WO2012042268A2 - Blowout preventer blade assembly and method of using same - Google Patents

Blowout preventer blade assembly and method of using same Download PDF

Info

Publication number
WO2012042268A2
WO2012042268A2 PCT/GB2011/051852 GB2011051852W WO2012042268A2 WO 2012042268 A2 WO2012042268 A2 WO 2012042268A2 GB 2011051852 W GB2011051852 W GB 2011051852W WO 2012042268 A2 WO2012042268 A2 WO 2012042268A2
Authority
WO
WIPO (PCT)
Prior art keywords
tubular
blade
guide
blowout preventer
blade assembly
Prior art date
Application number
PCT/GB2011/051852
Other languages
French (fr)
Other versions
WO2012042268A3 (en
Inventor
Frank Benjamin Springett
Christopher Dale Johnson
Shern Eugene Peters
Eric Trevor Ensley
Original Assignee
National Oilwell Varco, L.P.
Lucas, Brian Ronald
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by National Oilwell Varco, L.P., Lucas, Brian Ronald filed Critical National Oilwell Varco, L.P.
Priority to KR1020137010718A priority Critical patent/KR101523858B1/en
Priority to BR112013007701-8A priority patent/BR112013007701B1/en
Priority to EP11770144.1A priority patent/EP2622171B1/en
Priority to SG2013022009A priority patent/SG189080A1/en
Priority to CN201180057397.2A priority patent/CN103249907B/en
Priority to CA2812646A priority patent/CA2812646C/en
Publication of WO2012042268A2 publication Critical patent/WO2012042268A2/en
Publication of WO2012042268A3 publication Critical patent/WO2012042268A3/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/02Surface sealing or packing
    • E21B33/03Well heads; Setting-up thereof
    • E21B33/06Blow-out preventers, i.e. apparatus closing around a drill pipe, e.g. annular blow-out preventers
    • E21B33/061Ram-type blow-out preventers, e.g. with pivoting rams
    • E21B33/062Ram-type blow-out preventers, e.g. with pivoting rams with sliding rams
    • E21B33/063Ram-type blow-out preventers, e.g. with pivoting rams with sliding rams for shearing drill pipes
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/02Surface sealing or packing
    • E21B33/03Well heads; Setting-up thereof
    • E21B33/06Blow-out preventers, i.e. apparatus closing around a drill pipe, e.g. annular blow-out preventers
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/02Surface sealing or packing
    • E21B33/03Well heads; Setting-up thereof
    • E21B33/06Blow-out preventers, i.e. apparatus closing around a drill pipe, e.g. annular blow-out preventers
    • E21B33/061Ram-type blow-out preventers, e.g. with pivoting rams
    • E21B33/062Ram-type blow-out preventers, e.g. with pivoting rams with sliding rams

