WO2013168248A1 PCT/JP2012/061904 JP2012061904W WO2013168248A1 WO 2013168248 A1 WO2013168248 A1 WO 2013168248A1 JP 2012061904 W JP2012061904 W JP 2012061904W WO 2013168248 A1 WO2013168248 A1 WO 2013168248A1
Authority
WO
WIPO (PCT)
Prior art keywords
measurement
transmission line
measurement mode
line monitoring
unit
Prior art date
Application number
PCT/JP2012/061904
Other languages
English (en)
French (fr)
Inventor
和文 橋本
Original Assignee
中国電力株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 中国電力株式会社 filed Critical 中国電力株式会社
Priority to PCT/JP2012/061904 priority Critical patent/WO2013168248A1/ja
Priority to JP2014514297A priority patent/JPWO2013168248A1/ja
Publication of WO2013168248A1 publication Critical patent/WO2013168248A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01DMEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR
    • G01D9/00Recording measured values
    • G01D9/28Producing one or more recordings, each recording being of the values of two or more different variables
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01WMETEOROLOGY
    • G01W1/00Meteorology
    • G01W1/02Instruments for indicating weather conditions by measuring two or more variables, e.g. humidity, pressure, temperature, cloud cover or wind speed
    • G01W1/04Instruments for indicating weather conditions by measuring two or more variables, e.g. humidity, pressure, temperature, cloud cover or wind speed giving only separate indications of the variables measured
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00006Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
    • H02J13/00022Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment using wireless data transmission
    • H02J13/00024Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment using wireless data transmission by means of mobile telephony
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00006Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
    • H02J13/00022Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment using wireless data transmission
    • H02J13/00026Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment using wireless data transmission involving a local wireless network, e.g. Wi-Fi, ZigBee or Bluetooth
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00032Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for
    • H02J13/00034Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for the elements or equipment being or involving an electric power substation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A90/00Technologies having an indirect contribution to adaptation to climate change
    • Y02A90/10Information and communication technologies [ICT] supporting adaptation to climate change, e.g. for weather forecasting or climate simulation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/12Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
    • Y04S40/126Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment using wireless data transmission

