WO2012128635A1 - Outil pour construction et maintenance de puits de pétrole - Google Patents
Outil pour construction et maintenance de puits de pétrole Download PDFInfo
- Publication number
- WO2012128635A1 WO2012128635A1 PCT/NO2012/000029 NO2012000029W WO2012128635A1 WO 2012128635 A1 WO2012128635 A1 WO 2012128635A1 NO 2012000029 W NO2012000029 W NO 2012000029W WO 2012128635 A1 WO2012128635 A1 WO 2012128635A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- well
- elements
- list
- tool
- representation
- Prior art date
Links
- 239000003208 petroleum Substances 0.000 title claims abstract description 13
- 238000010276 construction Methods 0.000 title claims abstract description 10
- 238000012423 maintenance Methods 0.000 title claims abstract description 10
- 238000000034 method Methods 0.000 claims abstract description 10
- 238000005553 drilling Methods 0.000 claims abstract description 5
- 230000004888 barrier function Effects 0.000 claims description 26
- 230000000694 effects Effects 0.000 claims description 13
- 238000012544 monitoring process Methods 0.000 claims description 4
- 238000012797 qualification Methods 0.000 claims description 4
- 238000011161 development Methods 0.000 claims 2
- 230000001105 regulatory effect Effects 0.000 claims 2
- 238000013461 design Methods 0.000 claims 1
- 238000004519 manufacturing process Methods 0.000 description 3
- 238000004458 analytical method Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 238000004088 simulation Methods 0.000 description 2
- 239000000243 solution Substances 0.000 description 2
- 239000004568 cement Substances 0.000 description 1
- 239000007795 chemical reaction product Substances 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 229930195733 hydrocarbon Natural products 0.000 description 1
- 150000002430 hydrocarbons Chemical class 0.000 description 1
- 230000008676 import Effects 0.000 description 1
- 238000002347 injection Methods 0.000 description 1
- 239000007924 injection Substances 0.000 description 1
- 230000000116 mitigating effect Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B44/00—Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
Definitions
- the present invention relates to construction and maintenance of wells for petroleum production, such as exploration, appraisal, production and injection wells. Background of the invention and prior art
- the inconsistency of the well representation can result in wrong decisions and extensive work that should be avoided.
- the objective of the invention is to provide a tool, a method and use in order to construct and maintain petroleum wells, resulting in reduced failure rate of decisions and reduced work effort during construction, maintenance and operation of wells. Summary of the invention
- the invention provides a tool for construction and maintenance of petroleum wells, comprising representation of a well or each well in a group of well categories, such as well in the drilling, completion, intervention, workover or abandonment phase.
- the tool is distinctive in that each well is represented by elements having a consistent shape and position of assembly.
- each element represented is proportionally correct but the vertical dimension of well elements, curvature and optionally further selected geometrical parameters, can be varied as controlled by a user of the tool, and the assembly of the elements are arranged in a logical order or position so as to represent a functional well.
- vertical dimension of well elements it is meant the dimension along the longitudinal axis of the well or wellbore, which means that wells having deviated parts or side bores can be represented consistently.
- the invention also provides a method for the same purpose, distinctive by representing each well using a consistent shape and position of assembly.
- the invention also provides use of the tool and the method of the invention, for illustration of well barrier elements in petroleum wells, particularly for avoiding effects of failure of an element of a well system but also for reducing the risk for making wrong decisions and reducing the time for representing, interpreting and developing illustrations with qualification and monitoring requirements.
- Figures 1-20 illustrating how a well representation is drafted with the tool of the invention.
- the figures includes remarks, intended to make them self-explanatory.
- One embodiment of the invention is an electronic/web based tool to produce well barrier illustrations in an efficient and consistent repeated manner.
- the invention will inter alia:
- the invention will ensure that illustrations prepared by a company or by the industry will be presented in a graphically consistent manner. This will reduce the need for interpreting the well situation as it will always be presented in a consistent graphical fashion.
- the representation will always include the main well elements and the well barriers, and also representations for construction purposes without barrier definitions.
- the main well elements are the tubular elements constituting the well
- the well barrier elements are the elements controlling the pressure in the well.
