WO2014044628A1 - Method of orienting a second borehole relative to a first borehole - Google Patents
Method of orienting a second borehole relative to a first borehole Download PDFInfo
- Publication number
- WO2014044628A1 WO2014044628A1 PCT/EP2013/069100 EP2013069100W WO2014044628A1 WO 2014044628 A1 WO2014044628 A1 WO 2014044628A1 EP 2013069100 W EP2013069100 W EP 2013069100W WO 2014044628 A1 WO2014044628 A1 WO 2014044628A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- borehole
- magnetic field
- casing
- measuring
- component
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/02—Determining slope or direction
- E21B47/022—Determining slope or direction of the borehole, e.g. using geomagnetism
- E21B47/0228—Determining slope or direction of the borehole, e.g. using geomagnetism using electromagnetic energy or detectors therefor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/04—Directional drilling
Definitions
- the present invention relates to a method of creating a second borehole in an earth formation at a selected orientation relative to a first borehole formed in the earth formation.
- the first borehole is a well for the production of hydrocarbon oil and/or gas it can be required to drill the second borehole to intersect the first borehole at a lower end part thereof. This may be the case if due to an incident control of the hydrocarbon well is lost, whereby an uncontrolled hazardous hydrocarbon release to seabed or surface may result.
- a last resort is to drill a relief well in order to stop flow.
- the objective of the relief well is to provide fluid communication with the target well above the reservoir, and to pump a heavy fluid via the relief well into the blowout well to stop the uncontrolled hydrocarbon fluid flow.
- target well Due to some uncertainty in the positions of both the hydrocarbon well (hereinafter also referred to as "target well") and the relief well, it is not feasible to directly drill the relief well into the target well at depths that may range from 1000m to 6000m below the surface or sea- level. Such well position uncertainty is generally caused by instrument errors and/or operational errors while using the survey tools to determine the position of a well.
- a proven successful relative positioning technique is based on the principle of generating an alternating current (AC) in the target well by injecting a current in the open hole of the nearby relief well.
- the AC starts flowing inside the steel material of the target well, the steel material either being a casing, a drill-pipe or both.
- the resulting magnetic field of the AC in the target well can then be measured in the relief well to determine the relative distance (RD) between the two wells and the high-side to target direction (HSTD) from the relief well to the target well.
- RD relative distance
- HSTD high-side to target direction
- US 3,725,777 discloses a method of determining a relative position between a first well and a second well, whereby the first well is provided with a magnetized casing. The resulting magnetic field components are calculated as a function of the radial distance from the casing. Also the magnetic field is measured in the second well. The distance and direction between the wells is determined from a comparison between the calculated magnetic field and the measured magnetic field.
- a method of creating a second borehole in an earth formation at a selected orientation relative to a first borehole formed in the earth formation, wherein a position parameter represents a position of the first borehole comprises the steps of: a) providing a borehole element that generates a magnetic field and is adapted to be arranged in the first
- step (e) providing a finite element model of the magnetic field using each component of the magnetic field measured in step (b) as a boundary condition for the finite element model ;
- the method of the invention it is achieved that the HSTD direction and the RD between the two boreholes are determined more accurately than in the analytical methods used in the prior art.
- the magnetic field is measured at said selected distance from the borehole element, which measurement is then used in the finite element model to calculate the magnetic field in the second borehole. It is thereby taken into account that each magnetic pole of the magnetized borehole element has a spatial
- the borehole element comprises a casing to be installed in the first borehole, and step (a)
- the step of magnetizing the casing comprises magnetizing each casing joint.
- each casing joint is magnetized so as to have magnetic poles mutually spaced in longitudinal direction of the casing joint.
- This technique is also referred to as passive magnetic ranging (PMR) .
- PMR is based on the principle of magnetizing series of casing joints individually and longitudinally prior to running the casing joints (usually production casing joints) into the target well.
- the casing joints include first and second casing joints interconnected in a manner that the magnetic fields of the first and second casing joints strengthen each other.
