WO2012062209A1 - Ack/nack反馈信息和周期cqi/pmi/ri反馈比特同时传输的方法和设备 - Google Patents

Ack/nack反馈信息和周期cqi/pmi/ri反馈比特同时传输的方法和设备 Download PDF

Info

Publication number
WO2012062209A1
WO2012062209A1 PCT/CN2011/081996 CN2011081996W WO2012062209A1 WO 2012062209 A1 WO2012062209 A1 WO 2012062209A1 CN 2011081996 W CN2011081996 W CN 2011081996W WO 2012062209 A1 WO2012062209 A1 WO 2012062209A1
Authority
WO
WIPO (PCT)
Prior art keywords
terminal device
downlink
bit
ack
pdcch
Prior art date
Application number
PCT/CN2011/081996
Other languages
English (en)
French (fr)
Inventor
高雪娟
沈祖康
林亚男
Original Assignee
大唐移动通信设备有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 大唐移动通信设备有限公司 filed Critical 大唐移动通信设备有限公司
Priority to US14/002,105 priority Critical patent/US9628240B2/en
Priority to EP11840612.3A priority patent/EP2648354A4/en
Publication of WO2012062209A1 publication Critical patent/WO2012062209A1/zh

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L5/00Arrangements affording multiple use of the transmission path
    • H04L5/003Arrangements for allocating sub-channels of the transmission path
    • H04L5/0053Allocation of signaling, i.e. of overhead other than pilot signals
    • H04L5/0055Physical resource allocation for ACK/NACK
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04BTRANSMISSION
    • H04B7/00Radio transmission systems, i.e. using radiation field
    • H04B7/02Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas
    • H04B7/04Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas
    • H04B7/06Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas at the transmitting station
    • H04B7/0613Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas at the transmitting station using simultaneous transmission
    • H04B7/0615Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas at the transmitting station using simultaneous transmission of weighted versions of same signal
    • H04B7/0619Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas at the transmitting station using simultaneous transmission of weighted versions of same signal using feedback from receiving side
    • H04B7/0636Feedback format
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L1/00Arrangements for detecting or preventing errors in the information received
    • H04L1/0001Systems modifying transmission characteristics according to link quality, e.g. power backoff
    • H04L1/0023Systems modifying transmission characteristics according to link quality, e.g. power backoff characterised by the signalling
    • H04L1/0028Formatting
    • H04L1/0031Multiple signaling transmission
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L1/00Arrangements for detecting or preventing errors in the information received
    • H04L1/12Arrangements for detecting or preventing errors in the information received by using return channel
    • H04L1/16Arrangements for detecting or preventing errors in the information received by using return channel in which the return channel carries supervisory signals, e.g. repetition request signals
    • H04L1/1607Details of the supervisory signal
    • H04L1/1621Group acknowledgement, i.e. the acknowledgement message defining a range of identifiers, e.g. of sequence numbers
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L1/00Arrangements for detecting or preventing errors in the information received
    • H04L1/12Arrangements for detecting or preventing errors in the information received by using return channel
    • H04L1/16Arrangements for detecting or preventing errors in the information received by using return channel in which the return channel carries supervisory signals, e.g. repetition request signals
    • H04L1/1607Details of the supervisory signal
    • H04L1/1671Details of the supervisory signal the supervisory signal being transmitted together with control information
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04BTRANSMISSION
    • H04B7/00Radio transmission systems, i.e. using radiation field
    • H04B7/02Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas
    • H04B7/04Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas
    • H04B7/06Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas at the transmitting station
    • H04B7/0613Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas at the transmitting station using simultaneous transmission
    • H04B7/0615Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas at the transmitting station using simultaneous transmission of weighted versions of same signal
    • H04B7/0619Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas at the transmitting station using simultaneous transmission of weighted versions of same signal using feedback from receiving side
    • H04B7/0621Feedback content
    • H04B7/063Parameters other than those covered in groups H04B7/0623 - H04B7/0634, e.g. channel matrix rank or transmit mode selection
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04BTRANSMISSION
    • H04B7/00Radio transmission systems, i.e. using radiation field
    • H04B7/02Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas
    • H04B7/04Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas
    • H04B7/06Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas at the transmitting station
    • H04B7/0613Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas at the transmitting station using simultaneous transmission
    • H04B7/0615Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas at the transmitting station using simultaneous transmission of weighted versions of same signal
    • H04B7/0619Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas at the transmitting station using simultaneous transmission of weighted versions of same signal using feedback from receiving side
    • H04B7/0621Feedback content
    • H04B7/0632Channel quality parameters, e.g. channel quality indicator [CQI]
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04BTRANSMISSION
    • H04B7/00Radio transmission systems, i.e. using radiation field
    • H04B7/02Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas
    • H04B7/04Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas
    • H04B7/06Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas at the transmitting station
    • H04B7/0613Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas at the transmitting station using simultaneous transmission
    • H04B7/0615Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas at the transmitting station using simultaneous transmission of weighted versions of same signal
    • H04B7/0619Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas using two or more spaced independent antennas at the transmitting station using simultaneous transmission of weighted versions of same signal using feedback from receiving side
    • H04B7/0636Feedback format
    • H04B7/0639Using selective indices, e.g. of a codebook, e.g. pre-distortion matrix index [PMI] or for beam selection

