WO2012076917A1 - Apparatus for pre-heating a metal charge for a melting plant and connected method - Google Patents

Apparatus for pre-heating a metal charge for a melting plant and connected method Download PDF

Info

Publication number
WO2012076917A1
WO2012076917A1 PCT/IB2010/003197 IB2010003197W WO2012076917A1 WO 2012076917 A1 WO2012076917 A1 WO 2012076917A1 IB 2010003197 W IB2010003197 W IB 2010003197W WO 2012076917 A1 WO2012076917 A1 WO 2012076917A1
Authority
WO
WIPO (PCT)
Prior art keywords
fumes
expansion chamber
metal charge
hereinbefore
container
Prior art date
Application number
PCT/IB2010/003197
Other languages
French (fr)
Inventor
Thomas Narholz
Bernard Villemin
Original Assignee
Vwn Steel Solutions Gmbh
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority to EP10812880.2A priority Critical patent/EP2649209B1/en
Priority to JP2013542613A priority patent/JP5755754B2/en
Priority to PL10812880T priority patent/PL2649209T3/en
Priority to KR1020137017798A priority patent/KR101517124B1/en
Priority to MX2013006396A priority patent/MX2013006396A/en
Priority to CN201080071196.3A priority patent/CN103502478B/en
Priority to ES10812880.2T priority patent/ES2526130T3/en
Priority to US13/992,956 priority patent/US9335096B2/en
Application filed by Vwn Steel Solutions Gmbh filed Critical Vwn Steel Solutions Gmbh
Priority to PCT/IB2010/003197 priority patent/WO2012076917A1/en
Priority to PT108128802T priority patent/PT2649209E/en
Priority to BR112013014439A priority patent/BR112013014439B8/en
Priority to RU2013130215/02A priority patent/RU2557039C2/en
Publication of WO2012076917A1 publication Critical patent/WO2012076917A1/en
Priority to US15/138,952 priority patent/US9903654B2/en

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27BFURNACES, KILNS, OVENS, OR RETORTS IN GENERAL; OPEN SINTERING OR LIKE APPARATUS
    • F27B3/00Hearth-type furnaces, e.g. of reverberatory type; Tank furnaces
    • F27B3/10Details, accessories, or equipment peculiar to hearth-type furnaces
    • F27B3/18Arrangements of devices for charging
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C5/00Manufacture of carbon-steel, e.g. plain mild steel, medium carbon steel or cast steel or stainless steel
    • C21C5/52Manufacture of steel in electric furnaces
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C5/00Manufacture of carbon-steel, e.g. plain mild steel, medium carbon steel or cast steel or stainless steel
    • C21C5/52Manufacture of steel in electric furnaces
    • C21C5/527Charging of the electric furnace
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27BFURNACES, KILNS, OVENS, OR RETORTS IN GENERAL; OPEN SINTERING OR LIKE APPARATUS
    • F27B3/00Hearth-type furnaces, e.g. of reverberatory type; Tank furnaces
    • F27B3/10Details, accessories, or equipment peculiar to hearth-type furnaces
    • F27B3/18Arrangements of devices for charging
    • F27B3/183Charging of arc furnaces vertically through the roof, e.g. in three points
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D13/00Apparatus for preheating charges; Arrangements for preheating charges
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D13/00Apparatus for preheating charges; Arrangements for preheating charges
    • F27D13/002Preheating scrap
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D17/00Arrangements for using waste heat; Arrangements for using, or disposing of, waste gases
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D17/00Arrangements for using waste heat; Arrangements for using, or disposing of, waste gases
    • F27D17/001Extraction of waste gases, collection of fumes and hoods used therefor
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D17/00Arrangements for using waste heat; Arrangements for using, or disposing of, waste gases
    • F27D17/001Extraction of waste gases, collection of fumes and hoods used therefor
    • F27D17/002Details of the installations, e.g. fume conduits or seals
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D17/00Arrangements for using waste heat; Arrangements for using, or disposing of, waste gases
    • F27D17/004Systems for reclaiming waste heat
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D17/00Arrangements for using waste heat; Arrangements for using, or disposing of, waste gases
    • F27D17/008Arrangements for using waste heat; Arrangements for using, or disposing of, waste gases cleaning gases
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D3/00Charging; Discharging; Manipulation of charge
    • F27D3/0024Charging; Discharging; Manipulation of charge of metallic workpieces
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D99/00Subject matter not provided for in other groups of this subclass
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C5/00Manufacture of carbon-steel, e.g. plain mild steel, medium carbon steel or cast steel or stainless steel
    • C21C5/52Manufacture of steel in electric furnaces
    • C21C5/527Charging of the electric furnace
    • C21C2005/5282Charging of the electric furnace with organic contaminated scrap
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27MINDEXING SCHEME RELATING TO ASPECTS OF THE CHARGES OR FURNACES, KILNS, OVENS OR RETORTS
    • F27M2001/00Composition, conformation or state of the charge
    • F27M2001/02Charges containing ferrous elements
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27MINDEXING SCHEME RELATING TO ASPECTS OF THE CHARGES OR FURNACES, KILNS, OVENS OR RETORTS
    • F27M2001/00Composition, conformation or state of the charge
    • F27M2001/10Scrap material used as charge
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27MINDEXING SCHEME RELATING TO ASPECTS OF THE CHARGES OR FURNACES, KILNS, OVENS OR RETORTS
    • F27M2003/00Type of treatment of the charge
    • F27M2003/02Preheating, e.g. in a laminating line
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P10/00Technologies related to metal processing
    • Y02P10/20Recycling

