WO2013141797A3 - Scheduling of maintenance - Google Patents
Scheduling of maintenance Download PDFInfo
- Publication number
- WO2013141797A3 WO2013141797A3 PCT/SE2013/050296 SE2013050296W WO2013141797A3 WO 2013141797 A3 WO2013141797 A3 WO 2013141797A3 SE 2013050296 W SE2013050296 W SE 2013050296W WO 2013141797 A3 WO2013141797 A3 WO 2013141797A3
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- maintenance
- motor vehicle
- utilization data
- workshop
- visits
- Prior art date
Links
- 238000012423 maintenance Methods 0.000 title abstract 4
- 238000013480 data collection Methods 0.000 abstract 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/20—Administration of product repair or maintenance
-
- G06Q50/40—
-
- G—PHYSICS
- G07—CHECKING-DEVICES
- G07C—TIME OR ATTENDANCE REGISTERS; REGISTERING OR INDICATING THE WORKING OF MACHINES; GENERATING RANDOM NUMBERS; VOTING OR LOTTERY APPARATUS; ARRANGEMENTS, SYSTEMS OR APPARATUS FOR CHECKING NOT PROVIDED FOR ELSEWHERE
- G07C5/00—Registering or indicating the working of vehicles
- G07C5/006—Indicating maintenance
Abstract
A planning entity (100), which schedules a motor vehicle's maintenance visits to a workshop, includes: first and second input interfaces (110, 112), a main processing module (130) and an output interface (114). The first input interface (110) receives utilization data (UD) representing how the motor vehicle has been used during a data collection period. The second input interface (112) receives a client request (CR) containing at least one parameter specifying information relating to a desired maintenance strategy for the motor vehicle, which information is uncorrelated to the utilization data (UD). Based on the utilization data (UD) and the client request (CR), the main processing module (130) generates a maintenance program (MP) that is presented via the output interface (114). The maintenance program (MP) describes recommended visits to a workshop in terms of a series of time instances (T1, T2, …, Ty) to each of which is associated a set of maintenance instances (MI1, MI2, …, MIn) to execute at that time instance (T1, T2, …, Ty).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP13716079.2A EP2828807A2 (en) | 2012-03-20 | 2013-03-19 | Scheduling of maintenance |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SE1250270-4 | 2012-03-20 | ||
SE1250270 | 2012-03-20 |
Publications (2)
Publication Number | Publication Date |
---|---|
WO2013141797A2 WO2013141797A2 (en) | 2013-09-26 |
WO2013141797A3 true WO2013141797A3 (en) | 2013-11-14 |
Family
ID=48093064
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/SE2013/050296 WO2013141797A2 (en) | 2012-03-20 | 2013-03-19 | Scheduling of maintenance |
Country Status (2)
Country | Link |
---|---|
EP (1) | EP2828807A2 (en) |
WO (1) | WO2013141797A2 (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107729473B (en) * | 2017-10-13 | 2021-03-30 | 东软集团股份有限公司 | Article recommendation method and device |
CN107831745B (en) * | 2017-11-09 | 2019-06-07 | 西南交通大学 | A kind of slotting single action state method for optimizing scheduling of flexible job shop |
US11900330B1 (en) * | 2019-10-18 | 2024-02-13 | State Farm Mutual Automobile Insurance Company | Vehicle telematics systems and methods |
EP3872721A1 (en) * | 2020-02-26 | 2021-09-01 | Siemens Aktiengesellschaft | Methods and systems for optimizing maintenance of industrial machines |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20030065771A1 (en) * | 2001-09-28 | 2003-04-03 | Regine Cramer | Method for creating a maintenance algorithm |
US20060136105A1 (en) * | 2004-12-17 | 2006-06-22 | Larson Gerald L | Interactive data exchange system for vehicle maintenance scheduling and up-time optimization |
US20080269977A1 (en) * | 2007-04-30 | 2008-10-30 | International Truck Intellectual Property Company, Llc | Automated synchronized service intervals for vehicles |
-
2013
- 2013-03-19 WO PCT/SE2013/050296 patent/WO2013141797A2/en active Application Filing
- 2013-03-19 EP EP13716079.2A patent/EP2828807A2/en not_active Withdrawn
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20030065771A1 (en) * | 2001-09-28 | 2003-04-03 | Regine Cramer | Method for creating a maintenance algorithm |
US20060136105A1 (en) * | 2004-12-17 | 2006-06-22 | Larson Gerald L | Interactive data exchange system for vehicle maintenance scheduling and up-time optimization |
US20080269977A1 (en) * | 2007-04-30 | 2008-10-30 | International Truck Intellectual Property Company, Llc | Automated synchronized service intervals for vehicles |
Non-Patent Citations (1)
Title |
---|
ANONYMOUS: "Anytime algorithm", 10 December 2011 (2011-12-10), pages 1 - 4, XP002711877, Retrieved from the Internet <URL:http://en.wikipedia.org/w/index.php?title=Anytime_algorithm&oldid=465118869> [retrieved on 20130828] * |
Also Published As
Publication number | Publication date |
---|---|
EP2828807A2 (en) | 2015-01-28 |
WO2013141797A2 (en) | 2013-09-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Cheng et al. | Scheduling problems with deteriorating jobs and learning effects including proportional setup times | |
Cheng et al. | Single-machine scheduling with sum-of-logarithm-processing-times-based learning considerations | |
WO2011159433A3 (en) | Using virtual currency to compensate workers in a crowdsourced task | |
Wu et al. | Single-machine and flowshop scheduling with a general learning effect model | |
WO2015035098A3 (en) | Processing system and method | |
Lee et al. | Some single-machine and m-machine flowshop scheduling problems with learning considerations | |
WO2011159434A3 (en) | Distributing a task to multiple workers over a network for completion while providing quality control | |
WO2013141797A3 (en) | Scheduling of maintenance | |
WO2012170074A3 (en) | Resource scheduling method and system for use with computer directed assembly and manufacture | |
WO2013003271A3 (en) | System and method for managing projects | |
EP2680232A3 (en) | Decoupled parallel meshing in computer aided design | |
WO2012092556A3 (en) | System and method for online communications management | |
CA2862496A1 (en) | Customized transaction flow for multiple transaction types | |
WO2013033716A3 (en) | Dynamic tagging to create logical models and optimize caching in energy management systems | |
WO2013040668A3 (en) | Method and apparatus for assessing hair condition and prescribing customized cosmetic treatment and/or product | |
WO2013002600A3 (en) | Sewing design manufacturing management apparatus and method | |
JP2009037423A5 (en) | ||
EP2568420A3 (en) | An expert system for making automated decisions in the control of an automated process based on distributed activity data | |
WO2014059074A3 (en) | Wellness and weight management system and method | |
WO2014031454A3 (en) | Transaction-level health monitoring of online services | |
WO2017145171A3 (en) | Dynamic autonomous scheduling system and apparatus | |
GB201212231D0 (en) | Data selection | |
CN103077083A (en) | Method and system for processing tasks | |
Wang et al. | Scheduling jobs with processing times dependent on position, starting time, and allotted resource | |
WO2014210137A3 (en) | Method, apparatus, and computer program product for providing mobile location based sales lead identification |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 13716079 Country of ref document: EP Kind code of ref document: A2 |
|
DPE1 | Request for preliminary examination filed after expiration of 19th month from priority date (pct application filed from 20040101) | ||
WWE | Wipo information: entry into national phase |
Ref document number: 2013716079 Country of ref document: EP |