Definitions

  • the present invention relates generally to techniques for performing wellsite operations. More specifically, the present invention relates to techniques, such as a tubular centering device and/or a blowout preventer (BOP).
  • BOP blowout preventer
  • Oilfield operations are typically performed to locate and gather valuable downhole fluids.
  • Oil rigs may be positioned at wellsites and downhole tools, such as drilling tools, may be deployed into the ground to reach subsurface reservoirs. Once the downhole tools form a wellbore to reach a desired reservoir, casings may be cemented into place within the wellbore, and the wellbore completed to initiate production of fluids from the reservoir.
  • Tubulars or tubular strings may be positioned in the wellbore to enable the passage of subsurface fluids from the reservoir to the surface.
  • BOPs may be positioned about the wellbore to form a seal about a tubular therein, for example, to prevent leakage of fluid as it is brought to the surface.
  • BOPs may have selectively actuatable rams or ram bonnets, such as tubular rams (to contact, engage, and/or encompass tubulars to seal the wellbore) or shear rams (to contact and physically shear a tubular), that may be activated to sever and/or seal a tubular in a wellbore.
  • ram BOPs and/or ram blocks are provided in U.S. Patent/Application Nos. 3,554,278; 4,647,002; 5,025,708; 7,051 ,989; 5,575,452; 6,374,925; 7,798,466; 5,735,502; 5,897,094 and
  • the disclosure relates to a blade assembly of a blowout preventer for shearing a tubular of a wellbore penetrating a subterranean formation.
  • the blowout preventer includes a housing with a hole therethrough for receiving the tubular.
  • the blade assembly includes a ram block which is movable between a non-engagement position and an engagement position about the tubular.
  • the blade assembly also includes a blade carried by the ram block for cuttingly engaging the tubular.
  • the blade assembly also includes a retractable guide carried by the ram block and slidably movable therealong. The retractable guide has a guide surface for urging the tubular into a desired location in the blowout preventer as the ram block moves to the engagement position.
  • the guide surface may be concave with an apex along a central portion thereof and the retractable guide may have a notch extending through the apex with a puncture point of the blade extending beyond the notch for piercing the tubular.
  • the retractable guide may be made of a pair of angled links operative ly connected to an engagement end of the blade.
  • the retractable guide may be made of a brittle material positionable along an engagement end of the blade, the brittle material releasable from the blade as the blade engages the tubular.
  • the retractable guide may be made of a scissor link which may be made of a pair of cross plates having slots therein with a pin extending therethrough for slidable movement therebetween.
  • the retractable guide may be made of a skid plate with either at least one arm pivotally connectable thereto or an airbag thereon inflatable about the tubular.
  • the blade assembly may have a lip for selectively releasing the retractable guide to move between a guide position for engaging the tubular and a cutting position retracted a distance behind an engagement end of the blade.
  • the disclosure may relate to a blowout preventer for shearing a tubular of a wellbore penetrating a subterranean formation, the blowout preventer having a housing and a pair of blade assemblies.
  • the housing has a hole therethrough for receiving the tubular.
  • Each of the pair of blade assemblies has a ram block, a blade and a retractable guide.
  • the ram block is movable between a non-engagement position and an engagement position about the tubular.
  • the blade is carried by the ram block for cuttingly engaging the tubular.
  • the retractable guide is carried on the ram block and slidably movable therealong.
  • the retractable guide has a guide surface for urging the tubular into a desired location in the blowout preventer as the ram block moves to the engagement position.
  • the retractable guide and/or the blade of each of the pair of blade assemblies may be the same or may be different.
  • the blowout preventer may further have at least one actuator for actuating the ram block of each of the blade assemblies.
  • the disclosure relates to a method for shearing a tubular of a wellbore penetrating a subterranean formation.
  • the method includes providing a blowout preventer.
  • the blowout preventer includes a housing (having a hole therethrough for receiving the tubular) and a pair of blade assemblies.
  • Each blade assembly has a ram block, a blade carried on the ram block and a retractable guide with a guide surface thereon carried by the ram block.
  • the method further involves urging the tubular into a desired location in the blowout preventer with the guide surface of each of the retractable guides while moving each of the ram blocks from a non-engagement position to an engagement position about the tubular, slidably moving the retractable guide along a ram block and cuttingly engaging the tubular with the pair of blades as the ram blocks are moved to the engagement position.
  • the method may further involve selectively releasing the retractable guides to move between a guide position for engaging the tubular to a cutting position a distance behind an engagement end of the blade, biasing the guides toward the guide position, urging the tubular along a curved surface of the guides toward an apex along a center thereof, and/or advancing the tubular to a central portion of the blowout preventer with the retractable guides.
  • Each of the blade assemblies may be positionable on opposite sides of the tubular.
  • a blowout preventer comprising: a guide, mounted on a ram block, for guiding a tubular toward a cutting or shearing position within the blowout preventer; and
  • the arrangement being such that, in use, said guide prevents contact between said blade and said tubular before the latter has reached said cutting or shearing position.
  • the guide may stay in position in contact with the tubular whilst the blade cuts/shears the tubular.
  • the guide may retract away from contact with the tubular either just before, as or just after the blade comes into contact with the tubular. In either case, there may be a biasing and/or disconnect force which the ram block must overcome as the guide is urged against the tubular before the blade is able to cut/shear the tubular.
  • FIG 1 is a schematic view of an offshore wellsite having a blowout preventer (BOP) with a blade assembly.
  • BOP blowout preventer
  • Figure 2 is a schematic view, partially in cross-section, of the BOP of Figure 1 prior to initiating a BOP operation.
  • Figure 3-6 are various schematic views of a portion of the blade assembly of Figure 1 having a blade and a tubular centering system.
  • Figures 7-17 are schematic views of a portion of a cross-section of the BOP 104 of Figure 2 taken along line 7-7 and depicting the blade assembly severing a tubular.
  • FIGS 18-24 are schematic views of the BOP of Figure 7 with various alternate tubular centering systems.
  • Figure 25 is a flowchart depicting a method for shearing a tubular of a wellbore.
  • the techniques herein relate to blade assemblies for blowout preventers. These blade assemblies are configured to provide tubular centering and shearing capabilities. Retractable guides and/or release mechanisms may be used to position the tubulars during shearing. It may be desirable to provide techniques for positioning the tubular prior to severing the tubular. It may be further desirable that such techniques be performed on any sized tubular, such as those having a diameter of up to about 8 1 ⁇ 2" (21.59 cm) or more. Such techniques may involve one or more of the following, among others: positioning of the tubular, efficient parts replacement, reduced wear on blade, less force required to sever the tubular, efficient severing, and less maintenance time for part replacement.
  • FIG. 1 depicts an offshore wellsite 100 having a blade assembly 102 in a housing 105 of a blowout preventer (BOP) 104.
  • the blade assembly 102 may be configured to center a tubular 106 in the BOP 104 prior to or concurrently with a severing of the tubular 106.
  • the tubular 106 may be fed through the BOP 104 and into a wellbore 108 penetrating a subterranean formation 109.
  • the BOP 104 may be part of a subsea system 110 positioned on a floor 112 of the sea.
  • the subsea system 110 may also comprise the tubular (or pipe) 106 extending from the wellbore 108, a wellhead 1 14 about the wellbore 108, a conduit 1 16 extending from the wellbore 108 and other subsea devices, such as a stripper and a conveyance delivery system (not shown).
  • the blade assembly 102 may have at least one tubular centering system 1 18 and at least one blade 120.
  • the tubular centering system 1 18 may be configured to center the tubular 106 within the BOP 104 prior to and/or concurrently with the blade 120 engaging the tubular 106, as will be discussed in more detail below.
  • the tubular centering system 1 18 may be coupled to, or move with, the blade 120, thereby allowing the centering of the tubular 106 without using extra actuators, or the need to machine the BOP 104 body.
  • the tubular 106 may be any suitable tubular and/or conveyance for running tools into the wellbore 108, such as certain downhole tools, pipe, casing, drill tubular, liner, coiled tubing, production tubing, wireline, slickline, or other tubular members positioned in the wellbore and associated components, such as drill collars, tool joints, drill bits, logging tools, packers, and the like (referred to herein as "tubular" or “tubular strings").
  • a surface system 122 may be used to facilitate operations at the offshore wellsite 100.
  • the surface system 122 may comprise a rig 124, a platform 126 (or vessel) and a surface controller 128. Further, there may be one or more subsea controllers 130. While the surface controller 128 is shown as part of the surface system 122 at a surface location, and the subsea controller 130 is shown as part of the subsea system 1 10 in a subsea location, it will be appreciated that one or more surface controllers 128 and subsea controllers 130 may be located at various locations to control the surface and/or subsea systems.
  • the surface controller 128 and/or the subsea controller 130 may be placed in communication therewith.
  • the surface controller 128, the subsea controller 130, and/or any devices at the wellsite 100 may communicate via one or more communication links 132.
  • the communication links 132 may be any suitable communication system and/or device, such as hydraulic lines, pneumatic lines, wiring, fiber optics, telemetry, acoustics, wireless communication, any combination thereof, and the like.
  • the blade assembly 102, the BOP 104, and/or other devices at the wellsite 100 may be automatically, manually, and/or selectively operated via the surface controller 128 and/or subsea controller 130.
  • FIG 2 shows a schematic, cross-sectional view of the BOP 104 of Figure 1 having the blade assembly 102 and a seal assembly 200.
  • the BOP 104 has a hole 202 through a central axis 204 of the BOP 104.
  • the hole 202 may be for receiving the tubular 106.
  • the BOP 104 may have one or more channels 206 for receiving the blade assembly 102 and/or the seal assembly 200. As shown, there are two channels 206, one having the blade assembly 102 and the other having the seal assembly 200 therein. Although, there are two channels 206, it should be appreciated that there may be any number of channels 206 housing any number of blade assemblies 102 and/or seal assemblies 200.
  • the channels 206 may be configured to guide the blade assembly 102 and/or the seal assembly 200 radially toward and away from the tubular 106.
  • the BOP 104 may allow the tubular 106 to pass through the BOP 104 during normal operation, such as run in, drilling, logging, and the like. In the event of an upset, a pressure surge, or other triggering event, the BOP 104 may sever the tubular 106 and/or seal the hole 202 in order to prevent fluids from being released from the wellbore 108. While the BOP 104 is depicted as having a specific configuration, it will be appreciated that the BOP 104 may have a variety of shapes, and be provided with other devices, such as sensors (not shown). An example of a BOP that may be used is described in US Patent No. 5,735,502, the entire contents of which are hereby incorporated by reference.
  • the blade assembly 102 may have the tubular centering system 1 18 and the blades 120 each secured to a ram block 208.
  • Each of the ram blocks 208 may be configured to hold (and carry) the blade 120 and/or the tubular centering system 1 18 as the blade 120 is moved within the BOP 104.
  • the ram blocks 208 may couple to actuators 210 via ram shafts 212 in order to move the blade assembly 102 within the channel 206.
  • the actuator 210 may be configured to move the ram shaft 212 and the ram blocks 208 between an operating (or non-engagement) position, as shown in Figure 2, and an actuated (or engagement) position wherein the ram blocks 208 have engaged and/or severed the tubular 106 and/or sealed the hole 202.
  • the actuator 210 may be any suitable actuator, such as a hydraulic actuator, a pneumatic actuator, a servo, and the like.
  • the seal assembly 200 may also be used to center the tubular 106 in addition to, or as an alternative to the tubular centering system 1 18.
  • Figure 3 is a schematic perspective view of a portion of the blade assembly 102 having the blade 120 and the tubular centering system 1 18.
  • the blade 120 and tubular centering system 1 18 are supported by one of the ram blocks 208. It should be appreciated that there may be another ram block 208 holding another of the blades 120 and/or the tubular centering systems 1 18 working in cooperation therewith, as shown in Figure 2.
  • the blade 120 as shown, is configured to sever the tubular 106 using multi-phase shearing.
  • the blade 120 may have a puncture point 300 and one or more troughs 302 along an engagement end of the blade.
  • any suitable blade for severing the tubular 106 may be used in the blade assembly 102, such as the blades disclosed in US Patent/Application Nos. 7,367,396; 7,814,979; 12/883,469; 13/1 18,200; 13/118,252; and/or 13/1 18,289, the entire contents of which are hereby incorporated by reference.
  • the tubular centering system 1 18 may be configured to locate the tubular 106 at a central location in the BOP 104 (as shown, for example, in Figure 2).
  • the central location is a location wherein the puncture point 300 may be aligned with a central portion 304 of the tubular 106.
  • the puncture point 300 may pierce a tubular wall 306 of the tubular 106 proximate the central portion 304 of the tubular 106.
  • the tubular centering system 118 may have a retractable guide 308 configured to engage the tubular 106 prior to the blade 120.
  • the guide 308 may have any suitable shape for engaging the tubular 106 and moving (or urging) the tubular 106 toward the central location as the ram block 208 moves toward the tubular 106.
  • the guide 308 is a curved, concave or C-shaped, surface 310 having an apex 312 that substantially aligns with the puncture point 300 along a central portion of the surface 310 at an engagement end thereof.
  • the curved surface 310 may engage the tubular 106 prior to the blade 120 as the ram block 208 moves the blade assembly 102 radially toward the tubular 106.
  • the curved surface 310 may guide the tubular toward the apex 312 with the continued radial movement of the ram block 208 until the tubular 106 is located proximate the apex 312.
  • the tubular centering system 1 18 may have one or more biasing members 314 and/or one or more frangible members 316.
  • the biasing members 314 and/or the frangible members 316 may be configured to allow the guide 308 to collapse and/or move relative to the blade 120 as the blade 120 continues to move toward and/or engage the tubular 106. Therefore, the guide 308 may engage and align the tubular 106 to the central location in the BOP 104 (as shown in Figures 1 and 2).
  • the biasing members 314 and/or the frangible member(s) 316 may then allow the guide 308 to move as the blade 120 engages and severs the tubular 106.
  • Either the biasing members 314 or the frangible members 316 may be used to allow the guide 308 to move relative to the blade 120. Further, both the biasing member 314 and the frangible member 316 may be used together as redundant systems to ensure the ram blocks 208 are not damaged. In the case where both the biasing members 314 and the frangible members 316 are used together, the biasing members 314 may require a guide force to move the guide 308, greater than the guide force required to break the frangible members 316.
  • the biasing members 314 may be any suitable device for allowing the guide 308 to center the tubular 106 and move relative to the blade 120 with continued radial movement of the ram block 208.
  • a biasing force produced by the biasing members 314 may be large enough to maintain the guide 308 in a guiding position until the tubular 106 is centered at the apex 312. With continued movement of the ram block 208, the biasing force may be overcome.
  • the biasing member 314 may then allow the guide 308 to move relative to the blade 120 as the blade 120 continues to move toward and/or through the tubular 106.
  • the biasing member 314 may move the guide 308 to the initial position, as shown in Figure 3.
  • the biasing members 314 may be any suitable device for biasing the guide 308, such as a leaf spring, a resilient material, a coiled spring and the like.