Definitions

  • the present invention concerns an apparatus, and the connected method, for conveying and pre-heating a metal charge, such as iron scrap, hot or cold sponge iron (DRI), pig iron or other, which metal charge is then loaded inside a container, which can be a melting furnace, for example an electric arc furnace.
  • a metal charge such as iron scrap, hot or cold sponge iron (DRI), pig iron or other
  • Apparatuses of the vibratory or oscillating type are known, to convey a metal charge to a container of a melting plant, which container can be for example a melting furnace.
  • Such known apparatuses provide a segment long enough to pre-heat the metal charge sufficiently, by means of fumes exiting from the furnace, while it is being conveyed.
  • Each of the known apparatuses comprises a bearing structure on which a conveyor channel is mounted, having a substantially U-shaped cross section.
  • At least part of the conveyor channel is covered at the upper part by one or more hoods that define a tunnel into which the fumes exiting from the melting furnace flow, in the direction opposite to that in which the metal charge advances, and carry out the pre-heating.
  • Apparatuses are also known, for example from WO-A-94/09332, or from IT- B- 1359081 , i which in order to promote the distribution of the fumes and hence of the heat over the whole height of the metal charge, suction means are disposed on the lower wall or lateral walls of the conveyor channel, which take in a part of the fumes, obliging them to pass through the metal charge from the top to the bottom.
  • suction means are disposed on the lower wall or lateral walls of the conveyor channel, which take in a part of the fumes, obliging them to pass through the metal charge from the top to the bottom.
  • the fumes taken in then converge in the main discharge pipe.
  • the normal hoods that define the tunnel are disposed to cover the conveyor channel defining a space for the fumes to pass between the upper part of the mass of scrap and an internal surface thereof.
  • the passage space thus defined has a volume unrelated to the internal volume of the melting furnace and to the average quantity of fumes generated, so that the fumes transit at a high speed and remain for a short time in contact with the metal charge.
  • Localized melting especially if it occurs in the zone where the charge is introduced into the melting furnace, can entail the formation of compact blocks of metal charge that cause blockages of the conveyor channel, with consequent long and complex maintenance interventions on the plant.
  • CO carbon monoxide
  • the high temperature at which the fumes impact against the metal charge inside the tunnel causes oxidation of the scrap itself, requiring a greater energy consumption in order to melt them in the melting furnace; this also causes a loss of material, with a reduction in the yield of the metal charge.
  • One purpose of the present invention is to achieve an apparatus for conveying and, at the same time, pre-heating a metal charge in a melting plant, which has a high yield, that is, such that the heat energy given up by the fumes to the metal charge is as high as possible and, at the same time, the scrap can be heated uniformly, preventing, as much as possible, any oxidation thereof.
  • Another purpose of the present invention is to achieve an apparatus for conveying and pre-heating a metal charge which allows substantially both the complete combustion of the non-combusted gases and also, advantageously, the precipitation onto the metal charge of the particulate and powders present in the fumes arriving from the melting furnace.
  • Another purpose of the present invention is to achieve an apparatus that has limited management and maintenance costs compared with the state of the art. Yet another purpose is to achieve an apparatus that has a limited environmental impact, in which the powders have already been largely filtered from the gases sent outside.
  • a conveying and pre-heating apparatus serves to convey, in a generally known manner, a metal charge toward a container of a melting device, in quantities that can reach and exceed 8 tons a minute.
  • the apparatus comprises at least a conveyor channel, along which the metal charge is made to advance toward the melting device.
  • the conveyor channel comprises a bottom wall, on which the metal charge is disposed, and lateral containing walls.
  • At least a hood is disposed, which defines a tunnel inside which the fumes produced by the melting device or melting furnace are conveyed, in a known manner, in order to preheat the metal charge.
  • the apparatus in at least one segment or zone of the conveyor channel, advantageously the zone bordering the entrance of the metal charge, in correspondence with the lateral walls, the apparatus is provided with means to discharge the fumes, so that the latter pass through the metal charge, carrying out a pre-heating practically over a large part of its height.
  • a tunnel or expansion chamber is provided, disposed above the metal charge in a distinct position, communicating with the tunnel.
  • the fumes are thus conveyed inside the expansion chamber and are considerably slowed down, as they are made to remain inside the expansion chamber for at least a desired minimum time, so that the combustion of the fumes is substantially completed.
  • the internal volume of the expansion chamber is correlated to the internal volume an d/or quantity of fumes generated by the melting furnace, so that the fumes, once inside the expansion chamber, are subjected to an expansion such as to induce a desired and consistent reduction in their speed, which facilitates the release of the particulate and powders that fall onto the metal charge, returning inside the melting furnace with it.
  • the fumes are made to remain inside the expansion chamber for a time comprised between 1.5 seconds and 6 seconds, advantageously at least 2/3 seconds before impacting against the metal charge and passing through it.
  • the volume of the expansion chamber according to the invention, and the expansion of the fumes that takes place inside it, also allow to distribute the mass of fumes, in advance and uniformly, above a large segment of metal charge, to stabilize and make uniform the temperature thereof, and therefore to allow its uniform passage through the metal charge, so as to actuate an extended and considerable heating of the metal charge.
  • a variant of the invention provides that the section of the expansion chamber is longitudinally variable and decreasing in counter-flow to the direction of advance of the fumes.
  • the expansion determined by the expansion chamber leads to a reduction in temperature of the fumes from about 1300°C - 1400°C when entering the chamber to a temperature of about 800°C - 1000°C when they contact the metal charge.
  • the speed in the expansion chamber passes from about 40 m/s to a speed comprised between about 6 m/s and 18 m/s, advantageously around 10 m/s and about 14 m s. These speeds, according to the invention, can also be maintained as factors for the passage of the metal charge.
  • the reduction in temperature is such that the accelerated oxidation effects in the metal charge are also reduced, with a consequent reduction in the energy consumption of the plant for melting the metal charge, and an increased yield of the latter.
  • the present invention also allows that some noble elements present in the particulate and powders transiting with the fumes, such as for example zinc (Zn), are recovered by sedimentation on the metal charge and returned inside the melting furnace.
  • some noble elements present in the particulate and powders transiting with the fumes such as for example zinc (Zn) are recovered by sedimentation on the metal charge and returned inside the melting furnace.
  • Applicant has found that the energy recovered with the solution according to the present invention allows to reduce the tap-to-tap time by about 4 - 5 minutes, with a consequent increased productivity of the plant.
  • the volume of the expansion chamber is comprised between about 200 m 3 and about 600 m 3 .
  • this volume can vary, as it is a function of the internal volume of the container and/or the quantity of fumes produced therein, as well as the desired degree of expansion.
  • the plant comprises at least a melting furnace provided with a lateral loading aperture, into which the conveyor channel faces so as to introduce the metal charge inside the melting furnace.
  • the melting furnace typically has an upper exit to discharge the fumes
  • the invention provides a fluid connection pipe between the fume discharge exit and the expansion chamber, so that the fumes generated inside the melting furnace are introduced directly into the expansion chamber, substantially avoiding the passage through the conveyor channel.
  • the metal charge remains substantially outside the range of the hot fumes exiting from the melting furnace, at least until they have been subjected to expansion as defined by the expansion chamber.
  • the variant solution allows to reduce localized melting of the metal charge, preventing the formation of blocks of metal charge that can lead to blockages of the conveyor channel.
  • a plurality of partitions are provided, or other similar or comparable elements, able to define a mechanical contrast to the movement of the fumes, so as to condition the expansion steps and the release of the particulate and powders.
  • the internal surfaces of the at least one lateral wall and the covering wall are lined by an insulation layer, for example made of refractory material, to condition the variation in temperature of the fumes after expansion.
  • At least part of the internal surfaces of the expansion chamber are provided with cooling members, for example a coil, to condition the variation in temperature of the fumes after expansion.
  • At least a burner is provided, disposed inside the expansion chamber to cause or accelerate the post-combustion ..of the gases, advantageously cooperating with the fume entry zone.
  • one or more nozzles are provided, able to nebulize a desired quantity of water into the fumes entering the expansion chamber, so as to carry out an active control of the temperature of the fumes at inlet.
  • the lateral fume discharge means comprise at least a suction pipe, associated externally with the lateral walls of the conveyor channel, the at least one suction pipe being in a single piece with the lateral walls of the conveyor channel.
  • the at least one fume suction pipe is connected to but independent of the conveyor channel, so that the latter can be made to vibrate autonomously during the transfer steps of the metal charge.
  • Suction means possibly provided with suction regulation means, can be advantageously associated with the suction pipes so as to promote and regulate the stream of fumes and hence the temperature of the metal charge.
  • At least one of the lateral walls is advantageously provided with at least an aperture or slit which puts the conveyor channel in communication with the corresponding suction pipe in order to discharge the fumes.
  • the aperture or slit can also affect part of the bottom wall of the expansion chamber in order to better control the time the fumes remain within.
  • vibratory members are associated with the suction pipes, able to limit the deposit of powders and other impurities inside the respective lateral compartments.
