WO2014023210A1 - Arc de trajectoire de flamme de four de pyrolyse de charbon - Google Patents

Arc de trajectoire de flamme de four de pyrolyse de charbon Download PDF

Info

Publication number
WO2014023210A1
WO2014023210A1 PCT/CN2013/080819 CN2013080819W WO2014023210A1 WO 2014023210 A1 WO2014023210 A1 WO 2014023210A1 CN 2013080819 W CN2013080819 W CN 2013080819W WO 2014023210 A1 WO2014023210 A1 WO 2014023210A1
Authority
WO
WIPO (PCT)
Prior art keywords
gas
pipe
combustion
fire
exhaust gas
Prior art date
Application number
PCT/CN2013/080819
Other languages
English (en)
Chinese (zh)
Inventor
王新民
Original Assignee
山西鑫立能源科技有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 山西鑫立能源科技有限公司 filed Critical 山西鑫立能源科技有限公司
Publication of WO2014023210A1 publication Critical patent/WO2014023210A1/fr

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10BDESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
    • C10B3/00Coke ovens with vertical chambers
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10BDESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
    • C10B21/00Heating of coke ovens with combustible gases
    • C10B21/10Regulating and controlling the combustion
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10BDESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
    • C10B3/00Coke ovens with vertical chambers
    • C10B3/02Coke ovens with vertical chambers with heat-exchange devices
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10BDESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
    • C10B31/00Charging devices
    • C10B31/02Charging devices for charging vertically
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10BDESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
    • C10B33/00Discharging devices; Coke guides
    • C10B33/12Discharge valves
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10BDESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
    • C10B39/00Cooling or quenching coke
    • C10B39/02Dry cooling outside the oven