Definitions

  • the present invention relates to a transmission line monitoring device, a transmission line monitoring system, a transmission line monitoring program, and a transmission line monitoring method.
  • the main present invention for solving the above-mentioned problems is a power transmission line monitoring device that is provided in a power transmission tower and monitors a power transmission line installed on the power transmission tower, and includes a power source, and a measurement unit that measures at least temperature and wind speed.
  • a storage unit that stores measurement data including the temperature and wind speed measured by the measurement unit, and a timing control that activates the measurement unit by supplying power from the power source to the measurement unit for each predetermined measurement period And when the state in which the measured temperature is within a predetermined temperature range continues for a first predetermined time, the measurement unit sets the measurement mode to the first measurement mode, and Storage of the measurement data is started in the storage unit, and when the measured wind speed exceeds a predetermined value, the measurement mode is set to the second measurement mode, and storage of the measurement data in the storage unit is started. Letting A transmission line monitoring apparatus according to claim.
  • the present invention it is possible to acquire only the measurement data at the time of snowfall or storm while observing the weather condition regularly, and to grasp signs that may cause an accident of the transmission line.
  • FIG. 1 It is a block diagram which shows the structure of the power transmission line monitoring apparatus in one Embodiment of this invention. It is a schematic diagram which shows the structure of the whole power transmission line monitoring system in one Embodiment of this invention. It is a flowchart explaining the operation
  • FIG. It is a figure which shows an example of the start / end conditions of the measurement mode at the time of snowfall. It is a figure which shows an example of the start / end conditions of the measurement mode at the time of a storm.
  • FIG. 2 shows a configuration of the entire transmission line monitoring system in the present embodiment.
  • the power transmission line monitoring system shown in FIG. 2 is a system for monitoring a power transmission line (not shown) installed on the power transmission tower 9, and includes a power transmission line monitoring device 1 and a measurement data acquisition device 2. ing.
  • the power transmission line monitoring device 1 is provided in each power transmission tower 9, and observes the weather conditions around the power transmission line installed in the power transmission tower.
  • the measurement data acquisition device 2 is carried by a maintenance person on the ground or installed in an electric station and operated by the maintenance person.
  • the transmission line monitoring device 1 and the measurement data acquisition device 2 transmit a transmission request from the measurement data acquisition device 2 to the transmission line monitoring device 1 and also transmit measurement data from the transmission line monitoring device 1 to the measurement data acquisition device 2. It has a communication function.
  • FIG. 1 shows a configuration of a power transmission line monitoring apparatus in the present embodiment.
  • the power transmission line monitoring apparatus 1 shown in FIG. 1 includes a control module 10, a wind power generator 20, a solar cell module 30, a power storage means 40, a sensor group 50, a storage unit 60, and a communication unit 70.
  • the control module 10 includes a power supply control unit 101, a clock unit 102, a timing control unit 103, a measurement unit 104, and a communication control unit 105.
  • the wind power generator 20, the solar cell module 30, the power storage means 40, and the power supply control unit 101 constitute a power supply for the power transmission line monitoring device 1.
  • the wind power generator 20 is, for example, a small windmill generator, and is particularly suitable as a power generation means during a storm.
  • the solar cell module 30 is particularly suitable as a power generation means from spring to autumn.
  • the power storage means 40 stores the power generated by the power generation means (the wind power generator 20 and the solar cell module 30), and serves as a power supply source when there is no wind or no sunshine when the power generation means cannot generate power. .
  • the power supply control unit 101 performs charge control from the power generation unit to the power storage unit 40, voltage adjustment for supplying power to each unit of the transmission line monitoring device 1, and the like.
  • the clock unit 102 is operated by the battery BT and measures the current time CT.
  • the current time CT is input to the timing control unit 103 and the measurement unit 104.
  • the timing controller 103 is always supplied with power from the power controller 101 as much as possible.
  • the timing control unit 103 controls the start and stop of power supply from the power supply control unit 101 to the measurement unit 104 and the communication control unit 105 based on the current time CT.
  • the sensor group 50 and the storage unit 60 are connected to the measurement unit 104. Then, the measurement unit 104 acquires measurement data output from the sensor group 50, and stores the acquired measurement data in the storage unit 60 in association with the current time CT as necessary.
  • the sensor group 50 includes various weather sensors such as a temperature / humidity sensor and a wind direction / velocity sensor, and a stress sensor for measuring leg stress of the power transmission tower.
  • the storage unit 60 is configured such that power is supplied to the storage unit 60 only when accessed from the measurement unit 104 or the communication control unit 105 using a nonvolatile memory such as a flash memory or a small hard disk drive. It is desirable to do.
  • a communication unit 70 and a storage unit 60 are connected to the communication control unit 105. And the communication control part 105 transmits the measurement data memorize
  • the functions of the timing control unit 103, the measurement unit 104, and the communication control unit 105 can be realized, for example, by causing a processor to execute a power transmission line monitoring program.
  • 3 and 5 show the operation of the transmission line monitoring program.
  • the timing control unit 103 is always supplied with power from the power supply control unit 101 as long as the power generation unit generates power or the power storage unit 40 is charged. Then, the timing control unit 103 switches the operation mode of the power transmission line monitoring device 1 based on the current time CT timed by the clock unit 102.
  • FIG. 3 shows an operation of a program for causing a processor to realize a function corresponding to the timing control unit 103 (timing control processing) and a function corresponding to the communication control unit 105 (communication control processing).
  • timing control processing timing control processing
  • communication control unit 105 communication control processing
  • FIG. 3 shows an example of the timing of each operation mode of the power transmission line monitoring apparatus 1 which consists of sleep mode (S), communication mode (C), and measurement mode (M) is shown in FIG.
  • the timing control unit 103 activates the measurement unit 104 and the sensor group 50 at a timing (predetermined timing) of 50 minutes per hour for every hour (predetermined measurement cycle), and starts measurement processing.
  • the power supply from the power supply control unit 101 is stopped, the measurement unit 104 and the sensor group 50 are stopped, the sleep mode is entered (S6), and the process returns to S3.
  • a transmission request is accepted for a predetermined reception time (for example, about 1 to 2 minutes) (S8).
  • the transmission request from the measurement data acquisition device 2 is received within the reception time (S8: YES)
  • the requested measurement data is read from the storage unit 60 and transmitted to the measurement data acquisition device 2 (S9).
  • the communication control process ends, the power supply from the power supply control unit 101 is stopped, the communication control unit 105 and the communication unit 70 are stopped, the sleep mode is entered (S10), and the process returns to S3.
  • the communication control process is terminated as it is, the mode is shifted to the sleep mode (S10), and the process returns to S3.
  • the timing control unit 103 activates the communication control unit 105 and the communication unit 70 every 15 minutes (predetermined communication cycle) to start the communication control process.
  • the communication control unit 105 causes the communication unit 70 to transmit the measurement data stored in the storage unit 60 in response to a transmission request from the measurement data acquisition device 2.
  • the measurement data acquisition device 2 can acquire the measurement data stored in the storage unit 60 for grasping signs that may cause a power transmission line accident.
