WO2014157748A1 - 최근린기법을 이용한 하수처리장의 유입유량과 유입성분농도의 예측 장치 및 방법 - Google Patents

최근린기법을 이용한 하수처리장의 유입유량과 유입성분농도의 예측 장치 및 방법 Download PDF

Info

Publication number
WO2014157748A1
WO2014157748A1 PCT/KR2013/002567 KR2013002567W WO2014157748A1 WO 2014157748 A1 WO2014157748 A1 WO 2014157748A1 KR 2013002567 W KR2013002567 W KR 2013002567W WO 2014157748 A1 WO2014157748 A1 WO 2014157748A1
Authority
WO
WIPO (PCT)
Prior art keywords
data
sewage treatment
treatment plant
inflow
unit
Prior art date
Application number
PCT/KR2013/002567
Other languages
English (en)
French (fr)
Inventor
김창원
김예진
김효수
김민수
박문화
Original Assignee
부산대학교 산학협력단
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 부산대학교 산학협력단 filed Critical 부산대학교 산학협력단
Publication of WO2014157748A1 publication Critical patent/WO2014157748A1/ko

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F3/00Biological treatment of water, waste water, or sewage
    • C02F3/006Regulation methods for biological treatment
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F17/00Digital computing or data processing equipment or methods, specially adapted for specific functions
    • G06F17/10Complex mathematical operations
    • G06F17/18Complex mathematical operations for evaluating statistical data, e.g. average values, frequency distributions, probability functions, regression analysis
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2209/00Controlling or monitoring parameters in water treatment
    • C02F2209/001Upstream control, i.e. monitoring for predictive control
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2209/00Controlling or monitoring parameters in water treatment
    • C02F2209/005Processes using a programmable logic controller [PLC]
    • C02F2209/006Processes using a programmable logic controller [PLC] comprising a software program or a logic diagram
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2209/00Controlling or monitoring parameters in water treatment
    • C02F2209/08Chemical Oxygen Demand [COD]; Biological Oxygen Demand [BOD]
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2209/00Controlling or monitoring parameters in water treatment
    • C02F2209/10Solids, e.g. total solids [TS], total suspended solids [TSS] or volatile solids [VS]
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2209/00Controlling or monitoring parameters in water treatment
    • C02F2209/16Total nitrogen (tkN-N)
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2209/00Controlling or monitoring parameters in water treatment
    • C02F2209/18PO4-P
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2209/00Controlling or monitoring parameters in water treatment
    • C02F2209/40Liquid flow rate