Definitions

  • the present invention relates to the field of communications technologies, and in particular, to a method and a device for simultaneously transmitting ACK/NACK feedback information and periodic CQI/PMI/RI feedback bits. Background technique
  • LTE Long Term Evolution
  • M 1 carrier for uplink transmission
  • the LTE-A (Long Term Evolution Advanced) system currently determines that up to 5 carriers can be aggregated for aggregation, one LTE-A UE (User
  • ACK/NACK Negative Acknowledgement
  • ACK/NACK acknowledgement/NACK
  • configure the number of downlink carriers for the UE; in a TDD (Time Division Duplex) system, the UE needs to feed back ACK/NACK feedback in one uplink subframe
  • a plurality of downlink subframes corresponding to ACK/NACK feedback in the same uplink subframe are hereinafter referred to as a "feedback window".
  • PUCCH Physical Uplink Control Channel
  • PUCCH format 3 is a new ACK/NACK transmission scheme based on DFT-S-OFDM. Its structure is shown in Figure 3.
  • the channel coding is performed using RM (32,0) block code, which can transmit up to 20 bits of feedback information.
  • the time domain 5 uses a spreading sequence with a spreading factor of 5 for spreading.
  • Periodic CQI Channel Quality Indication
  • PMI Precoding Matrix Indicator
  • RI Rank Indication
  • the transmission scheme may be PUCCH format 2/2a/2b or PUCCH format 3, and may be transmitted on the channel resources of the upper layer configuration according to a predefined period.
  • the ACK/NACK feed ratio can be reduced by combining the time domain or the frequency domain.
  • the so-called time-domain bundling (also referred to as inter-subframe bundling), that is, the ACK corresponding to the data packet received by the UE in multiple downlink sub-frames in a feedback window on a configured downlink carrier.
  • the NACK feedback information is combined to obtain the combined L-bit ACK/NACK feedback information WA_p as shown in FIG. 4, where N ⁇ L ⁇ 2N, where N is the number of downlink carriers aggregated by the UE.
  • the configured downlink carrier is in the multi-codeword transmission mode, the UE needs to perform spatial bundling on the 2N-L configured downlink carriers, that is, multiple codewords are received in the same downlink subframe on the downlink carrier.
  • the ACK/NACK feedback information is merged.
  • the status of the feedback information includes ACK (correctly received packets), NACK (error received packets), and DTX (discontinuous transmission, indicating lost or unscheduled packets).
  • ACK correctly received packets
  • NACK error received packets
  • DTX discontinuous transmission, indicating lost or unscheduled packets.
  • the UE can use the DAI (Downlink Assignment Index) information to determine whether the downlink traffic of the currently configured downlink carrier is lost in the feedback window memory, or the UE is in the current configured downlink carrier in the feedback window.
  • DAI Downlink Assignment Index
  • DTX is generated as the combined feedback information for the downlink carrier; if the UE determines that the current configuration downlink carrier does not have downlink data packet loss in the feedback window, and at least one data received on the downlink carrier If the feedback information of the packet is NACK, the NACK is generated as the combined feedback information for the downlink carrier; if the UE determines that the current configured downlink carrier does not have downlink data packet loss in the feedback window, and all the data packets received on the downlink carrier The feedback information is all ACK, and an ACK is generated for the downlink carrier as the combined feedback information.
  • the UE may use the number of the last downlink subframe received in the feedback window or the total number of downlink subframes received in the feedback window as " bg2 M". Bit assist information
  • the base station can pass the received feedback bit in the post "l. g 2 M] bit information, determine whether the last scheduled packet is lost or judge the feedback window Whether there is packet loss in the port, so as to determine an appropriate retransmission scheme and improve system transmission efficiency.
  • the so-called frequency-domain bundling (also referred to as inter-carrier merging), that is, the UE combines the ACK/NACK information of the data packets received on each configured downlink carrier in the current downlink subframe in the feedback window, if configured
  • the downlink carrier is a multi-codeword transmission mode, and space combining is also required, as shown in FIG. 5, which is in the prior art.
  • the 2-bit DAI in the DL grant (downlink grant) in the LTE TDD system can be used to indicate the total number of downlink packets on the downlink carrier configured in the same downlink subframe in the feedback window.
  • the UE can use the DAI information to determine the current downlink subframe in the feedback window, the downlink data packet is lost on the configured downlink carrier, or the UE does not have any configured downlink carriers in the current downlink subframe.
  • the DTX is generated as the combined feedback information for the downlink subframe; if the UE determines that the current downlink subframe in the feedback window does not have downlink data packet loss on the configured downlink carrier, and the downlink sub-subs If the feedback information of the at least one data packet received on the downlink carrier of the multiple frames in the frame is NACK, the NACK is generated as the combined feedback information for the downlink subframe; if the UE determines the current downlink subframe in the feedback window, If there is no downlink data packet loss on the configured downlink carrier, and the feedback information of all the data packets received on the downlink carrier configured in the downlink subframe is ACK, the ACK is generated as the combined feedback information for the downlink subframe.
  • the base station can pass parameters
  • simultaneousAckNackAndCQI Semi-statically configure whether the UE supports simultaneous transmission of ACK/NACK and periodic CQI/PMI/RI at PUCCH.
  • the parameter is False and does not support simultaneous transmission
  • the UE will drop the periodic CQI/PMI/RI and only feed back ACK/NACK.
  • the parameter is True, simultaneous transmission is supported.
  • the ACK/NACK feedback bit at this time indicates that there is only one packet ACK/NACK information of the data packet when there is one packet scheduling or multiple scheduled data when there are multiple data packet scheduling.
  • the ACK in the ACK/NACK feedback information of the packet The number, which is shown in Table 2.
  • the PUCCH format 2a/2b transmission period CQI/PMI/RI feedback bits are used, and the ACK/NACK feedback bits are mapped in the second column of pilot resources for transmission; under the extended CP, the PUCCH format 2 transmission period is adopted.
  • the CQI/PMI/RI feedback bits, the ACK/NACK feedback bits are cascaded for joint coding transmission after the periodic CQI/PMI/RI feedback bits.
  • the number of bits of the ACK/NACK feedback information may be considered, and the PUCCH format 3 may transmit up to 20 bits of information, LTE Rel-8.
  • the embodiment of the invention provides an ACK/NACK feedback information and a periodic CQI/PMI/RI A method and a device for simultaneously transmitting feedback bits, solving the problem of jointly transmitting ACK/NACK feedback information and periodic CQI/PMI/RI feedback bits in an LTE-A system.
  • an embodiment of the present invention provides a method for simultaneously transmitting ACK/NACK feedback information and periodic CQI/PMI/RI feedback bits, including:
  • the terminal device receives downlink data
  • the terminal device generates a K-bit ACK/NACK feedback bit for the data in the M downlink subframes of the N configured downlink carriers, where N > 1 , M > 1 , in the M downlink subframes
  • the ACK/NACK feedback information of the data is transmitted in the same uplink subframe;
  • the terminal device generates an S-bit periodic CQI/PMI/RI feedback bit; the terminal device uses a PUCCH format 3 transmission scheme in the uplink subframe, and simultaneously transmits a S-bit periodic CQI/PMI/RI feedback bit and K-bit
  • the embodiment of the present invention further provides a terminal device, including: a receiving module, configured to receive downlink data;
  • a first generation module configured to generate K-bit ACK/NACK feedback bits for data in M downlink subframes of the N configured downlink carriers, where N > 1 , M > 1 , medium transmission;
  • the embodiment of the present invention further provides a method for simultaneously transmitting ACK/NACK feedback information and periodic CQI/PMI/RI feedback bits, including: The base station sends downlink data to the terminal device;
  • the base station receives, on a channel resource of the PUCCH format 3, a periodic CQI/PMI/RI feedback bit and a K-bit ACK/NACK feedback information of the S bit simultaneously transmitted by the terminal device, where N > 1 , M > 1
  • the ACK/NACK feedback information of the data in the M downlink subframes is transmitted in the same uplink subframe.
  • a base station including:
  • a sending module configured to send downlink data to the terminal device
  • a receiving module configured to receive, on a channel resource of the PUCCH format 3, a periodic CQI/PMI/RI feedback bit and a K-bit ACK/NACK feedback information of the S bit simultaneously sent by the terminal device, where N > 1 , M >1.
  • the ACK/NACK feedback information of the data in the M downlink subframes is transmitted in the same uplink subframe.
  • the embodiment of the invention has the following advantages:
  • the PUCCH format 3 transmission scheme can be used in the LTE-A system to simultaneously transmit periodic CQI/PMI/RI feedback bits and ACK/NACK feedback information in the same uplink subframe, thereby avoiding When the ACK/NACK feedback information and the periodic CQI/PMI/RI information are simultaneously fed back in the same uplink subframe, the periodic CQI/PMI/RI information transmission needs to be abandoned, and the feedback efficiency of the uplink control information is improved.
  • FIG. 1 is a schematic diagram of a single spectrum system in the prior art
  • FIG. 2 is a schematic diagram of a spectrum aggregation system in the prior art
  • FIG. 3 is a schematic diagram showing a transmission structure of a PUCCH format 3 under a conventional CP in the prior art
  • FIG. 4 is a schematic diagram of time domain merging of ACK/NACK feedback information of a TDD system in the prior art
  • FIG. 5 is a schematic diagram of frequency domain merging of ACK/NACK feedback information in the prior art
  • FIG. 6 is an ACK/NACK feedback information and period according to an embodiment of the present invention
  • FIG. 7 is a method for simultaneously transmitting ACK/NACK feedback information and periodic CQI/PMI/RI feedback bits in a specific application scenario according to an embodiment of the present invention; Schematic diagram of the process;
  • FIG. 8 is a schematic flow chart of a method for simultaneously transmitting ACK/NACK feedback information and periodic CQI/PMI/RI feedback bits in a specific application scenario according to an embodiment of the present invention
  • 9A and 9B are flowcharts showing a method for simultaneously transmitting ACK/NACK feedback information and periodic CQI/PMI/RI feedback bits in a specific application scenario according to Embodiment 1 of the present invention
  • 10A to 10E are schematic flowcharts of a method for simultaneously transmitting ACK/NACK feedback information and periodic CQI/PMI/RI feedback bits in another specific application scenario according to Embodiment 2 of the present invention
  • 11A to 11D are flowcharts showing a method for simultaneously transmitting ACK/NACK feedback information and periodic CQI/PMI/RI feedback bits in another specific application scenario according to Embodiment 3 of the present invention
  • FIG. 12 is a schematic structural diagram of a terminal device according to an embodiment of the present invention
  • FIG. 13 is a schematic structural diagram of a base station according to an embodiment of the present invention. detailed description
  • the UE when the base station aggregates multiple downlink carriers to send data to the user, the UE will feed back ACK/NACK feedback information corresponding to multiple downlink carriers and downlink subframes in one uplink subframe.
  • the UE periodically feeds back channel state information (CSI) corresponding to multiple downlink carriers in an uplink subframe, including CQI/PMI/RI.
  • CSI channel state information
  • an embodiment of the present invention provides an ACK/NACK feedback information.
  • the terminal device In the LTE-A system, if the terminal device is configured with N downlink carriers, N > 1, then the terminal device supports periodic CQI/PMI/RI feedback information and ACK/NACK feedback information in the PUCCH in the same uplink subframe.
  • the technical solution proposed by the embodiment of the present invention can be applied to the simultaneous transmission.
  • FIG. 6 is a schematic flowchart of a method for simultaneously transmitting ACK/NACK feedback information and periodic CQI/PMI/RI feedback bits according to an embodiment of the present invention, where the method specifically includes the following steps:
  • Step S601 The terminal device receives data.
  • Step S602 The terminal device generates K-bit ACK/NACK feedback bits for the data in the M downlink subframes of the N configured downlink carriers, where N > 1 , M > 1 , and data in the M downlink subframes
  • the ACK/NACK feedback information is transmitted in the same uplink subframe.
  • the corresponding processing includes the following three situations:
  • the corresponding generation modes include the following two types:
  • the terminal device generates an ACK/NACK feedback information for each data packet received in the N configured downlink carriers and M downlink subframes, and generates a NACK feedback information for determining the packet loss packet.
  • the terminal device performs M downlink sub-carriers for each of the N configured downlink carriers.
  • the ACK/NACK feedback information in the frame is combined to obtain an L-bit ACK/NACK feedback bit, where L > N.
  • the terminal device generates an ACK/NACK feedback information for each data packet received in the N configured downlink carriers and M downlink subframes, and generates a NACK feedback information for determining the packet loss packet.
  • the terminal device combines the ACK/NACK feedback information on all configured downlink carriers and M downlink subframes to generate a 1-bit ACK/NACK feedback bit.
  • the corresponding generation method includes the following three types:
  • the auxiliary information includes at least M states, where the M states are used to indicate that the terminal device receives the number of downlink subframes S with the PDCCH in the M downlink subframes, S>1, and the PDCCH is a transmission.
  • the auxiliary information is generated by the second mode.
  • the auxiliary information includes at least M states, where the M states are used to indicate that the terminal device receives the number of downlink subframes S with the PDCCH in the M downlink subframes, S>1, and the auxiliary information.
  • One of the M states indicates that the terminal device does not receive any downlink subframe with PDCCH transmission (ie, the terminal device only receives the downlink subframe without the corresponding PDCCH or does not receive any downlink subframe.
  • the PDCCH is a PDCCH for transmitting a downlink scheduling indication of the PDSCH and/or a PDCCH indicating a semi-persistent PDSCH activation/release.
  • the auxiliary information is generated by the third mode, and the auxiliary information includes at least M+2 states, where the M states are used to indicate that the terminal device receives the number of downlink subframes S with the PDCCH in the M downlink subframes, S>1, and One of the auxiliary information is different from the above M states
  • the independent state is used to indicate that the terminal device only receives the downlink subframe without the corresponding PDCCH transmission (that is, only receives one downlink subframe of the SPS PDSCH transmission without the corresponding PDCCH), which is different from the above M+1 states.
  • the state is used to indicate that the terminal device does not receive any downlink subframe, and the PDCCH is a PDCCH transmitting a downlink scheduling indication of the PDSCH and/or a PDCCH indicating a semi-persistent PDSCH activation/release.
  • the auxiliary information is generated by the method 4, the auxiliary information includes at least M+1 states, where the M states are used to indicate that the terminal device receives the number of downlink subframes S with the PDCCH in the M downlink subframes, S>1, and An independent state different from the above M states in the auxiliary information is used to indicate that the terminal device does not receive any downlink subframe with PDCCH transmission (ie, the terminal device only receives the downlink subframe without the corresponding PDCCH or the terminal)
  • the PDCCH is a PDCCH for transmitting a downlink scheduling indication of the PDSCH and/or a PDCCH indicating a semi-persistent PDSCH activation/release, in the case where the device does not receive any downlink subframes.
  • Case 2 The terminal device generates one ACK/NACK feedback information for each downlink subframe of the M downlink subframes, and generates one ACK/NACK feedback information for the data packets received on the N configured downlink carriers, and generates a packet for determining the packet loss packet.
  • NACK feedback information NACK feedback information
  • Case 3 The terminal device generates K-bit ACK/NACK feedback information according to the number of correctly received data packets in the N configured downlink carriers and M downlink subframes.
  • Case 4 Terminal Equipment Generating L-bit ACK/NACK feedback information for each downlink carrier, the L-bit information indicating the number of consecutively received subframes from the first scheduled subframe on the current downlink carrier (ie, the first scheduled one) From the sub-frame, the feedback information is consecutively the number of ACKs, where the ACK/NACK feedback information of the multi-codeword needs to be spatially combined); when the terminal device is configured with N downlink carriers, the terminal device is N configured downlink carriers.
  • Step S603 The terminal device generates a period CQI/PMI/RI feedback bit of S bits.
  • Step S604 The terminal device uses a PUCCH format 3 transmission scheme in the uplink subframe, and simultaneously transmits a periodic CQI/PMI/RI feedback bit of the S bit and an ACK/NACK feedback bit of the K bit.
  • the channel resources of the PUCCH format 3 applied by the terminal device may be specifically as follows:
  • the PUCCH format 3 channel resource used by the terminal equipment to transmit periodic CQI/PMI/RI feedback bits.
  • the PUCCH format 3 channel resource is specifically a channel resource pre-configured by the high layer signaling.
  • the PUCCH format 3 channel resource is specifically one of at least one channel resource configured by the high layer signaling indicated by the ACK/NACK resource indication bit in the PDCCH, and the PDCCH is used to transmit the PDSCH on the downlink secondary carrier.
  • a downlink scheduling indication, and/or a downlink scheduling indication for transmitting a PDSCH on the downlink primary carrier, and a DAI value in the PDCCH is greater than 1;
  • the terminal device receives at least two PDCCHs, at least two The ACK/NACK resource indication bits in the PDCCH indicate the same channel resource.
  • the schematic flowchart of the technical solution proposed by the embodiment of the present invention is as shown in FIG. 7, and includes the following steps:
  • Step S701 The terminal device receives data in M downlink subframes of the N1 downlink carriers.
  • N1 N > 1 , M > 1 , where N is the configured number of downlink carriers, and ACK/NACK feedback information of the data in the M downlink subframes and the periodic CQI/PMI/RI feedback bits are in the same uplink subframe. Simultaneous transmission.
  • Step S702 The terminal device determines whether the PDCCH including the ACK/NACK resource indication information is received, that is, whether the downlink secondary carrier in the N configured downlink carriers receives the PDSCH, and whether the DAI value is greater than the received on the downlink primary carrier.
  • the step is mainly used to determine whether the terminal receives the PDCCH that includes the resource indication information, and is configured to schedule the PDCCH with the DAI value greater than 1 on the downlink primary carrier and the resource indication field in the PDCCH for scheduling the data transmission on the downlink subcarrier ( That is, the reuse of the TPC field in the DCI format used by the PDCCH), only the PUCCH format 3 resource corresponding to the ACK/NACK transmission is obtained when the PDCCH is received.
  • step S703 When the terminal device determines that at least one of the PDCCHs is received, step S703 is performed; otherwise, step S704 is performed.
  • Step S703 the terminal device generates S-bit periodic CQI/PMI/RI feedback bits and K-bit ACK/NACK feedback information.
  • step S705 is further performed.
  • the terminal device feeds back S+K bit information, wherein the S+K bit information is fed back by the S bit period CQI/PMI/RI information a . , ai' si and ⁇ bit ACK/NACK feedback bit b . , b i '- b Ki cascading.
  • K-bit ACK/NACK feedback bit can be obtained by the following two methods:
  • K 4.
  • M represents the number of downlink subframes that need to perform ACK/NAK feedback in the same uplink subframe, 1 ⁇ M ⁇ 4.
  • the L-bit combined ACK/NACK feedback information b . , b i "" b Li is obtained by combining the ACK/NACK feedback information of the data packets received in the M downlink subframes on each configured downlink carrier by the terminal device.
  • the terminal device generates a NACK for a downlink subframe that does not receive a data packet or judges that there is a packet loss.
  • the ACK/NACK feedback information needs to be spatially combined.
  • the T-bit auxiliary information is the total number of downlink subframes of the dynamic PDCCH in which the terminal device receives the downlink scheduling indication for transmitting the PDSCH in the M downlink subframes
  • the dynamic PDCCH for transmitting the downlink scheduling indication of the PDSCH may be the corresponding PDSCH.
  • the PDCCH and the PDCCH indicating the SPS PDSCH release are as shown in Table 3.
  • the technical solution of the foregoing method 1 is actually a technical solution generated by combining the feedback bit generation mode 1 and the auxiliary information generating mode 1 in the case 1 in the foregoing step S602.
  • K bit 0 ⁇ feedback bit 13 ., 13 1 "" -1 is the data received by the terminal device on the downlink carriers of multiple configurations in each of the M downlink subframes
  • the terminal device when the configured downlink carrier is in the multi-codeword transmission mode, spatial combining is required, and the terminal device generates a NACK for the downlink subframe that does not receive the data packet or determines that the data packet is lost.
  • the terminal device sends S+K bit information on a PUCCH format 3 channel resource that transmits an ACK/NACK, where the channel resource is one of a plurality of semi-static channel resources configured by high-level signaling indicated by the ARI in the PDCCH.
  • the PDCCH is transmitted on the downlink primary carrier and/or the downlink secondary carrier, and is configured to schedule at least one downlink secondary carrier, and the ARIs in the multiple PDCCHs need to indicate the same ACK/NACK channel resource.
  • Step S704 The terminal device generates a S-bit periodic CQI/PMI/RI feedback bit and a corresponding bit according to the transmission scheme type used by the periodic CQI/PMI/RI feedback bit. ACK/NACK feedback information.
  • step S705 is further performed.
  • the difference between the types of transmission schemes used by the periodic CQI/PMI/RI feedback bits can be specifically divided into the following two cases:
  • Case 1 When the transmission scheme adopted by the periodic CQI/PMI/RI is PUCCH format 2/2a/2b, the terminal device simultaneously feeds back the S-bit period CQI/PMI/RI feedback bit 3 according to the Rel-8 mode. , &1, ⁇ -1 and 2-bit ACK/NACK feedback bits 13 . , 1 ⁇ , where S ⁇ ll.
  • the 2-bit ACK/NACK feedback bit is the number of packets correctly received by the terminal device in the N downlink carriers and/or M downlink subframes, that is, b shown in Table 2.
  • B 1 further, the CP in the conventional, the terminal apparatus using PUCCH format 2a / 2b transmission scheme S bit period of CQI / PMI / RI feedback bits, 2 bit ACK / NACK feedback bits modulated second pilot transmission on .