Definitions

  • the invention relates to a fire bow, in particular to a fire tunnel bow in a furnace cavity of a coal pyrolysis furnace.
  • coal pyrolysis furnaces on the market mostly use batch coking, and the process steps of proportioning, dewatering, coal feeding, preheating, carbonization, coke upgrading, and dry quenching are relatively independent. Continuous production, low production efficiency;
  • the waste gas generated in the coal pyrolysis process contains many useful components, such as S, HC1 and other acid gases, ⁇ 1 3 alkaline gas, tar, benzene, naphthalene, washing oil Organic matter such as the class, the complete process for the utilization of waste gas export, recovery and purification is not completed.
  • the invention provides a fire tunnel bow of a coal pyrolysis furnace, which not only supports the various devices in the furnace cavity of the coal pyrolysis furnace, but also provides a pipeline for each device in the furnace chamber of the coal pyrolysis furnace. layout.
  • a fire tunnel bow of a coal pyrolysis furnace is disposed in a furnace chamber below the carbonization chamber, the internal combustion heating device and the focal reforming device, and mainly comprises a strip bow and a fire bow center ring wall, and the fire bow center ring wall
  • a high-temperature combustible exhaust passage is formed in the middle portion, and one end of the strip is fixed on the center ring of the fire bow, and the other end is fixed on the furnace body, and the strip is arranged around the center of the center wall of the fire bow at a certain angular interval, and the number is
  • the total number of main and auxiliary internal fire passages of the internal combustion heating device is the same, wherein the wall of the upper fire bow is laid with the third gas entering the extension channel of the branch pipe and the third heat storage cavity, and the wall adjacent to the next next fire bow
  • the primary air supply pipe and the secondary air supply pipe laid in the body are repeatedly laid.
  • the technical scheme of the invention not only provides support for the carbonization indoor ring wall in the furnace cavity of the coal pyrolysis furnace, but also the fire channel partition wall and the central ring wall of the internal combustion heating device, and at the same time, provides various pipelines for the internal combustion heating device.
  • Figure 1 is an enlarged view of the portion F in Figure 15;
  • Figure 2 is a cross-sectional view taken along line X-X of Figure 1;
  • Figure 3 is a schematic view of a gas commutator according to the present invention
  • Figure 4 is a schematic view of the gas commutator of the present invention
  • Figure 5 is a schematic cross-sectional view taken at c-c in Figure 14;
  • Figure 5-1 is a schematic view showing the connection of a gas commutator and a gas heater pipe network according to the present invention
  • Figure 6 is a schematic cross-sectional view taken at z-z in Figure 11;
  • Figure 7 is a schematic cross-sectional view at w-w in Figure 11;
  • Figure 8 is a schematic cross-sectional view at y-y in Figure 11;
  • FIG. 9 is a schematic view of a coke upgrading device of a coal pyrolysis furnace according to the present invention (a cross-sectional view taken along line u-u in FIG. 11);
  • FIG. 10 is a schematic view of a fire tunnel bow of the coal pyrolysis furnace of the present invention (a FIG. 11 Sectional view at t);
  • Figure 11 is a schematic view showing the assembly of the present invention in a coal pyrolysis carbonization apparatus (enlarged view in Fig. 15);
  • Figure 12 is a schematic view of a dry quenching apparatus of a coal pyrolysis furnace according to the present invention (an enlarged view of H in Fig. 15);
  • Figure 13 is a schematic view showing the quenching bridge of the dry quenching device of the coal pyrolysis furnace according to the present invention.
  • Figure 14 is a schematic view showing the electrical connection of the industrial control center of the coal pyrolysis furnace according to the present invention.
  • Figure 15 is a general schematic view of a coal pyrolysis furnace according to the present invention.
  • a specific embodiment of the fire tunnel bow of a coal pyrolysis furnace of the present invention is mainly described in the third section of the fourth section (see also the contents of the first section).
  • coals are gas coal, fat coal, coking coal, one-third coking coal, lean coal first mixed and then sieved and crushed until the broken particles reach 5mm or less to form coal into the furnace.
  • the furnace is equally applicable to other coal blends of the ratio and particle size, and does not constitute a limitation on the coal powder required for the coal pyrolysis furnace of the present invention.
  • the second part is dewatering into the furnace
  • the dewatering of the coal entering the coal pyrolysis furnace is carried out in advance by the furnace coal dehydration device, thereby saving energy and reducing consumption.
  • the third part enters the coal into the coal, preheating, conditioning, cooling
  • the temperature generally drops to normal temperature, and the temperature may be lower. Therefore, it is necessary to preheat, adjust, and cool the coal entering the carbonization chamber before entering the carbonization chamber.
  • the first section enters the coal into the coal.
  • the coal feeding device is used to input the coal into the furnace after dehydration.
  • Section 2 Preheating of the coal into the furnace
  • the preheating unit is placed below the coal feeding unit and at the top of the coal pyrolysis furnace.
  • the preheating device uses preheating to enter the furnace coal after the temperature has been lowered after delivery.
  • the third section of the preheated coal into the furnace adjustment chamber is placed in the upper part of the furnace is located in the lower part of the preheating device, and the furnace coal conditioning chamber is used to adjust the amount of furnace coal injected into the carbonization chamber of the coal pyrolysis furnace. .
  • the fourth part is into the furnace coal pyrolysis (carbonization heating, coke modification, CD quenching)
  • the first section is into the furnace coal pyrolysis carbonization heating
  • the coal pyrolysis carbonization device 6 is disposed in the middle of the furnace body 91, and mainly comprises a carbonization chamber 61, an external gas heating device 64, an internal combustion heating device 67, and a tunnel bow 65; as shown in Fig. 2: carbonization
  • the chamber 61 is composed of a refractory heat conductive material, an inner ring wall 612 and an outer ring wall 611, and an annular space is formed around the outer circumference of the carbonized outdoor ring wall 611.
  • the outer gas heating device 64 is mainly composed of several groups. (Group 9 of this example)
  • the structure is the same as that of the first gas heater 62, the second gas heater 60, and the gas reversing device 66, and, as shown in Fig. 15, because the carbonization chamber 61 has a high height, the external gas heating device 64 is mainly divided into upper, middle and lower three-stage heating, and each section has nine sets of first gas heater 62 and second gas heater 60 having the same structure.
  • the inside of the carbonization indoor ring wall 612 is an internal combustion heating device 67, and the internal combustion heating device 67 is mainly composed of several groups (the third group of this example) having the same structure of the third gas heater 68 and the fourth gas heater. 69 and quenching exhaust gas heater 63.
