WO2014062064A1 - Midwater arch system - Google Patents

Midwater arch system Download PDF

Info

Publication number
WO2014062064A1
WO2014062064A1 PCT/NO2013/050172 NO2013050172W WO2014062064A1 WO 2014062064 A1 WO2014062064 A1 WO 2014062064A1 NO 2013050172 W NO2013050172 W NO 2013050172W WO 2014062064 A1 WO2014062064 A1 WO 2014062064A1
Authority
WO
WIPO (PCT)
Prior art keywords
lugs
lifting
buoy
mwa
anchoring
Prior art date
Application number
PCT/NO2013/050172
Other languages
French (fr)
Inventor
Jørgen Høgmoe
Geir GRIMSRUD
Original Assignee
Riser Support Systems
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Riser Support Systems filed Critical Riser Support Systems
Priority to BR112015008443A priority Critical patent/BR112015008443A2/en
Priority to GB1506276.3A priority patent/GB2520906A/en
Priority to AU2013332507A priority patent/AU2013332507B2/en
Publication of WO2014062064A1 publication Critical patent/WO2014062064A1/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B22/00Buoys
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B22/00Buoys
    • B63B22/04Fixations or other anchoring arrangements
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • E21B17/01Risers
    • E21B17/012Risers with buoyancy elements

Definitions

  • the gutter is in substance a ioadbearing structure per se, designed to withstand the load of the risers without having to be supported by the framework of the below positioned Ioadbearing structure. This has the benefit of allowing the gutter to be modified until very late in a development project.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Ocean & Marine Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Physics & Mathematics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Revetment (AREA)
  • Jib Cranes (AREA)
  • Load-Engaging Elements For Cranes (AREA)
  • Other Liquid Machine Or Engine Such As Wave Power Use (AREA)
  • Tents Or Canopies (AREA)

Abstract

The invention provides a mid water arch (MWA) buoy for flexible riser arrangements, for lifting and installation, with anchors connected, in one operation, the mid water arch buoy (MWA) comprising: a gutter, a loadbearing structure, buoyancy elements, lifting lugs for attachment to a crane, and anchoring lugs for attachment to an anchor wire, distinguished in that the lifting lugs and anchoring lugs are common or are arranged above and under horizontally extending elements of the loadbearing structure, so that the loadbearing structure is in substance independent of the lifting forces except of compression components thereof, wherein the buoyancy elements comprise three or more gas filled pressure vessels, said pressure vessels are without bulkheads.

