WO2012046549A1 - 電力制御装置、電力制御方法、および給電システム - Google Patents
電力制御装置、電力制御方法、および給電システム Download PDFInfo
- Publication number
- WO2012046549A1 WO2012046549A1 PCT/JP2011/070942 JP2011070942W WO2012046549A1 WO 2012046549 A1 WO2012046549 A1 WO 2012046549A1 JP 2011070942 W JP2011070942 W JP 2011070942W WO 2012046549 A1 WO2012046549 A1 WO 2012046549A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- voltage
- power
- storage element
- power generation
- control
- Prior art date
Links
Images
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05F—SYSTEMS FOR REGULATING ELECTRIC OR MAGNETIC VARIABLES
- G05F1/00—Automatic systems in which deviations of an electric quantity from one or more predetermined values are detected at the output of the system and fed back to a device within the system to restore the detected quantity to its predetermined value or values, i.e. retroactive systems
- G05F1/66—Regulating electric power
- G05F1/67—Regulating electric power to the maximum power available from a generator, e.g. from solar cell
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J7/00—Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
- H02J7/34—Parallel operation in networks using both storage and other dc sources, e.g. providing buffering
- H02J7/35—Parallel operation in networks using both storage and other dc sources, e.g. providing buffering with light sensitive cells
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02M—APPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF
- H02M3/00—Conversion of dc power input into dc power output
- H02M3/02—Conversion of dc power input into dc power output without intermediate conversion into ac
- H02M3/04—Conversion of dc power input into dc power output without intermediate conversion into ac by static converters
- H02M3/10—Conversion of dc power input into dc power output without intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode
- H02M3/145—Conversion of dc power input into dc power output without intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode using devices of a triode or transistor type requiring continuous application of a control signal
- H02M3/155—Conversion of dc power input into dc power output without intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode using devices of a triode or transistor type requiring continuous application of a control signal using semiconductor devices only
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
- Y02E10/56—Power conversion systems, e.g. maximum power point trackers
Definitions
- the present disclosure relates to a power control device, a power control method, and a power supply system that control supply of power generated by a power generation element.
- solar power generation elements are gradually spreading to ordinary households as the price of solar cells (solar panels) that can be placed on the roofs of houses and the like have increased and the efficiency of power generation has increased.
- solar power generation devices are becoming smaller, and sales of mobile phones equipped with solar cells have begun.
- a solar cell is different from a constant voltage source such as a dry cell and has a property as a current source depending on a voltage between terminals. Therefore, in order to obtain the maximum output from the solar cell, it is necessary to match the voltage of the load connected to the solar cell with the maximum operating point voltage of the solar cell. In addition, there is only one maximum operating point (MPP: Maximum Power Point) at which the power becomes maximum in the current-voltage characteristics of the solar cell. However, since the current-voltage characteristics of the solar cell change depending on the environment such as illuminance and temperature, it is necessary to perform control for obtaining the maximum operating point voltage during operation of the solar cell connected device. Such control for obtaining the maximum operating point during device operation is called MPPT (Maximum PowerPoint Tracking) control.
- a charge control method for performing full charge detection by comparing a terminal open voltage of a stored value with a threshold value is known (see, for example, Patent Document 1).
- charging and release are repeated at regular time intervals in the first step.
- charging is stopped when the open circuit voltage is equal to or higher than a certain voltage.
- the third step when the voltage becomes equal to or lower than the charge resumption voltage, the process returns to the first step again to resume charging.
- This technology is a charge control method to which a DC-DC converter that charges a storage battery with a load by stepping up or down a direct current voltage generated by a solar battery is applied.
- this charge control method the input voltage and the output voltage are compared, and when the ratio is within a certain range, the DC-DC converter is disconnected from the load side, and the solar cell and the storage battery are directly connected (directly connected).
- Patent Document 1 has the following disadvantages.
- the generated power at the time of opening is discarded, so that the full charge arrival time becomes longer if the ratio of the opening time is high. If the time interval is long from opening to the next opening, full charge detection may be delayed and overcharging may occur. Even if the amount of charge is still small, the battery is opened, so that the charging time becomes longer.
- the input voltage and the output voltage are compared, and when the ratio is within a certain range, switching from boosting to direct coupling is performed. Spot power may be low or power generation may not be possible.
- the present disclosure is to provide a power control device, a power control method, and a power feeding system that can be controlled to maintain the maximum operating point of a power generation element such as a solar cell and that can avoid power loss. .
- the power control device is configured to connect a power generation element and to connect a power path switching unit that switches a power path to a load-side power storage element according to a path switching signal, and the power path switching unit.
- a voltage conversion unit that converts a voltage level generated by the power generation element and that can be supplied to the load-side power storage element, and a function of measuring an open voltage of the power generation element.
- a characteristic measuring circuit for obtaining a maximum operating point voltage of the power generating element based on the magnitude relationship between at least the maximum operating point voltage of the open circuit voltage and the maximum operating point voltage of the power generating element and the voltage of the load side storage element
- a control unit that outputs the path switching signal according to a comparison result between the load side power storage element and the load side storage element to the power path switching unit, and the power path switching unit includes: Route cut off Depending on the signal path the power generating element connecting the output connected to said voltage conversion unit to the storage element side, or to form a path directly connecting the power generating element to the storage element side.
- the power generation element is connected to a voltage conversion unit that converts the voltage level generated by the power generation element and can be supplied to the load side power storage element, or the load side
- the open circuit voltage of the power generation element is measured
- the maximum operating point voltage of the power generation element is obtained based on the measured open circuit voltage
- the power generation element A switching threshold is set according to the magnitude relationship between at least the maximum operating point voltage and the voltage of the load side storage element among the open circuit voltage and the maximum operating point voltage, and the comparison result between the load side storage element and the switching threshold Accordingly, a path for connecting the power generation element to the voltage conversion unit and connecting the output to the power storage element side or a path for directly connecting the power generation element to the power storage element side is formed.
- a power supply system includes a power generation element that generates power, a power storage element that stores power generated by the power generation element, and supplies power from the power generation element to the power storage element on a load side.
- a power control device wherein the power control device includes a power path switching unit that is connectable to a power generation element and switches a power path to the load-side power storage element in accordance with a path switching signal, and the power path switching unit.
- the voltage level generated by the power generation element supplied via the voltage conversion unit that can be supplied to the load-side power storage element and the function of measuring the open voltage of the power generation element are measured and the measured open
- a characteristic measuring circuit for obtaining a maximum operating point voltage of the power generating element based on a voltage; and at least the maximum operating point voltage of the open circuit voltage and the maximum operating point voltage of the power generating element and the voltage of the load side storage element A switching threshold generated according to a small relationship, and a control unit that outputs the path switching signal according to a comparison result with the load-side storage element to the power path switching unit, the power path switching unit
- the power generation element is connected to the voltage conversion unit, and a path for connecting the output to the power storage element side or a path for directly connecting the power generation element to the power storage element side is formed.
- the power control device includes a control unit that performs charge control of the load-side power storage element of the power generated by the power generation element, the control unit monitors the voltage of the power storage element, When the voltage at the time of opening the storage element terminal reaches a full charge voltage or more, or the difference between the charging voltage before opening the storage element and the voltage at the time of opening the storage element terminal has reached a certain value or less. In this case, charge control for stopping charging is performed, and the terminal open time interval of the power storage element is changed according to the voltage or current of the power storage element or the power generation element.
- the power control apparatus includes a control unit that performs charge control of the load-side power storage element of the power generated by the power generation element, and the control unit monitors the voltage of the power storage element.
- the control unit monitors the voltage of the power storage element.
- charge control for stopping charging is performed, and control is performed so that full charge detection is not performed by opening the storage element terminal until the voltage of the storage element reaches the full charge voltage.
- the power control method monitors the voltage of the power storage element when performing charge control of the load side power storage element of the power generated by the power generation element, and the voltage when the power storage element terminal is opened. Charge control to stop charging when the battery reaches a full charge voltage or when the difference between the charge voltage before opening the storage element and the voltage when the storage element terminal is opened reaches a certain value or less. And the terminal open time interval of the power storage element is changed according to the voltage or current of the power storage element or the power generation element.
- the power control method monitors the voltage of the power storage element when performing charge control of the load side power storage element of the power generated by the power generation element, and opens the power storage element terminal.
- the charging stops charging. Until the voltage of the power storage element reaches the full charge voltage, control is performed so that full charge detection is not performed by opening the power storage element terminal.
- a power supply system includes: a power generation element that generates power; a power storage element that stores power generated by the power generation element; and a power control apparatus that supplies power from the power generation element to the power storage element
- the power control device has a control unit that performs charge control of the load-side power storage element of the power generated by the power generation element, the control unit monitors the voltage of the power storage element, and When the voltage when the storage element terminal is opened reaches or exceeds the full charge voltage, or when the difference between the charge voltage before opening the storage element and the voltage when the storage element terminal is opened reaches a certain value or less. Then, charge control for stopping charging is performed, and control is performed so that full charge detection is not performed by opening the storage element terminal until the voltage of the storage element reaches the full charge voltage.
- control can be performed so as to maintain the maximum operating point of a power generation element such as a solar battery, and power loss can be avoided.
- FIG. 18 is a diagram for explaining the operation of the step-up switching regulator of FIG. 17.
- FIG. 18 is a circuit diagram illustrating a configuration example of a step-up switching regulator including a detection system that detects a change in operating frequency in the PFM control unit of FIG. 17.
- FIG. 1 is a diagram illustrating an example of an overall configuration of a power feeding system according to an embodiment of the present disclosure.
- the power feeding system 10 includes a power generation element 20, a power control device 30, and a power storage element 40 as main components.
- the power feeding system 10 includes a thermistor 50 connected to the power control device 30.
- the power supply system 10 charges a power storage element (battery) 40, which is a secondary battery, from a power generation element 20 such as a solar battery, not only in daylight but also in daily life such as in the shade, indirect light, and in a bright room. It is configured to be possible in the environment.
- the power control device 30 is formed as a charge control LSI that uses the power generated by the power generation element 20 without waste for charging.
- the power control device 30 can be charged by connecting a Li + type (including polymer) secondary battery as the storage element 40.
- the power control apparatus 30 can connect one or a plurality of power generation elements 20. In the present embodiment, an example in which one power generating element 20 is connected is shown. In the present embodiment, the power control device 30 can use any number of series cells including a single cell.
- the power control device 30 can use various power generation elements 20 and can control the maximum efficiency without depending on the power-voltage characteristics of the power generation elements 20.
- the power control device 30 can be charged with high efficiency by performing MPPT control that follows the maximum power operating point of the power generation element (solar cell) 20.
- the power control device 30 can perform MPPT control even in the single-cell power generation element 20.
- the power control device 30 can control charging of the power storage element 40 and power control of the solar cell.
- the power control device 30 employs charging control for a storage battery that can detect full charge by comparing the terminal open voltage of the storage element with a threshold voltage.
- the electric power control apparatus 30 can monitor the voltage of the electrical storage element 40, and when the voltage at the time of storage battery terminal open
- the electric power control apparatus 30 controls so that an open time interval becomes short, so that the output of a power supply is high.
- the power control device 30 does not open the storage battery terminal when the charge control is performed to stop charging, and the voltage at the time of charging is fully charged. Control is performed so that full charge detection is not performed by opening the battery terminal until the voltage exceeds the voltage. Thereby, the power control apparatus 30 can reduce the charge loss at the time of full charge detection and can prevent overcharge in the charge to the electrical storage element 40.
- the power control device 30 is capable of switching control such as whether to input voltage to a voltage conversion unit such as a step-up or step-down DC-DC converter to perform step-up or step-down, or to disconnect the voltage conversion unit and connect directly. .
- a voltage conversion unit such as a step-up or step-down DC-DC converter
- the power control device 30 charges the storage battery through the voltage conversion unit (boost circuit) to the output of the power generation element 20, or does not pass the voltage conversion unit. Or control to switch the storage element without being moved.
- the power control device 30 obtains the open circuit voltage Voc and the maximum operating point voltage Vpm of the power generation element 20 such as a solar battery, and sets the voltage therebetween as a switching point.
- the power control device 30 charges the storage element through the voltage conversion unit (step-down circuit) to the output of the power generation element 20 or passes the voltage conversion unit. Control is performed to switch whether the power storage element is charged without moving. At this time, the power control device 30 obtains the maximum operating point voltage Vpm of the power generation element 20 such as a solar battery, and sets a voltage equal to or lower than the maximum operating point voltage Vpm as a switching point. Thereby, the power control apparatus 30 can obtain charging power with high power generation efficiency with a simple circuit configuration in charging from the power generation element 20 such as a solar battery.
- the power control device 30 can control the start and end (full charge) of charging of the power storage element 40.
- the power control device 30 has a function of stopping charging when, for example, a fixed or variable charging end voltage is reached.
- the power control device 30 has a function of starting charging when reaching a fixed or variable charging start voltage after stopping charging, for example.
- the power control device 30 can control the maximum charging current at high illumination, for example, by an external current control resistor.
- the current control threshold can be set by externally attaching a resistor for measuring the charging current flowing through the storage element 40.
- the power control device 30 has a function of reducing the loss of the forward voltage VF while preventing backflow by bypass control of the backflow prevention diode from the power storage element 40 to the power generation element 20.
- the power control device 30 has a function of outputting the power of the power generation element 20 from the load driving terminal after detecting full charge for detecting that the open circuit voltage of the power storage element 40 has reached a certain value.
- the power control device 30 can be initially charged until the voltage recovers when the storage element 40 is in an overdischarged state where the voltage is equal to or lower than a predetermined voltage, for example, 2.7 V or lower. In this case, the power control device 30 can be charged by reducing (squeezing) the current using, for example, an external current limiting resistor.
- the power control device 30 has a function of preventing charging at 0 ° C. or lower or 60 ° C. or higher using, for example, an externally connected thermistor.
- the power control device 30 can control charging stop and transition to the sleep mode, for example, by an external enable terminal. Further, the power control device 30 can be configured to output the output power information.
- the power generation element 20 has a function of generating power using natural energy such as sunlight or wind power, and supplies the generated power to the power control device 30.
- a solar power generation panel using photoelectric conversion of sunlight for example, a solar cell is employed.
- FIG. 2 is a diagram showing an equivalent circuit of a photovoltaic power generation panel as a power generation element according to this embodiment.
- the photovoltaic power generation panel (solar cell) 21 generates a current by light input.
- the current Ish is expressed by replacing the optical input OPT with an electromotive force (Iph).
- the total resistance of the base of the solar cell 21, the light receiving layer, and the electrode portion is indicated by a series resistance Rs, and the loss resistance of the solar battery 21 is indicated by Rsh.
- the output current of the solar cell 21 is indicated by Id, and the output voltage is indicated by V.
- the current increases when the amount of light incident is large (bright), and the current decreases when the amount of light incident is small (dark).
- the brightness of light is represented by the size of the current source. As the voltage increases, the current gradually decreases.
- This equivalent circuit has a configuration in which a current source 22, a diode 23, and a resistor 24 are connected in parallel, and a resistor 25 is connected in series.
- the current source 22 supplies a photocurrent Iph
- the diode 23 is an ideal diode.
- FIG. 3 is a diagram showing current-voltage characteristics of a general solar cell.
- the output current value is uniquely determined.
- the voltage between the terminals when the current value is 0 is called an open circuit voltage (Voc)
- the output current value when the voltage value between the terminals is 0 is called a short circuit current (Isc).
- Ipm maximum operating point current
- Vpm maximum operating point voltage
- the power storage element is charged to the output of the power generation element 20 through a voltage conversion unit that is a DC-DC converter, or the power storage element is charged without passing through the voltage conversion unit or moving. Control to switch between them is performed.
- the power control device 30 obtains the open circuit voltage Voc and the maximum operating point voltage Vpm of the power generation element 20 such as a solar battery, and sets the voltage therebetween as a switching point.
- the power control device obtains the maximum operating point voltage Vpm of the power generating element 20 such as a solar battery, and sets a voltage equal to or lower than the maximum operating point voltage Vpm as a switching point.
- the power control device 30 monitors the voltage of the storage element 40, and when the voltage when the storage battery terminal is opened reaches a full charge voltage or more, charge control is performed to stop charging, and the storage element The higher the voltage is, the shorter the terminal open time interval of the storage element is controlled. And in the electric power control apparatus 30, in the case of the charge to the electrical storage element 40 from the power supply from which the output of the electric power generating elements 20, such as a solar cell, fluctuates, it is controlled so that an open time interval becomes short, so that the output of a power supply is high. In the power control device 30, when performing charge control, do not open the storage battery terminal, and do not detect full charge by opening the storage battery terminal until the voltage at the time of charging becomes equal to or higher than the full charge voltage. Controlled.
- the electric power obtained by the solar cell 21 is direct current, and this direct current power (DC power) is supplied to the power control device 30.
- the power storage element 40 stores the power supplied by the power control device 30.
- the power storage element 40 for example, an electric double layer capacitor, a lithium ion secondary battery, or the like whose charge voltage changes can be adopted.
- FIG. 4 is a diagram illustrating a configuration example of the energy storage device according to the present embodiment.
- Power storage element 40 includes a battery pack 41, a charge control field effect transistor (FET) 42, a discharge control FET 43, a diode 44, and a current detection resistor 45.
- Power storage element 40 has positive electrode terminal T1 and negative electrode terminal T2 connected to a positive electrode terminal and a negative electrode terminal of an electronic device that is a load. In the storage element 40, charging / discharging of the assembled battery 41 is performed through the charge control FET 42, the discharge control FET 43, the diode 44, and the current detection resistor 45 under the control of the power control device 30.
- the assembled battery 41 is a secondary battery such as a lithium ion secondary battery, and is an assembled battery in which a plurality of battery cells are connected in series and / or in parallel.