  • the first gas heater 62 mainly includes a first combustion chamber 621, a first gas inlet branch 622, and a first heat storage heat exchanger 624.
  • the first combustion chamber 621 is made of a refractory material, an outer wall of the furnace body 91, and a refractory heat conductive material made of a carbonized outdoor ring wall 611 and an outer fire wall partition 625 to form a relatively closed gas combustion.
  • the fire passage as shown in FIG. 1, the first gas inlet branch pipe 622 passes through the outer wall of the furnace body 91 to the first combustion chamber 621.
  • the first heat storage heat exchanger 624 includes a first heat storage chamber 626, a first heat storage body 623, a first air inlet branch pipe 627, and a first combustion exhaust gas discharge branch pipe 628;
  • the heat chamber 626 is disposed in the outer wall of the furnace body 91.
  • the first heat storage body 623 is disposed in the first heat storage chamber 626.
  • the first heat storage chamber 626 is connected to the bottom of the first combustion chamber 621, and the other end is respectively connected to the first chamber.
  • An air enters the branch pipe 627 and the first combustion exhaust gas discharge branch pipe 628.
  • a first one-way air valve 629 is disposed between the first air inlet branch 627 and the first heat storage chamber 626, and the first one-way air valve 629 allows air to enter the branch pipe 627 from the first air.
  • the first heat storage chamber 626 flows into the first combustion chamber 621;
  • a first one-way exhaust valve 620 is disposed between the first combustion exhaust gas exhaust branch 628 and the first heat storage chamber 626, and the first one-way exhaust valve 620 allows the gas
  • the combustion exhaust gas flows from the first combustion chamber 621 through the first regenerator 626, and finally from the first combustion exhaust gas discharge branch 628 (of course, using the gas reversing device 66 as described below, when the air main pipe 667 is connected to the first air pipe 6671 is turned on, the air main pipe 667 and the second air pipe 6763 are cut off; at the same time, the combustion exhaust gas main pipe 669 is also cut off from the first combustion exhaust gas pipe 6691, and the corresponding combustion exhaust gas main pipe 669 and the
  • the second gas heater 60 having the same structure mainly includes a second combustion chamber 601, a second gas inlet branch 602 and a second heat storage heat exchanger 604, and the second combustion chamber 601 is made of refractory material.
  • the outer wall of the furnace body 91 and the refractory and heat conductive material are made into a carbonized outdoor ring wall 611 and an outer fire wall partition 625 to form a relatively closed gas combustion fire passage, and the second gas entering branch pipe 602 passes through the furnace body 91.
  • the wall passes into the second combustion chamber 601.
  • the second heat storage heat exchanger 604 includes a second heat storage chamber 606, a second heat storage body 603, a second air inlet branch pipe 607, and a second combustion exhaust gas discharge branch pipe 608.
  • the heat chamber 606 is disposed in the outer wall of the furnace body 91, the second heat storage body 603 is disposed in the second heat storage chamber 606, the second heat storage chamber 606 is connected to the bottom of the second combustion chamber 601, and the other end is respectively connected to the first chamber.
  • the second air enters the branch pipe 607 and the second combustion exhaust gas discharge branch pipe 608.
  • a second one-way air valve 609 is disposed between the second air inlet branch pipe 607 and the second heat storage cavity 606, and the second one-way air valve 609 allows air to pass from The second air inlet branch 607 and the second regenerator 606 flow into the second combustion chamber 601;
  • a second one-way exhaust valve 600 is disposed between the second combustion exhaust gas exhaust branch 608 and the second heat storage chamber 606, the second single The exhaust gas valve 600 allows the gas combustion exhaust gas to flow from the second combustion chamber 601 through the second regenerator 606, and finally from the second combustion exhaust gas discharge branch 608 (of course, using the gas reversing device 66 as described below, when the air mains 667 and first The gas pipe 6371 is cut off, the air main pipe 667 is connected to the second air pipe 6673, and at the same time, the combustion exhaust gas main pipe 669 and the first combustion exhaust gas pipe 6691 are also connected, and the corresponding combustion exhaust gas main pipe 669 and the second combustion exhaust gas main pipe are connected.
  • 6693 is also
  • a top portion of the outer fire passage partition 625 between the first combustion chamber 621 and the immediately adjacent second combustion chamber 601 is provided with a combustion chamber through hole 6251, and the combustion chamber through hole 6251 will be the first combustion chamber. 621 and the immediately adjacent second combustion chamber 601 are connected to form an associated group.
  • the external gas heating device 64 has a total of 18 outer fire passage partition walls 625 to form 9 groups of associated combustion groups; in addition, as shown in FIG. Because the carbonization chamber 61 has a high height, the external gas heating device 64 is mainly divided into upper, middle and lower three-stage heating, and each segment has nine sets of the first gas heater 62 and the second gas heater 60 having the same structure.
  • the gas heater and the heat storage heat exchange method are;
  • the net gas recovered by the waste gas recovery and purification enters the first combustion chamber 621 through the first gas inlet branch 622, and the first one-way air valve 629 is opened to allow air.
  • the first air inlet pipe 627 and the first heat storage chamber 626 flow into the first combustion chamber 621; the first one-way exhaust valve 620 is closed, and the generated hot exhaust gas enters the second combustion chamber 601 through the combustion chamber through hole 6251.
  • the hot exhaust gas passes through the second regenerator 603 in the second regenerator 606, the second regenerator 603 absorbs and cools the hot exhaust gas, and the hot exhaust gas becomes a relatively low temperature exhaust gas from the second combustion exhaust gas.
  • the discharge branch pipe 608 is discharged;
  • the net gas recovered by the waste gas recovery enters the second combustion chamber 601 through the second gas inlet branch 602, and the second one-way air valve 609 is opened, the air From the second air into the branch 607 passes through the second regenerator 606 into the second combustion chamber 601, and the air is heated by the heat released by the second regenerator 603 to become hot air to assist combustion of the gas in the second combustion chamber 601; at the same time, The second one-way exhaust valve 600 is closed, and the hot exhaust gas after the combustion of the gas in the second combustion chamber 601 enters the first combustion chamber 621 through the combustion chamber through hole 6251, and the hot exhaust gas passes through the first heat storage chamber 626.
  • a heat storage body 623 absorbs heat and cools the hot exhaust gas, and the hot exhaust gas becomes a relatively low temperature low temperature exhaust gas discharged from the first combustion exhaust gas discharge branch pipe 628;