Definitions

  • the present invention relates to an apparatus and method for predicting the inflow flow rate and the inflow component concentration of a sewage treatment plant using the latest lean technique.
  • a similar vector which is a data pair having a vector most similar to the data of the time point to be currently predicted, is selected from the accumulated data in the past. Deriving the weight using the distance value of the similar vector, and predicting the inflow and concentration of the sewage treatment plant using a recent Lean technique that predicts the inflow and the concentration of the influent components of the sewage treatment plant using the derived weight.
  • This model development can be divided into two types: i) Deterministic model, which is basically expressed in the form of differential equations based on mechanisms and mass balance related to process, and ii) Process. It can be said that it has been developed into a data driven model that simulates the target variable based on the measured data obtained from the data.
  • a set of various theoretical equations built into SWMM a commercial program for measuring the sewage and flow rate of sewage in the sewage pipe network, may be a representative example of a mathematical model having the same purpose as the present invention, and is widely used for modeling nonlinear data.
  • An artificial neural network can be a representative example of a data-driven model.
  • the present invention has been made to solve such a problem, and does not require tuning using a large amount of cumulative data, and can be easily installed in a system and does not require periodic tuning when applied to actual situations. That is, the present invention provides an apparatus and method for predicting the inflow and inflow component concentrations of sewage treatment plant using the latest lean technique to predict the future inflow and inflow component concentration of sewage treatment plant using time series modeling based on similar vector selection. Its purpose is to.
  • the data collection unit for collecting data of the inflow flow rate and inflow component concentration of the sewage treatment plant;
  • a data preprocessing unit which receives data collected by the data collecting unit and removes an outlier from the data and inputs a complementary value for the outlier to preprocess the data;
  • a similar vector selection unit for selecting similar vectors, which are data pairs having a vector most similar to the data pairs of one day and two days before the point of time to be predicted, based on the data preprocessed by the data preprocessor; And a constant weight is distributed based on the distance values of the similar vectors selected by the similar vector selection unit, and the weights are applied to the data one day and two days before the time point to be predicted, and the inflow flow rate and inflow components of the sewage treatment plant.
  • Data prediction unit for predicting the concentration including, wherein the influent component concentration is at least any one or more selected from BOD 5 , COD Mn , SS, TN, TP Influent flow rate and inflow of the sewage treatment plant using the latest lean method Provided is an apparatus for predicting component concentration.
  • the data collection unit includes a database for storing data of the inflow flow rate and influent component concentration of the sewage treatment plant, and a data set setting unit for setting the desired number of data sets from the database to align the set data set; It features.
  • the data pre-processing unit complements an outlier removal unit that removes an outlier that may reduce the reliability of data among the inflow flow rate and inflow component concentration data of the sewage treatment plant, and complements the outliers at the time when the outlier removal unit is removed
  • an outlier removal unit that removes an outlier that may reduce the reliability of data among the inflow flow rate and inflow component concentration data of the sewage treatment plant.
  • the outlier removal unit is configured to set the upper control limit (UCL) and the lower control limit (Lower Control Limit, LCL) as shown in the following equation, the control chart for determining the value out of the management upper limit and the lower management limit as an outlier.
  • the technique is used to eliminate outliers.
  • the pseudo-vector selection unit Euclid distance calculation unit for calculating the distance between the data corresponding to each time point of the pre-processed data using the Euclidean distance calculation method and the data of one time and two days before the time point, and the calculated value
  • a distance reference value deriving unit for deriving a distance reference value by multiplying the distance value having the smallest value among the golden division ratios, and a data selection unit for selecting a similar vector which is a data pair having a distance value less than the derived distance reference value. It features.
  • the data prediction unit multiplies the weight calculation unit for allocating the selected similar vector to the weights according to the following equation, and the data at one time and two days before the time point to predict the weights distributed by the weight calculation unit, respectively.
  • a predicting unit for predicting the inflow flow rate and the inflow component concentration of the sewage treatment plant by adding the multiplied values.
  • a data input step of receiving data of the inflow flow rate and influent component concentration from the sewage treatment plant A data preprocessing step of preprocessing the data by removing an outlier from the input data and inputting a complementary value to the outlier;
  • the Euclidean distance calculation method uses the Euclidean distance calculation method, the distance between the data corresponding to each time point of the preprocessed data and the data one day and two days before the time point, and the golden split ratio is applied to the distance value having the smallest value among the calculated values.
  • an upper control limit (UCL) and a lower control limit (LCL) are set as shown in the following equation, and a control chart for judging values outside the management upper limit and the lower limit is considered an outlier.
  • the method removes an outlier using a technique, and complements the outlier to maintain a data set by applying data average values of the previous day and the next day to the outlier to compensate for the outlier at the time of removal. It is done.
  • the method may further include a data search range setting step of searching for a similar vector with respect to the set data search range by setting a search range of data to be searched by a user for the data preprocessed in the data preprocessing step. It is done.
  • FIG. 1 is a block diagram showing an apparatus for predicting the inflow flow rate and influent component concentration of the sewage treatment plant using the latest lean method according to an embodiment of the present invention.
  • FIG. 2 is a flowchart illustrating a method of predicting the inflow flow rate and the inflow component concentration of a sewage treatment plant using a recent lean technique according to an embodiment of the present invention.
  • 3A to 3F are graphs comparing the prediction result and the measurement result one day after the current time point of each target variable executed according to the prediction method of FIG. 2.
  • 4A to 4F are graphs comparing the prediction result and the measurement result one week after the current time point of the target variables executed according to the prediction method of FIG. 2.
  • the data collection unit for collecting data of the inflow flow rate and inflow component concentration of the sewage treatment plant;
  • a data preprocessing unit which receives data collected by the data collecting unit and removes an outlier from the data and inputs a complementary value for the outlier to preprocess the data;
  • a similar vector selection unit for selecting similar vectors, which are data pairs having a vector most similar to the data pairs of one day and two days before the point of time to be predicted, based on the data preprocessed by the data preprocessor; And a constant weight is distributed based on the distance values of the similar vectors selected by the similar vector selection unit, and the weights are applied to the data one day and two days before the time point to be predicted, and the inflow flow rate and inflow components of the sewage treatment plant.
  • Data prediction unit for predicting the concentration including, wherein the influent component concentration is at least any one or more selected from BOD 5 , COD Mn , SS, TN, TP Influent flow rate and inflow of the sewage treatment plant using the latest lean method Provided is an apparatus for predicting component concentration.
  • FIG. 1 is a block diagram showing an apparatus for predicting the inflow flow rate and influent component concentration of the sewage treatment plant using the recent lean technique according to an embodiment of the present invention
  • Figure 2 is a sewage treatment plant using the recent lean technique according to an embodiment of the present invention
  • 3A to 3F are graphs comparing the prediction result and the measurement result one day after the current time point of each target variable executed according to the prediction method of FIG. 2.
  • 4A through 4F are graphs comparing the prediction result and the measurement result one week after the current time point of the target variables executed according to the prediction method of FIG. 2.
  • the apparatus 10 for predicting the inflow flow rate and the inflow component concentration of a sewage treatment plant includes a data collection unit 100, a data preprocessor 200, a pseudo vector search unit 300, and data.
  • the prediction unit 400 is included.
  • the influent component concentration is preferably at least any one selected from BOD 5 , COD Mn , SS, TN, TP.
  • the data collection unit 100 collects data of inflow flow rate and inflow component concentration of the sewage treatment plant. That is, the data collection unit 100 collects the inflow flow rate and inflow component concentration (BOD 5 , COD Mn , SS, TN, TP) which are measured once a day in the sewage treatment plant.
  • the data collection unit 100 arranges the set data set by setting the desired number of data sets from the database 110 and the database 110 storing data of the inflow flow rate and inflow component concentration of the sewage treatment plant. It includes a data set setting unit 120 to.
  • the data set setting unit 120 may be set in advance in the data collection unit 100 or may be set based on data preprocessed in the data preprocessor 200 to be described later. Therefore, the user can arbitrarily set 30, 90, 365, and 730 data sets of data stored in the database 110.
  • the set data set is used to predict the inflow flow rate and the inflow component concentration of the sewage treatment plant. To become data.
  • the data preprocessor 200 receives data collected by the data collector 100 to remove outliers from the data and inputs complementary values for the outliers to preprocess the data. .
  • the data pretreatment unit 200 includes an outlier removal unit 210 for removing an outlier that may reduce the reliability of data among inflow flow rates and inflow component concentration data of the sewage treatment plant, and the outlier removal unit 210.
  • an outlier removal unit 210 for removing an outlier that may reduce the reliability of data among inflow flow rates and inflow component concentration data of the sewage treatment plant, and the outlier removal unit 210.
  • the outlier removal unit 210 In order to compensate for the outlier of the time point removed in the outlier complementary unit 220 to maintain the data set by applying the data average value of the previous day and the next day of the removed time point.
  • the outliers are data that may reduce the reliability of data among the data obtained from the sewage treatment plant, and are removed because they may interfere with the implementation of accurate prediction models. Complementing the outliers is to compensate for the outliers by applying the average of the data before and after the corresponding point in time to compensate for the gap in time series data due to the removal of the outliers.
  • the outlier removal unit 210 sets an upper control limit (UCL) and a lower control limit (LCL) as shown in the following equation, and determines a value out of the management upper limit and the management lower limit as an outlier. It is desirable to remove outliers using control chart techniques.
  • UCL upper control limit
  • LCL lower control limit
  • the similar vector selection unit 300 selects a similar vector, which is a data pair having a vector most similar to the data pairs of one day and two days before the point of time to be predicted, based on the data preprocessed by the data preprocessor 200. Play a role.
  • the pseudo vector selection unit 300 calculates a Euclidean distance between the data corresponding to each time point of the preprocessed data using the Euclidean distance method, and the distance between the data one day and two days before the time point.
  • the unit 310 a distance reference value deriving unit 320 for deriving a distance reference value by multiplying the distance value having the smallest value among the calculated values by a golden division ratio, and data having a distance value less than the derived distance reference value.
  • a data selector 330 for selecting a pair of similar vectors.
  • the data predictor 400 distributes a predetermined weight based on the distance values of the similar vectors selected by the similar vector selection unit 300 and calculates the weights on the data of one and two days before the point of time to be predicted. It is applied to predict the flow rate and concentration of influent components in sewage treatment plant.
  • the data predictor 400 may include a weight calculator 410 for distributing the selected similar vector to the weights of the following equations, a day at a time point to predict the weights distributed by the weight calculator 410, and And a prediction unit 420 for predicting the inflow flow rate and the inflow component concentration of the sewage treatment plant by multiplying the data of two days ago and adding the multiplied values.
  • the weight calculator 410 calculates the weight by setting the sum of the inverses of the distance values of the selected similar vectors at each screening point as the denominator and placing the reciprocal of the distance values at the screening point in the numerator.
  • the present invention uses a recent Lean technique that can perform non-linear time series data prediction, and similar vector which is available data by analyzing the vector behavior of each time point and a day, two days ago to perform the latest Lean method
  • a distance criterion is set in order to select, and weights are distributed based on distance values for the selected similar vector to perform predictive modeling.
  • FIG. 2 describes the prediction method of the inflow flow rate and influent component concentration of the sewage treatment plant using the latest lean method according to the present invention.
  • the first step is a data input step of receiving data of inflow flow rate and inflow component concentration from the sewage treatment plant (S110).
  • the second step is a data preprocessing step of preprocessing data by removing an outlier from the input data and inputting a complementary value for the outlier at step S120.
  • the data that can search the similar vector for the set data search range by setting the search range of the data to be searched by the user for the data preprocessed in the data preprocessing step
  • the search range setting step S121 may be further included. This allows the user to set a desired search range from the number of data desired, for example, 30, 90, 365, 730, etc. In the following description, we will select and select 730 datasets.
  • the third step is to calculate the distance between the data corresponding to each time point of the pre-processed data and the data one day and two days before the time point using the Euclidean distance calculation method, the distance value having the smallest value among the calculated values Multiplying the golden division ratio to derive a distance reference value, and select a similar vector that is a data pair having a distance value less than the derived distance reference value (S130).
  • a constant weight is distributed based on the distance values of the selected similar vectors, and the weights are multiplied by the data at one time and two days before the point of time to be predicted, and the sums are added to the inflow of the sewage treatment plant. It is a data prediction step for predicting the flow rate and the concentration of influent components (S140).
  • the treatment capacity of the sewage treatment plant was selected as the target object for estimation of the sewage treatment plant 340,000m 3 / day of the inlet flow at a sewage treatment plant with a sewage treatment plant using the last N Lean and inlet concentrations when B.
  • Inflow water quality data (flow rate, BOD 5 , COD Mn , SS, TN, TP) from 2008 to 2010, which are actually measured in the target sewage treatment plant, will be collected through the data collection unit 100.
  • the data collected by the data collection unit 100 the data of 2008 and 2009 are subjected to data preprocessing, and 730 datasets subjected to data preprocessing are used in the prediction apparatus and the prediction method according to the present invention.
  • the remaining 2010 dataset will be used to verify the predictive performance of recent Lean techniques.
  • the data preprocessing step (S120) After going through the data collection step (S110) performed by the data collector 100, the data preprocessing step (S120) for removing the outliers and complementing the outliers. To this end, outliers, which may reduce the reliability of data among the data obtained from the sewage treatment plant, are removed because they are a obstacle in developing an accurate prediction model.
  • control chart technique is used to remove the outliers.
  • the upper control limit (UCL) and the lower control limit (LCL) are set as shown in the following equation, and values outside the management limit and the lower limit are regarded as outliers and removed.
  • the constant (A) is used as 3 with reference to the value proposed by Mjalli et al.
  • the model developer or the system operator After performing the above data preprocessing, the model developer or the system operator performs the pseudo vector selection step S130 through the Euclidean distance calculation method for the data search range set by the data search range setting step S121.
  • Similar vector selection step (S130) using the Euclidean distance calculation method used in the present invention is a method of finding the regularity from the data invisible regularity and performing the prediction and one day before, 2
  • the data are selected by the criterion of Euclidean distance. After that, the weights are distributed from the nearest data to increase the precision of the predicted value.
  • the present invention aims to predict the influent of a sewage treatment plant, and uses the Euclidean distance method as shown in the following equation for calculating distance for useful data selection based on preprocessed data to derive the value of each target variable. Was used.
  • a distance value having a minimum value among the calculated values is selected to select similar vectors for applying the Lean Lean method, and multiplied by the golden division ratio 1.62 to obtain a distance reference value.
  • a similar vector which is a data pair having a distance value less than the distance reference value, is selected by comparing the calculated distance value at each time point based on the derived distance reference value. Then, based on the similar vector selected through the data prediction step (S140), the sum of the inverses of the distance values at each screening time is defined as the denominator, and the weight of the inverse of the distance values at the screening time is placed in the numerator. Allocate
  • Wi is the weight at time i
  • D ⁇ 1 s, i is the inverse of the distance value at time i selected.
  • the derived weights are multiplied by the data at 1 day before and 2 days before the time point to be predicted, and the sum of the multiplied values predicts the inflow flow rate and the inflow component concentration to be predicted.
  • 3A to 3F illustrate results obtained by using the latest Lean technique and prediction results using 730 data sets for prediction one day after the current time point of each target variable according to an exemplary embodiment of the present invention.
  • FIG. 3A shows the inflow flow rate
  • FIG. 3B shows BOD 5
  • FIG. 3C shows COD Mn
  • FIG. 3D shows SS
  • FIG. 3E shows TN
  • FIG. 3F shows TP prediction results.
  • the quantitative evaluation of the influent prediction performance of the target sewage treatment plant using the recent Lean technique can be evaluated by the prediction accuracy (%) of the difference between the derived prediction value and the measured value.
  • the accuracy of the prediction is calculated by calculating the difference of average relative difference from the percentage of the actual measured value with the accuracy as 100 as shown in the following equation. Done.
  • Xm, i is a measured value at the i-th time point
  • Xp, j is a predicted value at the i-th time point.
  • the recent Lean technique used in the present invention derives the predicted value one day later through 730 given datasets, and secures the predicted values by fixing the number of datasets to 730 and changing the viewpoint only.
  • the results of verifying the performance of the latest Lean technique predicted using the 2010 data are shown in Table 2 below. Therefore, as can be seen from Figures 3a to 3f and Table 2, the present invention not only describes the change behavior of the measured values of each target variable well, but also the influent flow rate and influent component concentration (BOD 5). , COD, Mn , SS, TN, and TP) were found to be quite high.
  • results of the verification show that the method of predicting the influent flow rate and the influent component concentration of the sewage treatment plant using the latest lean technique of the present invention, which is used to predict the inflow flow rate and the influent component concentration after 1 day from the present point of time, is used in other sewage treatment plants. It may be generalized and used.
  • Figures 4a to 4f is an example of a graph showing the predicted value for the inflow flow rate and influent component concentration after one week by including the predicted value as a data set of the search range by this method.
  • 4A shows the inflow flow rate
  • FIG. 4B shows BOD 5
  • FIG. 4C shows COD Mn
  • FIG. 4D shows SS
  • FIG. 4E shows TN
  • FIG. 4F shows TP prediction results.
  • Accuracy (%) _ Estimated on the graph refers to the forecasted average accuracy after one week when only one day is forecasted
  • Accuracy (%) _ Re estimated is about one week later when the forecast is performed by including the forecast into the dataset. Mean average accuracy.
  • the recent Lean technique developed for forecasting 1 day, 2 days, and 3 days after the current point of view is suitable for changing the behavior of each target variable without causing problems of overfitting. It can be seen that the prediction.
  • the present invention through the apparatus and method for predicting the inflow flow rate and inflow component concentration of the sewage treatment plant using the latest lean method, the inflow flow rate of BOD 5 , COD Mn 1 day, 2 days, 3 days, etc.
  • the influent component concentrations such as, SS, TN, TP, etc.
  • the present invention selects a similar vector, which is a data pair having a vector most similar to the data of the time point to be predicted from the past accumulated data, and derives a weight using the distance value of the selected similar vector, and the derived weight.

