障信息, 实现故障自愈控制, 但是由于采用逐段恢复的策略, 供电恢复速度较慢。 另外, 现有技术中 还提出采用无线通信技术,将 FTU数据通过串行口接入无线对等通信网络实现分布式智能 FA, 然而整个供电恢复过程也需要 10s以上的时间。 其他的, 还有提出基于 CAN总线对等通信的 网络式配网保护系统,以及提出利用通用面向对象变电站事件 (GOOSE) 的高速网络对等通信 方式的快速自愈方案, 这两种方法针对线路开关均为断路器的情况。
发明内容
本发明的目的在于根据现有技术的不足之处而提供一种有效、 可靠、 能够极大缩短供电 恢复过程的分布式智能馈线自动化控制方法。
本发明的目的是通过以下途径来实现的:
分布式智能馈线自动化控制方法, 其要点在于, 包括如下步骤:
提供分布式智能 FA系统, 其具有复数个馈线终端 FTU, 每个馈线终端 FTU均链接并监 控一个或者多个开关;
对每个 FTU进行编号, 用字母表示, 按顺序依次为 1, 2, . . . N, N为馈线上 FTU的个数; 为每一个 FTU建立开关配置信息表, 对每个 FTU监控的所有开关进行编号, 然后用区 别于 FTU标示的字母标示被监控开关的类型及其相邻开关的信息, 其中开关类型分为 M端 电源开关, N端电源开关, 干线分段开关, 支线中间开关, 支线末端开关和联络开关, 依次 编号为 1-6; 其邻近开关的信息包括邻近开关的 FTU号, 及其在 FTU中的编号;
发生故障时, 根据上述 FTU的开关配置表, 采集 FTU根据本地所监控的开关及相邻开关 的测量信息, 根据信息反馈逐级进行监控, 完成故障定位、 隔离故障和供电恢复操作。
与现有技术相比本发明的有益效果是:
通过分布式智能 FA通用控制方法, 能够在 1.5s内完成非故障区段的供电恢复, 能够显 著地减少故障停电时间; 本发明所述方法通用性强, 适用于架空线、 电缆及架空线 /电缆混合 线路; FTU根据本地所监控的开关及相邻开关的测量信息, 即可完成故障定位、 隔离与供电 恢复操作, 整定配置简单。 现场测试及应用结果表明, 系统可以在保护动作跳闸后 600ms内 完成馈线故障定位、 隔离操作, 在 1. 5s内实现非故障区段的供电恢复操作。
附图说明
附图 1为采用所述分布式智能馈线自动化控制方法进行开关故障定位、 隔离的操作流程 图;
附图 2为采用所述分布式智能馈线自动化控制方法进行开关供电恢复操作流程图; 附图 3为基于智能馈线自动化控制方法的架空线路分布式智能 FA系统示意图; 附图 4为基于智能馈线自动化控制方法的电缆线路分布式智能 FA统示意图;
附图 5为基于智能馈线自动化控制方法的架空线 /电缆混合线路 FA系统示意图; 附图 6为基于智能馈线自动化控制方法的现场电缆环网供电线路示意图。
下面结合附图对本发明做进一步阐述。
具体实施方式
本发明解决其技术问题所采用的技术方案是: 在分布式智能 FA系统中, FTU控制被监 控的开关, 完成故障定位、 隔离与供电恢复操作, 需要建立 FTU的开关配置信息表。 FTU的开关配置信息表是通过如下方法实现的: 首先对馈线上的所有 FTU进行编号, 用 a表示, 按顺序依次为 1,2, ...N, N为馈线上 FTU的个数。 每个 FTU可能只监控一个开关 (断路器或者柱上开关), 也可能监控同一环网柜的多个 开关。 给每一个 FTU建立开关配置信息表, 对 FTU监控的所有开关进行编号, 然后标示被 监控开关的类型 (用 b表示)及其相邻开关的信息, 其中开关类型分为 M端电源开关, N端 电源开关, 干线分段开关, 支线中间开关, 支线末端开关和联络开关, 依次编号为 1-6, 如表 1所示; 其邻近开关的信息包括邻近开关的 FTU号, 及其在 FTU中的编号。