- the example of FIG. 4 shows a case where three battery cells are connected in series.
- the power control device 30 performs control to prevent overcharging and overdischarging of the storage element 40 and control so that it can be safely charged during charging.
- the voltage of each of the assembled battery 41 and the battery cells in the assembled battery 41 is measured every predetermined time, and the magnitude and direction of the current flowing through the current detection resistor 45 are measured every predetermined time.
- the charge control FET 42 is controlled to be OFF when the voltage of any cell of the assembled battery 41 becomes the overcharge detection voltage.
- the discharge control FET 43 is controlled to be OFF, and overcharge and overdischarge are prevented.
- the overcharge detection voltage is determined to be 4.2V ⁇ 0.5V, for example, and the overdischarge detection voltage is determined to be 2.4V ⁇ 0.1V.
- a CCCV (Constant Current Constant Voltage) charging method is generally used as a charging method for the assembled battery 41.
- CC charging Constant Current Constant Voltage
- CV charging constant voltage
- the power control device 30 includes a voltage conversion unit 31 and a power switch circuit 32 as a power path switching unit included in the power path unit.
- the power control device 30 includes a characteristic measurement circuit 33, a first control unit 34, a second control unit 35, a backflow prevention circuit 36, a current / voltage limiting circuit 37, and a startup circuit 38 as main components.
- the voltage conversion unit 31 has a function of increasing or decreasing the voltage generated by the power generation element 20 and selectively supplied by the power switch circuit 32.
- the voltage conversion unit 31 supplies the voltage obtained by stepping up or stepping down to the storage element 40 through the power switch circuit 32 and the backflow prevention circuit 36, for example.
- the voltage conversion unit 31 is constituted by a DC-DC converter, for example. A specific configuration of the voltage conversion unit 31 will be described in detail later.
- the power switch circuit 32 has a connection relationship among the power generation element (solar cell) 20, the voltage conversion unit (step-up and step-down circuit) 31, and the storage element (secondary battery) 40 according to the first control unit 34 or the second control unit 34. It has a function of determining according to the control of the control unit 35. That is, the power switch circuit 32 functions as a power path switching unit.
- the power switch circuit 32 connects the power generation element 20 to the voltage conversion unit 31 and connects the output to the storage element 40 side according to the control of the first control unit 34 or the second control unit 35. Alternatively, switching control such as directly connecting the output of the power generation element 20 to the power storage element 40 side is performed.
- FIG. 5 is a diagram illustrating a configuration example of the power switch circuit 32 according to the embodiment of the present disclosure.
- the power switch circuit 32 in FIG. 5 includes switches SW1 and SW2.
- the terminal a is connected to the voltage output line of the power generation element (solar cell) 20
- the terminal b is connected to the input terminal of the voltage converter 31
- the terminal c is connected to the terminal c of the switch SW2.
- the switch SW ⁇ b> 2 has a terminal a connected to the voltage input line of the storage element (storage battery) 40 and a terminal b connected to the conversion voltage output line of the voltage converter 31.
- the switches SW1 and SW2 connect the terminal a to the terminal b when receiving the path switching signal PATH from the first control unit 34 at, for example, a high level, and connect the terminal a to the terminal c when receiving the low level.
- the power switch circuit 32 when the power switch circuit 32 receives the path switching signal PATH at a high level, the power switch circuit 32 forms a path that connects the power generation element 20 to the voltage conversion unit 31 and connects the output to the power storage element 40 side.
- the power switch circuit 32 receives the path switching signal PATH at a low level, the power switch circuit 32 disconnects the voltage conversion unit 31 and the power storage element 40 as a load, and directly connects (directly connects) the power generation element 20 to the power storage element 40 side.
- the characteristic measurement circuit 33 has a function of measuring the short circuit current Ish and the open circuit voltage Voc of the power generation element (SC1) 20.
- the characteristic measurement circuit 33 performs current-voltage (IV) measurement for performing MPPT control in the voltage converter 31 when the power path including the voltage converter 31 including the booster circuit and the step-down circuit is selected. .
- the first control unit 34 performs selection control of the power path of the power switch circuit 32 based on the measurement result of the characteristic measurement circuit 33.
- the first control unit 34 selects, for example, an IV measurement result when the power path including the voltage conversion unit 31 including the booster circuit and the step-down circuit is selected. Based on this, MPPT control in the voltage converter 31 is performed.
- Control method of characteristic measurement circuit In general, when charging with a power generation element (solar cell) is performed in an energy-efficient manner, a method of performing MPPT control and using a booster circuit is used. In the present embodiment, for energy efficient charging, the connection of one or a plurality of power generation elements (solar cells) and the connection of a voltage conversion unit (step-up and step-down) circuit are changed according to the determination result, Control is performed such that the circuit configuration of the solar battery charging circuit can be optimized. In order to realize an optimum circuit configuration in the power switch circuit 32, optimum control is performed on the power switch circuit 32 based on the measurement result of the characteristic measurement circuit 33.
- the characteristic measurement circuit 33 measures the open circuit voltage Voc and the short circuit current Ish of the power generation element (SC1) 20 in order to obtain information for selecting the power path.
- the characteristic measurement circuit 33 supplies the measurement result to the first control unit 34.
- the characteristic measurement circuit 33 measures the voltage VC1 of the power generation element (SC1) 20 for MPPT control.
- the characteristic measurement circuit 33 supplies the measurement result to the first control unit 34 and the second control unit 35. In that case, information on the resistance value R is included.
- the current I during operation is obtained from V / R.
- FIG. 6 is a circuit diagram showing a configuration example of the characteristic measurement circuit according to the present embodiment.
- a capacitor C ⁇ b> 1 is connected in series with the power generation element (solar cell) 20.
- a switching transistor Q1 for resetting the capacitor C1 is connected between the connection node ND1 and the reference potential VSS.
- the switching transistor Q1 is formed of an NMOSFET, and a reset signal RST is selectively supplied to the gate.
- this characteristic side circuit 33A it is possible to search for the MPP even if it is not a simple convex PV characteristic, and it can be controlled by the voltage regulation method without performing so-called hill climbing processing. This is particularly effective when the MPP estimation from the open circuit voltage is insufficient. Moreover, if the capacitor of the booster circuit of the voltage converter 31 can be used, measurement can be performed without additional components.
- the power control device 30 of the present embodiment basically includes a circuit that charges the power storage element (storage battery) 40 from the power supply element (solar battery) 20 through the voltage converter 31 of the boosting system. It has a configuration.
- the power switch circuit 32 connects the power generation element 20 to the voltage conversion unit 31 and connects the output to the power storage element 40 side, or outputs the power generation element 20 to the power storage element 40 side. Switching control such as direct connection to is performed.
- FIG. 7 is a diagram showing the power voltage characteristics of the solar cell for explaining the concept of the step-up direct connection switching control according to the present embodiment.
- the first control unit 34 compares the voltage V BAT of the storage element (storage battery) 40 generating element (solar cell) 20 maximum power point voltage Vpm, and the open-circuit voltage Voc of the power generating element (solar cell) 20, Vpm ⁇ A voltage satisfying V BAT ⁇ Voc is set as a switching threshold value for the step-up direct coupling switching control. That is, the first control unit 34 uses a voltage V BAT of the power storage element 40 that is equal to or higher than the maximum operating point voltage Vpm of the power generation element 20 and equal to or lower than the open circuit voltage Voc of the power generation element 20 as a switching threshold. For example, the first control unit 34 sets VBAT> (Vpm + Voc) / 2 as a threshold value.
- the first control unit 34 determines whether or not the voltage V BAT of the power storage element 40 is greater than the average value of the maximum operating point voltage Vpm of the power generation element 20 and the open circuit voltage Voc of the power generation element 20.
- the voltage Vddc_start is set as a switching threshold.
- the first control unit 34 determines that boosting is unnecessary when the voltage V BAT of the power storage element 40 is equal to or lower than the maximum operating point voltage Vpm of the power generation element 20. Further, the first control unit 34 determines that the voltage needs to be boosted when the voltage V BAT of the power storage element 40 is equal to or higher than the open circuit voltage Voc of the power generation element 20. Therefore, the power generation efficiency is not greatly reduced by setting the switching threshold value in the region between them.
- the characteristic measurement circuit 33 periodically measures the open circuit voltage Voc and determines whether to connect to the boosting system voltage converter 31 or to directly connect the power generation element 20 and the storage element 40.
- the maximum operating point voltage Vpm used in this determination can be obtained by resistance division by multiplying the measured open circuit voltage by a predetermined coefficient Coef, for example, 0.8.
- FIG. 8 is a circuit diagram showing a detection system for the maximum operating point voltage of the power generating element in the case of the voltage converter of the boosting system according to the present embodiment.
- the maximum operating point voltage detection system MVDTB in FIG. 8 includes resistance dividers RDVB10 and RDVB20 and a comparator CMPB10.
- the resistance dividers RDVB10 and RDVB20 are arranged in the characteristic measuring circuit 33, and the comparator CMPB10 is arranged in the first controller 34.
- all of the detection systems MVDTB can be arranged in the characteristic measurement circuit 33 and the determination result of the comparator CMPB10 can be notified to the first control unit 34.
- the resistance dividing unit RDVB10 is configured by connecting resistance elements RB11 and RB12 in series between a voltage output line of the power generation element 20 and a reference potential (here, ground potential) GND, and the voltage obtained by resistance division at the connection node NDB11 is the maximum. Appears as operating point voltage Vpm.
- the resistance dividing unit RDVB20 is configured by connecting resistance elements RB21 and RB22 in series between the supply line of the measured open circuit voltage Voc and the supply line of the maximum operating point voltage Vpm, and a threshold value obtained by resistance division at the connection node NDB21. Appears as voltage ⁇ (Vpm + Voc) / 2 ⁇ .
- Comparator CMPB10 compares the voltage V BAT and the threshold voltage of the storage element 40 ⁇ (Vpm + Voc) / 2 ⁇ . When the voltage V BAT is higher than the threshold voltage ⁇ (Vpm + Voc) / 2 ⁇ , the comparator CMPB10 requires boosting and outputs the path switching signal PATH to the power switch circuit 32 at a high level, for example. When the power switch circuit 32 receives the path switching signal PATH at a high level, the power switch circuit 32 connects the power generation element 20 to the voltage conversion unit 31 and forms a path for connecting the output to the power storage element 40 side.
- the comparator CMPB10 When the voltage V BAT is equal to or lower than the threshold voltage ⁇ (Vpm + Voc) / 2 ⁇ , the comparator CMPB10 outputs the path switching signal PATH to the power switch circuit 32 at a low level because boosting is unnecessary.
- the power switch circuit 32 receives the path switching signal PATH at a low level, the power switch circuit 32 disconnects the voltage conversion unit 31 and the power storage element 40 as a load, and directly connects (directly connects) the power generation element 20 to the power storage element 40 side.
- FIG. 9 is a diagram more specifically showing the concept of step-up direct connection switching control according to the present embodiment.
- the first control unit 34 sets a voltage satisfying Vpm ⁇ V BAT ⁇ Voc as the switching threshold value for the step-up direct coupling switching control. For example, the first control unit 34 switches the voltage Vddc_start for determining whether or not the voltage V BAT of the power storage element 40 is greater than the average value of the maximum operating point voltage Vpm of the power generation element 20 and the open circuit voltage Voc of the power generation element 20.
- the threshold is used.
- PWRL indicates the amount of power generation reduction due to conversion loss when boosted.
- PWRB indicates the power when boosted
- PWRD indicates the power when directly connected (directly attached).
- a region indicated by a symbol X is a region where the voltage V BAT of the storage element 40 is equal to or lower than the switching threshold voltage Vddc_start.
- the path switching signal PATH is set to a low level.
- a region indicated by a symbol Y is a region in which the voltage V BAT of the power storage element 40 is not less than the switching threshold voltage Vddc_start and not more than the open circuit voltage Voc. In this region, it is basically better to boost the voltage.
- the minimum compensation threshold voltage Vddc_min is set for this power generation output voltage.
- the maximum operating point voltage Vpm is lower than the minimum compensation threshold ground voltage Vddc_min (Vpm ⁇ Vddc_min), it is directly attached. The reason is that although it is desired to boost the voltage, since the maximum operating point voltage Vpm is small, the loss is larger even when boosted. In this case, the path switching signal PATH is set to a low level. On the other hand, if Vpm ⁇ Vddc_min, the voltage is boosted. In this case, the path switching signal PATH is set to a high level.
- the region indicated by the symbol Z is a region in which power generation cannot be basically performed unless the pressure is increased. However, when Vpm ⁇ Vddc_min, the voltage is released, and when Vpm ⁇ Vddc_min, the voltage is boosted. When boosting, the path switching signal PATH is set to a high level.
- FIG. 10 is a flowchart showing a first example of the state determination process for determining whether to connect to the boosting system of the power generation element (solar cell) according to the present embodiment or to directly connect to the power storage element.
- the first control unit 34 determines whether or not the voltage VBAT of the storage element 40 is higher than the switching threshold voltage Vddc_start (ST1). If it is determined in step ST1 that the voltage V BAT of the storage element 40 is equal to or lower than the switching threshold voltage Vddc_start, the first control unit 34 outputs the path switching signal PATH to the power switch circuit 32 at a low level. When the power switch circuit 32 receives the path switching signal PATH at a low level, the power switch circuit 32 disconnects the voltage conversion unit 31 and the power storage element 40 as a load, and directly connects (directly connects) the power generation element 20 to the power storage element 40 side. Form.
- step ST1 when the voltage VBAT of the storage element 40 is higher than the switching threshold voltage Vddc_start, the first control unit 34 determines whether or not the maximum operating point voltage Vpm is equal to or higher than the minimum compensation threshold voltage Vddc_min (ST2). .
- step ST2 when determining that the maximum operating point voltage Vpm is equal to or higher than the minimum compensation threshold voltage Vddc_min, the first control unit 34 outputs the path switching signal PATH to the power switch circuit 32 at a low level.
- the power switch circuit 32 receives the path switching signal PATH at a high level, the power switch circuit 32 connects the power generation element 20 to the voltage conversion unit 31 and forms a path for connecting the output to the power storage element 40 side.
- step ST2 the when the maximum power point voltage Vpm is determined that the lowest compensation threshold voltage Vddc_min less than the first control unit 34, the voltage V BAT of the storage element 40 it is determined whether or not lower than the open voltage Voc ( ST3). If it is determined in step ST3 that the maximum operating point voltage Vpm is smaller than the minimum compensation threshold voltage Vddc_min, the path switching signal PATH is output to the power switch circuit 32 at a low level. When the power switch circuit 32 receives the path switching signal PATH at a low level, the power switch circuit 32 disconnects the voltage conversion unit 31 and the power storage element 40 as a load, and directly connects (directly connects) the power generation element 20 to the power storage element 40 side. Form. If it is determined in step ST3 that the maximum operating point voltage Vpm is equal to or higher than the minimum compensation threshold voltage Vddc_min, the terminal is opened. For example, the terminal open position is the terminal Vout of the power switch circuit 33 in FIG.
- FIG. 11 is a diagram more simply showing the concept of step-up direct connection switching control according to the present embodiment.
- the example of FIG. 11 shows the specific example of FIG. 9 more simply.
- the first control unit 34 sets a voltage satisfying Vpm ⁇ V BAT ⁇ Voc as a switching threshold value for the step-up direct coupling switching control.
- the first control unit 34 switches the voltage Vddc_start for determining whether or not the voltage V BAT of the power storage element 40 is greater than the average value of the maximum operating point voltage Vpm of the power generation element 20 and the open circuit voltage Voc of the power generation element 20.
- the threshold is used.
- step-up direct connection switching control is performed for only the X region lower than the switching threshold voltage Vddc_start and the higher Y region.
- a region indicated by reference sign X ⁇ b> 2 is a region where the voltage V BAT of the storage element 40 is equal to or lower than the switching threshold voltage Vddc_start.
- the path switching signal PATH is set to a low level.
- a region indicated by reference sign Y2 is a region where the voltage V BAT of the power storage element 40 is equal to or higher than the switching threshold voltage Vddc_start. In this region, it is basically necessary to boost the voltage. However, when Vpm ⁇ Vddc_min, the voltage is released, and when Vpm ⁇ Vddc_min, the voltage is boosted. When boosting, the path switching signal PATH is set to a high level.
- FIG. 12 is a flowchart showing a second example of the state determination process for determining whether the power generation element (solar cell) according to this embodiment is connected to the boosting system or directly connected to the power storage element.
- the first control unit 34 determines whether or not the voltage VBAT of the storage element 40 is higher than the switching threshold voltage Vddc_start (ST1A). If it is determined in step ST1A that the voltage VBAT of the storage element 40 is equal to or lower than the switching threshold voltage Vddc_start, the first control unit 34 outputs the path switching signal PATH to the power switch circuit 32 at a low level. When the power switch circuit 32 receives the path switching signal PATH at a low level, the power switch circuit 32 disconnects the voltage conversion unit 31 and the power storage element 40 as a load, and directly connects (directly connects) the power generation element 20 to the power storage element 40 side. Form.
- step ST1A when the voltage VBAT of the power storage element 40 is higher than the switching threshold voltage Vddc_start, the first control unit 34 determines whether or not the maximum operating point voltage Vpm is equal to or higher than the minimum compensation threshold voltage Vddc_min (ST2A). .
- step ST2A when determining that the maximum operating point voltage Vpm is equal to or higher than the minimum compensation threshold voltage Vddc_min, the first control unit 34 outputs the path switching signal PATH to the power switch circuit 32 at a low level.