- the first and second casing joints have magnetic poles of similar polarity, wherein the first and second casing joints are
- step (b) comprises measuring each component of the magnetic field at said selected distance prior to installing the borehole element in the first borehole.
- the borehole element has a substantially tubular shape, and wherein each component of the magnetic field is measured using an annular device comprising a magnetometer whereby the borehole element is moved in axial direction through the annular device.
- the annular device is arranged above the first borehole, and the borehole element is lowered substantially vertically into the first borehole via the annular device.
- the annular device is arranged at a drilling rig used to drill the first borehole.
- each component of the magnetic field is preferably measured at a plurality of axially spaced locations of the borehole element.
- the annular device suitably extends at a relatively short radial distance from the borehole element, for example at a distance of about 1 inch (25,4 mm) .
- step (b) comprises measuring the radial component of the magnetic field.
- step (b) preferably further comprises measuring an axial component of the magnetic field.
- a tangential component of the magnetic field should be absent for the rotationally symmetrical magnetic field. Therefore, in order to check whether the quality of the measurement is adequate and/or to check whether the calibration for magnetic
- Step (d) of the method of the invention suitably comprises measuring the magnetic field in the second borehole using an electronic multi shot system.
- Step (f) of the method of the invention suitably comprises calculating the magnetic field in a coordinate system characterized by an inclination angle and/or an azimuth angle of the second borehole. Further, said calculation suitably also takes into account an
- step (h) of the method of the invention comprises determining a high-side-to-target direction from the second borehole to the first borehole. More preferably, step (h) also comprises determining a relative distance between the second borehole and the first borehole.
- the method of the invention is particularly useful
- the casing generally cannot be magnetized by injecting a current into the second borehole .
- the first borehole is a hydrocarbon well
- the second borehole suitably is a relief well drilled to intersect the hydrocarbon well.
- the measurement result is corrected for magnetic interference from a source other than the borehole element.
- Such interference may be due to, for example, the earth magnetic field or a magnetized drill string.
- the invention also relates to a system for creating a second borehole in an earth formation at a selected orientation relative to a first borehole formed in the earth formation, wherein a position parameter represents a position of the first borehole, the system comprising:
- - calculating means for calculating the magnetic field in the second borehole using the finite element model, for determining a difference between the
- Fig. 1 shows a cross section of a first borehole and a second borehole extending into an earth formation
- Fig. 2 schematically shows a magnetized casing to be arranged in the first wellbore
- Fig. 3 schematically shows a cross-section of the first and second wellbores; and Fig. 4 schematically shows a vertically oriented casing and a related polar coordinate system;
- Fig. 5 schematically shows the vertically oriented casing and a related Cartesian coordinate system
- Fig. 6 schematically shows a target well oriented at an inclination angle and an azimuth angle
- Fig. 7 schematically shows the target well and a relief well oriented at respective inclination angles and azimuth angles
- Fig. 8 schematically shows a flow scheme of an exemplary method of steering the relief well in the direction of the target well.
- FIG. 1 there is shown a first borehole
- the first borehole is a wellbore 1 for the production of hydrocarbon fluid, and extends from a drilling rig 6 at surface to a reservoir zone 8 of the earth formation 4.
- a thick subsurface salt layer 10 overlays the reservoir zone 8.
- the wellbore 1 is also referred to as the target well 1.
- the target well 1 is provided with a casing 11 which extends through a major portion of the salt layer, and a lower casing 12 which extends below the casing 11 and into the reservoir zone 8.
- the casing 12 is formed of a plurality of magnetized casing sections 14 so that the magnetized casing 12 induces a static magnetic field in the earth formation surrounding the casing 12.
- An annular device comprising a magnetometer 13 is arranged below the drill floor (not shown) of the drilling rig 6 in a manner allowing the magnetized casing 12 to pass through the annular device and to measure the magnetic field during lowering of the casing 12 into the target well 1.