  • the power transmission line monitoring apparatus of the present embodiment activates the measurement unit 104 and the sensor group 50 only during the measurement mode every hour, and the communication control unit 105 only during the communication mode every 15 minutes. Then, the communication unit 70 is activated. During other sleep modes, power is supplied from the power supply control unit 101 only to the timing control unit 103, so that power consumption can be minimized.
  • the measurement unit 104 acquires the measurement data output from the sensor group 50, and based on the acquired measurement data, the measurement mode further includes the measurement mode during snowfall, the measurement mode during storm, and the normal measurement mode. Subdivide into three modes.
  • FIG. 5 shows an operation of a program for causing the processor to realize functions corresponding to the measurement unit 104 (measurement processing and storage processing). Examples of the start / end conditions of the measurement mode during snowfall and the measurement mode during storm are shown in FIGS. 6 and 7, respectively.
  • measurement data output from the sensor group 50 is acquired (S52). More specifically, the temperature and humidity measured by the temperature / humidity sensor, the wind direction and wind speed measured by the wind direction / wind speed sensor, the leg stress of the power transmission tower measured by the stress sensor, and the like are acquired.
  • the output of the wind direction / velocity sensor is sampled every 0.25 seconds, and an average of 3 seconds (12 samples) updated every 0.25 seconds is obtained as the instantaneous wind speed. Further, the average value of the instantaneous wind speed for 10 minutes is acquired as the (average) wind speed Mw. Further, the maximum values of the instantaneous wind speed and the wind speed Mw are acquired as the maximum instantaneous wind speed and the maximum wind speed, respectively.
  • the wind speed Mw is used as a start / end condition for the storm measurement mode.
  • the duration Ts is incremented (1 is added to the duration Ts) ( S54).
  • the duration Ts 0 is set (S55). Therefore, the duration Ts increases by 1 or becomes 0 according to the temperature Mt measured every hour.
  • Ts T1 + 1 (start of the measurement mode at the time of snowfall) between the duration Ts and the predetermined time T1. It is determined whether or not (condition) is satisfied (S57).
  • the measurement unit 104 determines that the measurement mode 104 is in the measurement mode when the state where the measured temperature Mt is within the range of ⁇ THt (within the predetermined temperature range) continues for the predetermined time T1 (first predetermined time). Is set to the measurement mode at the time of snowfall (first measurement mode), and the storage unit 60 starts storing measurement data.
  • the measurement unit 104 sets the measurement mode to the storm measurement mode (second measurement mode) when the measured wind speed Mw is equal to or higher than the predetermined value THw, and the measurement unit 104 performs measurement in the storage unit 60. Start storing data.
  • the duration time Tr is decremented (the duration time Tr). 1 is subtracted from (S65), the storage process is performed (S66), and the measurement process is terminated (S68).
  • the duration time Tr 0.
  • the measurement process is started again (S51)
  • the duration time Tr 0 in S61 (S61: YES)
  • the measurement unit 104 sets the measurement mode to the normal measurement mode when the predetermined time T2 (second predetermined time) has elapsed since the setting in the snowing measurement mode in the snowing measurement mode. (Third measurement mode) is set, and the storage unit 60 stops storing measurement data.
  • the measurement process is started again (S51)
  • the duration time Tr 0 in S61 (S61: YES)
  • the measurement process is terminated (S68).
  • the measurement unit 104 sets the measurement mode to the normal measurement mode when the state where Mw ⁇ THw continues for the predetermined time T3 (third predetermined time) in the storm measurement mode. Then, the storage unit 60 stops storing the measurement data.
  • the temperature Mt is in the range of ⁇ THt (for example, ⁇ 1 ° C.), and the state in which snow (ice) snow is likely to occur is only for a predetermined time T1 (for example, 5 hours). If it continues, the measurement mode is set to the measurement mode at the time of snowfall. Then, in preparation for the occurrence of an abnormal tension due to a snow load or a snow jump after the snow has arrived, measurement data for a predetermined time T2 (for example, 48 hours) is stored in the storage unit 60.
  • a predetermined time T2 for example, 48 hours
  • the measurement data at the time of snowfall or under the weather condition where there is a possibility of snowfall is stored, and the maintenance staff acquires the stored data using the measurement data acquisition device 2, It is possible to grasp signs that can cause an accident in a transmission line.
  • the transmission line monitoring apparatus of the present embodiment sets the measurement mode to the storm measurement mode when the wind speed Mw is a storm (strong wind) having a predetermined value THw (for example, 10 m / s) or more. Then, the measurement data from when the wind has settled until after a predetermined time T3 (for example, 4 hours) is stored in the storage unit 60. Therefore, in the storm measurement mode, the measurement data at the time of the storm is stored, and the maintenance staff can acquire the stored data by using the measurement data acquisition device 2, and can grasp signs that may cause the accident of the transmission line. .
  • THw strong wind
  • T3 for example, 4 hours
  • the measurement unit 104 and the sensor group 50 are activated every hour (predetermined measurement cycle) to acquire measurement data such as weather conditions, and the temperature Mt is ⁇ THt. If it is within the range (within the predetermined temperature range) and the state in which snowfall is likely to occur continues for the predetermined time T1 (first predetermined time), it shifts to the measurement mode during snowfall (first measurement mode).
  • the wind speed Mw is equal to or higher than the predetermined value THw
  • the stormy measurement mode second measurement mode
  • the weather condition is regularly observed, and when snowfalls (snowfall) Only measurement data under a possible weather condition) or during a storm can be stored in the storage unit 60. Then, using the measurement data stored in the storage unit 60, it is possible to grasp signs that may cause a power transmission line accident.
  • the measurement data for a predetermined time T2 (second predetermined time) after the transition to the measurement mode at the time of snowfall is stored in the storage unit 60, thereby using the stored data.
  • T2 second predetermined time
  • the measurement data from the time when the wind is stopped and Mw ⁇ THw is continuously satisfied until after a predetermined time T3 (third predetermined time) is stored in the storage unit 60.
  • T3 third predetermined time
  • measurement is performed every hour (predetermined measurement cycle) by starting the measurement unit 104 and the sensor group 50 at a timing of 50 minutes per hour (predetermined timing) based on the current time CT counted by the clock unit 102.
  • Data can be acquired and weather conditions etc. can be observed regularly.
  • the power generation means includes a wind power generator 20 suitable for a storm and a solar cell module 30 suitable for spring to autumn, and further a power storage means 40 serving as a power supply source while the power generation means cannot generate power.
  • the power transmission line monitoring device 1 can be operated throughout the year without using a commercial power source.
  • the maintenance staff on the ground acquires the measurement data from the transmission line monitoring device 1 provided in the power transmission tower 9. can do.
  • the transmission request is transmitted in accordance with the timing every 15 minutes, thereby monitoring the transmission line.
  • Measurement data can be acquired from the apparatus 1.
  • a transmission request is transmitted from the measurement data acquisition device 2 to the transmission line monitoring device 1, and is stored in the storage unit 60 from the transmission line monitoring device 1 according to the transmission request.
  • the measurement data acquisition device 2 can acquire the measurement data from the transmission line monitoring device 1 by transmitting the measurement data.
  • the sensor group 50 is activated every hour to acquire measurement data, and the temperature Mt Is in the range of ⁇ THt for a predetermined time T1, the process shifts to the measurement mode at the time of snowfall, and when the wind speed Mw exceeds the predetermined value THw, the process shifts to the measurement mode at the time of storm.
  • the measurement data during snowfall or storm can be stored in the storage unit 60 while observing the weather conditions regularly, and the stored data can be used to cause a transmission line accident. Can be grasped.
  • the mode shifts to the measurement mode during snowfall and the wind speed Mw is a predetermined value.
  • it becomes more than THw it is possible to store only the measurement data at the time of snowfall or storm in the storage unit 60 by shifting to the measurement mode at the time of storm, and using the stored data, Identify signs that can cause accidents.