  • the frangible members 316 may be any suitable device for allowing the guide 308 to center the tubular 106 and then disengage from the blade 120.
  • the frangible member(s) 316 may allow the guide 308 to center the tubular 106 in the BOP 104. Once the tubular 106 is centered, the continued movement of the ram block 208 toward the tubular 106 may increase the force on the frangible members 316 until a disconnect force is reached. When the disconnect force is reached, the frangible member(s) 316 may break, thereby allowing the guide 308 to move or remain stationary as the blade 120 engages and/or pierces the tubular 106.
  • the frangible member(s) 316 may be any suitable device or system for allowing the guide to disengage the blades 120 when the disconnect force is reached, such as a shear pin, and the like.
  • Figure 4 is an alternate view of the portion of the blade assembly 102 of Figure 3.
  • the guide 308, as shown, has the apex 312 located a distance D in the radial direction from the puncture point 300.
  • the tubular centering system 1 18 may be located on a top 400 of the blade 120 thereby allowing an opposing blade 120 (shown in Figure 2) to pass proximate the blade 120 as the tubular 106 is severed.
  • the opposing blade 120 may have the tubular centering system 118 located on a bottom 402 of the blade 120.
  • the ram block 208 may be any suitable ram block configured to support the blade 120 and/or the tubular centering system 118.
  • FIG. 5 is another view of the portion of the blade assembly 102 of Figure 3.
  • the tubular centering system 1 18 may have a release mechanism (or lip) 500 configured to maintain the guide 308 in a guide position, as shown.
  • the lip 500 may be any suitable upset, or shoulder, for engaging a ram block surface 502.
  • the lip 500 may maintain the guide 308 in the guide position until the force in the guide 308 becomes large, and a disconnect force is reached as a result of the tubular 106 reaching the apex 312.
  • the continued movement of the ram block 208 may deform, and/or displace the lip 500 from the ram block surface 502.
  • the lip 500 may then travel along a ramp 504 of the ram block 208 as the guide 308 displaces relative to the blade 120.
  • Figure 6 is another view of the blade assembly 102 of Figure 4.
  • the tubular centering system 1 18 is shown in the guide position.
  • the guide 308 In the guide position, the guide 308 has not moved and/or broken off and is located above the top 400 of the blade 120.
  • the lip 500 may be engaged with the ram block surface 502 for extra support of the guide 308.
  • Figures 7-17 are schematic views of a portion of a cross-section of the BOP 104 of Figure 2 taken along line 7-7 and depicting the blade assembly 102 severing (or shearing) the tubular 106.
  • Figure 7 shows the BOP 104 in an initial operating position.
  • the blade assembly 102 includes a pair of opposing tubular severing systems 118A and 1 18B, blades 120A and 120B and ram blocks 208 A and 208B for engaging tubular 106.
  • the pair of opposing blade assemblies 102 (and their corresponding severing systems 1 18A,B and blades 120A,B) are depicted as being the same and symmetrical about the BOP, but may optionally have different configurations (such as those shown herein).
  • the tubular 106 In the operating position, the tubular 106 is free to travel through the hole 202 of the BOP 104 and perform wellsite operations.
  • the ram blocks 208 A and 208B are retracted from the hole 202, and the guides 308 A and 308B of the tubular centering systems 118A and 1 18B may be positioned radially closer to the tubular 106 than the blades 120A and 120B.
  • the blade assembly 102 may remain in this position until actuation is desired, such as after an upset occurs. When the upset occurs, the blade assembly 102 may be actuated and the severing operation may commence.
  • the tubular severing systems 118A,B, blades 120A,B and ram blocks 208A,B may be the same as, for example, the tubular severing system 118, blade 120 and ram block 208 of Figures 3-6.
  • the severing system 118B, blade 120B and ram block 208B are inverted for opposing interaction with the severing system 1 18 A, blade 120B and ram block 208B (shown in an upright position).
  • the blade 120A (or top blade), may be the blade 120 (as shown in Figure 2) configured to face up, or travel over the blade 120B (or bottom blade) which may be the same blade 120 of Figure 2 configured to face down.
  • Figure 9 shows the blade assembly 102 as the tubular 106 is initially being centered by the guide 308 A.
  • the guide 308 A starts to center the tubular 106.
  • the tubular 106 may ride along a curved surface 31 OA of the guide 308A toward an apex 312A (in the same manner as the curved surface 310 and apex 312 of Figure 3).
  • the tubular 106 moves to a location closer to a center of the hole 202, as shown in Figure 10.
  • Figure 1 1 shows the blade assembly 102 as the tubular 106 continues to ride along the guide 308 A toward the apex 312A of the curved surface 31 OA and the other blade 120B (or bottom blade) is actuated. The blade 120B may then travel radially toward center of the hole 202 in order to engage the tubular 106.
  • Figure 12 shows the blade assembly 102 as both of the guides 308A and 308B engage the tubular 106 and continue to move the tubular 106 toward the apex 312A and 312B of the tubular centering systems 118A and 118B.
  • the curved surface 31 OA and a curved surface 310B may wedge the tubular 106 between the tubular centering systems 1 18A and 1 18B as the ram blocks 208A and 208B continue to move the blades 120A and 120B toward the center of the BOP 104.
  • Figure 13 shows the tubular 106 centered in the BOP 104 and aligned with puncture points 300A and 300B of the blades 120A and 120B.
  • the force may increase in the tubular centering systems 118A and 118B until, the biasing force is overcome, and/or the disconnect force is reached.
  • the guide(s) 308A and/or 308B may then move, or remain stationary relative to the blades 120A and 120B as the ram blocks 208 A and 208B continue to move.
  • the biasing force and/or the disconnect force for the tubular centering systems 118A and 1 18B may be the same, or one may be higher than the other, thereby allowing at least one of the blades 120A and/or 120B to engage the tubular 106.
  • Figure 14 shows the blade 120A puncturing the tubular 106.
  • the blade 120A has moved relative to the guide 308A, thereby allowing the puncture point 300A to extend past the guide 308 A and pierce the tubular 106.
  • the tubular centering system 118B for the blade 120B (or the bottom blade) may still be engaged with the blade 120B thereby allowing the guide 308B to hold the tubular 106 in place as the puncture point 300A pierces the tubular 106.
  • Figure 15 shows both of the blades 120A and 120B puncturing the tubular 106.
  • the tubular centering system 118B has been moved relative to the blade 120B (or bottom blade) thereby allowing the puncture point 300B to extend past the guide 308B and puncture the tubular 106.
  • Figure 16 shows the blades 120A and 120B continuing to shear the tubular 106 as the ram blocks 208 A and 208B move radially toward one another in the channel 206.
  • the top blade 120A is shown as passing over a portion of the bottom blade 120B. This movement is continued until the tubular 106 is severed as shown in Figure 17.
  • FIGs 18-24 are schematic views of the BOP 104 of Figure 7 with various alternate tubular centering systems.
  • the blade assembly 102 may be the same as described for Figures 1- 17.
  • tubular 106 is schematically shown in two possible positions in the hole 202.
  • alternate tubular centering systems 1800A and 1800B may have one or more angled links 1802A and 1802B.
  • the angled links 1802A and 1802B may couple to an outer arm 1804 of the ram blocks 208A and 208B.
  • the angled links 1802A and 1802B are schematically shown about outer arms 1804, but may be positioned above, below and/or between components of the blade assembly 102 as desired.
  • the tubular 106 (shown in two possible positions although there may be only one) may be configured to travel, or ride, along the angled links 1802 A and 1802B during the severing operation. As the ram blocks 208A and 208B move closer together, the tubular 106 may move to the apexes 312A and 312B of each of the angled links 1802A and 1802B.
  • the angled links 1802A and 1802B may have the frangible member 316 located between the angled links 1802A and 1802B proximate the apexes 312A and 312B. Further, the frangible member 316 may be replaced by a biasing member (as shown in Figure 3).
  • FIG 19 is a top view of the blade assembly 102 having second alternate tubular centering systems 1900A,B.
  • the second alternate tubular centering systems 1900A,B may have a brittle material 1902 mounted to portions of the ram blocks 208A and 208B and/or the blades 120A and 120B.
  • the brittle material 1902 may be formed with the apexes 312A and 312B in order to center the tubular 106 as the ram blocks 208 A and 208B move toward one another.
  • the brittle material 1902 is schematically shown about blades 120A and 120B, but may be located above, below, and/or between the blades 120A and 120B.
  • the brittle material 1902 may break prior to, or as the blades 120A and 120B are engaging the tubular 106 during the severing operation.
  • FIG 20 is a top view of the blade assembly 102 having third alternate tubular centering systems 2000 A,B.
  • the third alternate tubular centering systems 2000 A,B may have a centering plate 2002A,B mounted to each of the ram blocks 208A and 208B and/or the blades 120A and 120B.
  • the centering plates 2002 A,B are schematically shown about the ram blocks 208 A and 208B, but may be positioned above, below and/or between components of the blade assembly 102 as desired.
  • Each centering plate 2002A,B may have the guides 308 A and 308B and a notch 2004.
  • the notch 2004 may be located proximate the apexes 312A and 312B.
  • the notch 2004 may allow the puncture points 300A and 300B to engage the tubular 106 prior to the apexes 312A and 312B engaging the tubular 106.
  • the centering plate 2002 may have the biasing members 314 and/or the frangible member 316 (shown in Figure 3) to allow the centering plate 2002 to move relative to the blades 120A and 120B once the tubular 106 is centered.
  • the blades 120A,B optionally may be positioned with both blades in an upright (or aligned) position, rather than with one blade inverted.
  • Figure 21 is a top view of the blade assembly 102 having fourth alternate tubular centering systems 2100A,B.
  • the fourth alternate tubular centering systems 2100A,B may have a scissor link 2102 mounted to the ram blocks 208 A and 208B and/or the blades 120A and 120B.
  • the scissor links 2102 may have two cross plates 2104 mounted to each of the ram blocks 208 A and 208B or the blades 120A and 120B.
  • the cross plates 2104 are schematically shown about blades 120A and 120B, but may be positioned above, below and/or between components of the blade assembly 102, and may be stacked into position as desired.
  • Each of the cross plates 2104 may pivo tally couple to the ram blocks 208 A and 208B at a pivot connection 2106.
  • a scissor pin 21 10 may couple each of the two cross plates 2104 together at one or more longitudinal slots 2112 in the cross plates 2104.
  • One or more scissor actuators 2114 may be configured to push the cross plates 2104 out toward the tubular 106 in order to center the tubular 106 as the blades 120A and 120B approach the tubular 106.
  • a scissor actuator 2114 may be used for activation thereof.
  • the ram block 208B may be used for movement thereof.
  • Other actuators may also be provided.
  • FIG 22 is a top view of the blade assembly 102 having fifth alternate tubular centering systems 2200 A,B.
  • the fifth alternate tubular centering systems 2200 A,B may have two pivoting arms 2204.
  • the pivoting arms 2204 are schematically shown about the blades 120A and 120B, but may be positioned above, below and/or between components of the blade assembly 102 as desired.
  • the pivoting arms 2204 may be configured to move into the hole 202 and guide the tubular 106 toward the center of the hole 202.
  • the pivoting arms 2204 may be mounted in a skid plate 2206 of the BOP 104 at a skid plate pivot connection 2208.
  • the pivoting arms 2204 may be actuated by an actuator (not shown) or be configured to move ahead of the blades 120A and 120B as the ram blocks 208A and 208B move.
  • the pivoting arms 2204 may be curved in order to center the tubular 106 between the pivoting arms 2204 proximate the center of the hole 202.
  • FIG 23 is a top view of the blade assembly 102 having sixth alternate tubular centering systems 2300A,B.
  • the sixth alternate tubular centering systems 2300A,B may have four pivoting arms 2302.
  • the pivoting arms 2302 are schematically shown about the blades 120A and 120B, but may be positioned above, below and/or between components of the blade assembly 102 as desired.
  • the pivoting arms 2302 may be configured to move into the hole 202 and guide the tubular 106 toward the center of the hole 202.
  • the pivoting arms 2302 may be mounted in the skid plate 2206 of the BOP 104 at the skid plate pivot connection 2208.
  • the pivoting arms 2302 may be actuated by an actuator (not shown) or be configured to move ahead of the blades 120A and 120B as the ram blocks 208A and 208B move.
  • the pivoting arms 2302 may be curved in order to center the tubular 106 between the pivoting arms 2302. Because there are four pivoting arms 2302, the tubular 106 may be centered in the hole 202 closer to one side of the hole 202. This may allow one of the blades 120A and/or 120B to engage the tubular 106 prior to the other blade.
  • Figure 24 is a top view of the blade assembly 102 having a seventh alternate tubular centering system 2400.
  • the seventh alternate tubular centering system 2400 may have an airbag 2402 coupled to the skid plate 2206 of the BOP 104.
  • the airbag 2402 may move between a deflated position shown in hidden line as 2402 and an inflated position 2402' as shown. Inflation may occur prior to the blades 120A and 120B engaging the tubular 106.
  • the airbag 2402 inflates, the airbag guides the tubular 106 from an original position (two possible original positions are shown in hidden line) to a centered position 106' toward the center of the hole 202. With the tubular 106' in the center of the hole 202, the severing operation may be performed.
  • the operation as depicted in Figures 7-24 shows a specific sequence of movement of the blades 120A,B and the various tubular centering systems. Variations in the order of movement may be provided. For example, the blades 120A,B and/or tubular centering systems may be advanced simultaneously or in various order. Additionally, the blades 120A,B and tubular centering systems are depicted as being identical components positioned opposite to each other for opposing interaction therebetween, but may be non-identical and at various positions relative to each other. The operation as described may be reversed to retract the blades 120A,B and/or tubular centering systems, and to repeat as desired.
  • Figure 25 depicts a method 2500 of shearing a tubular of a wellbore, such as the wellbore 108 of Figure 1.
  • the method involves providing 2510 a BOP including a housing with a hole therethrough for receiving the tubular and a pair of blade assemblies.
  • Each of the pair of blade assemblies includes a ram block, a blade carried by the ram block, and a retractable guide with a guide surface thereon carried by the ram block.
  • the method further involves urging 2520 the tubular into a desired location in the BOP with the guide surface of each of the retractable guides while moving the ram blocks to an engagement position about the tubular, slidingly moving 2530 the retractable guide along the ram block, and 2540 cuttingly engaging the tubular with the blades as the ram blocks are moved to the engagement position. Additional steps may also be performed, and the steps may be repeated as desired.
  • the techniques disclosed herein can be implemented for automated/autonomous applications via software configured with algorithms to perform the desired functions. These aspects can be implemented by programming one or more suitable general-purpose computers having appropriate hardware. The programming may be accomplished through the use of one or more program storage devices readable by the processor(s) and encoding one or more programs of instructions executable by the computer for performing the operations described herein.
  • the program storage device may take the form of, e.g., one or more floppy disks; a CD ROM or other optical disk; a read-only memory chip (ROM); and other forms of the kind well known in the art or subsequently developed.
  • the program of instructions may be "object code,” i.e., in binary form that is executable more-or-less directly by the computer; in "source code” that requires compilation or interpretation before execution; or in some intermediate form such as partially compiled code.
  • object code i.e., in binary form that is executable more-or-less directly by the computer
  • source code that requires compilation or interpretation before execution
  • some intermediate form such as partially compiled code.
  • the precise forms of the program storage device and of the encoding of instructions are immaterial here. Aspects of the invention may also be configured to perform the described functions (via appropriate hardware/software) solely on site and/or remotely controlled via an extended communication (e.g., wireless, internet, satellite, etc.) network.
  • extended communication e.g., wireless, internet, satellite, etc.