  • the 2-bit ACK/NACK feedback bit b . , B i cascade behind the bit period S CQI / PMI / RI feedback bits, the terminal apparatus transmission scheme using PUCCH format 2 S + 2 bits of information.
  • the terminal device transmits the above S+2 bit information in one PUCCH format 2/2a/2b channel resource that is semi-statically configured in the upper layer.
  • Case 2 When the transmission scheme adopted by the CQI/PMI/RI is PUCCH format 3, the terminal device feeds back S+K bit information, and the S+K bit information is determined by S bit period.
  • the K-bit ACK/NACK feedback bit can be obtained by the following methods: Method 2 is similar to the method 2 in the foregoing step S703, and the description is not repeated here. Method 3: The K-bit ACK/NACK feedback bit indicates the number of correctly received data packets (ie, the number of ACKs) of the terminal device on the M downlink subframes and the N downlink carriers.
  • Table 4 shows the feedback information mapping table in Method 3
  • M represents the number of downlink subframes that need to perform ACK/NAK feedback in the same uplink subframe, 1 ⁇ M ⁇ 4;
  • the terminal device does not receive any PDSCH with the corresponding PDCCH or a downlink subframe with the PDCCH indicating the SPS PDSCH release (including the terminal device only receives one SPS without the corresponding PDCCH).
  • the case of PDSCH In the state of the T-bit auxiliary information, there is a case where the terminal device does not receive any PDSCH with the corresponding PDCCH or a downlink subframe with the PDCCH indicating the SPS PDSCH release (including the terminal device only receives one SPS without the corresponding PDCCH). The case of PDSCH).
  • the terminal device generates a NACK for a downlink subframe that does not receive a data packet or judges that there is a packet loss.
  • the ACK/NACK feedback information needs to be spatially combined.
  • the T-bit auxiliary information is the total number of downlink subframes of the dynamic PDCCH in which the terminal device receives the downlink scheduling indication for transmitting the PDSCH in the M downlink subframes
  • the dynamic PDCCH for transmitting the downlink scheduling indication of the PDSCH may be the corresponding PDSCH.
  • the technical solution of the foregoing method 4 is actually a technical solution generated by combining the feedback bit generation mode 1 and the auxiliary information generation mode 2 in the first case in the step S602.
  • Method 5 K-bit ACK/NACK feedback bit 15 . , 1 ⁇ , ⁇ - 1 is merged by P bits
  • ACK/NACK feedback information b . , b i, b pi and T+1 bit auxiliary information an independent state in the auxiliary information indicates that the terminal device does not receive any downlink subframe, and another independent state indicates that the terminal device does not receive any downlink with the PDCCH. Subframe.
  • an independent state indicates that the terminal device does not receive any downlink subframe
  • another independent state indicates that the terminal device only receives a downlink subframe of the PDSCH without the SPS corresponding to the PDCCH.
  • the remaining states sequentially indicate the PDSCH with the corresponding PDCCH received by the terminal device and have an indication
  • the number of downlink subframes of the PDCCH released by the SPS PDSCH, for example, T+l 3, as shown in Table 6, the 0 "000" states indicate that the terminal device has not received any downlink subframes (ie, the DTX state of the terminal device).
  • the T+1 bit auxiliary information is a total number of downlink subframes of the dynamic PDCCH in which the terminal device receives the downlink scheduling indication for transmitting the PDSCH in the M downlink subframes, and the dynamic PDCCH for transmitting the downlink scheduling indication of the PDSCH may be the PDCCH and the corresponding PDSCH.
  • a PDCCH indicating the release of the SPS PDSCH, where T may be fixed to 2, or T "log 2 M,;
  • an independent state multiplexing in the auxiliary information indicates that the terminal device does not receive any downlink subframe or the terminal device does not receive any downlink subframe with PDCCH.
  • an independent state indicates that the terminal device does not receive any PDSCH with a corresponding PDCCH or a downlink subframe with a PDCCH indicating SPS PDSCH release (including that the terminal device only receives one corresponding one)
  • the remaining states sequentially indicate the PDSCH of the corresponding PDCCH received by the terminal device and the downlink of the PDCCH indicating the SPS PDSCH release.
  • Table 7 Schematic diagram of the auxiliary information mapping of method six
  • the total number of downlink subframes b 0 , b 2 of the PDCCH that receives the downlink scheduling indication for transmitting the PDSCH does not receive any downlink subframes 0, 0, 0 with PDCCH.
  • the T+1 bit auxiliary information is a total number of downlink subframes of the dynamic PDCCH in which the terminal device receives the downlink scheduling indication for transmitting the PDSCH in the M downlink subframes, and the dynamic PDCCH for transmitting the downlink scheduling indication of the PDSCH may be the PDCCH and the corresponding PDSCH.
  • the PDCCH indicating the release of the SPS PDSCH, where T can be fixed to 2, or T "log 2 M," according to the foregoing description, the technical solution of the foregoing method 6 is actually the feedback bit generation manner in case 1 in the foregoing step S602. The technical solution generated by the combination of the second and auxiliary information generation methods.
  • K-bit ACK/NACK feedback bit 13 . , 131 , ... 1 ⁇ 1 includes L-bit combined ACK/NACK feedback information generated by the terminal device for each downlink carrier, the L-bit information indicating that the first scheduled subframe on the current downlink carrier is continuously received correctly
  • the number of subframes, that is, the first scheduled subframe, the feedback information is continuously the number of ACKs.
  • the terminal device does not receive any downlink subframes.
  • the case where the terminal device receives 4 consecutive correct downlink subframes corresponds to the same-interest state "00".
  • Table 8 2-bit merge information mapping table in method seven
  • the terminal device transmits the above S+K bit signal on the PUCCH format 3 channel resource of the transmission cycle CQI/PMI/RI of the upper half semi-static configuration.
  • Step S705 The terminal device sends the generated ACK/NACK feedback information and the periodic CQI/PMI/RI feedback bits to the base station in the same uplink subframe.
  • step S602 the base station applies the same rule of step S604 of step S601 to perform simultaneous reception of ACK/NACK feedback information and periodic CQI/PMI/RI feedback bits, and the corresponding processing is not repeated here.
  • step S701 to step S705 on the base station side, the corresponding processing flow is as shown in FIG. 8, and includes the following steps:
  • Step S801 The base station sends data to the terminal device in the M downlink subframes of the N1 configured downlink carriers.
  • N1 N > 1 , M > 1 , where N is the number of downlink carriers configured for the terminal device, and ACK/NACK feedback information of the data in the M downlink subframes and the periodic CQI/PMI/RI feedback bits are in the same uplink. Simultaneous transmission in frames.
  • Step S802 The base station detects whether there is a signal transmission on the PUCCH format3 channel resource of the ACK/NACK feedback information.
  • the base station first detects whether or not there is a signal transmission on the ACK/NACK PUCCH format 3 channel resource of the dynamic notification (instructed by the ARI of the PDCCH for scheduling the downlink subcarrier).
  • step S803 is performed
  • step S804 is performed.
  • Step S803 The base station acquires S-bit periodic CQI/PMI/RI feedback bits and K-bit ACK/NACK feedback information from the information reported by the terminal equipment in the same uplink subframe according to the S+K bit length.
  • the base station decodes and demodulates according to the S+K bit length, and obtains S-bit period CQI/PMI/RI feedback information a . , a i "" a s-i and ⁇ bit ACK/NACK feedback bits
  • the processing of this step includes: corresponding to the method 1 in step S703, the processing of this step includes: When there is an ACK in the merged bit, b i, b Li in the K-bit ACK/NACK feedback bit, the base station judges the data reception condition based on the auxiliary bit, 3 ⁇ 4, ⁇ 3 ⁇ 4 . The base station can determine whether the value matches the actual number of downlink subframes with dynamic PDCCH scheduled by the HA-i. If the packets match, the terminal device does not have downlink subframe loss, and the base station according to the merged bit b of each configured downlink carrier.
  • the base station determines that there is a downlink subframe loss, but cannot determine which downlink subframe is lost, so the base station retransmits all the scheduled downlink subframes;
  • the base station may retransmit all the scheduled downlink subframes without further resolving the auxiliary bits; or the base station may also determine the data reception condition according to the auxiliary bits according to the above steps, based on the reception situation and the merging bit b . , b i, ⁇ b L- ⁇ to determine the appropriate retransmission scheme;
  • the processing of this step includes: the base station according to b . And b i '- ⁇ determines the retransmission condition of each downlink subframe. If the ACK/NACK feedback information corresponding to the downlink subframe is NACK, retransmits the data packet scheduled on all configured downlink carriers in the downlink subframe.
  • Step S804 The base station detects a signal on the PUCCH channel resource corresponding to the periodic CQI/PMI/RI feedback bit, and reports the signal from the terminal device in the same uplink subframe according to the transmission scheme type used by the periodic CQI/PMI/RI feedback bit.
  • the SQ period CQI/PMI/RI feedback bits and the ACK/NACK feedback information of the corresponding bits are obtained in the information.
  • the base station detects a signal on the PUCCH channel resource corresponding to the periodic CQI/PMI/RI, and the subsequent processing includes the following three cases:
  • Case 1 Under the normal CP, the base station decodes and demodulates according to the S bit length on the PUCCH format 2a/2b channel resource, and obtains the S bit period CQI/PMI/RI feedback bit a . , a l niea s — i , the base station needs to further detect 2-bit ACK/NACK on the second column of pilots Feedback bit b . , b i.
  • the base station determines that the terminal device correctly receives all data and does not need to retransmit; if different, the base station determines the terminal device There is a packet loss or error detection packet, and all scheduled packets are retransmitted.
  • Case 2 Under the extended CP, the base station decodes and demodulates according to the S+2 bit length on the PUCCH format 2 channel resource, and obtains the S-bit period CQI/PMI/RI feedback bit a . , ai 'js-i and 2-bit ACK/NACK feedback bits 13 . .
  • Case 3 When the transmission scheme adopted by the periodic CQI/PMI/RI is PUCCH format 3, the base station (on the PUCCH format 3 channel resource of the transmission period CQI/PMI/RI) is decoded and demodulated according to the S+K bit length.
  • the S-bit period CQI/PMI/RI feedback information a ⁇ a ⁇ as- 1 and the ⁇ - bit ACK/NACK feedback bits b o, b i,"' b K-1 are obtained.
  • the specific processing method in this step includes the following:
  • the second method is similar to the method two in the foregoing step S803, and the description is not repeated here.
  • Method three corresponding to method three in step S704, when K bit b . , b i, b K- 1 indicates that the number of correctly received data packets of the terminal device is the same as the number of data packets actually transmitted by the base station, the base station determines that the terminal device correctly receives all data, and does not need to retransmit; if different, in The base station determines that the terminal device has a data packet loss or error detection data packet, and retransmits all the scheduled data packets;
  • Method 4 Corresponding to method four in step S704, the base station determines the data reception condition according to the auxiliary bit -1.
  • the base station judges the data reception condition based on the auxiliary bits ⁇ 3 ⁇ 4, ⁇ ⁇ 3 ⁇ 4 ⁇ . Specifically, the base station can determine whether the value is dynamic with the actual scheduling by using ⁇ , ⁇ - ⁇
  • the total number of downlink subframes of the PDCCH is the same. If the terminal device does not have the downlink subframe loss, the base station performs retransmission according to the merged bit bo A ' bw of each configured downlink carrier. If not, the base station determines that there is a downlink subframe. The frame is lost, but it is impossible to know which downlink subframe is lost. Therefore, the base station retransmits all the scheduled downlink subframes. Specifically, there is an error case, when ⁇ , ' ⁇ is "00", and the base station is in the downlink primary carrier. There is SPS PDSCH transmission, and the base station schedules 4 downlink subframes with dynamic PDCCH, if
  • the combined feedback information b corresponding to the PCC If the ACK is ACK, the base station cannot determine whether the four downlink subframes on the downlink primary carrier are correctly received, or only the SPS PDSCH is correctly received and its downlink subframe is lost.
  • the base station may re-transmit all the scheduled downlink subframes without further resolving the auxiliary bits; or the base station may also determine the data reception condition according to the auxiliary bits according to the above steps, based on the reception situation and the merging bits. b .
  • the base station determines the appropriate retransmission scheme, but when the state indicated by 3 ⁇ 4, ⁇ - ⁇ is "00", the base station cannot distinguish the specific packet loss situation, for example, if the base station actually schedules 4 downlink subframes:
  • the base station cannot distinguish whether the terminal device loses all downlink subframe scheduling or all the scheduled downlink subframes received by the terminal device but has erroneous reception.
  • SPS PDSCH the base station cannot distinguish that the terminal device only receives the SPS. The PDSCH is still, or all the data packets are lost, or all the scheduled downlink subframes received by the terminal device but there is error reception; but the retransmission operation is not affected.
  • Method 5 Corresponding to method 5 in step S704, the base station determines the data reception status according to the auxiliary bit.
  • the state indicated by ⁇ , ⁇ is that the terminal device does not receive any downlink subframe state (such as the "000" state)
  • the base station may Determine that the terminal device loses packets and retransmits all data packets;
  • the state indicated is that when the terminal device does not receive any downlink subframe state of the dynamic PDCCH transmitting the downlink scheduling indication of the PDSCH (eg, "001" state), if the base station has SPS transmission on the downlink primary carrier, then according to ⁇ bit W b in b .
  • the base station judges that the SPS packet is correctly received, and does not retransmit the SPS packet, b .
  • the base station determines the SPS data packet reception error, retransmits the SPS data packet, and if the base station has scheduling in other downlink subframes of the downlink primary carrier and/or there is scheduling in the downlink subcarrier, it can determine the packet loss and retransmit all the packets.
  • the data packet scheduled in the non-SPS downlink subframe when the indicated state is the number of downlink subframes of the dynamic PDCCH that is received by the terminal device and includes the downlink scheduling indication for transmitting the PDSCH (eg, "010", “011”, “100 “, "101” state), if the number of downlink subframes with dynamic PDCCH actually scheduled by the base station is different, the base station determines that the terminal device loses packets and retransmits all downlink subframes; if the base station does not have SPS transmission on the downlink primary carrier Then, the packet loss situation is determined according to whether the auxiliary information matches the actually scheduled downlink subframe number.
  • the auxiliary information matches the actually scheduled downlink subframe number.
  • the UE does not receive any downlink subframe because the UE does not have the SPS service, and the UE does not receive any downlink subframe with the PDCCH. Equivalent, that is, the state "000” is equivalent to the state "001"). If it does not match, it is judged that the UE loses the packet and retransmits all the scheduled data packets. If it matches, then According to the K-bit H b ⁇ where retransmission is determined for each downlink carrier of the uplink and downlink sub-frame.
  • Method six Corresponding to method six in step S704, the base station determines the data reception status according to the auxiliary bit.
  • indicates the state that the terminal device has not received any downlink sub-frame shape
  • the UE does not receive state or any state of a downlink subframe having a PDCCH (e.g., "000" state)
  • the base station exists in the downlink primary carrier SPS transmission, in accordance with the K-bit W b in b.
  • the base station judges that the SPS packet is correctly received, and does not retransmit the SPS packet, b .
  • the base station base station In the case of NACK, if the base station base station has scheduling in other downlink subframes of the downlink primary carrier and/or scheduling in the downlink subcarrier, it can determine the packet loss, but cannot confirm whether the SPS packet is lost or received, and retransmit all the data packets.
  • the indicated state is the number of downlink subframes of the dynamic PDCCH that are received by the terminal device and includes the downlink scheduling indication for transmitting the PDSCH (eg, "001", "010", “011”, "100” state)
  • the base station determines that the terminal device loses the packet and retransmits all the downlink subframes.
  • the downlink information is based on the auxiliary information and the actual scheduling. Whether the number of subframes matches the packet loss situation. If it does not match, it judges that the UE loses packets and retransmits all the scheduled data packets. If it matches, the weight of each downlink carrier uplink and downlink subframe is determined according to K bits ⁇ 1 ⁇ . Pass the situation.
  • Method seven corresponding to method seven in step S704, the base station determines the received K-bit feedback information 15 . , ... 1 ⁇ 1
  • Each L bits are a group, indicating the number of consecutively received subframes from the first scheduled subframe on one carrier. That is, i.e. represents the number of consecutively received subframes from the first scheduled subframe corresponding to the first carrier, and the base station can determine, according to the information, that the current carrier is correctly transmitted from the first scheduled subframe.
  • the number of subframes, and so on, is known as the number of subframes correctly transmitted from the first scheduling subframe on each carrier, and it is determined that the subframes that are not correctly received on each carrier are retransmitted.
  • the base station when the base station does not schedule any downlink data transmission on the M downlink subframes and the N downlink carriers, the base station can directly detect step 2, and does not need to further parse the ACK in step 2. /NACK feedback bit; when the base station is in M When at least one downlink subframe is configured on at least one downlink subcarrier, the foregoing steps 1 and 2 may be interchanged, that is, the base station may first detect the periodic CQI/PMI/RI corresponding PUCCH channel resource according to step 2. Is there a signal transmission, if not, then follow step 1 to detect the S+K bit information.
  • Step S805 After completing the foregoing information acquisition, the base station determines a corresponding data retransmission scheme according to the data receiving situation of the terminal device, and performs data retransmission on the terminal device.
  • the CQI adopts the PUCCH format 3 transmission scheme, that is, the high-level signaling semi-statically configures one PUCCH format 3 channel resource for the transmission period CQI/PMI/RI, regardless of the ACK/NACK
  • the feedback adopts PUCCH format 3 or PUCCH format lb with channel selection.
  • the transmission method adopts the following schemes: First, the terminal device always feeds back S+K bit information, S+K The bit information is fed back by the S bit period CQI/PMI/RI information a . , ai "" and K-bit ACK/NACK feedback bit A - and the combination.
  • the K-bit ACK/NACK feedback bit may be obtained by any one of the methods 2 to 7 in the foregoing step S704, and the terminal device transmits the S+K bit in the PUCCH format 3 channel resource of the transmission period CQI/PMI/RI configured in the upper layer. information.
  • the base station detects the signal on the PUCCH format 3 channel resource additionally configured by the high layer signaling.
  • the S-bit period CQI/PMI/RI feedback information ⁇ ' ⁇ -1 and the K-bit ACK/NACK feedback bit 13 are obtained . 1 ; wherein the K-bit ACK/NACK feedback bit is parsed for any one of the methods 2 to 7 in the foregoing step S704, and the method 2 to 7 in the foregoing step S804;
  • the PUCCH format 3 channel resource configured in the above case can be shared by multiple terminal devices to improve resource utilization.
  • the base station only needs to ensure multiple terminals configured with the same additional PUCCH format 3 channel resource.
  • the device does not feed back the cycle CQI/PMI/RI in the same uplink subframe.
  • the method for generating the actually used K-bit ACK/NACK feedback information is determined for the PUCCH format 3 resource corresponding to the ACK/NACK or the PUCCH format 3 resource corresponding to the CQI;
  • the method of any one of the foregoing methods 1 to 7 is applicable when there is only a PUCCH format 3 resource corresponding to the CQI or only the PUCCH format 3 resource corresponding to the ACK/NACK; when there is a PUCCH format corresponding to the ACK/NACK 3 resources, and the PUCCH format 3 resource corresponding to the CQI, any one of the foregoing methods 1 to 7 is also applicable.
  • the PUCCH format 3 resource used by the terminal device is the format 3 resource corresponding to the ACK/NACK or the CQI.
  • the corresponding format 3 resource may be notified to the terminal device by using high layer signaling or PDCCH signaling, or may be pre-agreed for the base station and the terminal device.
  • PUCCH format 3 scheme includes an improved scheme based on PUCCH format 3 (for example, a scheme for reducing the length of the format 3 time domain spreading sequence to 4, 3, 2, 1 or the like).
  • the embodiment of the invention has the following advantages:
  • the PUCCH format 3 transmission scheme can be used in the LTE-A system to simultaneously transmit periodic CQI/PMI/RI feedback bits and ACK/NACK feedback information in the same uplink subframe, thereby avoiding Since the ACK/NACK feedback information is opposite to the periodic CQI/PMI/RI information in the same uplink subframe In the case of the feed, the periodic CQI/PMI/RI information transmission needs to be abandoned, and the feedback efficiency of the uplink control information is improved.
  • the technical solution proposed by the embodiment of the present invention is described in conjunction with a specific application scenario.
  • ACK/NACK feedback information of the downlink subframes the base station schedules 4 downlink subframes on the downlink carrier 1 and the carrier 2, as shown in FIG. 9A and FIG. 9B, and the current uplink subframe is a periodic CQI feedback subframe, that is, the There are both CQI and ACK/NACK transmissions in the subframe, and the PUCCH format 3 transmission scheme is used for the ACK/NACK.
  • the specific transmission process is as follows:
  • the downlink subcarrier receives the data packet, and the PUCCH format 3 channel resource for transmitting the ACK/NACK indicated by the ARI is obtained, and the method proposed in steps S701 to S705 is used to transmit the ACK/NACK PUCCH format 3 channel resource.
  • the PUCCH format 3 scheme transmits cascading information of S+4 bit CQI and ACK/NACK; the 4-bit ACK/NACK feedback bit is obtained by the following method:
  • each downlink carrier corresponds to one-bit combined feedback information; on downlink carrier 1, the UE determines that downlink subframe 2 is lost, A 1-bit NACK is generated as the feedback information of the downlink carrier 1; on the downlink carrier 2, the UE determines that the downlink subframe 1 has no scheduling, and generates a 1-bit combined NACK as the feedback information of the downlink carrier 2 according to the data received in the remaining downlink subframes.
