WO2013105881A2 - Procédé de construction d'un système d'injection pour l'exploitation d'une partie non recouverte d'eau d'un amas de minerai lors de la lixiviation souterraine - Google Patents

Procédé de construction d'un système d'injection pour l'exploitation d'une partie non recouverte d'eau d'un amas de minerai lors de la lixiviation souterraine Download PDF

Info

Publication number
WO2013105881A2
WO2013105881A2 PCT/RU2013/000004 RU2013000004W WO2013105881A2 WO 2013105881 A2 WO2013105881 A2 WO 2013105881A2 RU 2013000004 W RU2013000004 W RU 2013000004W WO 2013105881 A2 WO2013105881 A2 WO 2013105881A2
Authority
WO
WIPO (PCT)
Prior art keywords
water
ore body
injection
constructing
leaching
Prior art date
Application number
PCT/RU2013/000004
Other languages
English (en)
Russian (ru)
Other versions
WO2013105881A3 (fr
Inventor
Геннадий Сергеевич ГРЕБНЕВ
Николай Васильевич САВЕНЯ
Михаил Николаевич САВЕНЯ
Константин Александрович ЗАБОЛОЦКИЙ
Original Assignee
Общество С Ограниченной Ответственностью "Уральская Геотехнологическая Компания"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Общество С Ограниченной Ответственностью "Уральская Геотехнологическая Компания" filed Critical Общество С Ограниченной Ответственностью "Уральская Геотехнологическая Компания"
Publication of WO2013105881A2 publication Critical patent/WO2013105881A2/fr
Publication of WO2013105881A3 publication Critical patent/WO2013105881A3/fr

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/28Dissolving minerals other than hydrocarbons, e.g. by an alkaline or acid leaching agent
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/22Methods of underground mining; Layouts therefor for ores, e.g. mining placers