Abstract

【課題】 気象状況などを定期的に観測しつつ、着雪時または暴風時の測定データのみを取得することができ、送電線の事故原因となり得る兆候を把握する。 【解決手段】 電源と、少なくとも気温および風速を測定する測定部と、前記測定部によって測定された気温および風速を含む測定データを記憶する記憶部と、所定の測定周期ごとに、前記測定部に前記電源からの電力を供給して前記測定部を起動するタイミング制御部と、を有し、前記測定部は、測定した気温が所定の温度範囲内にある状態が第1の所定時間継続した場合には、測定モードを第1の測定モードに設定して、前記記憶部に前記測定データの記憶を開始させ、測定した風速が所定値以上となった場合には、測定モードを第2の測定モードに設定して、前記記憶部に前記測定データの記憶を開始させる。

Description

送電線監視装置、送電線監視システム、送電線監視プログラムおよび送電線監視方法
 本発明は、送電線監視装置、送電線監視システム、送電線監視プログラム、および送電線監視方法に関する。
 電力系統の信頼性を確保するためには、発電所、変電所などの電気所や、送電線、配電線などの電線路を適宜監視することが重要である。特に、送電鉄塔に架設された(架空)送電線は、氷雪や暴風などの過酷な気象条件にさらされており、温度・湿度センサや風向・風速センサなど、各種気象センサを用いて監視される。例えば、特許文献1では、電源として太陽電池および蓄電池を備え、携帯電話などの通信手段へのデータ要求の着信を起動トリガとしてセンサが駆動する、商用電源を必要としない省電力型の(架空)送電線監視装置が開示されている。
特開2001-346341号公報
 気象状況などを観測して、着(氷)雪や暴風(強風)など、送電線の事故原因となり得る兆候を把握するためには、定期的(または定時的)に観測を行う必要がある。
 しかしながら、特許文献1の送電線監視装置では、各送電鉄塔に設けられた送電線監視装置に対して順番にデータ要求(ポーリング)を行う必要があり、装置の個数が増加するほど、各装置における観測時刻にばらつきが生じることとなる。さらに、通信障害などによってデータ要求の送信(中央監視側)または受信(送電線監視装置側)を行うことができない場合には、復旧までの間観測を行うことができない。
 また、送電線の事故原因となり得る兆候を把握するための様々な測定データを定期的に取得することができる場合であっても、時間の経過とともにデータ量が大きくなり、兆候の把握が困難となる。
 前述した課題を解決する主たる本発明は、送電鉄塔に設けられ、前記送電鉄塔に架設された送電線を監視する送電線監視装置であって、電源と、少なくとも気温および風速を測定する測定部と、前記測定部によって測定された気温および風速を含む測定データを記憶する記憶部と、所定の測定周期ごとに、前記測定部に前記電源からの電力を供給して前記測定部を起動するタイミング制御部と、を有し、前記測定部は、測定した気温が所定の温度範囲内にある状態が第1の所定時間継続した場合には、測定モードを第1の測定モードに設定して、前記記憶部に前記測定データの記憶を開始させ、測定した風速が所定値以上となった場合には、測定モードを第2の測定モードに設定して、前記記憶部に前記測定データの記憶を開始させることを特徴とする送電線監視装置である。
 本発明の他の特徴については、添付図面及び本明細書の記載により明らかとなる。
 本発明によれば、気象状況などを定期的に観測しつつ、着雪時または暴風時の測定データのみを取得することができ、送電線の事故原因となり得る兆候を把握することができる。
本発明の一実施形態における送電線監視装置の構成を示すブロック図である。 本発明の一実施形態における送電線監視システム全体の構成を示す模式図である。 タイミング制御部103のタイミング制御処理および通信制御部105の通信制御処理をプロセッサに実行させるためのプログラムの動作を説明するフローチャートである。 送電線監視装置1の各動作モードのタイミングの一例を示す図である。 測定部104の測定処理および記憶処理をプロセッサに実行させるためのプログラムの動作を説明するフローチャートである。 着雪時測定モードの開始・終了条件の一例を示す図である。 暴風時測定モードの開始・終了条件の一例を示す図である。
 本明細書および添付図面の記載により、少なくとも以下の事項が明らかとなる。
===送電線監視装置および送電線監視システムの構成===
 以下、図1および図2を参照して、本発明の一実施形態における送電線監視装置および送電線監視システムの構成について説明する。
 図2は、本実施形態における送電線監視システム全体の構成を示している。図2に示されている送電線監視システムは、送電鉄塔9に架設された送電線(不図示)を監視するためのシステムであり、送電線監視装置1と測定データ取得装置2とで構成されている。
 送電線監視装置1は、各送電鉄塔9に設けられ、その送電鉄塔に架設された送電線の周囲の気象状況などを観測する。一方、測定データ取得装置2は、地上の保守員に携帯されたり、電気所内に設置されたりして、保守員によって操作される。また、送電線監視装置1および測定データ取得装置2は、測定データ取得装置2から送電線監視装置1に送信要求を送信するとともに、送電線監視装置1から測定データ取得装置2に測定データを送信する通信機能を備えている。
 図1は、本実施形態における送電線監視装置の構成を示している。図1に示されている送電線監視装置1は、制御モジュール10、風力発電機20、太陽電池モジュール30、蓄電手段40、センサ群50、記憶部60、および通信部70を含んで構成されている。また、制御モジュール10は、電源制御部101、時計部102、タイミング制御部103、測定部104、および通信制御部105を含んで構成されている。
 風力発電機20、太陽電池モジュール30、蓄電手段40、および電源制御部101は、送電線監視装置1の電源を構成する。風力発電機20は、例えば小型の風車発電機であり、特に暴風時の発電手段として適している。一方、太陽電池モジュール30は、特に春から秋にかけての発電手段として適している。また、蓄電手段40は、発電手段(風力発電機20および太陽電池モジュール30)によって発電された電力を蓄電し、発電手段が発電を行うことができない無風・無日照時などにおける電力供給源となる。そして、電源制御部101は、発電手段から蓄電手段40への充電制御や、送電線監視装置1の各部に電力を供給するための電圧調整などを行う。
 時計部102は、バッテリBTによって動作し、現在時刻CTを計時する。そして、現在時刻CTは、タイミング制御部103および測定部104に入力されている。
 タイミング制御部103には、電源制御部101から可能な限り常時電力が供給されている。そして、タイミング制御部103は、現在時刻CTに基づいて、電源制御部101から測定部104および通信制御部105への電力供給の開始および停止を制御している。
 測定部104には、センサ群50および記憶部60が接続されている。そして、測定部104は、センサ群50から出力される測定データを取得するとともに、必要に応じて、取得した測定データを現在時刻CTと対応付けて記憶部60に記憶させる。なお、センサ群50には、温度・湿度センサや風向・風速センサなどの各種気象センサのほか、送電鉄塔の脚応力を測定するための応力センサなどが含まれる。また、記憶部60として、フラッシュメモリなどの不揮発性メモリや、小型のハードディスクドライブなどを用いて、測定部104や通信制御部105からのアクセス時にのみ、記憶部60に電力が供給される構成とすることが望ましい。
 通信制御部105には、通信部70および記憶部60が接続されている。そして、通信制御部105は、必要に応じて、記憶部60に記憶されている測定データを通信部70から送信させる。
===送電線監視装置の動作===
 以下、図3ないし図7を適宜参照して、本実施形態における送電線監視装置の動作について説明する。
 送電線監視装置1のうち、タイミング制御部103、測定部104、および通信制御部105の機能は、例えば、プロセッサに送電線監視プログラムを実行させることによって実現することができる。図3および図5は、当該送電線監視プログラムの動作を示している。
 タイミング制御部103には、発電手段が発電している、または蓄電手段40が充電されている限り、電源制御部101から常時電力が供給されている。そして、タイミング制御部103は、時計部102が計時する現在時刻CTに基づいて、送電線監視装置1の動作モードを切り替える。
