WO2013073997A3 - Method for eliminating and preventing the formation of asphaltene and paraffin deposits in oil wells and pipelines, and apparatus for the implementation thereof - Google Patents

Method for eliminating and preventing the formation of asphaltene and paraffin deposits in oil wells and pipelines, and apparatus for the implementation thereof Download PDF

Info

Publication number
WO2013073997A3
WO2013073997A3 PCT/RU2012/000937 RU2012000937W WO2013073997A3 WO 2013073997 A3 WO2013073997 A3 WO 2013073997A3 RU 2012000937 W RU2012000937 W RU 2012000937W WO 2013073997 A3 WO2013073997 A3 WO 2013073997A3
Authority
WO
WIPO (PCT)
Prior art keywords
unit
asphaltene
paraffin deposits
oil
eliminating
Prior art date
Application number
PCT/RU2012/000937
Other languages
French (fr)
Russian (ru)
Other versions
WO2013073997A2 (en
Inventor
Вадим Викторович ЛЫКОВ
Сергей Константинович ДОЛЖАНСКИЙ
Original Assignee
Lykov Vadim Viktorovich
Dolzhansky Sergei Konstantinovich
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Lykov Vadim Viktorovich, Dolzhansky Sergei Konstantinovich filed Critical Lykov Vadim Viktorovich
Publication of WO2013073997A2 publication Critical patent/WO2013073997A2/en
Publication of WO2013073997A3 publication Critical patent/WO2013073997A3/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B37/00Methods or apparatus for cleaning boreholes or wells

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)
  • Investigating Or Analyzing Materials By The Use Of Ultrasonic Waves (AREA)

Abstract

The invention relates to the oil industry and is intended for eliminating and preventing the formation of asphaltene and paraffin deposits in oil-producing wells and oil pipelines. An electric cable to which discharge units are attached is lowered into the borehole production tubing to a depth at which asphaltene and paraffin deposits are likely to occur. A discharge is generated at any one discharger or group of dischargers. The discharge units are comprised of the following electrically interconnected components: a unit for receiving and transmitting data to a surface control unit, a power supply, a controller, an echo sounding unit, a unit for receiving and processing sensor signals, a unit for controlling the parameters of the pulses generated by a pulse generator, a capacitor bank charging device, and a unit for distributing pulses to the dischargers. Acoustic sensors and also temperature and pressure sensors are mounted inside the production tubing and in the annulus for the purpose of monitoring and controlling the process. The technical result is a reduction in power consumption and an increase in well yield.
PCT/RU2012/000937 2011-11-17 2012-11-15 Method for eliminating and preventing the formation of asphaltene and paraffin deposits in oil wells and pipelines, apparatus for the implementation thereof WO2013073997A2 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
RU2011146464 2011-11-17
RU2011146464/03A RU2475627C1 (en) 2011-11-17 2011-11-17 Method of elimination and prevention of formation of asphaltene-resin-paraffin deposits in oil wells and oil pipelines and plant for its implementation

Publications (2)

Publication Number Publication Date
WO2013073997A2 WO2013073997A2 (en) 2013-05-23
WO2013073997A3 true WO2013073997A3 (en) 2013-07-11

Family

ID=48430326

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/RU2012/000937 WO2013073997A2 (en) 2011-11-17 2012-11-15 Method for eliminating and preventing the formation of asphaltene and paraffin deposits in oil wells and pipelines, apparatus for the implementation thereof

Country Status (2)

Country Link
RU (1) RU2475627C1 (en)
WO (1) WO2013073997A2 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4321664A1 (en) * 1992-07-21 1994-01-27 Geodrill Bohr Gmbh Cleaning deposits from inner surfaces of well pipes - using three simultaneous processes, fluid shock wave from discharge across spark gap, ultrasound wave and water jet
RU2175898C1 (en) * 2000-04-25 2001-11-20 Закрытое акционерное общество "Еврофинчерметхолдинг" Electric discharge apparatus for cleaning surfaces of hollow products
RU93700U1 (en) * 2009-12-28 2010-05-10 Федеральное государственное образовательное учреждение высшего профессионального образования "Азово-Черноморская государственная агроинженерная академия" (ФГОУ ВПО АЧГАА) DEVICE FOR ELECTRIC HYDRAULIC INSTALLATION CONTROL
RU2388908C1 (en) * 2009-04-03 2010-05-10 Общество С Ограниченной Ответственностью "Соновита" Method of electric hydraulic impact on oil formation and device for its implementation