Landscapes

  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Physics & Mathematics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Perforating, Stamping-Out Or Severing By Means Other Than Cutting (AREA)
  • Shearing Machines (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
  • Earth Drilling (AREA)
  • Knives (AREA)

Abstract

Techniques for shearing a tubular of a wellbore penetrating a subterranean formation with a blowout preventer are provided. The blowout preventer has a housing with a hole therethrough for receiving the tubular. The techniques relate to a blade assembly including a ram block movable between a non-engagement position and an engagement position about the tubular, a blade carried by the ram block for cuttingly engaging the tubular, and a retractable guide carried by the ram block and slidably movable therealong. The restractable guide has a guide surface for urging the tubular into a desired location in the blowout preventer as the ram block moves to the engagement position.

Description

BLOWOUT PREVENTER BLADE ASSEMBLY AND METHOD OF USING SAME
CROSS-REFERENCE TO RELATED APPLICATION
This application claims the benefit of U.S. Provisional Application No. 61/387,805, filed
September 29, 2010, and of U.S. Non-Provisional Application 13/247,465, filed September 28, 2011 , the entire contents of each of which are hereby incorporated by reference the entire contents of which are hereby incorporated by reference.
BACKGROUND
1. Field
The present invention relates generally to techniques for performing wellsite operations. More specifically, the present invention relates to techniques, such as a tubular centering device and/or a blowout preventer (BOP).
2. Description of Related Art
Oilfield operations are typically performed to locate and gather valuable downhole fluids. Oil rigs may be positioned at wellsites and downhole tools, such as drilling tools, may be deployed into the ground to reach subsurface reservoirs. Once the downhole tools form a wellbore to reach a desired reservoir, casings may be cemented into place within the wellbore, and the wellbore completed to initiate production of fluids from the reservoir. Tubulars or tubular strings may be positioned in the wellbore to enable the passage of subsurface fluids from the reservoir to the surface.
Leakage of subsurface fluids may pose an environmental threat if released from the wellbore. Equipment, such as BOPs, may be positioned about the wellbore to form a seal about a tubular therein, for example, to prevent leakage of fluid as it is brought to the surface. BOPs may have selectively actuatable rams or ram bonnets, such as tubular rams (to contact, engage, and/or encompass tubulars to seal the wellbore) or shear rams (to contact and physically shear a tubular), that may be activated to sever and/or seal a tubular in a wellbore. Some examples of ram BOPs and/or ram blocks are provided in U.S. Patent/Application Nos. 3,554,278; 4,647,002; 5,025,708; 7,051 ,989; 5,575,452; 6,374,925; 7,798,466; 5,735,502; 5,897,094 and
2009/0056132. Techniques have also been provided for cutting tubing in a BOP as disclosed, for example, in U.S. Pat. Nos. 3,946,806; 4,043,389; 4,313,496; 4,132,267; 2,752,1 19; 3,272,222; 3,744,749; 4,523,639; 5,056,418; 5,918,851 ; 5,360,061; 4,923,005; 4,537,250; 5,515,916;
6,173,770; 3,863,667; 6,158,505; 4,057,887; 5,505,426; 3,955,622; 7,234,530 and 5,013,005. Some BOPs may be provided guides as described, for example, in US Patent Nos. 5,400,857, 7,243,713 and 7,464,765.
Despite the development of techniques for cutting tubulars, there remains a need to provide advanced techniques for more effectively sealing and/or severing tubulars. The present invention is directed to fulfilling this need in the art.
SUMMARY
Disclosed herein is a method and apparatus for centering a tubular in a blowout preventer. In at least one aspect, the disclosure relates to a blade assembly of a blowout preventer for shearing a tubular of a wellbore penetrating a subterranean formation. The blowout preventer includes a housing with a hole therethrough for receiving the tubular. The blade assembly includes a ram block which is movable between a non-engagement position and an engagement position about the tubular. The blade assembly also includes a blade carried by the ram block for cuttingly engaging the tubular. The blade assembly also includes a retractable guide carried by the ram block and slidably movable therealong. The retractable guide has a guide surface for urging the tubular into a desired location in the blowout preventer as the ram block moves to the engagement position.
The guide surface may be concave with an apex along a central portion thereof and the retractable guide may have a notch extending through the apex with a puncture point of the blade extending beyond the notch for piercing the tubular. The retractable guide may be made of a pair of angled links operative ly connected to an engagement end of the blade. The retractable guide may be made of a brittle material positionable along an engagement end of the blade, the brittle material releasable from the blade as the blade engages the tubular. The retractable guide may be made of a scissor link which may be made of a pair of cross plates having slots therein with a pin extending therethrough for slidable movement therebetween. The retractable guide may be made of a skid plate with either at least one arm pivotally connectable thereto or an airbag thereon inflatable about the tubular. The blade assembly may have a lip for selectively releasing the retractable guide to move between a guide position for engaging the tubular and a cutting position retracted a distance behind an engagement end of the blade.
In another aspect, the disclosure may relate to a blowout preventer for shearing a tubular of a wellbore penetrating a subterranean formation, the blowout preventer having a housing and a pair of blade assemblies. The housing has a hole therethrough for receiving the tubular. Each of the pair of blade assemblies has a ram block, a blade and a retractable guide. The ram block is movable between a non-engagement position and an engagement position about the tubular. The blade is carried by the ram block for cuttingly engaging the tubular. The retractable guide is carried on the ram block and slidably movable therealong. The retractable guide has a guide surface for urging the tubular into a desired location in the blowout preventer as the ram block moves to the engagement position.
The retractable guide and/or the blade of each of the pair of blade assemblies may be the same or may be different. The blowout preventer may further have at least one actuator for actuating the ram block of each of the blade assemblies.
Finally, in another aspect, the disclosure relates to a method for shearing a tubular of a wellbore penetrating a subterranean formation. The method includes providing a blowout preventer. The blowout preventer includes a housing (having a hole therethrough for receiving the tubular) and a pair of blade assemblies. Each blade assembly has a ram block, a blade carried on the ram block and a retractable guide with a guide surface thereon carried by the ram block. The method further involves urging the tubular into a desired location in the blowout preventer with the guide surface of each of the retractable guides while moving each of the ram blocks from a non-engagement position to an engagement position about the tubular, slidably moving the retractable guide along a ram block and cuttingly engaging the tubular with the pair of blades as the ram blocks are moved to the engagement position.
The method may further involve selectively releasing the retractable guides to move between a guide position for engaging the tubular to a cutting position a distance behind an engagement end of the blade, biasing the guides toward the guide position, urging the tubular along a curved surface of the guides toward an apex along a center thereof, and/or advancing the tubular to a central portion of the blowout preventer with the retractable guides. Each of the blade assemblies may be positionable on opposite sides of the tubular.
In certain aspects of the present invention there is provided a blowout preventer comprising: a guide, mounted on a ram block, for guiding a tubular toward a cutting or shearing position within the blowout preventer; and
a blade for cutting/shearing the tubular;
the arrangement being such that, in use, said guide prevents contact between said blade and said tubular before the latter has reached said cutting or shearing position. In some embodiments, the guide may stay in position in contact with the tubular whilst the blade cuts/shears the tubular. In other embodiments, the guide may retract away from contact with the tubular either just before, as or just after the blade comes into contact with the tubular. In either case, there may be a biasing and/or disconnect force which the ram block must overcome as the guide is urged against the tubular before the blade is able to cut/shear the tubular.
BRIEF DESCRIPTION OF THE DRAWINGS
So that the above recited features and advantages of the present disclosure can be understood in detail, a more particular description of the disclosure, briefly summarized above, may be had by reference to the embodiments thereof that are illustrated in the appended drawings. It is to be noted, however, that the appended drawings illustrate only typical embodiments and are, therefore, not to be considered limiting of its scope, for the disclosure may admit to other equally effective embodiments. The figures are not necessarily to scale and certain features, and certain views of the figures may be shown exaggerated in scale or in schematic in the interest of clarity and conciseness.
Figure 1 is a schematic view of an offshore wellsite having a blowout preventer (BOP) with a blade assembly.
Figure 2 is a schematic view, partially in cross-section, of the BOP of Figure 1 prior to initiating a BOP operation.
Figure 3-6 are various schematic views of a portion of the blade assembly of Figure 1 having a blade and a tubular centering system.
Figures 7-17 are schematic views of a portion of a cross-section of the BOP 104 of Figure 2 taken along line 7-7 and depicting the blade assembly severing a tubular.
Figures 18-24 are schematic views of the BOP of Figure 7 with various alternate tubular centering systems.
Figure 25 is a flowchart depicting a method for shearing a tubular of a wellbore.
DETAILED DESCRIPTION
The description that follows includes exemplary apparatus, methods, techniques, and instruction sequences that embody techniques of the present subject matter. However, it is understood that the described embodiments may be practiced without these specific details.
The techniques herein relate to blade assemblies for blowout preventers. These blade assemblies are configured to provide tubular centering and shearing capabilities. Retractable guides and/or release mechanisms may be used to position the tubulars during shearing. It may be desirable to provide techniques for positioning the tubular prior to severing the tubular. It may be further desirable that such techniques be performed on any sized tubular, such as those having a diameter of up to about 8 ½" (21.59 cm) or more. Such techniques may involve one or more of the following, among others: positioning of the tubular, efficient parts replacement, reduced wear on blade, less force required to sever the tubular, efficient severing, and less maintenance time for part replacement. Figure 1 depicts an offshore wellsite 100 having a blade assembly 102 in a housing 105 of a blowout preventer (BOP) 104. The blade assembly 102 may be configured to center a tubular 106 in the BOP 104 prior to or concurrently with a severing of the tubular 106. The tubular 106 may be fed through the BOP 104 and into a wellbore 108 penetrating a subterranean formation 109. The BOP 104 may be part of a subsea system 110 positioned on a floor 112 of the sea. The subsea system 110 may also comprise the tubular (or pipe) 106 extending from the wellbore 108, a wellhead 1 14 about the wellbore 108, a conduit 1 16 extending from the wellbore 108 and other subsea devices, such as a stripper and a conveyance delivery system (not shown).
The blade assembly 102 may have at least one tubular centering system 1 18 and at least one blade 120. The tubular centering system 1 18 may be configured to center the tubular 106 within the BOP 104 prior to and/or concurrently with the blade 120 engaging the tubular 106, as will be discussed in more detail below. The tubular centering system 1 18 may be coupled to, or move with, the blade 120, thereby allowing the centering of the tubular 106 without using extra actuators, or the need to machine the BOP 104 body.
While the offshore wellsite 100 is depicted as a subsea operation, it will be appreciated that the wellsite 100 may be land or water based, and the blade assembly 102 may be used in any wellsite environment. The tubular 106 may be any suitable tubular and/or conveyance for running tools into the wellbore 108, such as certain downhole tools, pipe, casing, drill tubular, liner, coiled tubing, production tubing, wireline, slickline, or other tubular members positioned in the wellbore and associated components, such as drill collars, tool joints, drill bits, logging tools, packers, and the like (referred to herein as "tubular" or "tubular strings"). A surface system 122 may be used to facilitate operations at the offshore wellsite 100. The surface system 122 may comprise a rig 124, a platform 126 (or vessel) and a surface controller 128. Further, there may be one or more subsea controllers 130. While the surface controller 128 is shown as part of the surface system 122 at a surface location, and the subsea controller 130 is shown as part of the subsea system 1 10 in a subsea location, it will be appreciated that one or more surface controllers 128 and subsea controllers 130 may be located at various locations to control the surface and/or subsea systems.