  • 2-bit auxiliary information is generated, for example, "11" in the correspondence relationship shown in Table 3, indicating that the UE has received four downlink subframes with dynamic PDCCH;
  • the second method is used in the foregoing step S703: as shown in FIG. 9B:
  • the UE determines that the downlink carrier 2 has no scheduling, and generates a 1-bit ACK as the feedback information of the downlink subframe 1 based on the downlink carrier 1 data.
  • the UE determines the downlink carrier 1 packet loss, and generates 1
  • the bit NACK is used as the feedback information of the downlink subframe 1; in the downlink subframe 3, based on the data packets received on the two downlink carriers, a 1-bit NACK is generated as the feedback information of the downlink subframe 3; in the downlink subframe 4, Based on the data packets received on the two downlink carriers, a 1-bit NACK is generated as feedback information of the downlink subframe 4; 4-bit information [ACK, NACK, NACK, NACK] is obtained.
  • the PUCCH format 3 channel resource detection signal of one transmission ACK/NACK indicated by the ARI of the PDCCH of the downlink subcarrier is scheduled, and is decoded and demodulated according to the S+4 bit length to obtain an S bit period.
  • the base station determines, according to the received 4-bit feedback information, a retransmission scheme of each downlink subframe, such as receiving 4 bits. [ACK, NACK, NACK, NACK], retransmitting downlink subframes 2, 3, and 4 on 2 downlink carriers;
  • the format 3 transmission resource is pre-configured for the high layer signaling.
  • ACK/NACK feedback information of the downlink subframes the base station only schedules 4 downlink subframes on the downlink carrier 1, as shown in FIG. 10A to FIG. 10D, and the current uplink subframe is a periodic CQI feedback subframe, that is, in the subframe.
  • the CQI uses the PUCCH format 3 transmission scheme (that is, the high-layer pre-configured to the UE 1 PUCCH format 3 channel resource for transmitting CQI).
  • the specific transmission process is as follows:
  • the method of Case 1 is used to transmit the CQI PUCCH format 3 channel.
  • the PUCCH format 3 scheme is used to transmit cascading information of S+4 bit CQI and ACK/NACK; the 4-bit ACK/NACK feedback bit is obtained by the following method:
  • the UE determines that the downlink carrier 2 has no scheduling, and based on the data of the downlink carrier 1, generates 1-bit feedback information for each downlink subframe, and obtains 4-bit feedback bits [ACK, ACK, NACK, NACK].
  • step S704 the method in the foregoing step S704 is used, as shown in FIG. 10B:
  • the UE generates 1-bit feedback information for each downlink subframe received on each downlink carrier. Since there is a NACK, according to Table 4, the UE feeds back 4-bit "0 0 0 0" as an ACK/NACK feedback bit.
  • step S704 is five times, as shown in FIG. 10D:
  • the UE determines that the downlink carrier 2 has no scheduling according to the frequency domain DAI, and combines the feedback information of all the data packets received on the two downlink carriers ( Full bundling), generating a 1-bit NACK as the combined feedback information; the UE generates 3-bit auxiliary information according to the received number of downlink subframes with dynamic PDCCH, for example, "1 0 1" in the correspondence relationship shown in Table 6, It indicates that the UE has received 4 downlink subframes with dynamic PDCCH.
  • the UE determines that the downlink carrier 2 has no scheduling according to the frequency domain DAI, and combines the feedback information of all the data packets received on the two downlink carriers ( Full bundling ), generating a 1-bit NACK as the combined feedback information; the UE generates 3-bit auxiliary information according to the received number of downlink subframes with dynamic PDCCH, for example, "1 0 0" in the correspondence relationship shown in Table 7, It indicates that the UE has received 4 downlink subframes with dynamic PDCCH.
  • the 2-bit combined ACK/NACK feedback information generated by each downlink carrier of the UE indicates that the first scheduled subframe on the downlink carrier is continuously received correctly.
  • the number of consecutively received subframes in a scheduling subframe is 2, and it is determined that no data is received on downlink carrier 1.
  • the base station Since the base station only schedules data on the downlink primary carrier, the base station can directly decode and demodulate the PUCCH format 3 channel resource detection signal of the CQI according to the above step S704 to obtain the S-bit period CQI/ PMI/RI and 4-bit feedback information.
  • the second method is used in the foregoing step S804:
  • the base station determines a retransmission scheme of each downlink subframe according to the received 4-bit feedback information, such as obtaining 4-bit information as [ACK, ACK, NACK, NACK], and retransmitting downlink subframes 3 and 4.
  • step S804 The method in the foregoing step S804 is used for four hours:
  • the base station judges that " bg 2 M L2 bit auxiliary information, that is, the front of the 4-bit feedback information is required.
  • the two bits are the combined ACK/NACK feedback information of the downlink carrier 1 and the carrier 2, and the last two bits are the auxiliary information; since the combined 2-bit feedback information is [NACK, NACK], the base station may not further judge the UE according to the auxiliary information "00"
  • the downlink subframe is lost, and all downlink subframes are retransmitted.
  • the base station judges that " bg 2 is required.
  • the bit auxiliary information that is, the first bit in the 4-bit feedback information is the combined ACK/NACK feedback information of all the data packets on the downlink carrier 1 and the carrier 2, and the last 3 bits are the auxiliary information; since the combined 1-bit feedback information is NACK
  • the base station may not further determine the downlink subframe loss of the UE according to the auxiliary information, and retransmit all the downlink subframes.
  • the base station may further determine, according to the auxiliary information “1 0 1”, that the UE does not drop packets, and retransmits by using an appropriate retransmission scheme. All downlink subframes.
  • the base station judges that " bg 2 is required.
  • the bit auxiliary information that is, the first bit in the 4-bit feedback information is the combined ACK/NACK feedback information of all the data packets on the downlink carrier 1 and the carrier 2, and the last 3 bits are the auxiliary information; since the combined 1-bit feedback information is NACK
  • the base station may not further determine the downlink subframe loss of the UE according to the auxiliary information, and retransmit all the downlink subframes.
  • the base station may further determine, according to the auxiliary information “1 0 0”, that the UE does not drop packets, and retransmits by using an appropriate retransmission scheme. All downlink subframes.
  • Determining the first 2 bits "1 0" in the received 4-bit ACK/NACK information "1 0 0 0" indicates the number of consecutively received subframes from the first scheduled subframe on the downlink carrier 1, after The 2-bit "0 0" indicates the number of consecutively received subframes from the first scheduled subframe on the downlink carrier 2.
  • Table 8 it is determined that the downlink carrier 1 is continuously received correctly from the first scheduled subframe.
  • the number of subframes is 2, that is, the first two subframes are correctly received, and the last two subframes need to be transmitted.
  • the base station Since "0 0" is a many-to-one state, the base station needs Further determining its meaning, considering that the base station does not schedule any data on the downlink carrier 2, the base station can determine that "0 0" indicates that the UE has not received any data on the downlink carrier 2.
  • the format 3 transmission resource is pre-configured for the high layer signaling.
  • the feedback subframe that is, the CQI and ACK/NACK transmissions exist in the subframe, and the CQI adopts the PUCCH format 3 transmission scheme (that is, the high layer is pre-configured to the UE 1 PUCCH format 3 channel resource for transmitting CQI), and the specific transmission process is as follows:
  • the CQI adopts the PUCCH format 3 transmission scheme
  • the CQI adopts the method corresponding to the PUCCH format 3 transmission scheme, that is, the UE always uses the PUCCH format 3 scheme to transmit the S+4 bit CQI on the PUCCH format 3 channel resource for transmitting the CQI.
  • the 4-bit ACK/NACK feedback bit is obtained by the following method:
  • the UE receives data only in the first two downlink subframes, and generates 1-bit ACK as feedback information of downlink subframes 1 and 2 respectively based on the received data; generates downlink subframe 3 A 1-bit NACK is used as feedback information to obtain 3-bit feedback bits [ACK, ACK, NACK].
  • the UE generates 1-bit feedback information for each downlink subframe that receives data on each downlink carrier. Since there is no NACK and the number of ACKs is 4, according to Table 4, UE feedback
  • step S704 When the method of the foregoing step S704 is used, as shown in FIG. 11C:
  • step S704 is used for five times, as shown in Fig. 11D:
  • step S704 When the method of step S704 is used, the method is as shown in Fig. 11D:
  • Subframe Base station
  • the base station always transmits the PUCCH format 3 channel resource detection signal of the CQI, decodes and demodulates according to the S+4 bit length, and obtains the S bit period CQI/PMI/RI and 4-bit feedback information.
  • the second method is used in the foregoing step S804:
  • the base station determines a retransmission scheme of each downlink subframe according to the received 3-bit feedback information, such as obtaining 3-bit information as [ACK, ACK, NACK], and retransmitting the downlink subframe 3.
  • step S804 The method in step S804 described above is used for three times:
  • the base station determines that " b g 2 M L2 bit auxiliary information is required, that is, the first two bits of the 4-bit feedback information are the combined ACK/NACK feedback information of downlink carrier 1 and carrier 2, and the last two bits are auxiliary information;
  • the bit feedback information is [ACK, ACK], and the base station needs to further determine the downlink subframe loss of the UE according to the auxiliary information.
  • the auxiliary information "10" indicates that two downlink subframes with dynamic PDCCH are received, but the base station actually schedules three downlinks. The subframe, so the base station determines that the UE has lost packets and retransmits all downlink subframes.
  • the base station judges that " bg 2 is required.
  • the bit auxiliary information that is, the first 1 bit of the 4-bit feedback information is the combined ACK/NACK feedback information of all the data packets on the downlink carrier 1 and the carrier 2, and the last 3 bits are the auxiliary information; since the combined 1-bit feedback information is the ACK
  • the base station needs to further determine the downlink subframe loss of the UE according to the auxiliary information.
  • the auxiliary information "0 1 1"
  • the UE receives two downlink subframes with dynamic PDCCH, but the base station Actually, three subframes are scheduled, so that the UE is lost and all downlink subframes are retransmitted.
  • the method in step S804 is used to:
  • the base station judges that " bg 2 is required.
  • the bit auxiliary information that is, the first 1 bit of the 4-bit feedback information is the combined ACK/NACK feedback information of all the data packets on the downlink carrier 1 and the carrier 2, and the last 3 bits are the auxiliary information; since the combined 1-bit feedback information is the ACK
  • the base station needs to further determine the downlink subframe loss of the UE according to the auxiliary information.
  • the auxiliary information "0 1 0"
  • the UE receives two downlink subframes with dynamic PDCCH, but the base station actually schedules 3 subframes, so the UE is judged to be lost. Packet, retransmit all downlink subframes.
  • the format 3 transmission resource is pre-configured for the high layer signaling.
  • the embodiment of the invention has the following advantages:
  • the PUCCH format 3 transmission scheme can be used in the LTE-A system to simultaneously transmit periodic CQI/PMI/RI feedback bits and ACK/NACK feedback information in the same uplink subframe, thereby avoiding When the ACK/NACK feedback information and the periodic CQI/PMI/RI information are simultaneously reported in the same uplink subframe, the periodic CQI/PMI/RI information transmission needs to be abandoned, and the feedback efficiency of the uplink control information is improved.
  • the technical solution of the present invention further provides a terminal device, and a schematic structural diagram thereof is shown in FIG. 12, which specifically includes:
  • the receiving module 121 is configured to receive downlink data.
  • the first generating module 122 is configured to: M downlink sub-carriers of the N configured downlink carriers
  • the data in the frame generates K-bit ACK/NACK feedback bits, where N > 1 , M > 1 , and ACK/NACK feedback information of data in the M downlink subframes is transmitted in the same uplink subframe;
  • the second generation module 123 is configured to generate a SQ-bit periodic CQI/PMI/RI feedback bit.
  • the sending module 124 is configured to: in the uplink subframe, use a PUCCH format 3 transmission scheme, and simultaneously send the second generation module 123 to generate The S-bit periodic CQI/PMI/RI feedback bits and the K-bit ACK/NACK feedback bits generated by the first generation module 122.
  • the sending module 124 sends the SQ period CQI/PMI/RI feedback bit and the channel resource of the PUCCH format 3 applied by the K-bit ACK/NACK feedback bit, specifically:
  • the terminal device is configured to transmit a periodic CQI/PMI/RI feedback bit when the channel resource of the PUCCH format 3 applied by the sending module 124 is a PUCCH format 3 channel resource used by the terminal device to transmit a periodic CQI/PMI/RI feedback bit.
  • the PUCCH format 3 channel resource is specifically a channel resource pre-configured by the high layer signaling;
  • the terminal device is configured to transmit the PUCCH format 3 channel resource of the ACK/NACK feedback bit, specifically One of at least one channel resource configured by the high layer signaling indicated by the ACK/NACK resource indication bit in the PDCCH, the PDCCH is used to transmit a downlink scheduling indication of the PDSCH on the downlink secondary carrier, and/or used to transmit the downlink primary PDSCH on the carrier Downlink scheduling indication and the DAI value in the PDCCH is greater than 1;
  • the ACK/NACK resource indication bits in the at least two PDCCHs indicate the same channel resource.
  • the first generating module 122 is specifically configured to:
  • the first generating module 122 is specifically configured to:
  • the auxiliary information generated by the second generation module 123 is specifically configured to: include at least M states, where the M states indicate that the terminal device receives the downlink subframes with the PDCCH transmission in the M downlink subframes. a number S, S>1, the PDCCH is a PDCCH for transmitting a downlink scheduling indication of the PDSCH and/or a PDCCH indicating a semi-persistent PDSCH activation/release; or
  • the PDCCH is a PDCCH for transmitting a downlink scheduling indication of the PDSCH and/or a PDCCH indicating a semi-continuous PDSCH activation/release; or Included in the M+2 state, where the M states indicate that the terminal device receives the number S of downlink subframes with PDCCH transmission in the M downlink subframes, S>1, and the M information in the auxiliary information is different from the above.
  • the status of an independent state is used to indicate that the terminal device only receives the downlink subframe without the corresponding PDCCH transmission, and is different from the above M+1 states.
  • An independent state is used to indicate that the terminal device does not receive any downlink subframe.
  • the PDCCH is a PDCCH for transmitting a downlink scheduling indication of the PDSCH and/or a PDCCH indicating a semi-persistent PDSCH activation/release; or
  • the M states indicate that the terminal device receives the number of downlink subframes S with the PDCCH transmission in the M downlink subframes, S>1, and the auxiliary information is different from the above M
  • the state is an independent state for indicating that the terminal device does not receive any downlink subframe with PDCCH transmission
  • the PDCCH is a PDCCH for transmitting a downlink scheduling indication of the PDSCH and/or a PDCCH indicating a semi-persistent PDSCH activation/release.
  • the first generating module 122 is specifically configured to: generate, for each downlink subframe in the M downlink subframes, a data packet received on the N configured downlink carriers.
  • ACK/NACK feedback information generating a NACK feedback information for determining the packet loss packet;
  • the first generation module 122 is specifically configured to generate a ⁇ bit ACK according to the number of correctly received data packets in the downlink carrier and the downlink subframes of the configured terminal device. /NACK feedback information.
  • an embodiment of the present invention further provides a base station, and a schematic structural diagram thereof is shown in FIG.
  • the sending module 131 is configured to send downlink data to the terminal device.
  • the receiving module 132 is configured to receive, on a channel resource of the PUCCH format 3, a periodic CQI/PMI/RI feedback bit and a K-bit ACK/NACK feedback information of the S bit simultaneously transmitted by the terminal device, where N > 1 , M > 1.
  • the ACK/NACK feedback information of the data in the M downlink subframes is transmitted in the same uplink subframe.
  • the channel resource of the PUCCH format 3 applied by the receiving module 132 is specifically:
  • the base station is configured to transmit a PUCCH format 3 channel resource of a periodic CQI/PMI/RI feedback bit to the terminal device;
  • the base station is configured to transmit a PUCCH format 3 channel resource of the ACK/NACK feedback bit to the terminal device.
  • the base station configures the terminal device for the transmission period CQI/PMI/RI feedback.
  • the PUCCH format 3 channel resource of the bit is specifically a channel resource configured by the base station in advance for the terminal device by using the high layer signaling;
  • the base station configures the PUCCH format 3 channel resource used by the terminal device to transmit the ACK/NACK feedback bit, specifically One of at least one channel resource configured by the higher layer signaling indicated by the ACK/NACK resource indication bit in the PDCCH sent by the base station to the terminal device, and the PDCCH is used to transmit the downlink scheduling indication of the PDSCH on the downlink secondary carrier, and/or Or a downlink scheduling indication for transmitting a PDSCH on the downlink primary carrier, and a DAI value in the PDCCH is greater than 1;
  • the ACK/NACK resource indication bits indicate the same channel resource.
  • the K-bit ACK/NACK feedback bit received by the receiving module 132 includes:
  • the L-bit ACK/NACK feedback bit received by the receiving module 132 includes:
  • the terminal device generates an ACK/NACK feedback information for each data packet received in the N configured downlink carriers and M downlink subframes, and generates a NACK feedback information for determining the packet loss packet.
  • the terminal device combines the ACK/NACK feedback information of the M downlink subframes of each of the N configured downlink carriers to obtain an L-bit ACK/NACK feedback bit, where L>N, or the terminal device
  • the ACK/NACK feedback information on all configured downlink carriers and M downlink subframes is combined to generate a 1-bit ACK/NACK feedback bit.
  • the auxiliary information of the T bits received by the receiving module 132 is specifically used to:
  • the M states indicate that the terminal device receives the number of downlink subframes S with SPDCCH transmission in the M downlink subframes, S>1, where the PDCCH is the PDCCH and/or the downlink scheduling indication for transmitting the PDSCH. Or a PDCCH indicating a semi-persistent PDSCH activation/release; or,
  • the M states indicate that the terminal device receives the number S of downlink subframes with PDCCH transmission in the M downlink subframes, S>1, and one of the M states of the auxiliary information Indicate that the terminal device has not received any
  • the PDCCH is a PDCCH transmitting a downlink scheduling indication of the PDSCH and/or a PDCCH indicating a semi-persistent PDSCH activation/release; or, including at least M+2 states, where the M states indicate the terminal device Obtaining, in the M downlink subframes, the number S of downlink subframes with PDCCH transmission, S>1, and an independent state different from the foregoing M states in the auxiliary information is used to indicate that the terminal device only receives no corresponding The case of the downlink subframe of the PDCCH transmission is different from the above M+1 states.
  • the PDCCH is a PDCCH and/or indication for transmitting a downlink scheduling indication of the PDSCH.
  • the M states indicate that the terminal device receives the number S of downlink subframes with PDCCH transmission in the M downlink subframes, S>1, and the auxiliary information is different from the foregoing M states.
  • An independent state is used to indicate that the terminal device does not receive any downlink subframe with PDCCH transmission, and the PDCCH is a PDCCH for transmitting a downlink scheduling indication of the PDSCH and/or a PDCCH indicating a semi-persistent PDSCH activation/release.
  • the K-bit ACK/NACK feedback bit received by the receiving module 132 includes:
  • the terminal device generates one ACK/NACK feedback information for the data packets received on the N configured downlink carriers for each of the M downlink subframes, and generates a NACK feedback information for determining the packet loss packet. ;
  • the K-bit ACK/NACK feedback bit received by the receiving module 132 specifically includes: The terminal device generates K-bit ACK/NACK feedback information according to the number of correctly received data packets in the N configured downlink carriers and M downlink subframes.
  • the base station further includes a processing module 133, configured to determine, according to the content of the K-bit ACK/NACK feedback information received by the receiving module 132, the data receiving situation of the terminal device, and determine a data retransmission policy according to the data receiving situation. And performing data retransmission to the terminal device according to the data retransmission policy.
  • a processing module 133 configured to determine, according to the content of the K-bit ACK/NACK feedback information received by the receiving module 132, the data receiving situation of the terminal device, and determine a data retransmission policy according to the data receiving situation. And performing data retransmission to the terminal device according to the data retransmission policy.
  • the embodiment of the invention has the following advantages:
  • the PUCCH format 3 transmission scheme can be used in the LTE-A system to simultaneously transmit periodic CQI/PMI/RI feedback bits and ACK/NACK feedback information in the same uplink subframe, thereby avoiding When the ACK/NACK feedback information and the periodic CQI/PMI/RI information are simultaneously fed back in the same uplink subframe, the periodic CQI/PMI/RI information transmission needs to be abandoned, and the feedback efficiency of the uplink control information is improved.
  • the technical solution of the embodiment of the present invention may be embodied in the form of a software product, which may be stored in a non-volatile storage medium (which may be a CD-ROM, a USB flash drive, a mobile hard disk, etc.).
  • a non-volatile storage medium which may be a CD-ROM, a USB flash drive, a mobile hard disk, etc.
  • a number of instructions are included to cause a computer device (which may be a personal computer, server, or network device, etc.) to perform the methods described in various implementations of the embodiments of the present invention.
  • modules in the apparatus in the implementation scenario may be distributed in the apparatus for implementing the scenario according to the implementation scenario description, or may be correspondingly changed in one or more devices different from the implementation scenario.
  • the modules of the above implementation scenarios can be combined It is also a module, and can be further split into multiple sub-modules.