  • - fig. 1 is a schematic lateral view of a melting plant to which a conveying and pre-heating apparatus according to the present invention is applied
  • - fig. 2 is a section view from II to II of fig. 1;
  • - fig. 3 is a section view from III to III of fig. 1;
  • - fig. 4 is a schematic plane view of a detail of the apparatus in fig. 1 ;
  • - fig. 5 shows a detail of fig. 1 according to a variant
  • - fig. 8 is a variant of fig. 6;
  • - fig. 9 is a variant of fig. 6.
  • the reference number 10 denotes in its entirety a conveying and pre-heating apparatus according to the present invention.
  • the apparatus 10 is installed in a melting plant 11, of a substantially known type and provided with a melting furnace 12, for example of the electric arc type, fed laterally through a loading aperture 14, with a metal charge 13 such as for example iron scrap, hot or cold sponge iron, cold pig iron or other.
  • a metal charge 13 such as for example iron scrap, hot or cold sponge iron, cold pig iron or other.
  • the apparatus 10 allows to transport and pre-heat the metal charge 13 before it is introduced into the melting furnace 12.
  • the plant 10 comprises a loading module 15, in which the metal charge 13 is able to be deposited. Downstream of the loading module 15 the conveying and pre-heating apparatus 10 is disposed, into which the metal charge 13 is pre-heated before it is introduced into the melting furnace 12.
  • the apparatus 10 comprises a conveyor channel 21 conformed so as to cooperate with the loading aperture 14.
  • the conveyor channel 21 comprises a bottom wall 22, substantially horizontal, and two lateral walls 23 and 24 which define in this case a substantially U-shaped cross section (figs. 2 and 3).
  • the metal charge 13 advances in this case by means of a vibratory or oscillatory movement in a longitudinal direction of the conveyor channel 21 generated by a known vibration device.
  • the apparatus 10 also comprises one or more hoods 17 disposed above the conveyor channel 21 so as to define a pre-heating tunnel 17a functioning as an expansion chamber 18.
  • the hoods 17 have in this case lateral walls 20 and a covering wall 19, so as to define the expansion chamber 18 above the conveyor channel 21.
  • the expansion chamber 18 can have different cross sections depending on the production techniques and the spaces available; it can also have the cross section decreasing in size in a direction opposite that in which the metal charge 13 advances.
  • the expansion chamber 18 has a volume such as to allow the fumes to expand, slowing their speed and lowering their temperature.
  • one or more dividing partitions 16 may be present, which create an expansion and acceleration of the fumes, followed by another expansion, to accentuate the depositing of powders.
  • the effect of the expansion of the fumes inside the expansion chamber 18 is such that the speed is reduced from about 40 m/s to about 10 m/s - 14 m/s, and the temperature of the fumes is reduced from about 1300°C - 1400°C at exit from the melting furnace 12 to about 800°C - 1000°C when they contact the metal charge 13.
  • the low speed at which the fumes pass through the metal charge 13 promotes their homogeneous contact with the metal charge 13, preventing localized overheating.
  • cooling panels 35 consisting of a plurality of tubes in which cooling water is made to pass, are associated with the lateral walls 20 and the covering wall 19 of the expansion chamber 18.
  • the lateral walls 20 and the covering wall 19 consist of tubular elements, adjacent to each other and seal welded along their length so as to constitute the expansion chamber 18.
  • the tubular elements not only have a cooling function but also a function of sealing and conveying the fumes.
  • the lateral walls 20 and the covering wall 19 are cooled by means of intense fins provided on the respective external surfaces to increase the heat exchange surface.
  • one or more safety doors 47 are provided, to allow an energy vent following possible explosions that might occur in the expansion chamber 18.
  • inspection doors 49 are provided on the covering wall 1 , which allow access to the expansion chamber 18.
  • a burner cooperates, only shown schematically, to provide for the combustion of non-combusted fumes exiting from the melting furnace 12.
  • delivery lances 34 are provided to deliver nebulized water, to effect an active regulation of the temperature of the fumes, controlling them by means of temperature sensors disposed along the expansion chamber 18.
  • the apparatus 10 comprises a conveyor channel 28 disposed so as to connect the fourth hole of the melting furnace 12 with the expansion chamber 18.
  • the conveyor channel 28, when the loading aperture 14 is closed, allows to convey substantially the whole of the fumes produced inside the melting furnace 12 directly inside the expansion chamber 18.
  • the ratio between the usable passage surface of the conveyor channel 28 and the sizes of the cross section of the expansion chamber 18 is such that the expansion conditions of the fumes are obtained inside the expansion chamber 18 as described above.
  • the cover of the melting furnace 12 is provided with a lateral aperture 55 which is connected directly with a first portion 56 of the expansion chamber 18.
  • the first portion 56 of the expansion chamber is substantially divergent in the direction opposite the direction of advance of the metal charge 13, so as to impose on the fumes exiting from the melting furnace 12 a desired expansion, and is also disposed directly above the terminal discharge part of the conveyor channel 21.
  • the first portion 56 as described with reference to fig. 6, has cooling panels 35 to cool its surfaces on its external surface.
  • This form of embodiment is more advantageously than other types of connection between the melting furnace 12 and the conveyor channel 21, since the losses of load due to curved pipes, narrow sections or other are considerably reduced and heat dissipations are limited, given that the fumes pass directly into the expansion chamber 18, hitting the metal charge directly which is about to be unloaded into the melting furnace 12.
  • suction pipes 25 and 26 are provided (figs. 2, 3, 5 and 6), which define between them a central conveyor channel compartment of the metal charge 13.
  • suction pipes 25 and 26 comprise the lateral walls 23 and 24.
  • the suction pipes 25 and 26 are made in a single piece with the conveyor channel 21.
  • suction pipes 25 and 26 are associated independently with the conveyor channel 21.
  • relative hydraulic seals 50 of a known type are provided to connect the suction pipes 25 and 26 to each other.
  • the suction pipes 25 and 26 are mounted solid with the base of the whole apparatus 10, while the conveyor channel 21, as we said, is subjected to oscillations or vibrations to transport the material.
  • This solution allows to keep the two suction pipes 25 and 26 substantially stationary, to limit the mechanical stresses due to the movement of the conveyor channel 21.
  • each of the suction pipes 25 and 26 is provided with relative inspection doors 36, conformed to allow the selective inspection of the suction pipes 25 and 26 and/or to effect internal maintenance and cleaning.
  • the lateral walls 23 and 24 of the suction pipes 25 and 26 have passage apertures 30 or slits lateral at intervals (fig. 4), which allow the fumes to be discharged lateral from the central conveyor channel compartment 38 toward the suction pipes 25 and 26.
  • the passage apertures 30 are conformed as, or comprise, means which allow the fumes to exit but at the same time prevent the metal charge from getting jammed.
  • the passage apertures 30 are made in the lateral walls 23, 24 (fig. 6) and, in other forms of embodiment can be made at least for a part on the bottom wall 22 too. 7
  • vibration members 32 and 33 are provided, cooperating with the suction pipes 25 and 26 (fig. 3), so as to prevent, or at least limit, the sedimentation of powders or other impurities inside them.
  • connection between the conveyor channel 21 and the suctio pipes 25 and 26 is obtained by means of a labyrinth type mechanical seal 51 which comprises two separator elements 53 that extend substantially parallel to the lateral walls 23 and 24 of the conveyor channel 21, are solidly associated with the bottom of each suction pipe 25 and 26, and are lower I height than the lateral compartment 27 and 29.
  • a labyrinth type mechanical seal 51 which comprises two separator elements 53 that extend substantially parallel to the lateral walls 23 and 24 of the conveyor channel 21, are solidly associated with the bottom of each suction pipe 25 and 26, and are lower I height than the lateral compartment 27 and 29.
  • the lateral walls 23 and 24 can have the passage apertures 30, as already described, or provide a continuous aperture that extends for its entire length and only in the lower part of the lateral walls 23 and 24.
  • the fumes sucked in and made to pass through the scrap are obliged to follow a labyrinth-type path which lowers the speed of the fumes so as to deposit the powders and smaller fragments of metal charge on the bottom wall 22 of the conveyor channel 21, and thus to exert a first filtering of the fumes before they are treated.
  • Each of the suction pipes 25 and 26 is connected to a respective fume discharge pipe 37, 39.
  • the discharge pipes 37, 39 converge in an exit pipe 40, connected to a fume suction plant of a substantially known type.
  • the exit pipe 40 also connects the expansion chamber 18 with the suction plant, so as to determine a desired depression to take in the fumes.
  • valve element 43 is disposed, able to be selectively activated to regulate the quantity of fumes taken in through the discharge pipes 37 and 39.
  • the exit pipe 40 is also provided with a relative valve element 45, able to be selectively activated to regulate the heat exchange between the fumes and the metal charge 13.
  • valve elements 43 and 45 allow to use the apparatus 10 with different scrap heating modes, possibly regulating the penetration into the metal charge 13, or only making the fumes pass inside the expansion chamber 18.
  • the apparatus 10 also comprises, in correspondence with the zone where the metal charge 13 enters inside the tunnel 17a, a static sealing device 46, of a known type, and/or of the dynamic type.
  • the apparatus 10 as described heretofore functions as follows.
  • the suction action induces the fumes to pass through the passage apertures 30 provided along the tunnel 17a in proximity with the bottom wall 22 of the conveyor channel 21, thus passing through the moving metal charge 13 froin the top to the bottom.
  • the passage apertures 30 can have an adjustable amplitude depending on the type of metal charge 13 provided, or can comprise protective grids to prevent parts of the metal charge 13 from entering inside the suction pipes 25 and 26.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Materials Engineering (AREA)
  • Manufacturing & Machinery (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Vertical, Hearth, Or Arc Furnaces (AREA)
  • Furnace Details (AREA)
  • Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)
  • Manufacture And Refinement Of Metals (AREA)
  • Refinement Of Pig-Iron, Manufacture Of Cast Iron, And Steel Manufacture Other Than In Revolving Furnaces (AREA)
  • Furnace Charging Or Discharging (AREA)