- the power switch circuit 32 receives the path switching signal PATH at a high level, the power switch circuit 32 connects the power generation element 20 to the voltage conversion unit 31 and forms a path for connecting the output to the power storage element 40 side. If it is determined in step ST2A that the maximum operating point voltage Vpm is smaller than the minimum compensation threshold voltage Vddc_min, the first control unit 34 opens the terminal.
- the terminal open position is the terminal Vout of the power switch circuit 33 in FIG.
- the power control apparatus 30 of the present embodiment basically includes a circuit that charges the power storage element (storage battery) 40 from the power supply element (solar battery) 20 through the voltage converter 31 of the step-down system. It has a configuration. Then, as in the case of the boost system, the first control unit 34 is configured such that the power switch circuit 32 connects the power generation element 20 to the voltage conversion unit 31 and connects the output thereof to the power storage element 40 side. Switching control such as directly connecting the output of 20 to the storage element 40 side is performed.
- FIG. 13 is a diagram showing the power voltage characteristics of the solar cell for explaining the concept of step-down direct coupling switching control according to the present embodiment.
- the first control unit 34 compares the voltage V BAT of the power storage element (storage battery) 40 with the maximum operating point voltage Vpm of the power generation element (solar battery) 20, and switches the voltage satisfying V BAT ⁇ Vpm to the switching of the step-down direct connection switching control.
- the threshold is used. That is, the first control unit 34 sets a voltage at which the voltage V BAT of the power storage element 40 is equal to or lower than the maximum operating point voltage Vpm of the power generation element 20 as a switching threshold. For example, the first control unit 34 sets V BAT ⁇ Vpm ⁇ 0.9 as a threshold value.
- the first control unit 34 uses the voltage Vddc_start for determining whether or not the voltage V BAT of the power storage element 40 is equal to or less than 90% of the maximum operating point voltage Vpm of the power generation element 20 as a switching threshold. .
- the first control unit 34 determines that step-down is unnecessary when the voltage V BAT of the power storage element 40 is equal to or higher than the maximum operating point voltage Vpm of the power generating element 20 (V BAT ⁇ Vpm). Therefore, the power generation efficiency is not greatly reduced by setting the switching threshold in a region other than this.
- the characteristic measurement circuit 33 periodically measures the open circuit voltage Voc and determines whether to connect to the step-down voltage converter 31 or to directly connect the power generation element 20 and the storage element 40.
- the maximum operating point voltage Vpm used in this determination can be obtained by resistance division by multiplying the measured open circuit voltage by a predetermined coefficient Coef, for example, 0.8.
- FIG. 14 is a circuit diagram showing a detection system for the maximum operating point voltage of the power generating element in the case of the step-down voltage converter according to the present embodiment.
- the maximum operating point voltage detection system MVDD in FIG. 14 includes a resistance divider RDVD10, RDVD20, and a comparator CMPD10.
- the resistance dividers RDVD10 and RDVD20 are arranged in the characteristic measurement circuit 33, and the comparator CMPD10 is arranged in the first controller 34.
- all of the detection systems MVDTD can be arranged in the characteristic measurement circuit 33 and the determination result of the comparator CMPD10 can be notified to the first control unit 34.
- the resistance dividing unit RDVD10 is configured by connecting resistance elements RD11 and RD12 in series between a voltage output line of the power generation element 20 and a reference potential (here, ground potential) GND, and the voltage obtained by resistance division at the connection node NDD11 is the maximum. Appears as operating point voltage Vpm.
- the resistance divider RDVD20 is configured by connecting resistance elements RD21 and RD22 in series between the supply line of the maximum operating point voltage Vpm and the reference potential, and appears as a threshold voltage Vddc_start obtained by resistance division at the connection node NDD21.
- Comparator CMPD10 compares the voltage V BAT of the storage element 40 and a threshold voltage Vddc_start.
- the comparator CMPD10 When the voltage V BAT is lower than the threshold voltage Vddc_start, the comparator CMPD10 outputs a path switching signal PATH to the power switch circuit 32 at a high level, for example, because it needs to be stepped down.
- the power switch circuit 32 receives the path switching signal PATH at a high level, the power switch circuit 32 connects the power generation element 20 to the voltage conversion unit 31 and forms a path for connecting the output to the power storage element 40 side.
- the comparator CMPD10 When the voltage V BAT is equal to or higher than the threshold voltage Vddc_start, the comparator CMPD10 outputs a path switching signal PATH to the power switch circuit 32 at a low level, indicating that step-down is unnecessary.
- the power switch circuit 32 When the power switch circuit 32 receives the path switching signal PATH at a low level, the power switch circuit 32 disconnects the voltage conversion unit 31 and the power storage element 40 as a load, and directly connects (directly connects) the power generation element 20 to the power storage element 40 side. Form.
- FIG. 15 is a diagram more specifically showing the concept of step-down direct coupling switching control according to the present embodiment.
- the first control unit 34 sets a voltage satisfying V BAT ⁇ Vpm as the switching threshold value for the step-down direct coupling switching control. For example, the first control unit 34 uses the voltage Vddc_start for determining whether or not the voltage V BAT of the power storage element 40 is lower than the maximum operating point voltage Vpm of the power generation element 20 as a switching threshold.
- PWRL indicates a decrease in generated power due to conversion loss when boosted.
- a region indicated by a symbol X is a region where the voltage V BAT of the storage element 40 is equal to or lower than the switching threshold voltage Vddc_start. In this region X, the voltage is stepped down. In this case, the path switching signal PATH is set to a high level.
- the region indicated by the symbol Y is a region where the voltage V BAT of the power storage element 40 is equal to or higher than the switching threshold voltage Vddc_start. In this region, it is basically better to directly connect (directly attach) without stepping down. In this region X, since the voltage cannot be stepped down or is near the MPP, the loss of the stepped down amount is larger. Therefore, it is better to directly attach this region X without stepping down. In this case, the path switching signal PATH is set to a low level.
- the maximum compensation threshold voltage Vddc_max is set for this power output voltage.
- FIG. 16 is a flowchart illustrating an example of a state determination process for determining whether to connect to the step-down system of the power generation element (solar cell) according to this embodiment or to directly connect to the power storage element.
- the first control unit 34 determines whether or not the voltage VBAT of the power storage element 40 is lower than the switching threshold voltage Vddc_start (ST11). If it is determined in step ST11 that the voltage VBAT of the storage element 40 is equal to or higher than the switching threshold voltage Vddc_start, the first control unit 34 outputs the path switching signal PATH to the power switch circuit 32 at a low level. When the power switch circuit 32 receives the path switching signal PATH at a low level, the power switch circuit 32 disconnects the voltage conversion unit 31 and the power storage element 40 as a load, and directly connects (directly connects) the power generation element 20 to the power storage element 40 side. Form.
- step ST11 when the voltage VBAT of the storage element 40 is lower than the switching threshold voltage Vddc_start, the first control unit 34 determines whether or not the maximum operating point voltage Vpm is equal to or lower than the maximum compensation threshold voltage Vddc_max (ST12). .
- step ST2 when determining that the maximum operating point voltage Vpm is equal to or lower than the maximum compensation threshold voltage Vddc_max, the first control unit 34 outputs the path switching signal PATH to the power switch circuit 32 at a low level.
- the power switch circuit 32 receives the path switching signal PATH at a high level, the power switch circuit 32 connects the power generation element 20 to the voltage conversion unit 31 and forms a path for connecting the output to the power storage element 40 side.
- FIG. 17 is a circuit diagram illustrating a basic configuration example of a step-up switching regulator as a voltage conversion unit according to the present embodiment.
- the switching regulator 31A includes a power generation element side capacitor C31, an inductor L31, a diode D31, a secondary battery side capacitor C32, and an operating voltage control unit 310 as main components.
- the switching regulator constitutes a DC-DC converter.
- the operating voltage control unit 310 includes a switching transistor (SW) Q31, a comparator 311 as an input voltage detection unit, and a PFM (pulse frequency modulation) control unit 312.
- SW switching transistor
- PFM pulse frequency modulation
- the comparator 311 compares the variable reference voltage Vref supplied by the first control unit 34 with the input voltage VI that is a voltage generated by the power generation element (solar cell) 20.
- the comparator 310 switches its output to a high level when the input voltage VI exceeds the reference voltage Vref.
- the PFM control unit 312 generates a fixed-width pulse based on the output of the comparator 311 and turns on the switching transistor Q31 for a predetermined time.
- the PFM control unit 312 is enabled by an enable signal EN and can be reset by a reset signal RST.
- FIG. 18 is a diagram for explaining the basic operation of the step-up switching regulator.
- the step-up switching regulator performs a switching operation by self-excited oscillation.
- the operating point (operating voltage) of the power generation element (solar cell) 20 connected to the input is controlled.
- the input is a voltage generated by the power generation element 20, the output is a power storage element 40 (secondary battery (Li + battery)), and MPPT is performed by operating point control of the power generation element (solar cell) 20.
- step-up switching regulator basically, as shown in FIG. 18, when the switching transistor Q31 is turned on, energy is stored in the inductor L31 by the flowing current. When the switching transistor Q31 is turned off, the energy stored in the inductor L31 is released. Thereby, the energy of the inductor L31 is added to the input voltage VI. As a result, the input voltage is boosted.
- FIG. 19 is a diagram for explaining the operation of the step-up switching regulator of FIG. 17 according to the present embodiment.
- the power generation element (solar cell) 20 operates at a voltage near the reference voltage Vref.
- the operating point (operating voltage) of the power generation element (solar cell) 20 can be controlled.
- the present embodiment it is possible to provide a shutdown function for shutting down the comparator / PFM control circuit when the voltage is not boosted. Further, as described above, it is possible to provide a reset function for resetting when the self-excited oscillation stops for some reason. Further, since the on-time of the switching transistor Q31 affects the peak current of the inductor L31, the on-time can be changed depending on the input current and the connected power generation element (solar cell).
- the PFM pulse width (switch ON time) needs to be adjusted so that the peak current of the inductor L31 falls within a certain range. From the viewpoint of rating, noise, efficiency, etc., it is desirable to be able to select from several types for each range in some cases.
- the voltage conversion unit can be configured as follows. A change in the surrounding environment is detected from the change in switching frequency. In this case, the number of times of switching is counted for each ⁇ t, and a difference from the previous time is taken. Since the change in the switching frequency is measured and the frequency becomes higher, this corresponds to the increase in the amount of power generation. Therefore, the reference voltage Vref is changed to switch the path. When the frequency is lowered, the power generation amount is reduced. In response to this, the reference voltage Vref is changed, the path is switched, and the boosting operation is stopped.
- the current is measured from the switching frequency. If the reference voltage Vref and the ON time of the switching transistor Q31 are fixed, the switching frequency depends on the input current. Thereby, the current can be calculated from the switching frequency.
- FIG. 20 is a circuit diagram showing a configuration example of a step-up switching regulator including a detection system that detects a change in operating frequency in the PFM control unit of FIG.
- the switching regulator 31B of FIG. 20 includes an OFF timing detection unit 313, a charge end detection unit 314, a counter 315, a register 316, and a subtractor 317 in addition to the configuration of FIG.
- the OFF timing detection unit 313 and the charge end detection unit 314 can be configured by a comparator.
- a resistor R31 is connected between the source of the switching transistor Q31 and the reference potential VSS, and a node ND31 is formed by the connection point.
- the OFF timing detection unit 313 compares the threshold Vref1 with the potential of the node ND31, detects the OFF timing of the switching transistor Q31, and outputs the detection result to the PFM control unit 312.
- the charge end detection unit 314 compares the output voltage (cathode side potential of the diode) with the threshold value Vref2, detects the charge end, and outputs the detection result to the PFM control unit 312.
- the operating frequency of the PFM control unit 312 that is a transformer circuit changes due to a change in current (change in illuminance) of the power generation element 20 that is a solar cell.
- the charging time of the inductor L31 changes due to a change in the current of the power generation element 20 (change in illuminance). In this case, the charge time becomes shorter as the current increases.
- a transformer circuit PFM
- a change in illuminance can be measured by a change in switching frequency.
- this method can be controlled by using a change in a low power frequency as a trigger because it does not use an ADC.
- the frequency can be measured by counting the gate control signal of the switching transistor Q31 with the counter 315.
- the counter 315 counts the switching pulse signal of the PFM control unit 312 which is a transformer circuit. This can be realized by polling the counter value periodically M and obtaining the difference by the subtracter 317.
- FIG. 21 is a diagram showing how the IV characteristics of the power generation element (solar cell) change according to the temperature change.
- the thermistor 50 is monitored by the second control unit 35, and the detected temperature information is the first temperature information. Is supplied to the control unit 34.
- the first controller 34 selects a coefficient that is associated with the temperature in advance according to the temperature information, and performs MTTP control that follows the temperature conversion by multiplying, for example, the MTTP control reference voltage Vref by the coefficient.
- normal MTTP control is performed in a normal temperature range of about ⁇ 10 to 15 centering on a room temperature of 25 ° C.
- the first coefficient is used in a temperature range higher than the normal temperature range
- the second coefficient is used in a lower temperature range.
- Various modes are possible, such as using the coefficient of.
- the MTTP control here can be applied not only to the control of the voltage conversion unit 31 but also to connection switching of the power path of the power switch circuit 32.
- the voltage converter 31 is a step-up switching regulator, but a step-down switching regulator 31C as shown in FIG. 22 can also be applied.
- the step-down switching regulator 31C has the same configuration except that the step-up type and the connection form of the inductor L31 and the diode D31 are different. Therefore, the circuit configuration of FIG. 20 can also be applied as it is.
- FIG. 23 is a circuit diagram showing a configuration example of the backflow prevention circuit according to the present embodiment.
- the backflow prevention circuit 36 is disposed on the voltage supply line LV from the output of the power switch circuit 32 to the storage element 40.
- the backflow prevention circuit 36 includes a resistor R41, a switching transistor Q41 formed by a PMOSFET, a diode D41, and a comparator 361.
- a resistor R41 and a switching transistor Q41 are connected in series between the power generation element side node ND41 and the storage element 40 side node ND42 of the voltage supply line LV1, and a backflow prevention diode D41 is connected in parallel to the switching transistor Q41.
- the comparator 361 compares the potential of the node ND41 with the potential of the node ND42, and turns on / off the switching transistor Q41 according to the result.
- the backflow prevention circuit 36 performs bypass control of the backflow prevention diode from the power storage element 40 to the power generation element (solar cell) 20.
- the backflow prevention circuit 36 reduces the loss due to the forward voltage VF while preventing backflow.
- the switching transistor Q41 When the potential of the node ND41 is higher than the potential of the node ND42 and is not in a reverse flow state, the output of the comparator 361 becomes low level as no reverse flow is detected. As a result, the switching transistor Q41 is turned on to bypass the backflow prevention diode D41. When the potential of the node ND42 is higher than the potential of the node ND41 and is in reverse flow, the output of the comparator 361 becomes high level as reverse flow detection. As a result, the switching transistor Q41 is turned off, and the connection line includes only the backflow prevention diode D41.
- FIG. 24 is a diagram for describing the first charge control for the storage element (storage battery) 40 according to the present embodiment.
- the horizontal axis indicates time, and the vertical axis indicates the voltage V BAT of the storage element 40.
- FV indicates a voltage that is considered to be almost fully charged
- FVO indicates a fully charged open voltage
- VCRG indicates a charged voltage.
- P1 to P10 (Pn) indicate measurement points at which the terminal V of the power storage element 40 is opened and the voltage VBAT of the power storage element 40 is measured (monitored).
- FIG. 24 the horizontal axis indicates time, and the vertical axis indicates the voltage V BAT of the storage element 40.
- FV indicates a voltage that is considered to be almost fully charged
- FVO indicates a fully charged open voltage
- VCRG indicates a charged voltage.
- P1 to P10 (Pn) indicate measurement points at which the terminal V of the power storage element 40 is opened and the voltage VBAT of the power storage element 40 is measured (moni
- D1 to D9 indicate time intervals between adjacent measurement points, and have a relationship of D1>D2>D3>D4>D5>D6>D7>D8> D9. That is, the second control unit 35 dynamically changes the measurement point interval for measuring (monitoring) the voltage V BAT of the power storage element 40 by opening the terminal of the power storage element 40 according to the voltage VBAT of the power storage element 40. To control. In the present embodiment, the second control unit 35 performs control so that the measurement point interval becomes shorter as the voltage V BAT of the power storage element 40 becomes higher.
- the power control device 30 employs charging control for a storage battery that can detect full charge by comparing the terminal open voltage of the storage element 40 with a threshold voltage. Then, the second control unit 35 of the power control device 30 monitors the voltage of the power storage element 40, and when the voltage V BAT when the terminal of the power storage element 40 is opened reaches a certain full charge voltage FV or more, as follows. Control.
- the second control unit 35 for example, the control signal CTL35 by can perform charge control to stop charging, control signal CTL35 by higher voltage V BAT of the storage element 40 is high, the terminal opening time interval D of the storage element 40 Is controlled to be shorter.
- the power control device 30 uses the output voltage VC1 of the power generation element (power source) 20 supplied from the characteristic measurement circuit 33 in the case of charging the power storage element 40 from a power source in which the output of the power generation element 20 such as a solar battery varies. Control is performed so that the opening time interval D is shortened as the value increases.
- the second control unit 35 has a function of dynamically changing the open-circuit voltage measurement time interval D of the storage element 40 by the control signal CTL35.
- the second control unit 35 changes the open-circuit voltage measurement time interval D depending on the voltage V BAT of the storage element 4. Specifically, the measurement time interval D is shortened as the voltage V BAT of the power storage element 40 is higher.
- the second control unit 35 changes the output voltage VC1 of the power generation element (solar cell) 20 depending on the output voltage VC1. Specifically, the measurement time interval D is shortened as the output voltage VC1 of the power generation element (solar cell) 20 is higher.