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Data Mining & Analysis (AREA)
  • Water Supply & Treatment (AREA)
  • Organic Chemistry (AREA)
  • Chemical & Material Sciences (AREA)
  • Pure & Applied Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Computational Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Mathematical Physics (AREA)
  • Hydrology & Water Resources (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Bioinformatics & Cheminformatics (AREA)
  • Probability & Statistics with Applications (AREA)
  • Operations Research (AREA)
  • Algebra (AREA)
  • Evolutionary Biology (AREA)
  • Databases & Information Systems (AREA)
  • Software Systems (AREA)
  • General Engineering & Computer Science (AREA)
  • Bioinformatics & Computational Biology (AREA)
  • Health & Medical Sciences (AREA)
  • Molecular Biology (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Microbiology (AREA)
  • Testing And Monitoring For Control Systems (AREA)
  • Activated Sludge Processes (AREA)
  • Feedback Control In General (AREA)

Abstract

본 발명은 하수처리장의 효과적인 공정운영과 안정적인 처리효율을 지속하기 위해 과거의 축적된 데이터로부터 현재 예측하고자 하는 시점의 데이터와 가장 유사한 벡터를 가진 데이터쌍인 유사벡터를 선별하여 상기 선별된 유사벡터의 거리값을 이용하여 가중치를 도출하고, 상기 도출된 가중치를 이용하여 하수처리장의 유입유량과 유입성분농도를 예측하는 최근린기법을 이용하여 하수처리장의 유입유량과 유입성분농도를 예측하는 장치 및 방법에 관한 것이다. 본 발명에 의하면, 하수처리장의 유입유량과 유입성분농도의 데이터를 수집하는 데이터수집부; 상기 데이터수집부에 의해 수집된 데이터를 전달받아 상기 데이터 중에서 이상치(outlier)를 제거함과 동시에 상기 이상치에 대한 보완값을 입력하여 데이터를 전처리하는 데이터전처리부; 상기 데이터전처리부를 통해 전처리된 데이터를 기준으로, 예측하고자 하는 시점의 하루 전과 이틀 전의 데이터쌍과 가장 유사한 벡터를 가진 데이터쌍인 유사벡터를 선별하는 유사벡터선별부; 및 상기 유사벡터선별부에 의해 선별된 유사벡터의 거리값을 바탕으로 일정한 가중치를 배분하고 상기 가중치를, 예측하고자 하는 시점의 하루 및 이틀 전 시점의 데이터에 적용하여 하수처리장의 유입유량과 유입성분농도를 예측하는 데이터예측부;를 포함하되, 상기 유입성분농도는 BOD5, CODMn, SS, TN, TP 중에서 선택된 적어도 어느 하나 이상인 것을 특징으로 하는 최근린기법을 이용한 하수처리장의 유입유량과 유입성분농도의 예측장치를 제공한다.