To operate the blade assembly 102 and/or other devices associated with the wellsite 100, the surface controller 128 and/or the subsea controller 130 may be placed in communication therewith. The surface controller 128, the subsea controller 130, and/or any devices at the wellsite 100 may communicate via one or more communication links 132. The communication links 132 may be any suitable communication system and/or device, such as hydraulic lines, pneumatic lines, wiring, fiber optics, telemetry, acoustics, wireless communication, any combination thereof, and the like. The blade assembly 102, the BOP 104, and/or other devices at the wellsite 100 may be automatically, manually, and/or selectively operated via the surface controller 128 and/or subsea controller 130.
Figure 2 shows a schematic, cross-sectional view of the BOP 104 of Figure 1 having the blade assembly 102 and a seal assembly 200. The BOP 104, as shown, has a hole 202 through a central axis 204 of the BOP 104. The hole 202 may be for receiving the tubular 106. The BOP 104 may have one or more channels 206 for receiving the blade assembly 102 and/or the seal assembly 200. As shown, there are two channels 206, one having the blade assembly 102 and the other having the seal assembly 200 therein. Although, there are two channels 206, it should be appreciated that there may be any number of channels 206 housing any number of blade assemblies 102 and/or seal assemblies 200. The channels 206 may be configured to guide the blade assembly 102 and/or the seal assembly 200 radially toward and away from the tubular 106.
The BOP 104 may allow the tubular 106 to pass through the BOP 104 during normal operation, such as run in, drilling, logging, and the like. In the event of an upset, a pressure surge, or other triggering event, the BOP 104 may sever the tubular 106 and/or seal the hole 202 in order to prevent fluids from being released from the wellbore 108. While the BOP 104 is depicted as having a specific configuration, it will be appreciated that the BOP 104 may have a variety of shapes, and be provided with other devices, such as sensors (not shown). An example of a BOP that may be used is described in US Patent No. 5,735,502, the entire contents of which are hereby incorporated by reference.
The blade assembly 102 may have the tubular centering system 1 18 and the blades 120 each secured to a ram block 208. Each of the ram blocks 208 may be configured to hold (and carry) the blade 120 and/or the tubular centering system 1 18 as the blade 120 is moved within the BOP 104. The ram blocks 208 may couple to actuators 210 via ram shafts 212 in order to move the blade assembly 102 within the channel 206. The actuator 210 may be configured to move the ram shaft 212 and the ram blocks 208 between an operating (or non-engagement) position, as shown in Figure 2, and an actuated (or engagement) position wherein the ram blocks 208 have engaged and/or severed the tubular 106 and/or sealed the hole 202. The actuator 210 may be any suitable actuator, such as a hydraulic actuator, a pneumatic actuator, a servo, and the like. The seal assembly 200 may also be used to center the tubular 106 in addition to, or as an alternative to the tubular centering system 1 18.
Figure 3 is a schematic perspective view of a portion of the blade assembly 102 having the blade 120 and the tubular centering system 1 18. The blade 120 and tubular centering system 1 18 are supported by one of the ram blocks 208. It should be appreciated that there may be another ram block 208 holding another of the blades 120 and/or the tubular centering systems 1 18 working in cooperation therewith, as shown in Figure 2. The blade 120, as shown, is configured to sever the tubular 106 using multi-phase shearing. The blade 120 may have a puncture point 300 and one or more troughs 302 along an engagement end of the blade. Further, any suitable blade for severing the tubular 106 may be used in the blade assembly 102, such as the blades disclosed in US Patent/Application Nos. 7,367,396; 7,814,979; 12/883,469; 13/1 18,200; 13/118,252; and/or 13/1 18,289, the entire contents of which are hereby incorporated by reference.
The tubular centering system 1 18 may be configured to locate the tubular 106 at a central location in the BOP 104 (as shown, for example, in Figure 2). The central location is a location wherein the puncture point 300 may be aligned with a central portion 304 of the tubular 106. In the central location, the puncture point 300 may pierce a tubular wall 306 of the tubular 106 proximate the central portion 304 of the tubular 106. In order for the puncture point 300 to pierce the tubular 106 as desired, it may be required to center the tubular 106 prior to, or concurrent with, engaging the tubular 106 with the blade 120.
The tubular centering system 118, as shown in Figure 3, may have a retractable guide 308 configured to engage the tubular 106 prior to the blade 120. The guide 308 may have any suitable shape for engaging the tubular 106 and moving (or urging) the tubular 106 toward the central location as the ram block 208 moves toward the tubular 106. As shown, the guide 308 is a curved, concave or C-shaped, surface 310 having an apex 312 that substantially aligns with the puncture point 300 along a central portion of the surface 310 at an engagement end thereof. The curved surface 310 may engage the tubular 106 prior to the blade 120 as the ram block 208 moves the blade assembly 102 radially toward the tubular 106. The curved surface 310 may guide the tubular toward the apex 312 with the continued radial movement of the ram block 208 until the tubular 106 is located proximate the apex 312.
The tubular centering system 1 18 may have one or more biasing members 314 and/or one or more frangible members 316. The biasing members 314 and/or the frangible members 316 may be configured to allow the guide 308 to collapse and/or move relative to the blade 120 as the blade 120 continues to move toward and/or engage the tubular 106. Therefore, the guide 308 may engage and align the tubular 106 to the central location in the BOP 104 (as shown in Figures 1 and 2). The biasing members 314 and/or the frangible member(s) 316 may then allow the guide 308 to move as the blade 120 engages and severs the tubular 106. Either the biasing members 314 or the frangible members 316 may be used to allow the guide 308 to move relative to the blade 120. Further, both the biasing member 314 and the frangible member 316 may be used together as redundant systems to ensure the ram blocks 208 are not damaged. In the case where both the biasing members 314 and the frangible members 316 are used together, the biasing members 314 may require a guide force to move the guide 308, greater than the guide force required to break the frangible members 316.
The biasing members 314 may be any suitable device for allowing the guide 308 to center the tubular 106 and move relative to the blade 120 with continued radial movement of the ram block 208. A biasing force produced by the biasing members 314 may be large enough to maintain the guide 308 in a guiding position until the tubular 106 is centered at the apex 312. With continued movement of the ram block 208, the biasing force may be overcome. The biasing member 314 may then allow the guide 308 to move relative to the blade 120 as the blade 120 continues to move toward and/or through the tubular 106. When the ram block 208, if moved back toward the operation position (as shown in Figure 2) and/or when the tubular 106 is severed, the biasing member 314 may move the guide 308 to the initial position, as shown in Figure 3. The biasing members 314 may be any suitable device for biasing the guide 308, such as a leaf spring, a resilient material, a coiled spring and the like.
The frangible members 316 may be any suitable device for allowing the guide 308 to center the tubular 106 and then disengage from the blade 120. The frangible member(s) 316 may allow the guide 308 to center the tubular 106 in the BOP 104. Once the tubular 106 is centered, the continued movement of the ram block 208 toward the tubular 106 may increase the force on the frangible members 316 until a disconnect force is reached. When the disconnect force is reached, the frangible member(s) 316 may break, thereby allowing the guide 308 to move or remain stationary as the blade 120 engages and/or pierces the tubular 106. The frangible member(s) 316 may be any suitable device or system for allowing the guide to disengage the blades 120 when the disconnect force is reached, such as a shear pin, and the like.
Figure 4 is an alternate view of the portion of the blade assembly 102 of Figure 3. The guide 308, as shown, has the apex 312 located a distance D in the radial direction from the puncture point 300. The tubular centering system 1 18 may be located on a top 400 of the blade 120 thereby allowing an opposing blade 120 (shown in Figure 2) to pass proximate the blade 120 as the tubular 106 is severed. The opposing blade 120 may have the tubular centering system 118 located on a bottom 402 of the blade 120. The ram block 208 may be any suitable ram block configured to support the blade 120 and/or the tubular centering system 118.
Figure 5 is another view of the portion of the blade assembly 102 of Figure 3. As shown, the tubular centering system 1 18 may have a release mechanism (or lip) 500 configured to maintain the guide 308 in a guide position, as shown. The lip 500 may be any suitable upset, or shoulder, for engaging a ram block surface 502. The lip 500 may maintain the guide 308 in the guide position until the force in the guide 308 becomes large, and a disconnect force is reached as a result of the tubular 106 reaching the apex 312. The continued movement of the ram block 208 may deform, and/or displace the lip 500 from the ram block surface 502. The lip 500 may then travel along a ramp 504 of the ram block 208 as the guide 308 displaces relative to the blade 120.
Figure 6 is another view of the blade assembly 102 of Figure 4. The tubular centering system 1 18 is shown in the guide position. In the guide position, the guide 308 has not moved and/or broken off and is located above the top 400 of the blade 120. The lip 500 may be engaged with the ram block surface 502 for extra support of the guide 308.
Figures 7-17 are schematic views of a portion of a cross-section of the BOP 104 of Figure 2 taken along line 7-7 and depicting the blade assembly 102 severing (or shearing) the tubular 106. Figure 7 shows the BOP 104 in an initial operating position. The blade assembly 102 includes a pair of opposing tubular severing systems 118A and 1 18B, blades 120A and 120B and ram blocks 208 A and 208B for engaging tubular 106. As shown in each of the figures, the pair of opposing blade assemblies 102 (and their corresponding severing systems 1 18A,B and blades 120A,B) are depicted as being the same and symmetrical about the BOP, but may optionally have different configurations (such as those shown herein).
In the operating position, the tubular 106 is free to travel through the hole 202 of the BOP 104 and perform wellsite operations. The ram blocks 208 A and 208B are retracted from the hole 202, and the guides 308 A and 308B of the tubular centering systems 118A and 1 18B may be positioned radially closer to the tubular 106 than the blades 120A and 120B. The blade assembly 102 may remain in this position until actuation is desired, such as after an upset occurs. When the upset occurs, the blade assembly 102 may be actuated and the severing operation may commence.
The tubular severing systems 118A,B, blades 120A,B and ram blocks 208A,B may be the same as, for example, the tubular severing system 118, blade 120 and ram block 208 of Figures 3-6. The severing system 118B, blade 120B and ram block 208B are inverted for opposing interaction with the severing system 1 18 A, blade 120B and ram block 208B (shown in an upright position). The blade 120A (or top blade), may be the blade 120 (as shown in Figure 2) configured to face up, or travel over the blade 120B (or bottom blade) which may be the same blade 120 of Figure 2 configured to face down.
Figure 8 shows the blade assembly 102 upon the commencement of the severing operation. As shown, the ram block 208 A may have moved the blade 120A and the tubular centering system 118A into the hole 202 and toward the tubular 106. Although Figures 7-17 show the upper blade 120A (and the ram block 208 A and pipe centering system 118 A) moving first, the lower blade 120B may move first, or both blades 120A and 120B may move simultaneously. As the ram block 208A moves, the guide 308A engages the tubular 106.
Figure 9 shows the blade assembly 102 as the tubular 106 is initially being centered by the guide 308 A. As the ram block 208 A continues to move the blade 120A and the tubular centering system 1 18A radially toward the center of the BOP 104, the guide 308 A starts to center the tubular 106. The tubular 106 may ride along a curved surface 31 OA of the guide 308A toward an apex 312A (in the same manner as the curved surface 310 and apex 312 of Figure 3). As the tubular 106 rides along the curved surface 31 OA, the tubular 106 moves to a location closer to a center of the hole 202, as shown in Figure 10.
Figure 1 1 shows the blade assembly 102 as the tubular 106 continues to ride along the guide 308 A toward the apex 312A of the curved surface 31 OA and the other blade 120B (or bottom blade) is actuated. The blade 120B may then travel radially toward center of the hole 202 in order to engage the tubular 106.