- representations completion representations and pressure control equipment representations, are included, at a level of detail that can be chosen and configured by the user.
- the next level of detail can be reached by for example right button clicking on the specific element
- the detailed information can be arranged in one or more layers of more detailed or more specific information, and can include for example detailed as built illustrations, simulation and analysis data, governing provisions and consequence simulations or analysis by failure of the element. It will make it easier for stakeholders to visualize and assess the consequences if a barrier element fails and what is the resulting effect, with subsequent protection and potential need for mitigating actions to be planned for. With availability of graphical components in a library, less time will be spent on producing the end products, this will allow the engineering resources to be spent on quality assuring the technical solutions rather than on masterminding the drawing application to illustrate the chosen solution.
- the use of the invention will reduce numbers of hours needed to produce the necessary illustrations for a well activity. This can amount to several working days for a well activity with several illustration steps to be prepared. Having a proper well barrier definition clearly communicated to all stakeholders will give everyone a better possibility to prevent serious incidents that can have catastrophic effect and/or severe loss of revenue or reputation.
- Functionality is based on drag-and-drop technology with use of right-click menus with ability to manipulate the appearance of components though a parameter set associated with the component (size, complexity, configuration, position) (Fig. 9, 10).
- Drilling BOP configuration representing actual rig BOP, such as number and type of rams and choke and kill line access points (Fig. 9)
- the technical effect of the invention is expected to be considerable as it will provide a tool to consistently represent well integrity and barrier definitions in petroleum wells.
- the consistency and ease of use is believed to be a contributing factor to enhance stakeholders understanding of complex situations that can have high risk potentials.
- the direct economic effect is amounting to 2-10.000+ USD pr well activity in time saving in preparation of the necessary working illustrations. This time saved can then be used on quality engineering safeguarding the upcoming work.
- the potential economic effect of the invention is not derived from its direct use, but in its potential to prevent incidents, accidents and catastrophes.
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Earth Drilling (AREA)
Abstract
L'invention porte sur un outil pour la construction et la maintenance de puits de pétrole, lequel outil comprend la représentation d'un puits ou de chaque puits dans un groupe de catégories de puits, telles qu'un puits dans la phase de forage, de complétion, d'intervention, de reconditionnement ou d'abandon. L'outil se distingue en ce que chaque puits est représenté par des éléments ayant une forme et une position d'assemblage cohérentes, et est également présenté sous une forme normalisée en présentant une formulation par défaut qui peut être modifiée par l'utilisateur. L'invention porte également sur un procédé dans le même but, qui se distingue par la représentation de chaque puits à l'aide d'une forme et d'une position d'assemblage cohérentes. L'invention porte également sur l'utilisation de l'outil et sur le procédé de l'invention.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
NO20110435A NO20110435A1 (no) | 2011-03-22 | 2011-03-22 | Verktøy for konstruksjon og vedlikehold av brønner |
NO20110435 | 2011-03-22 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2012128635A1 true WO2012128635A1 (fr) | 2012-09-27 |
Family
ID=46650264
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/NO2012/000029 WO2012128635A1 (fr) | 2011-03-22 | 2012-03-22 | Outil pour construction et maintenance de puits de pétrole |
Country Status (2)
Country | Link |
---|---|
NO (1) | NO20110435A1 (fr) |
WO (1) | WO2012128635A1 (fr) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2015147652A1 (fr) * | 2014-03-25 | 2015-10-01 | Wellbarrier As | Outil et procédé pour la planification, la construction, le développement, la maintenance et l'abandon de puits de pétrole |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20020177955A1 (en) * | 2000-09-28 | 2002-11-28 | Younes Jalali | Completions architecture |
