WO2013121299A3 - High definition drilling rate of penetration for marine drilling - Google Patents
High definition drilling rate of penetration for marine drilling Download PDFInfo
- Publication number
- WO2013121299A3 WO2013121299A3 PCT/IB2013/000763 IB2013000763W WO2013121299A3 WO 2013121299 A3 WO2013121299 A3 WO 2013121299A3 IB 2013000763 W IB2013000763 W IB 2013000763W WO 2013121299 A3 WO2013121299 A3 WO 2013121299A3
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- drilling
- marine
- marine drill
- penetration
- rate
- Prior art date
Links
- 238000005553 drilling Methods 0.000 title abstract 4
- 230000035515 penetration Effects 0.000 title abstract 2
- 238000005259 measurement Methods 0.000 abstract 2
- 238000012544 monitoring process Methods 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B44/00—Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/12—Underwater drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B45/00—Measuring the drilling time or rate of penetration
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/001—Survey of boreholes or wells for underwater installation
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/04—Measuring depth or liquid level
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/12—Means for transmitting measuring-signals or control signals from the well to the surface, or from the surface to the well, e.g. for logging while drilling
Landscapes
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- Physics & Mathematics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Fluid Mechanics (AREA)
- Environmental & Geological Engineering (AREA)
- Geochemistry & Mineralogy (AREA)
- Geophysics (AREA)
- Remote Sensing (AREA)
- Earth Drilling (AREA)
- Arrangements For Transmission Of Measured Signals (AREA)
- Length Measuring Devices With Unspecified Measuring Means (AREA)
- Position Fixing By Use Of Radio Waves (AREA)
Abstract
Priority Applications (12)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SG11201404274TA SG11201404274TA (en) | 2012-01-23 | 2013-01-17 | High definition drilling rate of penetration for marine drilling |
NZ627706A NZ627706A (en) | 2012-01-23 | 2013-01-17 | High definition drilling rate of penetration for marine drilling |
CN201380006327.3A CN104364467A (en) | 2012-01-23 | 2013-01-17 | High definition drilling rate of penetration for marine drilling |
KR1020147020726A KR20140135689A (en) | 2012-01-23 | 2013-01-17 | High definition drilling rate of penetration for marine drilling |
AP2014007814A AP2014007814A0 (en) | 2012-01-23 | 2013-01-17 | High definition drilling rate of penetration for marine drilling |
EA201400837A EA201400837A1 (en) | 2012-01-23 | 2013-01-17 | HIGH-QUALITY DETERMINATION OF SPEED PUMP FOR MARINE DRILLING |
EP13734149.1A EP2807333B1 (en) | 2012-01-23 | 2013-01-17 | High definition drilling rate of penetration for marine drilling |
MX2014008937A MX360642B (en) | 2012-01-23 | 2013-01-17 | High definition drilling rate of penetration for marine drilling. |
CA2861962A CA2861962C (en) | 2012-01-23 | 2013-01-17 | High definition drilling rate of penetration for marine drilling |
JP2014552717A JP5930440B2 (en) | 2012-01-23 | 2013-01-17 | High-definition rate for offshore drilling |
BR112014018159A BR112014018159A8 (en) | 2012-01-23 | 2013-01-17 | PENETRATION HIGH DEFINITION DRILLING RATE FOR MARITIME DRILLING |
IN6133DEN2014 IN2014DN06133A (en) | 2012-01-23 | 2014-07-21 |
Applications Claiming Priority (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US201261589445P | 2012-01-23 | 2012-01-23 | |
US61/589,445 | 2012-01-23 | ||