Description

MIDWATER ARCH SYSTEM
Field of the invention
The present invention relates to flexible risers, anchoring and arrangement thereof. More specifically, the invention relates to midwater arch systems for flexible risers.
Background of the, invention and prior art
Flexible risers are used for oil and gas production and exploration, and they are in general used between floating or stationary vessels of various types and the seabed. Flexible risers are arranged through the water column so as to provide rigidity and flexibility at the same time. The most classical configuration is the so called lazy s, named from the shape of the conftguration as seen from the side. However, numerous arrangements exist, and in general the arrangements comprises at least one portion for which the riser is provided with buoyancy, the parts on either side hanging as inclined catenary Sines between the portion with buoyancy and for example a subsea production system and a FPSG (Floating Production, Storage and Offloading) vessel.
The buoyancy is in general of two types: so called distributed buoyancy, consisting of a number of discrete buoyancy elements, typically based on foam, arranged along a section of the riser; or gas filled tanks as buoyancy elements, typically used for mid water archs (MWA).
A mid water arch -MWA- provides support and buoyancy for the risers. Usually, several risers are arranged together on one MWA. A MWA comprises a buoy, a bottom anchor and an anchoring line or tether, the Sine connecting the buoy to the anchor and holding the buoy at an intended mid water position. A mid water arch (MWA) buoy is the subject matter of the present invention.
A typical MWA buoy comprises a gutter, a loadbearing structure below the gutter, buoyancy eSements, lifting lugs for attachment to a crane, a bridle and anchoring lugs for attachment to an anchor wire or tether. The gutter is a curved plate with grooves or tracks into which risers shall be arranged. The gutter has a curvature feasible in view of the minimum allowable bending radius of the risers and the movements of the risers. The loadbearing structure is arranged below the gutter, interconnected to and supporting the gutter. Two buoyancy tanks are typically arranged in the loadbearing structure. Lifting lugs for hanging up the unit in a crane is typically arranged on top or close to the top of the unit. Anchoring fugs for hanging up the anchor, are typicafly arranged to the lower side of the structure, to which a rigid bridle structure or bridle chains are connected. The structure is dense with limited access, and arranging the lifting lugs high and the anchoring lugs low provides orientation stability.
A typical 1V1WA buoy weights about 70 metric tons whilst the bottom anchor weights about 250 metric tons. MWA's are used mainly for moderate depths, typically 70 ~ 300 m depths. The buoy with anchor, having height about 30-50 m, is lifted and installed in one operation before the risers are arranged onto the gutter.
The buoyancy tanks of a MWA are designed for the operation depth plus a safety factor. However, for redundancy the tanks contain one or more bulkheads, rated to one bar differential pressure, in order to maintain sufficient buoyancy if one tank compartment starts leaking when the IVIWA is installed in submerged position. The tanks are typicaliy filled with gas at a pressure equal to the submerged position seawater pressure plus one atmosphere, The design, fabrication and installation of MWA's are often postponed in a field development project, since decisions with respect to number of and capacity of risers, often are subject to revisions until Sate in the development project.
Selection of main parameters for the MWA's are traditionally dependent on the riser particulars. Thus the IVIWA particulars are decided subsequent of riser design freeze. This places the MWA completion and installation on the critical path of the field development schedule, since the MWA design and fabrication cannot commence prior to completion of the riser design. Currently, a typica! MWA must be installed using a 400 ion lifting vessel, which is expensive. Possibility to use a lower cost lifting vessel would be beneficial.
Currently, design and fabrication of a typical MWA takes about 9 months, A shorter period of time for design and fabrication would be beneficial, allowing later revisions on riser layout.
Currently, a typica! MWA will fail if leakage in one buoyancy tank compartment takes place during installation, even though the MWA is designed to withstand leakage in one buoyancy tank compartment without loosing sufficient buoyancy capacity during normal operation as submerged. This is because the differentia! pressure rating of one atmosphere of the bulkhead easily is exceeded if leakage takes place during installation. More. specifically, the compartments between bulkheads are typically filled with nitrogen at one bar overpressure relative to the intended position as submerged, leakages at elevation far off can not be handled since the bulkhead differentia! pressure rating is one bar. Experience reveal that in substance all damage to the MWA occur during installation, ability to withstand damage better would be beneficial, Currently, some fVlWA's will break down if one of the lifting bridles or slings break, because of instability or overload on the remaining slings.