  • combustion chamber observation hole 6202 allows the technician to visually observe the gas combustion of each combustion chamber, the combustion chamber
  • a combustion chamber temperature table 6203 is provided in the temperature monitoring hole 6201 for temperature monitoring of the combustion chamber to facilitate evaluation of the coal pyrolysis process.
  • the combustion chamber temperature table 6203 is connected to the industrial control center 90, and the temperature data of the combustion chamber temperature table 6203 is automatically collected by the industrial control center 90.
  • the gas reversing device 66 includes an upper disc 661, a lower disc 662, a rotary reversing motor 663, an air blower 664, a gas blower 665, an exhaust fan 666, and a lower disc 662 respectively.
  • the upper plate 661 is attached to the upper plate 662, and the upper plate 661 is respectively provided with an air connecting pipe 6672, a gas connecting pipe 6682, a combustion exhaust pipe connecting pipe 6692, and a rotary commutating motor.
  • the 663 drives the upper plate 661 to reciprocally rotate on the lower plate 662, so that the air main pipe 667 continuously switches on and off with the first air pipe 6671 and the second air pipe 6673, and the gas main pipe 668 continuously communicates with the first gas pipe 6681 and the second gas.
  • the pipe branch 6683 performs the switching on and off, and the combustion exhaust gas main pipe 669 continuously switches on and off with the second combustion exhaust gas pipe 6693 and the first combustion exhaust gas pipe 6691 (with the first air pipe 6371 and the second air pipe 6673 and the first The switching of the gas pipe 6681 and the second gas pipe 6683 is just the opposite).
  • two sets of surrounding pipes are further disposed on the outer circumference of the furnace body 91, including a first air surrounding pipe 6674, a first gas surrounding pipe 6684, a first combustion exhaust gas surrounding pipe 6694; The air surrounding pipe 6675, the second gas surrounding pipe 6685, and the second combustion exhaust gas surrounding pipe 6695.
  • the first air pipe 6764 connects the first air pipe 6671 and the first air inlet pipe 627, and the first air pipe 6371, the first air pipe 6674, and the first air enter the branch pipe 627.
  • the first heat storage chamber 626 and the first combustion chamber 621 form the same passage;
  • the first gas enclosure tube 6684 will be the first gas manifold 6681 and the first A gas inlet branch pipe 622 is coupled, and the first gas pipe 6681, the first gas pipe 6684, the first gas inlet pipe 622 and the first combustion chamber 621 form the same passage; at this time, the first combustion exhaust pipe 6694 is
  • the first combustion exhaust gas branch pipe 6691 is coupled with the first combustion exhaust gas discharge branch pipe 628, and the first combustion exhaust gas branch pipe 6691, the first combustion exhaust gas discharge branch pipe 628, the first heat storage cavity 626 and the combustion chamber 621 form the same passage;
  • the second air enclosure 6675 connects the second air branch 6673 and the second air inlet branch 607, and the second air branch 6673, the second air envelope 6675, the second air enters the branch 607, and the second heat storage.
  • the cavity 606 and the second combustion chamber 601 form the same passage; at the same time, the second gas pipe 6685 connects the second gas pipe 6683 and the second gas inlet pipe 602, and the second gas pipe 6683 and the second gas pipe 6685, the second gas entering branch pipe 602 and the second combustion chamber 601 constitute the same passage; at the same time, the second combustion exhaust gas pipe 6695 connects the second combustion gas branch pipe 6693 with the second combustion exhaust gas discharge branch pipe 608, and will be the second The combustion exhaust gas branch 6693, the second combustion exhaust gas discharge branch pipe 608, the second heat storage chamber 606, and the second combustion chamber 601 constitute the same passage.
  • the example further includes a gas reversing device controller 906 for controlling the rotary commutating motor 663, air fan 664, gas fan 665, and exhaust fan 666, and the reversing device electrical controller 906 is further
  • the upper industrial control center 90 is connected.
  • the rotary commutating motor 663, air fan 664, gas fan 665, and exhaust fan 666 can also be directly controlled by the industrial control center 90, so the gas exchange is set here.
  • the device controller 906 does not constitute a limitation to the scope of protection of this example.
  • the heating method of the external gas heating device 64 is:
  • the rotary commutating motor 663 of the gas reversing device 66 drives the upper disc 661 to rotate on the lower disc 662, the air main pipe 667 is connected to the first air branch pipe 6671, and the air main pipe 667 and the second air branch pipe 6673 are cut off;
  • the gas main pipe 668 is also connected to the first gas pipe 6681, and the gas main pipe 668 and the second gas pipe 6668 are cut off; at the same time, the combustion exhaust gas main pipe 669 is cut off from the first combustion exhaust gas pipe 6691, and the corresponding combustion exhaust gas is cut off.
  • the main pipe 669 is in an on state with the second combustion exhaust pipe 6693;
  • the air fan 664 blows air into the air main pipe 667, and the air sequentially passes through the air connecting pipe 6672, the first air pipe 6371, the first air pipe 6674, and the first air inlet pipe 627 to enter the first heat storage chamber 626.
  • the heat released by the first regenerator 623 heats the air and enters the first combustion chamber 621.
  • the gas fan 665 passes the waste gas to the purified gas to obtain the net gas into the gas main pipe 668, and the gas passes through the gas connecting pipe in turn.
  • the first gas pipe 6681, the first gas pipe 6684, the first gas inlet pipe 622 enters the first combustion chamber 621 for combustion, and at the same time, because the combustion exhaust gas main pipe 669 is disconnected from the first combustion exhaust gas pipe 6691
  • the state, and the corresponding combustion exhaust gas main pipe 669 and the second combustion exhaust gas branch pipe 6693 are in an on state, so that the exhaust gas in the first combustion chamber 621 can only enter through the combustion chamber through hole 6251 in the upper portion of the outer fire passage partition wall 625.
  • the second regenerator 603 in the hot chamber 606 is exhausted from the second combustion exhaust gas exhaust pipe 608, the second combustion exhaust gas pipe 6695, the second combustion exhaust gas pipe 6693, and the combustion exhaust gas pipe 669 through the exhaust fan 666;
  • the rotary commutating motor 663 of the gas reversing device 66 drives the upper disc 661 to rotate in the opposite direction on the lower disc 662, and the air main pipe 667 is disconnected from the first air branch 6671, and the air main pipe 667 and the second air are cut.
  • the branch pipe 6673 is in the ON state, and at the same time, the gas main pipe 668 and the first gas pipe branch 6681 are also cut off, the gas main pipe 668 and the second gas pipe branch 6668 are connected, and at the same time, the combustion exhaust gas main pipe 669 and the first combustion exhaust gas branch pipe 6691 Also connected, and the corresponding combustion exhaust gas main pipe 669 and the second combustion exhaust gas branch pipe 6693 are also in a state of being cut off;