Landscapes

  • Engineering & Computer Science (AREA)
  • Signal Processing (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Quality & Reliability (AREA)
  • Mobile Radio Communication Systems (AREA)

Description

ACK/NACK反馈信息和周期 COI/PMI/RI反馈比特同时传输 的方法和设备 本申请要求于 2010年 11 月 9 日提交中国专利局, 申请号为 201010539328.2 , 发明名称为 " ACK/NACK 反馈信息和周期 CQI/PMI/RI反馈比特同时传输的方法和设备" 的中国专利申请的优 先权, 其全部内容通过引用结合在本申请中。 技术领域
本发明涉及通信技术领域, 特别涉及一种 ACK/NACK反馈信息 和周期 CQI/PMI/RI反馈比特同时传输的方法和设备。 背景技术
对于长期演进多载波系统, 为支持比 LTE ( Long Term Evolution, 长期演进) 系统更宽的系统带宽, 比如 100MHz, —种可能是直接分 配 100M带宽的频谱, 如图 1所示; 一种可能是将分配给现有的系统一 些频谱聚合起来, 凑成大带宽供给长期演进多载波系统使用, 此时系 统中上下行载波可以不对称配置, 即用户可能会占用 N > 1个载波进 行下行传输, M > 1个载波进行上行传输, 如图 2所示。
LTE-A ( Long Term Evolution Advanced, 高级长期演进 )系统目 前确定最多可支持 5个载波进行聚合, 一个 LTE-A UE ( User
Equipment, 用户设备)需要在同一个上行子帧内反馈对应多个下行 载波及下行子帧的 ACK ( Acknowledgement, 肯定确认) /NACK ( Negative Acknowledgement , 否定确认 )反馈信息。 目前 LTE- Α系 统中已经确定, UE反馈的 ACK/NACK信息比特数基于配置的下行载 波和每个下行载波的传输模式确定, 即在 FDD ( Frequency Division Duplex, 频分双工) 系统中, UE在一个上行子帧需要反馈 |;ς比特 ACK/NACK, 其中 为每个下行载波的码字数(单码字传 ^时 C=l , 多码字传输时 C=2 ) , 不同下行载波的传输模式(即码字数)可以不 同, Ν为 UE配置下行载波数; 在 TDD ( Time Division Duplex, 时分双 工)系统中, UE在一个上行子帧需要反馈 ACK/NACK反馈 |]ς · Μ,比 特 ACK/NACK , 其中 为第 i个载波上 UE需要在同一上行孚帧进行 ACK/NACK反馈的下行子帧数量, 对于不同的上下行配置及上行子 5 帧, M的取值不同, 即表 1中每一栏 K的数量。 对应同一个上行子帧进 行 ACK/NACK反馈的多个下行子帧, 在下文中筒称为 "反馈窗口" 。
表 1 Downlink association set index : {k0 ' ki ' " 'kM-i } for TDD
Figure imgf000004_0001
LTE-A系统中, 已确定对于不超过 4比特 ACK/NACK信息可采用 PUCCH ( Physical Uplink Control Channel , 物理上行控制信道) 0 format lb with channel selection和 PUCCH format 3作为 ACK/NACK信 息的复用传输方案, 其中, PUCCH format lb with channel selection传 输方案的最大传输比特数为 4比特。 PUCCH format 3是一种基于 DFT-S-OFDM的新的 ACK/NACK传输方案, 其结构如图 3所示, 采用 RM ( 32,0 )分组码进行信道编码, 可传输最大 20比特反馈信息; 时 5 域采用了扩频系数为 5的扩频序列进行扩频, 因此一个 PRB ( Physical Resource block, 物理资源块) 中可复用 5个用户同时传输。 周期 CQI ( Channel Quality Indication, 信道质量指示 ) /PMI ( Precoding Matrix Indicator, 预编码矩阵指示) / RI ( Rank Indication, 秩指示)信息的 传输方案可以是 PUCCH format 2/2a/2b,也可能采用 PUCCH format 3, 根据预定义的周期在高层配置的信道资源上进行传输。
在 LTE-A系统中,可采用时域或频域合并降低 ACK/NACK 馈比 特数。
( 1 )所谓时域合并( time-domain bundling, 又称子帧间合并 ) , 即 UE对一个配置的下行载波上反馈窗口内的多个下行子帧中接收到 的数据包所对应的 ACK/NACK反馈信息进行合并,得到合并的 L比特 ACK/NACK反馈信息 WA—p 如图 4所示, 其中, N≤L≤2N , N为 UE聚合的下行载波数目。 如果配置的下行载波为多码字传输模式, UE还需对 2N-L个配置的下行载波进行空间合(spatial bundling ) , 即 对该下行载波上同一下行子帧中接收到多个码字的 ACK/NACK反馈 信息进行合并。反馈信息状态包括 ACK(正确接收的数据包 )、 NACK (错误接收的数据包)和 DTX ( Discontinuous Transmission, 非连续 发送, 表示丢失或未调度的数据包) 。 合并过程中, 如果 UE可通过 DAI ( Downlink Assignment Index , 下行分配索引 )信息判断当前的 配置的下行载波在反馈窗口内存中下行数据包丢失,或者在反馈窗口 内 UE在当前的配置的下行载波上没有接收到任何数据包, 则对该下 行载波生成 DTX作为合并的反馈信息; 如果 UE判断当前的配置下行 载波在反馈窗口内不存在下行数据包丢失,并且该下行载波上接收到 的至少一个数据包的反馈信息为 NACK, 则对该下行载波生成 NACK 作为合并的反馈信息; 如果 UE判断当前的配置下行载波在反馈窗口 内不存在下行数据包丢失,并且该下行载波上接收到的所有数据包的 反馈信息都为 ACK, 则对该下行载波生成 ACK作为合并的反馈信息。
为了解决时域合并过程中数据包丢失造成的 UE和基站理解不一 致问题, UE可将反馈窗口内接收到的最后一个下行子帧的编号或者 反馈窗口内接收到的下行子帧总数作为「bg2 M,比特辅助信息
¾)' " · · 。¾ΜΊ— 与合并的 ACK/ NACK反馈信息级联, 形成 L+「bg2 M, 比特反馈比特进行传输。 这样,基站可通过接收到的反馈比特中的后 「l。g 2 M]比特信息, 判断最后调度的数据包是否丢失或者判断反馈窗 口内是否存在数据包丢失, 从而确定适当的重传方案, 提高系统传输 效率。
所谓频域合并 ( frequency-domain bundling, 又称载波间合并) , 即 UE对反馈窗口内当前下行子帧中每个配置的下行载波上接收到的 数据包的 ACK/ NACK信息进行合并, 如果配置的下行载波为多码字 传输模式, 还需要进行空间合并, 如图 5所示, 为现有技术中
ACK/NACK反馈信息频域合并示意图。 为判断丢包, LTE TDD系统 中 DL grant ( Downlink grant, 下行调度许可) 中的 2比特 DAI可用来 表示反馈窗口内同一下行子帧中配置的下行载波上存在调度传输的 下行数据包的总数。
合并过程中,如果 UE可通过 DAI信息判断反馈窗口内的当前下行 子帧中, 在配置的下行载波上存中下行数据包丢失, 或 UE在当前下 行子帧中在所有配置的下行载波都没有接收到下行数据包,则对该下 行子帧生成 DTX作为合并的反馈信息; 如果 UE判断反馈窗口内的当 前下行子帧中, 在配置的下行载波上不存在下行数据包丢失, 并且该 下行子帧中多个配置的下行载波上接收到的至少一个数据包的反馈 信息为 NACK, 则对该下行子帧生成 NACK作为合并的反馈信息; 如 果 UE判断反馈窗口内的当前下行子帧中, 在配置的下行载波上不存 在下行数据包丢失,并且该下行子帧中配置的下行载波上接收到的所 有数据包的反馈信息都为 ACK, 则对该下行子帧生成 ACK作为合并 的反馈信息。
在 LTE Rel-8系统中, 基站可通过参数
simultaneousAckNackAndCQI 半静态配置 UE是否支持 ACK/NACK与 周期 CQI/PMI/RI在 PUCCH的同时传输。 当该参数为 False, 不支持同 时传输, 则当 ACK/NACK与周期 CQI/PMI/RI需要在同一上行子帧中 采用 PUCCH传输时, UE将丢掉周期 CQI/PMI/RI,只反馈 ACK/NACK。 当该参数为 True, 支持同时传输,此时的 ACK/NACK反馈比特表示只 存在一个数据包调度时该数据包的 1比特 ACK/NACK信息或当存在 多个数据包调度时多个调度的数据包的 ACK/NACK反馈信息中 ACK 的个数, 即表 2中所示的 。 常规 CP下, 采用 PUCCH format 2a/2b传输 周期 CQI/PMI/RI反馈比特, ACK/NACK反馈比特则映射在第二列导 频资源进行传输; 扩展 CP下, 采用 PUCCH format 2传输周期
CQI/PMI/RI反馈比特, ACK/NACK反馈比特级联在周期 CQI/PMI/RI 反馈比特后进行联合编码传输。
表 2 多 ACK/NACK^馈信息映射表
Figure imgf000007_0001
在实现本发明实施例的过程中 ,申请人发现现有技术至少存在以 下问题:
在 LTE-A系统中, 考虑到 ACK/NACK反馈信息的比特数可能较 多, 且 PUCCH format 3可传输最多 20比特信息, LTE Rel-8的
ACK/NACK与周期 CQI/PMI/RI同时传输的方式不再完全适用于 LTE-A系统。
目前, 在现有的技术中还没有针对多载波的 ACK/NACK反馈信 息与周期 CQI/PMI/RI信息同时传输的解决方案。 发明内容
本发明实施例提供一种 ACK/NACK反馈信息和周期 CQI/PMI/RI 反馈比特同时传输的方法和设备, 解决在 LTE-A 系统中对于 ACK/NACK反馈信息和周期 CQI/PMI/RI反馈比特进行共同传输的问 题。
为达到上述目的, 本发明实施例一方面提供了一种 ACK/NACK 反馈信息和周期 CQI/PMI/RI反馈比特同时传输的方法, 包括:
终端设备接收下行数据;
所述终端设备为 N个配置的下行载波中的 M个下行子帧中的数 据生成 K比特的 ACK/NACK反馈比特, 其中, N > 1 , M > 1 , 所述 M个下行子帧中的数据的 ACK/NACK反馈信息同一个上行子帧中传 输;
所述终端设备生成 S比特的周期 CQI/PMI/RI反馈比特; 所述终端设备在所述上行子帧中, 采用 PUCCH format 3传输方 案, 同时发送 S 比特的周期 CQI/PMI/RI 反馈比特和 K 比特的
ACK/NACK反馈比特。 另一方面, 本发明实施例还提供了一种终端设备, 包括: 接收模块, 用于接收下行数据;
第一生成模块, 用于为 N个配置的下行载波中的 M个下行子帧 中的数据生成 K比特的 ACK/NACK反馈比特, 其中, N > 1 , M > 1 , 中传输;
第二生成模块, 用于生成 S比特的周期 CQI/PMI/RI反馈比特; 发送模块, 用于在所述上行子帧中, 采用 PUCCH format 3传输 方案,同时发送所述第二生成模块所生成的 S比特的周期 CQI/PMI/RI 反馈比特和所述第一生成模块所生成的 K比特的 ACK/NACK反馈比 特。 另一方面, 本发明实施例还提供了一种 ACK/NACK反馈信息和 周期 CQI/PMI/RI反馈比特同时传输的方法, 包括: 基站向终端设备发送下行数据;
所述基站在 PUCCH format 3的信道资源上, 接收所述终端设备 同时发送的 S 比特的周期 CQI/PMI/RI 反馈比特和 K 比特的 ACK/NACK反馈信息, 其中, N > 1 , M > 1 , 所述 M个下行子帧中 的数据的 ACK/NACK反馈信息同一个上行子帧中传输。 另一方面, 本发明实施例还提供了一种基站, 包括:
发送模块, 用于向终端设备发送下行数据;
接收模块, 用于在 PUCCH format 3的信道资源上, 接收所述终 端设备同时发送的 S比特的周期 CQI/PMI/RI反馈比特和 K比特的 ACK/NACK反馈信息, 其中, N > 1 , M > 1 , 所述 M个下行子帧中 的数据的 ACK/NACK反馈信息同一个上行子帧中传输。
与现有技术相比, 本发明实施例具有以下优点:
通过应用本发明实施例的技术方案, 可以在 LTE-A 系统中, 采 用 PUCCH format 3 传输方案, 在同一上行子帧中同时传输周期 CQI/PMI/RI 反馈比特和 ACK/NACK 反馈信息, 避免了由于 ACK/NACK反馈信息与周期 CQI/PMI/RI信息在同一上行子帧同时反 馈时, 需要放弃周期 CQI/PMI/RI信息传输的情况, 提高了上行控制 信息的反馈效率。 附图说明
图 1为现有技术中单频谱系统示意图;
图 2为现有技术中频谱聚合系统示意图;
图 3为现有技术中常规 CP下 PUCCH format 3的传输结构示意 图;
图 4 为现有技术中 TDD系统 ACK/NACK反馈信息时域合并示 意图;
图 5为现有技术中 ACK/NACK反馈信息频域合并示意图; 图 6 为本发明实施例提出的一种 ACK/NACK反馈信息和周期 CQI/PMI/RI反馈比特同时传输的方法的流程示意图; 图 7为本发明实施例提出的一种具体应用场景下的 ACK/NACK 反馈信息和周期 CQI/PMI/RI反馈比特同时传输的方法的流程示意 图;
图 8为本发明实施例提出的一种具体应用场景下的 ACK/NACK 反馈信息和周期 CQI/PMI/RI反馈比特同时传输的方法的流程示意 图;
图 9A和 9B为本发明实施例提出的实施例 1中的一种具体应用 场景下的 ACK/NACK反馈信息和周期 CQI/PMI/RI反馈比特同时传 输的方法的流程示意图;
图 10A至 10E为本发明实施例提出的实施例 2中的另一种具体 应用场景下的 ACK/NACK反馈信息和周期 CQI/PMI/RI反馈比特同 时传输的方法的流程示意图;
图 11A至 11D为本发明实施例提出的实施例 3中的另一种具体 应用场景下的 ACK/NACK反馈信息和周期 CQI/PMI/RI反馈比特同 时传输的方法的流程示意图;
图 12为本发明实施例提出的一种终端设备的结构示意图; 图 13为本发明实施例提出的一种基站的结构示意图。 具体实施方式
如背景技术所述, LTE-A系统中, 基站聚合了多个下行载波向用 户发送数据时, UE将在一个上行子帧中反馈对应多个下行载波和下 行子帧的 ACK/NACK反馈信息。 为了便于下行调度, UE将的在一 个上行子帧中周期地反馈对应多个下行载波的信道状态信息 ( Channel State Information , CSI ) , 包括 CQI/PMI/RI。
目前, 在 LTE-A系统中, 多比特 ACK/NACK反馈信息与多比特 周期 CQI/PMI/RI反馈比特在 PUCCH的同时传输还没有明确方案。
基于以上原因, 本发明实施例给出了一种 ACK/NACK反馈信息 和周期 CQI/PMI/RI反馈比特同时传输的方法。
在 LTE-A系统中, 如果终端设备被配置了 N个下行载波, N > 1 , 那么, 当该终端设备支持同一上行子帧中周期 CQI/PMI/RI反馈信息 与 ACK/NACK反馈信息在 PUCCH的同时传输时, 可以应用本发明 实施例所提出的技术方案。
如图 6所示, 为本发明实施例提出的一种 ACK/NACK反馈信息 和周期 CQI/PMI/RI反馈比特同时传输的方法的流程示意图, 该方法 具体包括以下步骤:
步骤 S601、 终端设备接收数据。
步骤 S602、 终端设备为 N个配置的下行载波中的 M个下行子帧 中的数据生成 K比特的 ACK/NACK反馈比特, 其中, N > 1 , M > 1 , M个下行子帧中的数据的 ACK/NACK反馈信息同一个上行子帧中传 输。
对于本步骤, 在实际应用中, 相应的处理过程, 具体包括以下三 种情况:
情况一、终端设备为 N个配置的下行载波中的 M个下行子帧中的 数据生成 L比特的 ACK/NACK反馈比特,并生成 T比特的辅助信息, 其中, K=L+T。
在本情况中, 对于 L比特的 ACK/NACK反馈比特, 相应的生成 方式包括以下两种:
反馈比特生成方式一:
终端设备对在 N个配置的下行载波, M个下行子帧中接收到的每 个数据包生成一个 ACK/NACK反馈信息, 对判断丢包的数据包生成 一个 NACK反馈信息;
终端设备对 N个配置的下行载波中的每个下行载波在 M个下行子 帧中的 ACK/NACK反馈信息进行合并, 得到 L 比特的 ACK/NACK 反馈比特, 其中, L > N。
反馈比特生成方式二:
终端设备对在 N个配置的下行载波, M个下行子帧中接收到的每 个数据包生成一个 ACK/NACK反馈信息, 对判断丢包的数据包生成 一个 NACK反馈信息;
终端设备对所有配置的下行载波上和 M 个下行子帧中的 ACK/NACK反馈信息进行合并, 生成 1比特的 ACK/NACK反馈比 特。
另一方面, 在本情况中, 对于 T比特的辅助信息, 相应的生成方 式包括以下三种:
辅助信息生成方式一、 辅助信息包括至少 M个状态, 其中 M个 状态用于指示终端设备在 M个下行子帧中接收到具有 PDCCH的下 行子帧的个数 S, S>1 , PDCCH 为传输 PDSCH 的下行调度指示的 PDCCH和 /或指示半持续的 PDSCH激活 /释放的 PDCCH。
辅助信息生成方式二、 辅助信息包括至少 M个状态, 其中 M个 状态用于指示终端设备在 M个下行子帧中接收到具有 PDCCH的下 行子帧的个数 S, S>1 , 且辅助信息的 M个状态中的一个状态复用指 示终端设备没有接收到任何有 PDCCH传输的下行子帧的情况(即终 端设备仅接收到无对应 PDCCH的下行子帧的情况或没有接收到任何 下行子帧的情况 ) , PDCCH为传输 PDSCH的下行调度指示的 PDCCH 和 /或指示半持续的 PDSCH激活 /释放的 PDCCH。
辅助信息生成方式三、 辅助信息包括至少 M+2个状态, 其中 M 个状态用于指示终端设备在 M个下行子帧中接收到具有 PDCCH的 下行子帧的个数 S, S>1 , 且辅助信息中不同于以上 M个状态的一个 独立的状态用于指示终端设备仅接收到无对应 PDCCH传输的下行子 帧的情况(即仅接收到一个无对应 PDCCH的 SPS PDSCH传输的下 行子帧 ),不同于以上 M+1个状态一个独立的状态用于指示终端设备 没有接收到任何下行子帧的情况, PDCCH为传输 PDSCH的下行调 度指示的 PDCCH和 /或指示半持续的 PDSCH激活 /释放的 PDCCH。
辅助信息生成方式四、 辅助信息包括至少 M+1 个状态, 其中 M 个状态用于指示终端设备在 M个下行子帧中接收到具有 PDCCH的 下行子帧的个数 S, S>1 , 且辅助信息中不同于以上 M个状态的一个 独立的状态用于指示终端设备没有接收到任何有 PDCCH传输的下行 子帧的情况(即终端设备仅接收到无对应 PDCCH的下行子帧的情况 或终端设备没有接收到任何下行子帧的情况), PDCCH 为传输 PDSCH的下行调度指示的 PDCCH和 /或指示半持续的 PDSCH激活 / 释放的 PDCCH。
需要说明的是, 不排除辅助信息比特数 T为 0的情况, 即终端设 备仅按照上述方式一和方式二生成 K=L比特合并的 ACK/NACK反馈 信息, 不需要进一步生成辅助信息。
情况二、终端设备对 M个下行子帧中的每个下行子帧,在 N个配 置的下行载波上接收到的数据包生成 1个 ACK/NACK反馈信息, 对 判断丢包的数据包生成一个 NACK反馈信息;
终端设备对 M个下行子帧中的每个下行子帧在 N个配置的下行载 波上的 ACK/NACK反馈信息进行合并, 生成 M比特的 ACK/NACK 反馈信息, 其中, K=M。
情况三、终端设备根据自身在 N个配置的下行载波和 M个下行子 帧中正确接收的数据包的个数,生成 K比特的 ACK/NACK反馈信息。
此外, 还可能包括另一种反馈信息生成方式, 情况四、 终端设备 为每个下行载波生成 L比特 ACK/NACK反馈信息,所述 L比特信息 表示当前下行载波上第一个被调度的子帧起连续正确接收的子帧的 个数(即第一个被调度的子帧起, 反馈信息连续为 ACK的个数, 其 中多码字的 ACK/NACK反馈信息需要进行空间合并); 当终端设备 被配置了 N个下行载波时, 终端设备为 N个配置的下行载波中的 M 个下行子帧中的数据生成 K=L N比特的合并的 ACK/NACK反馈比 特。
步骤 S603、 终端设备生成 S比特的周期 CQI/PMI/RI反馈比特。 步骤 S604、 终端设备在上行子帧中, 采用 PUCCH format 3传输 方案, 同时发送 S 比特的周期 CQI/PMI/RI反馈比特和 K 比特的 ACK/NACK反馈比特。
在步骤 S604实现的过程中, 终端设备所应用的 PUCCH format 3 的信道资源, 具体可以为以下两种:
( 1 ) 终端设备用于传输周期 CQI/PMI/RI反馈比特的 PUCCH format 3信道资源。
在此种情况下, PUCCH format 3信道资源具体为高层信令预先配 置的一个信道资源。
( 2 )终端设备用于传输 ACK/NACK反馈比特的 PUCCH format 3 信道资源。
在此种情况下, PUCCH format 3信道资源具体为 PDCCH中的 ACK/NACK资源指示比特所指示的高层信令所配置的至少一个信道 资源中的一个, PDCCH用于传输下行辅载波上的 PDSCH的下行调 度指示,和 /或用于传输下行主载波上的 PDSCH的下行调度指示且该 PDCCH中的 DAI值大于 1 ;
对于此种情况, 若终端设备接收到至少两个 PDCCH, 至少两个 PDCCH中的 ACK/NACK资源指示比特指示同一个信道资源。
需要指出的是,上述的各种生成方式可以根据实际需要进行组合, 施例的保护范围。 下面进一步对上述过程进行详细说明。
当 ACK/NACK反馈信息采用 PUCCH format 3传输方案, 且相应 的信道资源为动态指示 (通过 ARI指示) 时, 本发明实施例所提出 的技术方案的流程示意图如图 7所示, 包括以下步骤:
步骤 S701、终端设备在 N1个下行载波中的 M个下行子帧接收数 据。
其中, N1 > N > 1 , M > 1 , N为配置的下行载波数, M个下行子 帧中的数据的 ACK/NACK反馈信息和周期 CQI/PMI/RI反馈比特在 同一个上行子帧中同时传输。
步骤 S702、 终端设备判断是否接收到包含 ACK/NACK资源指示 信息的 PDCCH; 即判断 N个配置的下行载波中各下行辅载波是否接 收到 PDSCH, 以及在下行主载波上是否接收到由 DAI值大于 1 的 PDCCH调度的 PDSCH。
即此步骤主要用来判断终端是否接收到包含资源指示信息的 PDCCH,用于调度下行主载波上数据传输的 DAI值大于 1的 PDCCH 以及调度下行副载波上数据传输的 PDCCH 中包含资源指示域(即 PDCCH所使用的 DCI format中的 TPC域的重用 ) , 只有接收到所述 PDCCH,采用获得 ACK/NACK传输所对应的 PUCCH format 3资源。
当终端设备判断接收到至少一个所述 PDCCH时,执行步骤 S703; 否则, 执行步骤 S704。
步骤 S703、 终端设备生成 S比特的周期 CQI/PMI/RI反馈比特和 K比特的 ACK/NACK反馈信息。
完成本步骤的处理后, 进一步执行步骤 S705。
在本步骤中, 终端设备反馈 S+K比特信息, 其中, 该 S+K比特信 息由 S比特周期 CQI/PMI/RI反馈信息 a。, ai' s-i和 κ比特 ACK/NACK 反馈比特 b。,bi '-bK-i级联构成。
进一步的, 上述的 K比特 ACK/NACK反馈比特可由以下两种方 法获得:
在实际应用中, 上述的 K的一个优选取值为 K=4。
方法一、 Κ比特 ACK/NACK反馈比特13。, … - 1由 L比特合并的
ACK/NACK反馈信息 b。,bi, bL- 1及 T比特辅助信息 构成。
其中, K= L+T, M表示需要在同一上行子帧进行 ACK/NAK反馈 的下行子帧数, 1≤M≤4。
在上述的过程中, L比特合并的 ACK/NACK反馈信息 b。,bi ""bL-i为 终端设备对每个配置的下行载波上 M个下行子帧中接收到的数据包 的 ACK/NACK反馈信息进行合并得到的。
在实际应用中 L的取值可以为 2或者 3 , 较优的, 可以取 L=2。 终端设备对没有接收到数据包或判断存在数据包丢失的下行子帧 生成 NACK。
需要指出的是, 当终端设备配置的下行载波为多码字传输模式时, 需要对 ACK/NACK反馈信息进行空间合并。
另一方面, T比特辅助信息为终端设备在 M个下行子帧中接收到 传输 PDSCH的下行调度指示的动态 PDCCH的下行子帧总数, 传输 PDSCH 的下行调度指示的动态 PDCCH 可为具有对应 PDSCH 的 PDCCH和指示 SPS PDSCH释放的 PDCCH, 例如表 3所示。
其中, T可以固定为 2, 或 T=「bg2 M 表 3 方法一中的辅助信息映射示意表
Figure imgf000017_0001
根据前述说明, 上述的方法一的技术方案实际为前述的步骤 S602 中的情况一中反馈比特生成方式一和辅助信息生成方式一所组合后 产生的技术方案。 方法二、 K比特 0^^ ( 反馈比特13。,131 "" -1为终端设备对 M 个下行子帧中的每个下行子帧中,在多个配置的下行载波上接收到的 数据包的 ACK/NACK反馈信息进行合并得到的, K=M。
与方法一种的说明相类似, 当配置的下行载波为多码字传输模式 时, 需对进行空间合并, 并且终端设备对没有接收到数据包或判断存 在数据包丢失的下行子帧生成 NACK。
在实际应用中, 终端设备在传输 ACK/NACK的 PUCCH format 3 信道资源上发送 S+K比特信息, 该信道资源为 PDCCH中的 ARI指 示的高层信令配置的多个半静态信道资源中的 1个,其中,该 PDCCH 在下行主载波和 /或下行辅载波上传输, 用于调度至少 1 个下行辅载 波, 多个 PDCCH中的 ARI需指示同一个 ACK/NACK信道资源。
根据前述说明, 上述的方法二的技术方案实际为前述的步骤 S602 中的情况二的技术方案。 步骤 S704、 终端设备根据周期 CQI/PMI/RI反馈比特所采用的传 输方案类型, 生成 S比特的周期 CQI/PMI/RI反馈比特和相应比特的 ACK/NACK反馈信息。
完成本步骤的处理后, 进一步执行步骤 S705。
在本步骤中,根据周期 CQI/PMI/RI反馈比特所采用的传输方案类 型的差别, 具体可以分为以下两种情况:
情况一、 当周期 CQI/PMI/RI采用的传输方案为 PUCCH format 2/2a/2b时,终端设备按照 Rel-8方式,同时反馈 S比特周期 CQI/PMI/RI 反馈比特3。,&1, ^-1和 2比特 ACK/NACK反馈比特13。,1^ , 其中 S≤ll。
在此种情况下, 2比特 ACK/NACK反馈比特为终端设备在 N个 下行载波和 /或 M个下行子帧中正确接收的数据包个数, 即表 2中所 示的 b。,b1 ; 进一步的, 在常规 CP下, 终端设备采用 PUCCH format 2a/2b方 案传输 S比特周期 CQI/PMI/RI反馈比特, 2比特 ACK/NACK反馈比 特 调制在第二个导频上进行传输。 另一方面, 扩展 CP下, 2比特 ACK/NACK反馈比特 b。,bi级联在 S比特周期 CQI/PMI/RI反馈比特后面, 终端设备采用 PUCCH format 2方案传输 S+2比特信息。