- a drill string 16 with a drill bit 18 at its lower end extends from the drilling 6 via the casings 11, 12 into an open- hole lower section 20 of the target well 1.
- the target well 1 is S-shaped so that the open-hole section 20 is horizontally displaced from the drilling rig 6.
- the second borehole is a relief well 2 passing from a drilling rig 22 at surface through the salt layer 10, and directed to intersect the target well 1 at the open- hole section 20 thereof.
- the drilling rig 22 is
- a drill string 24 with a drill bit 26 at its lower end extends from the drilling 22 into the relief well 2.
- the drill string 24 is furthermore provided with a measurement-while-drilling (MWD) tool 28 including a magnetometer device for measuring the components of the static magnetic field in a three-dimensional coordinate system.
- MWD measurement-while-drilling
- FIG. 2 there is shown the casing 12 with casing sections 14.
- Each casing section 14 has been magnetized so as to have axially spaced magnetic poles whereby a magnetic north pole is located at one end part of the casing section, and a magnetic south pole is located at the other end part of the casing section.
- the casing sections 14 are made-up in a sequence so that a discrete pattern of magnetic poles is obtained whereby at selected axial positions of the casing magnetic poles of similar polarity are adjacent each other in order to strengthen the magnetic field.
- Fig. 2 the axial position of each magnetic north pole is indicated by a + sign, and the axial position of each magnetic South Pole is indicated by a - sign.
- HS direction of the borehole 1, 2 is defined by the intersection of a cross-sectional plane of the borehole 1, 2 and a vertical plane through the centre of the borehole 1, 2, and extends in upward direction.
- the HSR direction extends in the cross-sectional plane of the borehole 1, 2 and perpendicular to the HS direction.
- HSTD high-side-to-target
- RD relative distance
- FIG. 4 there is shown a vertically oriented portion of casing 12 at the drilling rig 6 during running-in into the wellbore 1.
- the magnetic field induced by the casing 12 is rotationally symmetric relative to the central longitudinal axis of the casing.
- the magnetic field can be characterized by a polar coordinate system having r- and z-axes whereby the z-axis extends vertically and the r-axis extends radially outward from the z-axis.
- a polar coordinate system having r- and z-axes whereby the z-axis extends vertically and the r-axis extends radially outward from the z-axis.
- the magnetic field induced by the vertically oriented casing has a vertical component Bz and a radial component Br .
- FIG. 5 there is shown the vertically oriented portion of casing 12 whereby the magnetic field is characterized by a Cartesian coordinate system having horizontally oriented x- and y-axes, and a vertically oriented z-axis.
- the magnetic field induced by the vertically oriented casing has a vertical component Bz and
- Fig. 6 there is shown a portion of the target well 1 oriented at an inclination angle ⁇ ⁇ and an azimuth angle ⁇ ⁇ . Furthermore there is shown a
- Cartesian coordinate system x° , y°, z° which is similar to the x, y, and z coordinate system referred to
- the subscript ⁇ refers to target well, the
- superscript 0 refers to a zero azimuth angle of the x- axis
- superscript ⁇ refers to the orientation of the target well at inclination angle ⁇ ⁇ and azimuth angle ⁇ ⁇ .
- Fig. 7 there is shown the portion of target well 1, the Cartesian coordinate system
- Fig. 7 also shows a portion of relief well 2 oriented at an inclination angle 6 R and an azimuth angle ⁇ , together f)ih f)ih f)ih
- the subscript R refers to the relief well
- the superscript ⁇ refers to the orientation of the relief well at inclination angle 6 R and azimuth angle ⁇ .