Figure 12 shows the blade assembly 102 as both of the guides 308A and 308B engage the tubular 106 and continue to move the tubular 106 toward the apex 312A and 312B of the tubular centering systems 118A and 118B. The curved surface 31 OA and a curved surface 310B may wedge the tubular 106 between the tubular centering systems 1 18A and 1 18B as the ram blocks 208A and 208B continue to move the blades 120A and 120B toward the center of the BOP 104.
Figure 13 shows the tubular 106 centered in the BOP 104 and aligned with puncture points 300A and 300B of the blades 120A and 120B. With the tubular 106 centered between the guides 308A and 308B, the continued radial movement of the ram blocks 208A and 208B will increase the force in the tubular centering systems 118A and 1 18B.
The force may increase in the tubular centering systems 118A and 118B until, the biasing force is overcome, and/or the disconnect force is reached. The guide(s) 308A and/or 308B may then move, or remain stationary relative to the blades 120A and 120B as the ram blocks 208 A and 208B continue to move. The biasing force and/or the disconnect force for the tubular centering systems 118A and 1 18B may be the same, or one may be higher than the other, thereby allowing at least one of the blades 120A and/or 120B to engage the tubular 106.
Figure 14 shows the blade 120A puncturing the tubular 106. The blade 120A has moved relative to the guide 308A, thereby allowing the puncture point 300A to extend past the guide 308 A and pierce the tubular 106. The tubular centering system 118B for the blade 120B (or the bottom blade) may still be engaged with the blade 120B thereby allowing the guide 308B to hold the tubular 106 in place as the puncture point 300A pierces the tubular 106.
Figure 15 shows both of the blades 120A and 120B puncturing the tubular 106. The tubular centering system 118B has been moved relative to the blade 120B (or bottom blade) thereby allowing the puncture point 300B to extend past the guide 308B and puncture the tubular 106.
Figure 16 shows the blades 120A and 120B continuing to shear the tubular 106 as the ram blocks 208 A and 208B move radially toward one another in the channel 206. The top blade 120A is shown as passing over a portion of the bottom blade 120B. This movement is continued until the tubular 106 is severed as shown in Figure 17.
Figures 18-24 are schematic views of the BOP 104 of Figure 7 with various alternate tubular centering systems. The blade assembly 102 may be the same as described for Figures 1- 17. In each of these figures, tubular 106 is schematically shown in two possible positions in the hole 202.
In Figure 18, alternate tubular centering systems 1800A and 1800B may have one or more angled links 1802A and 1802B. The angled links 1802A and 1802B may couple to an outer arm 1804 of the ram blocks 208A and 208B. The angled links 1802A and 1802B are schematically shown about outer arms 1804, but may be positioned above, below and/or between components of the blade assembly 102 as desired.
The tubular 106 (shown in two possible positions although there may be only one) may be configured to travel, or ride, along the angled links 1802 A and 1802B during the severing operation. As the ram blocks 208A and 208B move closer together, the tubular 106 may move to the apexes 312A and 312B of each of the angled links 1802A and 1802B. The angled links 1802A and 1802B may have the frangible member 316 located between the angled links 1802A and 1802B proximate the apexes 312A and 312B. Further, the frangible member 316 may be replaced by a biasing member (as shown in Figure 3).
Figure 19 is a top view of the blade assembly 102 having second alternate tubular centering systems 1900A,B. The second alternate tubular centering systems 1900A,B may have a brittle material 1902 mounted to portions of the ram blocks 208A and 208B and/or the blades 120A and 120B. The brittle material 1902 may be formed with the apexes 312A and 312B in order to center the tubular 106 as the ram blocks 208 A and 208B move toward one another. The brittle material 1902 is schematically shown about blades 120A and 120B, but may be located above, below, and/or between the blades 120A and 120B. The brittle material 1902 may break prior to, or as the blades 120A and 120B are engaging the tubular 106 during the severing operation.
Figure 20 is a top view of the blade assembly 102 having third alternate tubular centering systems 2000 A,B. The third alternate tubular centering systems 2000 A,B may have a centering plate 2002A,B mounted to each of the ram blocks 208A and 208B and/or the blades 120A and 120B. The centering plates 2002 A,B are schematically shown about the ram blocks 208 A and 208B, but may be positioned above, below and/or between components of the blade assembly 102 as desired. Each centering plate 2002A,B may have the guides 308 A and 308B and a notch 2004. The notch 2004 may be located proximate the apexes 312A and 312B. The notch 2004 may allow the puncture points 300A and 300B to engage the tubular 106 prior to the apexes 312A and 312B engaging the tubular 106. The centering plate 2002 may have the biasing members 314 and/or the frangible member 316 (shown in Figure 3) to allow the centering plate 2002 to move relative to the blades 120A and 120B once the tubular 106 is centered. As also demonstrated by Figure 20, the blades 120A,B optionally may be positioned with both blades in an upright (or aligned) position, rather than with one blade inverted.
Figure 21 is a top view of the blade assembly 102 having fourth alternate tubular centering systems 2100A,B. The fourth alternate tubular centering systems 2100A,B may have a scissor link 2102 mounted to the ram blocks 208 A and 208B and/or the blades 120A and 120B. The scissor links 2102 may have two cross plates 2104 mounted to each of the ram blocks 208 A and 208B or the blades 120A and 120B. The cross plates 2104 are schematically shown about blades 120A and 120B, but may be positioned above, below and/or between components of the blade assembly 102, and may be stacked into position as desired.
Each of the cross plates 2104 may pivo tally couple to the ram blocks 208 A and 208B at a pivot connection 2106. A scissor pin 21 10 may couple each of the two cross plates 2104 together at one or more longitudinal slots 2112 in the cross plates 2104. One or more scissor actuators 2114 may be configured to push the cross plates 2104 out toward the tubular 106 in order to center the tubular 106 as the blades 120A and 120B approach the tubular 106. As shown with respect to the cross plate 2104 on blade 120 A, a scissor actuator 2114 may be used for activation thereof. As shown with respect to the cross plate 2104 on blade 120B, the ram block 208B may be used for movement thereof. Other actuators may also be provided.
Figure 22 is a top view of the blade assembly 102 having fifth alternate tubular centering systems 2200 A,B. The fifth alternate tubular centering systems 2200 A,B may have two pivoting arms 2204. The pivoting arms 2204 are schematically shown about the blades 120A and 120B, but may be positioned above, below and/or between components of the blade assembly 102 as desired. The pivoting arms 2204 may be configured to move into the hole 202 and guide the tubular 106 toward the center of the hole 202. The pivoting arms 2204 may be mounted in a skid plate 2206 of the BOP 104 at a skid plate pivot connection 2208. The pivoting arms 2204 may be actuated by an actuator (not shown) or be configured to move ahead of the blades 120A and 120B as the ram blocks 208A and 208B move. The pivoting arms 2204 may be curved in order to center the tubular 106 between the pivoting arms 2204 proximate the center of the hole 202.
Figure 23 is a top view of the blade assembly 102 having sixth alternate tubular centering systems 2300A,B. The sixth alternate tubular centering systems 2300A,B may have four pivoting arms 2302. The pivoting arms 2302 are schematically shown about the blades 120A and 120B, but may be positioned above, below and/or between components of the blade assembly 102 as desired. The pivoting arms 2302 may be configured to move into the hole 202 and guide the tubular 106 toward the center of the hole 202. The pivoting arms 2302 may be mounted in the skid plate 2206 of the BOP 104 at the skid plate pivot connection 2208.
The pivoting arms 2302 may be actuated by an actuator (not shown) or be configured to move ahead of the blades 120A and 120B as the ram blocks 208A and 208B move. The pivoting arms 2302 may be curved in order to center the tubular 106 between the pivoting arms 2302. Because there are four pivoting arms 2302, the tubular 106 may be centered in the hole 202 closer to one side of the hole 202. This may allow one of the blades 120A and/or 120B to engage the tubular 106 prior to the other blade.
Figure 24 is a top view of the blade assembly 102 having a seventh alternate tubular centering system 2400. The seventh alternate tubular centering system 2400 may have an airbag 2402 coupled to the skid plate 2206 of the BOP 104. The airbag 2402 may move between a deflated position shown in hidden line as 2402 and an inflated position 2402' as shown. Inflation may occur prior to the blades 120A and 120B engaging the tubular 106. As the airbag 2402 inflates, the airbag guides the tubular 106 from an original position (two possible original positions are shown in hidden line) to a centered position 106' toward the center of the hole 202. With the tubular 106' in the center of the hole 202, the severing operation may be performed.
The operation as depicted in Figures 7-24 shows a specific sequence of movement of the blades 120A,B and the various tubular centering systems. Variations in the order of movement may be provided. For example, the blades 120A,B and/or tubular centering systems may be advanced simultaneously or in various order. Additionally, the blades 120A,B and tubular centering systems are depicted as being identical components positioned opposite to each other for opposing interaction therebetween, but may be non-identical and at various positions relative to each other. The operation as described may be reversed to retract the blades 120A,B and/or tubular centering systems, and to repeat as desired.
Figure 25 depicts a method 2500 of shearing a tubular of a wellbore, such as the wellbore 108 of Figure 1. The method involves providing 2510 a BOP including a housing with a hole therethrough for receiving the tubular and a pair of blade assemblies. Each of the pair of blade assemblies includes a ram block, a blade carried by the ram block, and a retractable guide with a guide surface thereon carried by the ram block. The method further involves urging 2520 the tubular into a desired location in the BOP with the guide surface of each of the retractable guides while moving the ram blocks to an engagement position about the tubular, slidingly moving 2530 the retractable guide along the ram block, and 2540 cuttingly engaging the tubular with the blades as the ram blocks are moved to the engagement position. Additional steps may also be performed, and the steps may be repeated as desired.
It will be appreciated by those skilled in the art that the techniques disclosed herein can be implemented for automated/autonomous applications via software configured with algorithms to perform the desired functions. These aspects can be implemented by programming one or more suitable general-purpose computers having appropriate hardware. The programming may be accomplished through the use of one or more program storage devices readable by the processor(s) and encoding one or more programs of instructions executable by the computer for performing the operations described herein. The program storage device may take the form of, e.g., one or more floppy disks; a CD ROM or other optical disk; a read-only memory chip (ROM); and other forms of the kind well known in the art or subsequently developed. The program of instructions may be "object code," i.e., in binary form that is executable more-or-less directly by the computer; in "source code" that requires compilation or interpretation before execution; or in some intermediate form such as partially compiled code. The precise forms of the program storage device and of the encoding of instructions are immaterial here. Aspects of the invention may also be configured to perform the described functions (via appropriate hardware/software) solely on site and/or remotely controlled via an extended communication (e.g., wireless, internet, satellite, etc.) network.
While the embodiments are described with reference to various implementations and exploitations, it will be understood that these embodiments are illustrative and that the scope of the inventive subject matter is not limited to them. Many variations, modifications, additions and improvements are possible. For example, various combinations of blades (e.g., identical or non-identical) and tubular centering systems may be provided in various positions (e.g, aligned, inverted) for performing centering and/or severing operations.
Plural instances may be provided for components, operations or structures described herein as a single instance. In general, structures and functionality presented as separate components in the exemplary configurations may be implemented as a combined structure or component. Similarly, structures and functionality presented as a single component may be implemented as separate components. These and other variations, modifications, additions, and improvements may fall within the scope of the inventive subject matter.