类别 编号 类别 编号
M端电源开关 1 支线中间开关 4
N端电源开关 2 支线末端开关 5 干线分段开关 3 联络开关 6
表 1 如图 1所示, 对于 FTU监控的馈线开关, 其故障信息包括开关过流信息, 邻侧开关的过 流信息及联络开关的两侧失压信息, 如表 2所示。 当故障开关与其邻侧开关被同一 FTU监控 时, 所有故障信息由当地 FTU监控获得; 当故障开关与邻侧开关被不同 FTU监控时, 其邻 侧的开关的过流信息通过对等通信网络由远方获得。
¾J 标示
开关检测到过流
开关 M侧某一邻近开关过流 c2
开关 N侧某一邻近开关过流 c3
联络开关 M侧失压 c4
联络开关 N侧失压 c5
表 2 如图 1所示, cl=l表示开关检测到过流; c2=0表示开关 M侧邻近开关均无过流; c3=0 表示开关 N侧邻近开关均无过流, 具体流程是: 当开关检测到过流, 则判断保护是否动作, 如果保护有动作, 则进一步判断开关的类型: 判断开关类型是否为 1 (M端电源开关), 如果 是, 则判断开关 N侧邻近开关是否均无过流 (c3=0), 如果不是, 判断开关类型是否为 2 (N 端电源开关), 如果是, 则判断开关 M侧邻近开关是否均无过流 (c2=0), 依序判别后, 发送 相应的跳闸命令给相应开关, 最后实现故障隔离。 如图 2所示, c2=l : 开关 M侧邻近开关过流; c3=l : 开关 N侧邻近开关过流; c4=0: 联 络开关 M侧有压; c5=0: 联络开关 N侧有压。 当故障隔离成功后, 判断开关的类型是否为 1 (M端电源开关)、 2 (N端电源开关) 或者是 6 (联络开关), 如果是, 进一步判断是否收到 重合闸闭锁信息, 直到重合闸成功。 如果开关为 b6联合开关, 则需要判断各个开关是否过流 或者有压, 并根据判断情况进行重合闸。 根据上述方法, 在实际应用中可以构建如下几种不 同的系统。
如图 6所示: 在实际应用中, 利用分布式智能馈线自动化通用控制方法, 开发了一 FA 系统在电缆环网供电线路现场试运行, 该线路包含 4个环网柜, 分别为湖西立交环网柜、 湖 西海湾 #1环网柜、 湖西污水环网柜以及滨南污水环网柜, 湖西立交环网柜的 901开关与滨南 污水环网柜的 901开关为断路器, 其余开关为负荷开关, 其中湖西污水环网柜的 902开关正 常运行时处于分闸状态,为联络开关。在电缆线路上的各环网柜处安装分布式智能终端 FTU, 进一步根据本发明所述方法对每个 FTU和其所监控的开关建立开关配置信息表如表 3, 如 FTU1标示为 al, 903负荷开关为支线末端开关 b5。
表 3
M侧开关 N侧开关
FTU FTU编号 被监控开关 开关编号 开关类型
FTU编号 开关编号 FTU编号 开关编号
901 1 1 0 0 1 2, 3, 4, 5, 6
902 2 3 1 1, 3, 4, 5, 6 2 1
903 3 5 1 1, 2 0 0
FTU 1 1
904 4 5 1 1, 2 0 0
905 5 5 1 1, 2 0 0
906 6 5 1 1, 2 0 0
901 1 3 1 2 2 2, 3, 4
903 2 3 2 1, 3, 4 3 1
FTU 2 2
905 3 5 2 1, 2 0 0
907 4 5 2 1, 2 0 0
FTU 3 3 902 1 6 2 2 3 2, 3, 4, 5, 6 901 2 3 3 1, 3, 4, 5, 6 4 1
903 3 5 3 1, 2 0 0
904 4 5 3 1, 2 0 0
905 5 5 3 1, 2 0 0
906 6 5 3 1, 2 0 0
902 1 3 3 2 4 2, 3, 4, 5