Abstract

Apparatus for pre-heating and conveying a metal charge (13) to a container (12) of a melting plant (11), comprising at least a conveyor channel (21) along which said metal charge (13) is able to advance so as to be delivered to the container (12), and in which above said conveyor channel (21) at least a hood (17) is disposed which defines a tunnel (17a) inside which at least part of the fumes exiting from said container (12) are able to advance. At least a zone of the hood (17) comprises an expansion chamber (18) located above at least a portion of said metal charge (13), and able to expand and keep said fumes inside it for a minimum desired time of at least 1.5 seconds before they go into contact with the metal charge (13).

Description

"APPARATUS FOR PRE-HEATING A METAL CHARGE FOR A MELTING PLANT AND CONNECTED METHOD"
FIELD OF THE INVENTION
The present invention concerns an apparatus, and the connected method, for conveying and pre-heating a metal charge, such as iron scrap, hot or cold sponge iron (DRI), pig iron or other, which metal charge is then loaded inside a container, which can be a melting furnace, for example an electric arc furnace.
BACKGROUND OF THE INVENTION
Apparatuses of the vibratory or oscillating type are known, to convey a metal charge to a container of a melting plant, which container can be for example a melting furnace.
Such known apparatuses provide a segment long enough to pre-heat the metal charge sufficiently, by means of fumes exiting from the furnace, while it is being conveyed.
Each of the known apparatuses comprises a bearing structure on which a conveyor channel is mounted, having a substantially U-shaped cross section.
At least part of the conveyor channel is covered at the upper part by one or more hoods that define a tunnel into which the fumes exiting from the melting furnace flow, in the direction opposite to that in which the metal charge advances, and carry out the pre-heating.
These known apparatuses have the disadvantage, however, that despite the large quantity of fumes that are introduced into the tunnel covering the conveyor channel, at a relatively high temperature, in the range of 1300°C - 1400°C, only the upper layer of the metal charge, that is, the layer that is directly hit by the stream of fumes, is able to be adequately heated. The part below remains cold, or reasonably cold.
Therefore, a considerable fraction of the energy content of the fumes is not adequately used to heat the metal charge, and therefore the fumes leave the pre- heating tunnel at a temperature that is still rather high, and the metal charge exits from the conveyor channel at an average temperature of less than 100°C, even if the upper layer can reach higher temperatures.
Apparatuses are also known, for example from WO-A-94/09332, or from IT- B- 1359081 , i which in order to promote the distribution of the fumes and hence of the heat over the whole height of the metal charge, suction means are disposed on the lower wall or lateral walls of the conveyor channel, which take in a part of the fumes, obliging them to pass through the metal charge from the top to the bottom. In these known solutions, the fumes taken in then converge in the main discharge pipe.
However, in known solutions, the normal hoods that define the tunnel are disposed to cover the conveyor channel defining a space for the fumes to pass between the upper part of the mass of scrap and an internal surface thereof.
The passage space thus defined has a volume unrelated to the internal volume of the melting furnace and to the average quantity of fumes generated, so that the fumes transit at a high speed and remain for a short time in contact with the metal charge.
Even the solution that provides that the metal charge is hit by the fumes does not solve the problem, because it entails an excessive heating of the metal charge limited to the zone where it is introduced into the furnace; in fact, an excessive heating can cause localized melting in the charge, or possible explosions caused by the high temperatures and by the fact that the fumes are not completely combusted.
Localized melting, especially if it occurs in the zone where the charge is introduced into the melting furnace, can entail the formation of compact blocks of metal charge that cause blockages of the conveyor channel, with consequent long and complex maintenance interventions on the plant.
Another disadvantage of known solutions is that some gases present in the fumes, for example carbon monoxide (CO), remain unburned, and therefore need further processing before they are introduced into the atmosphere.
Furthermore, given the high speed of the fumes in transit in the tunnel, most of the particulate present in the fumes remains in the stream of fumes, so that the particulate and the suspended powders pass through the tunnel, requiring at exit specific filtering actions and possible recovery, with an increase in the costs and times in both producing, managing and maintaining the plant.
Moreover, the high temperature at which the fumes impact against the metal charge inside the tunnel causes oxidation of the scrap itself, requiring a greater energy consumption in order to melt them in the melting furnace; this also causes a loss of material, with a reduction in the yield of the metal charge.
One purpose of the present invention is to achieve an apparatus for conveying and, at the same time, pre-heating a metal charge in a melting plant, which has a high yield, that is, such that the heat energy given up by the fumes to the metal charge is as high as possible and, at the same time, the scrap can be heated uniformly, preventing, as much as possible, any oxidation thereof.
Another purpose of the present invention is to achieve an apparatus for conveying and pre-heating a metal charge which allows substantially both the complete combustion of the non-combusted gases and also, advantageously, the precipitation onto the metal charge of the particulate and powders present in the fumes arriving from the melting furnace.
Another purpose of the present invention is to achieve an apparatus that has limited management and maintenance costs compared with the state of the art. Yet another purpose is to achieve an apparatus that has a limited environmental impact, in which the powders have already been largely filtered from the gases sent outside.
SUMMARY OF THE INVENTION
The independent claims set forth and characterize the present invention, while the dependent claims describe other characteristics of the invention or variants to the main inventive idea.
A conveying and pre-heating apparatus according to the present invention serves to convey, in a generally known manner, a metal charge toward a container of a melting device, in quantities that can reach and exceed 8 tons a minute. The apparatus comprises at least a conveyor channel, along which the metal charge is made to advance toward the melting device.
The conveyor channel comprises a bottom wall, on which the metal charge is disposed, and lateral containing walls.
Above the conveyor channel, in a known manner, at least a hood is disposed, which defines a tunnel inside which the fumes produced by the melting device or melting furnace are conveyed, in a known manner, in order to preheat the metal charge.
In one form of embodiment, in at least one segment or zone of the conveyor channel, advantageously the zone bordering the entrance of the metal charge, in correspondence with the lateral walls, the apparatus is provided with means to discharge the fumes, so that the latter pass through the metal charge, carrying out a pre-heating practically over a large part of its height.
In at least the segment or zone where the fumes are taken in through the lateral walls of the conveyor channel, a tunnel or expansion chamber is provided, disposed above the metal charge in a distinct position, communicating with the tunnel. The fumes are thus conveyed inside the expansion chamber and are considerably slowed down, as they are made to remain inside the expansion chamber for at least a desired minimum time, so that the combustion of the fumes is substantially completed.
The internal volume of the expansion chamber, according to the invention, is correlated to the internal volume an d/or quantity of fumes generated by the melting furnace, so that the fumes, once inside the expansion chamber, are subjected to an expansion such as to induce a desired and consistent reduction in their speed, which facilitates the release of the particulate and powders that fall onto the metal charge, returning inside the melting furnace with it.
To give an example, the fumes are made to remain inside the expansion chamber for a time comprised between 1.5 seconds and 6 seconds, advantageously at least 2/3 seconds before impacting against the metal charge and passing through it.
The volume of the expansion chamber according to the invention, and the expansion of the fumes that takes place inside it, also allow to distribute the mass of fumes, in advance and uniformly, above a large segment of metal charge, to stabilize and make uniform the temperature thereof, and therefore to allow its uniform passage through the metal charge, so as to actuate an extended and considerable heating of the metal charge.
A variant of the invention provides that the section of the expansion chamber is longitudinally variable and decreasing in counter-flow to the direction of advance of the fumes.
To give an example, the expansion determined by the expansion chamber leads to a reduction in temperature of the fumes from about 1300°C - 1400°C when entering the chamber to a temperature of about 800°C - 1000°C when they contact the metal charge. Again as an example, the speed in the expansion chamber passes from about 40 m/s to a speed comprised between about 6 m/s and 18 m/s, advantageously around 10 m/s and about 14 m s. These speeds, according to the invention, can also be maintained as factors for the passage of the metal charge.
