WO2013026642A1 - Rack for holding and guiding firework-mortar tubes - Google Patents
Rack for holding and guiding firework-mortar tubes Download PDFInfo
- Publication number
- WO2013026642A1 WO2013026642A1 PCT/EP2012/064364 EP2012064364W WO2013026642A1 WO 2013026642 A1 WO2013026642 A1 WO 2013026642A1 EP 2012064364 W EP2012064364 W EP 2012064364W WO 2013026642 A1 WO2013026642 A1 WO 2013026642A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- support
- mortar
- mortar tubes
- tubes
- support element
- Prior art date
Links
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F42—AMMUNITION; BLASTING
- F42B—EXPLOSIVE CHARGES, e.g. FOR BLASTING, FIREWORKS, AMMUNITION
- F42B4/00—Fireworks, i.e. pyrotechnic devices for amusement, display, illumination or signal purposes
- F42B4/20—Fireworks, i.e. pyrotechnic devices for amusement, display, illumination or signal purposes characterised by having holder or support other than casing, e.g. whirler or spike support
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F41—WEAPONS
- F41A—FUNCTIONAL FEATURES OR DETAILS COMMON TO BOTH SMALLARMS AND ORDNANCE, e.g. CANNONS; MOUNTINGS FOR SMALLARMS OR ORDNANCE
- F41A23/00—Gun mountings, e.g. on vehicles; Disposition of guns on vehicles
- F41A23/02—Mountings without wheels
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F41—WEAPONS
- F41F—APPARATUS FOR LAUNCHING PROJECTILES OR MISSILES FROM BARRELS, e.g. CANNONS; LAUNCHERS FOR ROCKETS OR TORPEDOES; HARPOON GUNS
- F41F1/00—Launching apparatus for projecting projectiles or missiles from barrels, e.g. cannons; Harpoon guns
- F41F1/06—Mortars
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F41—WEAPONS
- F41F—APPARATUS FOR LAUNCHING PROJECTILES OR MISSILES FROM BARRELS, e.g. CANNONS; LAUNCHERS FOR ROCKETS OR TORPEDOES; HARPOON GUNS
- F41F1/00—Launching apparatus for projecting projectiles or missiles from barrels, e.g. cannons; Harpoon guns
- F41F1/08—Multibarrel guns, e.g. twin guns
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F42—AMMUNITION; BLASTING
- F42B—EXPLOSIVE CHARGES, e.g. FOR BLASTING, FIREWORKS, AMMUNITION
- F42B4/00—Fireworks, i.e. pyrotechnic devices for amusement, display, illumination or signal purposes
- F42B4/24—Fireworks, i.e. pyrotechnic devices for amusement, display, illumination or signal purposes characterised by having plural successively-ignited charges
Definitions
- Present invention relates to a rack used for holding firework-mortar tubes in their firing position and for guiding firework-mortar tubes. More specifically the present invention relates to a rack used for holding mortar tubes to launch fireworks mortar shells and for guiding said tubes.
- racks having a flat bottom, a frame at the top and at the bottom of the rack, made of wood or preferably of plywood, and having wooden side walls.
- the firework-mortar tubes generally 3-10 mortar tubes, are placed into the holes in the frame.
- Those racks are installed at the launching site of the firework in the desired position and braced with wooden planks, fastened to the side walls of the rack by screws or nails.
- the disadvantage of this technology is that installing a rack on the fireworks launching site and later dismantling the rack exerts a great strain to the side walls of the rack, because increasingly great number of holes and cracks caused by the nails and screws are left in the side walls. Also generally the wood used in the racks is not weatherproof.
- the fireworks mortar bombs are let off at the firework display.
- the racks with mortar tubes are inclined according to the desired spread of the launched fireworks mortar bombs.
- the guiding of the commonly used racks is complicated, because the wooden or plywood board is used as the base of the rack. If the rack is inclined most of the bottom of the rack is hanging in the air without support surface and only the edge of the bottom of the rack is supported on the ground. If in all mortar tubes of the rack all charges are ignited simultaneously, the pressure exerted to the base plate could break it.
- the mortar tubes in rack are covered by the packaging membrane to protect mortar shells from moisture.