Description

최근린기법을 이용한 하수처리장의 유입유량과 유입성분농도의 예측 장치 및 방법
본 발명은 최근린기법을 이용한 하수처리장의 유입유량과 유입성분농도의 예측장치 및 방법에 관한 것이다. 보다 상세하게 설명하면, 하수처리장의 효과적인 공정운영과 안정적인 처리효율을 지속하기 위해 과거의 축적된 데이터로부터 현재 예측하고자 하는 시점의 데이터와 가장 유사한 벡터를 가진 데이터쌍인 유사벡터를 선별하여 상기 선별된 유사벡터의 거리값을 이용하여 가중치를 도출하고, 상기 도출된 가중치를 이용하여 하수처리장의 유입유량과 유입성분농도를 예측하는 최근린기법을 이용하여 하수처리장의 유입유량과 유입성분농도를 예측하는 장치 및 방법에 관한 것이다.
하수처리장의 처리능을 변화시키는 가장 기본적이며 일반적인 외란 중 하나는 바로 유입하수의 유량 및 성상의 변화이다. 따라서 유입하수의 유량과 수질성상을 예측하는 것은 공정의 안정적인 운전에 도움이 될 수 있는 바, 이러한 하수처리장의 유입수의 변화에 탄력적으로 대처하기 위한 유입수의 유량 및 성상 예측에 대한 모델 개발을 위한 연구도 활발하게 진행되어 왔다.
이러한 모델 개발은 크게 두 가지로 나뉠 수 있으며, i)결정론적 모델로써 기본적으로 공정과 관련된 메커니즘과 물질수지식 등에 기반하여 일반적으로 미분방정식의 형태로 표현되는 수학적 모델(Mathematical model)과 ii)공정으로부터 확보된 측정 데이터에 기반하여 목표 변수를 모사하는 데이터 기반 모델(Data driven model)로 구분되어 발전해 왔다고 할 수 있다. 그리고 현재 하수관망 내의 하수의 성상과 유량을 측정하기 위한 상용 프로그램인 SWMM에 내장되어 있는 각종 이론적 수식들의 집합은 본 발명과 동일한 목적을 가진 수학적 모델의 대표적인 예가 될 수 있으며, 비선형 데이터의 모델링에 널리 쓰이는 인공신경망(Artificial neural network)은 데이터 기반 모델의 대표적인 예가 될 수 있다.
이들 모델들은 하수처리장 건설을 위한 다양한 설계안들의 시뮬레이션에 의한 평가를 의미하는 공정 설계와, 다양한 시나리오 분석을 통한 하수처리플랜트의 공정의 향상 및 공정 이상 발생 시 적절한 대안 제시를 의미하는 공정의 최적화 및 제어라는 측면에서 유용하게 활용되고 있다.
특히 공정의 최적화 및 제어라는 측면에서 이러한 모델의 활용은 현재 시점을 기준으로 한 활용 즉 공정의 이상이 발생한 후 정상화하는데 있어서의 활용에 국한되었고, 이들 모델들은 공정 상태의 이상을 사전에 감지하여 발생할 수 있는 문제를 사전에 방지하기 위한 도구로써는 활용되지 못하고 있는 실정이다.
이러한 현재 기존 모델의 한계점을 극복하기 위해서는 적절한 유입수 예측 모델의 개발이 필요하고, 개발된 유입수 예측 모델이 기존의 공정 성능 예측모델과 결합이 된다면 공정의 미래 상태에 대한 정보가 사전에 제공되어 사후에 발생될 수 있는 문제가 사전에 감지되어 공정 이상이 발생하기 이전에 조치가 취해짐으로써 공정의 안정적인 운전에 기여할 수 있을 것으로 기대된다.
특히 몇몇 연구자들에 의해 유입수 예측 모델의 개발이 시도되었으나 이들에 의해 개발된 하수 발생 메커니즘과 물질수지식 등에 기반한 대부분의 결정론적 모델들은 시간에 따라 변화하는 많은 변수들을 가짐으로 보정(calibration)과 광범위한 모니터링 조사가 요구되는 단점을 가지고 있었다.
또한 데이터에 기반한 모델을 사용한 연구 결과가 보도가 되기도 하였지만, 예측 대상이 유입유량에만 국한되어 있었으며, 적용한 데이터양과 모델의 구조, 적절한 모델링 계수의 최적화 등에 매우 의존적인 예측 성능을 나타내고 있다는 한계점을 가지고 있었다. 뿐만 아니라 이러한 모델들은 예측 성능을 유지하기 위해 계수의 최적화가 주기적으로 요구되며, 시스템에 탑재될 시 매우 복잡한 코딩을 요한다는 단점을 가지고 있었다.
본 발명은 이와 같은 문제점을 해결하기 위해 안출된 것으로서, 많은 양의 누적데이터를 사용하여 튜닝할 필요가 없으며, 시스템에 쉽게 탑재가능하고 실제상황에 적용될 시에 주기적인 튜닝을 요구하지 않는 최근린기법 즉, 유사벡터 선별에 바탕한 시계열 모델링기법을 이용하여 하수처리장의 미래의 유입유량과 유입성분농도를 예측하기 위한 최근린기법을 이용한 하수처리장의 유입유량과 유입성분농도의 예측장치 및 방법을 제공하는데 그 목적이 있다.
본 발명에 의하면, 하수처리장의 유입유량과 유입성분농도의 데이터를 수집하는 데이터수집부; 상기 데이터수집부에 의해 수집된 데이터를 전달받아 상기 데이터 중에서 이상치(outlier)를 제거함과 동시에 상기 이상치에 대한 보완값을 입력하여 데이터를 전처리하는 데이터전처리부; 상기 데이터전처리부를 통해 전처리된 데이터를 기준으로, 예측하고자 하는 시점의 하루 전과 이틀 전의 데이터쌍과 가장 유사한 벡터를 가진 데이터쌍인 유사벡터를 선별하는 유사벡터선별부; 및 상기 유사벡터선별부에 의해 선별된 유사벡터의 거리값을 바탕으로 일정한 가중치를 배분하고 상기 가중치를, 예측하고자 하는 시점의 하루 및 이틀 전 시점의 데이터에 적용하여 하수처리장의 유입유량과 유입성분농도를 예측하는 데이터예측부;를 포함하되, 상기 유입성분농도는 BOD5, CODMn, SS, TN, TP 중에서 선택된 적어도 어느 하나 이상인 것을 특징으로 하는 최근린기법을 이용한 하수처리장의 유입유량과 유입성분농도의 예측장치를 제공한다.
한편, 상기 데이터수집부는 하수처리장의 유입유량과 유입성분농도의 데이터를 저장하는 데이터베이스와, 상기 데이터베이스로부터 사용자가 원하는 갯수의 데이터셋을 설정하여 상기 설정된 데이터셋을 정렬하는 데이터셋설정부를 포함하는 것을 특징으로 한다.
한편, 상기 데이터전처리부는 하수처리장의 유입유량과 유입성분농도의 데이터 중에서 데이터의 신뢰성을 떨어뜨릴 수 있는 이상치(outlier)를 제거하는 이상치제거부와, 상기 이상치제거부에서 제거된 시점의 이상치를 보완하기 위해 상기 제거된 시점 전날과 다음날의 데이터평균값을 제거된 시점의 이상치에 적용하여 데이터셋을 유지하도록 하는 이상치보완부를 포함하는 것을 특징으로 한다.
한편, 상기 이상치제거부는 아래의 식과 같이 관리상한선(Upper Control Limit, UCL)과 관리하한선(Lower Control Limit, LCL)을 설정하고, 상기 관리상한선과 상기 관리하한선을 벗어나는 값을 이상치로 판단하는 관리도기법을 사용하여 이상치를 제거하는 것을 특징으로 한다.
[규칙 제26조에 의한 보정 11.06.2013] 
Figure WO-DOC-FIGURE-14a
(여기서,
Figure WO-DOC-FIGURE-14b
는 수집된 데이터의 평균, A는 상수,
Figure WO-DOC-FIGURE-14c
는 표준편차를 말함)
한편, 상기 유사벡터선별부는 유클리드 거리계산방법을 이용하여 전처리된 데이터의 각 시점에 해당하는 데이터와 상기 시점의 하루 및 이틀 전 시점의 데이터 간의 거리를 계산하는 유클리드 거리계산부와, 상기 계산된 값 중 가장 작은 값을 가지는 거리값에 황금분할비를 곱하여 거리기준값을 도출하는 거리기준값 도출부와, 상기 도출된 거리기준값 미만의 거리값을 가지는 데이터쌍인 유사벡터를 선별하는 데이터 선별부를 포함하는 것을 특징으로 한다.
한편, 상기 데이터예측부는 선별된 유사벡터를 아래의 식에 의한 가중치로 배분하는 가중치계산부와, 상기 가중치계산부에 의해 배분된 가중치를 예측하고자 하는 시점의 하루 및 이틀 전 시점의 데이터에 각각 곱하고, 상기 곱한값들을 합산함으로써 하수처리장의 유입유량과 유입성분농도를 예측하는 예측부를 포함하는 것을 특징으로 한다.
[규칙 제26조에 의한 보정 11.06.2013] 
Figure WO-DOC-FIGURE-17
(여기서, Wi는 i시점에서의 가중치, D-1 s,i는 선별된 i시점에서의 거리값의 역수를 말함.)
또한 본 발명에 의하면, 하수처리장으로부터 유입유량과 유입성분농도의 데이터를 입력받는 데이터 입력단계; 상기 입력된 데이터 중에서 이상치(outlier)를 제거함과 동시에 상기 이상치에 대한 보완값을 입력하여 데이터를 전처리하는 데이터 전처리단계; 유클리드 거리계산방법을 이용하여 전처리된 데이터의 각 시점에 해당하는 데이터와 상기 시점의 하루 및 이틀 전 시점의 데이터 간의 거리를 계산하고, 상기 계산된 값 중 가장 작은 값을 가지는 거리값에 황금분할비를 곱하여 거리기준값을 도출하고, 상기 도출된 거리기준값 미만의 거리값을 가지는 데이터쌍인 유사벡터를 선별하는 유사벡터 선별단계; 및 상기 선별된 유사벡터의 거리값을 바탕으로 일정한 가중치를 배분하고 상기 가중치를, 예측하고자 하는 시점의 하루 및 이틀 전 시점의 데이터에 각각 곱하고, 상기 곱한값들을 합산함으로써 하수처리장의 유입유량과 유입성분농도를 예측하는 데이터 예측단계;를 포함하는 최근린기법을 이용한 하수처리장의 유입유량과 유입성분농도의 예측방법를 제공한다.
한편, 상기 데이터 전처리단계는 아래의 식과 같이 관리상한선(Upper Control Limit, UCL)과 관리하한선(Lower Control Limit, LCL)을 설정하고, 상기 관리상한선과 상기 관리하한선을 벗어나는 값을 이상치로 판단하는 관리도기법을 사용하여 이상치를 제거하며, 상기 제거된 시점의 이상치를 보완하기 위해 상기 제거된 시점 전날과 다음날의 데이터평균값을 제거된 시점의 이상치에 적용하여 데이터셋을 유지하도록 하는 이상치를 보완하는 것을 특징으로 한다.
[규칙 제26조에 의한 보정 11.06.2013] 
Figure WO-DOC-FIGURE-20a
(여기서,
Figure WO-DOC-FIGURE-20b
는 수집된 데이터의 평균, A는 상수,
Figure WO-DOC-FIGURE-20c
는 표준편차를 말함)
한편, 상기 데이터 전처리단계에서 전처리된 데이터에 대하여 사용자가 검색하고자 하는 데이터의 검색범위를 설정하여 상기 설정된 데이터 검색범위에 대해 유사벡터를 검색할 수 있는 데이터 검색범위 설정단계;를 더 포함하는 것을 특징으로 한다.
