WO2012159678A1 - Système d'alimentation - Google Patents

Système d'alimentation Download PDF

Info

Publication number
WO2012159678A1
WO2012159678A1 PCT/EP2011/058691 EP2011058691W WO2012159678A1 WO 2012159678 A1 WO2012159678 A1 WO 2012159678A1 EP 2011058691 W EP2011058691 W EP 2011058691W WO 2012159678 A1 WO2012159678 A1 WO 2012159678A1
Authority
WO
WIPO (PCT)
Prior art keywords
electrical network
power
load
change
generator
Prior art date
Application number
PCT/EP2011/058691
Other languages
English (en)
Inventor
Mark Sumner
Rama Shanker Parashar
Liangzhong Yao
Original Assignee
Alstom Technology Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Alstom Technology Ltd filed Critical Alstom Technology Ltd
Priority to PCT/EP2011/058691 priority Critical patent/WO2012159678A1/fr
Publication of WO2012159678A1 publication Critical patent/WO2012159678A1/fr

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • H02J3/32Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/12Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
    • H02J3/16Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by adjustment of reactive power
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/46Controlling of the sharing of output between the generators, converters, or transformers
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/46Controlling of the sharing of output between the generators, converters, or transformers
    • H02J3/48Controlling the sharing of the in-phase component
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/46Controlling of the sharing of output between the generators, converters, or transformers
    • H02J3/50Controlling the sharing of the out-of-phase component
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/10Flexible AC transmission systems [FACTS]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/30Reactive power compensation