 ここで、タイミング制御部103に相当する機能(タイミング制御処理)および通信制御部105に相当する機能(通信制御処理)をプロセッサに実現させるためのプログラムの動作を図3に示す。また、本実施形態において、スリープモード(S)、通信モード(C)、および測定モード(M)からなる、送電線監視装置1の各動作モードのタイミングの一例を図4に示す。
 タイミング制御処理が開始されると(S1)、まず、初期化処理を行い、動作モードをスリープモードに設定したうえで(S2)、通信モードまたは測定モードの開始タイミングであるか否かを判定する(S3、S4)。そして、何れかの開始タイミングとなるまでの間(S3:NO、S4:NO)、スリープモードを継続する。ここで、S3およびS4において、CTmは、現在時刻CTのうち、「分」の値を表している。
 本実施形態では、図4に示すように、毎時50分(CTm=Tm)になると(S3:NO、S4:YES)、測定モード(M)を開始する。そして、電源制御部101からの電力を供給して測定部104およびセンサ群50を起動する(S5)。これにより、測定部104は、測定処理を開始する。なお、測定処理についての詳細な説明は後述する。
 このようにして、タイミング制御部103は、1時間(所定の測定周期)ごとに、毎時50分のタイミング(所定のタイミング)で測定部104およびセンサ群50を起動し、測定処理を開始させる。そして、測定処理が終了すると、電源制御部101からの電力供給を停止して測定部104およびセンサ群50を停止し、スリープモードに移行して(S6)、S3に戻る。
 また、図4に示すように、毎時0分(CTm=Tc1)、15分(CTm=Tc2)、30分(CTm=Tc3)、または45分(CTm=Tc4)になると(S3:YES)、通信モード(C)を開始する。そして、電源制御部101からの電力を供給して通信制御部105および通信部70を起動する(S7)。これにより、通信制御部105は、通信制御処理を開始する。なお、測定処理には、10分程度の時間を要するため、測定モードからスリープモードに移行すると、速やかに毎時0分の通信モードに移行する。
 通信制御処理においては、所定の受付時間(例えば1~2分程度)だけ送信要求を受け付ける(S8)。受付時間内に測定データ取得装置2からの送信要求を受信した場合(S8:YES)には、要求された測定データを記憶部60から読み出し、測定データ取得装置2に送信する(S9)。そして、通信制御処理が終了すると、電源制御部101からの電力供給を停止して通信制御部105および通信部70を停止し、スリープモードに移行して(S10)、S3に戻る。一方、受付時間内に送信要求を受信しなかった場合(S8:NO)には、そのまま通信制御処理を終了し、スリープモードに移行して(S10)、S3に戻る。
 このようにして、タイミング制御部103は、15分(所定の通信周期)ごとに、通信制御部105および通信部70を起動し、通信制御処理を開始させる。そして、通信制御部105は、測定データ取得装置2からの送信要求に応じて、記憶部60に記憶されている測定データを通信部70から送信させる。これにより、測定データ取得装置2は、記憶部60に記憶された、送電線の事故原因となり得る兆候を把握するための測定データを取得することができる。
 以上のように、本実施形態の送電線監視装置は、1時間ごとの測定モードの間だけ、測定部104およびセンサ群50を起動し、15分ごとの通信モードの間だけ、通信制御部105および通信部70を起動する。そして、それ以外のスリープモードの間は、タイミング制御部103のみに電源制御部101から電力が供給されるため、消費電力を最小限に抑えることができる。
 前述したように、測定部104およびセンサ群50には、1時間ごとの測定モードの間だけ、電源制御部101から電力が供給される。そして、測定部104は、センサ群50から出力される測定データを取得するとともに、取得した測定データに基づいて、測定モードをさらに、着雪時測定モード、暴風時測定モード、および通常測定モードの3つのモードに細分化する。
 ここで、測定部104に相当する機能(測定処理および記憶処理)をプロセッサに実現させるためのプログラムの動作を図5に示す。また、着雪時測定モードおよび暴風時測定モードの開始・終了条件の一例をそれぞれ図6および図7に示す。なお、図5ないし図7において、モードフラグFLは、FL=1の場合に着雪時測定モードを示し、FL=2の場合に暴風時測定モードを示し、FL=3の場合に通常測定モードを示すこととする。
 測定処理が開始されると(S51)、まず、センサ群50から出力される測定データを取得する(S52)。より具体的には、温度・湿度センサによって測定された気温および湿度や、風向・風速センサによって測定された風向および風速、応力センサによって測定された送電鉄塔の脚応力などを取得する。
 ここで、風向・風速センサの出力は、0.25秒ごとにサンプリングされ、0.25秒ごとに更新される3秒(12サンプル)平均が瞬間風速として取得される。また、瞬間風速の10分間の平均値が(平均)風速Mwとして取得される。さらに、瞬間風速および風速Mwの最大値がそれぞれ最大瞬間風速および最大風速として取得される。なお、風速Mwは、暴風時測定モードの開始・終了条件として用いられる。
 次に、取得した気温Mtが±THt(例えば±1℃)の範囲内にあるか否かを判定する(S53)。そして、気温Mtが±THtの範囲内にある場合、すなわち、-THt≦Mt≦THtが成立する場合(S53:YES)には、継続時間Tsをインクリメント(継続時間Tsに1を加算)する(S54)。一方、-THt≦Mt≦THtが成立しない場合(S53:NO)には、継続時間Ts=0とする(S55)。したがって、継続時間Tsは、1時間ごとに測定される気温Mtに応じて、1ずつ増加するか、0となる。
 次に、測定モードが通常測定モード(FL=3)に設定されているか否かを判定する(S56)。
 S56において、測定モードが通常測定モード(FL=3)に設定されている場合(S56:YES)には、継続時間Tsと所定時間T1との間でTs=T1+1(着雪時測定モードの開始条件)が成立するか否かを判定する(S57)。ここで、図6に示すように、気温Mtが±THtの範囲内にある状態が所定時間T1(図6においては5時間)だけ継続した場合に、Ts=T1+1(=6)が成立する。
 S57において、Ts=T1+1が成立する場合(S57:YES)には、測定モードを着雪時測定モード(FL=1)に設定して、継続時間Tr=T2とする(S58)。そして、記憶処理を行い、取得した測定データを記憶部60に記憶させ(S66)、測定処理を終了する(S68)。
 このようにして、測定部104は、測定された気温Mtが±THtの範囲内(所定の温度範囲内)にある状態が所定時間T1(第1の所定時間)だけ継続した場合に、測定モードを着雪時測定モード(第1の測定モード)に設定して、記憶部60に測定データの記憶を開始させる。
 なお、継続時間Tsは、気温Mtが±THtの範囲内にある場合には、着雪時測定モードまたは暴風時測定モードの間もインクリメントされる。そのため、これらのモードから通常測定モードに移行する際に、Ts=T1+1(着雪時測定モードの開始条件)が成立している場合には、所定時間T1を待つことなく、速やかに着雪時測定モードに移行することができる。
 一方、S57において、Ts=T1+1が成立しない場合(S57:NO)には、取得した風速Mwと所定値THw(例えば10m/s)との間でMw≧THw(暴風時測定モードの開始条件)が成立するか否かを判定する(S59)。そして、図7に示すように、Mw<THwの場合(S59:NO)には、通常測定モード(FL=3)のまま、記憶処理を行うことなく、測定処理を終了する(S68)。一方、Mw≧THwとなった場合(S59:YES)には、測定モードを暴風時測定モード(FL=2)に設定して、継続時間Tr=T3+1とし(S60)、記憶処理を行ったうえで(S66)、測定処理を終了する(S68)。
 このようにして、測定部104は、測定された風速Mwが所定値THw以上となった場合に、測定モードを暴風時測定モード(第2の測定モード)に設定して、記憶部60に測定データの記憶を開始させる。
 S56において、測定モードが着雪時測定モード(FL=1)または暴風時測定モード(FL=2)に設定されている場合(S56:NO)には、継続時間Tr=0(各測定モードの終了条件)が成立するか否かを判定する(S61)。