These temperatures and the reduced speed, plus the fact that the fumes pass through the advancing metal charge, determine a homogeneous heating of the metal charge. The reduced temperature drastically reduces possible localized melting of the metal charge.
In this way it is possible to obtain a homogeneous heating of the metal charge taking it to about 600°C - 750°C.
The reduction in temperature is such that the accelerated oxidation effects in the metal charge are also reduced, with a consequent reduction in the energy consumption of the plant for melting the metal charge, and an increased yield of the latter.
Simply to give an example, with an apparatus according to the invention we obtain an average saving from about 30 kWh/t up to about 60 kWh/t of electric energy.
With the solution according to the present invention at least the need for filtering and processing of the fumes before they are discharged into the atmosphere is drastically reduced.
The present invention also allows that some noble elements present in the particulate and powders transiting with the fumes, such as for example zinc (Zn), are recovered by sedimentation on the metal charge and returned inside the melting furnace.
The reduction in the filtering, in the processing of the fumes and in the oxidation, lead to a reduction in both costs and times of production, management and maintenance of the plant.
Applicant has found that the energy recovered with the solution according to the present invention allows to reduce the tap-to-tap time by about 4 - 5 minutes, with a consequent increased productivity of the plant.
According to a variant, the volume of the expansion chamber is comprised between about 200 m3 and about 600 m3. However, it must be remembered that this volume can vary, as it is a function of the internal volume of the container and/or the quantity of fumes produced therein, as well as the desired degree of expansion.
According to another variant, the plant comprises at least a melting furnace provided with a lateral loading aperture, into which the conveyor channel faces so as to introduce the metal charge inside the melting furnace. In this variant, the melting furnace typically has an upper exit to discharge the fumes, and the invention provides a fluid connection pipe between the fume discharge exit and the expansion chamber, so that the fumes generated inside the melting furnace are introduced directly into the expansion chamber, substantially avoiding the passage through the conveyor channel.
In this variant solution, the metal charge remains substantially outside the range of the hot fumes exiting from the melting furnace, at least until they have been subjected to expansion as defined by the expansion chamber.
The variant solution allows to reduce localized melting of the metal charge, preventing the formation of blocks of metal charge that can lead to blockages of the conveyor channel.
According to another variant, inside the expansion chamber a plurality of partitions are provided, or other similar or comparable elements, able to define a mechanical contrast to the movement of the fumes, so as to condition the expansion steps and the release of the particulate and powders.
According to another variant, the internal surfaces of the at least one lateral wall and the covering wall are lined by an insulation layer, for example made of refractory material, to condition the variation in temperature of the fumes after expansion.
According to another variant, at least part of the internal surfaces of the expansion chamber are provided with cooling members, for example a coil, to condition the variation in temperature of the fumes after expansion.
According to another variant, at least a burner is provided, disposed inside the expansion chamber to cause or accelerate the post-combustion ..of the gases, advantageously cooperating with the fume entry zone.
According to another variant, one or more nozzles are provided, able to nebulize a desired quantity of water into the fumes entering the expansion chamber, so as to carry out an active control of the temperature of the fumes at inlet. This solution allows to lower and control any possible thermal peaks of the fumes, which occur in the different steps of the melting cycle.
According to another variant, the lateral fume discharge means comprise at least a suction pipe, associated externally with the lateral walls of the conveyor channel, the at least one suction pipe being in a single piece with the lateral walls of the conveyor channel.
In another form of embodiment, the at least one fume suction pipe is connected to but independent of the conveyor channel, so that the latter can be made to vibrate autonomously during the transfer steps of the metal charge.
Suction means, possibly provided with suction regulation means, can be advantageously associated with the suction pipes so as to promote and regulate the stream of fumes and hence the temperature of the metal charge.
At least one of the lateral walls is advantageously provided with at least an aperture or slit which puts the conveyor channel in communication with the corresponding suction pipe in order to discharge the fumes.
The aperture or slit, according to a variant, can also affect part of the bottom wall of the expansion chamber in order to better control the time the fumes remain within.
According to another variant, vibratory members are associated with the suction pipes, able to limit the deposit of powders and other impurities inside the respective lateral compartments.
BRIEF DESCRIPTION OF THE DRAWINGS
These and other characteristics of the present invention will become apparent from the following description, given as a non-restrictive example with reference to the attached drawings wherein:
- fig. 1 is a schematic lateral view of a melting plant to which a conveying and pre-heating apparatus according to the present invention is applied
- fig. 2 is a section view from II to II of fig. 1;
- fig. 3 is a section view from III to III of fig. 1;
- fig. 4 is a schematic plane view of a detail of the apparatus in fig. 1 ;
- fig. 5 shows a detail of fig. 1 according to a variant;
- fig. 6 is a variant of the section in fig. 3; - fig. 7 is a variant of fig. 4;
- fig. 8 is a variant of fig. 6;
- fig. 9 is a variant of fig. 6.
In the attached drawings, the same reference numbers have been used, where possible, to identify common elements that are substantially identical. It is understood that elements and characteristics of one form of embodiment can conveniently be incorporated into other forms of embodiment without further clarifications.
DETAILED DESCRIPTION OF A PREFERENTIAL FORM OF EMBODIMENT
With reference to the attached drawings, the reference number 10 denotes in its entirety a conveying and pre-heating apparatus according to the present invention.
With reference to fig. 1, the apparatus 10 is installed in a melting plant 11, of a substantially known type and provided with a melting furnace 12, for example of the electric arc type, fed laterally through a loading aperture 14, with a metal charge 13 such as for example iron scrap, hot or cold sponge iron, cold pig iron or other.
The apparatus 10 according to the present invention allows to transport and pre-heat the metal charge 13 before it is introduced into the melting furnace 12.
In this case, the plant 10 comprises a loading module 15, in which the metal charge 13 is able to be deposited. Downstream of the loading module 15 the conveying and pre-heating apparatus 10 is disposed, into which the metal charge 13 is pre-heated before it is introduced into the melting furnace 12.
The apparatus 10 comprises a conveyor channel 21 conformed so as to cooperate with the loading aperture 14.
The conveyor channel 21 comprises a bottom wall 22, substantially horizontal, and two lateral walls 23 and 24 which define in this case a substantially U-shaped cross section (figs. 2 and 3).
The metal charge 13 advances in this case by means of a vibratory or oscillatory movement in a longitudinal direction of the conveyor channel 21 generated by a known vibration device.
The apparatus 10 also comprises one or more hoods 17 disposed above the conveyor channel 21 so as to define a pre-heating tunnel 17a functioning as an expansion chamber 18.
In particular, in correspondence with a final zone of the tunnel 17a, that is, a zone near the entry of the conveyor channel 21 into the melting furnace 12, the hoods 17 have in this case lateral walls 20 and a covering wall 19, so as to define the expansion chamber 18 above the conveyor channel 21.
The expansion chamber 18 can have different cross sections depending on the production techniques and the spaces available; it can also have the cross section decreasing in size in a direction opposite that in which the metal charge 13 advances.
The expansion chamber 18 has a volume such as to allow the fumes to expand, slowing their speed and lowering their temperature.
Inside the expansion chamber 18 one or more dividing partitions 16 may be present, which create an expansion and acceleration of the fumes, followed by another expansion, to accentuate the depositing of powders.
The effect of the expansion of the fumes inside the expansion chamber 18 is such that the speed is reduced from about 40 m/s to about 10 m/s - 14 m/s, and the temperature of the fumes is reduced from about 1300°C - 1400°C at exit from the melting furnace 12 to about 800°C - 1000°C when they contact the metal charge 13.
