WO2013192524A3 - Système et procédé permettant de déterminer une progression incrémentielle entre des points de sondage pendant un forage - Google Patents
Système et procédé permettant de déterminer une progression incrémentielle entre des points de sondage pendant un forage Download PDFInfo
- Publication number
- WO2013192524A3 WO2013192524A3 PCT/US2013/047054 US2013047054W WO2013192524A3 WO 2013192524 A3 WO2013192524 A3 WO 2013192524A3 US 2013047054 W US2013047054 W US 2013047054W WO 2013192524 A3 WO2013192524 A3 WO 2013192524A3
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- bha
- survey
- drilling
- amount
- information
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/04—Directional drilling
- E21B7/10—Correction of deflected boreholes
Abstract
Priority Applications (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP13734913.0A EP2864572A2 (fr) | 2012-06-22 | 2013-06-21 | Système et procédé permettant de déterminer une progression incrémentielle entre des points de sondage pendant un forage |
CA2877793A CA2877793C (fr) | 2012-06-22 | 2013-06-21 | Systeme et methode de determination de la progression incrementielle entre des points de leve pendant le forage |
AU2013278048A AU2013278048B2 (en) | 2012-06-22 | 2013-06-21 | System and method for determining incremental progression between survey points while drilling |
MX2015000192A MX2015000192A (es) | 2012-06-22 | 2013-06-21 | Sistema y metodo para determinar el movimiento incremental entre puntos de levantamiento durante la perforacion. |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US13/530,298 | 2012-06-22 | ||
US13/530,298 US8596385B2 (en) | 2011-12-22 | 2012-06-22 | System and method for determining incremental progression between survey points while drilling |
Publications (2)
Publication Number | Publication Date |
---|---|
WO2013192524A2 WO2013192524A2 (fr) | 2013-12-27 |
WO2013192524A3 true WO2013192524A3 (fr) | 2014-08-07 |
Family
ID=48748534
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/US2013/047054 WO2013192524A2 (fr) | 2012-06-22 | 2013-06-21 | Système et procédé permettant de déterminer une progression incrémentielle entre des points de sondage pendant un forage |
Country Status (5)
Country | Link |
---|---|
EP (1) | EP2864572A2 (fr) |
AU (1) | AU2013278048B2 (fr) |
CA (1) | CA2877793C (fr) |
MX (1) | MX2015000192A (fr) |
WO (1) | WO2013192524A2 (fr) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA2969418C (fr) * | 2014-12-31 | 2020-08-18 | Halliburton Energy Services, Inc. | Localisation continue pendant un forage |
CN109899054A (zh) * | 2019-02-22 | 2019-06-18 | 中国石油天然气股份有限公司大港油田分公司 | 钻井轨迹确定方法和v型井 |
CN113464120B (zh) * | 2021-09-06 | 2021-12-03 | 中国石油集团川庆钻探工程有限公司 | 工具面状态的预测方法和系统、滑动定向钻井方法和系统 |
CN116067350B (zh) * | 2023-04-03 | 2023-05-30 | 山东交通职业学院 | 一种用于地质勘测的方位勘测装置 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090090555A1 (en) * | 2006-12-07 | 2009-04-09 | Nabors Global Holdings, Ltd. | Automated directional drilling apparatus and methods |
WO2009129461A2 (fr) * | 2008-04-17 | 2009-10-22 | Baker Hughes Incorporated | Système et procédé pour la correction améliorée de mesure de profondeur |
WO2011130159A2 (fr) * | 2010-04-12 | 2011-10-20 | Shell Oil Company | Procédés et systèmes de forage |
US20120024606A1 (en) * | 2010-07-29 | 2012-02-02 | Dimitrios Pirovolou | System and method for direction drilling |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7886844B2 (en) * | 2007-11-12 | 2011-02-15 | Schlumberger Technology Corporation | Borehole survey method and apparatus |
-
2013
- 2013-06-21 MX MX2015000192A patent/MX2015000192A/es unknown
- 2013-06-21 EP EP13734913.0A patent/EP2864572A2/fr not_active Ceased
- 2013-06-21 CA CA2877793A patent/CA2877793C/fr active Active
- 2013-06-21 WO PCT/US2013/047054 patent/WO2013192524A2/fr active Application Filing
- 2013-06-21 AU AU2013278048A patent/AU2013278048B2/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090090555A1 (en) * | 2006-12-07 | 2009-04-09 | Nabors Global Holdings, Ltd. | Automated directional drilling apparatus and methods |