Definitions

  • This invention relates to a weak power system and a method for regulating system frequency in the weak power system.
  • a microgrid is an example of a weak power system.
  • the microgrid produces power at a local level and comprises energy generators, energy storage devices and loads that are locally connected to each other.
  • the energy generators comprise a generator whose shaft is driven by a source of energy - the prime mover.
  • the speed of the prime mover is directly related to the electrical frequency from the generator, and is controlled by a governor.
  • the microgrid may be either connected to a main grid or disconnected from the main grid to enable autonomous operation.
  • a method for regulating system frequency in a weak power system including a power generator, a static synchronous compensator and an energy storage device, where the weak power system is connected to an electrical network and the power generator is operable to generate power for presentation to the electrical network, the method comprising the steps of: following a change in load of the electrical network, simultaneously modifying a power output of the power generator to match the load of the electrical network and operating the static synchronous compensator to control the energy storage device to either supply real power to the electrical network or absorb real power from the power generator.
  • the simultaneous modification of the power output of the power generator and operation of the static synchronous compensator as set out above allows the weak power system to temporarily meet the change in load of the connected electrical network until a prime mover of the generator is capable of providing the necessary output power to match the load of the connected electrical network.
  • This allows for a gradual, controlled change of power output of the power generator without running the risk of a change in system frequency that falls outside acceptable values of operating frequencies.
  • This permits the system frequency in the weak power system to be regulated at all times and thereby improves the reliability of the weak power system.
  • the inclusion of the static synchronous compensator allows the weak power system to rapidly respond to dynamic and transient power changes, while the inclusion of the energy storage device allows the static synchronous compensator to absorb and inject real power to the weak power system virtually instantaneously. Omission of the energy storage device limits the capabilities of the static synchronous compensator to the absorption and injection of reactive power, and thereby prevents the injection or absorption of real power to compensate for the change in load of the connected electrical network.
  • the real power supplied or absorbed by the energy storage device may be initially substantially equal to the change in load of the electrical network.
  • the ability of the weak power system to rapidly match any change in load of the connected electrical network prevents the occurrence of a rapid fall in system frequency resulting from the step change in load, and thereby reduces the risk of a change in system frequency that falls outside acceptable values of operating frequencies.
  • the method may further include the step of operating the static synchronous compensator to control the energy storage device to gradually reduce the supply or absorption of real power over a predetermined period of time.
  • the method may include the step of operating the static synchronous compensator to control the energy storage device to coordinate the gradual reduction of the supply or absorption of real power with the rate of change of power output of the generator so as to present a substantially constant power to the electrical network.
  • the presentation of a substantially constant power to the electrical network minimises the variation in system frequency during the time it takes for the power output of the generator to match the load of the connected electrical network.
  • Such coordination of the rates of change of the respective power outputs of the power generator and the energy storage device is possible via the capability of the static synchronous compensator to finely control the supply or absorption of real power.
  • the method may further include the step of calculating the time required to modify the power output of the power generator to match the load of the electrical network following the change in load of the electrical network.
  • the method may further include the step of calculating the static synchronous compensator current required to control the energy storage device to either supply real power to the electrical network or absorb real power from the power generator following the change in load of the electrical network.
  • the method further includes the step of detecting a change in load of the electrical network connected to the weak power system prior to the step of simultaneously modifying the power output of the power generator and operating the static synchronous compensator to control the energy storage device.
  • the step of detecting the change in load of the electrical network connected to the weak power system may include measuring a change in load current of the electrical network.
  • the step of detecting the change in load of the electrical network connected to the weak power system may include measuring a change in voltage at the point of common coupling .
  • the step of detecting the change in load of the electrical network connected to the weak power system may include measuring an instantaneous speed error of the power generator .
  • the step of detecting the change in load of the electrical network connected to the weak power system includes monitoring the impedance of the electrical network from the point of common coupling.
  • the method of detecting the change in load of the connected electrical network can be adjusted for compatibility with the type of weak power system in use. Moreover, it is possible to coordinate the detection step with the operation of the power generator and the static synchronous compensator to speed up the response to any change in load of the connected electrical network. This feature is particularly useful for unexpected load changes such as short circuit power system faults.
  • the method may further include the steps of: generating a first control signal following the detection of the change in load of the electrical network connected to the weak power system; and sending the first control signal to the power generator to effect modification of the power output of the power generator to match the load of the electrical network.