Definitions

  • the invention relates to mining, and in particular to geotechnological methods for mining deposits.
  • the geofiltration medium is characterized by heterogeneity both in plan and in section, especially in its non-irrigated part. Therefore, accounting, identifying and using these features can reduce costs in the construction of an injection system for working out the unified part of the ore body.
  • a known method of mining using the dissolution process (US JY "4586752, IPC C22BZ / 06; C22B60 / 02; E21B43 / 28, publ. 1986-05-06), which is especially applicable for the development of deposits, at least partially covered with underground water
  • the process is conducted in three stages: at the first stage, the leaching solution is injected and a production solution is discharged onto the surface; on the second, they carry out only the issuance of a production solution to the surface; on the third, they again start pumping the leach and pumping out the production solution.
  • SUBSTITUTE SHEET (RULE 26) horizon and after reaching the water level in the pumping wells corresponding to the provision of pumping, leaching solutions and pumping water from the pumping wells begin to be pumped into the pumping wells.
  • pools ponds
  • platforms ponds
  • ditches grooves
  • closed infiltration systems which are used as tubular drains, galleries, adits, boreholes and mine wells.
  • the use of open or closed infiltration systems is determined by the technical characteristics of the equipment used and the geological conditions at the place of work. Compulsory
  • SUBSTITUTE SHEET (RULE 26)
  • the condition for the effective operation of such structures is the presence of a high geofiltration uniformity in the non-irrigated part of the horizon into which water is supplied from the replenishment source, both in plan and in section, and the absence of deposits that impede the infiltration movement of water in the roof of the aquifer.
  • Mineral deposits mined by underground leaching are characterized by geofiltration heterogeneity of the medium both in plan and in section, which can be used to reduce costs in the construction of injection systems in underground leaching processes.
  • Geofiltration heterogeneity is created during the weathering of various intermediate and final decomposition products of minerals and rocks, which can dissolve and be carried away by surface waters. Their migration is carried out in the form of mechanical suspensions, colloidal and true solutions, as a result of which zones with different filtration permeability are formed.
  • layers of increased filtration capacity with a thickness of the order of a few meters in the upper part of the weathering crust, formed naturally as a result of chemical and physical weathering of rocks, fine fractions during crust formation and evolutionary weathering, can serve as a natural collector for feeding leaching solutions to the non-irrigated part of the ore body , and for the development of deposits having areas with a shallow ore bedding, with geotechnological methods of mining using calling infiltration channels, or trenches, or drains, or injection wells.
  • SUBSTITUTE SHEET (RULE 26)
  • the disadvantages of this method include the low percentage of extraction of the natural component, significant costs for the construction of the injection system and poor environmental conditions due to the organization of a large number of injection workings, and, as a result, the number of possible spills.
  • an open long-acting source of water should be located nearby, the selection of water from which will not harm the environment.
  • the problem to which the invention is directed is to develop a method for constructing an injection system for working out the non-irrigated part of the ore body during underground leaching.
  • the technical result of the proposed solution is to increase the degree of extraction of the useful component due to the involvement in the development of the non-irrigated part of the ore body, uniform distribution of the leaching solution, reducing the cost of constructing the injection system and improving the environmental situation at the place of work by reducing the number of injection workings and, as a result , the number of possible spills.
  • the flooded part of the ore body is opened as usual using injection and pumping openings.
  • the method of constructing an injection system for working out the non-watered part of the ore body during underground leaching including the construction of injection workings, according to the invention
  • the most water-spaced interval is allocated, usually located under cover deposits in the upper part of the non-irrigated ore body, and open it with injection workings.
  • injection workings infiltration ditches or trenches, or drains, or injection wells are used;
  • infiltration ditches or trenches, or drains, or injection wells are constructed depending on the thickness of the identified most water-conducting interval, its location and the thickness of the overburden.
  • Figure 1 shows a diagram of the infiltration ditch
  • FIG. 2- shows a diagram of the infiltration well
  • FIG. 3 shows the location of the wells on the test cells.
  • Diagram of the infiltration ditch includes: 1 - cover deposits; 2 - clay layer; 3 - zone of increased water conductivity; 4 - non-irrigated horizon; 5 - flooded horizon; 6 - injection manifold; 7 - a pipe; 8 - infiltration ditch; 9 - soil backfill; 10 - clay backfill; 1 1 - plastic film; 12 - filter material; 13 - spreading zone.
  • Scheme infiltration wells includes: 1 - cover deposits; 2 - clay layer; 3 - zone of increased water conductivity; 4 - non-irrigated horizon; 5 - flooded horizon; 12 - filter material; 13 - spreading zone; 14 is a well; 15 - casing with a filter; 16 - annular cementation.
  • the layout of the wells in the test cells includes: 1 - cover deposits; 2 - clay layer; 3 - zone of increased water conductivity; 4 - non-irrigated horizon; 5 - flooded horizon; 12 - filter material; 13 - spreading zone; 14 - well; 15 - casing with a filter; 16 - annular cementation.
  • An obligatory stage of field development should be the conduct of hydrogeological studies by known methods, for example, during which the degree of water cut of the field and the possibility of its development by geotechnological methods are established.
  • hydrogeological and geophysical methods identify the zone of increased water conductivity in its upper part and, depending on the depth and thickness of the location, open it with infiltration
  • SUBSTITUTE SHEET (RULE 26) ditches, or trenches, or drains, or injection wells, and in the case of a zone of increased filterability to the surface, ponds are built.
  • infiltration ditches 8 are constructed to open the identified zone of increased water conductivity 3, they are covered with filtering acid-resistant material 12, the filtration properties of which are higher than those of the identified most water-conducting interval, covered with plastic film 1 1, covered with clay 10 and backfill soil 9 and roll away. Leaching solutions are fed into the layer of filtering material through pipes 7 connected to the injection manifold 6.
  • Irrigation ponds are arranged in natural or artificial excavations on the surface of the ore body. The feasibility of their use is determined by the topography and properties of the leaching reagents.
  • the number of ditches, wells and ponds is selected from the condition of overlapping in terms of infiltration flows and the required irrigation density.
  • the non-irrigated zone was located in the upper part of the ore body and is overlain by alluvial deposits with a thickness of 5-7 meters.
  • the thicknesses of the non-irrigated part of the ore body and its upper, more permeable part were determined, which amounted, respectively, to 28-35 and 2-4 m.
  • a solution was supplied through the Ns l borehole to the upper, most permeable, non-irrigated part of the ore body, and through the J4b2 and N ° 3 boreholes, to the underlying non-watered parts located ten and twenty meters deeper, respectively.
  • the injectivity and spreading area of the solutions along the N ° l borehole constructed in the upper part of the non-irrigated ore body is significantly higher than the similar values for the 2 and _ ⁇ _3 boreholes, which makes it possible to use a significantly smaller number of injection boreholes with the same volume of solutions injected into the ore body , and therefore reduce the cost of their construction and minimize environmental risks associated with accidents of the injection system.
  • the uniform distribution of leaching solutions and the possibility of supplying them to the non-irrigated horizons of the ore body can increase the degree of extraction of useful components.
  • the above example shows the advantage of the proposed method of constructing an injection system for mining the non-irrigated part of the ore body during underground leaching over the known ones.