- the second control unit 35 can also change the open-circuit voltage measurement time interval D depending on the voltage VBAT of the storage element 4 and the output voltage VC1 of the power generation element (solar cell) 20.
- the second control unit 35 performs control to change the terminal opening time interval of the power storage element according to the voltage of the power storage element 40 or the power generation element 20 even when the voltage of the power storage element 40 becomes equal to or higher than the full charge release voltage. .
- Such charge control makes it possible to reduce charge loss when full charge is detected and to prevent overcharge when charging a storage element (storage battery).
- FIG. 25 is a diagram for describing the second charge control for the storage element (storage battery) 40 according to the present embodiment.
- the second charge control of FIG. 25 is different from the charge control of FIG. 24 in that the terminal of the storage element 40 is not opened until the charge voltage reaches the vicinity of the full charge release voltage FVO. Thereby, the charge loss by opening of the electrical storage element 40 is reduced. That is, after reaching the full charge voltage FV before opening, the measurement with the terminal of the storage element 40 opened is started.
- the open-circuit voltage measurement time interval D may be constant, and may be configured to change depending on the voltage V BAT of the power storage element 4 as in the first charge control method.
- the second control unit 35 of the power control device 30 performs the following control when the voltage when the storage element terminal is opened exceeds the full charge voltage.
- the second control unit 35 performs charge control to stop charging, the terminal of the storage element 40 is opened until the voltage during charging becomes equal to or higher than the full charge voltage FVO without opening the terminal of the storage element 40. Control to prevent full charge detection.
- the power control apparatus 30 can reduce the charge loss at the time of full charge detection and can prevent overcharge in the charge to the electrical storage element 40.
- FIG. 26 is a circuit diagram showing a configuration example of the current-voltage limiting circuit according to the present embodiment.
- the current / voltage limiting circuit 37 includes MOSFETs Q51 and Q52 arranged on the voltage supply line, error amplifiers 371 to 373, constant current sources I51 and I52, and external resistors R51 to R55.
- the gate potentials of the MOSFETs Q51 and Q52 are controlled by the error amplifiers 371 to 373.
- the reference voltage Vref1 is supplied to the error amplifier 371.
- a voltage drop when a current is pulled by the constant current sources I51 and I52 from the R55 path of the storage element (BAT) 40 as the control voltage is provided.
- V detection is started at a cycle of, for example, 5 minutes after CV charging.
- the period of 5 minutes depends on the output power performance of the power generation element (solar cell) 20 and the charge capacity of the storage element 40.
- Charging is stopped during ⁇ V detection, and the open circuit voltage of the storage element 40 is measured.
- the time for stopping charging is 2 seconds, 3 seconds, or the like.
- the stop time depends on the performance of the ADC and the power storage element 40.
- the difference between the charging voltage before opening of the storage element 40 and the voltage when the storage element terminal is opened is measured as ⁇ V, and the difference ⁇ V is less than a certain value, for example, 50 mV or less. If so, stop charging.
- FIG. 27 is a flowchart for explaining overall charging control of the power control apparatus according to the present embodiment.
- the second controller 35 controls the power switch circuit 32 and the like based on the detection result of the thermistor 50 and the like.
- overall charging control including the operations of the second control unit 35 and the startup circuit 38 will be described.
- step ST101 it is determined whether or not the input voltage VIN by the power generation element 20 is higher than the voltage V BAT of the power storage element 40 with the MPPT charge OFF (ST101) and the initial charge OFF (ST102) (ST103).
- Input voltage VIN in step ST103 it is determined if it is determined to be higher than the voltage V BAT of the storage element 40, the charge enable signal EN_X the active row whether the low level (ST 104).
- the charge enable signal EN_X is at a low level, the initial charge is turned on (ST107) when the temperature by the thermistor 50 is not 0 ° or lower (ST105) but not 60 ° or higher (ST106).
- step ST103 If a negative determination result is obtained in steps ST105 to ST107, the initial charge is kept off (ST108), and the process returns to step ST103.
- Input voltage VIN at step ST103 is, when determined to be lower than the voltage V BAT of the storage element 40, the initial charging is turned OFF (ST 109), MTTP charge is held in the OFF (ST110).
- voltage V BAT of power storage element 40 is lower than 4.1 V, which is limited to 4.2 V when fully charged (ST111).
- voltage V BAT of power storage element 40 is lower than 4.1 V, it is determined whether or not input voltage VIN by power generation elements 20-1 and 20-2 is higher than voltage V BAT of power storage element 40. (ST112).
- Input voltage VIN is higher than the voltage V BAT of the storage element 40, the process returns to step ST 103, the row is determined whether than the starting voltage VSTART low activation threshold value voltage VSCEN charging system circuit if low (ST113). If the starting voltage VSTART is higher than the starting threshold voltage VSCEN, the process returns to step ST109. When the starting voltage VSTART is lower than the starting threshold voltage VSCEN, the following occurs. That is, when the temperature by the thermistor 50 is not 0 ° or less (ST114) and not 60 ° or more (ST115), and the charge enable signal EN_X is at a low level (ST116), MTTP charging is turned on (ST117). .
- MPPT charge control is performed (ST118).
- MPPT charge is turned off (ST119), and it is determined whether or not the voltage VBAT of the storage element 40 is lower than 4.2 V at the time of full charge (ST120).
- voltage V BAT of power storage element 40 is lower than 4.2 V at full charge, it is determined whether or not input voltage VIN is higher than voltage V BAT of power storage element 40 (ST121).
- Input voltage VIN is lower than the voltage V BAT of the storage element 40, the output voltage VC1 of the power generating element 20 it is determined whether or not lower than the voltage VTHR performed (ST122).
- step ST120 If the output voltage VC1 is lower than the voltage VTHR, the process returns to step ST103, and if it is higher, the process returns to step ST114. If it is determined in step ST120 that voltage V BAT of power storage element 40 is higher than 4.2 V when fully charged, the system power supply function is turned on (ST123). Then, it is determined whether or not the voltage V BAT of the storage element 40 is lower than 4.1 V, which is limited to 4.2 V when fully charged (ST124), and if it is lower, the system power supply function is turned off. (ST125), the process returns from step ST103.
- the backflow prevention circuit 36 When the current / voltage limiting circuit 37 restricts the power supply, it is possible to control the backflow prevention circuit 36 to stop the backflow prevention function.
- This control can be configured to be performed directly by the current / voltage limiting circuit 37, or can be configured to be controlled by the first control unit 34 or the second control unit 35. is there.
- the second control unit 35 can monitor the voltage V BAT of the storage element 40 that is a secondary battery, and can perform control so as to turn off the voltage conversion unit 31 when fully charged.
- a current / voltage limiting circuit 37-2 is arranged at the connecting portion of the power generating element 202 so that the supplied power is limited when the power generated by the power generating element 20 exceeds a certain value. It is also possible to configure. Also in this case, when the current / voltage limiting circuit 37-2 restricts the power supply, it is possible to control the backflow prevention function of the backflow prevention circuit 36 to be stopped.
- FIG. 29 is a diagram showing that the rate of change of voltage (open circuit voltage or maximum operating point voltage) with respect to illuminance varies depending on the type of solar cell.
- Amorphous silicon (a-Si) has a small voltage change rate with respect to illuminance.
- Crystalline silicon (c-Si) has a large voltage change rate with respect to illuminance.
- the output of the solar cell having a large voltage change rate is controlled to be boosted by a DC-DC converter as the voltage conversion unit 31 when the voltage (open circuit voltage or maximum operating point voltage) is V1 or less. Further, when the voltage is equal to or higher than the electric constant voltage V2, control is performed so that the voltage is stepped down by the DC-DC converter. When the voltage is between V1 and V2, the power generation element 20 and the storage element 40 side are directly connected and output without passing through the DC-DC converter.
- charging (storage) from the power generation element 20 such as a solar battery to the storage element (battery) 40, which is a secondary battery, is performed not only in daylight but also in shade, indirect light, or in a bright room. It becomes possible in the daily environment such as. In particular, it can be controlled to maintain the maximum operating point of a power generation element such as a solar cell, and power loss can be avoided.
- the processing procedure described in the embodiment of the present disclosure may be regarded as a method having a series of these procedures, and a program for causing a computer to execute the series of procedures or a recording medium storing the program. You may catch it.