901 2 2 4 1, 3, 4, 5 0 0
FTU 4 4 903 3 5 4 1, 2 0 0
904 4 5 4 1, 2 0 0
905 5 5 4 1, 2 0 0
如图 3及表 4所示: 架空线路分布式智能 FA系统。 假设 F点发生永久故障, 变电站出 口断路器 CB1跳闸并重合失败后, 检测到过流现象的 FTU启动 FA算法, 并与相邻 FTU交 换故障检测信息。 故障点上游分段开关处的 FTU2检测到故障信息, 而故障点下游分段开关 处的 FTU3未检测到故障信息, 因此判断出故障位于 FTU2与 FTU3之间, FTU2与 FTU3分 别控制 S1和 S2跳闸隔离故障, 然后发出启动恢复供电信号, FTU1与 FTU4分别控制 CB1 与 S3合闸, 恢复非故障区段供电。
表 4
M侧开关 N侧开关
FTU FTU编号 被监控开关 开关编号 开关类型 b
FTU编号 开关编号 FTU编号 开关编号
FTU 1 1 CB1 1 1 0 0 2 1
FTU 2 2 S1 1 3 1 1 3 1
FTU 3 3 S2 1 3 2 1 4 1
FTU 4 4 S3 1 6 3 1 5 1
FTU 5 5 S4 1 3 4 1 6 1
Figure imgf000008_0001
如图 4及表 5所示: 电缆线路分布式智能 FA系统。 其系统构成与架空线路分布式智能 FA系统类似, 不同之处在于每个 FTU监控环网柜中的多个开关, 馈线故障点可能位于环网 柜之间、 环网柜母线或者环网柜出线上。 假如环网柜之间线路上 F1 点发生故障, FTU控制 故障线路两侧环网柜 RMU1与 RMU2的进线开关 S12 S21跳闸隔离故障, 然后合上断路器 CB1 RMU3的联络开关 S31恢复 RMU1与 RMU2的供电; 假如 RMU2母线上 F2点发生故 障, FTU控制 RMU2的所有开关 (进线开关 S21 S22和出线开关 S23 ) 跳闸隔离故障, 然 后合上断路器 CB1, 恢复 RMUl供电, 而 RMU2停电等待检修; 假如 RMU2出线上 F3点发 生故障, FTU控制 RMU2的出线开关 S23跳闸隔离故障, 然后断路器 CB1合闸恢复 RMU1 和 RMU2的供电。
表 5
M侧开关 N侧开关 开关 开关
FTU FTU编号 被监控开关 FTU编 开关编 FTU编 开关编 编号 类型
FTU 1 1 CB1 1 1 0 0 2 1
S11 1 3 1 1 2 2 3
FTU 2 2 S12 2 3 2 1 3 3 1
S13 3 5 2 1, 2 0 0
S21 1 3 2 2 3 2, 3
FTU 3 3 S22 2 3 3 1, 3 4 1
S23 3 5 3 1 2 0 0
S31 1 6 3 2 4 2 3
FTU 4 4 S32 2 3 4 1 3 5 1
S33 3 5 4 1, 2 0 0 S41 1 4 2 2 5 2, 3
FTU 5 5 S42 2 3 5 1, 3 6 1
S43 3 5 5 1, 2 0 0
FTU 6 6 CB2 1 2 5 2 0 0
如图 5和表 6所示: 混合线路上的架空线故障与电缆线路故障的故障定位、 隔离与供电 恢复操作过程同上述。 而在架空线与电缆邻接线路故障时,需要控制故障点两侧的架空线柱上 开关及环网柜的进线开关跳闸以隔离故障。 假如图 3所示 F点发生故障时, FTU控制故障点 两侧的开关 (柱上开关 S1和 RMU1 的进线开关 S11 ) 跳闸隔离故障, 然后控制断路器 CB1 和 RMU1的联络开关 S12合闸以恢复非故障区段的正常供电。
表 6
Figure imgf000009_0001
本发明未述部分与现有技术相同。