- the mortar tubes are covered by the aluminium foil to protect mortar shells from the sparks falling down during the fireworks display.
- the disadvantage involves also a need for many additional accessories (screws, battery-powered drill, wooden planks, etc.). As a result such a solution is laborious and the material consumption is relatively high.
- One known rack solution comprises two end supports made of aluminium, which are formed by two parallel support elements, upper and lower ones correspondingly, which are rigidly connected to two transverse elements, and whereas one support element a base, lying on the support surface is used.
- the parallel support elements comprise fixing holes along their entire length.
- an aluminium end bar is fixed onto both ends of the wooden support frame of the mortar tubes.
- the lower end of the end bar is fixed to fixing hole of the corresponding lower support element of the end support and the inclination of the support frame is fixed by connecting the end bar to the fixing hole of the upper support element.
- the rack is made of aluminium or of some other lightweight material.
- the rack comprises support lattices for holding mortar tubes and sides for holding support lattices.
- the sides of the rack comprise openings, wherein support beams, poles or customized support bars especially to be used in that rack can be inserted.
- the rack can also be supported in an inclined position for guiding fireworks mortar shells by placing a wooden support beam through the openings on the sides of the rack and by attaching said beam by nails or screws.
- This rack lacks bottom and mortar tubes rest on the ground or on some other material.
- the disadvantage of this rack is the complexity of the design. But at the same time aforesaid rack can be installed at different inclination angles. Additional accessories (beams or special support bars, screws or nails, hammer, etc.) are also needed for installation of said rack.
- the object of the present invention is to provide a rack for holding and guiding firework-mortar tubes, which enables simple installation on site and also a support frame or frames of the mortar tubes to be inclined as desired and which includes as few different elements as possible.
- the present invention provides a rack for holding and guiding firework-mortar tubes, comprising a pair of end supports and, between the pair of end supports crosswise to end supports, at least one support frame for the mortar tubes, said support frame comprising at least one support lattice for holding firework-mortar tubes.
- both end supports are formed by multiple elongated support elements, where by in both end supports at least one first support element forms a base for corresponding end support, resting on the support surface.
- At least one third elongated support element is used for fixing inclination of at least one support frame of the mortar tubes in relation to the base of the corresponding end support such that one end of at least one such third elongated support element is fixed to at least one first support element forming a base of end support and that third support element is fixed at the remaining part of said third support element in at least one point to at least one second elongated support element forming an end bar of the support frame of the mortar tubes.
- said third elongated support element is used for fixing an inclination of at least one support frame of the mortar tubes in relation to the corresponding base of the end support such that at least one third elongated support element is fixed at one end to the first support element forming a base of the end support and said third support element is fixed at the remaining part of said third support element in at least one point to the second elongated support element forming an end bar of at least one support frame of the mortar tubes such that triangle is formed between the fixing points of said three support elements.
- the support frame for the mortar tubes comprises between end bars at least two support lattices for holding mortar tubes near their upper and lower ends so that lower ends of the mortar tubes are supported on the elongated bottom bar between the lower ends of the end bars.
- the bottom bar of the support frame of the mortar tubes has a circular cross-section, the diameter of which corresponds to the width of the support elements forming a base of the end supports such that in a working situation both bases of the end supports and the bottom bar of the support frame of the mortar tubes are supported onto the support surface.
- the bottom bar comprises intermediate holders between the lower ends of the mortar tubes.
- a planar base is fixed to the bottom bar for supporting the end of the corresponding mortar tube.
- a single elongated planar base is fixed to the bottom bar in the direction of the bottom bar for supporting the ends of the mortar tubes.
- the end bars of support frames for the mortar tubes are connected at their distal parts in relation to the corresponding base of the end bar with at least one other longitudinal third support element to the end bar of the support frame for the mortar tubes having its inclination fixed in relation to the corresponding base of the end support.
- the elongated support elements comprise along the support elements multiple fixing holes for joining support elements.
- all elongated support elements i.e. support elements used as a base of the end support, as an end bar of the support frame and as a support element fixing the inclination of the support frame in relation to the base, are identical.
- connections for the support elements of the rack are made such that on the holding ground of the fireworks display there is no need for additional accessories and the rack can easily be installed also onto the uneven surface.