- this recording medium for example, a CD (Compact Disc), an MD (Mini Disc), a DVD (Digital Versatile Disc), a memory card, a Blu-ray Disc (Blu-ray Disc (registered trademark)), or the like can be used.
- SYMBOLS 10 Power feeding system, 20 ... Power generation element, 30 ... Power control device, 31 ... Voltage converter, 32 ... Power switch circuit (power path switching unit), 33 ... Characteristic measurement Circuit, 34... First control unit, 35... Second control unit, 36... Backflow prevention circuit, 37. Power storage element.
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Sustainable Development (AREA)
- Sustainable Energy (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- General Physics & Mathematics (AREA)
- Radar, Positioning & Navigation (AREA)
- Automation & Control Theory (AREA)
- Charge And Discharge Circuits For Batteries Or The Like (AREA)
- Secondary Cells (AREA)
Abstract
Description
また、太陽光発電素子は、小型化も進み、太陽電池を搭載した携帯電話などの販売も始まっている。
そのため、太陽電池から最大出力を得るには、太陽電池と接続する負荷の電圧を、太陽電池の最大動作点電圧と一致させる必要がある。
また、太陽電池の電流電圧特性において、電力が最大となる最大動作点(MPP:Maximum Power Point)は、ただ一点存在する。
しかし、太陽電池の電流電圧特性は照度や温度などの環境に依存して変化するため、最大動作点電圧を得る制御は太陽電池接続機器の動作時に行う必要がある。
このような、機器動作時に最大動作点を得るための制御は、MPPT(Maximum PowerPoint Tracking)制御と呼ばれる。
一般的に、蓄電値の端子開放電圧を閾値であると比較することで満充電検知を行う充電制御方法が知られている(たとえば特許文献1参照)。
特許文献1の充電制御方法では、第1ステップにおいて一定時間間隔で充電と開放を繰り返す。第2ステップにおいて開放電圧が一定電圧以上の場合に充電を停止する。そして、第3ステップにおいて、電圧が充電再開電圧以下になると、再度第1ステップに戻り充電を再開する。
この技術は、太陽電池で発電される直流の電圧を昇圧または降圧して負荷で蓄電池を充電するDC-DCコンバータが適用される充電制御方式である。この充電制御方式では、入力電圧と出力電圧を比較し、比が一定以内の場合、DC-DCコンバータを負荷側から切り離し、太陽電池と蓄電池を直接接続する(直結)する。
太陽電池の場合、開放時の発電電力は捨てられてしまうことから、開放時間の割合が高いと、満充電到達時間が長くなる。
開放から次の開放まで時間間隔が長いと、満充電検知が遅れて過充電してしまうおそれがある。
充電量がまだ少ない場合でも開放するため、充電時間が長くなる。
本開示の第1の観点の電力制御方法は、発電素子を、当該発電素子で発電された電圧レベルを変換し、上記負荷側蓄電素子に供給可能な電圧変換部に接続するか、当該負荷側蓄電素子に直接接続するかの電力経路の切り替えを行うに際し、上記発電素子の開放電圧を測定し、測定した開放電圧に基づいて上記発電素子の最大動作点電圧を取得し、上記発電素子の上記開放電圧および上記最大動作点電圧のうち少なくとも上記最大動作点電圧と上記負荷側蓄電素子の電圧との大小関係に応じて切替閾値を設定し、上記負荷側蓄電素子と当該切替閾値との比較結果に応じて、上記発電素子を上記電圧変換部に接続して当該出力を上記蓄電素子側に接続する経路、または、上記発電素子を蓄電素子側に直接接続する経路を形成する。
また、本開示の第3の観点の電力制御装置は、発電素子で発電された電力の負荷側蓄電素子の充電制御を行う制御部を有し、上記制御部は、上記蓄電素子の電圧を監視し、上記蓄電素子端子の開放時の電圧が満充電電圧以上に達した場合、または上記蓄電素子への開放前の充電電圧と上記蓄電素子端子の開放時の電圧との差分が一定値以下に達した場合、充電を停止する充電制御を行い、かつ、上記蓄電素子の電圧が満充電電圧に達するまでは、蓄電素子端子を開放しての満充電検知を行わないように制御する。
本開示の第3の観点の電力制御方法は、発電素子で発電された電力の負荷側蓄電素子の充電制御を行うに際し、上記蓄電素子の電圧を監視し、上記蓄電素子端子の開放時の電圧が満充電電圧以上に達した場合、または上記蓄電素子への開放前の充電電圧と上記蓄電素子端子の開放時の電圧との差分が一定値以下に達した場合、充電を停止する充電制御を行い、かつ、上記蓄電素子または上記発電素子の電圧または電流に応じて上記蓄電素子の端子開放時間間隔を変更する。
また、本開示の第3の観点の電力制御方法は、発電素子で発電された電力の負荷側蓄電素子の充電制御を行うに際し、上記蓄電素子の電圧を監視し、上記蓄電素子端子の開放時の電圧が満充電電圧以上に達した場合、または上記蓄電素子への開放前の充電電圧と上記蓄電素子端子の開放時の電圧との差分が一定値以下に達した場合、充電を停止する充電制御を行い、かつ、上記蓄電素子の電圧が満充電電圧に達するまでは、蓄電素子端子を開放しての満充電検知を行わないように制御する。
図1は、本開示の実施形態に係る給電システムの全体構成の一例を示す図である。
また、給電システム10は、電力制御装置30に接続されたサーミスタ50を有する。
特に、電力制御装置30は、発電素子20で発電した電力を無駄なく活用して充電に利用する充電制御LSIとして形成されている。
電力制御装置30は、1または複数の発電素子20を接続可能である。本実施形態では1つの発電素子20を接続した例を示している。
本実施形態において、電力制御装置30は、単セルを含む任意の直列数のセルを利用可能である。
電力制御装置30は、発電素子(太陽電池)20の最大電力動作点を追従する、MPPT制御を行うことにより、高効率で充電可能である。電力制御装置30は、単セルの発電素子20においてもMPPT制御が可能である。
電力制御装置30は、蓄電素子の端子開放電圧を閾値電圧と比較することで満充電検知ができる蓄電池への充電制御を採用している。
そして、電力制御装置30は、蓄電素子40の電圧を監視し、蓄電池端子開放時の電圧が満充電電圧以上に達した場合、充電を停止する充電制御を行うことが可能で、蓄電池の電圧が高いほど、蓄電素子の端子開放時間間隔が短くなるよう制御する。そして、電力制御装置30は、太陽電池等の発電素子20の出力が変動する電源から蓄電素子40への充電の場合、電源の出力が高いほど開放時間間隔が短くなるように制御する。
また、電力制御装置30は、蓄電素子端子開放時の電圧が満充電電圧以上に達した場合、充電を停止する充電制御を行う際に、蓄電池端子を開放しないで、充電時の電圧が満充電電圧以上になるまでは、電池端子を開放しての満充電検知を行わないように制御する。
これにより、電力制御装置30は、蓄電素子40への充電において、満充電検知時の充電損失を減らし、また過充電を防止することが可能となっている。
電力制御装置30は、昇圧型のDC-DCコンバータにより電圧変換部が形成されている場合、発電素子20の出力に電圧変換部(昇圧回路)を通して蓄電池に充電するか、電圧変換部を通さないか、動かさないで蓄電素子に充電するかを切り替える制御を行う。
この際、電力制御装置30は、太陽電池等の発電素子20の開放電圧Vocと最大動作点電圧Vpmを求め、その間の電圧を切替点に設定する。
電力制御装置30は、降圧型のDC-DCコンバータにより電圧変換部が形成されている場合、発電素子20の出力に電圧変換部(降圧回路)を通して蓄電素子に充電するか、電圧変換部を通さないか、動かさないで蓄電素子に充電するかを切り替える制御を行う。
この際、電力制御装置30は、太陽電池等の発電素子20の最大動作点電圧Vpmを求め、最大動作点電圧Vpm以下の電圧を切替点に設定する。
これにより、電力制御装置30は、太陽電池等の発電素子20からの充電において、簡単な回路構成で発電効率の高い充電電力が得られる。
電力制御装置30は、たとえば固定または可変の充電終了電圧に到達した時点で充電を停止する機能を有する。
電力制御装置30は、たとえば充電停止後に、固定または可変の充電開始電圧に到達した時点で充電を開始する機能を有する。
電力制御装置30は、蓄電素子40の開放電圧が一定値に到達したことを検出する満充電検出後、負荷駆動用端子から発電素子20の電力を出力する機能を有する。
電力制御装置30は、蓄電素子40が、電圧が所定電圧以下、たとえば2.7V以下等の過放電状態にあるとき、電圧が復帰するまで初期充電可能である。この場合、電力制御装置30は、たとえば外付けの電流制限抵抗を用いて、電流を小さくして(絞って)充電することが可能である。
電力制御装置30は、たとえば外部接続のサーミスタを用いて、0°C以下、もしくは60°C以上での充電を防止する機能を有している。
電力制御装置30は、たとえば外部イネーブル端子により、充電の停止およびスリープモードへの遷移を制御可能である。
また、電力制御装置30は、出力電力情報を出力可能に構成することも可能である。
以下では、発電素子20、蓄電素子40の構成および機能を説明した後、電力制御装置30の具体的な構成および機能について詳述する。
発電素子20は、太陽光や風力などの自然エネルギーにより発電する機能を有し、発電した電力を電力制御装置30に供給する。
本実施形態において、発電素子20としては、太陽光の光電変換を利用した太陽光発電パネル、たとえば太陽電池が採用される。
図2では、光入力OPTを起電力(Iph)に置き換えて電流Ishを表現している。
さらに、図2では、太陽電池21の基盤、受光層、電極部の抵抗の総和を直列抵抗Rs、太陽電池21の損失抵抗をRshで示している。
図2では、太陽電池21の出力電流がId、出力電圧がVで示されている。
太陽電池21は、光入射量が多い(明るい)と電流は多くなり、光入射量が少ないと(暗いと)電流は少なくなる。図2の等価回路では、光の明るさが電流源の大きさで表されている。電圧が高くなると、電流は徐々に下がる。
電流源22は光電流Iphを供給し、ダイオード23は理想ダイオードである。太陽電池21の端子間の電圧Vを上昇させると、電流源22からの電流Iphがダイオード23に流れるため、端子側に流れる電流Iは電圧Vの上昇とともに減少する。
太陽電池21は、端子間の電圧値が決まると、出力電流値が一意に定まる。
電流値が0の場合の端子間の電圧を開放電圧(Voc)と呼び、端子間の電圧値が0の場合の出力電流値を短絡電流(Isc)と呼ぶ。
上述のように、太陽電池の電流電圧特性のカーブにおいて、電力(=電圧×電流)が最大となる最大動作点はただ一点存在する。
この最大動作点における電流を最大動作点電流(Ipm)と呼び、最大動作点における電圧を最大動作点電圧(Vpm)と呼ぶ。
太陽電池の電流電圧特性は照度や温度などの環境に依存して変化するため、最大動作点電圧を得る制御を太陽電池接続機器の動作時に行う必要がある。
本実施形態では、電力制御装置30において、発電素子20の出力にDC-DCコンバータである電圧変換部を通して蓄電素子に充電するか、電圧変換部を通さないか、動かさないで蓄電素子に充電するかを切り替える制御が行われる。
この際、電力制御装置30は、昇圧型のDC-DCコンバータの場合、太陽電池等の発電素子20の開放電圧Vocと最大動作点電圧Vpmを求め、その間の電圧を切替点に設定する。電力制御装置は、降圧型のDC-DCコンバータの場合、太陽電池等の発電素子20の最大動作点電圧Vpmを求め、最大動作点電圧Vpm以下の電圧を切替点に設定する。
また、本実施形態では、電力制御装置30において、蓄電素子40の電圧を監視し、蓄電池端子開放時の電圧が満充電電圧以上に達した場合、充電を停止する充電制御が行われ、蓄電素子の電圧が高いほど、蓄電素子の端子開放時間間隔が短くなるよう制御される。そして、電力制御装置30では、太陽電池等の発電素子20の出力が変動する電源から蓄電素子40への充電の場合、電源の出力が高いほど開放時間間隔が短くなるように制御される。
また、電力制御装置30において、充電制御を行う際に、蓄電池端子を開放しないで、充電時の電圧が満充電電圧以上になるまでは、蓄電池端子を開放しての満充電検知を行わないように制御される。
蓄電素子40は、電力制御装置30により供給された電力を蓄電する。
蓄電素子40は、たとえば、電気二重層キャパシタやリチウムイオン型二次電池などのように充電電圧が変化するものを採用することが可能である。
45を有する。
蓄電素子40は、正極端子T1および負極端子T2が、負荷である電子機器の正極端子および負極端子に接続される。
蓄電素子40においては、電力制御装置30の制御の下、充電制御FET42、放電制御FET43、ダイオード44、および電流検出抵抗45を介して組電池41に対する充放電が行われる。
図4の例では、3個の電池セルが直列に接続された場合を示す。
本実施形態においては、電力制御装置30が、蓄電素子40の過充電や過放電を防止するための制御や充電の際に安全に充電できるように制御を行う。
蓄電素子40において、測定した電圧値および電流値に基づき、組電池41のいずれかのセルの電圧が過充電検出電圧になったときに充電制御FET42がOFFに制御される。
蓄電素子40において、組電池41の電圧が過放電検出電圧以下になったときに放電制御FET43がOFFに制御され、過充電や過放電が防止される。
ここで、リチウムイオン電池の場合、過充電検出電圧がたとえば4.2V±0.5Vと定められ、過放電検出電圧が2.4V±0.1Vと定められる。
CCCV充電方式では、組電池41の電圧が所定の電圧に達するまでは定電流で充電(CC充電)し、組電池41の電圧が所定の電圧に達した後は定電圧で充電(CV充電)する。そして、充電電流が略0[A]に収束した時点で充電が終了となる。
電力制御装置30は、図1に示すように、電圧変換部31、および電力経路部に含まれる電力経路切替部としてのパワースイッチ回路32を有する。
電力制御装置30は、特性測定回路33、第1の制御部34、第2の制御部35、逆流防止回路36、電流電圧制限回路37、およびスタートアップ回路38を主構成要素として有する。
電圧変換部31は、昇圧し、または降圧して得られた電圧を、たとえばパワースイッチ回路32、逆流防止回路36を通して蓄電素子40に供給する。
電圧変換部31は、たとえばDC-DCコンバータにより構成される。
この電圧変換部31の具体的な構成については後で詳述する。
パワースイッチ回路32は、発電素子(太陽電池)20、電圧変換部(昇圧および降圧回路)31、および蓄電素子(二次電池)40間の接続関係を、第1の制御部34または第2の制御部35の制御に従って決定する機能を有する。
すなわち、パワースイッチ回路32は、電力経路切替部として機能する。
スイッチSW1は、端子aが発電素子(太陽電池)20の電圧出力ラインに接続され、端子bが電圧変換部31の入力端子に接続され、端子cはスイッチSW2の端子cに接続されている。
スイッチSW2は、端子aが蓄電素子(蓄電池)40の電圧入力ラインに接続され、端子bが電圧変換部31の変換電圧の出力ラインに接続されている。
スイッチSW1およびSW2は、第1の制御部34による経路切替信号PATHを、たとえばハイレベルで受けると、端子aを端子bに接続し、ローレベルで受けると端子aを端子cに接続する。
このように、パワースイッチ回路32は、経路切替信号PATHをハイレベルで受けると、発電素子20を電圧変換部31に接続してその出力を蓄電素子40側に接続する経路を形成する。
パワースイッチ回路32は、経路切替信号PATHをローレベルで受けると、電圧変換部31と負荷である蓄電素子40とを切り離して、発電素子20を蓄電素子40側に直接接続(直結)する経路を形成する。
特性測定回路33は、発電素子(SC1)20の短絡電流Ish、開放電圧Vocを測定する機能を有する。
特性測定回路33は、昇圧回路および降圧回路を含む電圧変換部31を含む電力経路を選択した場合には、電圧変換部31でMPPT制御を行うための電流-電圧(I-V)測定を行う。
第1の制御部34は、選択された電力経路にて回路が動作するとき、昇圧回路および降圧回路を含む電圧変換部31を含む電力経路を選択した場合には、たとえばI-V測定結果を基に電圧変換部31でのMPPT制御を行う。
一般に、発電素子(太陽電池)による充電にて、エネルギー効率よく充電を行おうとするとき、MPPT制御を行い、昇圧回路を使うという方法が用いられている。
本実施形態では、エネルギー効率のよい充電のために、1個もしくは複数個の発電素子(太陽電池)の接続や電圧変換部(昇圧および降圧)回路の接続を判定結果に応じて変更して、太陽電池充電回路の回路構成を最適化可能となるような制御が行われる。
パワースイッチ回路32にて最適な回路構成を実現するために、特性測定回路33の測定結果を基に、パワースイッチ回路32に対し、最適な制御を行う。
特性測定回路33は、測定結果を第1の制御部34に供給する。
特性測定回路33は、MPPT制御のために、発電素子(SC1)20の電圧VC1を測定する。
特性測定回路33は、測定結果を第1の制御部34および第2の制御部35に供給する。その場合、抵抗値Rの情報を含む。V/Rにより、動作時の電流Iが求まる。
図6は、本実施形態に係る特性測定回路の構成例を示す回路図である。
これまでは、アンプを接続するなどして電流・電圧の変化分を増幅する方法が一般的であった。
本例では、発電素子(太陽電池)20がどのくらいの電流および電圧を発生させているのかを調べる手段として、キャパシタC1を用いた測定を行う。
また、図6の特性側的回路33Aでは、接続ノードND1と基準電位VSSとの間にキャパシタC1をリセットするためのスイッチングトランジスタQ1が接続されている。
スイッチングトランジスタQ1はNMOSFETにより形成され、ゲートにリセット信号RSTが選択的に供給される。
特に、開放電圧からのMPP推定で足りない場合は有効である。
また、電圧変換部31の昇圧回路のキャパシタを流用することができれば、追加部品なしで測定可能である。
ここで、電圧変換部31が昇圧型DC-DCコンバータの場合、および降圧型DC-DCコンバータの場合の第1の制御部34によるパワースイッチ回路32の直結切替制御について説明する。
まず、電圧変換部31が昇圧型DC-DCコンバータの場合の、第1の制御部34による昇圧直結切替制御について説明する。
図5に関連付けて説明したように、本実施形態の電力制御装置30は、基本的に昇圧系の電圧変換部31を通して給電素子(太陽電池)20から蓄電素子(蓄電池)40に充電する回路を構成を有している。
そして、第1の制御部34は、パワースイッチ回路32は、発電素子20を電圧変換部31に接続してその出力を蓄電素子40側に接続するか、発電素子20の出力を蓄電素子40側に直接接続する等の切替制御を行う。
すなわち、第1の制御部34は、蓄電素子40の電圧VBATが発電素子20の最大動作点電圧Vpm以上で、発電素子20の開放電圧Voc以下の電圧を切替閾値とする。
たとえば、第1の制御部34は、VBAT>(Vpm+Voc)/2を閾値とする。
すなわち、一例として、第1の制御部34は、蓄電素子40の電圧VBATが、発電素子20の最大動作点電圧Vpmと発電素子20の開放電圧Vocの平均値より大きいか否かを判定する電圧Vddc_startを切替閾値とする。
第1の制御部34は、蓄電素子40の電圧VBATが、発電素子20の最大動作点電圧Vpm以下の場合、昇圧は不要と判断する。
また、第1の制御部34は、蓄電素子40の電圧VBATが、発電素子20の開放電圧Voc以上の場合は昇圧を行う必要があると判断する。
したがって、この間の領域に切替閾値を設定することで、発電効率が大きく低下することはなくなる。
この判断で用いられる最大動作点電圧Vpmは、測定した開放電圧に所定の係数Coef、たとえば0.8を乗算して、抵抗分割で求めることが可能である。
検出系MVDTBは、たとえば抵抗分割部RDVB10,RDVB20が特性測定回路33に配置され、コンパレータCMPB10が第1の制御部34に配置される。
あるいは、検出系MVDTBのすべてを特性測定回路33に配置し、コンパレータCMPB10の判定結果を第1の制御部34に報知するように構成することも可能である。
抵抗分割部RDVB20は、測定した開放電圧Vocの供給ラインと最大動作点電圧Vpmの供給ラインとの間に抵抗素子RB21、RB22を直列に接続して構成され、その接続ノードNDB21に抵抗分割した閾値電圧{(Vpm+Voc)/2}として現れる。
コンパレータCMPB10は、蓄電素子40の電圧VBATと閾値電圧{(Vpm+Voc)/2}とを比較する。
コンパレータCMPB10は、電圧VBATが閾値電圧{(Vpm+Voc)/2}より高い場合には、昇圧が必要として、経路切替信号PATHをたとえばハイレベルでパワースイッチ回路32に出力する。
パワースイッチ回路32は、経路切替信号PATHをハイレベルで受けると、発電素子20を電圧変換部31に接続してその出力を蓄電素子40側に接続する経路を形成する。
コンパレータCMPB10は、電圧VBATが閾値電圧{(Vpm+Voc)/2}以下に場合には、昇圧が不要として、経路切替信号PATHをローレベルでパワースイッチ回路32に出力する。
パワースイッチ回路32は、経路切替信号PATHをローレベルで受けると、電圧変換部31と負荷である蓄電素子40とを切り離して、発電素子20を蓄電素子40側に直接接続(直結)する経路を形成する。
たとえば第1の制御部34は、蓄電素子40の電圧VBATが、発電素子20の最大動作点電圧Vpmと発電素子20の開放電圧Vocの平均値より大きいか否かを判定する電圧Vddc_startを切替閾値とする。
図9において、PWRLは昇圧した場合の変換ロスによる発電電力低下分を示している。PWRBは昇圧した場合の電力を示し、PWRDは直結(直付け)した場合の電力を示している。
この領域では、基本的に昇圧した方が得である。ここで、発電素子20による発電出力電圧がある程度の電圧以下であると動作上に影響を及ぼす場合があることから、本実施形態では、この発電出力電圧について最低補償閾値電圧Vddc_minを設定している。