A typical requirement is that a MWA shall be possible to install in one lifting operation. A typica! requirement is also that the lifting lugs and structure shal! be tested, however this is difficult in practice since the whole buoy must be tested since the lifting forces are taken up through the loadbearing structure .
The objective of the present invention is to provide mid water arch that is favorable with respect to one or more of the issues mentioned above.
Summary of the invention
The objective is met by the invention providing a mid water arch {MWA} buoy for flexible riser arrangements, for lifting and installation, with anchors
connected, in one operation, the mid water arch buoy comprising: a gutter,
a load bearing structure,
buoyancy elements,
lifting lugs for attachment to a crane, and
anchoring lugs for attachment to an anchor wire,
distinguished in that the Sifting lugs and anchoring lugs are common or are arranged above and under horizontally extending elements of the loadbearing structure, so that the loadbearing structure is in substance independent of the lifting forces except of compression components thereof, wherein the buoyancy elements comprise three or more gas filled pressure vessels, said pressure vessels are without bulkheads.
With the terms lifting lugs and anchoring lugs, it is meant any lifting lug, pad eye, hook, hole, fixation point or similar to which the chain, chain hook, twist eye. chain sling or slings, to the crane or anchor, respectively, can be fastened. Common anchoring and lifting lugs, or separation between them by only or in substance only horizontally oriented elements of the loadbearing structure, has a substantial technical effect. More specifically, this means that the loadbearing structure is independent or in substance independent of the lifting forces, so the loadbearing structure oriramework can be dimensioned not for the total weight of anchor plus MWA buoy plus a safety factor, but a significantly reduced load. More .specifically, during Sifting, the Soadbearing structure of the MWA of the invention function merely or substantially as a spreader and can be
dimensioned accordingly. The term arranged above and under horizontally extending elements, means that vertically orientated elements of the
loadbearing structure are not subject to the full lifting forces. An example of a horizontally extending element is a horizontal beam, spreader or yoke in the loadbearing structure. However, the MWA of the invention can comprise relative short rigid vertical elements, with lifting lugs on top and anchoring lugs on bottom, spread around or in between the loadbearing structure, but the full forces of lifting the buoy and anchor must not be carried by the Soadbearing structure, oniy horizontal compression components thereof. In other words, the lifting lugs and anchoring lugs are not separated by elements of the loadbearing structure carrying vertical load components when the buoy with anchor is lifted in a crane, if the lifting and anchoring iugs are separated, they are separated by elements independent of the loadbearing structure or elements of the
loadbearing structure carrying horizontal lifting force components. The number of lifting lugs equa! the number of anchoring lugs, and lifting !ugs and anchoring lugs are in substance vertically aligned.
The weight, size and lead time wif! be substantially reduced by the WWA of the present invention, which will have very favorable effects that will be better understood from the description below. The MWA buoy of the invention, with a bottom anchor connected, can be lifted in one operation by a 250 ton crane vessel, whilst prior art solutions require a 400 ton iifiing vessel, saving about 100 000 USD per day. The MWA buoy of the invention weights about 60 tons, prior art MWA buoys weight about 70 tons. The weight of the achor to be connected to the buoy, can be reduced by about 1 ,4 times the weight saving of the buoy. The lifting height and build height is reduced by about 10 m and 5-6, respectively, allowing reduced crane Siftsng reach out and hesght, which together with the reduced buoy weight allows a far less expensive crane vessel to be used. Furthermore, the lifting and anchoring lugs can easily be tested to three or four times the lifting force without damaging the loadbearing structure, contrary to prior art MWA'.s. Also, the lead time is reduced from about 9 months to 5-6 months....More specifically, the present invention de-couple the main riser design parameters from the sVIWA main parameters by modularizing the MWA design such that the main parts of the MWA can be pre fabricated prior to design freeze of risers. The main benefit of this is that the lead time for fvlWA's can be reduced from 9-12 months to less than 6 months, being on the critical path this will have a direct positive impact on the field development schedule which again yields a significant positive financial impact for the field operators and owners. Terms like vertical, horizontal, top, below and other position or orientation related words, refer to the mid water arch as positioned and oriented as installed, with the gutter on top, unless other meaning is specified. Preferably, all lifting lugs and anchoring lugs are arranged below the center of gravity. This allows a rigid bridle to be omitted, thereby reducing the height and weight and required lifting height of the MWA further. Furthermore, access to the lugs are far easier and safer on a vessel deck, and reduced height and weight facilitates transportation.