需要指出的是,终端设备在高层半静态配置的 1个 PUCCH format 2/2a/2b信道资源发送上述的 S+2比特信息。
情况二、 当周期 CQI/PMI/RI采用的传输方案为 PUCCH format 3 时, 终端设备反馈 S+K 比特信息, S+K 比特信息由 S 比特周期
CQI/PMI/RI 反馈信息^, …^-和 K 比特 ACK/NACK反馈比特 b。,bi ""bK-丄级联构成。
其中, K比特 ACK/NACK反馈比特可由以下几种方法获得: 方法二、 与前述的步骤 S703中的方法二相类似, 在此不再重复说 明。 方法三、 K比特 ACK/NACK反馈比特表示终端设备在 M个下行 子帧和 N个下行载波上正确接收到的数据包的个数(即 ACK个数)。
例如 K=4时, 如表 4所示, 不存在 error case的最大数据包个数 为 15, 超过 15个数据包则部分状态会重叠映射, 如 1个数据包正确 接收和 16个数据包正确接收映射到同一个状态。
表 4方法三中的反馈信息映射示意表
Figure imgf000019_0001
根据前述说明, 上述的方法三的技术方案实际为前述的步骤 S602 中的情况三的技术方案。 方法四、 K比特八0^ ( 反馈比特 ,, -1由 L比特合并的
ACK/NACK反馈信息 b。,bi, bL- 1及 Τ比特辅助信息 , ,·· 1构成, Κ= L+T。
其中, M表示需要在同一上行子帧进行 ACK/NAK反馈的下行子 帧数, 1<M<4;
T 比特辅助信息的状态中需存在用来表示终端设备没有接收到任 何有对应 PDCCH的 PDSCH或有指示 SPS PDSCH释放的 PDCCH的 下行子帧的情况(包括终端设备只接收到了一个没有对应 PDCCH的 SPS的 PDSCH的情况)。
但由于辅助信息状态有限, 存在多个终端设备接收状态对应同一 辅助信息的情况, 例如 T=2时, 表 5所示, 终端设备没有接收到任何 有对应 PDCCH的 PDSCH或有指示 SPS PDSCH释放的 PDCCH的下 行子帧(即包括终端设备只接收到了一个没有对应 PDCCH的 SPS的 PDSCH 的情况, 以及终端设备没有接收到任何下行子帧的情况)或 终端设备接收到了 4 个有对应 PDCCH 的 PDSCH 和有指示 SPS PDSCH释放的 PDCCH的下行子帧对应同一辅助信息 "00"。
表 5 方法四中的辅助信息映射示意表
Figure imgf000020_0001
L比特合并的 ACK/NACK反馈信息 b。,bl ""bw为终端设备对每个配 置的下行载波上 M个下行子帧中接收到的数据包的 ACK/NACK反馈 信息进行合并得到的。
在实际应用中 L的取值可以为 2或者 3 , 较优的, 可以取 L=2。 终端设备对没有接收到数据包或判断存在数据包丢失的下行子帧 生成 NACK。
需要指出的是, 当终端设备配置的下行载波为多码字传输模式时, 需要对 ACK/NACK反馈信息进行空间合并。
另一方面, T比特辅助信息为终端设备在 M个下行子帧中接收到 传输 PDSCH的下行调度指示的动态 PDCCH的下行子帧总数, 传输 PDSCH 的下行调度指示的动态 PDCCH 可为具有对应 PDSCH 的 PDCCH和指示 SPS PDSCH释放的 PDCCH
其中, T可以固定为 2, 或 T=「bg2M
根据前述说明, 上述的方法四的技术方案实际为前述的步骤 S602 中的情况一中反馈比特生成方式一和辅助信息生成方式二所组合后 产生的技术方案。 方法五、 K比特 ACK/NACK反馈比特15。,1^,··· - 1由 P比特合并的
ACK/NACK反馈信息 b。,bi, bp-i及 T+1比特辅助信息 构成,辅 助信息中的一个独立的状态表示终端设备未接收到任何下行子帧,另 一个独立的状态表示终端设备未接收到任何具有 PDCCH 的下行子 帧。
对于本方法中所生成的辅助信息, 一个独立的状态表示终端设备 未接收到任何下行子帧,另一个独立的状态表示终端设备只接收到了 一个没有对应 PDCCH的 SPS的 PDSCH的下行子帧的情况, 其余状 态依次表示终端设备接收到的有对应 PDCCH 的 PDSCH和有指示 SPS PDSCH释放的 PDCCH的下行子帧个数, 例如 T+l=3时, 表 6 所示, 0 个 "000" 状态表示终端设备未接收到任何下行子帧 (即终 端设备的 DTX状态), "001" 表示终端设备没有接收到任何有对应 PDCCH的 PDSCH或有指示 SPS PDSCH释放的 PDCCH的下行子帧; K= P+T+1 , 其中 Μ表示需要在同一上行子帧进行 ACK/NAK反馈的 下行子帧数, 1≤Μ≤4。
表 6 方法五中的辅助信息映射示意表
Figure imgf000022_0001
需要指出的是, P比特合并的 ACK/NACK反馈信息 b。,bi, bp-i为终 端设备对每个配置的下行载波上 M个下行子帧中接收到的数据包的 ACK/NACK反馈信息进行合并得到的, 此时 P≥l , 较优的, P=2; 或 对所有配置的下行载波和 M 个下行子帧上接收到的数据包的 ACK/NACK反馈信息进行合并(即 Full bundling )得到的,此时 P=l。
T+1 比特辅助信息为终端设备在 M 个下行子帧中接收到传输 PDSCH 的下行调度指示的动态 PDCCH 的下行子帧总数, 传输 PDSCH 的下行调度指示的动态 PDCCH 可为具有对应 PDSCH 的 PDCCH和指示 SPS PDSCH释放的 PDCCH, 其中, T可以固定为 2, 或 T=「log2 M,; 根据前述说明, 上述的方法五的技术方案实际为前述的步骤 S602 中的情况一中反馈比特生成方式二和辅助信息生成方式三所组合后 产生的技术方案。 方法六、 Κ比特 ACK/NACK反馈比特13。,1^,··· - 1由 Ρ比特合并的
ACK/NACK反馈信息 b。,bi, bp-i及 T+1比特辅助信息 构成,辅 助信息中的一个独立的状态复用表示终端设备未接收到任何下行子 帧或终端设备未接收到任何具有 PDCCH的下行子帧。
对于本方法中所生成的辅助信息, 一个独立的状态表示终端设备 未接收到任何有对应 PDCCH的 PDSCH或有指示 SPS PDSCH释放 的 PDCCH的下行子帧的情况(包括终端设备只接收到了一个没有对 应 PDCCH的 SPS的 PDSCH的下行子帧的情况, 以及终端设备未接 收到任何下行子帧的情况), 其余状态依次表示终端设备接收到的有 对应 PDCCH的 PDSCH和有指示 SPS PDSCH释放的 PDCCH的下行 子帧个数, 例如 T+l=3时, 表 7所示, 0个 "000" 状态表示终端设 备未接收到任何下行子帧(即终端设备的 DTX状态 ), 或终端设备没 有接收到任何有对应 PDCCH的 PDSCH或有指示 SPS PDSCH释放 的 PDCCH的下行子帧; K= P+T+1 , 其中 Μ表示需要在同一上行子 帧进行 ACK/NAK反馈的下行子帧数, 1≤Μ≤4。
表 7 方法六的辅助信息映射示意表
接收到存在传输 PDSCH的下行调度指示的 PDCCH的下行子帧总数 b0 ,b2 没有接收到任何具有 PDCCH的下行子帧 0, 0, 0
1 0, 0, 1
2 0, 1 , 0
3 0, 1 , 1
4 1 , 0, 0 需要指出的是, P比特合并的 ACK/NACK反馈信息 b。,bi, bL-i为终 端设备对每个配置的下行载波上 M个下行子帧中接收到的数据包的 ACK/NACK反馈信息进行合并得到的, 此时 P≥l , 较优的, P=2; 或 对所有配置的下行载波和 M 个下行子帧上接收到的数据包的 ACK/NACK反馈信息进行合并得到的, 此时 P=l。
T+1 比特辅助信息为终端设备在 M 个下行子帧中接收到传输 PDSCH 的下行调度指示的动态 PDCCH 的下行子帧总数, 传输 PDSCH 的下行调度指示的动态 PDCCH 可为具有对应 PDSCH 的 PDCCH和指示 SPS PDSCH释放的 PDCCH, 其中, T可以固定为 2, 或 T=「log2 M,; 根据前述说明, 上述的方法六的技术方案实际为前述的步骤 S602 中的情况一中反馈比特生成方式二和辅助信息生成方式四所组合后 产生的技术方案。
方法七、 K比特 ACK/NACK反馈比特13。,131,…1^1包括终端设备为 每个下行载波生成的 L比特合并的 ACK/NACK反馈信息,所述 L比 特信息表示当前下行载波上第一个被调度的子帧起连续正确接收的 子帧的个数, 即第一个被调度的子帧起, 反馈信息连续为 ACK的个 数。
需要说明的是, 其中多码字的 ACK/NACK反馈信息需要进行空 间合并; 当终端设备被配置了 N个下行载波时, 所述 K=L x N , 所 述 1≤L≤M, 其中 M表示需要在同一上行子帧进行 ACK/NAK反馈的 下行子帧数, 1<M<4; 较优的, L=2或 3。 例如 L=2时, 表 8所示对 应关系, 考虑到 2 比特信息状态有限, 存在多对一映射情况, 例如 T=2时, 终端设备没有正确接收到任何下行子帧(即包括终端设备接 收到的子帧错误的情况,以及终端设备没有接收到任何下行子帧的情 况)或终端设备接收到了 4个连续正确的下行子帧的情况对应同 - 息状态 "00"。 L=3时, 表 9所示对应关系, 不存在多对一映射。
表 8 方法七中的 2比特合并信息映射示意表
Figure imgf000025_0001
表 9 方法七的 3比特合并信息映射示意表
Figure imgf000025_0002
根据前述说明, 上述的方法七的技术方案实际为前述的步骤 S602 中的情况四的技术方案。
对于上述的各种方法, 终端设备在高层半静态配置的传输周期 CQI/PMI/RI的 PUCCH format 3信道资源上发送上述的 S+K比特信
步骤 S705、 终端设备将生成的 ACK/NACK反馈信息和周期 CQI/PMI/RI反馈比特在同一上行子帧中发送给基站。
需要指出的是, 在本实施例中所给出的七种方法实际为前述的步 骤 S602中所提出的各种技术方案的组合, 仅是本发明实施例给出的 优选技术方案, 在实际应用中, 还可以根据实际需要, 组合出其他技 术方案, 这样的技术方案同样属于本发明的保护范围。 相对应的, 在基站侧, 基站应用上述步骤 S601之步骤 S604相同 的规则进行 ACK/NACK反馈信息和周期 CQI/PMI/RI反馈比特的同 时接收, 相应的处理过程在此不再重复说明。
具体的, 与前述的步骤 S701至步骤 S705中的处理过程相对应, 在基站侧, 相应的处理流程如图 8所示, 包括以下步骤:
步骤 S801、基站在 N1个配置的下行载波中的 M个下行子帧向终 端设备发送数据。
其中, N1 > N > 1 , M > 1 , N 为终端设备配置的下行载波数, M 个下行子帧中的数据的 ACK/NACK反馈信息和周期 CQI/PMI/RI反 馈比特在同一个上行子帧中同时传输。
步骤 S802、 基站在 ACK/NACK反馈信息的 PUCCH format3信道 资源上, 检测是否有信号传输。
即基站首先在动态通知(调度下行副载波的 PDCCH的 ARI指示 的 )的 ACK/NACK PUCCH format 3信道资源上, 检测是否有信号传 输。
如果检测结果为有, 执行步骤 S803;
如果检测结果为没有, 执行步骤 S804。
步骤 S803、基站按照 S+K比特长度,从终端设备在同一上行子帧 中上报的信息中获取 S比特的周期 CQI/PMI/RI反馈比特和 K比特的 ACK/NACK反馈信息。
本步骤的处理过程即基站按照 S+K比特长度译码、 解调, 得到 S 比特周期 CQI/PMI/RI反馈信息 a。,ai "" as- i和 κ比特 ACK/NACK反馈 比特
其中, 对应于步骤 S703中的方法一, 本步骤的处理包括: 当 K比特 ACK/NACK反馈比特中的合并比特 , bi, bL-i存在 ACK 时, 基站根据辅助比特 , ¾, · · ¾ ι判断数据接收情况。 基站可通过 HA-i判断该值是否与实际调度的有动态 PDCCH 的下行子帧总数吻合, 如果吻合, 则终端设备不存在下行子帧丢失, 基站根据每个配置的下行载波的合并比特 b。,bi,〜bL-i进行重传;如果不 吻合,则基站判断存在下行子帧丢失,但无法确知哪个下行子帧丢失, 因此基站重传所有调度的下行子帧;
当 K 比特 ACK/NACK反馈比特中的合并比特13。 ,…1^全部为 NACK时,基站可以不进一步解析辅助比特, 重传所有调度的下行子 帧; 或基站也可按照如上步骤根据辅助比特判断数据接收情况,基于 接收情况和合并比特 b。,bi,〜bL- ^定适当的重传方案;
另一方面, 对应于步骤 S703中的方法二, 本步骤的处理包括: 基站根据 b。,bi '-^确定每个下行子帧的重传情况, 若下行子帧对 应的 ACK/NACK反馈信息为 NACK, 则重传该下行子帧中所有配置 的下行载波上调度的数据包。
步骤 S804、 基站在周期 CQI/PMI/RI反馈比特所对应的 PUCCH 信道资源上检测信号, 并根据周期 CQI/PMI/RI反馈比特所采用的传 输方案类型,从终端设备在同一上行子帧中上报的信息中获取 S比特 的周期 CQI/PMI/RI反馈比特和相应比特的 ACK/NACK反馈信息。
首先,基站在周期 CQI/PMI/RI对应的 PUCCH信道资源上检测信 号, 后续的处理包括以下三种情况:
情况一、 常规 CP下, 基站在 PUCCH format 2a/2b信道资源上按 照 S 比特长度译码、 解调, 得到 S 比特周期 CQI/PMI/RI反馈比特 a。,al „as— i , 基站还需进一步在第二列导频上检测 2比特 ACK/NACK 反馈比特 b。,bi。
b。,bi所指示的终端设备接收到正确数据包的个数与基站实际调 度的数据包个数相同时,基站判断终端设备正确接收所有数据, 不需 要重传; 如果不同, 在基站判断终端设备存在数据包丢失或错误检测 数据包, 重传所有调度的数据包。
情况二、扩展 CP下,基站在 PUCCH format 2信道资源上按照 S+2 比特长度译码、解调,得到 S比特周期 CQI/PMI/RI反馈比特 a。, ai 'js-i 和 2比特 ACK/NACK反馈比特13。 。
情况三、 当周期 CQI/PMI/RI采用的传输方案为 PUCCH format 3 时, 基站(在传输周期 CQI/PMI/RI的 PUCCH format 3信道资源上 ) 按照 S+K比特长度译码、 解调, 得到 S比特周期 CQI/PMI/RI反馈信 息 a^ a^ as— 1κ比特 ACK/NACK反馈比特 bo,bi," 'bK- 1。
其中, 与前述步骤 S704中的方法相对应, 本步骤具体的处理方法 包括以下几种:
方法二、 与前述的步骤 S803中的方法二相类似, 在此不再重复说 明。
方法三、 对应步骤 S704中的方法三, 当 K比特 b。,bi, bK- 1所指示 的终端设备正确接收数据包的个数与基站实际传输的数据包个数相 同时,基站判断终端设备正确接收所有数据,不需要重传;如果不同, 在基站判断终端设备存在数据包丢失或错误检测数据包,重传所有调 度的数据包;
方法四、 对应步骤 S704中的方法四, 基站根据辅助比特 -1 判读数据接收情况。
当 K比特 ACK/NACK反馈比特中的合并比特13。,131,…1^1存在 ACK 时, 基站根据辅助比特^ ¾, · · ¾ ι判断数据接收情况。 具体的, 基站可通过 ϋ,· ·^-ι判断该值是否与实际调度的有动态
PDCCH的下行子帧总数吻合, 如果吻合, 则终端设备不存在下行子 帧丢失, 基站根据每个配置的下行载波的合并比特 bo A ' bw进行重 传; 如果不吻合, 则基站判断存在下行子帧丢失, 但无法确知哪个下 行子帧丢失, 因此基站重传所有调度的下行子帧; 特别的, 存在一个 error case, 当 ^^,'^^为 "00" , 并且基站在下行主载波存在 SPS PDSCH传输, 基站调度了 4个具有动态 PDCCH的下行子帧, 如果
PCC所对应的合并的反馈信息 b。为 ACK, 则基站无法判断下行主载 波上是 4个下行子帧都正确接收, 还是只正确接收到了 SPS PDSCH 且其下行子帧丢失。
另一方面,当 比特八^^ 反馈比特中的合并比特13。,131,…1^1 全部为 NACK时, 基站可以不进一步解析辅助比特, 重传所有调度 的下行子帧;或基站也可按照如上步骤根据辅助比特判断数据接收情 况, 基于接收情况和合并比特 b。, , 确定适当的重传方案, 但当 ,¾,·· -ι所指示的状态为 "00" 时, 基站不能区分具体丢包情况, 例 如, 如果基站实际调度了 4个下行子帧: 当不存在 SPS PDSCH时, 基站无法区分终端设备丢失所有下行子帧调度,还是终端设备接收到 的所有调度的下行子帧但存在错误接收, 当存在 SPS PDSCH时, 基 站无法区分终端设备只收到了 SPS PDSCH还是, 还是所有数据包都 丢失, 还是终端设备接收到的所有调度的下行子帧但存在错误接收; 但不影响重传操作。 方法五、对应步骤 S704中的方法五,基站根据辅助比特 判 读数据接收情况。 当 ^,·· 所指示的状态为终端设备没有接收到任何下行子帧状 态时(如 "000"状态),如果基站实际存在至少一个下行子帧传输(包 括 SPS的 PDSCH传输), 则基站可判断终端设备丢包, 重传所有数 据包; 当 。,¾, · 所指示的状态为终端设备没有接收到任何传输 PDSCH的下行调度指示的动态 PDCCH的下行子帧状态时(如 "001" 状态 ),如果基站在下行主载波存在 SPS传输,则根据 Κ比特 W b 中 b。确定 SPS数据包的重传, 即 b。为 ACK时, 基站判断 SPS数据包 正确接收, 不重传 SPS数据包, b。为 NACK时, 基站判断 SPS数据 包接收错误,重传 SPS数据包,并且如果基站在下行主载波的其他下 行子帧存在调度和 /或在下行副载波存在调度, 可判断丢包, 重传所 有非 SPS下行子帧中调度的数据包; 当 所指示的状态为终端 设备接收到的包含传输 PDSCH的下行调度指示的动态 PDCCH的下 行子帧个数时 (如 "010"、 "011"、 "100"、 "101" 状态), 如果与基 站实际调度的具有动态 PDCCH的下行子帧个数不同, 则基站判断终 端设备丢包, 重传所有下行子帧; 如果基站在下行主载波不存在 SPS 传输,则根据辅助信息与实际调度的下行子帧数是否吻合判断丢包情 况(此时由于不存在 SPS业务, UE没有接收到任何下行子帧的情况 与 UE没有接收到任何具有 PDCCH的下行子帧的情况等价, 即状态 "000" 与状态 "001" 等效), 如果不吻合, 则判断 UE丢包, 重传 所有调度的数据包, 如果吻合, 则根据 K 比特 H b^确定每个下 行载波上下行子帧的重传情况。
方法六、对应步骤 S704中的方法六,基站根据辅助比特 判 读数据接收情况。
当^ ζ,·· 所指示的状态为终端设备没有接收到任何下行子帧状 态或 UE没有接收到任何具有 PDCCH的下行子帧状态时 (如 "000" 状态 ),如果基站在下行主载波存在 SPS传输,则根据 K比特 W b 中 b。确定 SPS数据包的重传, 即 b。为 ACK时, 基站判断 SPS数据包 正确接收, 不重传 SPS数据包, b。为 NACK时, 如果基站基站在下 行主载波的其他下行子帧存在调度和 /或在下行副载波存在调度, 可 判断丢包,但无法确认 SPS数据包是丢失还是接收错误,重传所有数 据包; 当 所指示的状态为终端设备接收到的包含传输 PDSCH 的下行调度指示的动态 PDCCH的下行子帧个数时(如 "001"、 "010"、 "011"、 "100" 状态), 如果与基站实际调度的具有动态 PDCCH的 下行子帧个数不同, 则基站判断终端设备丢包, 重传所有下行子帧; 如果基站在下行主载波不存在 SPS传输,则根据辅助信息与实际调度 的下行子帧数是否吻合判断丢包情况,如果不吻合,则判断 UE丢包, 重传所有调度的数据包, 如果吻合, 则根据 K 比特 ··1^确定每 个下行载波上下行子帧的重传情况。
方法七、 对应步骤 S704中的方法七, 基站确定接收到的 K比特 反馈信息15。, …1^1中每个 L个比特为一组,表示一个载波上第一个被 调度的子帧起连续正确接收的子帧的个数。即 .. — i表示第一个载 波对应的第一个被调度的子帧起连续正确接收的子帧的个数,基站可 以根据该信息判断当前载波上从第一个调度子帧起正确传输的子帧 个数, 以此类推, 获知每个载波上从第一个调度子帧起正确传输的子 帧个数, 并确定重传每个载波上没有正确接收的子帧。
需要特别之处的是, 以上步骤中, 当基站在 M个下行子帧和 N个 下行载波上没有调度任何下行数据传输时, 基站可直接检测步骤 2, 并且在步骤 2中不需进一步解析 ACK/NACK反馈比特; 当基站在 M 个下行子帧至少调度了一个下行副载波上的至少一个下行子帧时,以 上步骤 1 和 2 可以互换顺序, 即基站可以先按照步骤 2检测周期 CQI/PMI/RI对应的 PUCCH信道资源上是否有信号传输, 如果没有, 再按照步骤 1检测 S+K比特信息。
步骤 S805、 在完成上述的信息获取后, 基站根据终端设备的数据 接收情况, 确定相应的数据重传方案, 对终端设备进行数据重传。 在实际应用中, 除了上述的处理方案, 如果 CQI 采用 PUCCH format 3 传输方案, 即高层信令半静态配置 1 个用于传输周期 CQI/PMI/RI的 PUCCH format 3信道资源, 则不论 ACK/NACK反馈 采用 PUCCH format 3还是 PUCCH format lb with channel selection, 在反馈周期 CQI/PMI/RI的上行子帧中, 传输方法均采用如下方案: 首先, 终端设备总是反馈 S+K比特信息, S+K比特信息由 S比特 周期 CQI/PMI/RI反馈信息 a。,ai"" 和 K比特 ACK/NACK反馈比特 A—及联构成。
K比特 ACK/NACK反馈比特可由前述的步骤 S704中的方法二至 七中的任意一种方法获得, 终端设备在高层配置的传输周期 CQI/PMI/RI的 PUCCH format 3信道资源发送 S+K比特信息。
在此种场景下。基站在高层信令额外配置的 PUCCH format 3信道 资源上检测信号。
按照 S+K比特长度译码、 解调, 得到 S比特周期 CQI/PMI/RI反 馈信息 ^Α'···^-1和 K比特 ACK/NACK反馈比特131; 其中 K 比特 ACK/NACK反馈比特对于前述的步骤 S704中的方法二至七中 的任意一种方法的解析, 同前述的步骤 S804中的方法二至七;
特别的,在以上步骤中, 当基站在 M个下行子帧和 N个下行载波 上没有调度任何下行数据传输, 基站不需进一步解析 ACK/NACK反 馈比特。
另一方面,以上情况二中高层信令配置的 PUCCH format 3信道资 源可以被多个终端设备共享, 以提高资源利用率, 基站只需保证配置 了同一个额外 PUCCH format 3信道资源的多个终端设备不在同一上 行子帧中反馈周期 CQI/PMI/RI即可。
需要指出的是, 上述实施例中, 是针对采用 ACK/NACK对应的 PUCCH format 3资源或是采用 CQI对应的 PUCCH format 3资源来确 定实际使用的 K比特 ACK/NACK反馈信息的生成方法的; 实际上, 当仅存在 CQI对应的 PUCCH format 3资源或者仅存在 ACK/NACK 对应的 PUCCH format 3资源时, 上述方法一至方法七中的任一方法 都可适用; 当同时存在 ACK/NACK对应的 PUCCH format 3资源, 和 CQI对应的 PUCCH format 3资源时, 上述方法一至方法七中的任 一方法也都可适用, 此时终端设备具体使用的 PUCCH format 3资源 为 ACK/NACK对应的 format 3资源还是 CQI对应的 format 3资源, 可以通过高层信令或者 PDCCH信令通知终端设备, 或者可以为基站 和终端设备预先约定的。
需要进一步说明的是, 上述 PUCCH format 3 方案包括基于 PUCCH format 3改进的方案(如降低 format 3时域扩频序列长度为 4、 3、 2、 1等方案)。
与现有技术相比, 本发明实施例具有以下优点:
通过应用本发明实施例的技术方案, 可以在 LTE-A系统中, 采用 PUCCH format 3 传输方案, 在同一上行子帧中同时传输周期 CQI/PMI/RI 反馈比特和 ACK/NACK 反馈信息, 避免了由于 ACK/NACK反馈信息与周期 CQI/PMI/RI信息在同一上行子帧同时反 馈时, 需要放弃周期 CQI/PMI/RI信息传输的情况, 提高了上行控制 信息的反馈效率 下面, 结合具体的应用场景, 对本发明实施例所提出的技术方案 进行说明。
实施例 1
UE配置了 2个下行载波, 下行载波 1为下行主载波, 下行载波 1 采用多码字传输模式, 下行载波 2 采用单码字传输模式, M=4, 即 UE在当前上行子帧需要反馈 4个下行子帧的 ACK/NACK反馈信息; 基站在下行载波 1和载波 2都调度了 4个下行子帧, 如图 9A和 9B 所示, 且当前上行子帧为周期 CQI反馈子帧, 即该子帧中同时存在 CQI和 ACK/NACK传输, ACK/NACK采用 PUCCH format 3传输方 案, 具体传输流程如下:
在 UE端:
在下行副载波接收到数据包,可获得 ARI指示的传输 ACK/NACK 的 PUCCH format 3信道资源, 采用步骤 S701至步骤 S705所提出的 方法, 在传输 ACK/NACK 的 PUCCH format 3 信道资源上, 采用 PUCCH format 3方案发送 S+4比特 CQI与 ACK/NACK的级联信息; 4比特 ACK/NACK反馈比特采用如下方法获得:
采用前述步骤 S703中的方法一时, 如图 9A所示:
由于 M=4, 即需要「bg 2 M1=2比特辅助信息, 则 L=2, 即每个下 行载波对应 1比特合并的反馈信息; 在下行载波 1 , UE判断下行子 帧 2丢包, 生成 1比特 NACK作为下行载波 1的反馈信息; 在下行 载波 2, UE判断下行子帧 1无调度, 根据其余下行子帧中接收到的 数据, 生成 1比特合并的 NACK作为下行载波 2的反馈信息; UE根 据接收到的具有动态 PDCCH的下行子帧数, 生成 2比特辅助信息, 例如表 3所示的对应关系中的 "11" , 表示 UE接收到了 4个具有动 态 PDCCH的下行子帧;
采用前述步骤 S703中的方法二时: 如图 9B所示:
在下行子帧 1 , UE判断下行载波 2无调度, 基于下行载波 1的数 据, 生成 1比特 ACK作为下行子帧 1的反馈信息; 在下行子帧 2, UE判断下行载波 1丢包,生成 1比特 NACK作为下行子帧 1的反馈 信息; 在下行子帧 3中, 基于 2个下行载波上接收到的数据包, 生成 1比特 NACK作为下行子帧 3的反馈信息; 在下行子帧 4中, 基于 2 个下行载波上接收到的数据包, 生成 1 比特 NACK作为下行子帧 4 的反馈信息; 得到 4比特信息 [ACK,NACK,NACK,NACK]。
在基站端:
首先按照上述方法的步骤 S802, 在调度下行副载波的 PDCCH的 ARI指示的 1个传输 ACK/NACK的 PUCCH format 3信道资源检测 信号, 按照 S+4比特长度译码、 解调, 得到 S比特周期 CQI/PMI/RI 和 4比特 ACK/NACK反馈信息; 进一步解析 4比特 ACK/NACK反 馈信息, 确定重传。