そして、最大動作点電圧Vpmが最低補償閾地電圧Vddc_minより低い(Vpm<Vddc_min)場合は直付けする。その理由は、昇圧したいが、最大動作点電圧Vpmが小さいために、昇圧しても損失の方が大きいからである。この場合、経路切替信号PATHはローレベルに設定される。
一方、Vpm≧Vddc_minの場合は昇圧する。この場合、経路切替信号PATHはハイレベルに設定される。
ただし、Vpm<Vddc_minの場合は開放し、Vpm≧Vddc_minの場合は昇圧する。昇圧する場合、経路切替信号PATHはハイレベルに設定される。
ステップST1で、蓄電素子40の電圧VBATが切替閾値電圧Vddc_start以下であると判定した場合には、第1の制御部34は、経路切替信号PATHをローレベルでパワースイッチ回路32に出力する。
パワースイッチ回路32は、経路切替信号PATHをローレベルで受けると、電圧変換部31と負荷である蓄電素子40とを切り離して、発電素子20を蓄電素子40側に直接接続(直結)する経路を形成する。
ステップST1において、第1の制御部34は、蓄電素子40の電圧VBATが切替閾値電圧Vddc_startより高いと、最大動作点電圧Vpmが最低補償閾値電圧Vddc_min以上であるか否かを判定する(ST2)。
ステップST2において、最大動作点電圧Vpmが最低補償閾値電圧Vddc_min以上であると判定すると、第1の制御部34は、経路切替信号PATHをローレベルでパワースイッチ回路32に出力する。
パワースイッチ回路32は、経路切替信号PATHをハイレベルで受けると、発電素子20を電圧変換部31に接続してその出力を蓄電素子40側に接続する経路を形成する。
ステップST2において、最大動作点電圧Vpmが最低補償閾値電圧Vddc_minより小さいと判定すると、第1の制御部34は、蓄電素子40の電圧VBATが開放電圧Vocより低いか否かの判定を行う(ST3)。
ステップST3において、最大動作点電圧Vpmが最低補償閾値電圧Vddc_minより小さいと判定すると、経路切替信号PATHをローレベルでパワースイッチ回路32に出力する。
パワースイッチ回路32は、経路切替信号PATHをローレベルで受けると、電圧変換部31と負荷である蓄電素子40とを切り離して、発電素子20を蓄電素子40側に直接接続(直結)する経路を形成する。
ステップST3において、最大動作点電圧Vpmが最低補償閾値電圧Vddc_min以上であると判定すると、端子を開放する。この端子開放箇所としては、たとえば図1におけるパワースイッチ回路33の端子Voutとなる。
この場合も、第1の制御部34は、Vpm≦VBAT≦Vocを満たす電圧を昇圧直結切替制御の切替閾値とする。
たとえば第1の制御部34は、蓄電素子40の電圧VBATが、発電素子20の最大動作点電圧Vpmと発電素子20の開放電圧Vocの平均値より大きいか否かを判定する電圧Vddc_startを切替閾値とする。
図11の例は、切替閾値電圧Vddc_startより低いX領域と高いY領域のみに場合分けして昇圧直結の切替制御を行う。
この領域では、基本的に昇圧する必要がある。
ただし、Vpm<Vddc_minの場合は開放し、Vpm≧Vddc_minの場合は昇圧する。昇圧する場合、経路切替信号PATHはハイレベルに設定される。
ステップST1Aで、蓄電素子40の電圧VBATが切替閾値電圧Vddc_start以下であると判定した場合には、第1の制御部34は、経路切替信号PATHをローレベルでパワースイッチ回路32に出力する。
パワースイッチ回路32は、経路切替信号PATHをローレベルで受けると、電圧変換部31と負荷である蓄電素子40とを切り離して、発電素子20を蓄電素子40側に直接接続(直結)する経路を形成する。
ステップST1Aにおいて、第1の制御部34は、蓄電素子40の電圧VBATが切替閾値電圧Vddc_startより高いと、最大動作点電圧Vpmが最低補償閾値電圧Vddc_min以上であるか否かを判定する(ST2A)。
ステップST2において、最大動作点電圧Vpmが最低補償閾値電圧Vddc_min以上であると判定すると、第1の制御部34は、経路切替信号PATHをローレベルでパワースイッチ回路32に出力する。
パワースイッチ回路32は、経路切替信号PATHをハイレベルで受けると、発電素子20を電圧変換部31に接続してその出力を蓄電素子40側に接続する経路を形成する。
ステップST2Aにおいて、最大動作点電圧Vpmが最低補償閾値電圧Vddc_minより小さいと判定すると、第1の制御部34は、端子を開放する。この端子開放箇所としては、たとえば図1におけるパワースイッチ回路33の端子Voutとなる。
次に、電圧変換部31が降圧型DC-DCコンバータの場合の、第1の制御部34による昇圧直結切替制御について説明する。
図5に関連付けて説明したように、本実施形態の電力制御装置30は、基本的に降圧系の電圧変換部31を通して給電素子(太陽電池)20から蓄電素子(蓄電池)40に充電する回路を構成を有している。
そして、第1の制御部34は、昇圧系の場合と同様に、パワースイッチ回路32は、発電素子20を電圧変換部31に接続してその出力を蓄電素子40側に接続するか、発電素子20の出力を蓄電素子40側に直接接続する等の切替制御を行う。
すなわち、第1の制御部34は、蓄電素子40の電圧VBATが発電素子20の最大動作点電圧Vpm以下の電圧を切替閾値とする。
たとえば、第1の制御部34は、VBAT≦Vpm×0.9を閾値とする。
すなわち、一例として、第1の制御部34は、蓄電素子40の電圧VBATが、発電素子20の最大動作点電圧Vpmの90%の電圧以下か否かを判定する電圧Vddc_startを切替閾値とする。
第1の制御部34は、蓄電素子40の電圧VBATが、発電素子20の最大動作点電圧Vpm以上(VBAT≧Vpm)の場合、降圧は不要と判断する。
したがって、この以外の領域に切替閾値を設定することで、発電効率が大きく低下することはなくなる。
この判断で用いられる最大動作点電圧Vpmは、測定した開放電圧に所定の係数Coef、たとえば0.8を乗算して、抵抗分割で求めることが可能である。
検出系MVDDは、たとえば抵抗分割部RDVD10,RDVD20が特性測定回路33に配置され、コンパレータCMPD10が第1の制御部34に配置される。
あるいは、検出系MVDTDのすべてを特性測定回路33に配置し、コンパレータCMPD10の判定結果を第1の制御部34に報知するように構成することも可能である。
抵抗分割部RDVD20は、最大動作点電圧Vpmの供給ラインと基準電位間に抵抗素子RD21、RD22を直列に接続して構成され、その接続ノードNDD21に抵抗分割した閾値電圧Vddc_startとして現れる。
コンパレータCMPD10は、蓄電素子40の電圧VBATと閾値電圧Vddc_startとを比較する。
コンパレータCMPD10は、電圧VBATが閾値電圧Vddc_startより低い場合には、降圧が必要として、経路切替信号PATHをたとえばハイレベルでパワースイッチ回路32に出力する。
パワースイッチ回路32は、経路切替信号PATHをハイレベルで受けると、発電素子20を電圧変換部31に接続してその出力を蓄電素子40側に接続する経路を形成する。
コンパレータCMPD10は、電圧VBATが閾値電圧Vddc_start以上の場合には、降圧が不要として、経路切替信号PATHをローレベルでパワースイッチ回路32に出力する。
パワースイッチ回路32は、経路切替信号PATHをローレベルで受けると、電圧変換部31と負荷である蓄電素子40とを切り離して、発電素子20を蓄電素子40側に直接接続(直結)する経路を形成する。
たとえば第1の制御部34は、蓄電素子40の電圧VBATが、発電素子20の最大動作点電圧Vpmより低いか否かを判定する電圧Vddc_startを切替閾値とする。
図15において、PWRLは昇圧した場合の変換ロスによる発電電力低下分を示している。
信号PATHはハイレベルに設定される。
この領域では、基本的に降圧せずに直結(直付け)した方が得である。
この領域Xにおいては、降圧できない、またはMPP付近にあることから降圧分のロスの方が大きい。したがって、この領域Xでは降圧しないで直付けした方が得である。この場合、経路切替信号PATHはローレベルに設定される。
ステップST11で、蓄電素子40の電圧VBATが切替閾値電圧Vddc_start以上であると判定した場合には、第1の制御部34は、経路切替信号PATHをローレベルでパワースイッチ回路32に出力する。
パワースイッチ回路32は、経路切替信号PATHをローレベルで受けると、電圧変換部31と負荷である蓄電素子40とを切り離して、発電素子20を蓄電素子40側に直接接続(直結)する経路を形成する。
ステップST11において、第1の制御部34は、蓄電素子40の電圧VBATが切替閾値電圧Vddc_startより低いと、最大動作点電圧Vpmが最高補償閾値電圧Vddc_max以下であるか否かを判定する(ST12)。
ステップST2において、最大動作点電圧Vpmが最高補償閾値電圧Vddc_max以下であると判定すると、第1の制御部34は、経路切替信号PATHをローレベルでパワースイッチ回路32に出力する。
パワースイッチ回路32は、経路切替信号PATHをハイレベルで受けると、発電素子20を電圧変換部31に接続してその出力を蓄電素子40側に接続する経路を形成する。
図17は、本実施形態に係る電圧変換部としての昇圧型スイッチングレギュレータの基本的な構成例を示す回路図である。
コンパレータ310は、入力電圧VIがリファレンス電圧Vrefを超えると出力がハイレベルに切り替わる。
PFM制御部312は、イネーブル信号ENによりイネーブル状態となり、リセット信号RSTによりリセット可能に構成される。
入力に接続した発電素子(太陽電池)20の動作点(動作電圧)を制御する。
入力は発電素子20で発電された電圧であり、出力は蓄電素子40(二次電池(Li+電池)であり、発電素子(太陽電池)20の動作点制御によりMPPTを行う。
スイッチングトランジスタQ31がオフすると、インダクタL31が蓄えたエネルギーを放出する。
これにより、入力電圧VIにインダクタL31のエネルギーが上積みされる。その結果、入力電圧は昇圧される。
図19は、図17の昇圧型スイッチングレギュレータの動作を説明するための図である。
<2>コンパレータ311の出力に応答して、PFM制御部312が固定幅のパルスを発生する(SW=ON)。これにより、インダクタL31のエネルギーが放出される。
<3>入力電圧VIがリファレンス電圧Vrefより低くなると、コンパレータ311の出力はローレベルとなり、スイッチングトランジスタQ313がオフする。
これにより、インダクタ31に蓄えられたエネルギーの放出からインダクタL31へのエネルギーの充電動作となる。
以上の動作が繰り返される。
このリファレンス電圧Vrefを第1の制御部34が変えることで、発電素子(太陽電池)20の動作点(動作電圧)を制御可能である。
また、上記したように、自励発振が何らかの理由でストップしてしまったときにリセットをかけるリセット機能を持たせることも可能である。
また、スイッチングトランジスタQ31のオン時間はインダクタL31のピーク電流に影響することから、入力電流、接続する発電素子(太陽電池)によってオン時間を変えるように構成することも可能である。
定格、ノイズ、効率などの観点から、場合によってはレンジ毎に数種類から選択できるようにすることが望ましい。
スイッチング周波数の変化から周囲環境変化を検知する。
この場合、Δt毎にスイッチング回数をカウントし、前回との差分をとる。
スイッチング周波数の変化を測定し、周波数が高くなると、発電量が増大したことに相当することから、リファレンス電圧Vrefを変更し、パスを切り替える。
周波数が低くなると、発電量は減少したことに相当し、これに応答してリファレンス電圧Vrefを変更し、パスを切り替え、昇圧動作を停止する。
リファレンス電圧Vref、スイッチングトランジスタQ31のON時間を固定とすると、スイッチング周波数は入力電流に依存する。
これにより、スイッチング周波数から電流を算出することが可能である。
図20においては、理解を容易にするために図17と同一構成部分は同一符号をもって表している。
図20のスイッチングレギュレータ31Bは、図17の構成に加えて、OFFタイミング検出部313、充電終了検出部314、カウンタ315、レジスタ316、および減算器317を有する。
OFFタイミング検出部313、および充電終了検出部314はコンパレータにより構成可能である。
OFFタイミング検出部313は、閾値Vref1とノードND31の電位を比較して、スイッチングトランジスタQ31のOFFタイミングを検出し、その検出結果をPFM制御部312に出力する。
充電終了検出部314は、出力電圧(ダイオードのカソード側電位)と閾値Vref2とを比較して、充電終了を検出し、その検出結果をPFM制御部312に出力する。
発電素子20の電流の変化(照度の変化)によりインダクタL31のチャージ時間が変化する。この場合、電流が多いほどチャージ時間は短くなる。
変圧回路(PFM)を使用している場合、スイッチング周波数の変化で照度の変化を測定可能である。
この手法は、定期的に変圧回路であるPFM制御部312を止めて開放電圧を測る手法に比べ、ADCを使わないので低電力周波数の変化をトリガとして制御可能である。
図20の例では、スイッチングトランジスタQ31のゲート制御信号をカウンタ315でカウントすることで周波数を測定可能である。
太陽電池太陽電池である発電素子20の電流が小さいほど周波数は低いかスイッチングが停止状態にあると判断できる。
そして、第1の制御部34の制御部の下、周波数の変化が既定以上になった場合,I-V特性(あるいは短絡電流)を測定しなおし、MPPT制御をやり直す。
また、変化が大きくなった場合に測定しなおすように構成することも可能である。
周波数の測定は、変圧回路であるPFM制御部312のスイッチングパルス信号をカウンタ315でカウントする。そしてM定期的にカウンタ値をポーリングし、減算器317で差分を求めることで実現可能である。
追従トリガを周波数の変化とすることにより、MPPTのずれを測定する回数を減らし制御電力を低減することが可能となる。
図21は、発電素子(太陽電池)のI-V特性が温度変化に応じて変化する様子を示す図である。
図21に示すように、発電素子(太陽電池)のI-V特性が温度変化に応じて変化することから、第2の制御部35でサーミスタ50を監視して、その検出温度情報を第1の制御部34に供給する。
第1の制御部34は、温度情報に応じてあらかじめ温度と対応つけた係数を選択して、たとえばMTTP制御のリファレンス電圧Vrefにその係数を乗算して温度変換に追従したMTTP制御を行う。
この場合、常温25°Cを中心として、±10~15程度の通常温度範囲では、通常のMTTP制御を行い、通常温度範囲より高い温度範囲では第1の係数を用い、低い温度範囲では第2の係数を用いる等、種々の態様が可能である。
ここでのMTTP制御は、電圧変換部31の制御だけでなく、パワースイッチ回路32の電力経路の接続切り替えにも適用可能である。
基本的に、この降圧型スイッチングレギュレータ31Cは、昇圧型とインダクタL31、ダイオードD31との接続形態が異なる以外は同様の構成を有している。
したがって、図20の回路構成もそのまま適用可能である。
図23は、本実施形態に係る逆流防止回路の構成例を示す回路図である。
この逆流防止回路36は、抵抗R41、PMOSFETにより形成されるスイッチングトランジスタQ41、ダイオードD41、およびコンパレータ361を有する。
電圧供給ラインLV1の発電素子側ノードND41と蓄電素子40側ノードND42との間に、抵抗R41およびスイッチングトランジスタQ41が直列に接続され、スイッチングトランジスタQ41に並列に逆流防止用ダイオードD41が接続されている。
コンパレータ361は、ノードND41の電位とノードND42の電位を比較し、その結果によりスイッチングトランジスタQ41をオン、オフする。
逆流防止回路36は、逆流を防止しつつ、順方向電圧VFによる損失を低減する。
その結果、スイッチングトランジスタQ41はオンし、逆流防止用ダイオードD41をバイパスする。
ノードND42の電位がノードND41の電位より高く逆流となる状態である場合は、逆流検出としてコンパレータ361の出力がハイレベルとなる。
その結果、スイッチングトランジスタQ41はオフし、逆流防止用ダイオードD41のみの接続ラインとする。
MOSFETのオン抵抗だけで逆流を検出できるようにすることも可能である。
コンパレータ361の消費電力をできるだけ抑えることが望ましい。
この場合、充電中に電池電圧が急激に低下したら逆流防止用ダイオードD41のみの接続ラインとする(充電電圧 > 放電電圧)。
次に、第2の制御部35を中心とした蓄電素子(蓄電池)40に対する充電制御について説明する。
図24において、横軸が時間を示し、縦軸が蓄電素子40の電圧VBATを示している。
そして、図24において、FVはほぼ満充電とみさせる電圧を、FVOは満充電開放電圧を、VCRGは充電電圧をそれぞれ示している。
さらに、図24において、P1~P10(Pn)は蓄電素子40の端子を開放して蓄電素子40の電圧VBATを測定(監視)する測定ポイントを示している。
そして、図24において、D1~D9は隣接する測定ポイント間の時間間隔を示し、D1>D2>D3>D4>D5>D6>D7>D8>D9の関係にある。
すなわち、第2の制御部35は、蓄電素子40の電圧VBATに応じて蓄電素子40の端子を開放して蓄電素子40の電圧VBATを測定(監視)する測定ポイント間隔を動的に変えるように制御する。
本実施形態では、第2の制御部35は、蓄電素子40の電圧VBATが高くなるに従って測定ポイント間隔が短くなるように制御する。
そして、電力制御装置30の第2の制御部35は、蓄電素子40の電圧を監視し、蓄電素子40の端子開放時の電圧VBATがある満充電電圧FV以上に達した場合に次のような制御を行う。
第2の制御部35は、たとえば制御信号CTL35により充電を停止する充電制御を行うことが可能で、制御信号CTL35により蓄電素子40の電圧VBATが高いほど、蓄電素子40の端子開放時間間隔Dが短くなるよう制御する。
また、電力制御装置30は、太陽電池等の発電素子20の出力が変動する電源から蓄電素子40への充電の場合、特性測定回路33から供給される発電素子(電源)20の出力電圧VC1が高いほど開放時間間隔Dが短くなるように制御する。
第2の制御部35は、開放電圧測定時間間隔Dを蓄電素子4の電圧VBATに依存して変更する。具体的には、蓄電素子40の電圧VBATが高いほど、測定時間間隔Dを短くする。
また、第2の制御部35は、発電素子(太陽電池)20の出力電圧VC1に依存して変更する。具体的には、発電素子(太陽電池)20の出力電圧VC1が高いほど、測定時間間隔Dを短くする。
なお、第2の制御部35は、開放電圧測定時間間隔Dを蓄電素子4の電圧VBATおよび発電素子(太陽電池)20の出力電圧VC1に依存して変更することも可能である。
第2の制御部35は、蓄電素子40の電圧が満充電開放電圧以上になった場合も、蓄電素子40または発電素子20の電圧に応じて蓄電素子の端子開放時間間隔を変更する制御を行う。
これにより、蓄電素子40の開放による充電損失を少なくする。
すなわち、開放前に満充電電圧FVに達してから、蓄電素子40の端子を開放しての測定を開始する。
この場合、開放電圧測定時間間隔Dは一定でもよく、また第1の充電制御方法と同様に、蓄電素子4の電圧VBATに依存して変更するように構成することも可能である。
第2の制御部35は、充電を停止する充電制御を行う際に、蓄電素子40の端子を開放しないで充電時の電圧が満充電電圧FVO以上になるまでは、蓄電素子40の端子を開放しての満充電検知を行わないように制御する。
これにより、電力制御装置30は、蓄電素子40への充電において、満充電検知時の充電損失を減らし、また過充電を防止することが可能となっている。
次に、電力制御装置30の電流電圧制限回路37による蓄電素子40への充電制御について説明する。
図26は、本実施形態に係る電流電圧制限回路の構成例を示す回路図である。
制御電圧として、電圧レギュレーションの場合は誤差アンプ371に与えられる基準電圧Vref1である。
電流レギュレーションの場合は、制御電圧として蓄電素子(BAT)40のR55のパスから定電流源I51、I52で電流を引っ張った場合の電圧ドロップ分とする。
また、最大制限と初期充電制限の2種類の制御を設ける。
CV充電になってから、たとえば5分などの周期でΔV検出を開始する。
周期を5分としたのは発電素子(太陽電池)20の出力電力性能や蓄電素子40の充電容量等による。
ΔV検出中に充電を停止し、蓄電素子40の開放電圧を測定する。
充電を停止する時間は2秒、3秒などである。停止時間はADCや蓄電素子40の性能等による。
本実施形態においては、蓄電素子40への開放前の充電電圧と、蓄電素子端子の開放時の電圧との差分をΔVとして測定し、その差分ΔVが一定値以下、たとえば50mVなどの値以下の場合、充電を停止する。
次に、電力制御装置30による蓄電素子40への充電制御について説明する。
図27は、本実施形態に係る電力制御装置の全体的な充電制御を説明するためのフローチャートである。
ここで、第2の制御部35は、サーミスタ50の検出結果等を踏まえたパワースイッチ回路32等への制御を行う。
以下の説明では、この第2の制御部35、スタートアップ回路38の動作も含めて全体的な充電制御について説明する。
ステップST103で入力電圧VINが、蓄電素子40の電圧VBATより高いと判定すると、ローでアクティブの充電イネーブル信号EN_Xがローレベルであるか否かを判定する(ST104)。
充電イネーブル信号EN_Xがローレベルであると、サーミスタ50による温度が0°以下でなく(ST105)、60°以上でない場合に(ST106)、初期充電がONになる(ST107)。
これにより、発電素子20で発電された電力による蓄電素子40に対する初期充電が行われる。そして、ステップST103の処理に戻る。
また、ステップST105~ST107で否定的な判定結果が得られた場合、初期充電をOFFのままで(ST108)、ステップST103の処理に戻る。
次に、蓄電素子40の電圧VBATが、満充電時の4.2Vに制限をかけた4.1Vより低いか否かの判定が行われる(ST111)。
蓄電素子40の電圧VBATが、4.1Vより低い場合には、発電素子20-1,20-2による入力電圧VINが、蓄電素子40の電圧VBATより高いか否かの判定が行われる(ST112)。
入力電圧VINが、蓄電素子40の電圧VBATより高い場合には、ステップST103の処理に戻り、低い場合には充電系回路の起動閾値電圧VSCENより起動電圧VSTARTが低
いか否かの判定が行われる(ST113)。
起動閾値電圧VSCENより起動電圧VSTARTが高い場合はステップST109からの処理に戻る。
起動閾値電圧VSCENより起動電圧VSTARTが低い場合には次のようになる。
すなわち、サーミスタ50による温度が0°以下でなく(ST114)、60°以上でない場合で(ST115)、充電イネーブル信号EN_Xがローレベルである場合に(ST116)、MTTP充電をONになる(ST117)。