  • the first control signal may include the calculated time required to modify the power output of the power generator to match the load of the electrical network.
  • the method may further include the steps of: generating a second control signal following the detection of the change in load of the electrical network connected to the weak power system; and sending the second control signal to the static synchronous compensator to effect control of the energy storage device to either supply real power to the electrical network or absorb real power from the power generator
  • the second control signal may include the calculated static synchronous compensator current required to control the energy storage device to either supply real power to the electrical network or absorb real power from the power generator .
  • the generation of the first and/or second control signals enables the automation of the regulation of the system frequency in the weak power system, and thereby removes the need for an operator to manually operate the prime mover of the power generator and the static synchronous generator. This in turn improves the operational reliability and efficiency of the weak power system.
  • a weak power system comprising a power generator; a static synchronous compensator, an energy storage device and a control unit, the weak power system being connectable to an electrical network, the power generator being operable to generate power for presentation to the electrical network, and the control unit being operable to control the power generator and the static synchronous compensator, wherein the control unit is operable in accordance with the method of the first aspect of the invention to regulate system frequency in the weak power system.
  • the energy storage device includes at least one capacitor or at least one other device that is capable of storing or releasing energy.
  • the energy storage device may include one or more short-term energy storage media that can respond within a few milliseconds.
  • Energy storage devices with fast charging and discharging characteristics are preferred to provide a fast response of the weak power system to a change in load of the connected electrical network.
  • the control unit is configured to generate a first control signal and send the first control signal to the power generator to effect modification of the power output of the power generator to match the load of the electrical network in response to the detection of the change in load of the electrical network connected to the weak power system.
  • the control unit is configured to generate a second control signal and send the second control signal to the static synchronous compensator to effect control of the energy storage device to either supply real power to the electrical network or absorb real power from the power generator.
  • the weak power system may further include a governor being configured to measure an instantaneous speed error of the power generator and the control unit is configured to generate the second control signal upon measurement of the instantaneous speed error.
  • the weak power system may further include a high gain, high bandwidth error amplifier configured to amplify the instantaneous speed error measured by the governor for presentation to the control unit.
  • Figure 1 shows, in schematic form, a weak power system according to a first embodiment of the invention
  • Figure 2 shows a simplified control diagram illustrating the control of the embedded power generator
  • Figure 3 illustrates a throttle response of a diesel engine
  • Figure 4 illustrates a step change in load of the connected electrical network and the variations in the supply of real power from the energy storage device and in the power output of the embedded power generator in response to the step change in load of the connected electrical network;
  • Figures 5 and 6 respectively show a change in speed of a synchronous generator in response to a change in load of the connected electrical network when real power is supplied and not supplied from the energy storage device;
  • Figures 7 and 8 respectively show a variation in voltage and voltage angle at a point of common coupling of the weak power system in response to a change in load of the connected electrical network when real power is supplied from the energy storage device ;
  • Figure 9 shows the variation in load current, generator current and static synchronous compensator current in response to a change in load of the connected electrical network when real power is supplied from the energy storage device;
  • Figures 10 and 11 respectively show the rate of change of system frequency in response to a change in load of the connected electrical network when real power is supplied and not supplied from the energy storage device;
  • Figure 12 shows, in schematic form, a simulation circuit representing a weak power system according to a second embodiment of the invention.
  • Figure 13 shows the changes in speed of the synchronous generator and voltage at the point of common coupling in response to a change in load of the electrical network when real power is supplied and not supplied from the energy storage device.
  • a weak power system according to a first embodiment of the invention is shown in Figure 1.
  • weak power system refers to a power system connected to a single load that is comparable to the supply rating of the power system.
  • the weak power system in Figure 1 is a microgrid 10 that comprises an embedded power generator 12, a static synchronous compensator 14, an energy storage device 16 and a control unit 18.
  • the embedded power generator 12 and the static synchronous compensator 14 are connected to a main grid 20 and a connected electrical network 22 via a point of common coupling 24 of the microgrid 10. It is envisaged that, in other embodiments, the microgrid 10 may be disconnected from the main grid 20.
  • the embedded power generator 12 includes a synchronous generator 26, a prime mover (not shown), an automatic voltage regulator 28 and a governor 30.
  • the prime mover is a diesel engine configured to drive the synchronous generator 26.
  • the automatic voltage regulator 28 is configured to regulate the amplitude of the output voltage of the synchronous generator 26 while the governor 30 is configured to control the speed of the prime mover to maintain the frequency of the synchronous generator 26.
  • Figure 2 shows a simplified control diagram illustrating the control of the embedded power generator 12.
  • the speed of the synchronous generator 26 is controlled to be set at 50 Hz by measuring the speed and using a proportional plus integral controller to provide a reference value 34 for the control 32 of the prime mover.
  • the output of the prime mover is the torque Tm driving the synchronous generator 26.