 S61において、継続時間Tr≠0の場合(S61:NO)には、さらに、測定モードが暴風時測定モード(FL=2)に設定されているか否か、およびMw≧THw(暴風時測定モードの開始条件)が成立しているか否かを判定する(S62、S63)。そして、測定モードが暴風時測定モード(FL=2)に設定され、Mw≧THwが成立している場合(S62:YES、S63:YES)には、再び継続時間Tr=T3+1とし(S64)、記憶処理を行ったうえで(S66)、測定処理を終了する(S68)。一方、測定モードが着雪時測定モード(FL=1)に設定されている場合(S62:NO)、またはMw<THwの場合(S63:NO)には、継続時間Trをデクリメント(継続時間Trから1を減算)し(S65)、記憶処理を行ったうえで(S66)、測定処理を終了する(S68)。
 したがって、図6に示すように、着雪時測定モードにおいては、継続時間Trは、1時間ごとに1ずつ減少し、着雪時測定モード(FL=1)に設定されてから所定時間T2(図6においては48時間)が経過すると、継続時間Tr=0となる。そして、再び測定処理が開始されると(S51)、S61において、継続時間Tr=0である(S61:YES)ため、測定モードを通常測定モード(FL=3)に設定し、記憶処理を行うことなく、測定処理を終了する(S68)。
 このようにして、測定部104は、着雪時測定モードにおいて、着雪時測定モードに設定されてから所定時間T2(第2の所定時間)が経過した場合には、測定モードを通常測定モード(第3の測定モード)に設定して、記憶部60に測定データの記憶を停止させる。
 また、図7に示すように、暴風時測定モードにおいては、継続時間Trは、Mw<THwの間、1時間ごとに1ずつ減少し、Mw<THwである状態が所定時間T3(図7においては4時間)だけ継続すると、継続時間Tr=0となる。そして、再び測定処理が開始されると(S51)、S61において、継続時間Tr=0である(S61:YES)ため、測定モードを通常測定モード(FL=3)に設定し、記憶処理を行うことなく、測定処理を終了する(S68)。なお、風が一旦収まって、一時的にMw<THwとなっても、所定時間T3以内に再びMw≧THwとなると、再び継続時間Tr=T3+1となる(S64)ため、暴風時測定モードの終了までの時間が延長される。
 このようにして、測定部104は、暴風時測定モードにおいて、Mw<THwである状態が所定時間T3(第3の所定時間)だけ継続した場合には、測定モードを通常測定モードに設定して、記憶部60に測定データの記憶を停止させる。
 以上のように、本実施形態の送電線監視装置は、気温Mtが±THt(例えば±1℃)の範囲内にあり、着(氷)雪が生じやすい状態が所定時間T1(例えば5時間)だけ継続すると、測定モードを着雪時測定モードに設定する。そして、着雪の荷重や、着雪後のスリートジャンプなどによる異常張力の発生に備えて、そこから所定時間T2(例えば48時間)分の測定データを記憶部60に記憶する。したがって、着雪時測定モードにおいて、着雪時、または着雪の可能性がある気象状況下における測定データが記憶され、保守員は、測定データ取得装置2を用いて当該記憶データを取得し、送電線の事故原因となり得る兆候を把握することができる。
 また、本実施形態の送電線監視装置は、風速Mwが所定値THw(例えば10m/s)以上の暴風(強風)時に、測定モードを暴風時測定モードに設定する。そして、風が収まってから所定時間T3(例えば4時間)後までの測定データを記憶部60に記憶する。したがって、暴風時測定モードにおいて、暴風時における測定データが記憶され、保守員は、測定データ取得装置2を用いて当該記憶データを取得し、送電線の事故原因となり得る兆候を把握することができる。
 前述したように、送電線監視装置1において、1時間(所定の測定周期)ごとに測定部104およびセンサ群50を起動して気象状況などの測定データを取得しつつ、気温Mtが±THtの範囲内(所定の温度範囲内)にあり、着雪が生じやすい状態が所定時間T1(第1の所定時間)だけ継続した場合には、着雪時測定モード(第1の測定モード)に移行し、風速Mwが所定値THw以上となった場合には、暴風時測定モード(第2の測定モード)に移行することによって、気象状況などを定期的に観測しつつ、着雪時(着雪の可能性がある気象状況下)または暴風時における測定データのみを記憶部60に記憶することができる。そして、記憶部60に記憶されている測定データを用いて、送電線の事故原因となり得る兆候を把握することができる。
 また、着雪時測定モードにおいては、着雪時測定モードに移行してから所定時間T2(第2の所定時間)分の測定データを記憶部60に記憶することによって、当該記憶データを用いて、着雪の荷重による異常張力だけでなく、着雪後のスリートジャンプによる異常張力の発生も把握することができる。
 また、暴風時測定モードにおいては、風が収まって、継続的にMw<THwである状態となってから所定時間T3(第3の所定時間)後までの測定データを記憶部60に記憶することによって、風が一旦収まって、一時的にMw<THwとなっても、測定データの記憶を継続することができる。
 また、時計部102が計時する現在時刻CTに基づいて、毎時50分のタイミング(所定のタイミング)で測定部104およびセンサ群50を起動することによって、1時間ごと(所定の測定周期)に測定データを取得し、気象状況などを定期的に観測することができる。
 また、発電手段として、暴風時に適した風力発電機20、および春から秋に適した太陽電池モジュール30を備え、さらに、発電手段が発電を行うことができない間の電力供給源となる蓄電手段40を備えることによって、商用電源を用いることなく、年間を通じて送電線監視装置1を動作させることができる。
 また、送信要求に応じて、記憶部60に記憶されている測定データを通信部70から送信することによって、地上の保守員が送電鉄塔9に設けられた送電線監視装置1から測定データを取得することができる。
 また、15分(所定の通信周期)ごとに通信制御部105および通信部70を起動して送信要求を受け付けることによって、当該15分ごとのタイミングに合わせて送信要求を送信して、送電線監視装置1から測定データを取得することができる。
 また、図2に示した送電線監視システムにおいて、測定データ取得装置2から送電線監視装置1に送信要求を送信し、当該送信要求に応じて、送電線監視装置1から記憶部60に記憶されている測定データを送信することによって、測定データ取得装置2が送電線監視装置1から測定データを取得することができる。
 また、送電線監視装置1のプロセッサに、タイミング制御処理、測定処理、および記憶処理を実行させる送電線監視プログラムにおいて、1時間ごとにセンサ群50を起動して測定データを取得しつつ、気温Mtが±THtの範囲内にある状態が所定時間T1だけ継続した場合には、着雪時測定モードに移行し、風速Mwが所定値THw以上となった場合には、暴風時測定モードに移行することによって、気象状況などを定期的に観測しつつ、着雪時または暴風時における測定データのみを記憶部60に記憶させることができ、当該記憶データを用いて、送電線の事故原因となり得る兆候を把握することができる。
 また、1時間ごとに気象状況などを観測しつつ、気温Mtが±THtの範囲内にある状態が所定時間T1だけ継続した場合には、着雪時測定モードに移行し、風速Mwが所定値THw以上となった場合には、暴風時測定モードに移行することによって、着雪時または暴風時における測定データのみを記憶部60に記憶させることができ、当該記憶データを用いて、送電線の事故原因となり得る兆候を把握することができる。
 なお、上記実施形態は、本発明の理解を容易にするためのものであり、本発明を限定して解釈するためのものではない。本発明は、その趣旨を逸脱することなく、変更、改良され得るとともに、本発明にはその等価物も含まれる。
  1     送電線監視装置
  2     測定データ取得装置
  9     送電鉄塔
  10    制御モジュール
  20    風力発電機
  30    太陽電池モジュール
  40    蓄電手段
  50    センサ群
  60    記憶部
  70    通信部
  101   電源制御部
  102   時計部
  103   タイミング制御部
  104   測定部
  105   通信制御部
  BT    バッテリ