US13/741,990 US9217290B2 (en) | 2012-01-23 | 2013-01-15 | High definition drilling rate of penetration for marine drilling |
US13/741,990 | 2013-01-15 |
Publications (2)
Publication Number | Publication Date |
---|---|
WO2013121299A2 WO2013121299A2 (en) | 2013-08-22 |
WO2013121299A3 true WO2013121299A3 (en) | 2014-04-03 |
Family
ID=51519437
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/IB2013/000763 WO2013121299A2 (en) | 2012-01-23 | 2013-01-17 | High definition drilling rate of penetration for marine drilling |
Country Status (14)
Country | Link |
---|---|
EP (1) | EP2807333B1 (en) |
JP (2) | JP5930440B2 (en) |
KR (1) | KR20140135689A (en) |
CN (1) | CN104364467A (en) |
AP (1) | AP2014007814A0 (en) |
AU (1) | AU2013203035B2 (en) |
BR (1) | BR112014018159A8 (en) |
CA (1) | CA2861962C (en) |
EA (1) | EA201400837A1 (en) |
IN (1) | IN2014DN06133A (en) |
MX (1) | MX360642B (en) |
NZ (1) | NZ627706A (en) |
SG (1) | SG11201404274TA (en) |
WO (1) | WO2013121299A2 (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2016145398A1 (en) * | 2015-03-12 | 2016-09-15 | Transocean Sedco Forex Ventures Limited | Dynamic positioning (dp) drive-off (do) mitigation with inertial navigation system |
CN106351648B (en) * | 2016-09-13 | 2023-10-31 | 中国石油天然气集团公司 | Device and method for monitoring deep water drilling pipe while drilling |
KR20190048101A (en) | 2017-10-30 | 2019-05-09 | (주)일흥 | Welding guide system for monitoring |
CN109820879A (en) * | 2018-11-14 | 2019-05-31 | 永腾生技有限公司 | Antrodia camphorata extract, the preparation method of Antrodia camphorata composition and medical composition |
KR102294384B1 (en) * | 2020-12-31 | 2021-08-26 | 동아대학교 산학협력단 | Method for constructing drilling driving guide model to predict drilling rate using machine learning and system for predicting drilling rate using thereof |
CN113236233B (en) * | 2021-03-25 | 2022-10-14 | 西南石油大学 | Displacement measuring device for drilling traction robot |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1319800A1 (en) * | 2001-12-12 | 2003-06-18 | Cooper Cameron Corporation | Borehole equipment position detection system |
WO2008127125A2 (en) * | 2007-04-16 | 2008-10-23 | Marine Cybernetics | System and method for testing drilling control systems |
US20110048737A1 (en) * | 2009-09-01 | 2011-03-03 | Tesco Corporation | Method of Preventing Dropped Casing String with Axial Load Sensor |
WO2011094689A1 (en) * | 2010-02-01 | 2011-08-04 | Aps Technology, Inc. | System and method for monitoring and controlling underground drilling |
Family Cites Families (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3681928A (en) * | 1970-09-15 | 1972-08-08 | Leonardus M J Vincken | Method and apparatus for carrying out underwater well operations |
FR2278908A1 (en) * | 1974-01-23 | 1976-02-13 | Schlumberger Prospection | METHODS AND DEVICES FOR DETERMINING THE PROGRESS OF A BOREHOLE |
DE3325962A1 (en) * | 1983-07-19 | 1985-01-31 | Bergwerksverband Gmbh, 4300 Essen | TARGET DRILL ROD FOR ROTATING DRILL ROD WITH RINSING CHANNEL FOR UNDERGROUND OPERATION |
US4852052A (en) * | 1987-05-28 | 1989-07-25 | Teleco Oilfield Services Inc. | Kelly-to-riser position determining system with adjustment for uncompensated heave |
JP2605492B2 (en) * | 1991-02-26 | 1997-04-30 | 鹿島建設株式会社 | Active vibration control offshore structure |
WO2004074623A2 (en) * | 2003-02-15 | 2004-09-02 | Varco I/P, Inc. | Automated control system for back-reaming |
US7044239B2 (en) * | 2003-04-25 | 2006-05-16 | Noble Corporation | System and method for automatic drilling to maintain equivalent circulating density at a preferred value |