  • the load of the connected electrical network 22 is represented by a load torque Te in the control diagram shown in Figure 2. Both torque values, Tm and Te, are equal under steady state conditions. However, a change in load of the connected electrical network 22 will result in a change in speed of the synchronous generator 26. For example, when the load torque Te exceeds the torque driving the synchronous generator 26 Tm, the difference in torque will cause the synchronous generator 26 to decelerate.
  • the resulting speed error will cause the speed control 36 to increase Tm to initially accelerate the speed of the synchronous generator 26 back to its original value, and to ensure that the load torque Te matches the torque Tm driving the synchronous generator 26.
  • the static synchronous compensator 14 is configured to control the energy storage device 16 to inject or absorb real power via the point of common coupling 24.
  • the energy storage device 16 may, for example, include one or more short-term energy storage media, such as a capacitor, that can typically respond within a few milliseconds.
  • the control unit 18 is configured to generate a first control signal 38, which is subsequently sent to the embedded power generator 12.
  • the control unit 18 is also configured to generate a second control signal 40, which is subsequently sent to the static synchronous compensator 14.
  • Each control signal includes a reference value for the control of the power generator and the static synchronous compensator 14 respectively.
  • the control unit 18 is configured to monitor and measure the load current 42 of the connected electrical network 22. This allows the control unit 18 to detect any change in load current of the electrical network, which corresponds to a change in load of the connected electrical network 22. Examples of a change in load of the connected electrical network 22 include, but are not limited to, large step changes in load or short-duration, short circuit power system faults in the connected electrical network 22 and load shedding in the connected electrical network 22. It is envisaged that, in other embodiments, the control unit 18 for the microgrid 10 may be integrated into a control platform for the static synchronous compensator 14. The detection of the change in load of the connected electrical network 22 may be carried out in different ways.
  • the governor 30 may be configured to measure an instantaneous speed error of the synchronous generator 26 and the control unit 18 may be configured to generate the second control signal 40 upon measurement of the instantaneous speed error.
  • a weak power system may further include a high gain, high bandwidth error amplifier configured to amplify the instantaneous speed error measured by the governor 30 for presentation to the control unit 18.
  • the detection of the change in load of the connected electrical network 22 may be triggered by measurement of a change in voltage at the point of common coupling 24. or may be triggered by monitoring the impedance to source at the point of common coupling using the static synchronous compensator 14 using the technique described in the publication titled “Sumner M, Palethorpe B and Thomas, D W P T, "Impedance Measurement for Improved Power Quality - Part 1: the Measurement Technique", IEEE Transactions on Power Delivery, Volume 19, Issue 3, July 2004 Page (s) : 1442 - 1448".
  • the detection of a change in load of the connected electrical network 22 by the control unit 18 triggers the calculation of the time t es required to modify the power output of the embedded power generator 12 to match the load of the connected electrical network 22 following the change in load of the connected electrical network 22.
  • the value of t es determines the time required to apply a maximum throttle Th max to the input of the diesel engine in order to modify the torque driving the synchronous generator 26 Tm from a value of T e c to a value of T ea c / where T e s and T ea c are the values of the load torque required before and after the change in load of the connected electrical network 22 respectively.
  • the change in load torque before and after the change in load of the connected electrical network 22 is calculated using Equations (1) to (4) based on the assumption that both the system voltage and system frequency of the microgrid 10 are constant during the change in load of the connected electrical network 22.
  • Equation (6) is derived by rearranging Equation (5) .
  • t es ( ⁇ log( (kTh max -T eac ) /kTh max T e dc) ) /Tgov (6)
  • the detection of a change in load of the connected electrical network 22 by the control unit 18 also triggers the calculation of the static synchronous compensator current IdST required to control the energy storage device 16 to either supply real power to the connected electrical network 22 or absorb real power from the embedded power generator 12 following the change in load of the connected electrical network 22.
  • the real power supplied or absorbed by the energy storage device 16 is initially set to be substantially equal to the change in load of the connected electrical network 22.
  • the corresponding initial value of IdST can be calculated using Equation (7)
  • V d is a variable used in the control of the static synchronous compensator 14 to represent the supply voltage of the microgrid 10
  • I dS T is the in- phase (real) component of the injected static synchronous compensator 14 current.
  • the calculated values of t es and I dS T are respectively included as a reference value in the first and second control signals 38,40, which are simultaneously sent by the control unit 18 to the embedded power generator 12 and the static synchronous generator 26 respectively. This in turn results in the simultaneous modification of the power output of the embedded power generator 12 and operation of the static synchronous compensator 14 to control the energy storage device 16, which is illustrated in Figure 4 in which the change in load of the connected electrical network 22 is represented by a step function 46.
  • the sending of the first control signal 38 to the embedded power generator 12 effects the application of a maximum throttle Th max to the input of the diesel engine for a period of time equivalent to t es until the torque Tm driving the synchronous generator 26 is equivalent to the value of the load torque Te required after the change in load of the connected electrical network 22.
  • the output power of the embedded power generator 12 is changing over the interval t eS/ the sending of the second control signal 40 to the static synchronous compensator 14 effects control of the energy storage device 16 to either supply real power to the electrical network or absorb real power from the embedded power generator 12 depending on whether the load of the connected electrical network 22 increases or decreases.