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2540413B1 (en) * 1983-02-04 1986-07-11 Commissariat Energie Atomique METHOD AND DEVICE FOR SURFACE TREATMENT USING ELECTRIC SHOCK
RU2055171C1 (en) * 1993-12-14 1996-02-27 Всероссийский нефтегазовый научно-исследовательский институт Method for stimulation of oil recovery
RU2244109C1 (en) * 2004-05-06 2005-01-10 Толоконский Сергей Игоревич Method of treating bottom zone of well
RU2368765C2 (en) * 2007-12-24 2009-09-27 Белянский Владимир Самуилович Method of electric hydraulic pulse action in oil and gas wells and downhole generator for method's realisation
RU2382373C1 (en) * 2008-06-23 2010-02-20 Анатолий Яковлевич Картелев Method for remote control of well electric discharge devices

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4321664A1 (en) * 1992-07-21 1994-01-27 Geodrill Bohr Gmbh Cleaning deposits from inner surfaces of well pipes - using three simultaneous processes, fluid shock wave from discharge across spark gap, ultrasound wave and water jet
RU2175898C1 (en) * 2000-04-25 2001-11-20 Закрытое акционерное общество "Еврофинчерметхолдинг" Electric discharge apparatus for cleaning surfaces of hollow products
RU2388908C1 (en) * 2009-04-03 2010-05-10 Общество С Ограниченной Ответственностью "Соновита" Method of electric hydraulic impact on oil formation and device for its implementation
RU93700U1 (en) * 2009-12-28 2010-05-10 Федеральное государственное образовательное учреждение высшего профессионального образования "Азово-Черноморская государственная агроинженерная академия" (ФГОУ ВПО АЧГАА) DEVICE FOR ELECTRIC HYDRAULIC INSTALLATION CONTROL

Also Published As

Publication number Publication date
WO2013073997A2 (en) 2013-05-23
RU2475627C1 (en) 2013-02-20

Similar Documents

Publication Publication Date Title
MX342049B (en) Stimulation method.
CA3078835C (en) Method and system for performing operations with communications
WO2011150251A8 (en) Assembly and method for multi-zone fracture stimulation of a reservoir using autonomous tubular units
WO2007105167A3 (en) Method and apparatus for hydraulic fracturing and monitoring
CA2913882C (en) Closed loop deployment of a work string including a composite plug in a wellbore
WO2009134669A3 (en) Hydrocarbon recovery testing method
WO2014018868A3 (en) A system and method for stimulating wells, deposits and boreholes using the plasma source
GB201317567D0 (en) Managed pressure drilling withrig heave compensation
WO2015040155A3 (en) Producing hydrocarbons
WO2013055691A3 (en) Method for real-time monitoring and transmitting hydraulic fracture seismic events to surface using the pilot hole of the treatment well as the monitoring well
WO2009118625A1 (en) Method and apparatus for detecting acoustic activity in a subsurface formation
WO2013079928A3 (en) An adaptive method for high data rate communication in wells
MX2012003553A (en) Fracture imaging methods employing skeletonization of seismic emission tomography data.
WO2010137986A3 (en) Method and system for transferring signals through a drill pipe system
WO2014163853A3 (en) Producing hydrocarbons from a formation
WO2013049124A3 (en) Methods of evaluating rock properties while drilling using downhole acoustic sensors and telemetry system
MX351518B (en) Expanded mud pulse telemetry.
NZ612810A (en) Apparatus and methods for tracking the location of fracturing fluid in a subterranean formation
WO2015030930A3 (en) Systems and mehtods for artificial lift via a downhole piezoelectric pump
WO2013049158A3 (en) Methods of evaluating rock properties while drilling using downhole acoustic sensors and a downhole broadband transmitting system
GB2495001B (en) Method and system for performing an electrically operated function with a running tool in a subsea wellhead
CA2844345C (en) Single vertical or inclined well thermal recovery process
RU2405106C1 (en) Control system of mutual orientation process of shafts during cluster drilling of oil and gas wells
RU2640846C1 (en) Method and device for recovery of horizontal well production and effect on formation
WO2013073997A3 (en) Method for eliminating and preventing the formation of asphaltene and paraffin deposits in oil wells and pipelines, and apparatus for the implementation thereof

Legal Events

Date Code Title Description
DPE2 Request for preliminary examination filed before expiration of 19th month from priority date (pct application filed from 20040101)
122 Ep: pct application non-entry in european phase

Ref document number: 12849265

Country of ref document: EP

Kind code of ref document: A2