Claims (10)

  1.  送電鉄塔に設けられ、前記送電鉄塔に架設された送電線を監視する送電線監視装置であって、
     電源と、
     少なくとも気温および風速を測定する測定部と、
     前記測定部によって測定された気温および風速を含む測定データを記憶する記憶部と、
     所定の測定周期ごとに、前記測定部に前記電源からの電力を供給して前記測定部を起動するタイミング制御部と、
     を有し、
     前記測定部は、
     測定した気温が所定の温度範囲内にある状態が第1の所定時間継続した場合には、測定モードを第1の測定モードに設定して、前記記憶部に前記測定データの記憶を開始させ、
     測定した風速が所定値以上となった場合には、測定モードを第2の測定モードに設定して、前記記憶部に前記測定データの記憶を開始させることを特徴とする送電線監視装置。
  2.  前記測定部は、測定モードが前記第1の測定モードに設定されている場合に、測定モードが前記第1の測定モードに設定されてから第2の所定時間が経過したときには、測定モードを第3の測定モードに設定して、前記記憶部に前記測定データの記憶を停止させることを特徴とする請求項1に記載の送電線監視装置。
  3.  前記測定部は、測定モードが前記第2の測定モードに設定されている場合に、測定した風速が前記所定値未満である状態が第3の所定時間継続したときには、測定モードを第3の測定モードに設定して、前記記憶部に前記測定データの記憶を停止させることを特徴とする請求項1に記載の送電線監視装置。
  4.  現在時刻を計時する時計部をさらに有し、
     前記タイミング制御部は、前記時計部が計時する前記現在時刻に基づいて、毎時所定のタイミングで前記測定部を起動することを特徴とする請求項1ないし請求項3の何れかに記載の送電線監視装置。
  5.  前記電源は、
     風力発電機および太陽電池を含む発電手段と、
     前記発電手段によって発電された電力を蓄電する蓄電手段と、
     を備えることを特徴とする請求項1ないし請求項4の何れかに記載の送電線監視装置。
  6.  送信要求に応じて、前記記憶部に記憶されている前記測定データを送信する通信部をさらに有することを特徴とする請求項1ないし請求項5の何れかに記載の送電線監視装置。
  7.  前記タイミング制御部は、所定の通信周期ごとに、前記通信部に前記電源からの電力を供給して前記通信部を起動することを特徴とする請求項6に記載の送電線監視装置。
  8.  請求項6または請求項7に記載の送電線監視装置と、
     前記記憶部に記憶されている前記測定データを取得する測定データ取得装置と、
     を備え、
     前記通信部は、前記測定データ取得装置からの送信要求に応じて、前記記憶部に記憶されている前記測定データを前記測定データ取得装置に送信することを特徴とする送電線監視システム。
  9.  電源と、少なくとも気温および風速を測定するセンサと、前記センサによって測定された気温および風速を含む測定データを記憶する記憶部と、を備え、送電鉄塔に設けられて、前記送電鉄塔に架設された送電線を監視する送電線監視装置のプロセッサに、
     所定の測定周期ごとに、前記センサに前記電源からの電力を供給して前記センサを起動するタイミング制御処理と、
     前記センサから前記測定データを取得する測定処理と、
     測定した気温が所定の温度範囲内にある状態が第1の所定時間継続した場合には、測定モードを第1の測定モードに設定して、前記記憶部に前記測定データの記憶を開始させ、測定した風速が所定値以上となった場合には、測定モードを第2の測定モードに設定して、前記記憶部に前記測定データの記憶を開始させる記憶処理と、
     を実行させることを特徴とする送電線監視プログラム。
  10.  送電鉄塔において、前記送電鉄塔に架設された送電線を監視する送電線監視方法であって、
     所定の測定周期ごとに、少なくとも気温および風速を測定し、
     測定された気温が所定の温度範囲内にある状態が第1の所定時間継続した場合には、測定モードを第1の測定モードに設定し、
     測定された風速が所定値以上となった場合には、測定モードを第2の測定モードに設定し、
     測定モードが前記第1または第2の測定モードに設定されている場合には、測定された気温および風速を含む測定データを記憶部に記憶させることを特徴とする送電線監視方法。
PCT/JP2012/061904 2012-05-09 2012-05-09 送電線監視装置、送電線監視システム、送電線監視プログラムおよび送電線監視方法 WO2013168248A1 (ja)