- the rack according to the invention can be placed in the ignition position as a single rack or set comprising multiple racks; it is also possible to install the rack in different inclination positions with the help of the support elements provided according to the desired launching direction of the fireworks mortar shells.
- the support elements can be left attached to the rack in the position facilitating their transportation such that no additional space is needed.
- the support elements of the rack, support frame of the mortar tubes and support lattices are made of glass fibre material, plastic material or some other suitable material.
- the design of the support lattices of the mortar tubes reduces a risk of spreading sharp fragments in case fireworks mortar shell explodes within the tube and the support lattice provides better protection for other shells in other tubes of the rack avoiding them being crushed and being mass exploded.
- Loops can also be attached to the support lattice for fusecords and for ignition wires in case of electronically controlled fireworks, for the delay charges, etc.
- Figure 1 shows schematically a frontal view of a rack according to the embodiment of the present invention comprising one support frame for mortar tubes
- Figure 2 shows schematically an elongated support element used in the rack according to the invention
- Figure 3 shows schematically a frontal view of a rack according to the embodiment of the present invention comprising three support frames for the mortar tubes, wherein outermost support frames are flaring out from the support frame in the centre
- Figure 4 shows schematically a frontal view of a rack according to the embodiment of the present invention comprising four support frames for the mortar tubes, wherein all support frames are inclined at the same angle and in the same direction
- Figure 5 shows schematically a frontal view of an embodiment of the support frame of the mortar tubes
- Figure 6 shows schematically a side view of a support frame according to Figure 5
- Figure 7 shows schematically a top view of a support frame according to Figures 5 and 6 as viewed from the side of the openings of the mortar tubes
- Figure 8 shows schematically
- Figure 1 shows a frontal view of one end support of a rack 1 according to the present invention for holding and guiding mortar tubes 2. It goes without saying that at the other end of the rack there is a similar end support. This applies also for the embodiments in Figures 3 and 4. Between said end supports a support frame 3 of the mortar tubes 2 is fixed, and the embodiment as shown in Figures 3 and 4 is described in greater detail with the help of Figures 5, 6 and 7.
- support element 6 is identified according to its function and reference number 6a indicates a first support element functioning as a base for the end support, reference number 6b indicates a second support element functioning as an end bar for the support frame of the mortar tubes and reference number 6c indicates a third support element used for fixing inclination of the end bar (support element 6b) in relation to the base (support element 6a).
- reference number 6a indicates a first support element functioning as a base for the end support
- reference number 6b indicates a second support element functioning as an end bar for the support frame of the mortar tubes
- reference number 6c indicates a third support element used for fixing inclination of the end bar (support element 6b) in relation to the base (support element 6a).
- support elements of different length can be used for the base as an end bar and for fixing the inclination.
- end supports i.e. corresponding base, or in other words the first support element 6a in the corresponding end support, is connected to the end bar of the support frame 3 of the mortar tubes 2, or in other words it is connected to the second support element 6b at its lower end with the pin 5 in connection 9.
- the third support element 6c is connected to the base with the help of connection 11 and the other part of the third support element 6c is connected with the connection 10 to the support element 6b acting in its role as an end bar. Since said support element 6b is also an end bar of the support frame 3 of the mortar tubes 2, it fixes inclination of the support frame 3 of the mortar tubes 2 in relation to the base, or i.e. in relation to the first support element 6a.
- Connections 8, 9, 10 and 11 as shown in the drawings are preferably formed as mechanical quick connections. But also threaded connections (screws, bolts, wing nuts), pin joints, wedge joints, eccentric joints, etc. can be used.
- first one support frame (in present case the one in the middle in Figure 3) is fixed by means of the second support element 6b functioning as an end bar using the third support element 6c in relation to the first support element 6a functioning as a base.
- another third support element 6c is used for fixing two other support frames 3 (on drawing one in the left and one in the right) in relation to the base.
- the second third support element 6c is used, which in its middle part is attached to the end bar of that support frame, the inclination of which in relation to the base is already fixed by the first third support element 6c.
- rack 1 according to the invention is used to point four support frames of the mortar tubes towards the sky at the same inclination angle.
- the base is formed using two first support elements 6a, which are rigidly fixed together.