Claims

A blade assembly of a blowout preventer for shearing a tubular of a wellbore penetrating a subterranean formation, the blowout preventer having a housing with a hole therethrough for receiving the tubular, the blade assembly comprising:
a ram block movable between a non-engagement position and an engagement position about the tubular;
a blade carried by the ram block for cuttingly engaging the tubular; and
a retractable guide carried by the ram block and slidably movable therealong, the retractable guide having a guide surface for urging the tubular into a desired location in the blowout preventer as the ram block moves to the engagement position.
The blade assembly of Claim 1 , wherein the guide surface is concave with an apex along a central portion thereof.
The blade assembly of Claim 2, wherein the retractable guide has a notch extending through the apex, a puncture point of the blade extending beyond the notch for piercing the tubular.
The blade assembly of Claim 1 , wherein the retractable guide comprises a pair of angled links operatively connected to an engagement end of the blade.
The blade assembly of Claim 1 , wherein the retractable guide comprises a brittle material positionable along an engagement end of the blade, the brittle material releasable from the blade as the blade engages the tubular.
The blade assembly of Claim 1 , wherein the retractable guide comprises a scissor link.
7. The blade assembly of Claim 6, wherein the scissor link comprises a pair of cross plates having slots therein with a pin extending therethrough for slidable movement therebetween.
8. The blade assembly of Claim 1 , wherein the retractable guide comprises a skid plate with at least one arm pivotally connectable thereto.
9. The blade assembly of Claim 1, wherein the retractable guide comprises a skid plate with an airbag thereon inflatable about the tubular.
10. The blade assembly of any of Claims 1 to 3, further comprising a lip for selectively releasing the retractable guide to move between a guide position for engaging the tubular and a cutting position retracted a distance behind an engagement end of the blade.
1 1. A blowout preventer for shearing a tubular of a wellbore penetrating a subterranean formation, the blowout preventer comprising:
a housing with a hole therethrough for receiving the tubular; and
a pair of blade assemblies, each of the pair of blade assemblies comprising a blade assembly as claimed in any of claims 1 to 10.
12. The blowout preventer of Claim 11 , wherein the retractable guide of each of the pair of blade assemblies is the same.
13. The blowout preventer of Claim 11 , wherein the retractable guide of each of the pair of blade assemblies is different.
14. The blowout preventer of Claim 11 , 12 or 13, wherein the blade of each of the pair of blade assemblies is the same.
15. The blowout preventer of Claim 11 , 12 or 13, wherein the blade of each of the pair of blade assemblies is different.
16. The blowout preventer of any of Claims 11 to 15, further comprising at least one actuator for actuating the ram block of each of the blade assemblies.
17. A method of shearing a tubular of a wellbore penetrating a subterranean formation using a blowout preventer as claimed in any of claims 11 to 16, the method comprising:
urging the tubular into a desired location in the blowout preventer with the guide surface of each of the retractable guides while moving each of the ram blocks from a non- engagement position to an engagement position about the tubular; slidably moving the retractable guide along the ram block; and
cuttingly engaging the tubular with the pair of blades as the ram blocks are moved to the engagement position.
18. The method of Claim 17, further comprising selectively releasing the retractable guide to move between a guide position for engaging the tubular to a cutting position a distance behind an engagement end of the blade.
19. The method of Claim 18, further comprises biasing the retractable guide toward the guide position.
20. The method of Claim 17, 18 or 19, wherein the urging comprises urging the tubular along a curved surface of the retractable guide toward an apex along a center thereof.
21. The method of Claim 20, wherein the urging further comprises advancing the tubular to a central portion of the blowout preventer with the retractable guide.
22. The method of Claim 17, wherein each of the blade assemblies are positionable on opposite sides of the tubular.
PCT/GB2011/051852 2010-09-29 2011-09-29 Blowout preventer blade assembly and method of using same WO2012042268A2 (en)

Priority Applications (6)

Application Number Priority Date Filing Date Title
KR1020137010718A KR101523858B1 (en) 2010-09-29 2011-09-29 Blowout preventer blade assembly and method of using same
BR112013007701-8A BR112013007701B1 (en) 2010-09-29 2011-09-29 blade assembly of a well plug block, and method for shearing a tubular from a well hole
EP11770144.1A EP2622171B1 (en) 2010-09-29 2011-09-29 Blowout preventer blade assembly and method of using same
SG2013022009A SG189080A1 (en) 2010-09-29 2011-09-29 Blowout preventer blade assembly and method of using same
CN201180057397.2A CN103249907B (en) 2010-09-29 2011-09-29 Preventer blade assembly and using method thereof
CA2812646A CA2812646C (en) 2010-09-29 2011-09-29 Blowout preventer blade assembly with retractable guide

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
US38780510P 2010-09-29 2010-09-29
US61/387,805 2010-09-29
US13/247,465 US9022104B2 (en) 2010-09-29 2011-09-28 Blowout preventer blade assembly and method of using same
US13/247,465 2011-09-28

Publications (2)

Publication Number Publication Date
WO2012042268A2 true WO2012042268A2 (en) 2012-04-05
WO2012042268A3 WO2012042268A3 (en) 2013-03-14

Family

ID=44801027

Family Applications (2)

Application Number Title Priority Date Filing Date
PCT/GB2011/051853 WO2012042269A2 (en) 2010-09-29 2011-09-29 Blowout preventer blade assembly and method of using same
PCT/GB2011/051852 WO2012042268A2 (en) 2010-09-29 2011-09-29 Blowout preventer blade assembly and method of using same

Family Applications Before (1)

Application Number Title Priority Date Filing Date
PCT/GB2011/051853 WO2012042269A2 (en) 2010-09-29 2011-09-29 Blowout preventer blade assembly and method of using same

Country Status (8)

Country Link
US (2) US8807219B2 (en)
EP (2) EP2622171B1 (en)
KR (2) KR101523152B1 (en)
CN (1) CN103249907B (en)
BR (2) BR112013007713B1 (en)
CA (2) CA2812646C (en)
SG (2) SG189080A1 (en)
WO (2) WO2012042269A2 (en)

Families Citing this family (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8807219B2 (en) * 2010-09-29 2014-08-19 National Oilwell Varco, L.P. Blowout preventer blade assembly and method of using same
US9175538B2 (en) * 2010-12-06 2015-11-03 Hydril USA Distribution LLC Rechargeable system for subsea force generating device and method
KR101583220B1 (en) * 2014-03-14 2016-01-07 삼성중공업 주식회사 Test apparatus for bop stack
EP2995768B1 (en) * 2014-09-12 2020-01-22 Cameron Technologies Limited Blowout preventer with blade including multiple profiles
US20160084031A1 (en) * 2014-09-22 2016-03-24 Zp Interests, Llc Multi-stage blowout preventer and method of using same
US9869149B2 (en) 2014-09-29 2018-01-16 Saudi Arabian Oil Company Scissor-mechanism closing rams of blow out preventors
US10370926B2 (en) 2014-09-29 2019-08-06 Saudi Arabian Oil Company Apparatus and method to contain flange, pipe and valve leaks
US10655419B2 (en) 2014-09-29 2020-05-19 Saudi Arabian Oil Company Vehicle mounted blowout preventor equipment
MY190978A (en) * 2014-10-23 2022-05-25 Eni Spa Valve assembly and control method for extraction wells under emergency conditions
WO2017019547A1 (en) * 2015-07-24 2017-02-02 National Oilwell Varco, L.P. Wellsite tool guide assembly and method of using same
US9976373B2 (en) * 2015-09-02 2018-05-22 Cameron International Corporation Blowout preventer with shear ram
CA2903859A1 (en) * 2015-09-14 2017-03-14 Control Technology Inc. Pipe centering and washing apparatus
EP3187681B1 (en) * 2015-12-30 2019-05-22 Cameron Technologies Limited Shearing sequence for a blowout preventer
AU2016384770B2 (en) * 2016-01-05 2020-02-20 Noble Drilling Services Inc. Pressure assisted motor operated ram actuator for well pressure control device
AU2017244287B2 (en) * 2016-03-30 2022-08-04 Electrical Subsea & Drilling Annular blowout preventer
CA3036510C (en) 2016-09-12 2021-11-23 Kinetic Pressure Control, Ltd. Improved blowout preventer
US10577884B2 (en) 2017-03-31 2020-03-03 General Electric Company Blowout prevention system including blind shear ram
US11401770B2 (en) * 2018-04-06 2022-08-02 Hydril USA Distribution LLC Hardfaced metal surface and method of manufacture
US12006781B2 (en) 2019-04-21 2024-06-11 Schlumberger Technology Corporation Blowout preventer with multiple application ram blades
US11286740B2 (en) 2019-04-21 2022-03-29 Schlumberger Technology Corporation Blowout preventer shearing ram
USD973734S1 (en) * 2019-08-06 2022-12-27 Nxl Technologies Inc. Blind shear
US11391108B2 (en) 2020-06-03 2022-07-19 Schlumberger Technology Corporation Shear ram for a blowout preventer

