WO2013148741A1 - Electrofracturing formations - Google Patents
Electrofracturing formations Download PDFInfo
- Publication number
- WO2013148741A1 WO2013148741A1 PCT/US2013/033961 US2013033961W WO2013148741A1 WO 2013148741 A1 WO2013148741 A1 WO 2013148741A1 US 2013033961 W US2013033961 W US 2013033961W WO 2013148741 A1 WO2013148741 A1 WO 2013148741A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- electrodes
- formation
- wellbores
- fractures
- essentially
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
- E21B43/17—Interconnecting two or more wells by fracturing or otherwise attacking the formation
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
- E21B43/24—Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection
- E21B43/2401—Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection by means of electricity
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
- E21B43/24—Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection
- E21B43/2405—Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection in association with fracturing or crevice forming processes
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
- E21B43/267—Methods for stimulating production by forming crevices or fractures reinforcing fractures by propping
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C37/00—Other methods or devices for dislodging with or without loading
- E21C37/18—Other methods or devices for dislodging with or without loading by electricity
Definitions
- the invention relates to a method of increasing hydrocarbon productivity from a relatively low permeability formation
- Hydraulic fracturing is typically utilized to enhance production from formations which have low permeabilities.
- the hydraulic fractures are propped open by proppants such as sand having specific distribution of sizes.
- proppants such as sand having specific distribution of sizes.
- By providing hydraulic fractures a considerably larger surface area is provided for hydrocarbons to migrate to through the low permeability formation.
- Improvements to hydraulic fracturing technology has permitted profitable production of natural gas and light hydrocarbon liquids from formations previously thought to be impractical to produce.
- hydraulic fracturing has enabled economical production from many low permeability formations, hydraulic fractures cause increases in formation stress due to compression of the formation to create volume for the fractures. This increased stress results in reduction of formation permeability.
- the resonance vibrations created in the productive stratum are said to make it possible to clean the existing filtration channels and create new filtration channels at distances of over fifteen hundred meters from the well being treated.
- the plasma pulses created by Novas Energy Services appear to be utilized to generate mechanical shock waves that are intended to open existing pores within the formation. Because the release of the electrical pulses within the wellbore are directed toward electrical grounds, the current density decreases rapidly with distance from the wellbore thus the mechanism of Novas Energy Services is not to remove mass from the formation by vaporization of mineral mass.
- Placement of electrodes within hydraulic fractures in a formation is known, for example, from US patent 7,631,691.
- electrical voltage is applied across the fracture to provide heat to the formation for pyrolysis of kerogen within the formation.
- a method is provided to produce hydrocarbons from a formation, the method comprising the steps of: placing a pair of electrodes within a formation; applying pulses of differential voltages between pairs of electrodes wherein the voltage differences between the electrodes is greater than at least 10,000 volts or in other embodiments, greater than 100,000 volts; and producing hydrocarbons from the formation or an adjacent formation wherein the formation has an initial permeability of less than ten millidarcy.
- the voltage could be applied in a plurality of pulses of, for example, less than about 500 nanoseconds in duration. Electrodes could be, for example, 10 meters to 300 meters apart. This method provides permeability by removal of mass which also results in reduction of formation stress.
- the method can be useful in formations having low initial permeability, such as in the range of 0.00001 to 10.0 millidarcy.
- Produced hydrocarbons could be essentially natural gas, light tight oil, or combinations thereof.
- the high voltage pulses may cause plasma discharges with can follow random paths between electrodes.
- the electrodes may be formed by placing electrically conducting proppants in hydraulic fractures and to provide a large area from which the pluses of electrical power may be emitted.
- Alternating fractures from, for example, a horizontal wellbore, could be equipped to be oppositely charged electrodes. Mass could then be removed from the formation between the two electrodes.
- Figure 1 is a schematic drawing showing placement of electrodes in parallel horizontal wellbores for the practice of the present invention.
- Figure 2 is a schematic drawing of two parallel fractures propped with conductive proppant useful as electrodes for the practice of the present invention.
- Figure 3 is a schematic drawing of horizontal wellbores below a hydrocarbon containing formation where the present invention is used to create fractures in the hydrocarbon containing formation.