US20040122640A1 (en) * | 2002-12-20 | 2004-06-24 | Dusterhoft Ronald G. | System and process for optimal selection of hydrocarbon well completion type and design |
WO2006024865A1 (fr) * | 2004-09-03 | 2006-03-09 | Robert Gordon University | Conception et commande d'une formation de puits de petrole |
EP1956506A2 (fr) * | 2007-02-06 | 2008-08-13 | Tekla Corporation | Modelage assisté par ordinateur |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7596481B2 (en) * | 2004-03-16 | 2009-09-29 | M-I L.L.C. | Three-dimensional wellbore analysis and visualization |
-
2011
- 2011-03-22 NO NO20110435A patent/NO20110435A1/no unknown
-
2012
- 2012-03-22 WO PCT/NO2012/000029 patent/WO2012128635A1/fr active Application Filing
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20020177955A1 (en) * | 2000-09-28 | 2002-11-28 | Younes Jalali | Completions architecture |
US20040122640A1 (en) * | 2002-12-20 | 2004-06-24 | Dusterhoft Ronald G. | System and process for optimal selection of hydrocarbon well completion type and design |
WO2006024865A1 (fr) * | 2004-09-03 | 2006-03-09 | Robert Gordon University | Conception et commande d'une formation de puits de petrole |
EP1956506A2 (fr) * | 2007-02-06 | 2008-08-13 | Tekla Corporation | Modelage assisté par ordinateur |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2015147652A1 (fr) * | 2014-03-25 | 2015-10-01 | Wellbarrier As | Outil et procédé pour la planification, la construction, le développement, la maintenance et l'abandon de puits de pétrole |
Also Published As
Publication number | Publication date |
---|---|
NO332280B1 (no) | 2012-08-13 |
NO20110435A1 (no) | 2012-08-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Macpherson et al. | Drilling-systems automation: Current state, initiatives, and potential impact | |
US20080126168A1 (en) | Oilfield management system | |
CN102007504A (zh) | 工作流程自动化、自适应和集成的系统及方法 | |
AU2006279437A1 (en) | Method and system for integrated asset management utilizing multi-level modeling of oil field assets | |
Chanana et al. | Emerging technologies and workflows in digital oil field | |
Atchison | Automated well control: From automated detection to automated shut-in | |
WO2012128635A1 (fr) | Outil pour construction et maintenance de puits de pétrole | |
Amir-Heidari et al. | Risk assessment of oil and gas well drilling activities in Iran–a case study: Human factors | |
Sahu et al. | Exception-Based Surveillance-Integrating well models, Real Time production estimates and Hydrocarbon accounting tool in well operating envelopes to ensure optimal well production within safe limits | |
Mckay et al. | Blowout preventer (BOP) health monitoring | |
Ahmad et al. | Samarang Integrated Operations (IO)–Achieving Well Performance Monitoring, Surveillance & Optimization Through Data and Model Driven Workflows Automation | |
Hummes et al. | Executing the Digital Well Plan-Enhancing Process Automation | |
US20240003214A1 (en) | Interactive monitoring and control system for a mineral extraction system | |
Al-Jasmi et al. | Oil production optimization in an integrated digital field: the KOC Burgan Pilot Project experience | |
Mickens et al. | Automated trend-based alerting enhances real-time hazard avoidance | |
Pritchard et al. | Trends in monitoring: How to use real-time data effectively | |
Shyeh et al. | Examples of Right-Time Decisions from High Frequency Data | |
Barrilleaux et al. | Downhole Flow Control for High Rate Water Injection Applications | |
Gupta et al. | Transforming the World of Asset Management in Near Real-Time Using an Intelligent Application to Optimize Daily Production Operations | |
Ahluwalia et al. | Managing blowout risk using a dynamic barrier approach | |
Al-Shammari et al. | Smart Workflows for Well and Facility Surveillance and Optimization: A Burgan Oil Field Experience | |
Barros et al. | Novel Approach in Digital Diagnostic for Plunger Lift in Unconventional Wells at Vaca Muerta | |
Anand et al. | Lookback Analysis and Benchmarking to Improve Success Rate of Thru Tubing Perforations for Accessing Behind Casing Opportunities in Brown Fields | |
Reeves et al. | Gas lift automation: Real time data to desktop for optimizing an offshore GOM platform | |
Sahu et al. | IPTC-17981-MS |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 12760430 Country of ref document: EP Kind code of ref document: A1 |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 12760430 Country of ref document: EP Kind code of ref document: A1 |