Priority Applications (2)

Application Number Priority Date Filing Date Title
PCT/JP2012/061904 WO2013168248A1 (ja) 2012-05-09 2012-05-09 送電線監視装置、送電線監視システム、送電線監視プログラムおよび送電線監視方法
JP2014514297A JPWO2013168248A1 (ja) 2012-05-09 2012-05-09 送電線監視装置、送電線監視システム、送電線監視プログラムおよび送電線監視方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2012/061904 WO2013168248A1 (ja) 2012-05-09 2012-05-09 送電線監視装置、送電線監視システム、送電線監視プログラムおよび送電線監視方法

Publications (1)

Publication Number Publication Date
WO2013168248A1 true WO2013168248A1 (ja) 2013-11-14

Family

ID=49550333

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2012/061904 WO2013168248A1 (ja) 2012-05-09 2012-05-09 送電線監視装置、送電線監視システム、送電線監視プログラムおよび送電線監視方法

Country Status (2)

Country Link
JP (1) JPWO2013168248A1 (ja)
WO (1) WO2013168248A1 (ja)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015125228A1 (ja) * 2014-02-19 2015-08-27 中国電力株式会社 風騒音記録システムおよび風騒音記録方法
JP2018074778A (ja) * 2016-10-31 2018-05-10 住友電気工業株式会社 電線監視システム
WO2020021802A1 (ja) * 2018-07-25 2020-01-30 住友電気工業株式会社 監視装置
CN111443218A (zh) * 2020-05-19 2020-07-24 南京环电科技有限公司 一种输电线路风速监测系统

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03287073A (ja) * 1990-04-03 1991-12-17 Ota Keiki Seisakusho:Kk 風速監視装置
JP2002202158A (ja) * 2000-12-28 2002-07-19 Yokogawa Electric Corp 記録装置
JP2005278367A (ja) * 2004-03-26 2005-10-06 Chugoku Electric Power Co Inc:The 架空送電線鉄塔基別監視システム
JP2008157745A (ja) * 2006-12-22 2008-07-10 Central Res Inst Of Electric Power Ind 着雪予測方法および着雪予測プログラム
JP2009291046A (ja) * 2008-05-30 2009-12-10 Fukuoka Institute Of Technology 電力供給線監視装置及びそのネットシステム

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03287073A (ja) * 1990-04-03 1991-12-17 Ota Keiki Seisakusho:Kk 風速監視装置
JP2002202158A (ja) * 2000-12-28 2002-07-19 Yokogawa Electric Corp 記録装置
JP2005278367A (ja) * 2004-03-26 2005-10-06 Chugoku Electric Power Co Inc:The 架空送電線鉄塔基別監視システム
JP2008157745A (ja) * 2006-12-22 2008-07-10 Central Res Inst Of Electric Power Ind 着雪予測方法および着雪予測プログラム
JP2009291046A (ja) * 2008-05-30 2009-12-10 Fukuoka Institute Of Technology 電力供給線監視装置及びそのネットシステム

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015125228A1 (ja) * 2014-02-19 2015-08-27 中国電力株式会社 風騒音記録システムおよび風騒音記録方法
JP2018074778A (ja) * 2016-10-31 2018-05-10 住友電気工業株式会社 電線監視システム
JP2020145925A (ja) * 2016-10-31 2020-09-10 住友電気工業株式会社 電線監視システム
WO2020021802A1 (ja) * 2018-07-25 2020-01-30 住友電気工業株式会社 監視装置
JPWO2020021802A1 (ja) * 2018-07-25 2021-08-05 住友電気工業株式会社 監視装置
JP7173146B2 (ja) 2018-07-25 2022-11-16 住友電気工業株式会社 監視装置
CN111443218A (zh) * 2020-05-19 2020-07-24 南京环电科技有限公司 一种输电线路风速监测系统

Also Published As

Publication number Publication date
JPWO2013168248A1 (ja) 2015-12-24

Similar Documents

Publication Publication Date Title
WO2013168248A1 (ja) 送電線監視装置、送電線監視システム、送電線監視プログラムおよび送電線監視方法
EP2110549A2 (en) Wind farm with battery storage
CN102576047B (zh) 用于识别光伏设备中的故障的方法和装置
CN104303386B (zh) 电力控制装置以及电力控制方法
US20070024246A1 (en) Battery Chargers and Methods for Extended Battery Life
ES2798086T3 (es) Respuesta de frecuencia
DK2131038T3 (en) Trigger event data acquisition and wind turbine system and method incorporating the same
CN104823065B (zh) 控制装置、控制方法、电源系统与电动车辆
EP3314750B1 (en) System and method for charging autonomously powered devices using variable power source
JP2012523215A (ja) ハイブリッドエネルギー貯蔵システム、該貯蔵システムを含む再生可能エネルギーシステムおよびその使用方法
WO2010091244A2 (en) Method and apparatus for determining a corrected monitoring voltage
JP2017073370A (ja) 蓄電池保全装置、及び、蓄電池保全方法
JP2012186877A (ja) 太陽光発電用バッテリーシステムのバッテリー状態検知装置
CN205333828U (zh) 一种风力发电机蓄电池在线监测系统
CN111525693A (zh) 一种输电线路的振动状态监测方法、装置及系统
CN104682439A (zh) 一种可并网运行光伏发电系统的运行和监控方法
JP6132829B2 (ja) 計測装置及び計測方法
CN104682438A (zh) 一种可并网运行光伏发电系统的监控装置
JP2018510287A (ja) 風力発電装置の運転方法
CN104538981A (zh) 一种具有无功调节功能的电池储能系统的监控方法
JP4943533B2 (ja) 自立駆動型テレメトリ観測装置とその動作方法
ES2324648T3 (es) Procedimiento para la evaluacion del estado de baterias.
JP4373409B2 (ja) 電源システム
WO2011139822A1 (en) Energy storage level indication circuit
KR101949289B1 (ko) 기지국 타워용 배터리 모니터링 시스템

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 12876250

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2014514297

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 12876250

Country of ref document: EP

Kind code of ref document: A1