The buoyancy elements comprise three or more gas filled pressure vessels, the pressure vessels are without bulkheads, and preferably the pressure vessels are dimensioned so that at least two pressure vessels are sufficient for maintaining buoyancy of the MWA, as installed and during installation.
Alternative buoyancy elements can be used, such as elements based on syntactic foam or other foam, which can be feasible for larger depths than about 300 m. The MWA buoy comprises at least three lifting lugs, and at least three anchoring lugs, the number of lifting lugs preferably equals the number of anchoring lugs, the lugs are spread horizontally and Sifting lugs are common with anchoring lugs or respective lifting and anchoring lugs are in substance vertically aligned. Preferably, the MWA comprises four lifting lugs and four anchoring lugs, the lifting lugs are arranged on top of a horizontal spreader bar and the anchoring lugs are arranged below the horizontal spreader bar, which means on the underside, below the lifting lug. The MWA and associated lifting equipment are preferably designed so that failure in one sling will not result in loss of stability or loss of control.
Preferably, the gutter is in substance a ioadbearing structure per se, designed to withstand the load of the risers without having to be supported by the framework of the below positioned Ioadbearing structure. This has the benefit of allowing the gutter to be modified until very late in a development project.
Preferably the gutter is fastened to the ioadbearing structure in three positions, on top, at a central position, and at or close to either end. Thereby the gutter is independent of the tank and tank stiffener structure Preferably, the mid water arch buoy comprises a truss type loadbearing structure (where the majority of the forces are carried by axial forces) with at least three tanks where one tank is piaced in or in immediate vicinity of the buoy centerline. The .prior art loadbearing structures are based on plates, obstructing access to iifting iugs. Also the gutter can be a truss structure, facilitating access to anchoring and Sifting lugs or points even further in addition to increased strength relative to weight. The invention also provides use of the mid water arch (MWA) buoy of the invention, for use in mid water arch systems for flexible riser arrangements.
Figures
The invention, is illustrated with twelve figures, namely
Figure 1 illustrating a MWA buoy of the invention,
Figure 2 illustrating a MWA buoy of the invention, without gutter,
Figure 3 illustrating a gutter of a MWA of the invention,
Figure 4 illustrating a loadbearing structure of a MWA of the invention,
Figure 5 illustrating a buoyancy tank of a MWA of the invention,
Figures 6-10S illustrating details of a MWA of the invention, and
Figures 11 and 12, illustrating details of a gutter and how it is fastened or arranged in a MWA of the invention.
Deta i led desert ption
Reference is made to Fig.1 f illustrating a Mid Water Arch buoy 1 (MWA) of the invention, for flexible riser arrangements. The MWA 1 comprises a gutter 2, a loadbearing structure 3, three buoyancy elements 4, iifting lugs 5 for attachment to a crane, and anchoring lugs 6 for attachment to an anchor wire. As can be seen, the iifting lugs 5 and anchoring lugs 6 are common or are arranged above and under horizontally extending elements of the loadbearing structure, so that the loadbearing structure is in substance independent of the Iifting forces except of compression components thereof. In the illustrated embodiment, the Iifting lugs 5, of which only one can be seen clearly, is arranged on top of a horizontal member of the loadbearing structure 3, and the anchoring lugs 6, of which only one can be seen clearly, are arranged under said horizontal member of the loadbearing structure. Accordingly, when the MWA buoy with anchor connected is Sifted, the loadbearing structure is not taking up any vertical Sifting force components directly.
Reference is made to Fig. 2, illustrating the MWA of Fig, 1 , without gutter, for increased clarity. The components or elements loadbearing structure 3, gutter 2 and buoyancy tank 4, are illustrated separately on Figures 3S 4 and 5, respectively. Further details, with only some components illustrated for clarity, are shown on Figures 6, 7 and 8, 'illustrating the loadbearing structure and one central buoyancy tank, with lifting slings attached and anchoring slings or bridle attached, as seen from different points of view. Figures 9 and 10 are provided in order to illustrate clearly how the lifting lugs 5 and anchoring lugs 6 are arranged for the illustrated embodiment of a MWA 'buoy of ihe. invention, so as not or substantially not to transfer lifting loads vertically through the loadbearing structure 3.
Reference is made to Figures 1 1 and 12, illustrating the gutter 2 as a
loadbearing structure per se, and how it is fastened to the loadbearing structure in center 1 1 , which is on top, and at or towards the ends 12. Since the gutter is loadbearing per se, it is not dependent on the loadbearing structure, and the configuration or detailed design of the gutter can be postponed to very late in a development project, reducing the iead time.
Only one specific embodiment of a MWA buoy of the invention is illustrated, for the sake of clarity. Numerous variations are possible, as is clear from the description. The MWA buoy of the invention can comprise any feature as here described or illustrated, in any operative combination, and each such operative combination is an embodiment of a MWA buoy of the invention.