- one support frame is fixed with the help of its end bar in relation to the base, i.e. is the second support element 6b functioning as an end bar of the support frame is attached to the first support element 6a and the inclination angle is fixed in relation to the first support element 6a with the help of the third support element 6c.
- another third support element 6c is fixed at the upper part to the end bar of the support frame having its inclination fixed, and this third support element 6c being used to fix the inclination angle of the remaining three support frames with the second support elements 6b functioning as end bars in relation to the first support elements 6a functioning as a base.
- the support frame 3 comprises two support lattices 4 including series of openings for capturing mortar tubes 2.
- support lattices 4 have at their ends attached with the help of connections 8, support elements 6b functioning as end bars of the support frame 2.
- support lattices 4 are formed from two halves, each of which comprises semi-circular recesses, which form openings for the mortar tubes 2, when two halves are put together.
- the two halves of the support lattice are joined with the bolted joint – the hexagonal bolt heads and nuts of the bolted joints can be seen in the drawing between parts of the support lattice 4 comprising mortar tubes 2.
- the lower ends of the mortar tubes 2 are supported onto the bottom bar 7 of the support frame 2, where the pins 5 at the ends of the bottom bar are located at the lower ends of the ends bars (support element 6b).
- the bottom bar 7 consists of a tube having circular cross-section, the diameter of which corresponds to the width of the support element 6a used as a base. This ensures that when changing inclination of the support frame 3 of the mortar tubes 2 in relation to the base, the bottom bar of the support frame is always supported on the support surface, onto which the bases of the end supports are also supported.
- the bottom bar can also have a semi-circular cross-section, where the ends of the mortar tubes 2 are supported onto the planar part of that cross-section.
- the semi-circular cross-section ensures that irrespective of the inclination of the support frame, the bottom bar 7 rests on the support surface.
- Figure 8 a second embodiment of the support frame 3 of the mortar tubes 2. This differs from the embodiment of the Figures 5 to 7 in that the bottom bar 7 has intermediate holders 12 attached to the bottom bar 7 between the ends of the mortar tubes 2 – in Figure 8 one of the intermediate holders 12 can be better seen between two lower ends of the mortar tubes 2 in the left, where said support lattice 4 is shown in partial cut for better clarity.
- Intermediate holders 12 comprise a groove 13 for connecting two halves of the support lattice 4 with the help of the bolt joint. Grooves 13 in the intermediate holders 12 enable the support lattice 4 to be moved closer to or away from the bottom bar 7. This can be used to move support lattice 4 to the height of the mortar shell in the mortar tube 2 such that the mortar tube 2 is surrounded in the explosion area of the mortar shell by the semi-circular parts of the support lattice 4. This reduces the risk of fragments to be blown around in case the mortar tube 2 bursts in explosion. This also reduces the risk of the mass explosion, when the broken mortar tube initiates explosion within the adjacent tubes.
- the intermediate holders 12 between mortar tubes 2 have the same purpose.
- This base can also be implemented as a single elongated base in the direction of the bottom bar to for support the ends of the mortar tubes.
- readymade mortar tube boxes can be used, which are formed as a wooden frame or a case, comprising usually compartments for each mortar tube (mortar tubes can be housed also in the common compartment).
- This box when used is supported on the bottom bar of the support frame between two support elements functioning as end bars, which in turn are fixed to the ends of the box.
