WO2012069796A3 - Improvements in the formation of underground constructions - Google Patents
Improvements in the formation of underground constructions Download PDFInfo
- Publication number
- WO2012069796A3 WO2012069796A3 PCT/GB2011/001657 GB2011001657W WO2012069796A3 WO 2012069796 A3 WO2012069796 A3 WO 2012069796A3 GB 2011001657 W GB2011001657 W GB 2011001657W WO 2012069796 A3 WO2012069796 A3 WO 2012069796A3
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- allow
- formation
- support structures
- underground
- receive
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/045—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
- E02D29/05—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them at least part of the cross-section being constructed in an open excavation or from the ground surface, e.g. assembled in a trench
- E02D29/055—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them at least part of the cross-section being constructed in an open excavation or from the ground surface, e.g. assembled in a trench further excavation of the cross-section proceeding underneath an already installed part of the structure, e.g. the roof of a tunnel
Abstract
The invention relates to a method and apparatus for the formation of underground structures. The method includes the provision of the formation of at least two spaced support structures which are provided to include a slide track thereon to receive and allow the sliding movement therealong of a roof structure which is moved into position once the support structures are formed to form the underground structure. The support structures can include piled foundations and include a series of units in which the slide tracks are formed. Further articles can be provided to allow the excretion of lubricant to allow the movement of the structure units into position to be improved. Said articles can also be used subsequently to receive a filler material to allow any spaces between the structure and surrounding soil or rock to be filled.
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011800566235A CN103270222A (en) | 2010-11-26 | 2011-11-28 | Improvements in the formation of underground constructions |
US13/988,757 US20130243528A1 (en) | 2010-11-26 | 2011-11-28 | Formation of Underground Constructions |
EP11811362.0A EP2643528A2 (en) | 2010-11-26 | 2011-11-28 | Improvements in the formation of underground constructions |
Applications Claiming Priority (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GB1020097.0 | 2010-11-26 | ||
GBGB1020097.0A GB201020097D0 (en) | 2010-11-26 | 2010-11-26 | Apparatus and method for forming excavations |
GB1020699.3 | 2010-12-07 | ||
GBGB1020699.3A GB201020699D0 (en) | 2010-12-07 | 2010-12-07 | Improvements in the formation of underground constructions |
Publications (2)
Publication Number | Publication Date |
---|---|
WO2012069796A2 WO2012069796A2 (en) | 2012-05-31 |
WO2012069796A3 true WO2012069796A3 (en) | 2013-03-07 |
Family
ID=45524871
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/GB2011/001657 WO2012069796A2 (en) | 2010-11-26 | 2011-11-28 | Improvements in the formation of underground constructions |
Country Status (4)
Country | Link |
---|---|
US (1) | US20130243528A1 (en) |
EP (1) | EP2643528A2 (en) |
CN (1) | CN103270222A (en) |
WO (1) | WO2012069796A2 (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106013240A (en) * | 2016-07-12 | 2016-10-12 | 中国电建集团昆明勘测设计研究院有限公司 | Assembly type comprehensive pipe rack |
CN105971014A (en) * | 2016-07-12 | 2016-09-28 | 中国电建集团昆明勘测设计研究院有限公司 | Steel-structural urban comprehensive pipe rack |
CN105971015A (en) * | 2016-07-12 | 2016-09-28 | 中国电建集团昆明勘测设计研究院有限公司 | Fragmentation assembly type steel and concrete structure comprehensive pipe rack |
CN106959338A (en) * | 2017-03-10 | 2017-07-18 | 西南交通大学 | A kind of dynamic response analogue means of multi-level underground space structure and country rock |
DE102017005994A1 (en) | 2017-06-15 | 2018-12-20 | Berliner Wasserbetriebe Anstalt des öffentlichen Rechts | Device for the automated flushing of sewer network sections |
CN109145520B (en) * | 2018-10-22 | 2023-03-24 | 重庆大学 | Earth-rock mixture tunnel design method based on digital image and big data |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1999019603A1 (en) * | 1997-10-09 | 1999-04-22 | James Crawford Thomson | Arched support structure |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