- Figure 4 is a schematic drawing of two parallel wellbores wherein the present invention is utilized to create slippage between two planes in a formation.
- Figure 5 is a schematic drawing of an alternative embodiment of the present invention.
- the present invention creates permeability in a formation by multiple mechanisms.
- Decomposition of rocks may be, for example, decomposition of dolomite or decomposition of calcite.
- Decomposition of dolomite can occur, for example, at a temperature of at least 530 °C leading to 21% loss of solid mass of dolomite according to the reaction:
- Decomposition of calcite may occur at about 900 to 1000 C and leads to 44% loss of initial calcite mass:
- rock For each pair of positions of electrodes rock will be removed in essentially a path between the positions of the electrodes. Because formations are not homogeneous, the path of removal of rock will not be a straight line but along paths of least resistance between the electrodes. In a coal or oil shale formation, the presence of carbon will result in a first arc forming a more conductive path and further arcs tend to follow that path. In formations that do not contain high contents of hydrocarbons, such as tight gas formations, the result is different. The arcs tend to be transmitted along the surface of mineral solids.
- the wellbores can be open hole completions, or cased completions. If the wellbores are cased within the formation for which the electrofractures are to be created, the wellbores may be cemented with electrically conductive cement, or may be expanded casings where in the casing is expanded to form contact with the formation. When the wellbores are cased, the casings may be electrically isolated from casings and tubulars outside of the formation which is to be subjected to the process of the present invention.
- the casing could comprise segments of electrically conductive casing connected by segments of casing that are not electrically conductive.
- Casing segments that are not electrically conductive could be, for example, fiberglass segments that are of sufficient length so that the plasma pulse does not arc past the non-conductive segment.
- Electrodes 103 and 104 may have a significant contact area with either the wellbore or the casing by for example, being pressed outward such as a packer assembly or expandable mandrel such as the mandrel taught in US patent no. 7,131,498, to reduce electrical resistance in the outward radial direction. Providing good electrical contact between the electrode and the wellbore or casing will reduce the voltages required to cause formation minerals to conduct electrical current between the two electrodes.
- the wellbore could be an open hole completion.
- the electrodes could be provided with an electrically isolating section on each end of the electrode, with the electrically isolating section including an elastomeric expandable packing so that loss of electrical current to wellbore fluids from the electrodes will be minimized.
- Plasma pulse generation systems 105 and 106 may be located in close proximity to the electrodes to minimize power loss between the two elements, but with sufficiently low resistance electrical connections between the two, the plasma pulse generation system could be remotely positioned.
- Electrical lead-ins 107 and 108 provide electrical power from a power supply to the plasma pulse generation systems 105 and 106, and also, in the embodiment shown, provide a means for moving the electrodes within the wellbore.
- the electrical lead-ins may also support conduits for control signals to the system.
- Plasma pulse generation systems may be similar to the system disclosed by Melton or the systems used by Novas Energy Services. Generally, these systems capture high voltage charges in a bank of storage capacitors and then release the charges via calibrated conductors to electrodes in bursts of short duration.
- a plasma arc 109 is formed between the electrodes 103 and 104.
- the electrical arc will travel along mineral surfaces in a path of least electrical resistance between the two electrodes.
- vapors will be generated by vaporization of water and decomposition and vaporization of mineral components from the formation.
- carbon dioxide may form from carbonates that are present in the minerals of the formation.
- Hydrocarbons may also decompose forming carbon and hydrogen, along with hydrogen sulfide, carbon dioxide and other products depending on the composition of the hydrocarbons. With sufficiently large amounts of hydrocarbons present, residual carbon may form a path of less electrical resistance, and cause subsequent arcs to pass over the same path.
- Effective permeability of the formation is not only increased by the removal of mass, but the rapid vaporization of water and/or carbon dioxide from the carbonates or hydrocarbons, causes localized high pore pressures that can cause micro fractures around the path of the plasma.
- Parallel wellbores that are horizontal within the formation to which the electrofractures are to be created could be utilized to provide placement of electrodes according to the present invention.