본 발명에 의한 최근린기법을 이용한 하수처리장의 유입유량 및 유입성분농도의 예측장치 및 방법에 의해 하수처리장으로부터 확보된 유입데이터만을 활용하여 현재 시점 기준 1일 뒤, 2일 뒤, 3일 뒤 등의 유입유량 및 BOD5, CODMn, SS, TN, TP 등과 같은 유입성분농도를 예측함으로써 하수처리장 내에서 적절한 대응(공정조건 변화 등)을 자동으로 행할 수 있는 효과가 있다.
도 1은 본 발명의 실시예에 따른 최근린기법을 이용한 하수처리장의 유입유량과 유입성분농도의 예측장치를 나타내는 구성도이다.
도 2는 본 발명의 실시예에 따른 최근린기법을 이용한 하수처리장의 유입유량과 유입성분농도의 예측방법을 나타내는 순서도이다.
도 3a 내지 도 3f는 도 2의 예측방법에 따라 실행된 각 목표변수들의 현재시점 기준 1일 뒤의 예측결과와 실측결과를 비교한 그래프들이다.
도 4a 내지 도 4f는 도 2의 예측방법에 따라 실행된 각 목표변수들의 현재시점 기준 일주일 뒤의 예측결과와 실측결과를 비교한 그래프들이다.
본 발명에 의하면, 하수처리장의 유입유량과 유입성분농도의 데이터를 수집하는 데이터수집부; 상기 데이터수집부에 의해 수집된 데이터를 전달받아 상기 데이터 중에서 이상치(outlier)를 제거함과 동시에 상기 이상치에 대한 보완값을 입력하여 데이터를 전처리하는 데이터전처리부; 상기 데이터전처리부를 통해 전처리된 데이터를 기준으로, 예측하고자 하는 시점의 하루 전과 이틀 전의 데이터쌍과 가장 유사한 벡터를 가진 데이터쌍인 유사벡터를 선별하는 유사벡터선별부; 및 상기 유사벡터선별부에 의해 선별된 유사벡터의 거리값을 바탕으로 일정한 가중치를 배분하고 상기 가중치를, 예측하고자 하는 시점의 하루 및 이틀 전 시점의 데이터에 적용하여 하수처리장의 유입유량과 유입성분농도를 예측하는 데이터예측부;를 포함하되, 상기 유입성분농도는 BOD5, CODMn, SS, TN, TP 중에서 선택된 적어도 어느 하나 이상인 것을 특징으로 하는 최근린기법을 이용한 하수처리장의 유입유량과 유입성분농도의 예측장치를 제공한다.
이하, 본 발명의 바람직한 실시예를 첨부된 도면들을 참조하여 상세히 설명한다. 우선 각 도면의 구성요소들에 참조번호를 부가함에 있어서, 동일한 구성요소들에 대해서는 비록 다른 도면상에 표시되더라도 가능한 한 동일한 부호를 가지도록 하고 있음에 유의해야 한다. 또한 본 발명을 설명함에 있어, 관련된 공지 구성 또는 기능에 대한 구체적인 설명이 본 발명의 요지를 흐릴 수 있다고 판단되는 경우에는 그 상세한 설명은 생략한다.
도 1은 본 발명의 실시예에 따른 최근린기법을 이용한 하수처리장의 유입유량과 유입성분농도의 예측장치를 나타내는 구성도이고, 도 2는 본 발명의 실시예에 따른 최근린기법을 이용한 하수처리장의 유입유량과 유입성분농도의 예측방법을 나타내는 순서도이고, 도 3a 내지 도 3f는 도 2의 예측방법에 따라 실행된 각 목표변수들의 현재시점 기준 1일 뒤의 예측결과와 실측결과를 비교한 그래프들이고, 도 4a 내지 도 4f는 도 2의 예측방법에 따라 실행된 각 목표변수들의 현재시점 기준 일주일 뒤의 예측결과와 실측결과를 비교한 그래프들이다.
도 1을 참조하면, 본 발명에 의한 하수처리장의 유입유량과 유입성분농도의 예측장치(10)는 데이터수집부(100), 데이터전처리부(200), 유사벡터검색부(300), 및 데이터예측부(400)를 포함한다. 상기 유입성분농도는 BOD5, CODMn, SS, TN, TP 중에서 선택된 적어도 어느 하나 이상인 것이 바람직하다.
상기 데이터수집부(100)는 하수처리장의 유입유량과 유입성분농도의 데이터를 수집하는 역할을 한다. 즉, 상기 데이터수집부(100)는 하수처리장에서 1일 1회 측정하고 있는 유입유량과 유입성분농도(BOD5, CODMn, SS, TN, TP )를 수집하게 된다.
상기 데이터수집부(100)는 하수처리장의 유입유량과 유입성분농도의 데이터를 저장하는 데이터베이스(110)와, 상기 데이터베이스(110)로부터 사용자가 원하는 갯수의 데이터셋을 설정하여 상기 설정된 데이터셋을 정렬하는 데이터셋설정부(120)를 포함한다. 상기 데이터셋설정부(120)는 상기 데이터수집부(100)에서 미리 설정될 수 있고, 또는 후술할 데이터전처리부(200)에서 전처리된 데이터들을 기준으로 설정될 수도 있을 것이다. 따라서 상기 데이터베이스(110)에 저장된 데이터들을 사용자가 임의로 30개, 90개, 365개, 730개 등의 데이터셋을 설정할 수 있으며, 상기 설정된 데이터셋은 하수처리장의 유입유량과 유입성분농도를 예측하기 위한 데이터가 되는 것이다.
상기 데이터전처리부(200)는 상기 데이터수집부(100)에 의해 수집된 데이터를 전달받아 상기 데이터 중에서 이상치(outlier)를 제거함과 동시에 상기 이상치에 대한 보완값을 입력하여 데이터를 전처리하는 역할을 한다.
상기 데이터전처리부(200)는 하수처리장의 유입유량과 유입성분농도의 데이터 중에서 데이터의 신뢰성을 떨어뜨릴 수 있는 이상치(outlier)를 제거하는 이상치제거부(210)와, 상기 이상치제거부(210)에서 제거된 시점의 이상치를 보완하기 위해 상기 제거된 시점 전날과 다음날의 데이터평균값을 제거된 시점의 이상치에 적용하여 데이터셋을 유지하도록 하는 이상치보완부(220)를 포함한다.
상기 이상치는 하수처리장으로부터 확보된 데이터 중에서 데이터의 신뢰성을 떨어뜨릴 수 있는 데이터로서, 정확한 예측 모델을 구현하는데 있어 방해요인이 되기 때문에 제거한다. 그리고 이상치의 보완은 이상치 제거로 인한 시계열 데이터의 공백을 보완하기 위해, 해당 시점의 전, 후 시점의 데이터 평균을 적용하여 이상치의 데이터를 보완하는 것이다.
상기 이상치제거부(210)는 아래의 식과 같이 관리상한선(Upper Control Limit, UCL)과 관리하한선(Lower Control Limit, LCL)을 설정하고, 상기 관리상한선과 상기 관리하한선을 벗어나는 값을 이상치로 판단하는 관리도기법을 사용하여 이상치를 제거하는 것이 바람직하다.
[규칙 제26조에 의한 보정 11.06.2013] 
Figure WO-DOC-FIGURE-37a
(여기서,
Figure WO-DOC-FIGURE-37b
는 수집된 데이터의 평균, A는 상수,
Figure WO-DOC-FIGURE-37c
는 표준편차를 말함)
상기 유사벡터선별부(300)는 상기 데이터전처리부(200)를 통해 전처리된 데이터를 기준으로, 예측하고자 하는 시점의 하루 전과 이틀 전의 데이터쌍과 가장 유사한 벡터를 가진 데이터쌍인 유사벡터를 선별하는 역할을 한다.
상기 유사벡터선별부(300)는 유클리드 거리계산방법(Euclidean distance method)을 이용하여 전처리된 데이터의 각 시점에 해당하는 데이터와 상기 시점의 하루 및 이틀 전 시점의 데이터 간의 거리를 계산하는 유클리드 거리계산부(310)와, 상기 계산된 값 중 가장 작은 값을 가지는 거리값에 황금분할비를 곱하여 거리기준값을 도출하는 거리기준값 도출부(320)와, 상기 도출된 거리기준값 미만의 거리값을 가지는 데이터쌍인 유사벡터를 선별하는 데이터 선별부(330)를 포함한다.
상기 데이터예측부(400)는 상기 유사벡터선별부(300)에 의해 선별된 유사벡터의 거리값을 바탕으로 일정한 가중치를 배분하고 상기 가중치를, 예측하고자 하는 시점의 하루 및 이틀 전 시점의 데이터에 적용하여 하수처리장의 유입유량과 유입성분농도를 예측하는 역할을 한다.
상기 데이터예측부(400)는 선별된 유사벡터를 아래의 식에 의한 가중치로 배분하는 가중치계산부(410)와, 상기 가중치계산부(410)에 의해 배분된 가중치를 예측하고자 하는 시점의 하루 및 이틀 전 시점의 데이터에 각각 곱하고, 상기 곱한값들을 합산함으로써 하수처리장의 유입유량과 유입성분농도를 예측하는 예측부(420)를 포함한다.
[규칙 제26조에 의한 보정 11.06.2013] 
Figure WO-DOC-FIGURE-42
(여기서, Wi는 i시점에서의 가중치, D-1 s,i는 선별된 i시점에서의 거리값의 역수를 말함.)
따라서 가중치계산부(410)는 각 선별 시점의 선별된 유사벡터의 거리값들의 역수의 합을 분모로 두고, 선별시점의 거리값의 역수를 분자에 두어 가중치를 계산하게 되는 것이다.
따라서 본 발명에서는 비선형 시계열 데이터 예측을 수행할 수 있는 최근린기법을 사용하게 되며, 상기 최근린기법을 수행하기 위해 각 시점과 하루, 이틀 전 시점과의 벡터 거동을 분석하여 가용한 데이터인 유사벡터를 선별하기 위해 거리기준을 설정하고, 선별된 유사벡터에 대한 거리값을 기준으로 가중치를 분배하여 예측모델링을 수행하게 되는 것이다.
도 2를 참조하여 본 발명에 의한 최근린기법을 이용한 하수처리장의 유입유량과 유입성분농도의 예측방법을 설명하면 다음과 같다.
제 1단계는 하수처리장으로부터 유입유량과 유입성분농도의 데이터를 입력받는 데이터 입력단계이다(S110).
제 2단계는 상기 입력된 데이터 중에서 이상치(outlier)를 제거함과 동시에 상기 이상치에 대한 보완값을 입력하여 데이터를 전처리하는 데이터 전처리단계이다(S120).
그리고 제 2단계에서 제 3단계로 넘어가기 전, 상기 데이터 전처리단계에서 전처리된 데이터에 대하여 사용자가 검색하고자 하는 데이터의 검색범위를 설정하여 상기 설정된 데이터 검색범위에 대해 유사벡터를 검색할 수 있는 데이터 검색범위 설정단계(S121)를 더 포함할 수 있다. 이는 사용자가 원하는 데이터의 갯수 예를 들어, 30개, 90개, 365개, 730개 등의 데이터셋 중에서 원하는 검색범위를 설정할 수 있는 것이다. 이후의 설명에서는 730개의 데이터셋을 선택하여 설명하기로 하겠다.
제 3단계는 유클리드 거리계산방법을 이용하여 전처리된 데이터의 각 시점에 해당하는 데이터와 상기 시점의 하루 및 이틀 전 시점의 데이터 간의 거리를 계산하고, 상기 계산된 값 중 가장 작은 값을 가지는 거리값에 황금분할비를 곱하여 거리기준값을 도출하고, 상기 도출된 거리기준값 미만의 거리값을 가지는 데이터쌍인 유사벡터를 선별하는 유사벡터 선별단계이다(S130).
제 4단계는 상기 선별된 유사벡터의 거리값을 바탕으로 일정한 가중치를 배분하고 상기 가중치를, 예측하고자 하는 시점의 하루 및 이틀 전 시점의 데이터에 각각 곱하고, 상기 곱한값들을 합산함으로써 하수처리장의 유입유량과 유입성분농도를 예측하는 데이터 예측단계이다(S140).