AU2004324515B8 (en) * | 2004-11-03 | 2009-11-19 | Single Buoy Moorings Inc. | Oscillation suppression and control system for a floating platform |
US7775297B2 (en) * | 2006-12-06 | 2010-08-17 | Omron Oilfield & Marine, Inc. | Multiple input scaling autodriller |
MX2009006095A (en) * | 2006-12-07 | 2009-08-13 | Nabors Global Holdings Ltd | Automated mse-based drilling apparatus and methods. |
US8672055B2 (en) * | 2006-12-07 | 2014-03-18 | Canrig Drilling Technology Ltd. | Automated directional drilling apparatus and methods |
US8256534B2 (en) * | 2008-05-02 | 2012-09-04 | Baker Hughes Incorporated | Adaptive drilling control system |
CN201292834Y (en) * | 2008-10-08 | 2009-08-19 | 抚州市临川白勇海洋工程有限公司 | Riser monitoring system based on underwater sound |
US20100252325A1 (en) * | 2009-04-02 | 2010-10-07 | National Oilwell Varco | Methods for determining mechanical specific energy for wellbore operations |
CN101575940B (en) * | 2009-04-10 | 2012-06-27 | 中国石油集团海洋工程有限公司 | Drilling operation method by utilizing dual drill drilling system |
US8727038B2 (en) * | 2010-01-19 | 2014-05-20 | Yun Tak Chan | Control system for drilling operations |
CN201802388U (en) * | 2010-09-10 | 2011-04-20 | 中国海洋石油总公司 | Offshore drilling multi-parameter monitor |
-
2013
- 2013-01-17 CA CA2861962A patent/CA2861962C/en not_active Expired - Fee Related
- 2013-01-17 MX MX2014008937A patent/MX360642B/en active IP Right Grant
- 2013-01-17 AU AU2013203035A patent/AU2013203035B2/en not_active Ceased
- 2013-01-17 AP AP2014007814A patent/AP2014007814A0/en unknown
- 2013-01-17 EA EA201400837A patent/EA201400837A1/en unknown
- 2013-01-17 EP EP13734149.1A patent/EP2807333B1/en not_active Not-in-force
- 2013-01-17 SG SG11201404274TA patent/SG11201404274TA/en unknown
- 2013-01-17 BR BR112014018159A patent/BR112014018159A8/en not_active Application Discontinuation
- 2013-01-17 KR KR1020147020726A patent/KR20140135689A/en not_active Application Discontinuation
- 2013-01-17 JP JP2014552717A patent/JP5930440B2/en not_active Expired - Fee Related
- 2013-01-17 NZ NZ627706A patent/NZ627706A/en not_active IP Right Cessation
- 2013-01-17 CN CN201380006327.3A patent/CN104364467A/en active Pending
- 2013-01-17 WO PCT/IB2013/000763 patent/WO2013121299A2/en active Application Filing
-
2014
- 2014-07-21 IN IN6133DEN2014 patent/IN2014DN06133A/en unknown
-
2016
- 2016-01-18 JP JP2016006828A patent/JP2016053302A/en not_active Withdrawn
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1319800A1 (en) * | 2001-12-12 | 2003-06-18 | Cooper Cameron Corporation | Borehole equipment position detection system |
WO2008127125A2 (en) * | 2007-04-16 | 2008-10-23 | Marine Cybernetics | System and method for testing drilling control systems |
US20110048737A1 (en) * | 2009-09-01 | 2011-03-03 | Tesco Corporation | Method of Preventing Dropped Casing String with Axial Load Sensor |
WO2011094689A1 (en) * | 2010-02-01 | 2011-08-04 | Aps Technology, Inc. | System and method for monitoring and controlling underground drilling |
Also Published As
Publication number | Publication date |
---|---|
JP5930440B2 (en) | 2016-06-08 |
EA201400837A1 (en) | 2014-11-28 |
AU2013203035B2 (en) | 2015-06-11 |
NZ627706A (en) | 2015-06-26 |
CN104364467A (en) | 2015-02-18 |
IN2014DN06133A (en) | 2015-08-14 |
EP2807333A2 (en) | 2014-12-03 |
SG11201404274TA (en) | 2014-08-28 |
AP2014007814A0 (en) | 2014-07-31 |
BR112014018159A2 (en) | 2017-06-20 |
EP2807333B1 (en) | 2016-11-02 |
MX2014008937A (en) | 2015-06-02 |
WO2013121299A2 (en) | 2013-08-22 |
KR20140135689A (en) | 2014-11-26 |
CA2861962A1 (en) | 2013-08-22 |
BR112014018159A8 (en) | 2017-07-11 |