WO2009129461A2 (fr) * | 2008-04-17 | 2009-10-22 | Baker Hughes Incorporated | Système et procédé pour la correction améliorée de mesure de profondeur |
WO2011130159A2 (fr) * | 2010-04-12 | 2011-10-20 | Shell Oil Company | Procédés et systèmes de forage |
US20120024606A1 (en) * | 2010-07-29 | 2012-02-02 | Dimitrios Pirovolou | System and method for direction drilling |
Non-Patent Citations (1)
Title |
---|
ROBERT MITCHELL ET AL: "Lateral Buckling - The Key to Lockup", SPE/IADC DRILLING CONFERENCE AND EXHIBITION, 30 September 2011 (2011-09-30), XP055122198, DOI: 10.2118/139824-MS * |
Also Published As
Publication number | Publication date |
---|---|
CA2877793A1 (fr) | 2013-12-27 |
EP2864572A2 (fr) | 2015-04-29 |
WO2013192524A2 (fr) | 2013-12-27 |
AU2013278048A1 (en) | 2015-01-22 |
CA2877793C (fr) | 2018-04-10 |
AU2013278048B2 (en) | 2017-01-19 |
MX2015000192A (es) | 2015-08-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2013022725A3 (fr) | Prédiction de gravité de déviation en patte de chien en temps réel | |
WO2009064656A3 (fr) | Procédé et appareil de levé de trou de forage | |
WO2013092906A3 (fr) | Estimation de l'inclinaison d'un réservoir | |
WO2013095974A3 (fr) | Système et procédé pour forage pouvant être dirigé depuis la surface | |
GB2549014A (en) | Continuous locating while drilling | |
WO2013009801A3 (fr) | Estimation d'un paramètre de puits de forage | |
GB2531465A (en) | Automating downhole drilling using wellbore profile energy and shape | |
WO2012109352A3 (fr) | Modélisation tridimensionnelle de paramètres pour un forage de champ de pétrole | |
WO2013188241A3 (fr) | Procédés et systèmes connexes pour la modélisation et la prédiction des résultats opérationnels d'une opération de forage | |
WO2010081981A3 (fr) | Procédé de détermination de la teneur d'une pluralité de composés contenus dans un fluide de forage. | |
WO2013188597A3 (fr) | Mappage de caractéristiques irrégulières | |
EP2592223A3 (fr) | Procédés et systèmes de forage | |
WO2012015894A8 (fr) | Système et procédé de forage dirigé | |
WO2014049369A3 (fr) | Procédé de forage pour forer un trou de forage souterrain | |
GB2510706A (en) | System and method for stick-slip correction | |
MX2008016220A (es) | Planificación y operación de pozos en yacimiento petrolífero. | |
GB201319210D0 (en) | Method and system for passive electroseismic surveying | |
MX2016012826A (es) | Metodo y sistema para activar, adquirir y comunicar datos del pozo de sondeo para un sistema de medicion durante la perforacion. | |
FI123153B (fi) | Porauskaavion laatiminen kalliotilan louhimista varten | |
WO2012096826A3 (fr) | Modélisation de profil d'écoulement pour puits | |
WO2013192524A3 (fr) | Système et procédé permettant de déterminer une progression incrémentielle entre des points de sondage pendant un forage | |
WO2010132432A3 (fr) | Dispositif et procédé pour estimer à l'aide de capteurs multiples une propriété d'une formation terrestre | |
MX2014007236A (es) | Deteccion de las ubicaciones de limite de diversas capas del subsuelo. | |
WO2014059282A3 (fr) | Référence d'attitude pour un traitement de raccordement/superposition | |
WO2014037619A3 (fr) | Procédé pour examiner des trous de forage, agencement de forage, et ensemble d'examen de trous de forage |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 13734913 Country of ref document: EP Kind code of ref document: A2 |
|
ENP | Entry into the national phase |
Ref document number: 2877793 Country of ref document: CA |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2013734913 Country of ref document: EP |
|
WWE | Wipo information: entry into national phase |
Ref document number: MX/A/2015/000192 Country of ref document: MX |
|
ENP | Entry into the national phase |
Ref document number: 2013278048 Country of ref document: AU Date of ref document: 20130621 Kind code of ref document: A |