- item 30 indicates a finite element model of the static magnetic field induced by casing 12;
- item 34 indicates the magnetic field components measured with magnetometer 13 during lowering of casing 12 into the wellbore 1, expressed in the polar z-, r- coordinate system;
- item 36 indicates the inclination angles and azimuth angles of the target well and the relief well as a function of along hole depth
- - item 38 indicates the computed magnetic field components in the relief well, expressed in the , ', coordinate system;
- item 40 indicates the measured magnetic field components in the relief well, expressed in the , ', z R coordinate system;
- item 42 indicates a difference between the computed magnetic field components in the relief well and the measured magnetic field components in the relief we11 ;
- item 46 indicates the calculated high-side-to- target (HSTD) direction from the relief well to the target well;
- HSTD high-side-to- target
- - item 48 indicates the relative distance (RD) between the relief well and the target well.
- the wellbore 1 is drilled from the drilling rig 6 using the drill string 16 whereby the wellbore 1 passes through the salt layer 10 and into the reservoir zone 8 containing hydrocarbon fluid.
- the wellbore 1 is cased with casing 11 in conventional manner as drilling of the wellbore proceeds .
- the lowermost casing installed in the wellbore 1 is the magnetized casing 12 which is passed through the annular device 13 during lowering into the wellbore 1.
- the magnetometer 13 As the casing 12 passes through the annular device, the magnetometer 13 thereof measures the components Bz and Br of the magnetic field as a function of the axial position of the casing
- the measured components are stored in a memory of a computer (not shown) .
- the magnetometer device 28 is operated order to measure the components 40 of the magnetic field in the coordinate system x R , y R , z R . Also, the components 38 of the magnetic field in the fill) f)ih f)ih
- coordinate system x R , y R , z R are calculated by the finite element program 30, whereby the position parameter 32 is used as input parameter for the calculation.
- the mathematical procedure to calculate the components 38 of f)ih f)ih f)ih the magnetic field in the coordinate system x R , y R , z R will be explained hereinafter in more detail.
- the measured components 40 of the magnetic field and the computed components 38 of the magnetic field are compared in order to determine the difference 42 (if any) between these components.
- the difference 42 between the computed magnetic field components in the relief well and the measured magnetic field components in the relief well is used to determine an adjustment 44 to the position parameter 32.
- the difference 42 between the computed magnetic field and the measured magnetic field is again determined.
- the calculation procedure with the finite element model 30 is then repeated until the difference 42 between the computed magnetic field components in the relief well and the measured magnetic field components in the relief well is smaller than a selected maximum.
- the computer system 30 calculates the high-side-to-target (HSTD) direction from the relief well to the target well and the relative distance (RD) between the relief well and the target well.
- the relief well 2 is then further steered in a direction dependent on the calculated HSTD and RD .
- the magnetic field induced by the magnetized casing 12 is rotational symmetric relative to the longitudinal axis of the casing.
- the magnetic field can be expressed in a polar coordinate system with axes z and r, wherein the z-axis extends in the longitudinal direction of the casing, and the r-axis extends radially outward from the casing.
- the casing 12 is oriented vertically at the drilling rig 6 during measurement with magnetometer 13, therefore the z-axis extends vertically and the r-axis extends horizontally.
- the component Bz of the magnetic field is a vertical component and the component Br of the magnetic field is a horizontal component.
- the magnetic field can also be expressed as a vector: [r,z,Br,Bz] . The components of this vector are computed with the finite element method.
- Cartesian coordinate system with x-, y- and z-axes.
- the z-axis extends vertically, and the x- and y-axes extend horizontally.
- the x-axis is taken in North direction and the y-axis in East direction, therefore the x, y, z
- the magnetic field is in vector notation: [x,y,z, Bx, By, Bz] .
- the following notation is used whereby the subscript ⁇ refers to the Cartesian coordinate system pertaining to the target well and the superscript 0 refers to the North direction of the x-axis.
- the target well usually does not extend vertically, but rather extends at inclination angle ⁇ ⁇ and azimuth angle ⁇ ⁇ , which angles may vary with depth. Therefore the coordinate system in which the radial magnetic
- the rotations can be represented using the following matrices :
- the position vector in the rotated coordinate system of the target well is:
- the HSTD is also derived from the target well survey and the MWD tool measurements in the relief well, and is referred to as HSTD ffieasu ed . Due to survey errors in both the target well and the relief well, HSTD ffiodeIIed may deviate from HSTD ffieasured .