이하, 실시예를 기준으로 본 발명에서 언급하는 하수처리장의 유입유량과 유입성분농도의 예측방법을 설명하기로 한다.
먼저, 대상 하수처리장의 처리장 용량이 340,000m3/day인 B시 N하수처리장을 최근린기법을 이용한 하수처리장의 유입유량과 유입성분농도의 예측 대상 하수처리장으로 선정하였다.
대상 하수처리장에서 실제 측정된 2008년부터 2010년까지의 유입수질 데이터들(유량, BOD5, CODMn, SS, TN, TP)을 데이터수집부(100)를 통해 수집하게 된다. 상기 데이터수집부(100)를 통해 수집된 데이터 중 2008년과 2009년의 데이터는 데이터전처리를 거치게 되며, 데이터전처리를 거친 730개의 데이터셋은 본 발명에 의한 예측장치 및 예측방법에 사용된다. 나머지 2010년의 데이터셋은 최근린기법의 예측성능을 검증하기 위해 사용하기로 하겠다.
아래의 [표 1]은 대상 하수처리장의 유입수의 통계학적 특성을 보여주고 있다.
표 1
유량(m3/d) BOD5(mg/l) CODMn(mg/l) SS(mg/l) TN(mg/l) TP(mg/l)
평균 308,612.4 101.3 57.2 101.8 31.6 3.1
표준편차 40,982.0 11.2 7.8 20.82 3.0 0.3
최대값 450,540.0 149.2 111.8 310.0 48.2 5.9
최소값 240,720.0 61.5 38.7 70.0 20.6 1.6
상기 데이터수집부(100)에 의해 수행된 데이터수집단계(S110)를 거치게 된 후, 수집된 데이터의 이상치 제거 및 이상치 보완을 위한 데이터 전처리단계(S120)를 거치게 된다. 이를 위해 우선, 하수처리장으로부터 확보된 상기 데이터들 중 데이터의 신뢰성을 떨어뜨릴 수 있는 이상치(Outlier)는 정확한 예측모델을 개발하는 데 있어 방해요인이 되므로 제거하게 된다.
본 발명에서는 이상치 제거를 위해 관리도 기법을 사용하였다.
특히 아래의 식과 같이 관리상한선(Upper Control Limit, UCL)과 관리하한선(Lower Control Limit, LCL)을 설정하고, 상기 관리상한선과 상기 관리하한선을 벗어나는 값을 이상치로 간주하고 제거하였다.
[규칙 제26조에 의한 보정 11.06.2013] 
Figure WO-DOC-FIGURE-59
본 발명에서는 Mjalli 등에 의해 제안된 값을 참조로 하여 상수(A)를 3으로 사용하였다.
그리고 나서 이상치 제거로 인해 데이터의 공백을 보완하기 위해 이상치가 제거된 시점 전일과 후일에 대한 데이터 평균값을 공백 데이터에 적용하여 730개의 데이터셋을 유지하도록 하였다.
상기의 데이터 전처리를 수행한 후, 모델 개발자 또는 시스템 운영자는 데이터 검색범위 설정단계(S121)에 의해 설정된 데이터 검색범위에 대해 유클리드 거리계산법을 통한 유사벡터 선별단계(S130)를 수행하게 된다.
본 발명에서 사용된 유클리드 거리계산법을 통한 유사벡터 선별단계(S130)는 규칙성이 보이지 않는 데이터로부터 규칙성을 찾아 예측을 수행하는 방법으로 예측하고자 하는 시점의 데이터와 그 시점으로부터 1일 전, 2일 전 시점에 대한 데이터와의 관계에서 가장 가까운 과거의 데이터를 참조하여 예측값을 도출하기 위해 유클리드 거리라는 기준에 의해 데이터를 선별해 나간다. 이후에는 가장 가까운 데이터부터 가중치를 분배하여 예측값의 정밀도를 높이게 되는 것이다.
본 발명에서는 하수처리장의 유입수 예측을 목적으로 하고 있으며, 각 목표변수의 값을 도출하기 위해 전처리된 데이터를 바탕으로 유용한 데이터 선별을 위한 거리 계산을 위해 아래 식에서와 같이 유클리드 거리계산법(Euclidean distance method)을 사용하였다.
[규칙 제26조에 의한 보정 11.06.2013]  
Figure WO-DOC-FIGURE-65
(여기서, Di는 i시점에서의 거리값, Y728은 728번째 시점에서의 측정값, Y729는 729번째 시점에서의 측정값, t는 시점을 말함.)
상기 유클리드 거리계산법에 의해 계산된 각 시점에서의 거리값들을 바탕으로 최근린기법 적용을 위한 유사벡터를 선별하기 위해 상기 계산값들 중 최소값을 가지는 거리값을 선정하여 황금분할비인 1.62를 곱하여 거리 기준값을 도출한다.
상기 도출된 거리 기준값을 기반으로 하여 각 시점에서의 계산된 거리값과 비교하여 거리 기준값 미만의 거리값을 가지는 데이터쌍인 유사벡터를 선별한다. 그리고 나서 데이터 예측단계(S140)를 통해 상기 선별된 유사벡터를 바탕으로 아래 식에서와 같이 각 선별 시점의 거리값의 역수의 합을 분모로 두고, 선별시점의 거리값의 역수를 분자에 두어 가중치를 배분한다.
[규칙 제26조에 의한 보정 11.06.2013] 
Figure WO-DOC-FIGURE-68
(여기서, Wi는 i시점에서의 가중치, D-1 s,i는 선별된 i시점에서의 거리값의 역수를 말함.)
그리고 상기 도출된 가중치를 예측하고자 하는 시점의 1일 전 및 2일 전 시점의 데이터에 각각 곱하고, 곱하여진 값을 합함으로써 예측하고자 하는 유입유량 및 유입성분농도를 예측하게 된다.
도 3a 내지 도 3f는 본 발명의 실시예에 따른 각 목표변수의 현재시점 기준 1일 뒤 예측을 위해 730개의 데이터셋을 이용하여 최근린기법을 통해 예측한 결과와 실측값의 결과를 나타내고 있다.
여기서, 도 3a는 유입유량, 도 3b는 BOD5, 도 3c는 CODMn, 도 3d는 SS, 도 3e는 TN, 도 3f는 TP의 예측결과를 나타낸다.
특히 최근린기법을 이용한 대상 하수처리장의 유입수 예측 성능의 정량적 평가는 도출된 예측값과 실측값 간의 차이를 백분율로 나타낸 예측 정확도(Prediction accuracy)로 평가될 수 있다.
따라서 본 발명에서 개발된 최근린기법의 정량적인 예측성능 평가를 위하여 아래의 식과 같이 정확성을 100으로 한 실제측정값의 백분율에서 평균 상대 오차율(Average relative difference)의 차이를 계산하여 예측의 정확도를 사용하게 된다. 여기서, Xm,i는 i번째 시점에서의 측정값, Xp,j는 i번째 시점에서의 예측값이다.
[규칙 제26조에 의한 보정 11.06.2013] 
Figure WO-DOC-FIGURE-74
본 발명에서 사용된 최근린기법은 주어진 데이터셋인 730개를 통해 1일 뒤의 예측값을 도출하고 있으며, 데이터셋의 갯수를 730개로 고정하고 시점만을 변경하여 예측값을 확보하였다. 2010년 데이터를 사용하여 예측된 최근린기법의 성능을 검증한 결과는 아래 [표 2]와 같다. 따라서 도 3a 내지 도 3f 및 [표 2]를 통해 알 수 있듯이, 본 발명은 각 목표변수들의 실측값들의 변화 거동을 최근린기법이 잘 묘사하고 있을 뿐만 아니라, 유입유량과 유입성분농도(BOD5, CODMn, SS, TN, TP)의 예측정확도는 상당히 높음을 확인할 수 있었다.
표 2
유입 유량 BOD5 CODMn SS TN TP
정확도(%) 93.2 94.1 91.6 92.6 93.1 89.4
이러한 검증결과를 통해 살펴보건대, 현재시점 기준 1일 뒤 유입유량과 유입성분농도를 예측하기 위해 이용된 본 발명의 최근린기법을 이용한 하수처리장 유입유량과 유입성분농도의 예측방법은 다른 하수처리장에서도 일반화되어 사용될 수 있을 것이다.
상기 현재시점 기준 1일 뒤의 예측에 이어 현재시점 기준 2일 뒤, 3일 뒤 예측을 수행한 결과, 현재시점 기준 2일 뒤, 3일 뒤 각 유입유량과 유입성분농도의 예측을 위해 730개의 데이터셋을 통해 예측된 1일 뒤의 예측데이터를 다시 데이터셋에 포함시켜 2일 뒤, 3일 뒤의 목표변수의 예측값을 도출하는 것이 가능했다.
도 4a 내지 도 4f는 이러한 방법에 의해 예측값을 검색범위의 데이터셋으로 포함시켜 일주일 뒤의 유입유량 및 유입성분농도에 관한 예측값을 나타낸 그래프의 실예이다. 여기서, 도 4a는 유입유량, 도 4b는 BOD5, 도 4c는 CODMn, 도 4d는 SS, 도 4e는 TN, 도 4f는 TP의 예측결과를 나타낸다. 그리고 그래프 상의 Accuracy(%)_Estimated는 1일만 예측을 수행한 경우의 일주일 뒤의 예측평균 정확도를 말하고, Accuracy(%)_Re estimated는 예측값을 데이터셋에 포함시켜 예측을 수행한 경우의 일주일 뒤의 예측평균 정확도를 의미한다.
도 4a 내지 도 4f를 통해 알 수 있듯이, 1일만 예측을 수행한 경우 및 예측값을 데이터셋에 모두 포함시켜 예측을 수행한 경우의 일주일 뒤의 예측평균 정확도는 꽤 높음을 알 수 있다.
따라서 전체적으로 현재시점 기준 1일 뒤, 2일 뒤, 3일 뒤의 예측을 위해 개발된 최근린기법은 일주일 뒤의 예측에도 과적합(Overfitting)의 문제를 일으키지 않으면서 각 목표변수들의 변화거동을 적절하게 예측하고 있다는 것을 알 수 있었다.
그러므로 본 발명에 의하 최근린기법을 이용한 하수처리장의 유입유량과 유입성분농도의 예측장치 및 방법을 통해 현재 시점 기준 1일 뒤, 2일 뒤, 3일 뒤 등의 유입유량 및 BOD5, CODMn, SS, TN, TP 등과 같은 유입성분농도를 예측함으로써 하수처리장 내에서 유입유량 및 유출성분농도에 따른 적절한 대응(공정조건 변화 등)을 할 수 있게 된다.
이상의 설명은 본 발명을 예시적으로 설명한 것에 불과한 것으로, 본 발명이 속하는 기술분야에서 통상의 지식을 가지는 자라면 본 발명의 본질적인 특성에서 벗어나지 않는 범위에서 다양한 변형이 가능할 것이다. 따라서 본 명세서에 개시된 실시예들은 본 발명을 한정하기 위한 것이 아니라 설명하기 위한 것이고, 이러한 실시예에 의하여 본 발명의 사상과 범위가 한정되는 것은 아니다. 본 발명의 범위는 아래의 청구범위에 의하여 해석되어야 하며, 그와 동등한 범위 내에 있는 모든 기술은 본 발명의 권리범위에 포함되는 것으로 해석되어야 할 것이다.
본 발명은 과거의 축적된 데이터로부터 현재 예측하고자 하는 시점의 데이터와 가장 유사한 벡터를 가진 데이터쌍인 유사벡터를 선별하여 상기 선별된 유사벡터의 거리값을 이용하여 가중치를 도출하고, 상기 도출된 가중치를 이용하여 하수처리장의 유입유량과 유입성분농도를 예측하는 최근린기법을 이용하여 하수처리장의 유입유량과 유입성분농도를 예측함으로써 하수처리장의 효과적인 공정운영과 안정적인 처리효율에 널리 사용될 수 있다.