采用步骤 S803中的方法一时, 基站判断需要「bg 2 M1=2比特辅助 信息,即 4比特反馈信息中的前两比特为下行载波 1和载波 2的合并 的 ACK/NACK反馈信息, 后两比特为辅助信息; 基站根据辅助信息 "11" 判断 UE不存在下行子帧完全丢失情况, 可根据每个下行载波 的合并的 ACK/NACK反馈信息进行重传, 例如 2 比特合并信息为 [NACK,NACK] , 重传 2个下行载波上的所有调度的下行子帧。
采用前述步骤 S803中的方法一时,基站根据接收到的 4比特反馈 信息确定每个下行子帧的重传方案, 如接收到 4 比特 [ACK,NACK,NACK,NACK] , 重传 2个下行载波上的下行子帧 2、 3 和 4;
需要说明的是, 上述实施例中, 当 ACK/NACK没有采用 PUCCH format 3传输方案, 而 CQI采用 PUCCH format 3传输方案时同样适 用; 所不同的是, format 3传输资源为高层信令预先配置给终端设备 的用于传输 CQI的 PUCCH format 3资源。 实施例 2:
UE配置了 2个下行载波, 下行载波 1为下行主载波, 下行载波 1 采用多码字传输模式, 下行载波 2 采用单码字传输模式, M=4, 即 UE在当前上行子帧需要反馈 4个下行子帧的 ACK/NACK反馈信息; 基站只在下行载波 1调度了 4个下行子帧, 如图 10A至 10D所示, 且当前上行子帧为周期 CQI反馈子帧, 即该子帧中同时存在 CQI和 ACK/NACK传输, CQI采用 PUCCH format 3传输方案(即高层预先 配置给了 UE 1个传输 CQI的 PUCCH format 3信道资源 ), 具体传输 流程如下:
在 UE端:
在下行副载波上没有接收到数据包, 则在 CQI的资源上同时发送 CQI和 ACK/NACK信息, 又由于 CQI采用 PUCCH format 3传输方 案,采用情况 1的方法,在传输 CQI的 PUCCH format 3信道资源上, 采用 PUCCH format 3方案, 发送 S+4比特 CQI与 ACK/NACK的级 联信息; 4比特 ACK/NACK反馈比特采用如下方法获得:
采用前述步骤 S704中的方法二时, 如图 10A所示:
在 4个下行子帧, UE判断下行载波 2无调度, 基于下行载波 1 的数据, 对每个下行子帧生成 1比特反馈信息, 得到 4比特反馈比特 [ACK,ACK,NACK,NACK]。 采用前述步骤 S704中的方法三时, 如图 10B所示:
UE对每个下行载波上接收到数据的每个下行子帧生成 1 比特反 馈信息, 由于存在 NACK, 则根据表 4, UE反馈 4比特 "0 0 0 0"作 为 ACK/NACK反馈比特。
采用前述步骤 S704中的方法四时, 如图 10C所示:
由于 M=4, 即需要「bg 2 M1=2比特辅助信息; 在 4个下行子帧, UE判断下行载波 2无调度, 生成 1比特 NACK作为反馈信息; 基于 下行载波 1的数据, 生成 1比特 NACK作为反馈信息; UE根据接收 到的具有动态 PDCCH的下行子帧数, 生成 2比特辅助信息, 例如表 5所示的对应关系中的 "00" ,表示 UE接收到了 4个具有动态 PDCCH 的下行子帧。
采用前述步骤 S704中的方法五时, 如图 10D所示:
由于 M=4, 即需要「bg 2 M1+l=3比特辅助信息; UE根据频域 DAI 判断下行载波 2无调度,对 2个下行载波上接收到的所有数据包的反 馈信息进行合并( full bundling ), 生成 1比特 NACK作为合并的反馈 信息; UE根据接收到的具有动态 PDCCH的下行子帧数, 生成 3比 特辅助信息, 例如表 6所示的对应关系中的 "1 0 1" , 表示 UE接收 到了 4个具有动态 PDCCH的下行子帧。
采用前述步骤 S704中的方法六时, 如图 10D所示:
由于 M=4, 即需要「bg 2 M1+l=3比特辅助信息; UE根据频域 DAI 判断下行载波 2无调度,对 2个下行载波上接收到的所有数据包的反 馈信息进行合并( full bundling ), 产生 1比特 NACK作为合并的反馈 信息; UE根据接收到的具有动态 PDCCH的下行子帧数, 产生 3比 特辅助信息, 例如表 7所示的对应关系中的 "1 0 0" , 表示 UE接收 到了 4个具有动态 PDCCH的下行子帧。 采用前述步骤 S704中的方法七时, 如图 10E所示: UE每个下行载波生成的 2比特合并的 ACK/NACK反馈信息, 表 示该下行载波上第一个被调度的子帧起连续正确接收的子帧的个数, 对于载波 1 , 对每个子帧中的多码字反馈信息进行空间合并后, 前两 个子帧正确接收, 第三个子帧开始错误, 则 UE确定下行载波 1上从 第一个调度子帧开始连续正确接收的子帧数为 2, 确定下行载波 1上 没有接收到数据,根据表 8,对下行载波 1产生 L=2比特合并信息 "1 0" , 对下行载波 2 产生 L=2 比特合并信息 "0 0" , 得到 4 比特 ACK/NACK反馈信息 "1 0 0 0"。
在基站端:
由于基站只在下行主载波调度了数据, 则基站可直接按照上述步 骤 S704, 在传输 CQI的 PUCCH format 3信道资源检测信号, 按照 S+4比特长度译码、 解调, 得到 S比特周期 CQI/PMI/RI和 4比特反 馈信息。
采用前述步骤 S804中的方法二时:
基站根据接收到的 4 比特反馈信息确定每个下行子帧的重传方 案, 如得到 4比特信息为 [ACK,ACK,NACK,NACK] , 重传下行子帧 3 和 4。
采用前述步骤 S804中的方法三时:
基站根据接收到的 4比特反馈信息所指示的 ACK个数是否与实际 调度的数据包个数吻合判断丢包情况, 确定重传方案; 如接收到 4比 特信息为 "0 0 0 0" , 则基站判断 UE完全丢包或存在错误接收的数据 包, 重传所有下行子帧。
采用前述步骤 S804中的方法四时:
基站判断需要「b g 2 ML2比特辅助信息,即 4比特反馈信息中的前 两比特为下行载波 1和载波 2的合并的 ACK/NACK反馈信息, 后两 比特为辅助信息; 由于合并的 2比特反馈信息为 [NACK,NACK] , 基 站可不进一步根据辅助信息 "00" 判断 UE下行子帧丢失情况, 重传 所有下行子帧。
采用前述步骤 S804中的方法五时:
基站判断需要「b g 2
Figure imgf000039_0001
比特辅助信息, 即 4比特反馈信息中 的前 1比特为下行载波 1和载波 2上所有数据包的合并的 ACK/NACK 反馈信息, 后 3 比特为辅助信息; 由于合并的 1 比特反馈信息为 NACK, 基站可不进一步根据辅助信息判断 UE下行子帧丢失情况, 重传所有下行子帧; 或者, 基站也可进一步根据辅助信息 "1 0 1" 判 断 UE未丢包, 采用适当的重传方案重传所有下行子帧。
采用前述步骤 S804中的方法六时:
基站判断需要「b g 2
Figure imgf000039_0002
比特辅助信息, 即 4比特反馈信息中 的前 1比特为下行载波 1和载波 2上所有数据包的合并的 ACK/NACK 反馈信息, 后 3 比特为辅助信息; 由于合并的 1 比特反馈信息为 NACK, 基站可不进一步根据辅助信息判断 UE下行子帧丢失情况, 重传所有下行子帧; 或者, 基站也可进一步根据辅助信息 "1 0 0" 判 断 UE未丢包, 采用适当的重传方案重传所有下行子帧。
采用前述步骤 S804中的方法七时:
确定接收到的 4比特 ACK/NACK信息 "1 0 0 0"中的前 2比特 "1 0" 表示下行载波 1上第一个被调度的子帧起连续正确接收的子帧的 个数, 后 2比特 "0 0" 表示下行载波 2上第一个被调度的子帧起连 续正确接收的子帧的个数, 根据表 8, 确定下行载波 1上从第一个调 度子帧开始连续正确接收的子帧数为 2, 即确定其上前 2个子帧正确 接收, 后 2个子帧需要沖传输, 由于 "0 0" 为多对一状态, 基站需 进一步确定其表达意思, 考虑到基站没有在下行载波 2调度任何数 据, 基站可确定 "0 0" 表示 UE在下行载波 2上未接收到任何数据。
需要说明的是, 上述实施例中, 当 CQI没有采用 PUCCH format 3 传输方案, 而 ACK/NACK采用 PUCCH format 3传输方案时同样适 用; 所不同的是, format 3传输资源为高层信令预先配置给终端设备 的用于传输 ACK/NACK的 PUCCH format 3资源或者 PDCCH中的资 源指示域所指示的高层信令预先配置的多个 format 3资源中的一个。 实施例 3:
UE配置了 2个下行载波, 下行载波 1为下行主载波, 下行载波 1 采用多码字传输模式, 下行载波 2 采用单码字传输模式, M=3, 即 UE在当前上行子帧需要反馈 3个下行子帧的 ACK/NACK反馈信息; 基站在下行载波 1和 2都调度了 3个下行子帧, 但下行子帧 3丢失, 如图 11A至 11D所示, 且当前上行子帧为周期 CQI反馈子帧, 即该 子帧中同时存在 CQI和 ACK/NACK传输, CQI采用 PUCCH format 3 传输方案(即高层预先配置给了 UE 1个传输 CQI的 PUCCH format 3 信道资源), 具体传输流程如下:
UE端:
由于 CQI采用 PUCCH format 3传输方案,采用 CQI采用 PUCCH format 3传输方案所对应的方法, 即 UE总是在传输 CQI的 PUCCH format 3信道资源上,采用 PUCCH format 3方案,发送 S+4比特 CQI 与 ACK/NACK的级联信息。
其中, 4比特 ACK/NACK反馈比特采用如下方法获得:
采用前述的步骤 S704中的方法二时, 如图 11A所示:
UE只在前 2个下行子帧接收到数据,基于接收到的数据, 分别生 成 1比特 ACK作为下行子帧 1和 2的反馈信息; 对下行子帧 3生成 1比特 NACK作为反馈信息,得到 3比特反馈比特 [ACK,ACK,NACK]。 采用前述的步骤 S704中的方法三时, 如图 11B所示:
UE对每个下行载波上接收到数据的每个下行子帧生成 1 比特反 馈信息, 由于不存在 NACK, ACK个数为 4, 则根据表 4, UE反馈
4比特 "0 1 0 0" 作为 ACK/NACK反馈比特。
采用前述的步骤 S704中的方法四时, 如图 11C所示:
由于 M=4, 即需要「lQg 2 ML2比特辅助信息; 基于各下行载波上 接收到的数据, 分别生成 1比特 ACK作为下行载波 1和 2的反馈信 息; UE根据接收到的具有动态 PDCCH的下行子帧数, 生成 2比特 辅助信息, 例如表 5所示的对应关系中的 "10" , 表示 UE接收到了 2 个具有动态 PDCCH的下行子帧。
采用前述的步骤 S704中的方法五时, 如图 11D所示:
由于 M=4, 即需要「bg 2 M1+l=3比特辅助信息; UE根据 2个下行 载波上接收到的所有数据包的反馈信息进行合并(full bundling ), 生 成 1 比特 ACK作为合并的反馈信息; UE根据接收到的具有动态 PDCCH的下行子帧数, 生成 3比特辅助信息, 例如表 6所示的对应 关系中的 "0 1 Γ ,表示 UE接收到了 2个具有动态 PDCCH的下行子 帧;
采用前述的步骤 S704中的方法六时, 如图 11D所示:
由于 M=4, 即需要「bg 2 M1+l=3比特辅助信息; UE根据 2个下行 载波上接收到的所有数据包的反馈信息进行合并(full bundling ), 产 生 1 比特 ACK作为合并的反馈信息; UE根据接收到的具有动态 PDCCH的下行子帧数, 产生 3比特辅助信息, 例如表 6所示的对应 关系中的 "0 1 0" ,表示 UE接收到了 2个具有动态 PDCCH的下行子 帧; 基站端:
基站总是在传输 CQI的 PUCCH format 3信道资源检测信号, 按 照 S+4比特长度译码、 解调, 得到 S比特周期 CQI/PMI/RI和 4比特 反馈信息。
采用前述的步骤 S804中的方法二时:
基站根据接收到的 3 比特反馈信息确定每个下行子帧的重传方 案, 如得到 3比特信息为 [ACK,ACK,NACK] , 重传下行子帧 3。
采用前述的步骤 S804中的方法三时:
基站根据接收到的 4比特反馈信息所指示的 ACK个数是否与实际 调度的数据包个数吻合判断丢包情况, 确定重传方案; 如接收到 4比 特信息为 "0 1 0 0" , 指示正确接收 4个数据包, 但基站实际调度了 6 个数据包, 则基站判断 UE存在丢包, 重传所有下行子帧。
采用前述的步骤 S804中的方法四时:
基站判断需要「bg 2 ML2比特辅助信息,即 4比特反馈信息中的前 两比特为下行载波 1和载波 2的合并的 ACK/NACK反馈信息, 后两 比特为辅助信息; 由于合并的 2比特反馈信息为 [ACK,ACK] ,基站需 进一步根据辅助信息判断 UE下行子帧丢失情况, 辅助信息 "10"表 示接收到 2个具有动态 PDCCH的下行子帧, 但基站实际调度了 3个 下行子帧, 因此基站判断 UE存在丢包, 重传所有下行子帧。
采用前述的步骤 S804中的方法五时:
基站判断需要「b g 2
Figure imgf000042_0001
比特辅助信息, 即 4比特反馈信息中 的前 1比特为下行载波 1和载波 2上所有数据包的合并的 ACK/NACK 反馈信息,后 3比特为辅助信息;由于合并的 1比特反馈信息为 ACK, 基站需进一步根据辅助信息判断 UE下行子帧丢失情况, 据辅助信息 " 0 1 1"表示 UE接收到 2个具有动态 PDCCH的下行子帧,但基站 实际调度了 3个子帧, 因此判断 UE丢包, 重传所有下行子帧; 采用前述的步骤 S804中的方法六时:
基站判断需要「b g 2
Figure imgf000043_0001
比特辅助信息, 即 4比特反馈信息中 的前 1比特为下行载波 1和载波 2上所有数据包的合并的 ACK/NACK 反馈信息,后 3比特为辅助信息;由于合并的 1比特反馈信息为 ACK, 基站需进一步根据辅助信息判断 UE下行子帧丢失情况, 据辅助信息 " 0 1 0"表示 UE接收到 2个具有动态 PDCCH的下行子帧,但基站 实际调度了 3个子帧, 因此判断 UE丢包, 重传所有下行子帧。
需要说明的是, 上述实施例中, 当 CQI没有采用 PUCCH format 3 传输方案, 而 ACK/NACK采用 PUCCH format 3传输方案时同样适 用; 所不同的是, format 3传输资源为高层信令预先配置给终端设备 的用于传输 ACK/NACK的 PUCCH format 3资源或者 PDCCH中的资 源指示域所指示的高层信令预先配置的多个 format 3资源中的一个。
与现有技术相比, 本发明实施例具有以下优点:
通过应用本发明实施例的技术方案, 可以在 LTE-A系统中, 采用 PUCCH format 3 传输方案, 在同一上行子帧中同时传输周期 CQI/PMI/RI 反馈比特和 ACK/NACK 反馈信息, 避免了由于 ACK/NACK反馈信息与周期 CQI/PMI/RI信息在同一上行子帧同时反 馈时, 需要放弃周期 CQI/PMI/RI信息传输的情况, 提高了上行控制 信息的反馈效率 为了实现本发明实施例的技术方案, 本发明实施例还提供了一种 终端设备, 其结构示意图如图 12所示, 具体包括:
接收模块 121 , 用于接收下行数据;
第一生成模块 122, 用于为 N个配置的下行载波中的 M个下行子 帧中的数据生成 K比特的 ACK/NACK反馈比特, 其中, N > 1 , M > 1 , M个下行子帧中的数据的 ACK/NACK反馈信息同一个上行子帧 中传输;
第二生成模块 123 ,用于生成 S比特的周期 CQI/PMI/RI反馈比特; 发送模块 124, 用于在上行子帧中, 采用 PUCCH format 3传输方 案, 同时发送第二生成模块 123所生成的 S比特的周期 CQI/PMI/RI 反馈比特和第一生成模块 122所生成的 K比特的 ACK/NACK反馈比 特。
在实际应用中,发送模块 124发送 S比特的周期 CQI/PMI/RI反馈 比特和 K比特的 ACK/NACK反馈比特所应用的 PUCCH format 3的 信道资源, 具体为:
终端设备用于传输周期 CQI/PMI/RI反馈比特的 PUCCH format 3 信道资源; 或,
终端设备用于传输 ACK/NACK反馈比特的 PUCCH format 3信道 资源。
其中, 当发送模块 124所应用的 PUCCH format 3的信道资源为终 端设备用于传输周期 CQI/PMI/RI反馈比特的 PUCCH format 3信道资 源时,终端设备用于传输周期 CQI/PMI/RI反馈比特的 PUCCH format 3信道资源, 具体为高层信令预先配置的一个信道资源;
当发送模块 124所应用的 PUCCH format 3的信道资源为终端设备 用于传输 ACK/NACK反馈比特的 PUCCH format 3信道资源时, 终 端设备用于传输 ACK/NACK反馈比特的 PUCCH format 3信道资源, 具体为 PDCCH中的 ACK/NACK资源指示比特所指示的高层信令所 配置的至少一个信道资源中的一个, PDCCH用于传输下行辅载波上 的 PDSCH的下行调度指示, 和 /或用于传输下行主载波上的 PDSCH 的下行调度指示且所述 PDCCH中的 DAI值大于 1;
若终端设备接收到至少两个 PDCCH, 至少两个 PDCCH 中的 ACK/NACK资源指示比特指示同一个信道资源。
另一方面, 第一生成模块 122, 具体用于:
为 N个配置的下行载波中的 M个下行子帧中的数据生成 L比特 的 ACK/NACK反馈比特,并生成 T比特的辅助信息,其中, K=L+T。
进一步的, 在另一种具体的应用场景中, 第一生成模块 122, 具 体用于:
对在 N个配置的下行载波, M个下行子帧中接收到的每个数据包 生成一个 ACK/NACK反馈信息, 对判断丢包的数据包生成一个 NACK反馈信息;
对 N个配置的下行载波中的每个下行载波在 M个下行子帧中的 ACK/NACK反馈信息进行合并, 得到 L 比特的 ACK/NACK反馈比 特, 其中, L > N, 或对所有配置的下行载波上和 M个下行子帧中的 ACK/NACK反馈信息进行合并, 生成 1比特的反馈比特。
另一方面, 第二生成模块 123所生成的辅助信息, 具体用于: 包括至少 M个状态, 其中 M个状态指示终端设备在 M个下行子 帧中接收到具有 PDCCH传输的下行子帧的个数 S, S>1 , PDCCH为 传输 PDSCH的下行调度指示的 PDCCH和 /或指示半持续的 PDSCH 激活 /释放的 PDCCH; 或,
包括至少 M个状态, 其中 M个状态指示终端设备在 M个下行子 帧中接收到具有 PDCCH传输的下行子帧的个数 S, S>1 , 且辅助信 息的 M 个状态中的一个状态复用指示终端设备没有接收到任何有 PDCCH传输的下行子帧的情况, PDCCH为传输 PDSCH的下行调度 指示的 PDCCH和 /或指示半持续的 PDSCH激活 /释放的 PDCCH;或, 包括至少 M+2个状态, 其中 M个状态指示终端设备在 M个下行 子帧中接收到具有 PDCCH传输的下行子帧的个数 S, S>1 , 且辅助 信息中的不同于以上 M个状态一个独立的状态用于指示终端设备仅 接收到无对应 PDCCH传输的下行子帧的情况, 不同于以上 M+1个 状态一个独立的状态用于指示终端设备没有接收到任何下行子帧的 情况, PDCCH为传输 PDSCH的下行调度指示的 PDCCH和 /或指示 半持续的 PDSCH激活 /释放的 PDCCH; 或,
包括至少 M+1个状态, 其中 M个状态指示终端设备在 M个下行 子帧中接收到具有 PDCCH传输的下行子帧的个数 S, S>1 , 且辅助 信息中的不同于以上 M个状态一个独立的状态用于指示终端设备没 有接收到任何有 PDCCH传输的下行子帧的情况, PDCCH 为传输 PDSCH的下行调度指示的 PDCCH和 /或指示半持续的 PDSCH激活 / 释放的 PDCCH。
在另一种具体的应用场景中, 第一生成模块 122, 具体用于: 对 M个下行子帧中的每个下行子帧,在 N个配置的下行载波上接 收到的数据包生成 1个 ACK/NACK反馈信息, 对判断丢包的数据包 生成一个 NACK反馈信息;
对 M个下行子帧中的每个下行子帧在 N个配置的下行载波上的 ACK/NACK反馈信息进行合并, 生成 M比特的 ACK/NACK反馈信 息, 其中, Κ=Μ。
在另一种具体的应用场景中, 第一生成模块 122, 具体用于根据 终端设备在 Ν个配置的下行载波和 Μ个下行子帧中正确接收的数据 包的个数, 生成 Κ比特的 ACK/NACK反馈信息。 另一方面, 本发明实施例还提供了一种基站, 其结构示意图如图 13所示, 具体包括: 发送模块 131 , 用于向终端设备发送下行数据;
接收模块 132, 用于在 PUCCH format 3的信道资源上, 接收终端 设备同时发送的 S 比特的周期 CQI/PMI/RI反馈比特和 K 比特的 ACK/NACK反馈信息, 其中, N > 1 , M > 1 , M个下行子帧中的数 据的 ACK/NACK反馈信息同一个上行子帧中传输。
其中, 接收模块 132所应用的 PUCCH format 3的信道资源, 具体 为:
基站配置给终端设备用于传输周期 CQI/PMI/RI 反馈比特的 PUCCH format 3信道资源; 或,
基站配置给终端设备用于传输 ACK/NACK反馈比特的 PUCCH format 3信道资源。
相应的, 当 PUCCH format 3的信道资源为基站配置给终端设备用 于传输周期 CQI/PMI/RI反馈比特的 PUCCH format 3信道资源时,基 站配置给终端设备用于传输周期 CQI/PMI/RI反馈比特的 PUCCH format 3信道资源, 具体为基站通过高层信令预先为终端设备配置的 一个信道资源;
当 PUCCH format 3的信道资源为基站配置给终端设备用于传输 ACK/NACK反馈比特的 PUCCH format 3信道资源时,基站配置给终 端设备用于传输 ACK/NACK反馈比特的 PUCCH format 3信道资源, 具体为基站发送给终端设备的 PDCCH中的 ACK/NACK资源指示比 特所指示的高层信令所配置的至少一个信道资源中的一个, PDCCH 用于传输下行辅载波上的 PDSCH的下行调度指示,和 /或用于传输下 行主载波上的 PDSCH的下行调度指示且所述 PDCCH中的 DAI值大 于 1;
若基站发送给终端设备至少两个 PDCCH,至少两个 PDCCH中的 ACK/NACK资源指示比特指示同一个信道资源。
进一步的, 接收模块 132所接收到的 K比特的 ACK/NACK反馈 比特, 具体包括:
终端设备为 N个配置的下行载波中的 M个下行子帧中的数据所生 成的 L比特的 ACK/NACK反馈比特和 T比特的辅助信息, 其中, K=L+T。
在另一种具体的应用场景中, 接收模块 132所接收到的 L比特的 ACK/NACK反馈比特, 具体包括:
终端设备对在 N个配置的下行载波, M个下行子帧中接收到的每 个数据包生成一个 ACK/NACK反馈信息, 对判断丢包的数据包生成 一个 NACK反馈信息;
终端设备对 N个配置的下行载波中的每个下行载波在 M个下行子 帧中的 ACK/NACK反馈信息进行合并, 得到 L 比特的 ACK/NACK 反馈比特, 其中, L > N, 或终端设备对所有配置的下行载波上和 M 个下行子帧中的 ACK/NACK反馈信息进行合并, 生成 1 比特的 ACK/NACK反馈比特。
另一方面, 接收模块 132所接收到的 T比特的辅助信息, 具体用 于:
包括至少 M个状态, 其中 M个状态指示终端设备在 M个下行子 帧中接收到具有 PDCCH传输的下行子帧的个数 S, S>1 , PDCCH为 传输 PDSCH的下行调度指示的 PDCCH和 /或指示半持续的 PDSCH 激活 /释放的 PDCCH; 或,
包括至少 M个状态, 其中 M个状态指示终端设备在 M个下行子 帧中接收到具有 PDCCH传输的下行子帧的个数 S, S>1 , 且辅助信 息的 M 个状态中的一个状态复用指示终端设备没有接收到任何有 PDCCH传输的下行子帧的情况, PDCCH为传输 PDSCH的下行调度 指示的 PDCCH和 /或指示半持续的 PDSCH激活 /释放的 PDCCH;或, 包括至少 M+2个状态, 其中 M个状态指示终端设备在 M个下行 子帧中接收到具有 PDCCH传输的下行子帧的个数 S, S>1 , 且辅助 信息中不同于以上 M个状态的一个独立的状态用于指示终端设备仅 接收到无对应 PDCCH传输的下行子帧的情况, 不同于以上 M+1个 状态一个独立的状态用于指示终端设备没有接收到任何下行子帧的 情况, PDCCH为传输 PDSCH的下行调度指示的 PDCCH和 /或指示 半持续的 PDSCH激活 /释放的 PDCCH; 或,
包括至少 M+1个状态, 其中 M个状态指示终端设备在 M个下行 子帧中接收到具有 PDCCH传输的下行子帧的个数 S, S>1 , 且辅助 信息中不同于以上 M个状态的一个独立的状态用于指示终端设备没 有接收到任何有 PDCCH传输的下行子帧的情况, PDCCH 为传输 PDSCH的下行调度指示的 PDCCH和 /或指示半持续的 PDSCH激活 / 释放的 PDCCH。
具体的, 接收模块 132所接收到的 K比特的 ACK/NACK反馈比 特, 具体包括:
终端设备对 M个下行子帧中的每个下行子帧,在 N个配置的下行 载波上接收到的数据包生成 1个 ACK/NACK反馈信息, 对判断丢包 的数据包生成一个 NACK反馈信息;
终端设备对 M个下行子帧中的每个下行子帧在 N个配置的下行载 波上的 ACK/NACK反馈信息进行合并, 生成 M比特的 ACK/NACK 反馈信息, 其中, K=M。
另一种情况下, 接收模块 132所接收到的 K比特的 ACK/NACK 反馈比特, 具体包括: 终端设备根据自身在 N个配置的下行载波和 M个下行子帧中正确 接收的数据包的个数, 生成 K比特的 ACK/NACK反馈信息。
进一步的, 该基站还包括处理模块 133 , 具体用于根据接收模块 132所接收到的 K比特的 ACK/NACK反馈信息的内容, 确定终端设 备的数据接收情况, 根据数据接收情况确定数据重传策略, 并根据数 据重传策略向终端设备进行数据重传。
与现有技术相比, 本发明实施例具有以下优点:
通过应用本发明实施例的技术方案, 可以在 LTE-A系统中, 采用 PUCCH format 3 传输方案, 在同一上行子帧中同时传输周期 CQI/PMI/RI 反馈比特和 ACK/NACK 反馈信息, 避免了由于 ACK/NACK反馈信息与周期 CQI/PMI/RI信息在同一上行子帧同时反 馈时, 需要放弃周期 CQI/PMI/RI信息传输的情况, 提高了上行控制 信息的反馈效率。 通过以上的实施方式的描述, 本领域的技术人员可以清楚地了解 到本发明实施例可以通过硬件实现,也可以借助软件加必要的通用硬 件平台的方式来实现。基于这样的理解, 本发明实施例的技术方案可 以以软件产品的形式体现出来,该软件产品可以存储在一个非易失性 存储介质 (可以是 CD-ROM, U盘, 移动硬盘等) 中, 包括若干指 令用以使得一台计算机设备(可以是个人计算机, 服务器, 或网络设 备等)执行本发明实施例各个实施场景所述的方法。
本领域技术人员可以理解附图只是一个优选实施场景的示意图, 附图中的模块或流程并不一定是实施本发明实施例所必须的。
本领域技术人员可以理解实施场景中的装置中的模块可以按照实 施场景描述进行分布于实施场景的装置中,也可以进行相应变化位于 不同于本实施场景的一个或多个装置中。上述实施场景的模块可以合 并为一个模块, 也可以进一步拆分成多个子模块。
上述本发明实施例序号仅仅为了描述, 不代表实施场景的优劣。 明实施例并非局限于此,任何本领域的技术人员能思之的变化都应落 入本发明实施例的业务限制范围。