- measurements in steps (b) and (d) should be corrected for magnetic fields that may originate from sources other than the magnetized borehole casing, such as the earth magnetic field and magnetized parts of the drill string.
- the finite element method is powerful and simple for the rotationally symmetric magnetic field, as the problem is a two-dimensional problem whereby the magnetic field is calculated in the axial direction and the radial direction only.
- the trajectory of the target well is relatively straight since typical trajectory curves generally have a radius of much more than 100 m.
- the relative distance and direction to the target well can be derived directly, i.e. by
- the magnetic field is generated by magnetized casing joints.
- the magnetic field can be generated by other suitable borehole elements such as, for example, one or more magnetized drill pipe sections.
Landscapes
- Physics & Mathematics (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Electromagnetism (AREA)
- Geophysics (AREA)
- Geophysics And Detection Of Objects (AREA)
Description
Claims
Priority Applications (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| BR112015005664-4A BR112015005664B1 (en) | 2012-09-18 | 2013-09-16 | method for creating a second drillhole in a terrestrial formation |
| GB1503463.0A GB2521297B (en) | 2012-09-18 | 2013-09-16 | Method of orienting a second borehole relative to a first borehole |
| US14/428,557 US9932819B2 (en) | 2012-09-18 | 2013-09-16 | Method of orienting a second borehole relative to a first borehole |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| EP12184829.5 | 2012-09-18 | ||
| EP12184829 | 2012-09-18 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2014044628A1 true WO2014044628A1 (en) | 2014-03-27 |
Family
ID=46970026
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/EP2013/069100 Ceased WO2014044628A1 (en) | 2012-09-18 | 2013-09-16 | Method of orienting a second borehole relative to a first borehole |
Country Status (4)
| Country | Link |
|---|---|
| US (1) | US9932819B2 (en) |
| BR (1) | BR112015005664B1 (en) |
| GB (1) | GB2521297B (en) |
| WO (1) | WO2014044628A1 (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2016039755A1 (en) * | 2014-09-11 | 2016-03-17 | Halliburton Energy Services, Inc. | Rare earth alloys as borehole markers |
| US9534488B2 (en) | 2014-07-18 | 2017-01-03 | Halliburton Energy Services, Inc. | Electromagnetic ranging source suitable for use in a drill string |
| WO2017003487A1 (en) * | 2015-07-02 | 2017-01-05 | Halliburton Energy Services, Inc. | Establishing hydraulic communication between relief well and target well |
Families Citing this family (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CA2951528C (en) * | 2014-07-07 | 2019-12-03 | Halliburton Energy Services, Inc. | Downhole thermal anomaly detection for passive ranging to a target wellbore |
| US10273799B2 (en) * | 2014-08-11 | 2019-04-30 | Halliburton Energy Services, Inc. | Well ranging apparatus, systems, and methods |
| EP3359777B1 (en) | 2015-12-18 | 2021-12-22 | Halliburton Energy Services, Inc. | Systems and methods to calibrate individual component measurement |
| GB2583663B (en) | 2018-01-10 | 2022-04-06 | Shell Int Research | Apparatus and method for downhole measurement |
| US11781421B2 (en) | 2020-09-22 | 2023-10-10 | Gunnar LLLP | Method and apparatus for magnetic ranging while drilling |
| CN114961703B (en) * | 2022-04-15 | 2023-01-20 | 中国石油天然气集团有限公司 | Method and device for positioning cement plug well, electronic equipment and storage medium |
| CN117027764B (en) * | 2022-05-20 | 2024-02-09 | 中国石油天然气集团有限公司 | Drilling positioning device, method and system |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP0301671A2 (en) * | 1987-07-30 | 1989-02-01 | Shell Internationale Researchmaatschappij B.V. | Method of magnetizing well tubulars |