Claims (9)

  1. 하수처리장의 유입유량과 유입성분농도의 데이터를 수집하는 데이터수집부;
    상기 데이터수집부에 의해 수집된 데이터를 전달받아 상기 데이터 중에서 이상치(outlier)를 제거함과 동시에 상기 이상치에 대한 보완값을 입력하여 데이터를 전처리하는 데이터전처리부;
    상기 데이터전처리부를 통해 전처리된 데이터를 기준으로, 예측하고자 하는 시점의 하루 전과 이틀 전의 데이터쌍과 가장 유사한 벡터를 가진 데이터쌍인 유사벡터를 선별하는 유사벡터선별부; 및
    상기 유사벡터선별부에 의해 선별된 유사벡터의 거리값을 바탕으로 일정한 가중치를 배분하고 상기 가중치를, 예측하고자 하는 시점의 하루 및 이틀 전 시점의 데이터에 적용하여 하수처리장의 유입유량과 유입성분농도를 예측하는 데이터예측부;를 포함하되,
    상기 유입성분농도는 BOD5, CODMn, SS, TN, TP 중에서 선택된 적어도 어느 하나 이상인 것을 특징으로 하는 최근린기법을 이용한 하수처리장의 유입유량과 유입성분농도의 예측장치.
  2. 제 1항에 있어서,
    상기 데이터수집부는 하수처리장의 유입유량과 유입성분농도의 데이터를 저장하는 데이터베이스와, 상기 데이터베이스로부터 사용자가 원하는 갯수의 데이터셋을 설정하여 상기 설정된 데이터셋을 정렬하는 데이터셋설정부를 포함하는 것을 특징으로 하는 최근린기법을 이용한 하수처리장의 유입유량과 유입성분농도의 예측장치.
  3. 제 2항에 있어서,
    상기 데이터전처리부는 하수처리장의 유입유량과 유입성분농도의 데이터 중에서 데이터의 신뢰성을 떨어뜨릴 수 있는 이상치(outlier)를 제거하는 이상치제거부와, 상기 이상치제거부에서 제거된 시점의 이상치를 보완하기 위해 상기 제거된 시점 전날과 다음날의 데이터평균값을 제거된 시점의 이상치에 적용하여 데이터셋을 유지하도록 하는 이상치보완부를 포함하는 것을 특징으로 하는 최근린기법을 이용한 하수처리장의 유입유량과 유입성분농도의 예측장치.
  4. [규칙 제26조에 의한 보정 11.06.2013]
    제 3항에 있어서,
    상기 이상치제거부는 아래의 식과 같이 관리상한선(Upper Control Limit, UCL)과 관리하한선(Lower Control Limit, LCL)을 설정하고, 상기 관리상한선과 상기 관리하한선을 벗어나는 값을 이상치로 판단하는 관리도기법을 사용하여 이상치를 제거하는 것을 특징으로 하는 최근린기법을 이용한 하수처리장의 유입유량과 유입성분농도의 예측장치.
    (여기서, 는 수집된 데이터의 평균, A는 상수, 는 표준편차를 말함)
    Figure WO-DOC-FIGURE-4aa
    Figure WO-DOC-FIGURE-4bb
    Figure WO-DOC-FIGURE-4cc
  5. 제 4항에 있어서,
    상기 유사벡터선별부는 유클리드 거리계산방법을 이용하여 전처리된 데이터의 각 시점에 해당하는 데이터와 상기 시점의 하루 및 이틀 전 시점의 데이터 간의 거리를 계산하는 유클리드 거리계산부와, 상기 계산된 값 중 가장 작은 값을 가지는 거리값에 황금분할비를 곱하여 거리기준값을 도출하는 거리기준값 도출부와, 상기 도출된 거리기준값 미만의 거리값을 가지는 데이터쌍인 유사벡터를 선별하는 데이터 선별부를 포함하는 것을 특징으로 하는 최근린기법을 이용한 하수처리장의 유입유량과 유입성분농도의 예측장치.
  6. [규칙 제26조에 의한 보정 11.06.2013]
    제 5항에 있어서,
    상기 데이터예측부는 선별된 유사벡터를 아래의 식에 의한 가중치로 배분하는 가중치계산부와, 상기 가중치계산부에 의해 배분된 가중치를 예측하고자 하는 시점의 하루 및 이틀 전 시점의 데이터에 각각 곱하고, 상기 곱한값들을 합산함으로써 하수처리장의 유입유량과 유입성분농도를 예측하는 예측부를 포함하는 것을 특징으로 하는 최근린기법을 이용한 하수처리장의 유입유량과 유입성분농도의 예측장치.
    (여기서, Wi는 i시점에서의 가중치, D-1 s,i는 선별된 i시점에서의 거리값의 역수를 말함.)
    Figure WO-DOC-FIGURE-6
  7. 하수처리장으로부터 유입유량과 유입성분농도의 데이터를 입력받는 데이터 입력단계;
    상기 입력된 데이터 중에서 이상치(outlier)를 제거함과 동시에 상기 이상치에 대한 보완값을 입력하여 데이터를 전처리하는 데이터 전처리단계;
    유클리드 거리계산방법을 이용하여 전처리된 데이터의 각 시점에 해당하는 데이터와 상기 시점의 하루 및 이틀 전 시점의 데이터 간의 거리를 계산하고, 상기 계산된 값 중 가장 작은 값을 가지는 거리값에 황금분할비를 곱하여 거리기준값을 도출하고, 상기 도출된 거리기준값 미만의 거리값을 가지는 데이터쌍인 유사벡터를 선별하는 유사벡터 선별단계; 및
    상기 선별된 유사벡터의 거리값을 바탕으로 일정한 가중치를 배분하고 상기 가중치를, 예측하고자 하는 시점의 하루 및 이틀 전 시점의 데이터에 각각 곱하고, 상기 곱한값들을 합산함으로써 하수처리장의 유입유량과 유입성분농도를 예측하는 데이터 예측단계;를 포함하는 최근린기법을 이용한 하수처리장의 유입유량과 유입성분농도의 예측방법.
  8. [규칙 제26조에 의한 보정 11.06.2013]
    제 7항에 있어서,
    상기 데이터 전처리단계는 아래의 식과 같이 관리상한선(Upper Control Limit, UCL)과 관리하한선(Lower Control Limit, LCL)을 설정하고, 상기 관리상한선과 상기 관리하한선을 벗어나는 값을 이상치로 판단하는 관리도기법을 사용하여 이상치를 제거하며, 상기 제거된 시점의 이상치를 보완하기 위해 상기 제거된 시점 전날과 다음날의 데이터평균값을 제거된 시점의 이상치에 적용하여 데이터셋을 유지하도록 하는 이상치를 보완하는 것을 특징으로 하는 최근린기법을 이용한 하수처리장의 유입유량과 유입성분농도의 예측방법.
    (여기서, 는 수집된 데이터의 평균, A는 상수, 는 표준편차를 말함)
    Figure WO-DOC-FIGURE-8aa
    Figure WO-DOC-FIGURE-8bb
    Figure WO-DOC-FIGURE-8cc
  9. 제 8항에 있어서,
    상기 데이터 전처리단계에서 전처리된 데이터에 대하여 사용자가 검색하고자 하는 데이터의 검색범위를 설정하여 상기 설정된 데이터 검색범위에 대해 유사벡터를 검색할 수 있는 데이터 검색범위 설정단계;를 더 포함하는 것을 특징으로 하는 최근린기법을 이용한 하수처리장의 유입유량과 유입성분농도의 예측방법.
PCT/KR2013/002567 2013-03-27 2013-03-28 최근린기법을 이용한 하수처리장의 유입유량과 유입성분농도의 예측 장치 및 방법 WO2014157748A1 (ko)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR10-2013-0032729 2013-03-27
KR1020130032729A KR101432436B1 (ko) 2013-03-27 2013-03-27 최근린기법을 이용한 하수처리장의 유입유량과 유입성분농도의 예측 장치 및 방법