Claims

1.
Mid water arch buoy for flexible riser arrangements, for lifting and installation, with anchors connected, in one operation, the mid water arch buoy (MWA) comprising:
a gutter,
a load bearing structure,
buoyancy elements,
lifting lugs for attachment to a crane, and
anchoring lugs for attachment to an anchor wire,
c h a r a c t e r i s e d i n that the lifting lugs and anchoring lugs are common or are arranged above and under horizontally extending elements of the loadbearing structure, so that the loadbearing structure is in substance independent of the lifting forces except of compression components thereof, wherein the buoyancy elements comprise three or more gas filled pressure vessels, said pressure vessels are without bulkheads.
2.
Mid water arch buoy according to claim 1 , wherein all lifting lugs and anchoring lugs are arranged below the center of gravity,
3.
Mid water arch buoy according to claim 1 , wherein the pressure vessels are dimensioned so that at least two pressure vessels are sufficient for maintaining buoyancy of the MWA, as installed and during installation.
4.
Mid water arch buoy according to any one of claim 1-3, wherein at least three lifting lugs are arranged, and at least three anchoring lugs, the number of lifting lugs equal the number of anchoring lugs, the lugs are spread horizontally and lifting lugs are common with anchoring lugs or respective lifting and anchoring lugs are in substance vertically aligned.
5.
Mid water arch buoy according to claim 1 -4, wherein the MWA comprises four lifting lugs and four anchoring lugs, the Sifting lugs are arranged on top of a horizontal spreader bar and the anchoring !ugs are arranged below the horizontal spreader bar.
6.
Mid water arch buoy according to claim 1-5, wherein the gutter is in substance a loadbearing structure per se, designed to withstand the load of the risers without having to be supported by the framework of the below positioned loadbearing structure.
7.
Mid water arch buoy according to claim 1 or 6, wherein the gutter is fastened to the toadbearing structure only, and is independent of the tank and tank stiffener structure.
8.
Mid water arch buoy according to any one of claim 1-7, comprising a truss type loadbearing structure (where the majority of the forces are carried by axial forces) with at least three tanks where one tank is placed in or in immediate vicinity of the buoy centerline.
9.
Use of a mid water arch buoy according to any one of claims 1 -8, for lifting and installation, with anchors connected, in one operation, for flexible riser arrangements.
PCT/NO2013/050172 2012-10-16 2013-10-14 Midwater arch system WO2014062064A1 (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
BR112015008443A BR112015008443A2 (en) 2012-10-16 2013-10-14 floating arc system for medium water depth
GB1506276.3A GB2520906A (en) 2012-10-16 2013-10-14 Midwater arch system
AU2013332507A AU2013332507B2 (en) 2012-10-16 2013-10-14 Midwater arch system

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
NO20121193 2012-10-16
NO20121193A NO336936B1 (en) 2012-10-16 2012-10-16 underwater Buoy

Publications (1)

Publication Number Publication Date
WO2014062064A1 true WO2014062064A1 (en) 2014-04-24

Family

ID=50488527

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/NO2013/050172 WO2014062064A1 (en) 2012-10-16 2013-10-14 Midwater arch system

Country Status (5)

Country Link
AU (1) AU2013332507B2 (en)
BR (1) BR112015008443A2 (en)
GB (1) GB2520906A (en)
NO (1) NO336936B1 (en)
WO (1) WO2014062064A1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2577107B (en) * 2018-09-14 2021-06-16 Subsea 7 Do Brasil Servicos Ltda Installation of subsea risers

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6206742B1 (en) * 1997-01-15 2001-03-27 Abb Offshore Technology As Buoyancy device and method for using same
US20060159523A1 (en) * 2002-09-28 2006-07-20 Cooper Cameron Corporation Underwater enclosure apparatus and method for constructing the same
WO2007045850A1 (en) * 2005-10-18 2007-04-26 Foster Wheeler Energy Limited Tethered buoyant support and method for installation thereof
US7975769B2 (en) * 2004-03-23 2011-07-12 Single Buoy Moorings Inc. Field development with centralised power generation unit