Claims

权利要求
1、 一种 ACK/NACK反馈信息和周期 CQI/PMI/RI反馈比特同时 传输的方法, 其特征在于, 包括:
终端设备接收下行数据,;
所述终端设备为 N个配置的下行载波中的 M个下行子帧中的数 据生成 K比特的 ACK/NACK反馈比特, 其中, N > 1 , M > 1 , 所述 M个下行子帧中的数据的 ACK/NACK反馈信息同一个上行子帧中传 输;
所述终端设备生成 S比特的周期 CQI/PMI/RI反馈比特; 所述终端设备在所述上行子帧中, 采用 PUCCH format 3传输方 案, 同时发送 S 比特的周期 CQI/PMI/RI 反馈比特和 K 比特的
ACK/NACK反馈比特。
2、 如权利要求 1所述的方法, 其特征在于, 所述终端设备在所 述上行子帧中, 采用 PUCCH format 3传输方案, 同时发送 S比特的 周期 CQI/PMI/RI反馈比特和 K比特的 ACK/NACK反馈比特的过程 中, 所述终端设备所应用的 PUCCH format 3的信道资源, 具体为: 所述终端设备用于传输周期 CQI/PMI/RI反馈比特的 PUCCH format 3信道资源; 或,
所述终端设备用于传输 ACK/NACK反馈比特的 PUCCH format 3 信道资源。
3、 如权利要求 2所述的方法, 其特征在于, 所述 PUCCH format 3的信道资源为所述终端设备用于传输周期 CQI/PMI/RI反馈比特的 PUCCH format 3 信道资源时, 所述终端设备用于传输周期 CQI/PMI/RI反馈比特的 PUCCH format 3信道资源, 具体为:
高层信令预先配置的一个信道资源。
4、 如权利要求 2所述的方法, 其特征在于, 所述 PUCCH format 3 的信道资源为所述终端设备用于传输 ACK/NACK反馈比特的 PUCCH format 3信道资源时,所述终端设备用于传输 ACK/NACK反 馈比特的 PUCCH format 3信道资源, 具体为:
PDCCH中的 ACK/NACK资源指示比特所指示的高层信令所配 置的至少一个信道资源中的一个, 所述 PDCCH用于传输下行辅载波 上的 PDSCH的下行调度指示,和 /或用于传输下行主载波上的 PDSCH 的下行调度指示且所述 PDCCH中的 DAI值大于 1;
若所述终端设备接收到至少两个所述 PDCCH, 所述至少两个 PDCCH中的 ACK/NACK资源指示比特指示同一个信道资源。
5、 如权利要求 1所述的方法, 其特征在于, 所述终端设备为 N 个配置的下行载波中的 M 个下行子帧中的数据生成 K 比特的 ACK/NACK反馈比特, 具体包括:
所述终端设备为所述 N个配置的下行载波中的 M个下行子帧中 的数据生成 L比特的 ACK/NACK反馈比特,并生成 T比特的辅助信 息, 其中, K=L+T。
6、 如权利要求 5所述的方法, 其特征在于, 所述终端设备为所 述 N个配置的下行载波中的 M个下行子帧中的数据生成 L比特的 ACK/NACK反馈比特, 具体包括: 所述终端设备对在所述 N个配置的下行载波, M个下行子帧中 接收到的每个数据包生成一个 ACK/NACK反馈信息, 对判断丢包的 数据包生成一个 NACK反馈信息;
所述终端设备对所述 N 个配置的下行载波中的每个下行载波在 所述 M个下行子帧中的 ACK/NACK反馈信息进行合并, 得到 L 比 特的 ACK/NACK反馈比特, 其中, L > N。
7、 如权利要求 5所述的方法, 其特征在于, 所述终端设备为所 述 N个配置的下行载波中的 M个下行子帧中的数据生成 L比特的 ACK/NACK反馈比特, 具体包括:
所述终端设备对在所述 N个配置的下行载波, M个下行子帧中 接收到的每个数据包生成一个 ACK/NACK反馈信息, 对判断丢包的 数据包生成一个 NACK反馈信息;
所述终端设备对所有配置的下行载波上和 M 个下行子帧中的 ACK/NACK反馈信息进行合并, 生成 1比特的 ACK/NACK反馈比 特。
8、 如权利要求 5所述的方法, 其特征在于, 所述终端设备为所 述 N个配置的下行载波中的 M个下行子帧中的数据生成 T比特的辅 助信息, 具体包括:
所述辅助信息包括至少 M个状态, 其中 M个状态用于指示所述 终端设备在所述 M个下行子帧中接收到具有 PDCCH传输的下行子 帧的个数 S, S>1 , 所述 PDCCH为传输 PDSCH的下行调度指示的 PDCCH和 /或指示半持续的 PDSCH激活 /释放的 PDCCH。
9、 如权利要求 5所述的方法, 其特征在于, 所述终端设备为所 述 N个配置的下行载波中的 M个下行子帧中的数据生成 T比特的辅 助信息, 具体包括:
所述辅助信息包括至少 M个状态, 其中 M个状态用于指示所述 终端设备在所述 M个下行子帧中接收到具有 PDCCH传输的下行子 帧的个数 S, S>1 , 且所述辅助信息的所述 M个状态中的一个状态复 用指示所述终端设备没有接收到任何有 PDCCH传输的下行子帧的情 况, 所述 PDCCH为传输 PDSCH的下行调度指示的 PDCCH和 /或指 示半持续的 PDSCH激活 /释放的 PDCCH。
10、 如权利要求 5所述的方法, 其特征在于, 所述终端设备为所 述 N个配置的下行载波中的 M个下行子帧中的数据生成 T比特的辅 助信息, 具体包括:
所述辅助信息包括至少 M+2个状态, 其中 M个状态用于指示所 述终端设备在所述 M个下行子帧中接收到具有 PDCCH传输的下行 子帧的个数 S, S>1 , 且所述辅助信息中不同于所述 M个状态的一个 独立的状态用于指示所述终端设备仅接收到无对应 PDCCH传输的下 行子帧的情况, 不同于所述 M+1个状态一个独立的状态用于指示所 述终端设备没有接收到任何下行子帧的情况, 所述 PDCCH 为传输 PDSCH的下行调度指示的 PDCCH和 /或指示半持续的 PDSCH激活 / 释放的 PDCCH。
11、 如权利要求 5所述的方法, 其特征在于, 所述终端设备为所 述 N个配置的下行载波中的 M个下行子帧中的数据生成 T比特的辅 助信息, 具体包括:
所述辅助信息包括至少 M+1个状态, 其中 M个状态用于指示所 述终端设备在所述 M个下行子帧中接收到具有 PDCCH传输的下行 子帧的个数 S, S>1 , 且所述辅助信息中不同于所述 M个状态的一个 独立的状态用于指示所述终端设备没有接收到任何有 PDCCH传输的 下行子帧的情况, 所述 PDCCH 为传输 PDSCH 的下行调度指示的 PDCCH和 /或指示半持续的 PDSCH激活 /释放的 PDCCH。
12、 如权利要求 1所述的方法, 其特征在于, 所述终端设备为 N 个配置的下行载波中的 M 个下行子帧中的数据生成 K 比特的 ACK/NACK反馈比特, 具体包括:
所述终端设备对所述 M个下行子帧中的每个下行子帧,在所述 N 个配置的下行载波上接收到的数据包生成 1 个 ACK/NACK反馈信 息, 对判断丢包的数据包生成一个 NACK反馈信息;
所述终端设备对所述 M个下行子帧中的每个下行子帧在所述 N 个配置的下行载波上的 ACK/NACK反馈信息进行合并,生成 M比特 的 ACK/NACK反馈信息, 其中, K=M。
13、 如权利要求 1所述的方法, 其特征在于, 所述终端设备为 N 个配置的下行载波中的 M 个下行子帧中的数据生成 K 比特的 ACK/NACK反馈比特, 具体包括:
所述终端设备根据自身在所述 N个配置的下行载波和 M个下行 子帧中正确接收的数据包的个数,生成 K比特的 ACK/NACK反馈信
14、 一种终端设备, 其特征在于, 包括:
接收模块, 用于接收下行数据;
第一生成模块, 用于为 N个配置的下行载波中的 M个下行子帧 中的数据生成 K比特的 ACK/NACK反馈比特, 其中, N > 1 , M > 1 , 中传输;
第二生成模块, 用于生成 S比特的周期 CQI/PMI/RI反馈比特; 发送模块, 用于在所述上行子帧中, 采用 PUCCH format 3传输 方案,同时发送所述第二生成模块所生成的 S比特的周期 CQI/PMI/RI 反馈比特和所述第一生成模块所生成的 K比特的 ACK/NACK反馈比 特。
15、 如权利要求 14所述的终端设备, 其特征在于, 所述发送模 块发送所述 S 比特的周期 CQI/PMI/RI反馈比特和所述 K 比特的 ACK/NACK反馈比特所应用的 PUCCH format 3的信道资源,具体为: 所述终端设备用于传输周期 CQI/PMI/RI反馈比特的 PUCCH format 3信道资源; 或,
所述终端设备用于传输 ACK/NACK反馈比特的 PUCCH format 3 信道资源。
16、 如权利要求 15所述的终端设备, 其特征在于,
当所述发送模块所应用的所述 PUCCH format 3的信道资源为所 述终端设备用于传输周期 CQI/PMI/RI反馈比特的 PUCCH format 3信 道资源时, 所述终端设备用于传输周期 CQI/PMI/RI 反馈比特的 PUCCH format 3信道资源, 具体为高层信令预先配置的一个信道资 源;
当所述发送模块所应用的所述 PUCCH format 3的信道资源为所 述终端设备用于传输 ACK/NACK反馈比特的 PUCCH format 3信道 资源时, 所述终端设备用于传输 ACK/NACK反馈比特的 PUCCH format 3信道资源, 具体为 PDCCH中的 ACK/NACK资源指示比特 所指示的高层信令所配置的至少一个信道资源中的一个, 所述 PDCCH用于传输下行辅载波上的 PDSCH的下行调度指示, 和 /或用 于传输下行主载波上的 PDSCH的下行调度指示且所述 PDCCH中的 DAI值大于 1;
若所述终端设备接收到至少两个所述 PDCCH, 所述至少两个 PDCCH中的 ACK/NACK资源指示比特指示同一个信道资源。
17、 如权利要求 14所述的终端设备, 其特征在于, 所述第一生 成模块, 具体用于:
为所述 N个配置的下行载波中的 M个下行子帧中的数据生成 L 比特的 ACK/NACK反馈比特, 并生成 T 比特的辅助信息, 其中, K=L+T。
18、 如权利要求 17所述的终端设备, 其特征在于, 所述第一生 成模块, 具体用于:
对在所述 N个配置的下行载波, M个下行子帧中接收到的每个 数据包生成一个 ACK/NACK反馈信息, 对判断丢包的数据包生成一 个 NACK反馈信息;
对所述 N个配置的下行载波中的每个下行载波在所述 M个下行 子帧中的 ACK/NACK反馈信息进行合并,得到 L 比特的 ACK/NACK 反馈比特, 其中, L > N, 或对所有配置的下行载波上和 M个下行子 帧中的 ACK/NACK反馈信息进行合并, 生成 1比特的反馈比特。
19、 如权利要求 17所述的终端设备, 其特征在于, 所述第二生 成模块所生成的所述辅助信息, 具体用于:
包括至少 M个状态, 其中 M个状态指示所述终端设备在所述 M 个下行子帧中接收到具有 PDCCH传输的下行子帧的个数 S, S≥l , 所述 PDCCH为传输 PDSCH的下行调度指示的 PDCCH和 /或指示半 持续的 PDSCH激活 /释放的 PDCCH; 或,
包括至少 M个状态, 其中 M个状态指示所述终端设备在所述 M 个下行子帧中接收到具有 PDCCH传输的下行子帧的个数 S, S≥l , 且所述辅助信息的所述 M个状态中的一个状态复用指示所述终端设 备没有接收到任何有 PDCCH传输的下行子帧的情况, 所述 PDCCH 为传输 PDSCH的下行调度指示的 PDCCH和 /或指示半持续的 PDSCH 激活 /释放的 PDCCH; 或,
包括至少 M+2个状态, 其中 M个状态指示所述终端设备在所述 M个下行子帧中接收到具有 PDCCH传输的下行子帧的个数 S, S≥l , 且所述辅助信息中不同于所述 M个状态的一个独立的状态用于指示 所述终端设备仅接收到无对应 PDCCH传输的下行子帧的情况, 不同 于所述 M+1个状态一个独立的状态用于指示所述终端设备没有接收 到任何下行子帧的情况, 所述 PDCCH为传输 PDSCH的下行调度指 示的 PDCCH和 /或指示半持续的 PDSCH激活 /释放的 PDCCH; 或, 包括至少 M+1个状态, 其中 M个状态指示所述终端设备在所述 M个下行子帧中接收到具有 PDCCH传输的下行子帧的个数 S, S≥l , 且所述辅助信息中不同于所述 M个状态的一个独立的状态用于指示 所述终端设备没有接收到任何有 PDCCH传输的下行子帧的情况, 所 述 PDCCH为传输 PDSCH的下行调度指示的 PDCCH和 /或指示半持 续的 PDSCH激活 /释放的 PDCCH。
20、 如权利要求 14所述的终端设备, 其特征在于, 所述第一生 成模块, 具体用于:
对所述 M个下行子帧中的每个下行子帧, 在所述 N个配置的下 行载波上接收到的数据包生成 1个 ACK/NACK反馈信息, 对判断丢 包的数据包生成一个 NACK反馈信息;
对所述 M个下行子帧中的每个下行子帧在所述 N个配置的下行 载波上的 ACK/NACK反馈信息进行合并,生成 M比特的 ACK/NACK 反馈信息, 其中, K=M。
21、 如权利要求 14所述的终端设备, 其特征在于, 所述第一生 成模块, 具体用于:
根据所述终端设备在所述 N个配置的下行载波和 M个下行子帧 中正确接收的数据包的个数, 生成 K比特的 ACK/NACK反馈信息。
22、 一种 ACK/NACK反馈信息和周期 CQI/PMI/RI反馈比特同 时传输的方法, 其特征在于, 包括:
基站向终端设备发送下行数据;
所述基站在 PUCCH format 3的信道资源上, 接收所述终端设备 同时发送的 S 比特的周期 CQI/PMI/RI 反馈比特和 K 比特的 ACK/NACK反馈信息, 其中, N > 1 , M > 1 , M个下行子帧中的数 据的 ACK/NACK反馈信息同一个上行子帧中传输。
23、如权利要求 22所述的方法,其特征在于,所述 PUCCH format 3的信道资源, 具体为:
所述基站配置给所述终端设备用于传输周期 CQI/PMI/RI反馈比 特的 PUCCH format 3信道资源; 或,
所述基站配置给所述终端设备用于传输 ACK/NACK反馈比特的 PUCCH format 3信道资源。
24、如权利要求 23所述的方法,其特征在于,所述 PUCCH format 3 的信道资源为所述基站配置给所述终端设备用于传输周期 CQI/PMI/RI反馈比特的 PUCCH format 3信道资源时, 所述基站配置 给所述终端设备用于传输周期 CQI/PMI/RI反馈比特的 PUCCH format 3信道资源, 具体为:
所述基站通过高层信令预先为所述终端设备配置的一个信道资 源。
25、如权利要求 23所述的方法,其特征在于,所述 PUCCH format 3 的信道资源为所述基站配置给所述终端设备用于传输 ACK/NACK 反馈比特的 PUCCH format 3信道资源时, 所述基站配置给所述终端 设备用于传输 ACK/NACK反馈比特的 PUCCH format 3信道资源, 具体为:
所述基站发送给所述终端设备的 PDCCH中的 ACK/NACK资源 指示比特所指示的高层信令所配置的至少一个信道资源中的一个,所 述 PDCCH用于传输下行辅载波上的 PDSCH 的下行调度指示, 和 / 或用于传输下行主载波上的 PDSCH的下行调度指示且所述 PDCCH 中的 DAI值大于 1;
若所述基站发送给所述终端设备至少两个所述 PDCCH, 所述至 少两个 PDCCH中的 ACK/NACK资源指示比特指示同一个信道资源。
26、 如权利要求 22所述的方法, 其特征在于, 所述基站所接收 到的 K比特的 ACK/NACK反馈比特, 具体包括:
所述终端设备为 N个配置的下行载波中的 M个下行子帧中的数 据所生成的 L比特的 ACK/NACK反馈比特和 T比特的辅助信息,其 中, K=L+T。
27、 如权利要求 26所述的方法, 其特征在于, 所述基站所接收 到的 L比特的 ACK/NACK反馈比特, 具体包括:
所述终端设备对在所述 N个配置的下行载波, M个下行子帧中 接收到的每个数据包生成一个 ACK/NACK反馈信息, 对判断丢包的 数据包生成一个 NACK反馈信息;
所述终端设备对所述 N 个配置的下行载波中的每个下行载波在 所述 M个下行子帧中的 ACK/NACK反馈信息进行合并, 得到 L 比 特的 ACK/NACK反馈比特, 其中, L > N。
28、 如权利要求 26所述的方法, 其特征在于, 所述基站所接收 到的 L比特的 ACK/NACK反馈比特, 具体包括:
所述终端设备对在所述 N个配置的下行载波, M个下行子帧中 接收到的每个数据包生成一个 ACK/NACK反馈信息, 对判断丢包的 数据包生成一个 NACK反馈信息;
所述终端设备对所有配置的下行载波上和 M 个下行子帧中的 ACK/NACK反馈信息进行合并, 生成 1比特的 ACK/NACK反馈比 特。
29、 如权利要求 26所述的方法, 其特征在于, 所述基站所接收 到的 T比特的辅助信息, 具体包括:
所述辅助信息包括至少 M个状态, 其中 M个状态用于指示所述 终端设备在所述 M个下行子帧中接收到具有传输 PDCCH的下行子 帧的个数 S, S>1 , 所述 PDCCH为传输 PDSCH的下行调度指示的 PDCCH和 /或指示半持续的 PDSCH激活 /释放的 PDCCH。
30、 如权利要求 26所述的方法, 其特征在于, 所述基站所接收 到的 T比特的辅助信息, 具体包括:
所述辅助信息包括至少 M个状态, 其中 M个状态用于指示所述 终端设备在所述 M个下行子帧中接收到具有 PDCCH传输的下行子 帧的个数 S, S>1 , 且所述辅助信息的所述 M个状态中的一个状态复 用指示所述终端设备没有接收到任何有 PDCCH传输的下行子帧的情 况, 所述 PDCCH为传输 PDSCH的下行调度指示的 PDCCH和 /或指 示半持续的 PDSCH激活 /释放的 PDCCH。
31、 如权利要求 26所述的方法, 其特征在于, 所述基站所接收 到的 T比特的辅助信息, 具体包括:
所述辅助信息包括至少 M+2个状态, 其中 M个状态用于指示所 述终端设备在所述 M个下行子帧中接收到具有 PDCCH传输的下行 子帧的个数 S, S>1 , 且所述辅助信息中不同于所述 M个状态的一个 独立的状态用于指示所述终端设备仅接收到无对应 PDCCH传输的下 行子帧的情况, 不同于所述 M+1个状态一个独立的状态用于指示所 述终端设备没有接收到任何下行子帧的情况, 所述 PDCCH 为传输 PDSCH的下行调度指示的 PDCCH和 /或指示半持续的 PDSCH激活 / 释放的 PDCCH。
32、 如权利要求 26所述的方法, 其特征在于, 所述基站所接收 到的 T比特的辅助信息, 具体包括:
所述辅助信息包括至少 M+1个状态, 其中 M个状态用于指示所 述终端设备在所述 M个下行子帧中接收到具有 PDCCH传输的下行 子帧的个数 S, S>1 , 且所述辅助信息中不同于所述 M个状态的一个 独立的状态用于指示所述终端设备没有接收到任何有 PDCCH传输的 下行子帧的情况, 所述 PDCCH 为传输 PDSCH 的下行调度指示的 PDCCH和 /或指示半持续的 PDSCH激活 /释放的 PDCCH。
33、 如权利要求 22所述的方法, 其特征在于, 所述基站所接收 到的 K比特的 ACK/NACK反馈比特, 具体包括:
所述终端设备对所述 M个下行子帧中的每个下行子帧, 在 N个 配置的下行载波上接收到的数据包生成 1个 ACK/NACK反馈信息, 对判断丢包的数据包生成一个 NACK反馈信息;
所述终端设备对所述 M个下行子帧中的每个下行子帧在所述 N 个配置的下行载波上的 ACK/NACK反馈信息进行合并,生成 M比特 的 ACK/NACK反馈信息, 其中, K=M。
34、 如权利要求 22所述的方法, 其特征在于, 所述基站所接收 到的 K比特的 ACK/NACK反馈比特, 具体包括:
所述终端设备根据自身在 N个配置的下行载波和 M个下行子帧 中正确接收的数据包的个数, 生成 K比特的 ACK/NACK反馈信息。
35、如权利要求 22所述的方法,其特征在于,所述基站在 PUCCH format 3的信道资源上, 接收所述终端设备同时发送的 S比特的周期 CQI/PMI/RI反馈比特和 K比特的 ACK/NACK反馈信息之后, 所述 方法还包括:
所述基站根据接收到的 K比特的 ACK/NACK反馈信息的内容, 确定所述终端设备的数据接收情况,根据所述数据接收情况确定数据 重传策略, 并根据所述数据重传策略向所述终端设备进行数据重传。
36、 一种基站, 其特征在于, 包括:
发送模块, 用于向终端设备发送下行数据;
接收模块, 用于在 PUCCH format 3的信道资源上, 接收所述终 端设备同时发送的 S比特的周期 CQI/PMI/RI反馈比特和 K比特的 ACK/NACK反馈信息, 其中, N > 1 , M > 1 , M个下行子帧中的数 据的 ACK/NACK反馈信息同一个上行子帧中传输。
37、 如权利要求 36所述的基站, 其特征在于, 所述接收模块所 应用的所述 PUCCH format 3的信道资源, 具体为:
所述基站配置给所述终端设备用于传输周期 CQI/PMI/RI反馈比 特的 PUCCH format 3信道资源; 或,
所述基站配置给所述终端设备用于传输 ACK/NACK反馈比特的 PUCCH format 3信道资源。
38、 如权利要求 37所述的基站, 其特征在于,
当所述 PUCCH format 3的信道资源为所述基站配置给所述终端 设备用于传输周期 CQI/PMI/RI反馈比特的 PUCCH format 3信道资源 时, 所述基站配置给所述终端设备用于传输周期 CQI/PMI/RI反馈比 特的 PUCCH format 3信道资源, 具体为所述基站通过高层信令预先 为所述终端设备配置的一个信道资源;
当所述 PUCCH format 3的信道资源为所述基站配置给所述终端 设备用于传输 ACK/NACK反馈比特的 PUCCH format 3信道资源时, 所述基站配置给所述终端设备用于传输 ACK/NACK反馈比特的 PUCCH format 3信道资源, 具体为所述基站发送给所述终端设备的 PDCCH中的 ACK/NACK资源指示比特所指示的高层信令所配置的 至少一个信道资源中的一个, 所述 PDCCH用于传输下行辅载波上的 PDSCH的下行调度指示, 和 /或用于传输下行主载波上的 PDSCH的 下行调度指示且所述 PDCCH中的 DAI值大于 1;
若所述基站发送给所述终端设备至少两个所述 PDCCH, 所述至 少两个 PDCCH中的 ACK/NACK资源指示比特指示同一个信道资源。
39、 如权利要求 38所述的基站, 其特征在于, 所述接收模块所 接收到的 K比特的 ACK/NACK反馈比特, 具体包括:
所述终端设备为 N个配置的下行载波中的 M个下行子帧中的数 据所生成的 L比特的 ACK/NACK反馈比特和 T比特的辅助信息,其 中, K=L+T。
40、 如权利要求 39所述的基站, 其特征在于, 所述接收模块所 接收到的 L比特的 ACK/NACK反馈比特, 具体包括:
所述终端设备对在所述 N个配置的下行载波, M个下行子帧中 接收到的每个数据包生成一个 ACK/NACK反馈信息, 对判断丢包的 数据包生成一个 NACK反馈信息;
所述终端设备对所述 N 个配置的下行载波中的每个下行载波在 所述 M个下行子帧中的 ACK/NACK反馈信息进行合并, 得到 L 比 特的 ACK/NACK反馈比特, 其中, L > N, 或所述终端设备对所有配 置的下行载波上和 M个下行子帧中的 ACK/NACK反馈信息进行合 并, 生成 1比特的 ACK/NACK反馈比特。
41、 如权利要求 39所述的基站, 其特征在于, 所述接收模块所 接收到的 T比特的辅助信息, 具体用于:
包括至少 M个状态, 其中 M个状态指示所述终端设备在所述 M 个下行子帧中接收到具有 PDCCH传输的下行子帧的个数 S, S≥l , 所述 PDCCH为传输 PDSCH的下行调度指示的 PDCCH和 /或指示半 持续的 PDSCH激活 /释放的 PDCCH; 或,
包括至少 M个状态, 其中 M个状态指示所述终端设备在所述 M 个下行子帧中接收到具有 PDCCH传输的下行子帧的个数 S, S≥l , 且所述辅助信息的所述 M个状态中的一个状态复用指示所述终端设 备没有接收到任何有 PDCCH传输的下行子帧的情况, 所述 PDCCH 为传输 PDSCH的下行调度指示的 PDCCH和 /或指示半持续的 PDSCH 激活 /释放的 PDCCH; 或,
包括至少 M+2个状态, 其中 M个状态指示所述终端设备在所述 M个下行子帧中接收到具有 PDCCH传输的下行子帧的个数 S, S≥l , 且所述辅助信息中不同于所述 M个状态的一个独立的状态用于指示 所述终端设备仅接收到无对应 PDCCH传输的下行子帧的情况, 不同 于所述 M+1个状态一个独立的状态用于指示所述终端设备没有接收 到任何下行子帧的情况, 所述 PDCCH为传输 PDSCH的下行调度指 示的 PDCCH和 /或指示半持续的 PDSCH激活 /释放的 PDCCH; 或, 包括至少 M+1个状态, 其中 M个状态指示所述终端设备在所述 M个下行子帧中接收到具有 PDCCH传输的下行子帧的个数 S, S≥l , 且所述辅助信息中不同于所述 M个状态的一个独立的状态用于指示 所述终端设备没有接收到任何有 PDCCH传输的下行子帧的情况, 所 述 PDCCH为传输 PDSCH的下行调度指示的 PDCCH和 /或指示半持 续的 PDSCH激活 /释放的 PDCCH。
42、 如权利要求 36所述的基站, 其特征在于, 所述接收模块所 接收到的 K比特的 ACK/NACK反馈比特, 具体包括:
所述终端设备对所述 M个下行子帧中的每个下行子帧, 在 N个 配置的下行载波上接收到的数据包生成 1个 ACK/NACK反馈信息, 对判断丢包的数据包生成一个 NACK反馈信息;
所述终端设备对所述 M个下行子帧中的每个下行子帧在所述 N 个配置的下行载波上的 ACK/NACK反馈信息进行合并,生成 M比特 的 ACK/NACK反馈信息, 其中, K=M。
43、 如权利要求 36所述的基站, 其特征在于, 所述接收模块所 接收到的 K比特的 ACK/NACK反馈比特, 具体包括:
所述终端设备根据自身在 N个配置的下行载波和 M个下行子帧 中正确接收的数据包的个数, 生成 K比特的 ACK/NACK反馈信息。
44、 如权利要求 36所述的基站, 其特征在于, 还包括处理模块, 具体用于:
根据所述接收模块所接收到的 K比特的 ACK/NACK反馈信息的 内容, 确定所述终端设备的数据接收情况, 根据所述数据接收情况确 定数据重传策略,并根据所述数据重传策略向所述终端设备进行数据 重传。
PCT/CN2011/081996 2010-11-09 2011-11-09 Ack/nack反馈信息和周期cqi/pmi/ri反馈比特同时传输的方法和设备 WO2012062209A1 (zh)

Priority Applications (2)

Application Number Priority Date Filing Date Title
US14/002,105 US9628240B2 (en) 2010-11-09 2011-11-09 Method and device for simultaneous transmission of ACK/NACK feedback information and periodic CQI/PMI/RI feedback bits
EP11840612.3A EP2648354A4 (en) 2010-11-09 2011-11-09 Method and device for simultaneously transmitting ack/nack feedback information and periodic cqi/pmi/ri feedback bits

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201010539328.2A CN102468936B (zh) 2010-11-09 2010-11-09 Ack/nack反馈信息和周期cqi/pmi/ri反馈比特同时传输的方法和设备
CN201010539328.2 2010-11-09

Publications (1)

Publication Number Publication Date
WO2012062209A1 true WO2012062209A1 (zh) 2012-05-18

Family

ID=46050412

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2011/081996 WO2012062209A1 (zh) 2010-11-09 2011-11-09 Ack/nack反馈信息和周期cqi/pmi/ri反馈比特同时传输的方法和设备

Country Status (4)

Country Link
US (1) US9628240B2 (zh)
EP (1) EP2648354A4 (zh)
CN (1) CN102468936B (zh)
WO (1) WO2012062209A1 (zh)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103580825B (zh) * 2012-08-03 2017-05-24 电信科学技术研究院 Uci的传输方法和设备
CN103581891B (zh) * 2012-08-06 2019-01-25 中兴通讯股份有限公司 信息的处理方法及装置
KR101984594B1 (ko) * 2016-02-04 2019-06-03 주식회사 케이티 차량 통신 제어 방법 및 그 장치
WO2018084790A1 (en) 2016-11-04 2018-05-11 Telefonaktiebolaget Lm Ericsson (Publ) Ack/nack transmission strategies
CN108306720B (zh) * 2017-01-13 2022-06-21 北京三星通信技术研究有限公司 一种传输uci信息的方法和设备
WO2019127379A1 (zh) * 2017-12-29 2019-07-04 Oppo广东移动通信有限公司 上行带宽部分的激活方法、终端设备及计算机存储介质
US11076407B2 (en) * 2018-04-27 2021-07-27 Marvell Asia Pte, Ltd. Methods and apparatus for detecting ACK/NACK bits with dual list-RM decoder and symbol regeneration for LTE PUCCH format 3
CN111435847B (zh) * 2019-01-11 2022-07-12 华为技术有限公司 传输信息的方法和装置
CN110311768B (zh) * 2019-06-28 2022-08-19 展讯通信(上海)有限公司 反馈信息的发送方法、网元设备、终端及存储介质

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101383683A (zh) * 2008-09-22 2009-03-11 中兴通讯股份有限公司 反馈信息的发送方法和装置
CN101729217A (zh) * 2008-10-31 2010-06-09 华为技术有限公司 一种传输方法、装置和系统
CN101742452A (zh) * 2008-11-10 2010-06-16 华为技术有限公司 承载管理方法、相关设备及网络系统
CN101771502A (zh) * 2009-01-07 2010-07-07 中兴通讯股份有限公司 一种信息复用的方法、系统和用户终端

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8630184B2 (en) * 2007-08-15 2014-01-14 Qualcomm Incorporated Uplink control channel format
EP2238704B1 (en) * 2008-02-04 2011-08-31 Telefonaktiebolaget L M Ericsson (publ) Method and arrangement in a telecommunication system in which an acknowledgment message is fed back for a bundle of frames
WO2009157849A1 (en) * 2008-06-26 2009-12-30 Telefonaktiebolaget L M Ericsson (Publ) Staggered cqi /ack reporting in hsdpa systems with multiple up-link control channels
CN101635987B (zh) * 2008-07-25 2012-03-07 中兴通讯股份有限公司 一种反馈下行接收状态的方法
CN101686076A (zh) * 2008-09-26 2010-03-31 三星电子株式会社 利用多天线发送ack/nack信息的方法
CN102484869B (zh) * 2009-06-19 2015-09-16 交互数字专利控股公司 在lte-a中用信号发送上行链路控制信息
US20110103247A1 (en) * 2009-11-02 2011-05-05 Qualcomm Incorporated Channel status reporting
CN101789823B (zh) * 2010-02-11 2017-04-12 中兴通讯股份有限公司 控制格式指示值的传输方法和传输系统
US9515773B2 (en) * 2010-04-13 2016-12-06 Qualcomm Incorporated Channel state information reporting in a wireless communication network
US9219571B2 (en) * 2010-04-13 2015-12-22 Qualcomm Incorporated Aperiodic CQI reporting in a wireless communication network
US8315221B2 (en) * 2010-06-18 2012-11-20 Sharp Laboratories Of America, Inc. Reducing feedback overhead for multiple component carriers
US10135595B2 (en) * 2010-06-21 2018-11-20 Telefonaktiebolaget L M Ericsson (Publ) Uplink control information (UCI) mapping indicator for long term evolution (LTE) carrier aggregation

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101383683A (zh) * 2008-09-22 2009-03-11 中兴通讯股份有限公司 反馈信息的发送方法和装置
CN101729217A (zh) * 2008-10-31 2010-06-09 华为技术有限公司 一种传输方法、装置和系统
CN101742452A (zh) * 2008-11-10 2010-06-16 华为技术有限公司 承载管理方法、相关设备及网络系统
CN101771502A (zh) * 2009-01-07 2010-07-07 中兴通讯股份有限公司 一种信息复用的方法、系统和用户终端

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
"PUCCH Format 3 Resource Selection", 3GPP TSG-RAN WGI MEETING #62BI, RL-105711, 11 October 2010 (2010-10-11) - 15 October 2010 (2010-10-15), XI'AN, CHINA, XP050489336 *
See also references of EP2648354A4 *

Also Published As

Publication number Publication date
CN102468936A (zh) 2012-05-23
US20140023011A1 (en) 2014-01-23
EP2648354A4 (en) 2018-02-21
CN102468936B (zh) 2014-12-10
US9628240B2 (en) 2017-04-18
EP2648354A1 (en) 2013-10-09

Similar Documents

Publication Publication Date Title
JP5948423B2 (ja) Pucchフォーマット3リソースを用いるack/nackとチャネル状態情報の同時報告
KR101927719B1 (ko) 하향링크 반송파 집적을 채용한 tdd 시스템에서 harq-ack 전송을 코딩하는 방법 및 장치
US9241342B2 (en) Method and apparatus for ACK/NACK transmission
JP5705965B2 (ja) 複数のキャリアについての制御情報のフィードバック
WO2012062209A1 (zh) Ack/nack反馈信息和周期cqi/pmi/ri反馈比特同时传输的方法和设备
JP5498506B2 (ja) 動的pdschに対するharqack/nack
WO2017049463A1 (zh) 载波聚合下的上行控制信息传输方法及装置
EP2640119B1 (en) Mobile station device, base station device, wireless communication system, wireless communication method, and integrated circuit
WO2012144865A2 (ko) 통신 시스템에서 제어신호 송수신 장치 및 방법
WO2017045138A1 (zh) 控制信息的发送方法和通信设备
WO2011085582A1 (zh) 一种多载波系统及其正确/错误应答消息的发送方法
WO2017028038A1 (zh) 一种上行控制信息的发送方法、接收方法及相关装置
WO2012022140A1 (zh) 正确错误应答在物理上行控制信道上的反馈方法及系统
JP2015527781A (ja) 無線通信システムにおけるアップリンク制御チャネルのためのリソース割当方法および装置
WO2012171413A1 (zh) Harq-ack的反馈处理方法及系统
WO2011120411A1 (zh) 上行控制信道资源的确定方法和设备
WO2012088874A1 (zh) 一种混合自动重传请求应答消息的发送方法及用户终端
WO2011098047A1 (zh) 实现半持续调度业务或类似半持续调度业务的方法及设备
WO2011079774A1 (zh) 一种反馈信息的传输方法及传输装置
CN102293039A (zh) 无线通信系统、基站装置、移动站装置、以及无线通信方法
EP2536060A1 (en) Method for transmitting acknowledgement/negative acknowledgement message on physical uplink control channel and user equipment thereof
WO2012155701A1 (zh) 一种反馈信息的发送方法及终端
WO2012062128A1 (zh) 一种上行控制信令的传输方法及终端、基站
WO2012113305A1 (zh) 控制信息的传输方法、装置及系统
WO2012088877A1 (zh) 一种应答信息的发送方法及用户终端

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 11840612

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

WWE Wipo information: entry into national phase

Ref document number: 14002105

Country of ref document: US