Publications (1)

Publication Number Publication Date
WO2014157748A1 true WO2014157748A1 (ko) 2014-10-02

Family

ID=51624701

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR2013/002567 WO2014157748A1 (ko) 2013-03-27 2013-03-28 최근린기법을 이용한 하수처리장의 유입유량과 유입성분농도의 예측 장치 및 방법

Country Status (2)

Country Link
KR (1) KR101432436B1 (ko)
WO (1) WO2014157748A1 (ko)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108793351A (zh) * 2017-04-26 2018-11-13 北京济安金信科技有限公司 污水处理方法、系统及具有该系统的电子设备
CN110929359A (zh) * 2019-11-20 2020-03-27 合肥泽众城市智能科技有限公司 基于pnn神经网络和swmm技术的管网淤积风险预测建模方法
CN115310887A (zh) * 2022-10-12 2022-11-08 合肥凯泉电机电泵有限公司 一种应用于污水处理设备的质量评估系统及方法
CN115372579A (zh) * 2022-08-24 2022-11-22 江苏省环境工程技术有限公司 一种基于水力停留时间的水质超标预警方法
CN115544431A (zh) * 2022-12-05 2022-12-30 湖南迪亚环境工程股份有限公司 一种渗滤液污水组分含量动态监测系统

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101977214B1 (ko) * 2017-01-06 2019-05-10 한양대학교 산학협력단 이상치 탐지 방법, 이를 이용하는 장치 및 시스템
KR102194871B1 (ko) * 2018-12-10 2020-12-23 대한민국 작물수확량 예측방법 및 이를 구현하는 작물수확량 예측장치
KR102262279B1 (ko) * 2019-10-02 2021-06-08 (주)디지탈쉽 이상치 탐지를 위한 데이터 처리 방법 및 장치
KR102271177B1 (ko) * 2019-10-30 2021-06-30 (주)지피지기소프트 미세먼지 측정기를 통해 산출된 미세먼지 측정 데이터의 오류를 보정할 수 있는 원인 데이터 비교 기반의 미세먼지 측정 데이터 보정 장치
KR102308697B1 (ko) * 2020-01-09 2021-10-05 주식회사 261하우스 리뷰 콘텐츠 수익 분배 시스템
KR20210109160A (ko) 2020-02-27 2021-09-06 (주) 더아이엠씨 빅데이터 및 인공지능 기반 하수 유입수 예측방법, 그리고 이를 포함하는 저장매체

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6408227B1 (en) * 1999-09-29 2002-06-18 The University Of Iowa Research Foundation System and method for controlling effluents in treatment systems
KR20090078501A (ko) * 2008-01-15 2009-07-20 부산대학교 산학협력단 인공 신경망에 의한 하수처리장의 유입 유량 및 유입 성분농도의 예측 방법 및 장치
KR20090078502A (ko) * 2008-01-15 2009-07-20 부산대학교 산학협력단 하수처리장 공정 운영 상태 진단을 위한 방법 및 장치
US20100300966A1 (en) * 2007-02-13 2010-12-02 VRTX Technologies Systems for treatment of wastewater

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006021085A (ja) 2004-07-06 2006-01-26 Hitachi Ltd 下水処理運転支援装置、下水処理運転支援システム、下水処理運転支援方法および下水処理運転支援プログラム

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6408227B1 (en) * 1999-09-29 2002-06-18 The University Of Iowa Research Foundation System and method for controlling effluents in treatment systems
US20100300966A1 (en) * 2007-02-13 2010-12-02 VRTX Technologies Systems for treatment of wastewater
KR20090078501A (ko) * 2008-01-15 2009-07-20 부산대학교 산학협력단 인공 신경망에 의한 하수처리장의 유입 유량 및 유입 성분농도의 예측 방법 및 장치
KR20090078502A (ko) * 2008-01-15 2009-07-20 부산대학교 산학협력단 하수처리장 공정 운영 상태 진단을 위한 방법 및 장치

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
KIM, MIN SU ET AL.: "Development of Diagnosis Module on Influent Disturbances Utilizing Statistical Analysis Techniques", JOURNAL OF 2012 COMMON REFERENCE, 21 March 2012 (2012-03-21), pages 322 - 323 *
MOON, TAE SUP ET AL.: "Data preprocessing and analysis methods for prognosis of wastewater treatment plants", JOURNAL OF 2006 COMMON FALL REFERENCE, 15 November 2006 (2006-11-15), pages 88 - 89 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108793351A (zh) * 2017-04-26 2018-11-13 北京济安金信科技有限公司 污水处理方法、系统及具有该系统的电子设备
CN110929359A (zh) * 2019-11-20 2020-03-27 合肥泽众城市智能科技有限公司 基于pnn神经网络和swmm技术的管网淤积风险预测建模方法
CN110929359B (zh) * 2019-11-20 2023-09-22 合肥泽众城市智能科技有限公司 基于pnn神经网络和swmm技术的管网淤积风险预测建模方法
CN115372579A (zh) * 2022-08-24 2022-11-22 江苏省环境工程技术有限公司 一种基于水力停留时间的水质超标预警方法
CN115310887A (zh) * 2022-10-12 2022-11-08 合肥凯泉电机电泵有限公司 一种应用于污水处理设备的质量评估系统及方法
CN115310887B (zh) * 2022-10-12 2022-12-30 合肥凯泉电机电泵有限公司 一种应用于污水处理设备的质量评估系统及方法
CN115544431A (zh) * 2022-12-05 2022-12-30 湖南迪亚环境工程股份有限公司 一种渗滤液污水组分含量动态监测系统

Also Published As

Publication number Publication date
KR101432436B1 (ko) 2014-08-21

Similar Documents

Publication Publication Date Title
WO2014157748A1 (ko) 최근린기법을 이용한 하수처리장의 유입유량과 유입성분농도의 예측 장치 및 방법
CN105550323B (zh) 一种分布式数据库负载均衡预测方法和预测分析器
KR20090078501A (ko) 인공 신경망에 의한 하수처리장의 유입 유량 및 유입 성분농도의 예측 방법 및 장치
WO2020098016A1 (zh) 一种网络流量预测方法、装置及电子设备
CN111723839A (zh) 一种基于边缘计算的台区线损率预测方法
CN107301570A (zh) 业务量预测方法、异常业务量检测方法、装置和电子设备
CN101620645A (zh) 一种仿真大型电子信息系统体系结构的方法和系统
WO2017071369A1 (zh) 一种预测用户离网的方法和设备
CN108830417A (zh) 一种基于arma和回归分析的生活能源消费预测方法及系统
CN108984307A (zh) 计算任务迁移方法及计算任务迁移器
MirhoseiniNejad et al. ALTM: Adaptive learning-based thermal model for temperature predictions in data centers
CN110414086B (zh) 一种基于灵敏度的综合应力加速因子计算方法
CN113837383B (zh) 模型训练方法、装置、电子设备及存储介质
CN108446841A (zh) 一种利用灰色关联确定事故因素层次结构的系统方法
CN112463532B (zh) 构建snn工作负载自动映射器的方法及自动映射器
CN115392477A (zh) 基于深度学习的Skyline查询基数估计方法及装置
CN111523727A (zh) 基于不确定过程的考虑恢复效应的电池剩余寿命预测方法
CN110880055A (zh) 楼宇智能电表系统
CN115618743B (zh) 一种瞄准镜系统的状态评估方法及状态评估系统
CN117076887A (zh) 一种泵站机组运行状态预测和健康评估方法及系统
CN111612227A (zh) 一种基于K-means聚类与蝙蝠优化神经网络的负荷预测方法
CN106980675B (zh) 一种高效的桥梁结构健康预警系统
Chang et al. Dynamic traffic prediction for insufficient data roadways via automatic control theories
CN111242347A (zh) 基于历史权重更新的桥梁管养辅助决策系统
CN115034140A (zh) 一种基于关键控制因子的地表水水质变化趋势预测方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 13879918

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 13879918

Country of ref document: EP

Kind code of ref document: A1