- the wellbores could be vertical or positioned so they are not parallel.
- the present invention could be used to create electrofractures between electrodes at one set of positions within a pair of wellbores, and then the electrodes moved and electro fractures created between two different positions.
- Different lines of electrofractured formation could be provided in close enough proximity to the adj acent lines of electrofractured formation so that the formation would contain essentially a plane of electrofractured formation between the two wellbores.
- paths of electrofractures that connect the positions of the electrodes may be essentially perpendicular to the plane of natural fractures, 110.
- the plane of natural fractures are not always perpendicular to the direction of minimal stress, the natural fractures are typically in the general direction of perpendicular to the direction of minimal stress. Any hydraulic fractures placed in the formation would also tend to prorogate in a plane perpendicular to the direction of minimal stress. Electrofractures placed essentially perpendicular to the direction of minimal stress would therefore tend then connect with more natural fractures and hydraulic fractures and provide a more connected fracture system for flow of hydrocarbons to wellbores.
- the lines of electrofractures that connect the positions of the electrodes may be therefore advantageously placed essentially parallel to the direction of minimum stress in the formation.
- the lines of electrofractures that connect the positions of the electrodes may be therefore advantageously placed essentially parallel to the direction of minimum stress in the formation.
- the formation 111 within which the electrofractures are provided according to the present invention may be a hydrocarbon containing formation.
- hydrocarbons may be produced from the hydrocarbon containing formation.
- the present invention may be applicable to formations known as tight gas formations.
- Tight gas formations may have porosities of between two and ten percent, as opposed to most hydrocarbon reservoir formations which have 20 to 35 percent porosity.
- the permeabilities of tight gas reservoirs may be in the range of 0.00001 to 0.001 millidarcys.
- Hydrocarbons have in the past generally only been economically produced from these formations if many hydraulic fractures are provided to increase flow of hydrocarbons to production wellbores.
- a detrimental aspect of providing hydraulic fractures is that providing these hydraulic fractures compresses the minerals in the formation, causing increased stress. This increase in stress has a detrimental effect on permeability.
- the present invention by removing mass of minerals, reduces the stress on the formation, which tends to open natural fractures and increase permeability.
- effective permeability of a formation may be increased by between 10 and 10,000 percent, where the "effective permeability is defined as the average permeability in the volume between the electrodes, where the volume between the electrodes is defined as the volume within a cylinder having a diameter equal to the length of the electrodes, around a line connecting the centers of the electrodes.
- the mass between the electrodes is defined as the mass within a cylinder having a diameter equal to the length of the electrodes, around a line connecting the centers of the electrodes.
- hydrocarbons within the formation may be produced using the wellbores are production wells.
- the hydrocarbons may be natural gas.
- a wellbore 201 is shown with a horizontal section 202 within a formation 200 with two hydraulic fractures, 204 and 205, the hydraulic fractures propped with electrically conductive proppant 206.
- the wellbore is provided essentially in the direction of minimal stress in the formation, so that the hydraulic fractures will tend to be perpendicular to the horizontal wellbore.
- a pair of electrical power sources 207 and 208 in the wellbores are aligned with the two hydraulic fractures and electrically connected to the electrically conductive proppant within the hydraulic fractures.
- Plasma pulse generation systems 209 and 210 are located within the wellbores in close proximity to the electrodes. Electrical lead-in 211 provides electrical power from a power supply to the plasma pulse generation systems 209 and 210, and may also provide a means for moving the electrodes within the wellbore.
- Electrical pulses are conducted from the electrical power sources through the proppant to provide an electrode that essentially fills the hydraulic fracture 204 and 205. Because electrical resistance within the fracture is considerably less than electrical resistance within the formation itself, a high voltage may be applied to the large area of the fracture. Formation between the two electrodes, 212, may be subjected to plasma pulse transmissions which vaporize some mineral components within the formation.
- the power sources may be relocated to a different location in the wellbore, preferably adjacent to another set of adjacent fractures filled with electrically conductive proppant, and the process repeated.
- the wellbore could be converted to a hydrocarbon production well, and hydrocarbons could be produced from the formation.