Claims

WO 2014/201989 权 要 求 书 PCT/CN2014/080041
1、 分布式智能馈线自动化控制方法, 其特征在于, 包括如下步骤:
提供分布式智能 FA系统, 其具有复数个馈线终端 FTU, 每个馈线终端 FTU均链接并监 控一个或者多个开关;
对每个 FTU进行编号, 用字母表示, 按顺序依次为 1, 2, . . . N, N为馈线上 FTU的个数; 为每一个 FTU建立开关配置信息表, 对每个 FTU监控的所有开关进行编号, 然后用区 别于 FTU标示的字母标示被监控开关的类型及其相邻开关的信息, 其中开关类型分为 M端 电源开关, N端电源开关, 干线分段开关, 支线中间开关, 支线末端开关和联络开关, 依次 编号为 1-6; 其邻近开关的信息包括邻近开关的 FTU号, 及其在 FTU中的编号;
发生故障时, 根据上述 FTU的开关配置表, 采集 FTU根据本地所监控的开关及相邻开关的测 量信息, 根据信息反馈逐级进行监控, 完成故障定位、 隔离故障和供电恢复操作。
PCT/CN2014/080041 2013-06-19 2014-06-17 分布式智能馈线自动化控制方法 Ceased WO2014201989A1 (zh)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201310244663.3 2013-06-19
CN201310244663.3A CN103354390B (zh) 2013-06-19 2013-06-19 分布式智能馈线自动化控制方法

Publications (1)

Publication Number Publication Date
WO2014201989A1 true WO2014201989A1 (zh) 2014-12-24

Family

ID=49310725

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2014/080041 Ceased WO2014201989A1 (zh) 2013-06-19 2014-06-17 分布式智能馈线自动化控制方法

Country Status (2)

Country Link
CN (1) CN103354390B (zh)
WO (1) WO2014201989A1 (zh)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111289839A (zh) * 2020-03-11 2020-06-16 国网河北省电力有限公司电力科学研究院 一种配网单相接地故障区段定位方法
CN111327465A (zh) * 2020-02-14 2020-06-23 珠海欧力配网自动化股份有限公司 智能分布式馈线自动化终端节点配置方法
CN111651845A (zh) * 2020-05-28 2020-09-11 广东电网有限责任公司 配电网故障定位方法、装置、电子设备及存储介质
CN111952929A (zh) * 2020-08-13 2020-11-17 广东电网有限责任公司 一种配网馈线自动化终端自愈误合闸判别方法及判别装置
CN112290518A (zh) * 2020-10-23 2021-01-29 珠海许继电气有限公司 一种基于5g通信的智能分布式馈线保护方法及系统
CN113541109A (zh) * 2021-07-02 2021-10-22 国网浙江省电力有限公司金华供电公司 一种基于电力无线专网的馈线故障处理系统及方法
CN114336545A (zh) * 2021-12-15 2022-04-12 北京科锐配电自动化股份有限公司 一种具有自适应通信速率能力的分布式保护方法、介质
CN114726087A (zh) * 2022-02-28 2022-07-08 国网湖北省电力有限公司孝感供电公司 一种配电网馈线自动化故障处理方法、系统及电子设备
CN114844213A (zh) * 2022-05-13 2022-08-02 国网山东省电力公司滨州供电公司 一种基于配网自动化终端的配套小区节能系统及方法
CN115062798A (zh) * 2022-05-16 2022-09-16 中国南方电网有限责任公司 基于停电信息池的配网报障信息的研判方法及装置
CN115149526A (zh) * 2022-08-04 2022-10-04 四川电力设计咨询有限责任公司 有源配电网有计划孤岛时分布式馈线自动化供电恢复方法
CN115693648A (zh) * 2022-09-28 2023-02-03 国网浙江省电力有限公司海宁市供电公司 一种配电网线路故障自愈方法及系统
CN119010005A (zh) * 2024-08-23 2024-11-22 国网江苏省电力有限公司连云港供电分公司 一种提高环网开关死区故障下供电可靠性的方法及系统
CN121440617A (zh) * 2025-12-29 2026-01-30 帝凯(福建)电力成套设备有限公司 一种数字化环网柜的智能配电运行调控系统