MX360642B (en) | 2018-11-12 |
CA2861962C (en) | 2017-08-15 |
JP2015504122A (en) | 2015-02-05 |
JP2016053302A (en) | 2016-04-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2013121299A3 (en) | High definition drilling rate of penetration for marine drilling | |
WO2012010835A3 (en) | Monitoring of objects in conjunction with a subterranean well | |
WO2015030799A8 (en) | Estimating and predicting wellbore tortuosity | |
WO2014055428A3 (en) | Enhanced position measurement systems and methods | |
GB201319210D0 (en) | Method and system for passive electroseismic surveying | |
GB2510753A (en) | Steering head with integrated drilling dynamics control | |
MY169945A (en) | Sensor transportation apparatus and guide device | |
WO2011139696A3 (en) | At-bit evaluation of formation parameters and drilling parameters | |
WO2013009801A3 (en) | Estimating a wellbore parameter | |
MX2019002694A (en) | Estimation of orientation of a cutting tool. | |
WO2013134503A3 (en) | Methods And Compositions For Detecting Multiple Analytes With A Single Signal | |
WO2011128105A3 (en) | Monitoring apparatus for a soil-working machine | |
WO2012167078A3 (en) | Apparatus and method for determining inclination and orientation of a downhole tool using pressure measurements | |
WO2015017190A3 (en) | Dynamic in-situ measurement of reservoir wettability | |
WO2014168960A3 (en) | Sensor standoff | |
WO2012067958A3 (en) | Noise attenuation in passive seismic data | |
WO2011059959A3 (en) | Integrating multiple data source for drilling applications | |
WO2015058110A3 (en) | Apparatus and method of monitoring a fluid by a tracer | |
CA2863432A1 (en) | Element, preferably a closure element for inserting into a bore in a component | |
MX2014013976A (en) | Methods and apparatus for determining downhole fluid parameters. | |
GB201304878D0 (en) | Dtem with shop spacing for deep, ahead of the drill bit measurements | |
WO2012069795A3 (en) | Downhole traction | |
WO2009105660A3 (en) | Distributed sensors for dynamics modeling | |
WO2013164570A3 (en) | Determining the depth and orientation of a feature in a wellbore | |
WO2014043073A3 (en) | Early detection and anti-collision system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
DPE1 | Request for preliminary examination filed after expiration of 19th month from priority date (pct application filed from 20040101) | ||
REEP | Request for entry into the european phase |
Ref document number: 2013734149 Country of ref document: EP |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2013734149 Country of ref document: EP |
|
ENP | Entry into the national phase |
Ref document number: 2861962 Country of ref document: CA |
|
ENP | Entry into the national phase |
Ref document number: 2014552717 Country of ref document: JP Kind code of ref document: A |
|
ENP | Entry into the national phase |
Ref document number: 20147020726 Country of ref document: KR Kind code of ref document: A |
|
WWE | Wipo information: entry into national phase |
Ref document number: MX/A/2014/008937 Country of ref document: MX |
|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 13734149 Country of ref document: EP Kind code of ref document: A2 |
|
WWE | Wipo information: entry into national phase |
Ref document number: 201400837 Country of ref document: EA |
|
REG | Reference to national code |
Ref country code: BR Ref legal event code: B01A Ref document number: 112014018159 Country of ref document: BR |
|
ENP | Entry into the national phase |
Ref document number: 112014018159 Country of ref document: BR Kind code of ref document: A2 Effective date: 20140723 |