- FIG. 3 a vertical section is shown with horizontal wells 301, 302 and 303 perpendicular to the plane of the view.
- the horizontal wells are below a formation from which hydrocarbons are to be produced, 304, in a formation underlying the formation from which hydrocarbons are to be produced, 305.
- Electrical pulses may be provided according to the present invention between the horizontal wellbores resulting in removal of mass from the formation underlying the formation from which hydrocarbons are to be produced. Removal of this mass results in reduction of vertical stress from the formation from which hydrocarbons are to be produced. This reduction of stress results in increased permeability due to opening of natural fractures by stress relief and by tensile failure due to subsidence.
- Hydrocarbons may be produced from the formation 304.
- two wellbores are shown, 401 and 492, the wellbores being horizontal and perpendicular to the view.
- the horizontal wellbores are shown in at different depths, and perpendicular to the direction of the maximum formation stress, shown as 403.
- a region of reduced mass exists between the two wellbores, 404. Because of the formation stress 403, the formation will tend to slip along the direction of the reduced formation mass along directions 405 and 406.
- Electrofractures of the present invention are used to extend hydraulic fractures to increase the total fracture size, and to remove mass from the formation.
- Horizontal reduction wells 501 and 502 are shown with fractures 503 filled with electrically conductive proppant 504.
- Two wells are shown, but a matrix or line of essentially parallel wells could be provided.
- Electrofractures are provided connecting the tips of the fractures with electrofratures 506.
- Electrofractures may also more easily advance from an electrically charged tip due to the concentration of charge and current at such locations.
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- Production Of Liquid Hydrocarbon Mixture For Refining Petroleum (AREA)
- Physical Or Chemical Processes And Apparatus (AREA)
- Organic Low-Molecular-Weight Compounds And Preparation Thereof (AREA)
Description
Claims
Priority Applications (6)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CA2867878A CA2867878A1 (en) | 2012-03-29 | 2013-03-27 | Electrofracturing formations |
| AU2013239809A AU2013239809B2 (en) | 2012-03-29 | 2013-03-27 | Electrofracturing formations |
| GB1415026.2A GB2519420B (en) | 2012-03-29 | 2013-03-27 | Electrofracturing formations |
| RU2014143457A RU2640520C2 (en) | 2012-03-29 | 2013-03-27 | Formations electric fracturing |
| DE112013001734.2T DE112013001734T5 (en) | 2012-03-29 | 2013-03-27 | Electrical fracturing of rock formations |
| CN201380017774.9A CN104204405B (en) | 2012-03-29 | 2013-03-27 | It is electroluminescent to split stratum |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US201261617221P | 2012-03-29 | 2012-03-29 | |
| US61/617,221 | 2012-03-29 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2013148741A1 true WO2013148741A1 (en) | 2013-10-03 |
Family
ID=49233322
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/US2013/033961 Ceased WO2013148741A1 (en) | 2012-03-29 | 2013-03-27 | Electrofracturing formations |
Country Status (8)
| Country | Link |
|---|---|
| US (1) | US9243487B2 (en) |
| CN (1) | CN104204405B (en) |
| AU (1) | AU2013239809B2 (en) |
| CA (1) | CA2867878A1 (en) |
| DE (1) | DE112013001734T5 (en) |
| GB (1) | GB2519420B (en) |
| RU (1) | RU2640520C2 (en) |
| WO (1) | WO2013148741A1 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| RU2686742C1 (en) * | 2016-12-22 | 2019-04-30 | Чайна Юниверсити Оф Майнинг Энд Текнолоджи | Method of eliminating blocking and increasing gas permeability for methane wells of coal beds under electric impulse |