Furthermore, the low speed at which the fumes pass through the metal charge 13 promotes their homogeneous contact with the metal charge 13, preventing localized overheating.
As shown for example in fig. 6, cooling panels 35, consisting of a plurality of tubes in which cooling water is made to pass, are associated with the lateral walls 20 and the covering wall 19 of the expansion chamber 18.
In other forms of embodiment, the lateral walls 20 and the covering wall 19 consist of tubular elements, adjacent to each other and seal welded along their length so as to constitute the expansion chamber 18. In this case the tubular elements not only have a cooling function but also a function of sealing and conveying the fumes.
In other forms of embodiment, the lateral walls 20 and the covering wall 19 are cooled by means of intense fins provided on the respective external surfaces to increase the heat exchange surface.
In the solution shown in fig. 6, on one of the lateral walls 20 one or more safety doors 47 are provided, to allow an energy vent following possible explosions that might occur in the expansion chamber 18.
In the same way (figs. 6, 8 and 9), inspection doors 49 are provided on the covering wall 1 , which allow access to the expansion chamber 18.
Inside the expansion chamber 18 (fig. 1) a burner cooperates, only shown schematically, to provide for the combustion of non-combusted fumes exiting from the melting furnace 12.
In the same way, delivery lances 34 are provided to deliver nebulized water, to effect an active regulation of the temperature of the fumes, controlling them by means of temperature sensors disposed along the expansion chamber 18.
The apparatus 10 comprises a conveyor channel 28 disposed so as to connect the fourth hole of the melting furnace 12 with the expansion chamber 18.
The conveyor channel 28, when the loading aperture 14 is closed, allows to convey substantially the whole of the fumes produced inside the melting furnace 12 directly inside the expansion chamber 18.
The ratio between the usable passage surface of the conveyor channel 28 and the sizes of the cross section of the expansion chamber 18 is such that the expansion conditions of the fumes are obtained inside the expansion chamber 18 as described above.
According to another form of embodiment (fig. 5), instead of using the conveyor channel 28, the cover of the melting furnace 12 is provided with a lateral aperture 55 which is connected directly with a first portion 56 of the expansion chamber 18. In particular, the first portion 56 of the expansion chamber is substantially divergent in the direction opposite the direction of advance of the metal charge 13, so as to impose on the fumes exiting from the melting furnace 12 a desired expansion, and is also disposed directly above the terminal discharge part of the conveyor channel 21.
The first portion 56, as described with reference to fig. 6, has cooling panels 35 to cool its surfaces on its external surface.
This form of embodiment is more advantageously than other types of connection between the melting furnace 12 and the conveyor channel 21, since the losses of load due to curved pipes, narrow sections or other are considerably reduced and heat dissipations are limited, given that the fumes pass directly into the expansion chamber 18, hitting the metal charge directly which is about to be unloaded into the melting furnace 12.
Advantageously, along the whole length of the tunnel 17a, at the side of the lateral walls 23 and 24 of the conveyor channel 21 suction pipes 25 and 26 are provided (figs. 2, 3, 5 and 6), which define between them a central conveyor channel compartment of the metal charge 13.
Furthermore, the suction pipes 25 and 26 comprise the lateral walls 23 and 24. In the form of embodiment shown in figs. 2 and 3 and 9, the suction pipes 25 and 26 are made in a single piece with the conveyor channel 21.
In the form of embodiment shown in figs. 6 and 9, the suction pipes 25 and 26 are associated independently with the conveyor channel 21.
In this case, relative hydraulic seals 50 of a known type are provided to connect the suction pipes 25 and 26 to each other.
In one form of embodiment (fig. 8), the suction pipes 25 and 26 are mounted solid with the base of the whole apparatus 10, while the conveyor channel 21, as we said, is subjected to oscillations or vibrations to transport the material. This solution allows to keep the two suction pipes 25 and 26 substantially stationary, to limit the mechanical stresses due to the movement of the conveyor channel 21.
Advantageously, each of the suction pipes 25 and 26 is provided with relative inspection doors 36, conformed to allow the selective inspection of the suction pipes 25 and 26 and/or to effect internal maintenance and cleaning.
The lateral walls 23 and 24 of the suction pipes 25 and 26 have passage apertures 30 or slits lateral at intervals (fig. 4), which allow the fumes to be discharged lateral from the central conveyor channel compartment 38 toward the suction pipes 25 and 26.
In the solutions shown in figs. 4 and 7, the passage apertures 30 are conformed as, or comprise, means which allow the fumes to exit but at the same time prevent the metal charge from getting jammed.
The passage apertures 30 are made in the lateral walls 23, 24 (fig. 6) and, in other forms of embodiment can be made at least for a part on the bottom wall 22 too. 7
- 12 -
In this case, vibration members 32 and 33 are provided, cooperating with the suction pipes 25 and 26 (fig. 3), so as to prevent, or at least limit, the sedimentation of powders or other impurities inside them.
In another form of embodiment (fig. 9), the connection between the conveyor channel 21 and the suctio pipes 25 and 26 is obtained by means of a labyrinth type mechanical seal 51 which comprises two separator elements 53 that extend substantially parallel to the lateral walls 23 and 24 of the conveyor channel 21, are solidly associated with the bottom of each suction pipe 25 and 26, and are lower I height than the lateral compartment 27 and 29.
In this form of embodiment, the lateral walls 23 and 24 can have the passage apertures 30, as already described, or provide a continuous aperture that extends for its entire length and only in the lower part of the lateral walls 23 and 24.
The fumes sucked in and made to pass through the scrap are obliged to follow a labyrinth-type path which lowers the speed of the fumes so as to deposit the powders and smaller fragments of metal charge on the bottom wall 22 of the conveyor channel 21, and thus to exert a first filtering of the fumes before they are treated.
Each of the suction pipes 25 and 26 is connected to a respective fume discharge pipe 37, 39.
In this case shown here, the discharge pipes 37, 39 converge in an exit pipe 40, connected to a fume suction plant of a substantially known type.
The exit pipe 40 also connects the expansion chamber 18 with the suction plant, so as to determine a desired depression to take in the fumes.
Inside each of the discharge pipes 37 and 39 a valve element 43 is disposed, able to be selectively activated to regulate the quantity of fumes taken in through the discharge pipes 37 and 39.
In this way, a desired suction of the fumes through the discharge pipes 37 and 39 can be guaranteed, thus allowing to regulate the pre-heating temperature of the metal charge 13, as a function of the type of metal charge 13 used.
The exit pipe 40 is also provided with a relative valve element 45, able to be selectively activated to regulate the heat exchange between the fumes and the metal charge 13.
The selective opening of the valve elements 43 and 45 allows to use the apparatus 10 with different scrap heating modes, possibly regulating the penetration into the metal charge 13, or only making the fumes pass inside the expansion chamber 18.
The apparatus 10 also comprises, in correspondence with the zone where the metal charge 13 enters inside the tunnel 17a, a static sealing device 46, of a known type, and/or of the dynamic type.
The apparatus 10 as described heretofore functions as follows.
By activating the suction plant upstream of the exit pipe 40, the stream of fumes produced in the melting furnace 12 is generated, inside the connection pipe 28, until they arrive inside the expansion chamber 18,
When the fumes reach the expansion chamber 18, they reduce speed and lower their temperature.
The suction action induces the fumes to pass through the passage apertures 30 provided along the tunnel 17a in proximity with the bottom wall 22 of the conveyor channel 21, thus passing through the moving metal charge 13 froin the top to the bottom.
By regulating the opening of the valve elements 43 and 45, depending on the type of metal charge 13 used, it is possible to regulate the heating temperature of the metal charge 13 itself.
By inducing the passage of the fumes through the cross section of the metal charge 13, a substantially uniform heating is determined of the metal charge 13, with optimum use of the heat energy of the fumes.
It is clear that modifications and/or additions of parts may be made to the apparatus 10 as described heretofore, and that a person of skill in the art shall certainly be able to achieve many other equivalent forms of conveying and preheating apparatus for conveying iron scrap in a melting plant, having the characteristics as set forth in the claims and hence all coming within the field of protection defined thereby.
For example, according to another variant, the passage apertures 30 can have an adjustable amplitude depending on the type of metal charge 13 provided, or can comprise protective grids to prevent parts of the metal charge 13 from entering inside the suction pipes 25 and 26.