ES414134A1 (en) * | 1973-04-27 | 1976-02-01 | Mackina Westfalia S A | Tunneling methods and apparatus |
US4558969A (en) * | 1984-03-19 | 1985-12-17 | Bebo Of America | Hinge for use with large pre-cast overfilled load support structures |
CA1262055A (en) * | 1987-03-27 | 1989-10-03 | William Teron | Roof structure for tunnel |
IT1216116B (en) * | 1988-03-16 | 1990-02-22 | Rocksoil Srl | METHOD FOR THE CONSTRUCTION OF GALLERIES OF GREAT LIGHT THROUGH CELL ARC. |
US5632575A (en) * | 1994-08-30 | 1997-05-27 | Lorenzen; Frank J. | Method and apparatus for controlled pumping of bentonite around a pipe jacked tunnel |
-
2011
- 2011-11-28 EP EP11811362.0A patent/EP2643528A2/en not_active Withdrawn
- 2011-11-28 WO PCT/GB2011/001657 patent/WO2012069796A2/en active Application Filing
- 2011-11-28 US US13/988,757 patent/US20130243528A1/en not_active Abandoned
- 2011-11-28 CN CN2011800566235A patent/CN103270222A/en active Pending
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1999019603A1 (en) * | 1997-10-09 | 1999-04-22 | James Crawford Thomson | Arched support structure |
Also Published As
Publication number | Publication date |
---|---|
CN103270222A (en) | 2013-08-28 |
US20130243528A1 (en) | 2013-09-19 |
WO2012069796A2 (en) | 2012-05-31 |
EP2643528A2 (en) | 2013-10-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2012069796A3 (en) | Improvements in the formation of underground constructions | |
CA2971898C (en) | Method and apparatus for forming tunnels for transport routes. | |
CN103696771B (en) | Skip-mining type wangeviry stope branch roadway filling and coal mining method | |
US9494037B2 (en) | Inclined layered solid-filling mining method in ultrathick coal layer | |
ZA201404803B (en) | Underground coal gasification and linkage method | |
Zhang et al. | Behaviors of existing twin subway tunnels due to new subway station excavation below in close vicinity | |
WO2014013508A3 (en) | Stepwise repeated de-stabilisation and stabilisation of highly collapsible soil mass by 'soil nailing technique' used for construction of railway/road underpass | |
WO2012010119A3 (en) | Pile-driver for piles and methods for pile-driving piles | |
PL410528A1 (en) | Method for preventing relocation of impurities from the excavations after exploitation of mineral material to ground waters | |
CN202849877U (en) | Split type roadbed structure | |
WO2014114941A3 (en) | Method and apparatus for forming tunnels and tunnels formed thereby | |
EP2572072A4 (en) | Method for drilling through nuisance hydrocarbon bearing formations | |
BR112013015561A2 (en) | packer assembly, method, and system for use in wellbore penetrating an underground foundation | |
CN205529702U (en) | Be close to wide reinforcing structure of existing ballastless track road bed group | |
RU2449124C1 (en) | Method to increase stability of ceiling in downward slicing development of deposit with backfilling | |
Harris | How tunnels work | |
Park et al. | Introduction of FUSEM (Floating Underground Space Extension Method) for Preservation and Continuous Utilization of Old Seoul City Hall | |
Forsman et al. | Mass stabilization in infrastructure and environmental construction | |
Yu et al. | Study on the mechanism and control technology of floor heave in the laneway | |
Liu et al. | Study on the Law of Ground Subsidence for Shallow Buried and Thick Coal Seam by Fully Mechanized Caving Mining Method | |
LV14506A (en) | Method for reconstruction and renovation of vertical joints between prefabricated elements of hydraulic structures | |
Zhao et al. | Ground Volume Loss Prediction and Rail Settlement Control Method for Tunneling Subway Underneath Wu-Guang High-Speed Railway | |
Kenney et al. | Excavation of an Early Nineteenth Century Brick Kiln at the Gardner House in Hart County, Kentucky | |
UA57201U (en) | Method for open mining of horizontal and flat mineral pits | |
Richards | Chippenham Western Bypass |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
REEP | Request for entry into the european phase |
Ref document number: 2011811362 Country of ref document: EP |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2011811362 Country of ref document: EP |
|
WWE | Wipo information: entry into national phase |
Ref document number: 13988757 Country of ref document: US |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 11811362 Country of ref document: EP Kind code of ref document: A2 |