Families Citing this family (52)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20140096951A1 (en) * | 2012-10-04 | 2014-04-10 | Geosierra Llc | Enhanced hydrocarbon recovery from a single well by electrical resistive heating of multiple inclusions in an oil sand formation |
| US20140096953A1 (en) * | 2012-10-04 | 2014-04-10 | Geosierra Llc | Enhanced hydrocarbon recovery from multiple wells by electrical resistive heating of oil sand formations |
| US20140096952A1 (en) * | 2012-10-04 | 2014-04-10 | Geosierra Llc | Enhanced hydrocarbon recovery from a single well by electrical resistive heating of a single inclusion in an oil sand formation |
| US9410408B2 (en) * | 2013-03-12 | 2016-08-09 | Schlumberger Technology Corporation | Electrical heating of oil shale and heavy oil formations |
| CN103174406B (en) * | 2013-03-13 | 2015-12-02 | 吉林大学 | A kind of method of oil shale underground in situ heating |
| US10077644B2 (en) | 2013-03-15 | 2018-09-18 | Chevron U.S.A. Inc. | Method and apparatus for generating high-pressure pulses in a subterranean dielectric medium |
| US9726000B2 (en) * | 2013-10-31 | 2017-08-08 | West Virginia High Technology Consortium Foundation | Pulsed fracturing method and apparatus |
| US9890627B2 (en) | 2013-12-13 | 2018-02-13 | Chevron U.S.A. Inc. | System and methods for controlled fracturing in formations |
| CN104863561B (en) * | 2015-04-15 | 2017-06-23 | 中国矿业大学 | A kind of down-hole coal bed pulse detonation wave orientation fracturing anti-reflection method |
| CN104832149A (en) * | 2015-05-16 | 2015-08-12 | 太原理工大学 | Electric pulse assisted hydrofracture unconventional gas reservoir permeability increasing method |
| CN105201477B (en) * | 2015-09-26 | 2017-11-24 | 吉林大学 | Directional crack forming method for in-situ volume crushing of oil shale |
| CN105370257B (en) * | 2015-11-06 | 2018-09-14 | 中国矿业大学 | A kind of coal bed gas well high power electric detonation shake auxiliary hydraulic fracturing method for increasing |
| CN106761641B (en) * | 2016-12-06 | 2020-01-03 | 中国矿业大学 | Coal body electric pulse fracturing and permeability increasing experimental system and method |
| CN107120083A (en) * | 2017-06-05 | 2017-09-01 | 中国地质调查局油气资源调查中心 | A kind of control method of shale underground frequency spectrum resonance |
| CN107420077A (en) * | 2017-09-06 | 2017-12-01 | 中国矿业大学(北京) | One kind is based on high energy CO2The shale oil recovery method and device of fluid fracturing |
| CN107939364B (en) * | 2017-11-14 | 2020-10-09 | 中国矿业大学 | A device and method for integrating electric pulse fracturing, anti-reflection and gas seepage |
| CN108318528A (en) * | 2018-01-09 | 2018-07-24 | 中国石油天然气股份有限公司 | Method and device for determining working parameters of electric pulse fracturing |
| US10941644B2 (en) | 2018-02-20 | 2021-03-09 | Saudi Arabian Oil Company | Downhole well integrity reconstruction in the hydrocarbon industry |
| US11091991B1 (en) | 2018-05-25 | 2021-08-17 | Eden GeoPower Inc. | System and method for pulsed electrical reservoir stimulation |
| CN109577930A (en) * | 2018-12-13 | 2019-04-05 | 苏州峰极电磁科技有限公司 | Two-way geothermal well and hoistway fracturing crack method for communicating |
| US11187068B2 (en) * | 2019-01-31 | 2021-11-30 | Saudi Arabian Oil Company | Downhole tools for controlled fracture initiation and stimulation |
| CN109944576B (en) * | 2019-04-12 | 2021-03-26 | 西安科技大学 | Electric pulse enhanced pulsating hydraulic fracturing device and application method thereof |
| CN110273684B (en) * | 2019-06-13 | 2021-01-29 | 太原理工大学 | Method for reducing composite strong mine pressure of thick hard top plate and left coal pillar in plasma U-type manner |