  • the microgrid 10 Since the real power supplied or absorbed by the energy storage device 16 is initially set to be substantially equal to the change in load of the connected electrical network 22 as set out above, the microgrid 10 is capable of providing real power to temporarily compensate for the change in load of the connected electrical network 22 until the embedded power generator 12 is capable of providing all the necessary power output to match the load of the connected electrical network 22.
  • the static synchronous compensator 14 is operated to control the energy storage device 16 to linearly decrease the supply or absorption of real power over the interval t es ⁇
  • the linear decrease 48 of the supply or absorption of real power by the energy storage device 16 over the interval t es is controlled to approximately match the rate of change 50 of embedded generator power output. This allows the microgrid 10 to present a substantially constant power that matches the load of the connected electrical network 22 over the interval t es and thereby minimises the variation in speed of the synchronous generator 26.
  • Figures 5 and 6 respectively show a change 52,54 in speed of a synchronous generator 26 in response to a change in load of the connected electrical network 22 when real power is supplied or not supplied from the energy storage device 16.
  • the prime mover i.e. the diesel engine, is represented by a time constant (T gov ) which is equal to 100 ms and represents a delay in actuation. Any delay in combustion is ignored.
  • the control of the prime mover of the embedded power generator 12 is a proportional plus integral controller designed to give a closed loop bandwidth of 5Hz, and the system inertia is 0.2 kgm 2 .
  • the result 50 in Figure 5 includes the operation of the static synchronous compensator 14 to control the energy storage device 16 to supply real power to the connected electrical network 22 following the change in load of the electrical network.
  • the static synchronous compensator 14 has a current control bandwidth of 150Hz, and operates at a switching frequency of 5kHz.
  • the DC link of the static synchronous compensator 14 is fed from a bank of supercapacitors with a power capability of 1 PU for 100ms.
  • the result 52 in Figure 6 omits the operation of the static synchronous compensator 14 to control the energy storage device 16 to supply real power to the connected electrical network 22 following the change in load of the electrical network.
  • the speed of the power generator changes by over 2.5% and the initial rate of change of frequency is 75 Hz/s.
  • this change 52 in speed of the power generator may be sufficiently large to either cause the output frequency go outside of a statutory range of operating frequency, or be detected by a rate of change of frequency (ROCOF) relay, which could cause tripping of the embedded power generator 12 and potential system failure.
  • ROCOF rate of change of frequency
  • Figures 7 and 8 respectively shows a variation in voltage and voltage angle at a point of common coupling 24 of the microgrid 10 in response to a change in load of the connected electrical network 22 when real power is supplied from the energy storage device 16.
  • Figure 9 shows the variations 58,60,62 in load current, generator current and static synchronous compensator current in response to a change in load of the connected electrical network 22 when real power is supplied from the energy storage device 16.
  • the load current 58 is represented as a step function, whereas the generator current 60 includes an initial fast transient followed by a comparatively slow, controlled change as the load torque of the embedded power generator 12 is built up with minimal variation in synchronous generator speed.
  • the initial fast transient of the generator current is required to briefly match the load of the connected electrical network 22 in the time it takes for the static synchronous compensator 14 to respond to the change in load of the connected electrical network 22.
  • the static synchronous compensator current is seen to be increasing quickly once the change in load is detected.
  • the current profiles in Figure 9 are comparable to the ideal profiles shown in Figure 3, but includes a rise time of approximately 3-4ms.
  • the rate of change of system frequency 64 in the microgrid 10 according to the invention is shown in Figure 10.
  • the rate of change of frequency 64 is calculated as the derivative of the synchronous generator speed, and is passed through a first order filter with a time constant of six fundamental cycles, as described in the publication titled "Performance of ROCOF relays for embedded generation applications", Affonso, CM.; Freitas, W.; Xu, W.; da Silva, L.C.P.; TEE Proceedings Generation, Transmission &
  • the rate of change of system frequency 64 was found to be less than 0.4 Hz/s, which is within typical threshold ranges of O.lHz/s and l.OHz/s for ROCOF relays.
  • Figure 12 shows, in schematic form, a simulation circuit representing a weak power system according to a second embodiment of the invention.
  • the weak power system in Figure 12 is an isolated microgrid 110 that is connected via a point of common coupling 124 to a lOkW load 122a and an electrical network 122b that is capable of producing a 3MW step change of load, as illustrated in Figure 12.
  • the isolated microgrid 110 is also connected via the point of common coupling 124 to a 3.5 MVA diesel generator 112 via a transformer and a static synchronous compensator 114 connected an energy storage device 16.
  • the simultaneous modification of the power output of the power generator and operation of the static synchronous compensator during a change in load of the connected electrical network therefore minimises the change in speed of the synchronous power generator and thereby enables regulation of the system frequency in the microgrid. This improves the overall reliability of the microgrid.
  • the inclusion of the static synchronous compensator not only allows the weak power system to rapidly respond to dynamic and transient power changes, but also allows the virtually instantaneous absorption and injection of real power to the microgrid.
  • the coordination of the rates of change of the respective power outputs of the power generator and the energy storage device is possible via the capability of the static synchronous compensator to finely control the supply or absorption of real power.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