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Remote Sensing (AREA)
  • Geophysics And Detection Of Objects (AREA)
  • Sewage (AREA)

Abstract

Le procédé de construction d'un système d'injection pour l'exploitation d'une partie non recouverte d'eau d'un amas de minerai lors de la lixiviation souterraine se rapporte au domaine de l'industrie minière et notamment des procédés géotechnologiques d'exploitation de gisements. Le procédé consiste à construire des structures d'exploitation à injection et à isoler dans la partie non recouverte d'eau d'un amas de minerai, lors d'une prospection hydrogéoloqique et géophysique, l'intervalle à conduction d'eau maximal qui se situe en règle générale sous les dépôts de couverture dans la partie supérieure de la partie non recouverte d'eau de l'amas de minerai, et l'extraire au moyen de structures d'exploitation à injection. On utilise en tant que structures d'exploitation à injection des canaux ou tranchées à infiltration, des drainages ou des puits à injection ménagés en fonction de la puissance de l'intervalle de conduction d'eau, de sa disposition et de l'importance des dépôts de couverture. L'utilisation du procédé de l'invention permet d'augmenter sensiblement le degré d'exploitation du composant utile grâce à l'utilisation dans les exploitations de la partie non recouverte d'eau de l'amas de minerai; de réduire les frais liés à la construction d'un système de pompage et d'améliorer la situation écologique sur le site des travaux grâce à la réduction du nombre de structures d'exploitation à injection et, partant, du nombre de déversements accidentels possibles.
PCT/RU2013/000004 2012-01-11 2013-01-09 Procédé de construction d'un système d'injection pour l'exploitation d'une partie non recouverte d'eau d'un amas de minerai lors de la lixiviation souterraine WO2013105881A2 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
RU2012100893 2012-01-11
RU2012100893/03A RU2012100893A (ru) 2012-01-11 2012-01-11 Способ сооружения закачной системы для отработки необводненной части рудного тела при подземном выщелачивании

Publications (2)

Publication Number Publication Date
WO2013105881A2 true WO2013105881A2 (fr) 2013-07-18
WO2013105881A3 WO2013105881A3 (fr) 2013-10-03

Family

ID=48782037

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/RU2013/000004 WO2013105881A2 (fr) 2012-01-11 2013-01-09 Procédé de construction d'un système d'injection pour l'exploitation d'une partie non recouverte d'eau d'un amas de minerai lors de la lixiviation souterraine

Country Status (3)

Country Link
EA (1) EA201300066A1 (fr)
RU (1) RU2012100893A (fr)
WO (1) WO2013105881A2 (fr)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109083644A (zh) * 2018-08-16 2018-12-25 中南大学 一种缓倾斜中厚矿体安全高效采矿方法
CN114000859A (zh) * 2021-10-25 2022-02-01 紫金矿业集团股份有限公司 一种基于溶浸采矿法的采矿装置及采矿方法