| RU2733239C1 (en) * | 2020-05-25 | 2020-09-30 | Публичное акционерное общество «Татнефть» имени В.Д. Шашина | Method for development of dense oil deposit by electric fracture |
| RU2733240C1 (en) * | 2020-05-25 | 2020-09-30 | Публичное акционерное общество «Татнефть» имени В.Д. Шашина | Method for development of multi-face low-permeable oil deposit by electric fracture |
| US11414985B2 (en) | 2020-05-28 | 2022-08-16 | Saudi Arabian Oil Company | Measuring wellbore cross-sections using downhole caliper tools |
| US11631884B2 (en) | 2020-06-02 | 2023-04-18 | Saudi Arabian Oil Company | Electrolyte structure for a high-temperature, high-pressure lithium battery |
| US11391104B2 (en) | 2020-06-03 | 2022-07-19 | Saudi Arabian Oil Company | Freeing a stuck pipe from a wellbore |
| US11149510B1 (en) | 2020-06-03 | 2021-10-19 | Saudi Arabian Oil Company | Freeing a stuck pipe from a wellbore |
| US11719089B2 (en) | 2020-07-15 | 2023-08-08 | Saudi Arabian Oil Company | Analysis of drilling slurry solids by image processing |
| US11255130B2 (en) | 2020-07-22 | 2022-02-22 | Saudi Arabian Oil Company | Sensing drill bit wear under downhole conditions |
| US11506044B2 (en) | 2020-07-23 | 2022-11-22 | Saudi Arabian Oil Company | Automatic analysis of drill string dynamics |
| CN112345324A (en) * | 2020-11-02 | 2021-02-09 | 东北石油大学 | Preparation method of natural crack in rock core |
| US11867008B2 (en) | 2020-11-05 | 2024-01-09 | Saudi Arabian Oil Company | System and methods for the measurement of drilling mud flow in real-time |
| CN112459722B (en) * | 2020-11-23 | 2021-08-31 | 中国矿业大学 | A nanofluid-based punching device and method for synergistic hydroelectric breakdown and infrared thermal radiation |
| US11434714B2 (en) | 2021-01-04 | 2022-09-06 | Saudi Arabian Oil Company | Adjustable seal for sealing a fluid flow at a wellhead |
| US11697991B2 (en) | 2021-01-13 | 2023-07-11 | Saudi Arabian Oil Company | Rig sensor testing and calibration |
| CN112943210A (en) * | 2021-02-08 | 2021-06-11 | 中国矿业大学 | Electric pulse and ultrasonic wave cooperated coalbed methane enhanced mining method |
| US11572752B2 (en) | 2021-02-24 | 2023-02-07 | Saudi Arabian Oil Company | Downhole cable deployment |
| US11727555B2 (en) | 2021-02-25 | 2023-08-15 | Saudi Arabian Oil Company | Rig power system efficiency optimization through image processing |
| US11846151B2 (en) | 2021-03-09 | 2023-12-19 | Saudi Arabian Oil Company | Repairing a cased wellbore |
| US11725504B2 (en) | 2021-05-24 | 2023-08-15 | Saudi Arabian Oil Company | Contactless real-time 3D mapping of surface equipment |
| US11619097B2 (en) | 2021-05-24 | 2023-04-04 | Saudi Arabian Oil Company | System and method for laser downhole extended sensing |
| US11788394B2 (en) | 2021-07-15 | 2023-10-17 | Eden Geopower, Inc. | Systems and methods for deployment of electric-based fracturing tools in vertical wells |
| US11649710B2 (en) | 2021-07-15 | 2023-05-16 | Eden Geopower, Inc. | Downhole apparatus and system for electric-based fracturing |
| US11624265B1 (en) | 2021-11-12 | 2023-04-11 | Saudi Arabian Oil Company | Cutting pipes in wellbores using downhole autonomous jet cutting tools |
| US11867012B2 (en) | 2021-12-06 | 2024-01-09 | Saudi Arabian Oil Company | Gauge cutter and sampler apparatus |
| US11954800B2 (en) | 2021-12-14 | 2024-04-09 | Saudi Arabian Oil Company | Converting borehole images into three dimensional structures for numerical modeling and simulation applications |
| US11739616B1 (en) | 2022-06-02 | 2023-08-29 | Saudi Arabian Oil Company | Forming perforation tunnels in a subterranean formation |
| CN115247984B (en) * | 2022-07-15 | 2024-02-06 | 太原理工大学 | Electrode structure capable of focusing impact wave energy and electrode device composed of electrode structure |
| US12203366B2 (en) | 2023-05-02 | 2025-01-21 | Saudi Arabian Oil Company | Collecting samples from wellbores |