Claims

1. Apparatus for pre-heating and conveying a metal charge (13) to a container (12) of a melting plant (11), comprising at least a conveyor channel (21) along which said metal charge (13) is able to advance so as to be delivered to said container (12), and in which above said conveyor channel (21) at least a hood (17) is disposed which defines a tunnel (17a) inside which at least part of the fumes exiting from said container (12) are able to advance, which fumes hit the upper part of the metal charge (13), characterized in that at least a zone of said hood (17) comprises an expansion chamber (18) located above at least a portion of said metal charge (13), and able to expand and keep said fumes inside it for a minimum desired time of at least 1.5 seconds before they go into contact with said metal charge (13).
2. Conveyor apparatus as in claim 1, characterized in that the internal volume of said expansion chamber (18) is a function at least of the quantity of fumes generated in the container (12), so that the fumes remain inside said expansion chamber (18) for at least said minimum desired time.
3. Conveyor apparatus as in any claim hereinbefore, wherein said conveyor channel (21) comprises lateral walls (23, 24), characterized in that at least a longitudinal portion of said conveyor channel (21) cooperates with the inside of the expansion chamber (18) and is provided with fume discharge apertures (30) positioned along the lateral walls (23, 24) and cooperating with suction pipes (25, 26) to discharge said fumes.
4. Conveyor apparatus as in any claim hereinbefore, characterized in that the volume of the expansion chamber (18) is suitable to retain the expanded fumes inside it for a time comprised between about 1.5 seconds and about 6 seconds.
5. Conveyor apparatus as in any claim hereinbefore, characterized in that the volume of the expansion chamber (18) is comprised between about 200 and about 600.
6. Conveyor apparatus as in any claim hereinbefore, characterized in that said expansion chamber (18) has a cross section whose sizes decrease in the direction opposite to the direction of advance of the metal charge (13).
7. Conveyor apparatus as in any claim hereinbefore, wherein the container (12) is provided with a lateral loading aperture (14) into which the conveyor channel (21) converges to introduce the metal charge (13), characterized in that it comprises a fluid connection pipe (28) for the exit of the fumes from said container (12) confluent into the expansion chamber (18), and able to convey said fumes directly inside said expansion chamber (18).
8. Conveyor apparatus as in any claim hereinbefore, characterized in that inside the expansion chamber (18) a plurality of elements or partitions (16) are provided, able to define a mechanical contrast and/or cascade expansion against the longitudinal movement of the fumes.
9. Conveyor apparatus as in any claim hereinbefore, characterized in that at least one of the internal surfaces (19, 20) of the expansion chamber (18) is insulated.
10. Conveyor apparatus as in any claim hereinbefore, characterized in that at least one of the surfaces (19, 20) of the expansion chamber (18) is provided with cooling means (35).
1 1. Conveyor apparatus as in any claim hereinbefore, characterized in that inside the expansion chamber (18) there are means (34) to delver nebulized water.
12. Conveyor apparatus as in any claim hereinbefore, characterized in that the suction pipes (25, 26) are connected to but independent from the conveyor channel (21).
13. Conveyor apparatus as in any claim hereinbefore, characterized in that the suction pipes (25, 26) are associated with suction means (37, 39, 40).
14. Conveyor apparatus as in claim 13, characterized in that said suction means (37, 39, 40) comprise valve members (43, 45).
15. Conveyor apparatus as in any claim hereinbefore, characterized in that vibratory members (32, 33) are associated with the suction pipes (25, 26).
16. Method for pre-heating a metal charge (13) to a container (12) of a melting plant (1 1), comprising a conveyor step in which said metal charge (13) is made to advance in counter-flow toward said container (12) along at least a conveyor channel (21), while in a tunnel (17a) above the hot fumes exiting from said container (12) are made to advance, characterized in that it comprises at least an expansion step in which the tunnel (17a) is conformed as an expansion chamber (18) operating on at least a portion of said metal charge (13) longitudinal near to said container (12), said fumes being expanded and kept inside said expansion chamber (18) for a desired minimum time of at least 1.5 seconds before they impact with said metal charge (13).
17. Method as in claim 16, characterized in that during said expansion step the fumes are slowed down so as to deposit at least a large part of the particulate and powders on the metal charge (13) advancing in counter- flow.
18. Method as in claim 16 or 17, characterized in that the fumes at least at entry to the expansion chamber (18) are made to cooperate with the flame of a burner (34) to burn the non-combusted gases.
19. Method as in any claim from 16 to 18, characterized in that the fumes in the expansion chamber (18) are made to cooperate with water nebulized by delivery means (34).
20. Method as in any claim from 16 to 19, characterized in that the time the fumes remain in the expansion chamber (18) is also regulated by regulation means (43, 45).
21. Method as in any claim from 16 to 20, characterized in that the fumes in the expansion chamber (18) are expanded at least twice by the presence of partitions
PCT/IB2010/003197 2010-12-10 2010-12-10 Apparatus for pre-heating a metal charge for a melting plant and connected method WO2012076917A1 (en)

Priority Applications (13)

Application Number Priority Date Filing Date Title
ES10812880.2T ES2526130T3 (en) 2010-12-10 2010-12-10 Apparatus for preheating a metal load for a fusion plant and associated procedure
PL10812880T PL2649209T3 (en) 2010-12-10 2010-12-10 Apparatus for pre-heating a metal charge for a melting plant and connected method
KR1020137017798A KR101517124B1 (en) 2010-12-10 2010-12-10 Apparatus for pre-heating a metal charge for a melting plant and connected method
MX2013006396A MX2013006396A (en) 2010-12-10 2010-12-10 Apparatus for pre-heating a metal charge for a melting plant and connected method.
CN201080071196.3A CN103502478B (en) 2010-12-10 2010-12-10 Apparatus for pre-heating a metal charge for a melting plant and connected method
EP10812880.2A EP2649209B1 (en) 2010-12-10 2010-12-10 Apparatus for pre-heating a metal charge for a melting plant and connected method
US13/992,956 US9335096B2 (en) 2010-12-10 2010-12-10 Apparatus for pre-heating a metal charge for a melting plant and connected method
JP2013542613A JP5755754B2 (en) 2010-12-10 2010-12-10 Apparatus and related methods for preheating metal charges for a melting plant
PCT/IB2010/003197 WO2012076917A1 (en) 2010-12-10 2010-12-10 Apparatus for pre-heating a metal charge for a melting plant and connected method
PT108128802T PT2649209E (en) 2010-12-10 2010-12-10 Apparatus for pre-heating a metal charge for a melting plant and connected method
BR112013014439A BR112013014439B8 (en) 2010-12-10 2010-12-10 apparatus for preheating a metal charge for a melting plant and related method
RU2013130215/02A RU2557039C2 (en) 2010-12-10 2010-12-10 Device and method for pre-heating of metal charge for smelting unit
US15/138,952 US9903654B2 (en) 2010-12-10 2016-04-26 Apparatus for pre-heating a metal charge for a melting plant and connected method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/IB2010/003197 WO2012076917A1 (en) 2010-12-10 2010-12-10 Apparatus for pre-heating a metal charge for a melting plant and connected method

Related Child Applications (2)

Application Number Title Priority Date Filing Date
US13/992,956 A-371-Of-International US9335096B2 (en) 2010-12-10 2010-12-10 Apparatus for pre-heating a metal charge for a melting plant and connected method
US15/138,952 Continuation US9903654B2 (en) 2010-12-10 2016-04-26 Apparatus for pre-heating a metal charge for a melting plant and connected method

Publications (1)

Publication Number Publication Date
WO2012076917A1 true WO2012076917A1 (en) 2012-06-14

Family

ID=43721897

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/IB2010/003197 WO2012076917A1 (en) 2010-12-10 2010-12-10 Apparatus for pre-heating a metal charge for a melting plant and connected method

Country Status (12)

Country Link
US (2) US9335096B2 (en)
EP (1) EP2649209B1 (en)
JP (1) JP5755754B2 (en)
KR (1) KR101517124B1 (en)
CN (1) CN103502478B (en)
BR (1) BR112013014439B8 (en)
ES (1) ES2526130T3 (en)
MX (1) MX2013006396A (en)
PL (1) PL2649209T3 (en)
PT (1) PT2649209E (en)
RU (1) RU2557039C2 (en)
WO (1) WO2012076917A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101569968B1 (en) * 2013-10-29 2015-11-27 주식회사 엠텍이엔지 A electric arc furnace whit scrap preheating device using high temperature exhaust gas
IT202000022990A1 (en) * 2020-09-29 2022-03-29 Danieli Off Mecc APPARATUS AND METHOD FOR FEEDING AND PREHEATING A METALLIC CHARGE IN A MELTING FURNACE
RU2816886C1 (en) * 2020-09-29 2024-04-08 Даньели & К. Оффичине Мекканике С.П.А. Device and method for preheating and feeding metal charge into melting furnace

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103502479B (en) * 2010-12-10 2016-03-16 达涅利机械设备股份公司 For for smelting equipment conveying and preheated metallic furnace charge device and be correlated with method
WO2012076920A1 (en) * 2010-12-10 2012-06-14 Vwn Steel Solutions Gmbh Apparatus for conveying and pre-heating a metal charge for a melting plant and connected method
BR112013014439B8 (en) 2010-12-10 2020-04-28 Danieli Off Mecc apparatus for preheating a metal charge for a melting plant and related method
CN103954133B (en) * 2014-02-11 2016-05-25 河南太行全利重工股份有限公司 A kind of middle frequency furnace reinforced device of fluxing continuously
DE102014107778A1 (en) * 2014-06-03 2015-12-03 Uwe Geib Segmented outlet trough
IT201900023667A1 (en) * 2019-12-11 2021-06-11 Danieli Off Mecc MELTING FURNACE AND MELTING PROCEDURE
KR20210001631U (en) 2020-01-07 2021-07-15 주식회사 비원씨앤알 Food packaging box
WO2024077265A1 (en) * 2022-10-07 2024-04-11 General Kinematics Corporation Feed trough, method of feed trough fabrication, and feeder and system including feed trough