  • the air fan 664 blows air into the air main pipe 667, and the air sequentially passes through the air connecting pipe 6672, the second air pipe 6673, the second air pipe 6675, and the second air inlet pipe 607 to enter the second heat storage chamber 606.
  • the heat released by the second regenerator 603 in the second regenerator 606 heats the air and enters the second combustion chamber 601.
  • the gas fan 665 passes the waste gas to the purified gas to obtain the net gas into the gas main pipe.
  • the gas passes through the gas connecting pipe 6682, the second gas pipe 6683, the second gas pipe 6685, and the second gas entering branch pipe 602 enters the second combustion chamber 601 for combustion, at the same time, because the combustion exhaust pipe 669 and the first A combustion exhaust gas branch 6691 is turned on, and the corresponding combustion exhaust gas main pipe 669 and the second combustion exhaust gas main pipe 6693 are in a phase cut state, so that the exhaust gas after the combustion of the gas in the second combustion chamber 601 can only pass through the upper portion of the outer fire passage partition wall 625.
  • the combustion chamber through hole 6251 enters the first combustion chamber 621, and then passes through the first heat storage body 623 in the first heat storage chamber 626 to absorb heat and cool down. Thereafter, the first combustion exhaust gas discharge branch pipe 628, the first combustion exhaust gas pipe 6694, the first combustion exhaust gas branch pipe 6691, and the combustion exhaust gas main pipe 669 are discharged through the exhaust gas blower 666.
  • the combustion principle of the external gas heating device 64 is that the exhaust gas generated after the combustion of the gas in the first combustion chamber 621 enters the second combustion chamber 601 from the combustion chamber through hole 6251, passes through the second combustion chamber 601 and the second thermal storage chamber 606.
  • the second heat accumulator 603 is cooled after the rest of the heat absorption is discharged.
  • the two-in-one operation mode of the gas through the gas reversing device and the heat storage heat exchange operation mode of the regenerative heat exchanger realize the alternate combustion of the two gas heaters, that is, the gas reversing device.
  • Air is supplied to the combustion chamber of the first gas heater 62, and the net gas is combusted, while the hot exhaust gas after combustion is sucked from the combustion chamber of the second gas heater 60, and the hot exhaust gas is passed through the second storage of the second gas heater 60.
  • the second heat storage body 603 in the heat exchanger 604 absorbs heat and cools down to a relatively low temperature exhaust gas discharge; similarly, the gas reversing device sends air and clean gas to the combustion chamber of the second gas heater 60.
  • the combusted hot exhaust gas is sucked from the combustion chamber of the first gas heater 62, and the hot exhaust gas is cooled by the first heat accumulator 623 in the first heat storage heat exchanger 624 of the first gas heater 62. It is discharged into a low-temperature exhaust gas having a relatively low temperature; the method of heating the air by utilizing the residual heat of the exhaust gas after the combustion of the gas not only serves to charge the exhaust gas after the combustion of the gas By utilizing, the combustion efficiency of the gas in the combustion chamber is improved, and the exhaust gas after the combustion of the gas is cooled to a certain extent, without consuming external energy, thereby saving energy and reducing consumption, and saving coking costs.
  • the internal combustion heating device 67 is mainly composed of a plurality of groups (the third group of this example) having the same structure of the third gas heater 68, the fourth gas heater 69, and the quenching exhaust gas heater 63.
  • the quenching exhaust gas heater 63 includes an inner fire passage 631, an air supply pipe 632, a primary air supply pipe 6321, a secondary air supply pipe 6322, an air supply ring 633, a center ring wall 634, and an internal fire.
  • a track partition 635, a center passage 638, and an inner fire passage 631 are disposed on the fire tunnel bow 65.
  • the inner fire channel 631 is mainly composed of a carbonized indoor annular wall 612 and a central annular wall 634 located in the carbonization indoor annular wall 612 and at least one inner fire passage partition 635 separated by at least one set of main internal fires.
  • Lane 636 and sub-internal fire passage 637 as shown in Fig. 8, in this example, six main inner fire passages 636 and six sub-internal fire passages 637 are juxtaposed to form a total of six sets of inner fire passages 631.
  • the auxiliary inner passage 637 is provided with an upper blocking partition 6371, and the lower inner partition 637 is divided into upper, middle and lower sections, that is, the upper auxiliary inner passage 6375,
  • the middle section of the inner fire channel 6374 and the lower section of the inner fire channel 6373; the upper section of the inner fire channel 6375 and the main inner fire channel 636 are provided with an exhaust gas stringing hole 6303, and the upper section of the inner fire channel 6375 and
  • a hot exhaust gas exhaust passage 6306 is opened at the top of the main inner fire passage 636, and the hot exhaust gas discharge passage 6306 communicates with the exhaust gas chamber 391 at the upper portion of the furnace body 91.
  • a fire channel cross hole 6304 is disposed on the inner fire passage partition 635 between the lower sub-internal fire passage 6373 and the main inner fire passage 636, and the fire train string passage hole 6304 is adjacent to the lower plug partition plate 6372.
  • six fire tunneling through holes 6304 respectively connect six lower sub-inside fire passages 6373 and main inner fire passages 636.
  • the center ring wall 634 encloses a central passage 638, and a central partition 638 is provided with a passage partition 6382 at the level of the upper blocking partition 6371, and the central passage 638 is divided into upper and lower portions, that is, The lower portion forms a high temperature combustible exhaust gas into the passage 6383, and the upper portion forms a buffer zone 6381.
  • the lower part of the center ring wall 634 is provided with a combustible exhaust gas inlet hole 639 penetrating the high-temperature combustible exhaust gas inlet passage 6383 and the main inner fire passage 636 and the lower sub-internal fire passage 6373.
  • the exhaust buffer 6381 communicates with the main inner fire passage 636 and the exhaust gas inlet hole 6301 of the upper sub-internal fire passage 6375.
  • the air supply ring 633 is disposed on the furnace body 91, and the air supply pipe 632 leads to the air supply ring 633, the primary air supply pipe 6321, the secondary air supply pipe 6322 and the air supply ring.
  • Lane 633 is connected, extending from below the bow 651 of the fireway bow 65 to the interior of the fireway partition 635 between the main and secondary inner fire lanes 636, 637.
  • the primary air supply pipe 6321 is disposed inside the fire channel partition 635 between the main and auxiliary inner fire passages 636 and 637, and the outlet 6323 of the primary air supply pipe 6321 is located in the lower sealing partition 6372.