これに伴い、たとえば電圧変換部31が適用されるようにスイッチングが行われている場合に、MPPT充電制御が行われる(ST118)。
MPPT充電制御後、MPPT充電がOFFにされ(ST119)、蓄電素子40の電圧VBATが、満充電時の4.2Vより低いか否かの判定が行われる(ST120)。
蓄電素子40の電圧VBATが、満充電時の4.2Vより低い場合には、入力電圧VINが、蓄電素子40の電圧VBATより高いか否かの判定が行われ(ST121)、高い場合にはステップST103からの処理に戻る。
入力電圧VINが、蓄電素子40の電圧VBATより低い場合には、発電素子20の出力電圧VC1が電圧VTHRより低いか否かの判定が行われる(ST122)。
そして、出力電圧VC1が電圧VTHRより低い場合にはステップST103からの処理に戻り、高い場合には、ステップST114からの処理に戻る。
また、ステップST120で、蓄電素子40の電圧VBATが、満充電時の4.2Vより高いと判定されると、システム給電機能がONとなる(ST123)。
そして、蓄電素子40の電圧VBATが、満充電時の4.2Vに制限をかけた4.1Vより低いか否かの判定が行われ(ST124)、低い場合にシステム給電機能がOFFにされ(ST125)、ステップST103からの処理に戻る。
この制御は、電流電圧制限回路37が直接的に行うように構成することも可能であり、また、第1の制御部34または第2の制御部35により制御するように構成することも可能である。
この場合も、電流電圧制限回路37-2が電力供給を制限しているときは、逆流防止回路36の逆流防止機能を停止させるように制御することも可能である。
図29は、照度に対する電圧(開放電圧または最大動作点電圧)の変化率は、太陽電池の種類によって異なることを示す図である。
アモルファスシリコン(a-Si)は照度に対する電圧の変化率が少ない。
結晶シリコン(c-Si)は照度に対する電圧の変化率が大きい。
また、電圧が電定電圧V2以上の場合はDC-DCコンバータで降圧するよう制御する。電圧がV1とV2の間にある場合、DC-DCコンバータを通さないで、発電素子20と蓄電素子40側を直結して出力する。
特に、太陽電池等の発電素子の最大動作点を維持するよう制御することができ、電力損失を回避することができる。
Claims (39)
- 発電素子が接続可能で、経路切替信号に応じて負荷側蓄電素子への電力経路を切り替える電力経路切替部と、
上記電力経路切替部を介して供給される、上記発電素子で発電された電圧レベルを変換し、上記負荷側蓄電素子に供給可能な電圧変換部と、
上記発電素子の開放電圧を測定する機能を有し、測定した開放電圧に基づいて上記発電素子の最大動作点電圧を得る特性測定回路と、
上記発電素子の上記開放電圧および上記最大動作点電圧のうち少なくとも上記最大動作点電圧と上記負荷側蓄電素子の電圧との大小関係に応じて生成される切替閾値と、上記負荷側蓄電素子との比較結果に応じた上記経路切替信号を上記電力経路切替部に出力する制御部と、を有し、
上記電力経路切替部は、
上記経路切替信号に応じて、上記発電素子を上記電圧変換部に接続して当該出力を上記蓄電素子側に接続する経路、または、上記発電素子を蓄電素子側に直接接続する経路を形成する
電力制御装置。 - 上記電圧変換部は、
入力電圧を昇圧する昇圧系を含み、
上記制御部は、
上記発電素子の上記最大動作点電圧以上で上記開放電圧以下の電圧を上記切替閾値とし、
上記蓄電素子の電圧が上記切替閾値以下の場合には、上記電力経路切替部に対して上記発電素子を蓄電素子側に直接接続する経路を形成するように上記経路切替信号を出力し、
上記蓄電素子の電圧が上記切替閾値以上の場合には、上記電力経路切替部に対して上記発電素子を上記電圧変換部に接続して当該出力を上記蓄電素子側に接続する経路を形成するように上記経路切替信号を出力する
請求項1記載の電力制御装置。 - 上記制御部は、
上記蓄電素子の電圧が上記切替閾値以上の場合で、上記発電素子の上記最大動作点電圧があらかじめ設定した上記発電素子による発電出力電圧についての最低補償閾値電圧以上のときに、上記電力経路切替部に対して上記発電素子を上記電圧変換部に接続して当該出力を上記蓄電素子側に接続する経路を形成するように上記経路切替信号を出力する
請求項2記載の電力制御装置。 - 上記制御部は、
上記蓄電素子の電圧が上記切替閾値以上で上記開放電圧以下の場合で、上記発電素子の上記最大動作点電圧があらかじめ設定した上記発電素子による発電出力電圧についての最低補償閾値電圧より低いときには、上記電力経路切替部に対して上記発電素子を蓄電素子側に直接接続する経路を形成するように上記経路切替信号を出力する
請求項3記載の電力制御装置。 - 上記制御部は、
上記蓄電素子の電圧が上記開放電圧以上の場合で、上記発電素子の上記最大動作点電圧があらかじめ設定した上記発電素子による発電出力電圧についての最低補償閾値電圧より低いときには、上記蓄電素子側端子を開放する
請求項3記載の電力制御装置。 - 上記電圧変換部は、
入力電圧を降圧する降圧系を含み、
上記制御部は、
上記発電素子の上記最大動作点電圧以下の電圧を上記切替閾値とし、
上記蓄電素子の電圧が上記切替閾値以下の場合には、上記電力経路切替部に対して上記発電素子を上記電圧変換部に接続して当該出力を上記蓄電素子側に接続する経路を形成するように上記経路切替信号を出力し、
上記蓄電素子の電圧が上記切替閾値以上の場合には、上記電力経路切替部に対して上記発電素子を蓄電素子側に直接接続する経路を形成するように上記経路切替信号を出力する
請求項1記載の電力制御装置。 - 上記制御部は、
上記蓄電素子の電圧が上記切替閾値以下の場合で、上記発電素子の上記最大動作点電圧があらかじめ設定した上記発電素子による発電出力電圧についての最高補償閾値電圧以下のときに、上記電力経路切替部に対して上記発電素子を上記電圧変換部に接続して当該出力を上記蓄電素子側に接続する経路を形成するように上記経路切替信号を出力する
請求項6記載の電力制御装置。 - 上記制御部は、
上記蓄電素子の電圧が上記切替閾値以下の場合で、上記発電素子の上記最大動作点電圧があらかじめ設定した上記発電素子による発電出力電圧についての最高補償閾値電圧より高いときに、上記電力経路切替部に対して上記発電素子を蓄電素子側に直接接続する経路を形成するように上記経路切替信号を出力する
請求項7記載の電力制御装置。 - 電力供給ラインの電位より負荷側の電位が高くなる場合に、上記負荷側からの逆流を防止する機能を含む逆流防止回路を含む
請求項1記載の電力制御装置。 - 上記発電素子の電力を負荷側の蓄電素子に供給し充電し、当該供給電力を制限可能な制限回路で、上記蓄電素子への供給電圧が満充電電圧より低い電圧になるように電力供給を制限する制限回路を含む
請求項1記載の電力制御装置。 - 上記発電素子の電力を負荷側の蓄電素子に供給し充電し、当該供給電力を制限可能な制限回路で、上記蓄電素子への供給電圧が満充電電圧より低い電圧になるように電力供給を制限する制限回路を含み、
上記制御部は、
上記制限回路が電力供給を制限しているときは、上記逆流防止回路の逆流防止機能を停止させる
請求項1記載の電力制御装置。 - 発電素子を、当該発電素子で発電された電圧レベルを変換し、上記負荷側蓄電素子に供給可能な電圧変換部に接続するか、当該負荷側蓄電素子に直接接続するかの電力経路の切り替えを行うに際し、
上記発電素子の開放電圧を測定し、
測定した開放電圧に基づいて上記発電素子の最大動作点電圧を取得し、
上記発電素子の上記開放電圧および上記最大動作点電圧のうち少なくとも上記最大動作点電圧と上記負荷側蓄電素子の電圧との大小関係に応じて切替閾値を設定し、
上記負荷側蓄電素子と当該切替閾値との比較結果に応じて、上記発電素子を上記電圧変換部に接続して当該出力を上記蓄電素子側に接続する経路、または、上記発電素子を蓄電素子側に直接接続する経路を形成する
電力制御方法。 - 上記電圧変換部は、
入力電圧を昇圧する昇圧系を含み、
上記発電素子の上記最大動作点電圧以上で上記開放電圧以下の電圧を上記切替閾値とし、
上記蓄電素子の電圧が上記切替閾値以下の場合には、上記発電素子を蓄電素子側に直接接続する経路を形成し、
上記蓄電素子の電圧が上記切替閾値以上の場合には、上記発電素子を上記電圧変換部に接続して当該出力を上記蓄電素子側に接続する経路を形成する
請求項12記載の電力制御方法。 - 上記蓄電素子の電圧が上記切替閾値以上の場合で、上記発電素子の上記最大動作点電圧があらかじめ設定した上記発電素子による発電出力電圧についての最低補償閾値電圧以上のときに、上記発電素子を上記電圧変換部に接続して当該出力を上記蓄電素子側に接続する経路を形成する
請求項13記載の電力制御方法。 - 上記蓄電素子の電圧が上記切替閾値以上で上記開放電圧以下の場合で、上記発電素子の上記最大動作点電圧があらかじめ設定した上記発電素子による発電出力電圧についての最低補償閾値電圧より低いときには、上記発電素子を蓄電素子側に直接接続する経路を形成する
請求項14記載の電力制御方法。 - 上記蓄電素子の電圧が上記開放電圧以上の場合で、上記発電素子の上記最大動作点電圧があらかじめ設定した上記発電素子による発電出力電圧についての最低補償閾値電圧より低いときには、上記蓄電素子側端子を開放する
請求項14記載の電力制御方法。 - 上記電圧変換部は、
入力電圧を降圧する降圧系を含み、
上記発電素子の上記最大動作点電圧以下の電圧を上記切替閾値とし、
上記蓄電素子の電圧が上記切替閾値以下の場合には、上記発電素子を上記電圧変換部に接続して当該出力を上記蓄電素子側に接続する経路を形成し、
上記蓄電素子の電圧が上記切替閾値以上の場合には、上記発電素子を蓄電素子側に直接接続する経路を形成する
請求項12記載の電力制御方法。 - 上記蓄電素子の電圧が上記切替閾値以下の場合で、上記発電素子の上記最大動作点電圧があらかじめ設定した上記発電素子による発電出力電圧についての最高補償閾値電圧以下のときに、上記発電素子を上記電圧変換部に接続して当該出力を上記蓄電素子側に接続する経路を形成する
請求項17記載の電力制御方法。 - 上記蓄電素子の電圧が上記切替閾値以下の場合で、上記発電素子の上記最大動作点電圧があらかじめ設定した上記発電素子による発電出力電圧についての最高補償閾値電圧より高いときに、上記発電素子を蓄電素子側に直接接続する経路を形成する
請求項18記載の電力制御方法。 - 電力を発電する発電素子と、
上記発電素子で発電された電力を蓄電する蓄電素子と、
上記発電素子の電力を負荷側の上記蓄電素子に供給する電力制御装置と、を有し、
上記電力制御装置は、
発電素子が接続可能で、経路切替信号に応じて負荷側蓄電素子への電力経路を切り替える電力経路切替部と、
上記電力経路切替部を介して供給される、上記発電素子で発電された電圧レベルを変換し、上記負荷側蓄電素子に供給可能な電圧変換部と、
上記発電素子の開放電圧を測定する機能を有し、測定した開放電圧に基づいて上記発電素子の最大動作点電圧を得る特性測定回路と、
上記発電素子の上記開放電圧および上記最大動作点電圧のうち少なくとも上記最大動作点電圧と上記負荷側蓄電素子の電圧との大小関係に応じて生成される切替閾値と、上記負荷側蓄電素子との比較結果に応じた上記経路切替信号を上記電力経路切替部に出力する制御部と、を含み、
上記電力経路切替部は、
上記経路切替信号に応じて、上記発電素子を上記電圧変換部に接続して当該出力を上記蓄電素子側に接続する経路、または、上記発電素子を蓄電素子側に直接接続する経路を形成する
給電システム。 - 発電素子で発電された電力の負荷側蓄電素子の充電制御を行う制御部を有し、
上記制御部は、
上記蓄電素子の電圧を監視し、上記蓄電素子端子の開放時の電圧が満充電電圧以上に達した場合、または上記蓄電素子への開放前の充電電圧と上記蓄電素子端子の開放時の電圧との差分が一定値以下に達した場合、充電を停止する充電制御を行い、かつ、
上記蓄電素子または上記発電素子の電圧または電流に応じて上記蓄電素子の端子開放時間間隔を変更する
電力制御装置。 - 上記制御部は、
上記蓄電素子の電圧を監視し、上記蓄電素子端子の開放時の電圧が満充電電圧以上に達した場合、または上記蓄電素子への開放前の充電電圧と上記蓄電素子端子の開放時の電圧との差分が一定値以下に達した場合、充電を停止する充電制御を行い、かつ、
上記蓄電素子の電圧が高いほど上記蓄電素子の端子開放時間間隔が短くなるよう制御する
請求項21記載の電力制御装置。 - 上記制御部は、
上記蓄電素子の電圧を監視し、上記蓄電素子端子の開放時の電圧が満充電電圧以上に達した場合、または上記蓄電素子への開放前の充電電圧と上記蓄電素子端子の開放時の電圧との差分が一定値以下に達した場合、充電を停止する充電制御を行い、かつ、
上記発電素子の出力電圧が高いほど上記蓄電素子の端子開放時間間隔が短くなるよう制御する
請求項21記載の電力制御装置。 - 上記制御部は、
上記蓄電素子の電圧が満充電開放電圧以上になった場合、または上記蓄電素子への開放前の充電電圧と上記蓄電素子端子の開放時の電圧との差分が一定値以下になった場合も、上記蓄電素子または上記発電素子の電圧または電流に応じて上記蓄電素子の端子開放時間間隔を変更する制御を行う
請求項21記載の電力制御装置。 - 上記制御部は、
上記蓄電素子の電圧が満充電電圧に達するまでは、蓄電素子端子を開放しての満充電検知を行わないように制御する
請求項21記載の電力制御装置。 - 上記制御部は、
上記蓄電素子の電圧が満充電電圧に達してから、蓄電素子端子を開放しての満充電検知を行うように制御する
請求項25記載の電力制御装置。 - 発電素子で発電された電力の負荷側蓄電素子の充電制御を行う制御部を有し、
上記制御部は、
上記蓄電素子の電圧を監視し、上記蓄電素子端子の開放時の電圧が満充電電圧以上に達した場合、または上記蓄電素子への開放前の充電電圧と上記蓄電素子端子の開放時の電圧との差分が一定値以下に達した場合、充電を停止する充電制御を行い、かつ、
上記蓄電素子の電圧が満充電電圧に達するまでは、蓄電素子端子を開放しての満充電検知を行わないように制御する
電力制御装置。 - 上記制御部は、
上記蓄電素子の電圧が満充電電圧に達してから、蓄電素子端子を開放しての満充電検知を行うように制御する
請求項27記載の電力制御装置。 - 電力供給ラインの電位より負荷側の電位が高くなる場合に、上記負荷側からの逆流を防止する機能を含む逆流防止回路を含む
請求項21記載の電力制御装置。 - 上記発電素子の電力を負荷側の蓄電素子に供給し充電し、当該供給電力を制限可能な制限回路で、上記蓄電素子への供給電圧が満充電電圧より低い電圧になるように電力供給を制限する制限回路を含む
請求項21記載の電力制御装置。 - 上記発電素子の電力を負荷側の蓄電素子に供給し充電し、当該供給電力を制限可能な制限回路で、上記蓄電素子への供給電圧が満充電電圧より低い電圧になるように電力供給を制限する制限回路を含み、
上記制御部は、
上記制限回路が電力供給を制限しているときは、上記逆流防止回路の逆流防止機能を停止させる
請求項21記載の電力制御装置。 - 発電素子で発電された電力の負荷側蓄電素子の充電制御を行うに際し、
上記蓄電素子の電圧を監視し、上記蓄電素子端子の開放時の電圧が満充電電圧以上に達した場合、または上記蓄電素子への開放前の充電電圧と上記蓄電素子端子の開放時の電圧との差分が一定値以下に達した場合、充電を停止する充電制御を行い、かつ、
上記蓄電素子または上記発電素子の電圧または電流に応じて上記蓄電素子の端子開放時間間隔を変更する
電力制御方法。 - 上記蓄電素子の電圧が高いほど上記蓄電素子の端子開放時間間隔が短くなるよう制御する
請求項32記載の電力制御方法。 - 上記発電素子の出力電圧が高いほど上記蓄電素子の端子開放時間間隔が短くなるよう制御する
請求項32記載の電力制御方法。 - 上記蓄電素子の電圧が満充電電圧に達するまでは、蓄電素子端子を開放しての満充電検知を行わないように制御する
請求項32記載の電力制御方法。 - 発電素子で発電された電力の負荷側蓄電素子の充電制御を行うに際し、
上記蓄電素子の電圧を監視し、上記蓄電素子端子の開放時の電圧が満充電電圧以上に達した場合、または上記蓄電素子への開放前の充電電圧と上記蓄電素子端子の開放時の電圧との差分が一定値以下に達した場合、充電を停止する充電制御を行い、かつ、
上記蓄電素子の電圧が満充電電圧に達するまでは、蓄電素子端子を開放しての満充電検知を行わないように制御する
電力制御方法。 - 上記蓄電素子の電圧が満充電電圧に達してから、蓄電素子端子を開放しての満充電検知を行うように制御する
請求項36記載の電力制御方法。 - 電力を発電する発電素子と、
上記発電素子で発電された電力を蓄電する蓄電素子と、
上記発電素子の電力を上記蓄電素子に供給する電力制御装置と、を有し、
上記電力制御装置は、
発電素子で発電された電力の負荷側蓄電素子の充電制御を行う制御部を有し、
上記制御部は、
上記蓄電素子の電圧を監視し、上記蓄電素子端子の開放時の電圧が満充電電圧以上に達した場合、または上記蓄電素子への開放前の充電電圧と上記蓄電素子端子の開放時の電圧との差分が一定値以下に達した場合、充電を停止する充電制御を行い、かつ、
上記蓄電素子または上記発電素子の電圧または電流に応じて上記蓄電素子の端子開放時間間隔を変更する
給電システム。 - 電力を発電する発電素子と、
上記発電素子で発電された電力を蓄電する蓄電素子と、
上記発電素子の電力を上記蓄電素子に供給する電力制御装置と、を有し、
上記電力制御装置は、
発電素子で発電された電力の負荷側蓄電素子の充電制御を行う制御部を有し、
上記制御部は、
上記蓄電素子の電圧を監視し、上記蓄電素子端子の開放時の電圧が満充電電圧以上に達した場合、または上記蓄電素子への開放前の充電電圧と上記蓄電素子端子の開放時の電圧との差分が一定値以下に達した場合、充電を停止する充電制御を行い、かつ、
上記蓄電素子の電圧が満充電電圧に達するまでは、蓄電素子端子を開放しての満充電検知を行わないように制御する
給電システム。
Priority Applications (5)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011800474958A CN103154844A (zh) | 2010-10-07 | 2011-09-14 | 电力控制装置、电力控制方法和馈电系统 |
EP11830482.3A EP2626763A4 (en) | 2010-10-07 | 2011-09-14 | POWER CONTROL DEVICE, POWER CONTROL METHOD AND POWER SUPPLY SYSTEM |
KR1020137007861A KR101979961B1 (ko) | 2010-10-07 | 2011-09-14 | 전력 제어 장치, 전력 제어 방법 및 급전 시스템 |
US13/877,292 US9325202B2 (en) | 2010-10-07 | 2011-09-14 | Power control device, power control method, and feed system |
BR112013007691A BR112013007691A2 (pt) | 2010-10-07 | 2011-09-14 | dispositivo de controle de potência, método de controle de potência, e, sistema de alimentação |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2010-227143 | 2010-10-07 | ||
JP2010227143A JP5691365B2 (ja) | 2010-10-07 | 2010-10-07 | 電力制御装置、電力制御方法、および給電システム |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2012046549A1 true WO2012046549A1 (ja) | 2012-04-12 |
Family
ID=45927546
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2011/070942 WO2012046549A1 (ja) | 2010-10-07 | 2011-09-14 | 電力制御装置、電力制御方法、および給電システム |
Country Status (8)
Country | Link |
---|---|
US (1) | US9325202B2 (ja) |
EP (1) | EP2626763A4 (ja) |
JP (1) | JP5691365B2 (ja) |
KR (1) | KR101979961B1 (ja) |
CN (2) | CN103154844A (ja) |
BR (1) | BR112013007691A2 (ja) |
TW (1) | TWI448045B (ja) |
WO (1) | WO2012046549A1 (ja) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TWI491858B (zh) * | 2013-03-15 | 2015-07-11 | Richtek Technology Corp | 溫度偵測電路及其方法 |
Families Citing this family (34)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8937822B2 (en) | 2011-05-08 | 2015-01-20 | Paul Wilkinson Dent | Solar energy conversion and utilization system |
US10090777B2 (en) | 2011-05-08 | 2018-10-02 | Koolbridge Solar, Inc. | Inverter with independent current and voltage controlled outputs |
US11460488B2 (en) | 2017-08-14 | 2022-10-04 | Koolbridge Solar, Inc. | AC electrical power measurements |
US11901810B2 (en) | 2011-05-08 | 2024-02-13 | Koolbridge Solar, Inc. | Adaptive electrical power distribution panel |
JP6008668B2 (ja) * | 2012-09-19 | 2016-10-19 | シャープ株式会社 | 電力変換装置及び蓄電システム並びに蓄電方法 |
FR3006512A1 (fr) * | 2013-05-31 | 2014-12-05 | St Microelectronics Sa | Circuit de gestion d'energie d'un capteur autonome |