| US20020112856A1 (en) * | 2001-02-16 | 2002-08-22 | Van Steenwyk Donald H. | Method for magnetizing wellbore tubulars |
| US20060131013A1 (en) * | 2004-12-20 | 2006-06-22 | Pathfinder Energy Services, Inc. | Magnetization of target well casing strings tubulars for enhanced passive ranging |
| US20090173504A1 (en) * | 2006-08-25 | 2009-07-09 | Pathfinder Energy Services, Inc. | Transverse magnetization of casing string tubulars |
| US20120139530A1 (en) * | 2010-12-07 | 2012-06-07 | Smith International, Inc. | Electromagnetic array for subterranean magnetic ranging operations |
Family Cites Families (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3725777A (en) | 1971-06-07 | 1973-04-03 | Shell Oil Co | Method for determining distance and direction to a cased borehole using measurements made in an adjacent borehole |
| US5064006A (en) * | 1988-10-28 | 1991-11-12 | Magrange, Inc | Downhole combination tool |
| US5230387A (en) * | 1988-10-28 | 1993-07-27 | Magrange, Inc. | Downhole combination tool |
| US6633816B2 (en) * | 2000-07-20 | 2003-10-14 | Schlumberger Technology Corporation | Borehole survey method utilizing continuous measurements |
| US6854192B2 (en) * | 2001-02-06 | 2005-02-15 | Smart Stabilizer Systems Limited | Surveying of boreholes |
| US7510030B2 (en) * | 2006-06-30 | 2009-03-31 | Vector Magnetics Llc | Elongated cross coil assembly for use in borehole location determination |
| ATE472115T1 (en) * | 2006-12-22 | 2010-07-15 | Prad Res & Dev Nv | PROBE FOR ELECTRICAL EXAMINATION OF A BOREHOLE |
| US8010290B2 (en) * | 2007-05-03 | 2011-08-30 | Smith International, Inc. | Method of optimizing a well path during drilling |
| AU2010310816B2 (en) * | 2009-10-20 | 2016-01-28 | Schlumberger Technology B.V. | Methods for characterization of formations, navigating drill paths, and placing wells in earth boreholes |
| EP2317069A1 (en) * | 2009-10-30 | 2011-05-04 | Welltec A/S | Magnetic ranging system for controlling a drilling process |
| US9181754B2 (en) * | 2011-08-02 | 2015-11-10 | Haliburton Energy Services, Inc. | Pulsed-electric drilling systems and methods with formation evaluation and/or bit position tracking |
-
2013
- 2013-09-16 BR BR112015005664-4A patent/BR112015005664B1/en active IP Right Grant
- 2013-09-16 US US14/428,557 patent/US9932819B2/en active Active
- 2013-09-16 GB GB1503463.0A patent/GB2521297B/en active Active
- 2013-09-16 WO PCT/EP2013/069100 patent/WO2014044628A1/en not_active Ceased
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP0301671A2 (en) * | 1987-07-30 | 1989-02-01 | Shell Internationale Researchmaatschappij B.V. | Method of magnetizing well tubulars |
| US20020112856A1 (en) * | 2001-02-16 | 2002-08-22 | Van Steenwyk Donald H. | Method for magnetizing wellbore tubulars |
| US20060131013A1 (en) * | 2004-12-20 | 2006-06-22 | Pathfinder Energy Services, Inc. | Magnetization of target well casing strings tubulars for enhanced passive ranging |
| US20090173504A1 (en) * | 2006-08-25 | 2009-07-09 | Pathfinder Energy Services, Inc. | Transverse magnetization of casing string tubulars |
| US20120139530A1 (en) * | 2010-12-07 | 2012-06-07 | Smith International, Inc. | Electromagnetic array for subterranean magnetic ranging operations |
Cited By (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US9534488B2 (en) | 2014-07-18 | 2017-01-03 | Halliburton Energy Services, Inc. | Electromagnetic ranging source suitable for use in a drill string |
| WO2016039755A1 (en) * | 2014-09-11 | 2016-03-17 | Halliburton Energy Services, Inc. | Rare earth alloys as borehole markers |