  • the main inner fire passage 636 and the lower sub-internal fire passage 6373 are respectively connected; as shown in FIG. 11, the secondary air supply duct 6322 is also disposed in the main and auxiliary inner fire passages 636 and 637.
  • the interior of the fire channel partition 635, and the secondary air supply outlet 6234 of the secondary air supply pipe 6322 is located flush with the upper blocking partition 6371 or slightly higher than the upper blocking partition 6371, leading to the main inner fire channel 636.
  • the middle sub-internal fire passage 6374 forms a relatively closed independent gas combustion chamber, and the upper middle sub-internal fire passage 6374 is adjacent to the next middle middle sub-inside fire passage 6374 through the combustion chamber passage 6305.
  • the combustion chamber passage 6305 is located below the upper blocking partition 6371 and passes through a main inner fire passage 636 between the upper middle sub-inside fire passage 6374 and the next middle middle sub-inside fire passage 6374, as shown in the figure.
  • six middle-stage inner fire passages 6374 pass through three combustion chamber passages 6305 to form three groups.
  • two middle-stage inner fire passages 6374 in the sub-internal fire passage 637 are provided with the same correlation of the same group.
  • the three gas heaters 68 and the fourth gas heaters 69 have the same structure and combustion principle as the first combustion heater 62 and the second combustion heater 60 described above, and the third gas heater 68 includes the third.
  • the third combustion chamber 681 of the third combustion heater 68 is the middle sub-internal fire passage 6374, that is, relatively closed between the upper and lower blocking partitions 6371 and 6372. The gas burns the fire.
  • the third gas inlet branch pipe 682 extends from the lower side of the bow 651 of the fire tunnel bow 65 and extends upward through the fire passage partition wall 635 to the third combustion chamber 681 (ie, the middle section).
  • the third heat storage chamber 686 is disposed on the furnace body 91 below the strip 651, the third heat storage body 683 is disposed in the third heat storage chamber 686, and the third heat storage chamber 686 is extended at one end.
  • the passage 6861 passes through the underside of the strip 651 of the fireway bow 65, extends upward through the interior of the fire compartment partition 635 to the bottom of the third combustion chamber 681, and the other end of the third regenerator 686 is connected to the third air inlet branch, respectively. 687 and a third combustion exhaust gas exit branch 688.
  • the structure of the fourth gas heater 69 is the same as that of the third gas heater 68, and details are not described herein again, wherein the fourth combustion chamber 691 and the third combustion chamber 681 are connected to each other through the combustion chamber channel 6305 to form a group (Fig. 7)).
  • the third gas entering branch pipe 682, the third air entering branch pipe 687, and the third combustion exhaust gas exhausting branch pipe 688 of the third combustion chamber 681 of the third combustion heater 68 respectively pass the first gas wall.
  • the tube 6684, the first air enclosure pipe 6674, and the first combustion exhaust gas enclosure 6694 communicate with the first gas manifold 6681, the first air manifold 6671, and the first combustion exhaust manifold 6691.
  • the fourth gas inlet branch 692, the third air inlet branch 697, and the third combustion exhaust gas exhaust branch 698 of the fourth combustion chamber 691 of the fourth combustion heater 69 pass through the second gas enclosure 6685, respectively.
  • the second air enclosure pipe 6675 and the second combustion exhaust gas enclosure 6695 are in communication with the second gas manifold 6683, the second air branch 6673, and the second combustion exhaust pipe 6693.
  • the third combustion heater 68 and the fourth gas heater 69 have almost the same combustion principle as the first combustion heater 62 and the second combustion heater 60, and are not described herein again.
  • the method of the internal combustion heating device 67 of the present example is that the upper sub-internal fire passage 6375 and the lower sub-internal fire passage 6373 and the main inner fire passage 636 are high-temperature combustible exhaust gas generated by dry quenching and quenching and combustion heating, and the middle section is internally heated.
  • the fire channel 6374 is a net gas combustion heating which is additionally purified by waste gas recovery.
  • the method of the internal combustion heating device 67 of this example is: (1), when the high-temperature combustible exhaust gas enters from the high-temperature combustible exhaust gas entering the passage 6383 at the lower portion of the central passage 638, passes through the combustible exhaust gas inlet hole 639 and enters the main inner fire passage 636 and the lower sub-indoor fire.
  • the temperature of the high-temperature combustible exhaust gas that has just entered is generally higher at 1000 °C to 1100 °C, but as the exhaust gas rises in the main inner fire passage 636 and the lower sub-internal fire passage 6373, the temperature is lowered. ;
  • the air supplied to the main inner fire passage 636 and the lower sub-internal fire passage 6373 is supplied through the primary air supply pipe 6321, so that the high-temperature combustible exhaust gas obtains oxygen in the air to be burned, after all, the combustible gas in the high-temperature combustible gas
  • the amount is constant and is not sufficient to provide the heat and temperature required for the coal pyrolysis of the carbonization chamber 61;
  • the upper portion of the center annular wall 634 is provided with a through buffer buffer 6381 and a main inner fire passage 636 and an upper sub-inside fire passage 6375.
  • the exhaust gas enters the hole 6301, and the exhaust passage hole 6303 is disposed on the fire passage partition 635 between the main inner fire passage 636 and the upper sub-internal fire passage 6375, and each of the main inner fire passages 636 and the upper sub-internal fire passages 6375
  • the two sides are completely interpenetrated, so that the exhaust gas after the second supplemental combustion can be completely mixed together, and the average temperature equalization between the main inner fire passage 636 and the upper sub-internal fire passage 6375 can be given to the upper portion of the entire carbonization chamber 61.
  • Coal pyrolysis provides balanced heat and temperature;
  • the reforming device 610 is disposed in the furnace body on the fire tunnel bow 65, and the focal reforming device 610 includes a lower portion of the carbonization chamber 6 to form a focal reforming chamber 6100.
  • the combustible exhaust gas of the inner fire passage 636 and the lower sub-internal fire passage 6373 enters the hole 639.
  • the outer wall of the furnace body 91 is provided with a reforming temperature monitoring hole 6101, and a reforming temperature table 6102 is arranged in the hole of the reforming temperature monitoring hole 6101.
  • the industrial control center 90 It is electrically connected to the focus modification temperature meter 6102, and the focus reform temperature signal of the autofocus modification temperature table 6102 is monitored.
  • the modification method of the present coke upgrading device is: externally, the external wall of the furnace is insulated by the refractory material, and the inside is heated from the combustible exhaust gas into the hole 639 to enter the lower part of the main inner fire channel 636 and the lower inner fire channel.