Le procédé selon l'invention permet de réguler la fréquence du système dans un système d'alimentation faible (10). Le système d'alimentation faible comprend un générateur d'énergie (12), un compensateur synchrone statique (14) et un dispositif accumulateur d'énergie (16), le système d'alimentation faible (10) étant connecté à un réseau électrique (22) et le générateur d'énergie (12) pouvant générer de l'énergie pour la présenter au réseau électrique (22). Les étapes du procédé consistent : à suivre un changement dans la charge du réseau électrique (22), à modifier simultanément une sortie de puissance du générateur d'énergie (12) pour correspondre à la charge du réseau électrique (22) et à actionner le compensateur synchrone statique (14) pour contrôler le dispositif accumulateur d'énergie (16) pour alimenter en puissance active le réseau électrique (22) ou absorber une puissance active du générateur d'énergie (12).
PCT/EP2011/058691 2011-05-26 2011-05-26 Système d'alimentation WO2012159678A1 (fr)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PCT/EP2011/058691 WO2012159678A1 (fr) 2011-05-26 2011-05-26 Système d'alimentation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/EP2011/058691 WO2012159678A1 (fr) 2011-05-26 2011-05-26 Système d'alimentation

Publications (1)

Publication Number Publication Date
WO2012159678A1 true WO2012159678A1 (fr) 2012-11-29

Family

ID=44627656

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/EP2011/058691 WO2012159678A1 (fr) 2011-05-26 2011-05-26 Système d'alimentation

Country Status (1)

Country Link
WO (1) WO2012159678A1 (fr)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109038684A (zh) * 2018-08-15 2018-12-18 国电南瑞科技股份有限公司 一种大型同步调相机组惰转同期并网方法
WO2019157005A1 (fr) * 2018-02-07 2019-08-15 Flexgen Power Systems, Inc. Appareil et procédés de réduction de variation de fréquence de générateur
CN110492532A (zh) * 2019-08-14 2019-11-22 华润电力唐山丰润有限公司 供电系统的调频方法、装置和设备
CN113241778A (zh) * 2021-05-25 2021-08-10 云南电网有限责任公司电力科学研究院 一种基于多区域互联电网的agc控制方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4232516A1 (de) * 1992-09-22 1993-03-04 Hans Peter Beck Autonomes modulares energieversorgungssystem fuer inselnetze
EP0790689A2 (fr) * 1996-02-14 1997-08-20 RWE Energie Aktiengesellschaft Procédé pour l'amélioration de la qualité de tension dans un réseau AC et dispositif pour mettre en oeuvre ce procédé
EP1122856A2 (fr) * 2000-02-03 2001-08-08 Sumitomo Electric Industries, Ltd. Système de stabilisation d'une alimentation en énergie et procédé utilisant un système de batterie rechargeable
WO2004059814A2 (fr) * 2002-12-20 2004-07-15 Hawaiian Electric Company Inc Interface de regulation d'energie entre une eolienne et un systeme de transmission d'energie
US20070135970A1 (en) * 2005-12-08 2007-06-14 General Electric Company System and method for providing reactive power support with distributed energy resource inverter
EP1887674A1 (fr) * 2005-05-19 2008-02-13 Endesa Generacion, S.A. Systeme de generation repartie avec la meilleure qualite de service du reseau electronique

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4232516A1 (de) * 1992-09-22 1993-03-04 Hans Peter Beck Autonomes modulares energieversorgungssystem fuer inselnetze
EP0790689A2 (fr) * 1996-02-14 1997-08-20 RWE Energie Aktiengesellschaft Procédé pour l'amélioration de la qualité de tension dans un réseau AC et dispositif pour mettre en oeuvre ce procédé
EP1122856A2 (fr) * 2000-02-03 2001-08-08 Sumitomo Electric Industries, Ltd. Système de stabilisation d'une alimentation en énergie et procédé utilisant un système de batterie rechargeable
WO2004059814A2 (fr) * 2002-12-20 2004-07-15 Hawaiian Electric Company Inc Interface de regulation d'energie entre une eolienne et un systeme de transmission d'energie
EP1887674A1 (fr) * 2005-05-19 2008-02-13 Endesa Generacion, S.A. Systeme de generation repartie avec la meilleure qualite de service du reseau electronique
US20070135970A1 (en) * 2005-12-08 2007-06-14 General Electric Company System and method for providing reactive power support with distributed energy resource inverter