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4586752A (en) * 1978-04-10 1986-05-06 Union Oil Company Of California Solution mining process
RU2185507C1 (ru) * 2001-03-27 2002-07-20 Общество с ограниченной ответственностью "Геоприд" Способ извлечения благородных металлов из руд на месте залегания методом подземного выщелачивания

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4586752A (en) * 1978-04-10 1986-05-06 Union Oil Company Of California Solution mining process
RU2185507C1 (ru) * 2001-03-27 2002-07-20 Общество с ограниченной ответственностью "Геоприд" Способ извлечения благородных металлов из руд на месте залегания методом подземного выщелачивания

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109083644A (zh) * 2018-08-16 2018-12-25 中南大学 一种缓倾斜中厚矿体安全高效采矿方法
CN109083644B (zh) * 2018-08-16 2019-08-02 中南大学 一种缓倾斜中厚矿体安全高效采矿方法
CN114000859A (zh) * 2021-10-25 2022-02-01 紫金矿业集团股份有限公司 一种基于溶浸采矿法的采矿装置及采矿方法

Also Published As

Publication number Publication date
EA201300066A1 (ru) 2013-07-30
WO2013105881A3 (fr) 2013-10-03
RU2012100893A (ru) 2013-07-20

Similar Documents

Publication Publication Date Title
Sinclair et al. In situ leaching of copper: Challenges and future prospects
CN106623389A (zh) 氰化物污染土壤修复方法
CN102787236B (zh) 一种离子吸附型稀土原地浸矿母液回收工艺
CN111622269B (zh) 一种离子型稀土浅层地下水污染防控方法
RU2341658C1 (ru) Способ предотвращения затопления калийных рудников и опасных деформаций земной поверхности при прорывах в рудники подземных вод
Sobko et al. Substantiation of rational mining method at the Motronivskyi titanium-zirconium ore deposit exploration
CN106381405A (zh) 一种稀土矿山集液系统及方法
CN107858536A (zh) 离子型稀土全覆式矿山原地浸矿孔网参数设计方法
WO2013105881A2 (fr) Procédé de construction d'un système d'injection pour l'exploitation d'une partie non recouverte d'eau d'un amas de minerai lors de la lixiviation souterraine
RU2584190C1 (ru) Способ разработки многопластовой нефтяной залежи
RU2185507C1 (ru) Способ извлечения благородных металлов из руд на месте залегания методом подземного выщелачивания
Klimchouk et al. Environmental problems in gypsum karst terrains
RU2546704C1 (ru) Способ разработки нефтяной малоразведанной залежи
CN107858537B (zh) 离子型稀土裸脚式矿山原地浸矿孔网参数设计方法
RU2664281C1 (ru) Способ разработки кимберлитовых месторождений
Brudnik et al. The complex hydrogeology of the unique Wieliczka salt mine
CN112127844B (zh) 一种空气驱动采卤系统
Johnson Salt dissolution and subsidence or collapse caused by human activities
Klimchouk et al. Gypsum karst in the western Ukraine: Hydrochemistry and solution rates
RU2469191C1 (ru) Способ открытой разработки обводненных месторождений полезных ископаемых
RU2235206C1 (ru) Способ разработки глубокозалегающих месторождений полезных ископаемых
CN112627796B (zh) 一种采卤渠系统的施工方法
Erg CHANGES IN GROUNDWATER SULPHATE CONTENT IN ESTONIAN OIL SHALE MINING AREA.
RU2580671C1 (ru) Способ разработки многопластовых залежей нефти
Klimchouk Evolution of karst in evaporites

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 13736044

Country of ref document: EP

Kind code of ref document: A2

122 Ep: pct application non-entry in european phase

Ref document number: 13736044

Country of ref document: EP

Kind code of ref document: A2