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1994009332A1 (en) 1992-10-16 1994-04-28 Nippon Steel Corporation Scrap conveyor
JPH08157930A (en) 1994-12-01 1996-06-18 Nippon Steel Corp Device for conveying scrap
DE102008037111A1 (en) 2008-08-06 2010-02-11 Sms Siemag Aktiengesellschaft Continuous scrap feeding into an electric melting furnace (EAF)

Family Cites Families (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3301662A (en) * 1962-12-10 1967-01-31 Mcdowell Wellman Eng Co Basic oxygen steel making process
US3985497A (en) 1974-11-21 1976-10-12 Melting Systems, Inc. Scrap preheating system
US4135702A (en) 1976-10-29 1979-01-23 Venetta, Inc. Method and apparatus for preheating scrap
DE4015916A1 (en) * 1990-05-17 1991-11-21 Fuchs Technology Ag MELTING UNIT WITH TWO MELTING OVENS arranged next to each other
US5400358A (en) * 1992-10-13 1995-03-21 Consteel, S.A. Continuous scrap preheating
JP2568391Y2 (en) * 1993-03-11 1998-04-08 新日本製鐵株式会社 Arc furnace scrap conveyor
JP2550677Y2 (en) * 1992-10-16 1997-10-15 新日本製鐵株式会社 Continuous scrap loading device
JPH0727489A (en) * 1993-07-15 1995-01-27 Nippon Steel Corp Preheating heat transfer device of scrap
JP3273168B2 (en) * 1995-04-18 2002-04-08 新日本製鐵株式会社 Arc furnace scrap conveyor
JPH09159376A (en) 1995-12-13 1997-06-20 Ishikawajima Harima Heavy Ind Co Ltd Charging bucket for preheating scrap
JP2000205751A (en) * 1999-01-14 2000-07-28 Nippon Steel Corp Continuous scrap feeder
US6155333A (en) * 1999-02-23 2000-12-05 Techint Compagnia Tecnica Internazionale Continuous electric steelmaking with charge preheating, melting, refining and casting
CN1183261C (en) * 2000-11-10 2005-01-05 刘恩琛 Electric arc furnace for reducing and smelting iron ore and refining steel and its technology
ITUD20050022A1 (en) 2005-02-22 2006-08-23 Danieli Off Mecc CONVEYANCE EQUIPMENT TO CONTAIN A METAL CHARGE IN A MERGER PLANT
ITUD20050021A1 (en) 2005-02-22 2006-08-23 Danieli Off Mecc DEVICE FOR LOADING A METAL CHARGE IN A MERGER PLANT
ITUD20050041A1 (en) 2005-03-18 2006-09-19 Danieli Off Mecc CONVEYANCE EQUIPMENT AND PRE-HEATING OF A METALLIC CHARGE IN A MERGER PLANT
JP2008002736A (en) * 2006-06-21 2008-01-10 Ihi Corp Melting device
US7959436B2 (en) 2008-07-29 2011-06-14 Carmeuse Lime, Inc. Fine dust removal system for lime kiln
CN101684507B (en) * 2008-09-24 2012-02-08 莱芜钢铁集团有限公司 Direct steel making technique by reducing iron ore with gas
WO2011091685A1 (en) 2010-02-01 2011-08-04 中冶赛迪工程技术股份有限公司 Preheating and conveying equipment for steel scrap
WO2012076920A1 (en) * 2010-12-10 2012-06-14 Vwn Steel Solutions Gmbh Apparatus for conveying and pre-heating a metal charge for a melting plant and connected method
BR112013014439B8 (en) 2010-12-10 2020-04-28 Danieli Off Mecc apparatus for preheating a metal charge for a melting plant and related method
CN103502479B (en) * 2010-12-10 2016-03-16 达涅利机械设备股份公司 For for smelting equipment conveying and preheated metallic furnace charge device and be correlated with method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1994009332A1 (en) 1992-10-16 1994-04-28 Nippon Steel Corporation Scrap conveyor
JPH08157930A (en) 1994-12-01 1996-06-18 Nippon Steel Corp Device for conveying scrap
DE102008037111A1 (en) 2008-08-06 2010-02-11 Sms Siemag Aktiengesellschaft Continuous scrap feeding into an electric melting furnace (EAF)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101569968B1 (en) * 2013-10-29 2015-11-27 주식회사 엠텍이엔지 A electric arc furnace whit scrap preheating device using high temperature exhaust gas
IT202000022990A1 (en) * 2020-09-29 2022-03-29 Danieli Off Mecc APPARATUS AND METHOD FOR FEEDING AND PREHEATING A METALLIC CHARGE IN A MELTING FURNACE
EP3974544A1 (en) * 2020-09-29 2022-03-30 Danieli & C. Officine Meccaniche S.P.A. Apparatus and method for feeding and preheating a metal charge in a melting furnace
WO2022070221A1 (en) * 2020-09-29 2022-04-07 Danieli & C. Officine Meccaniche S.P.A. Apparatus and method for feeding and preheating a metal charge in a melting furnace
RU2816886C1 (en) * 2020-09-29 2024-04-08 Даньели & К. Оффичине Мекканике С.П.А. Device and method for preheating and feeding metal charge into melting furnace

Also Published As

Publication number Publication date
KR101517124B1 (en) 2015-05-04
KR20140004121A (en) 2014-01-10
US20160252304A1 (en) 2016-09-01
CN103502478B (en) 2015-05-06
JP5755754B2 (en) 2015-07-29
EP2649209A1 (en) 2013-10-16
MX2013006396A (en) 2013-10-30
US9903654B2 (en) 2018-02-27
JP2014502336A (en) 2014-01-30
ES2526130T3 (en) 2015-01-07
RU2013130215A (en) 2015-01-20
PT2649209E (en) 2014-12-24
BR112013014439B1 (en) 2018-01-23
US20130328251A1 (en) 2013-12-12
PL2649209T3 (en) 2015-03-31
RU2557039C2 (en) 2015-07-20
CN103502478A (en) 2014-01-08
BR112013014439A2 (en) 2016-09-13
EP2649209B1 (en) 2014-09-24
US9335096B2 (en) 2016-05-10
BR112013014439B8 (en) 2020-04-28

Similar Documents

Publication Publication Date Title
US9903654B2 (en) Apparatus for pre-heating a metal charge for a melting plant and connected method
EP2649394B1 (en) Apparatus for conveying and pre-heating a metal charge for a melting plant
EP2649210B1 (en) Apparatus for conveying and pre-heating a metal charge for a melting plant and connected method
TW201412994A (en) Plant and relative procedure for the continuous feeding of heated metallic material to a melting furnace for the production of steel
JP3165876U (en) Reduction roasting equipment
JPH0727489A (en) Preheating heat transfer device of scrap
MX2007010210A (en) Melting plant and method for the production of steel.
EP2107327B1 (en) Thermal gas flow control system in the electric arc furnace
JPS60253785A (en) Charger for melting furnace
RU2361927C1 (en) Device for receiving of iron from steel made of ironoxide materials
EP3894770B1 (en) Induration machine
JP2568391Y2 (en) Arc furnace scrap conveyor
JP2014219139A (en) Method for preheating heated material and preheating device
WO2006089869A1 (en) Cover for a connection conveyor for loading a metal charge into a melting furnace and relative movement device

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 10812880

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2013542613

Country of ref document: JP

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: MX/A/2013/006396

Country of ref document: MX

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 20137017798

Country of ref document: KR

Kind code of ref document: A

ENP Entry into the national phase

Ref document number: 2013130215

Country of ref document: RU

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: 2010812880

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 13992956

Country of ref document: US

REG Reference to national code

Ref country code: BR

Ref legal event code: B01A

Ref document number: 112013014439

Country of ref document: BR

ENP Entry into the national phase

Ref document number: 112013014439

Country of ref document: BR

Kind code of ref document: A2

Effective date: 20130610