Families Citing this family (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103354390B (zh) * 2013-06-19 2015-12-02 国家电网公司 分布式智能馈线自动化控制方法
CN103855810B (zh) * 2014-03-31 2016-11-23 国网上海市电力公司 一种用于110千伏变电站的自愈安稳系统
CN104113141B (zh) * 2014-07-30 2016-06-22 国网电力科学研究院 一种智能纵向互联馈线自动化控制方法
CN104767182B (zh) * 2015-01-20 2017-12-08 国家电网公司 一种架空线路型配电网故障处理方法
CN106154113B (zh) * 2016-06-24 2019-01-08 国网江苏省电力公司常州供电公司 有源配电网分布式馈线自动化故障定位方法
CN106814267B (zh) * 2016-12-07 2019-06-11 珠海许继电气有限公司 一种基于拓扑的配电台区故障研判的实现方法
CN107069676B (zh) * 2016-12-09 2019-08-20 国家电网公司 配电网故障定位及快速隔离恢复控制方法
CN106646124B (zh) * 2016-12-09 2019-03-26 国网江苏省电力公司淮安供电公司 一种高渗透分布式电源的馈线故障自适应诊断方法
CN106532663B (zh) * 2016-12-09 2019-04-12 国网北京市电力公司 配电线路自反馈控制方法和装置
CN106787216A (zh) * 2017-02-27 2017-05-31 武汉浩宏科技有限公司 一种用于多电源环网结构中的智能分布式fa系统
CN107465177B (zh) * 2017-10-11 2019-08-27 山东理工大学 一种基于区域代理的配电网小电流接地故障隔离方法
CN108233345A (zh) * 2018-02-14 2018-06-29 广西思维奇电力工程咨询有限公司 一种智能分布式配网馈线故障快速切除隔离方法
CN108306265A (zh) * 2018-02-14 2018-07-20 广西思维奇电力工程咨询有限公司 一种智能分布式配网馈线故障处理方法
CN108306264A (zh) * 2018-02-14 2018-07-20 广西思维奇电力工程咨询有限公司 一种智能分布式配网馈线故障快速处理方法
CN109818373A (zh) * 2019-04-02 2019-05-28 国网黑龙江省电力有限公司电力科学研究院 含高渗透分布式电源配电网的故障恢复性重构方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102306956A (zh) * 2011-09-14 2012-01-04 宁波市鄞州供电局 一种馈线自动化系统
CN102497027A (zh) * 2011-12-20 2012-06-13 浙江省电力公司 数字化故障录波装置自动建模的方法
CN102709889A (zh) * 2012-05-29 2012-10-03 长园深瑞继保自动化有限公司 电力配电网络故障自愈方法和系统
US20120294214A1 (en) * 2010-01-19 2012-11-22 Samsung Electronics Co. Ltd. Method and apparatus for switching a frequency assignment in a wireless communication system
CN103051059A (zh) * 2012-12-13 2013-04-17 上海市电力公司 一种智能配网小区的馈线自动化实现方法
CN103354390A (zh) * 2013-06-19 2013-10-16 国家电网公司 分布式智能馈线自动化控制方法

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102981103A (zh) * 2012-11-19 2013-03-20 山东理工大学 利用故障信号自同步实现闭环网故障定位的方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120294214A1 (en) * 2010-01-19 2012-11-22 Samsung Electronics Co. Ltd. Method and apparatus for switching a frequency assignment in a wireless communication system
CN102306956A (zh) * 2011-09-14 2012-01-04 宁波市鄞州供电局 一种馈线自动化系统
CN102497027A (zh) * 2011-12-20 2012-06-13 浙江省电力公司 数字化故障录波装置自动建模的方法
CN102709889A (zh) * 2012-05-29 2012-10-03 长园深瑞继保自动化有限公司 电力配电网络故障自愈方法和系统
CN103051059A (zh) * 2012-12-13 2013-04-17 上海市电力公司 一种智能配网小区的馈线自动化实现方法
CN103354390A (zh) * 2013-06-19 2013-10-16 国家电网公司 分布式智能馈线自动化控制方法