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6206742B1 (en) * 1997-01-15 2001-03-27 Abb Offshore Technology As Buoyancy device and method for using same
US20060159523A1 (en) * 2002-09-28 2006-07-20 Cooper Cameron Corporation Underwater enclosure apparatus and method for constructing the same
US7975769B2 (en) * 2004-03-23 2011-07-12 Single Buoy Moorings Inc. Field development with centralised power generation unit
WO2007045850A1 (en) * 2005-10-18 2007-04-26 Foster Wheeler Energy Limited Tethered buoyant support and method for installation thereof

Also Published As

Publication number Publication date
AU2013332507A2 (en) 2015-06-04
BR112015008443A2 (en) 2018-04-24
AU2013332507A1 (en) 2015-05-21
AU2013332507B2 (en) 2017-06-01
NO336936B1 (en) 2015-11-30
GB2520906A (en) 2015-06-03
NO20121193A1 (en) 2014-04-17
GB201506276D0 (en) 2015-05-27

Similar Documents

Publication Publication Date Title
RU2519456C2 (en) Mooring system with separated anchor lines and/or marine riser system
EP2156004B1 (en) Disconnectable riser-mooring system
KR102055049B1 (en) Hydrocarbon processing vessel and method
EP2192260B1 (en) Riser disconnect and support mechanism
US10183730B2 (en) Twin-hull offshore structure comprising an interconnecting central deck
CN106061831A (en) A transfer structure, a transfer system and a method for transferring lng and/or electric power
US6435124B1 (en) Mooring and flowline system
KR20110124219A (en) Preloading to reduce loads and save steel on topsides and grillage of catamaran systems
US20110294380A1 (en) Floating production unit with disconnectable transfer system
EP2931632B1 (en) Marine fall pipe system, marine vessel comprising such fall pipe system, and marine rock placement method
KR101300707B1 (en) Topside load support structure of floating ocean construct
WO2007100394A2 (en) Lashing of a tender assist drilling unit to a floating production facility
KR20160001236U (en) Hanging type mono rail series connection apparatus and offshore structure having the connection apparatus
AU2013332507B2 (en) Midwater arch system
US6869325B1 (en) Rotating tower system for transferring hydrocarbons to a ship
US9168985B2 (en) Frame shaped submersible deck box structure comprising at least one structural module
KR20230041656A (en) Damage prevention system for power cables inside and outside the floating offshore wind power plant
KR20140005356U (en) Topside module structure and marine structure having the same
US9011046B2 (en) Retractable chain connector
EP2778042A1 (en) Assembly for transferring fluids between a vessel and a turret structure mounted in said vessel
CN104044703A (en) Assembly for transferring fluids between a vessel and a turret structure mounted in said vessel
SG173783A1 (en) Deep water and ultra deep water mooring system
CN210338233U (en) Suspension device of counterweight chain
KR101605342B1 (en) Device of jack up rig towing line installation, and jack up rig including the same
BR102014028328A2 (en) floating element for submerged oil exploration anchor system

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 13847412

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 1506276

Country of ref document: GB

Kind code of ref document: A

Free format text: PCT FILING DATE = 20131014

WWE Wipo information: entry into national phase

Ref document number: 1506276.3

Country of ref document: GB

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 2013332507

Country of ref document: AU

Date of ref document: 20131014

Kind code of ref document: A

32PN Ep: public notification in the ep bulletin as address of the adressee cannot be established

Free format text: NOTING OF LOSS OF RIGHTS PURSUANT TO RULE 112(1) EPC (EPO FORM 1205A DATED 31/08/2015)

122 Ep: pct application non-entry in european phase

Ref document number: 13847412

Country of ref document: EP

Kind code of ref document: A1

REG Reference to national code

Ref country code: BR

Ref legal event code: B01A

Ref document number: 112015008443

Country of ref document: BR

ENP Entry into the national phase

Ref document number: 112015008443

Country of ref document: BR

Kind code of ref document: A2

Effective date: 20150415