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
AFFONSO, C.M., FREITAS, W., XU, W., DA SILVA, L.C.P.: "Performance of ROCOF relays for embedded generation applications", IEE PROCEEDINGS GENERATION, TRANSIMISSION & DISTRIBUTION, vol. 152, January 2005 (2005-01-01), pages 109 114
SUMNER M, PALETHORPE B, THOMAS, D W P T: "Impedance Measurement for Improved Power Quality - Part 1: the Measurement Technique", IEEE TRANSACTIONS ON POWER DELIVERY, vol. 19, no. 3, July 2004 (2004-07-01), pages 1442 - 1448

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019157005A1 (fr) * 2018-02-07 2019-08-15 Flexgen Power Systems, Inc. Appareil et procédés de réduction de variation de fréquence de générateur
US11418039B2 (en) 2018-02-07 2022-08-16 Flexgen Power Systems, Inc. Apparatus and methods for reducing generator frequency variation
AU2019217528B2 (en) * 2018-02-07 2023-03-30 Flexgen Power Systems, Inc. Apparatus and methods for reducing generator frequency variation
CN109038684A (zh) * 2018-08-15 2018-12-18 国电南瑞科技股份有限公司 一种大型同步调相机组惰转同期并网方法
CN109038684B (zh) * 2018-08-15 2021-10-01 国电南瑞科技股份有限公司 一种大型同步调相机组惰转同期并网方法
CN110492532A (zh) * 2019-08-14 2019-11-22 华润电力唐山丰润有限公司 供电系统的调频方法、装置和设备
CN113241778A (zh) * 2021-05-25 2021-08-10 云南电网有限责任公司电力科学研究院 一种基于多区域互联电网的agc控制方法

Similar Documents

Publication Publication Date Title
EP2267306B1 (fr) Contrôle du courant dans un parc éolien
CN102084572B (zh) 发电机网络和本地电力系统
Gowaid et al. Improved inertia and frequency support from grid-connected DFIG wind farms
EP2319170B1 (fr) Commande d' un convertisseur de circuit de tension intermediaire à l aide d' une émulation de machine synchrone
EP2532888B1 (fr) Agencement de génération d'un signal de commande pour contrôler la sortie d'alimentation d'un système de génération de puissance
EP2798718B1 (fr) Génératrice éolienne
KR101727087B1 (ko) 이종 발전 장치 간의 병렬 운전 제어 방법 및 제어 시스템
CN104426155B (zh) 用于风力发电机的电压控制的系统和方法
CN105794067B (zh) 具有改进的上升时间的风力发电站
US9331486B2 (en) Method and apparatus for detecting islanding conditions of a distributed grid
JP5508796B2 (ja) 電源システム制御方法及び電源システム制御装置
US10358984B2 (en) Gas turbine power generation system, control method for gas turbine power generation system, and control device for gas turbine power generation system
EP2477298B1 (fr) Contrôleurs pour unités d'alimentation d'énergie statique
CN103684158A (zh) 一种基于pss投切的同步发电机励磁控制方法
WO2012159678A1 (fr) Système d'alimentation
Wickramasinghe et al. Synchronous mode operation of DFIG based wind turbines for improvement of power system inertia
Konstantinopoulos et al. Active power control of DFIG wind turbines for transient stability enhancement
Pholboon et al. Virtual synchronous machine control for grid transmission compliance studies
Duggan et al. Synchronisation control action for very low-frequency oscillations
Papangelis et al. Design principles of wind turbine inertia emulators for autonomous systems
Konstantinopoulos et al. Dynamic active power control in type-3 wind turbines for transient stability enhancement
Liu et al. Research the influence of PSS on power system transient stability
CN113985775B (zh) 一种考虑快关汽门动作的核电机组控制方法及系统
Rosyadi et al. Damping load frequency in multi-area power system using wind farm cooperated Primary Load Frequency Control
Kucuk et al. RMS modeling of grid-forming power electronics for renewable energy power plant integration and classical power system stability studies

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 11728196

Country of ref document: EP

Kind code of ref document: A1

DPE1 Request for preliminary examination filed after expiration of 19th month from priority date (pct application filed from 20040101)
NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 11728196

Country of ref document: EP

Kind code of ref document: A1