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111327465B (zh) * 2020-02-14 2022-12-13 珠海欧力配网自动化股份有限公司 智能分布式馈线自动化终端节点配置方法
CN111327465A (zh) * 2020-02-14 2020-06-23 珠海欧力配网自动化股份有限公司 智能分布式馈线自动化终端节点配置方法
CN111289839A (zh) * 2020-03-11 2020-06-16 国网河北省电力有限公司电力科学研究院 一种配网单相接地故障区段定位方法
CN111289839B (zh) * 2020-03-11 2022-09-09 国网河北省电力有限公司电力科学研究院 一种配网单相接地故障区段定位方法
CN111651845A (zh) * 2020-05-28 2020-09-11 广东电网有限责任公司 配电网故障定位方法、装置、电子设备及存储介质
CN111651845B (zh) * 2020-05-28 2023-09-29 广东电网有限责任公司 配电网故障定位方法、装置、电子设备及存储介质
CN111952929A (zh) * 2020-08-13 2020-11-17 广东电网有限责任公司 一种配网馈线自动化终端自愈误合闸判别方法及判别装置
CN111952929B (zh) * 2020-08-13 2022-08-16 广东电网有限责任公司 一种配网馈线自动化终端自愈误合闸判别方法及判别装置
CN112290518A (zh) * 2020-10-23 2021-01-29 珠海许继电气有限公司 一种基于5g通信的智能分布式馈线保护方法及系统
CN113541109A (zh) * 2021-07-02 2021-10-22 国网浙江省电力有限公司金华供电公司 一种基于电力无线专网的馈线故障处理系统及方法
CN114336545A (zh) * 2021-12-15 2022-04-12 北京科锐配电自动化股份有限公司 一种具有自适应通信速率能力的分布式保护方法、介质
CN114726087A (zh) * 2022-02-28 2022-07-08 国网湖北省电力有限公司孝感供电公司 一种配电网馈线自动化故障处理方法、系统及电子设备
CN114844213A (zh) * 2022-05-13 2022-08-02 国网山东省电力公司滨州供电公司 一种基于配网自动化终端的配套小区节能系统及方法
CN115062798A (zh) * 2022-05-16 2022-09-16 中国南方电网有限责任公司 基于停电信息池的配网报障信息的研判方法及装置
CN115149526A (zh) * 2022-08-04 2022-10-04 四川电力设计咨询有限责任公司 有源配电网有计划孤岛时分布式馈线自动化供电恢复方法
CN115693648A (zh) * 2022-09-28 2023-02-03 国网浙江省电力有限公司海宁市供电公司 一种配电网线路故障自愈方法及系统
CN119010005A (zh) * 2024-08-23 2024-11-22 国网江苏省电力有限公司连云港供电分公司 一种提高环网开关死区故障下供电可靠性的方法及系统
CN121440617A (zh) * 2025-12-29 2026-01-30 帝凯(福建)电力成套设备有限公司 一种数字化环网柜的智能配电运行调控系统

Also Published As

Publication number Publication date
CN103354390A (zh) 2013-10-16
CN103354390B (zh) 2015-12-02

Similar Documents

Publication Publication Date Title
WO2014201989A1 (zh) 分布式智能馈线自动化控制方法
CN109347093B (zh) 一种主站与就地控制结合的配电网自愈控制方法
CN109193582B (zh) 一种智能配电网区域保护控制系统及控制方法
CN102270836B (zh) 配电网广域过电流保护方法
CN102411117B (zh) 一种基于分布式智能多重校准的配电网短路故障定位方法
CN102213735B (zh) 一种配电自动化典型试验网络
CN109713794B (zh) 一种分布式智能自恢复系统及方法
CN107394897A (zh) 一种基于拓扑图的配电网智能自愈方法及系统
CN103887879B (zh) 花瓣型配电网保护控制系统
CN103606910A (zh) 一种基于广域信息的配电网馈线出口死区的故障自愈方法
WO2017166735A1 (zh) 110kV链式供电模式下的电网自愈系统及其自愈逻辑
CN103872660B (zh) 基于电力网络闭环模式运行的网络式保护方法
CN205753377U (zh) 基于配电自动化终端的环网合环网架系统
CN109768527B (zh) 一种智能牵引变电站层次化保护方法及系统
CN102290799B (zh) 一种开环运行配电网小规模快速供电恢复方法
CN108957243A (zh) 一种应用于配电网的单相接地故障定位方法及系统
CN101741137B (zh) 网络集中式备用电源自动投入方法
CN103336220A (zh) 对配电网故障进行监测和定位的方法和装置
CN103001193A (zh) 一种用于分界故障处理的集中型馈线自动化控制方法
CN103490392A (zh) 含分布式电源或微网的配电网的故障处理方法
CN107846015B (zh) 基于对等式通讯的智能配电网负荷转供最优路径选择方法
CN106026088A (zh) 基于负荷分层分区转移的配电网自动化策略
CN104701825A (zh) 一种适用于智能配电网的快速保护方法
CN205231842U (zh) 一种新型网络备自投系统
CN119050968A (zh) 一种中压配电网就地分布式区域保护自愈方法及系统

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 14813138

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 14813138

Country of ref document: EP

Kind code of ref document: A1