| WO2025207774A1 (en) * | 2024-03-27 | 2025-10-02 | Eden Geopower, Inc. | System and method for utilization of electrical reservoir stimulation for enhanced natural hydrogen recovery |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4046194A (en) * | 1976-05-03 | 1977-09-06 | Mobil Oil Corporation | Electrolinking method for improving permeability of hydrocarbon formation |
| US4667738A (en) * | 1984-01-20 | 1987-05-26 | Ceee Corporation | Oil and gas production enhancement using electrical means |
| US20070000662A1 (en) * | 2003-06-24 | 2007-01-04 | Symington William A | Methods of treating a subterranean formation to convert organic matter into producible hydrocarbons |
| US20080230219A1 (en) * | 2007-03-22 | 2008-09-25 | Kaminsky Robert D | Resistive heater for in situ formation heating |
Family Cites Families (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4084638A (en) * | 1975-10-16 | 1978-04-18 | Probe, Incorporated | Method of production stimulation and enhanced recovery of oil |
| CA1095400A (en) * | 1976-05-03 | 1981-02-10 | Howard J. Rowland | In situ processing of organic ore bodies |
| ZA91612B (en) * | 1990-04-20 | 1991-10-30 | Noranda Inc | Plasma blasting method |
| US5473165A (en) * | 1993-11-16 | 1995-12-05 | Stinnett; Regan W. | Method and apparatus for altering material |
| RU2102587C1 (en) * | 1995-11-10 | 1998-01-20 | Линецкий Александр Петрович | Method for development and increased recovery of oil, gas and other minerals from ground |
| US6199634B1 (en) * | 1998-08-27 | 2001-03-13 | Viatchelav Ivanovich Selyakov | Method and apparatus for controlling the permeability of mineral bearing earth formations |
| CN2350524Y (en) * | 1998-10-23 | 1999-11-24 | 四川万兴科技发展有限责任公司 | Oil well oil-increasing and water-decreasing device |
| US7631691B2 (en) * | 2003-06-24 | 2009-12-15 | Exxonmobil Upstream Research Company | Methods of treating a subterranean formation to convert organic matter into producible hydrocarbons |
| US7131498B2 (en) | 2004-03-08 | 2006-11-07 | Shell Oil Company | Expander for expanding a tubular element |
| US8448707B2 (en) * | 2009-04-10 | 2013-05-28 | Shell Oil Company | Non-conducting heater casings |
| US20110033238A1 (en) * | 2009-08-06 | 2011-02-10 | Bp Corporation North America Inc. | Greenhouse Gas Reservoir Systems and Processes of Sequestering Greenhouse Gases |
-
2013
- 2013-03-27 RU RU2014143457A patent/RU2640520C2/en not_active IP Right Cessation
- 2013-03-27 CA CA2867878A patent/CA2867878A1/en not_active Abandoned
- 2013-03-27 DE DE112013001734.2T patent/DE112013001734T5/en not_active Withdrawn
- 2013-03-27 WO PCT/US2013/033961 patent/WO2013148741A1/en not_active Ceased
- 2013-03-27 CN CN201380017774.9A patent/CN104204405B/en not_active Expired - Fee Related
- 2013-03-27 AU AU2013239809A patent/AU2013239809B2/en not_active Ceased
- 2013-03-27 GB GB1415026.2A patent/GB2519420B/en not_active Expired - Fee Related
- 2013-03-28 US US13/852,680 patent/US9243487B2/en not_active Expired - Fee Related
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4046194A (en) * | 1976-05-03 | 1977-09-06 | Mobil Oil Corporation | Electrolinking method for improving permeability of hydrocarbon formation |
| US4667738A (en) * | 1984-01-20 | 1987-05-26 | Ceee Corporation | Oil and gas production enhancement using electrical means |
| US20070000662A1 (en) * | 2003-06-24 | 2007-01-04 | Symington William A | Methods of treating a subterranean formation to convert organic matter into producible hydrocarbons |
| US20080230219A1 (en) * | 2007-03-22 | 2008-09-25 | Kaminsky Robert D | Resistive heater for in situ formation heating |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| RU2686742C1 (en) * | 2016-12-22 | 2019-04-30 | Чайна Юниверсити Оф Майнинг Энд Текнолоджи | Method of eliminating blocking and increasing gas permeability for methane wells of coal beds under electric impulse |