  • the residual heat of the high-temperature combustible exhaust gas itself is used to provide the heat and temperature required for the heat preservation, especially the temperature of the high-temperature combustible exhaust gas just entering is between 1000 ° C and 1100 ° C, which is just suitable for the reforming of the coke, so that the coke is in the reforming chamber. It stays for a certain period of time, and the coke bulk particles are in full contact with each other and heat transfer between them to achieve the purpose of uniform size of the coke block.
  • the fire tunnel bow 65 is required to provide support thereof. Further, the inner combustion heating device 67 is provided with various pipes. As shown in FIG. 11 and FIG. 10, the fire channel bow 65 is disposed in the furnace chamber below the carbonization chamber 61, the internal combustion heating device 67, and the focal reforming device 610.
  • the strip 651 is arranged radially around the center of the fire ring center ring wall 652 at a certain angular interval.
  • the fire bow 651 is 12 bows
  • the number and the internal combustion heating device 67 are main and auxiliary internal fires.
  • the total number of roads 636 and 637 is the same.
  • a third gas inlet branch 682 and an extension passage 6861 of the third regenerator 686 are disposed in the wall of a fire bow 651, and are disposed in the wall of another adjacent fire bow 651.
  • One supplemental gas tube 6321, secondary qi The pipe 6322 provides convenience for the pipeline laying of the internal combustion heating device 67.
  • the six third gas inlet 682 and the third heat storage cavity 686 are respectively arranged in parallel in the wall of the six fire bows 651.
  • the six primary air supply pipes 6321 and the secondary air supply pipes 6322 are arranged side by side in the wall of the fire bow 651, so that the various pipes of the internal combustion heating device 67 are arranged in an orderly manner without interference.
  • the modified coke has a higher temperature, generally between 1000 ° C and 1100 ° C. It is necessary to cool the high temperature coke to facilitate transportation and storage. A dry extinction device is required.
  • the dry extinguishing device 7 is disposed under the fire tunnel bow 65, and includes a high temperature quenching chamber 71, a low temperature quenching chamber 72, a quenching bridge bow 73, a quenching exhaust fan 75; and a high temperature quenching chamber.
  • the quenching bridge bow 73 is disposed between the high temperature quenching chamber 71 and the low temperature quenching chamber 72, and the quenching bridge bow 73 includes a bridge bow 731, a plenum 74, a dry quenching loop 76, and a dry quenching duct 77; the six bridge arches are at a certain angle in the center of the high temperature quenching chamber 71 and the low temperature quenching chamber 72 at the dry quenching ring
  • the passage 76 is arranged in a radial arrangement, and the middle portion of the bridge arch 731 forms a plenum 74.
  • the plenum 74 is an inverted truncated cone-shaped chamber that is straight up and down.
  • the top of the plenum 74 is provided with a hemispherical hood 78.
  • the lower opening 79 of the plenum 74 faces the low temperature quenching chamber 72;
  • the dry quenching duct 77 is disposed in the bridge 731, the dry quenching duct 77 is connected to the plenum 74, and the other end is connected to the dry quenching ring
  • the passage 76, the dry blower ring 76 is connected to the quenching exhaust fan 75 through the air inlet pipe 761;
  • the low temperature quenching chamber 72 At the bottom of the opening 721 is provided with a power valve 70.
  • a quenching temperature monitoring hole 711 leading to the high temperature quenching chamber 71 is provided on the outer wall 91 of the furnace body, and a quenching temperature table 712 is provided in the quenching temperature monitoring hole.
  • the quenching temperature table 712, the quenching exhaust fan 75 and the out-of-focus valve 70 are electrically connected to the industrial control center 90, and the industrial control center 90 automatically controls the quenching exhaust fan 75 and the out-of-focus valve 70 through quenching.
  • the temperature meter 712 monitors the quenching temperature.
  • the quenching temperature table 712, the quenching exhaust fan 75 and the out-of-focus valve 70 are electrically connected to the industrial control center 90 through the quenching device controller 907.
  • the quenching device controller 907 does not constitute in this example. Limitation on the scope of protection of this example.
  • the dry quenching method using the low-temperature combustion exhaust gas in the dry extinguishing device 7 of this example is:
  • the quenching exhaust fan 75 uses the quenching exhaust fan 75 to sequentially circulate the low temperature exhaust gas through the air inlet pipe 761, the dry quenching air duct 76, and the dry quenching air duct 77 into the chamber of the wind collecting chamber 74, and the low temperature exhaust gas is concentrated in the chamber of the wind collecting chamber 74. Because the plenum 74 has a unique structure, the top hood 78 is hemispherical, and the middle chamber has an inverted truncated cone structure, so the low temperature exhaust gas will blow out from the lower opening 79.
  • the dry-extinguishing device 7 can also produce a certain amount of high-temperature combustible gas during the dry-extinguishing process, because, first, the low-temperature exhaust gas contains a small amount of water, and the high-temperature coke after the coke reforming occurs.
  • the chemical reaction produces some combustible gas; second, the low-temperature exhaust gas itself still has some partially combustible combustible gas; third, the high-temperature coke after the coke reforming itself still has a part of combustible gas, and the combustible gas enters the center of the flame bow upward.
  • the high temperature combustible exhaust passage 653 in the middle of the wall 652 provides a source of air to the primary and secondary fire passages 636, 637 of the internal combustion heating unit 67 of the coal pyrolysis furnace.
  • the low-temperature exhaust gas in this example refers to the exhaust gas generated after the waste gas recovered and purified in the coal pyrolysis process is burned by the external gas heating device of the coal pyrolysis furnace and the gas heater in the internal combustion heating device.
  • the exhaust gas is turned into a low-temperature gas after being cooled by the heat storage body in the heat storage chamber, and the dry-extinguishing device is also advantageous in that the incombustibility of the combustion exhaust gas itself is used instead of the existing inert gas for dry quenching, the device is simple, and the cost is low.
  • the economic benefits are significant. Compared with the traditional wet quenching, this example does not cause a large amount of water gas to be discharged into the air because a large amount of water encounters high temperature coke. The air pollution is small, water is saved, and at the same time, the waste generated in the coal pyrolysis process can be generated. The gas is fully utilized.
  • a major advantage of the coal pyrolysis furnace is that it can continuously coke, replacing the traditional batch coking or soil coking, which has incomparable advantages compared with the traditional coking method.