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EEU201100062 | 2011-08-25 | ||
EEU201100062U EE01096U1 (et) | 2011-08-25 | 2011-08-25 | Rakis ilutulestiku lasketorude hoidmiseks ja suunamiseks |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2013026642A1 true WO2013026642A1 (en) | 2013-02-28 |
Family
ID=45908196
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/EP2012/064364 WO2013026642A1 (en) | 2011-08-25 | 2012-07-23 | Rack for holding and guiding firework-mortar tubes |
Country Status (2)
Country | Link |
---|---|
EE (1) | EE01096U1 (et) |
WO (1) | WO2013026642A1 (et) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20220113113A1 (en) * | 2020-09-10 | 2022-04-14 | Emil Guy Decker | Explosive projectile launch system rack with fiber and adhesive connection and connection reinforcement interlocking members modular replacement shatter resistant material and light emitting material |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE8816071U1 (et) * | 1988-12-24 | 1989-03-02 | Jaenig, Franz G., 8500 Nuernberg, De | |
JPH0433897U (et) * | 1990-07-06 | 1992-03-19 | ||
WO1997048959A1 (de) * | 1996-06-20 | 1997-12-24 | Dynamit Nobel Graz Ges.Mbh | Steilfeuergeschütz, insbesondere granatwerfer |
US7011220B2 (en) | 2003-12-18 | 2006-03-14 | Shooting Star Products, Inc. | Rack for holding fireworks for ignition |
DE102007061108A1 (de) * | 2007-12-19 | 2009-07-02 | Herbert Steinleitner | Verfahren und Vorrichtung zur Brandbekämpfung |
-
2011
- 2011-08-25 EE EEU201100062U patent/EE01096U1/et not_active IP Right Cessation
-
2012
- 2012-07-23 WO PCT/EP2012/064364 patent/WO2013026642A1/en active Application Filing
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE8816071U1 (et) * | 1988-12-24 | 1989-03-02 | Jaenig, Franz G., 8500 Nuernberg, De | |
JPH0433897U (et) * | 1990-07-06 | 1992-03-19 | ||
WO1997048959A1 (de) * | 1996-06-20 | 1997-12-24 | Dynamit Nobel Graz Ges.Mbh | Steilfeuergeschütz, insbesondere granatwerfer |
US7011220B2 (en) | 2003-12-18 | 2006-03-14 | Shooting Star Products, Inc. | Rack for holding fireworks for ignition |
DE102007061108A1 (de) * | 2007-12-19 | 2009-07-02 | Herbert Steinleitner | Verfahren und Vorrichtung zur Brandbekämpfung |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20220113113A1 (en) * | 2020-09-10 | 2022-04-14 | Emil Guy Decker | Explosive projectile launch system rack with fiber and adhesive connection and connection reinforcement interlocking members modular replacement shatter resistant material and light emitting material |
Also Published As
Publication number | Publication date |
---|---|
EE01096U1 (et) | 2012-04-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7011220B2 (en) | Rack for holding fireworks for ignition | |
US7431302B2 (en) | Modular ballistic wall and target system | |
ES2350005T3 (es) | Almacén de munición e instalación de mortero de autoprotección configurada con dicho almacén. | |
US5429053A (en) | Pyrotechnic fan rack | |
US5947477A (en) | Breakdown shooting target | |
US10066907B2 (en) | Target stand | |
CN101675200B (zh) | 防护掩体 | |
US7845646B1 (en) | Practice targeting system and method of use thereof | |
US20050126420A1 (en) | Wall breaching apparatus and method | |
US20130026308A1 (en) | Mounting bracket means for solar arrays and the like | |
US5209492A (en) | Shooting target stand | |
ES2194645T3 (es) | Procedimiento y dispositivo para fabricar un componente tridimensional de grandes dimensiones. | |
ES2829606T3 (es) | Sistema modular de estante para vinos con cables | |
WO2013026642A1 (en) | Rack for holding and guiding firework-mortar tubes | |
US20120168702A1 (en) | Rapid deployment barrier | |
EP2975198A1 (en) | Explosion and bullet resistant wall construction | |
US10021971B2 (en) | Display stand | |
RU2006128615A (ru) | Опорная система для вспомогательной силовой установки | |
US11402182B2 (en) | Fireworks firing device | |
EP3144626B1 (en) | Pyrotechnic carrier structure | |
CA2597607A1 (en) | Kinetic energy rod warhead with projectile spacing | |
US9382707B2 (en) | Acoustic shell frame and system | |
US11306565B2 (en) | Firing stand for shaped charges | |
US20210088315A1 (en) | Support for launching artillery shell fireworks | |
WO2019159159A1 (en) | Protective cable nets system (pcns) |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 12737814 Country of ref document: EP Kind code of ref document: A1 |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
32PN | Ep: public notification in the ep bulletin as address of the adressee cannot be established |
Free format text: NOTING OF LOSS OF RIGHTS PURSUANT TO RULE 112(1) EPC (EPO FORM 1205 DATED 08/05/2014) |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 12737814 Country of ref document: EP Kind code of ref document: A1 |