Also Published As
| Publication number | Publication date |
|---|---|
| GB2519420A (en) | 2015-04-22 |
| GB201415026D0 (en) | 2014-10-08 |
| DE112013001734T5 (en) | 2014-12-18 |
| CA2867878A1 (en) | 2013-10-03 |
| CN104204405A (en) | 2014-12-10 |
| AU2013239809B2 (en) | 2015-12-17 |
| GB2519420B (en) | 2016-11-09 |
| RU2014143457A (en) | 2016-05-27 |
| RU2640520C2 (en) | 2018-01-09 |
| AU2013239809A1 (en) | 2014-09-18 |
| US9243487B2 (en) | 2016-01-26 |
| CN104204405B (en) | 2017-10-24 |
| US20130255936A1 (en) | 2013-10-03 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US9243487B2 (en) | Electrofracturing formations | |
| RU2518581C2 (en) | Oil and gas, shale and coal deposit development method | |
| US10400568B2 (en) | System and methods for controlled fracturing in formations | |
| US6427774B2 (en) | Process and apparatus for coupled electromagnetic and acoustic stimulation of crude oil reservoirs using pulsed power electrohydraulic and electromagnetic discharge | |
| US20120325458A1 (en) | Electrically Conductive Methods For In Situ Pyrolysis of Organic-Rich Rock Formations | |
| CA2807663C (en) | Rf fracturing to improve sagd performance | |
| US8689865B2 (en) | Process for enhanced production of heavy oil using microwaves | |
| RU2432460C2 (en) | Procedures for formation fracturing and extraction of hydrocarbon fluid medium from formation | |
| RU2660683C1 (en) | Method of developing low-permeability oil fields based on the use of horizontal wells with longitudinal fractures of hydraulic fracturing | |
| RU2728107C2 (en) | Pyrolysis to create pressure in oil formations | |
| WO2021005383A1 (en) | Method for enhancing oil recovery | |
| CA2913609C (en) | Recovery of hydrocarbons from underground reservoirs | |
| US20150285049A1 (en) | Method of Drilling for and Producing Oil and Gas from Earth Boreholes | |
| RU2733239C1 (en) | Method for development of dense oil deposit by electric fracture | |
| Rezaeyan et al. | Recovery Enhancement in Unconventional Shale Resources | |
| RU2733240C1 (en) | Method for development of multi-face low-permeable oil deposit by electric fracture | |
| EP2739820A2 (en) | Method for extending a network of existing fractures | |
| RU2574652C1 (en) | Hydraulic fracturing method and device for low-permeable oil-and-gas-bearing formations | |
| Rezaeyan et al. | 7 Recovery Enhancement | |
| Szabó et al. | Stimulation of unconventional hydrocarbon reservoirs | |
| CA2777790A1 (en) | Process for enhanced production of heavy oil using microwaves |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 13769733 Country of ref document: EP Kind code of ref document: A1 |
|
| ENP | Entry into the national phase |
Ref document number: 1415026 Country of ref document: GB Kind code of ref document: A Free format text: PCT FILING DATE = 20130327 |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 1415026.2 Country of ref document: GB |
|
| ENP | Entry into the national phase |
Ref document number: 2867878 Country of ref document: CA Ref document number: 2013239809 Country of ref document: AU Date of ref document: 20130327 Kind code of ref document: A |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 112013001734 Country of ref document: DE Ref document number: 1120130017342 Country of ref document: DE |
|
| ENP | Entry into the national phase |
Ref document number: 2014143457 Country of ref document: RU Kind code of ref document: A |
|
| WWE | Wipo information: entry into national phase |
Ref document number: A201411724 Country of ref document: UA |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 13769733 Country of ref document: EP Kind code of ref document: A1 |