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Materials Engineering (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Organic Chemistry (AREA)
  • Combustion & Propulsion (AREA)
  • Air Supply (AREA)

Abstract

La présente invention concerne un arc de trajectoire de flamme de four de pyrolyse de charbon, l'arc de trajectoire de flamme étant situé dans une cavité de four sous une chambre de carbonisation, un dispositif interne de chauffage par combustion et un dispositif de modification de coke, et comprenant principalement des arcs et une paroi annulaire centrale d'arc de flamme. Un canal 653 de gaz résiduaire de combustible à température élevée est formé au centre de la paroi annulaire centrale d'arc de flamme. Une extrémité de chaque arc est fixée sur un anneau central d'arc de flamme et l'autre extrémité est fixée sur un corps de four. Les arcs sont distribués radialement à des intervalles et à un certain angle autour du centre de la paroi annulaire centrale d'arc de flamme, le nombre d'arcs étant identique au nombre total de trajectoires de flamme principales et secondaires du dispositif interne de chauffage par combustion. Une troisième conduite dérivée d'entrée de gaz et un canal d'extension d'une troisième cavité de stockage de chaleur sont répartis dans la paroi d'un arc de flamme précédent, et une première conduite d'alimentation en air et une conduite secondaire d'alimentation en air sont réparties dans la paroi de l'arc de flamme adjacent suivant, la répartition étant réalisée à plusieurs reprises comme ceci.
PCT/CN2013/080819 2012-08-06 2013-08-05 Arc de trajectoire de flamme de four de pyrolyse de charbon WO2014023210A1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201210278573.1 2012-08-06
CN201210278573.1A CN102786954B (zh) 2012-08-06 2012-08-06 一种煤热解炉的火道弓

Publications (1)

Publication Number Publication Date
WO2014023210A1 true WO2014023210A1 (fr) 2014-02-13

Family

ID=47152547

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2013/080819 WO2014023210A1 (fr) 2012-08-06 2013-08-05 Arc de trajectoire de flamme de four de pyrolyse de charbon

Country Status (2)

Country Link
CN (1) CN102786954B (fr)
WO (1) WO2014023210A1 (fr)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102786954B (zh) * 2012-08-06 2014-04-30 山西鑫立能源科技有限公司 一种煤热解炉的火道弓

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004231750A (ja) * 2003-01-29 2004-08-19 Mitsubishi Chemicals Corp コークス炉炭化室の窯口炉底構造
CN102250629A (zh) * 2011-06-13 2011-11-23 山西利华新科技开发有限公司 一种热能循环利用的焦化炉及炼焦方法
CN102786954A (zh) * 2012-08-06 2012-11-21 山西鑫立能源科技有限公司 一种煤热解炉的火道弓
CN202898324U (zh) * 2012-08-06 2013-04-24 山西鑫立能源科技有限公司 一种煤热解炉的火道弓

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE202006009985U1 (de) * 2006-06-06 2006-10-12 Uhde Gmbh Bodenkonstruktion für horizontale Koksöfen

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004231750A (ja) * 2003-01-29 2004-08-19 Mitsubishi Chemicals Corp コークス炉炭化室の窯口炉底構造
CN102250629A (zh) * 2011-06-13 2011-11-23 山西利华新科技开发有限公司 一种热能循环利用的焦化炉及炼焦方法
CN102786954A (zh) * 2012-08-06 2012-11-21 山西鑫立能源科技有限公司 一种煤热解炉的火道弓
CN202898324U (zh) * 2012-08-06 2013-04-24 山西鑫立能源科技有限公司 一种煤热解炉的火道弓

Also Published As

Publication number Publication date
CN102786954B (zh) 2014-04-30
CN102786954A (zh) 2012-11-21

Similar Documents

Publication Publication Date Title
WO2014023203A1 (fr) Dispositif de pyrolyse et de carbonisation du charbon d'un four de pyrolyse de charbon
WO2014023202A1 (fr) Four automatisé de pyrolyse continue du charbon à cycle thermique
WO2014044084A1 (fr) Four de pyrolyse de charbon pour charbon bitumineux à faible métamorphisme
WO2014023206A1 (fr) Dispositif d'inversion de gaz pour dispositif de chauffage de gaz d'un four de pyrolyse de charbon
WO2014023208A1 (fr) Dispositif interne de chauffage par combustion d'un four de pyrolyse de charbon
WO2014023204A1 (fr) Dispositif externe de chauffage de gaz d'un four de pyrolyse de charbon
WO2014023211A1 (fr) Dispositif d'extinction à sec pour four de pyrolyse de charbon
CN102766473A (zh) 一种煤热解炉燃气加热器的蓄热换热器
CN102786942B (zh) 一种煤热解炉燃气加热器用的气体换向方法
WO2014023210A1 (fr) Arc de trajectoire de flamme de four de pyrolyse de charbon
WO2014023205A1 (fr) Appareil de chauffage au gaz pour un dispositif de chauffage d'un four à pyrolyse au charbon
CN202881177U (zh) 一种煤热解炉燃气加热器用的气体换向装置
CN202898326U (zh) 一种煤热解炉的干熄装置
CN202898327U (zh) 一种煤热解炉的熄焦桥弓
CN202898324U (zh) 一种煤热解炉的火道弓
CN202881176U (zh) 一种煤热解炉加热装置的燃气加热器
CN202898320U (zh) 一种煤热解炉的连续炼焦装置
CN202881175U (zh) 一种煤热解炉外燃气加热装置
CN103087728B (zh) 一种煤热解炉的连续炼焦装置
CN202898335U (zh) 一种煤热解炉的焦改质装置
CN202898321U (zh) 一种干熄焦废气产生及燃烧加热装置
CN202881173U (zh) 一种煤热解炉的煤热解炭化装置
CN202792087U (zh) 一种蓄热换热器
CN102786961B (zh) 一种煤热解炉的熄焦桥弓
CN102786945B (zh) 一种煤热解炉外燃气加热方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 13828708

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 13828708

Country of ref document: EP

Kind code of ref document: A1