| GB2545821A (en) * | 2014-09-11 | 2017-06-28 | Halliburton Energy Services Inc | Rare earth alloys as borehole markers |
| US10539006B2 (en) | 2014-09-11 | 2020-01-21 | Halliburton Energy Services, Inc. | Rare earth alloys as borehole markers |
| GB2545821B (en) * | 2014-09-11 | 2021-05-26 | Halliburton Energy Services Inc | Rare earth alloys as borehole markers |
| NO348493B1 (en) * | 2014-09-11 | 2025-02-17 | Halliburton Energy Services Inc | Rare earth alloys as borehole markers |
| WO2017003487A1 (en) * | 2015-07-02 | 2017-01-05 | Halliburton Energy Services, Inc. | Establishing hydraulic communication between relief well and target well |
| GB2555273A (en) * | 2015-07-02 | 2018-04-25 | Halliburton Energy Services Inc | Establishing hydraulic communication between relief well and target well |
| US10590706B2 (en) | 2015-07-02 | 2020-03-17 | Halliburton Energy Services, Inc. | Establishing hydraulic communication between relief well and target well |
| GB2555273B (en) * | 2015-07-02 | 2021-04-07 | Halliburton Energy Services Inc | Establishing hydraulic communication between relief well and target well |
Also Published As
| Publication number | Publication date |
|---|---|
| GB201503463D0 (en) | 2015-04-15 |
| GB2521297A (en) | 2015-06-17 |
| BR112015005664A2 (en) | 2017-07-04 |
| BR112015005664B1 (en) | 2021-06-08 |
| US9932819B2 (en) | 2018-04-03 |
| GB2521297B (en) | 2017-09-06 |
| US20150240623A1 (en) | 2015-08-27 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US9932819B2 (en) | Method of orienting a second borehole relative to a first borehole | |
| CA2727885C (en) | Enhanced passive ranging methodology for well twinning | |
| US7617049B2 (en) | Distance determination from a magnetically patterned target well | |
| CA2458246C (en) | Passive ranging techniques in borehole surveying | |
| US6985814B2 (en) | Well twinning techniques in borehole surveying | |
| CA2458254C (en) | Downhole referencing techniques in borehole surveying | |
| RU2436924C2 (en) | Determination of distance with magnetic devices at drilling of parallel wells | |
| US8010290B2 (en) | Method of optimizing a well path during drilling | |
| CA2440994C (en) | Supplemental referencing techniques in borehole surveying | |
| US8684107B2 (en) | System and method for densely packing wells using magnetic ranging while drilling | |
| US10294773B2 (en) | Method and system for magnetic ranging and geosteering | |
| CN102356212A (en) | Relative and absolute error models for subterranean wells | |
| US12612852B2 (en) | Devices, systems, and methods for downhole surveying | |
| CA3004887C (en) | Methods and systems employing a gradient sensor arrangement for ranging | |
| CA2460788C (en) | Magnetic field enhancement for use in passive ranging | |
| CA2470305C (en) | Well twinning techniques in borehole surveying |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 13766922 Country of ref document: EP Kind code of ref document: A1 |
|
| ENP | Entry into the national phase |
Ref document number: 1503463 Country of ref document: GB Kind code of ref document: A Free format text: PCT FILING DATE = 20130916 |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 1503463.0 Country of ref document: GB |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 14428557 Country of ref document: US |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| REG | Reference to national code |
Ref country code: BR Ref legal event code: B01A Ref document number: 112015005664 Country of ref document: BR |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 13766922 Country of ref document: EP Kind code of ref document: A1 |
|
| ENP | Entry into the national phase |
Ref document number: 112015005664 Country of ref document: BR Kind code of ref document: A2 Effective date: 20150313 |