JP6227359B2 (ja) * | 2013-10-01 | 2017-11-08 | パイオニア株式会社 | 受電装置、通信制御方法、コンピュータプログラム及び給電装置 |
JP2015095948A (ja) * | 2013-11-12 | 2015-05-18 | オムロンオートモーティブエレクトロニクス株式会社 | Dc−dcコンバータ |
JP6182773B2 (ja) * | 2013-11-15 | 2017-08-23 | コニカミノルタ株式会社 | 充放電システム |
JP5668132B1 (ja) | 2013-12-27 | 2015-02-12 | 株式会社フジクラ | 蓄電システム、及び蓄電方法 |
US10033302B2 (en) | 2014-08-29 | 2018-07-24 | Koolbridge Solar, Inc. | Rotary solar converter |
US9893527B2 (en) * | 2014-12-18 | 2018-02-13 | Fujikura Ltd. | Power storage system and power storage method |
KR101653788B1 (ko) * | 2015-02-05 | 2016-09-05 | (주) 조인테크놀로지 | 전력생성장치 |
CN107431252B (zh) * | 2015-03-25 | 2020-06-23 | 株式会社杰士汤浅国际 | 蓄电元件的监视装置、蓄电装置以及蓄电元件的监视方法 |
CN104836513A (zh) * | 2015-04-17 | 2015-08-12 | 宁波高新区聚光太阳能有限公司 | 太阳能电池间歇性输出方法 |
US9954384B2 (en) * | 2015-05-13 | 2018-04-24 | Nucleus Scientific Inc. | Instrumented super-cell |
US10148093B2 (en) | 2015-06-16 | 2018-12-04 | Koolbridge Solar, Inc. | Inter coupling of microinverters |
DE112016002218T5 (de) | 2015-11-18 | 2018-04-19 | Next-E Solutions Inc. | Steuervorrichtung, elektrische Speichervorrichtung und elektrisches Speichersystem |
US10903669B2 (en) | 2016-01-29 | 2021-01-26 | Toyota Motor Europe | Control device and method for charging a rechargeable battery |
WO2017129259A1 (en) * | 2016-01-29 | 2017-08-03 | Toyota Motor Europe Nv/Sa | Control device and method for discharging a rechargeable battery |
US11196272B2 (en) * | 2016-06-29 | 2021-12-07 | Koolbridge Solar, Inc. | Rapid de-energization of DC conductors with a power source at both ends |
RU2638564C1 (ru) * | 2016-09-19 | 2017-12-14 | Акционерное общество "Авиационная электроника и коммуникационные системы" (АО "АВЭКС") | Способ экстремального регулирования выходной мощности фотоэлектрической батареи |
FR3061814B1 (fr) * | 2017-01-12 | 2020-01-24 | Commissariat A L'energie Atomique Et Aux Energies Alternatives | Dispositif de stockage d'energie electrique apte a se recharger sous une premiere tension et a restituer son energie sous une deuxieme tension |
US11228171B2 (en) | 2017-08-14 | 2022-01-18 | Koolbridge Solar, Inc. | Overcurrent trip coordination between inverter and circuit breakers |
US10250162B2 (en) | 2017-08-14 | 2019-04-02 | Koolbridge Solar, Inc. | DC bias prevention in transformerless inverters |
EP3673558B1 (en) * | 2017-08-22 | 2024-01-10 | UCAP POWER, Inc. | System and method for providing bidirectional transient voltage support and power |
DE102018110785A1 (de) * | 2018-05-04 | 2019-11-07 | Abb Schweiz Ag | Autonomes drahtloses Sensorgerät und zugehöriges Anlaufverfahren |
CN110505728B (zh) * | 2018-05-17 | 2022-05-10 | 朗德万斯公司 | 降压转换器 |
WO2020158006A1 (ja) * | 2019-01-30 | 2020-08-06 | パナソニックIpマネジメント株式会社 | 直流電力供給システムおよび電力システム |
US20220190632A1 (en) * | 2019-03-28 | 2022-06-16 | Tohoku University | Solar unit, solar system, method of controlling solar unit, and method of controlling solar system |
TWI693772B (zh) * | 2019-04-01 | 2020-05-11 | 黃保生 | 具有針對每一串聯二次電池芯進行充電管理功能的電池模組 |
US10742242B1 (en) | 2019-06-05 | 2020-08-11 | Silicon Laboratories Inc. | Apparatus for improving the effective performance of a power source and associated methods |
KR102312805B1 (ko) * | 2020-05-29 | 2021-10-15 | 주식회사 스카이칩스 | 에너지 하베스팅 시스템에서의 최대 전력 지점 추적 장치 및 그 제어 방법 |
TWI773392B (zh) * | 2021-06-21 | 2022-08-01 | 立錡科技股份有限公司 | 可追蹤最大效率之充電控制方法與充電系統 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS62154122A (ja) | 1985-12-27 | 1987-07-09 | Kyocera Corp | 太陽光発電装置における充電制御方式 |
JP2003134690A (ja) * | 2001-10-19 | 2003-05-09 | Matsushita Electric Works Ltd | 充電制御方法および装置並びに照明装置 |
WO2008018250A1 (fr) * | 2006-08-11 | 2008-02-14 | Toyota Jidosha Kabushiki Kaisha | Système de génération d'électricité photovoltaïque solaire, véhicule, procédé de commande de système de génération d'électricité photovoltaïque solaire, et support d'enregistrement lisible par ordinateur doté d'un programme pour amener l'ord |
WO2011062088A1 (ja) * | 2009-11-20 | 2011-05-26 | ソニー株式会社 | 蓄電制御装置および蓄電制御方法 |
WO2011108412A1 (ja) * | 2010-03-03 | 2011-09-09 | ソニー株式会社 | 電力制御装置、電力制御方法、および給電システム |
Family Cites Families (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3430264B2 (ja) * | 1992-06-23 | 2003-07-28 | ソニー株式会社 | 充電装置 |
JPH0779535A (ja) * | 1993-09-08 | 1995-03-20 | Toshiba Corp | 電池残存容量検知方式 |
JPH1146457A (ja) * | 1997-07-25 | 1999-02-16 | Tdk Corp | 太陽電池を利用した充電装置 |
US20060185727A1 (en) * | 2004-12-29 | 2006-08-24 | Isg Technologies Llc | Converter circuit and technique for increasing the output efficiency of a variable power source |
US7193872B2 (en) * | 2005-01-28 | 2007-03-20 | Kasemsan Siri | Solar array inverter with maximum power tracking |
TWI274454B (en) * | 2005-03-04 | 2007-02-21 | Ind Tech Res Inst | A power management method and system of a hybrid power supply |
JP5401003B2 (ja) * | 2006-01-27 | 2014-01-29 | シャープ株式会社 | 太陽光発電システム |
JP2007228753A (ja) * | 2006-02-24 | 2007-09-06 | Toyota Motor Corp | 電動車両 |
CN100463332C (zh) * | 2006-11-27 | 2009-02-18 | 孙民兴 | 太阳能电源系统的最大功率追踪方法和太阳能电源装置 |
JP4782663B2 (ja) * | 2006-11-29 | 2011-09-28 | パナソニック株式会社 | 充電システム、充電装置、及び電池パック |
DE102008004675B3 (de) * | 2007-10-12 | 2009-03-05 | Fraunhofer-Gesellschaft zur Förderung der angewandten Forschung e.V. | Steuerbare Umschaltvorrichtung für ein Solarmodul |
CN101146388A (zh) * | 2007-12-03 | 2008-03-19 | 孙民兴 | 独立式直流电源之led灯放电控制系统 |
US7969133B2 (en) * | 2008-05-14 | 2011-06-28 | National Semiconductor Corporation | Method and system for providing local converters to provide maximum power point tracking in an energy generating system |
JP5143631B2 (ja) * | 2008-05-26 | 2013-02-13 | 株式会社エヌ・ピー・シー | 太陽電池特性測定用の疑似太陽光生成装置 |
CN101841160A (zh) * | 2009-03-19 | 2010-09-22 | 孔小明 | 一种太阳能光伏发电并网控制方法 |
KR101036098B1 (ko) * | 2009-12-04 | 2011-05-19 | 삼성에스디아이 주식회사 | 최대 전력점 추종 컨버터 및 그 방법 |
-
2010
- 2010-10-07 JP JP2010227143A patent/JP5691365B2/ja not_active Expired - Fee Related
-
2011
- 2011-09-14 US US13/877,292 patent/US9325202B2/en not_active Expired - Fee Related
- 2011-09-14 KR KR1020137007861A patent/KR101979961B1/ko active IP Right Grant
- 2011-09-14 CN CN2011800474958A patent/CN103154844A/zh active Pending
- 2011-09-14 BR BR112013007691A patent/BR112013007691A2/pt not_active IP Right Cessation
- 2011-09-14 CN CN201410602697.XA patent/CN104348246B/zh not_active Expired - Fee Related
- 2011-09-14 EP EP11830482.3A patent/EP2626763A4/en not_active Withdrawn
- 2011-09-14 WO PCT/JP2011/070942 patent/WO2012046549A1/ja active Application Filing
- 2011-09-27 TW TW100134857A patent/TWI448045B/zh not_active IP Right Cessation
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS62154122A (ja) | 1985-12-27 | 1987-07-09 | Kyocera Corp | 太陽光発電装置における充電制御方式 |
JP2003134690A (ja) * | 2001-10-19 | 2003-05-09 | Matsushita Electric Works Ltd | 充電制御方法および装置並びに照明装置 |
JP3795370B2 (ja) | 2001-10-19 | 2006-07-12 | 松下電工株式会社 | 充電制御方法および装置並びに照明装置 |
WO2008018250A1 (fr) * | 2006-08-11 | 2008-02-14 | Toyota Jidosha Kabushiki Kaisha | Système de génération d'électricité photovoltaïque solaire, véhicule, procédé de commande de système de génération d'électricité photovoltaïque solaire, et support d'enregistrement lisible par ordinateur doté d'un programme pour amener l'ord |
WO2011062088A1 (ja) * | 2009-11-20 | 2011-05-26 | ソニー株式会社 | 蓄電制御装置および蓄電制御方法 |
WO2011108412A1 (ja) * | 2010-03-03 | 2011-09-09 | ソニー株式会社 | 電力制御装置、電力制御方法、および給電システム |
Non-Patent Citations (1)
Title |
---|
See also references of EP2626763A4 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TWI491858B (zh) * | 2013-03-15 | 2015-07-11 | Richtek Technology Corp | 溫度偵測電路及其方法 |
Also Published As
Publication number | Publication date |
---|---|
JP5691365B2 (ja) | 2015-04-01 |
JP2012085380A (ja) | 2012-04-26 |
TWI448045B (zh) | 2014-08-01 |
BR112013007691A2 (pt) | 2016-08-09 |
CN103154844A (zh) | 2013-06-12 |
KR101979961B1 (ko) | 2019-05-17 |
CN104348246B (zh) | 2017-10-13 |
EP2626763A4 (en) | 2016-10-05 |
US20130181655A1 (en) | 2013-07-18 |
US9325202B2 (en) | 2016-04-26 |
KR20130121824A (ko) | 2013-11-06 |
TW201230611A (en) | 2012-07-16 |
CN104348246A (zh) | 2015-02-11 |
EP2626763A1 (en) | 2013-08-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5691365B2 (ja) | 電力制御装置、電力制御方法、および給電システム | |
JP5569044B2 (ja) | 電力制御装置、電力制御方法、および給電システム | |
US10396590B2 (en) | Variable power energy harvesting system | |
US9973832B2 (en) | Sensor node and method of controlling sensor node | |
US20170310141A1 (en) | Energy converting apparatus and method | |
US20120025752A1 (en) | Battery charger | |
US8350411B2 (en) | Modular system for unattended energy generation and storage | |
JP2014060900A (ja) | 電力変換装置及び蓄電システム並びに蓄電方法 | |
US8410750B2 (en) | Method for solar power energy management with intelligent selection of operating modes | |
JP2011250608A (ja) | 太陽電池システム | |
US8937402B2 (en) | Converter circuit and electronic system comprising such a circuit | |
US20120223579A1 (en) | Electrical charging and discharging system and charge and discharge control device | |
US20150381041A1 (en) | Low-light solar boost converter and control method therefor | |
JP2011186583A (ja) | 回路装置および電子機器 | |
KR101794615B1 (ko) | 에너지 하베스팅 압전발전기용 소전력 변환시스템 | |
JP2019193524A (ja) | 太陽電池充電装置および太陽電池充電方法 | |
CN117040047A (zh) | Mppt充电电路的充电控制方法、控制装置及储能系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
WWE | Wipo information: entry into national phase |
Ref document number: 201180047495.8 Country of ref document: CN |
|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 11830482 Country of ref document: EP Kind code of ref document: A1 |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2011830482 Country of ref document: EP |
|
ENP | Entry into the national phase |
Ref document number: 20137007861 Country of ref document: KR Kind code of ref document: A |
|
WWE | Wipo information: entry into national phase |
Ref document number: 13877292 Country of ref document: US |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
REG | Reference to national code |
Ref country code: BR Ref legal event code: B01A Ref document number: 112013007691 Country of ref document: BR |
|
ENP | Entry into the national phase |
Ref document number: 112013007691 Country of ref document: BR Kind code of ref document: A2 Effective date: 20130328 |