Citations (36)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2752119A (en) 1952-03-24 1956-06-26 Cameron Iron Works Inc Blowout preventer
US3272222A (en) 1963-10-28 1966-09-13 Cameron Iron Works Inc Blowout preventer
US3554278A (en) 1969-07-31 1971-01-12 Exxon Production Research Co Pipe alignment apparatus
US3744749A (en) 1971-05-18 1973-07-10 Hydril Co Blowout preventer with ram support and guide means
US3863667A (en) 1973-03-21 1975-02-04 Pipe Line Development Co Combined shear head and housing plug
US3946806A (en) 1972-06-16 1976-03-30 Cameron Iron Works, Inc. Ram-type blowout preventer
US3955622A (en) 1975-06-09 1976-05-11 Regan Offshore International, Inc. Dual drill string orienting apparatus and method
US4043389A (en) 1976-03-29 1977-08-23 Continental Oil Company Ram-shear and slip device for well pipe
US4057887A (en) 1974-05-06 1977-11-15 Cameron Iron Works, Inc. Pipe disconnecting apparatus
US4132267A (en) 1978-04-06 1979-01-02 Cameron Iron Works, Inc. Pipe shearing ram assembly for blowout preventer
US4313496A (en) 1980-04-22 1982-02-02 Cameron Iron Works, Inc. Wellhead shearing apparatus
US4523639A (en) 1983-11-21 1985-06-18 Koomey Blowout Preventers, Inc. Ram type blowout preventers
US4537250A (en) 1983-12-14 1985-08-27 Cameron Iron Works, Inc. Shearing type blowout preventer
US4647002A (en) 1983-09-23 1987-03-03 Hydril Company Ram blowout preventer apparatus
US4923005A (en) 1989-01-05 1990-05-08 Otis Engineering Corporation System for handling reeled tubing
US5013005A (en) 1986-04-18 1991-05-07 Cameron Iron Works, Inc. Blowout preventer
US5025708A (en) 1990-01-30 1991-06-25 Baroid Technology, Inc. Actuator with automatic lock
US5056418A (en) 1990-10-18 1991-10-15 Granger Stanley W Self-adjusting automatic locking piston for RAM blowout preventers
US5360061A (en) 1992-10-14 1994-11-01 Womble Lee M Blowout preventer with tubing shear rams
US5400857A (en) 1993-12-08 1995-03-28 Varco Shaffer, Inc. Oilfield tubular shear ram and method for blowout prevention
US5505426A (en) 1995-04-05 1996-04-09 Varco Shaffer, Inc. Hydraulically controlled blowout preventer
US5515916A (en) 1995-03-03 1996-05-14 Stewart & Stevenson Services, Inc. Blowout preventer
US5575452A (en) 1995-09-01 1996-11-19 Varco Shaffer, Inc. Blowout preventer with ram wedge locks
US5735502A (en) 1996-12-18 1998-04-07 Varco Shaffer, Inc. BOP with partially equalized ram shafts
US5897094A (en) 1996-12-27 1999-04-27 Varco Shaffer, Inc. BOP with improved door connectors
US5918851A (en) 1998-03-03 1999-07-06 Cooper Cameron Corporation Blowout preventer ram automatic locking system
US6158505A (en) 1999-08-30 2000-12-12 Cooper Cameron Corporation Blade seal for a shearing blind ram in a ram type blowout preventer
US6173770B1 (en) 1998-11-20 2001-01-16 Hydril Company Shear ram for ram-type blowout preventer
US6374925B1 (en) 2000-09-22 2002-04-23 Varco Shaffer, Inc. Well drilling method and system
US7051989B2 (en) 2004-04-30 2006-05-30 Varco I/P, Inc. Blowout preventer and movable ram block support
US7234530B2 (en) 2004-11-01 2007-06-26 Hydril Company Lp Ram BOP shear device
US7243713B2 (en) 2004-11-29 2007-07-17 National-Oilwell Dht, L.P. Shear/seal ram assembly for a ram-type blowout prevention system
US7367396B2 (en) 2006-04-25 2008-05-06 Varco I/P, Inc. Blowout preventers and methods of use
US7464765B2 (en) 2005-08-24 2008-12-16 National-Oilwell Dht, L.P. Inner guide seal assembly and method for a ram type BOP system
US20090056132A1 (en) 2007-08-28 2009-03-05 Darwell Industries Ltd. Method of forming a blowout preventer body
US7798466B2 (en) 2007-04-27 2010-09-21 Varco I/P, Inc. Ram locking blowout preventer

Family Cites Families (119)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2178698A (en) 1936-05-04 1939-11-07 Arthur J Penick Tubing head
US2231613A (en) 1940-04-03 1941-02-11 Paul Stock Blowout preventer and control head
US2304793A (en) 1941-06-09 1942-12-15 Calpat Corp Method of and apparatus for cutting pipe
US2592197A (en) 1947-10-27 1952-04-08 Jr Frank J Schweitzer Side-plug hydraulic cellar gate
US3040611A (en) 1956-11-15 1962-06-26 Duralumin Guillotine shears
US3379255A (en) * 1966-07-28 1968-04-23 Bowen Tools Inc Cutoff assembly for use at wellheads
US3399728A (en) 1966-12-01 1968-09-03 Allan R. Taylor Conduit closure apparatus
US3554480A (en) 1968-01-16 1971-01-12 Cameron Iron Works Inc Blowout preventer
US3561526A (en) 1969-09-03 1971-02-09 Cameron Iron Works Inc Pipe shearing ram assembly for blowout preventer
US3647174A (en) 1970-09-25 1972-03-07 Hydril Co Blowout preventer
US3670761A (en) 1970-10-13 1972-06-20 Hydril Co Blowout preventer with resistance means between the body and the piston
US3716068A (en) 1971-06-11 1973-02-13 F Addison Surface controlled blowout arrester
US3741296A (en) 1971-06-14 1973-06-26 Hydril Co Replacement of sub sea blow out preventer packing units
US3766979A (en) 1972-04-20 1973-10-23 J Petrick Well casing cutter and sealer
US3918478A (en) 1974-02-11 1975-11-11 Hydril Co Blowout preventer with locking means
US4007797A (en) 1974-06-04 1977-02-15 Texas Dynamatics, Inc. Device for drilling a hole in the side wall of a bore hole
US3922780A (en) 1974-11-04 1975-12-02 Cyril Robert Green Cable spearing and cutting apparatus
GB1516273A (en) 1976-03-19 1978-06-28 British Gas Corp Stopping fluid flow in pipes
FR2362332A1 (en) 1976-04-29 1978-03-17 Commissariat Energie Atomique PYROTECHNICAL DEVICE FOR BLOCKING A PIPELINE
US4132265A (en) 1978-04-06 1979-01-02 Cameron Iron Works, Inc. Pipe shearing ram assembly for blowout preventer
US4220206A (en) 1979-01-22 1980-09-02 Winkle Denzal W Van Quick opening closure arrangement for well completions
US4215749A (en) 1979-02-05 1980-08-05 Acf Industries, Incorporated Gate valve for shearing workover lines to permit shutting in of a well
US4253638A (en) 1979-08-02 1981-03-03 Cameron Iron Works, Inc. Blowout preventer
US4416441A (en) 1979-10-29 1983-11-22 Winkle Denzal W Van Blowout preventer
US4392633A (en) 1979-10-29 1983-07-12 Winkle Denzal W Van Valve structure having movable seat means
US4372527A (en) 1980-05-05 1983-02-08 Dresser Industries, Inc. Blowout preventer
US4341264A (en) 1980-10-15 1982-07-27 Cameron Iron Works, Inc. Wellhead shearing apparatus
US4347898A (en) 1980-11-06 1982-09-07 Cameron Iron Works, Inc. Shear ram blowout preventer
US4437643A (en) 1981-06-25 1984-03-20 Cameron Iron Works, Inc. Ram-type blowout preventer
US4492359A (en) 1982-06-25 1985-01-08 Baugh Benton F Valve assembly
US4508313A (en) 1982-12-02 1985-04-02 Koomey Blowout Preventers, Inc. Valves
US4519577A (en) 1982-12-02 1985-05-28 Koomey Blowout Preventers, Inc. Flow controlling apparatus
US4518144A (en) 1983-09-01 1985-05-21 Cameron Iron Works, Inc. Ram-type blowout preventer and packer therefor
US4558842A (en) 1983-09-06 1985-12-17 Bowen Tools, Inc. Connector for joining blowout preventer members
US4540046A (en) 1983-09-13 1985-09-10 Nl Industries, Inc. Shear ram apparatus
US4504037A (en) 1983-09-26 1985-03-12 Hydril Company Ram blowout preventer securing and retracting apparatus
US4516598A (en) 1983-10-24 1985-05-14 Stupak Adam E Well safety valve
US4526339A (en) 1984-05-11 1985-07-02 Universal Well Control Systems Blowout preventer
US4550895A (en) 1984-09-24 1985-11-05 Shaffer Donald U Ram construction for oil well blow out preventer apparatus
FR2580053B1 (en) 1985-04-04 1987-09-25 Petroles Cie Francaise
US4612983A (en) 1985-10-15 1986-09-23 Gray Tool Company Shear type gate valve
US4690033A (en) 1985-12-16 1987-09-01 Winkle Denzal W Van Self actuating locking and unlocking arrangement and method for reciprocating piston type actuators
US4690411A (en) 1985-12-23 1987-09-01 Winkle Denzal W Van Bonded mechanically inner connected seal arrangement for a blowout preventer
US4646825A (en) 1986-01-02 1987-03-03 Winkle Denzal W Van Blowout preventer, shear ram, shear blade and seal therefor
CA1291923C (en) 1989-01-16 1991-11-12 Stanley W. Wachowicz Hydraulic power system
US4969390A (en) 1989-05-30 1990-11-13 Cooper Industries, Inc. Rod locking device
US4943031A (en) 1989-08-17 1990-07-24 Drexel Oilfield Services, Inc. Blowout preventer
US5002130A (en) 1990-01-29 1991-03-26 Otis Engineering Corp. System for handling reeled tubing
US5199493A (en) 1991-05-03 1993-04-06 Sodder George Jr Methods and apparatus for shutting a conduit
DE4114887A1 (en) 1991-05-07 1992-11-12 Bruns Werner DISCONNECTING AND LOCKING DEVICE FOR PRESSURE PIPES IN CONVEYOR AND SUPPLY PLANTS
US5178215A (en) 1991-07-22 1993-01-12 Folsom Metal Products, Inc. Rotary blowout preventer adaptable for use with both kelly and overhead drive mechanisms
CA2048780C (en) 1991-08-08 1997-12-16 Edward Joseph Schartinger Blade for cutting cylindrical structures
US5361832A (en) 1993-06-17 1994-11-08 Drexel Oilfield Services, Inc. Annular packer and insert
ATE216461T1 (en) 1995-01-13 2002-05-15 Hydril Co LOW-BUILD AND LIGHTWEIGHT HIGH PRESSURE BREAKOUT VALVE
US5575451A (en) 1995-05-02 1996-11-19 Hydril Company Blowout preventer ram for coil tubing
US5590867A (en) 1995-05-12 1997-01-07 Drexel Oil Field Services, Inc. Blowout preventer for coiled tubing
US5566753A (en) 1995-06-07 1996-10-22 Drexel Oil Field Services, Inc. Stripper/packer
US5588491A (en) 1995-08-10 1996-12-31 Varco Shaffer, Inc. Rotating blowout preventer and method
US5863022A (en) 1996-01-16 1999-01-26 Van Winkle; D. Wayne Stripper/packer and blowout preventer with split bonnet
US5778918A (en) 1996-10-18 1998-07-14 Varco Shaffer, Inc. Pilot valve with improved cage
US6016880A (en) 1997-10-02 2000-01-25 Abb Vetco Gray Inc. Rotating drilling head with spaced apart seals
WO1999049179A1 (en) * 1998-03-26 1999-09-30 Hydril Company Shear ram for ram-type blowout preventer
US6006647A (en) 1998-05-08 1999-12-28 Tuboscope I/P Inc. Actuator with free-floating piston for a blowout preventer and the like
US6012528A (en) 1998-06-24 2000-01-11 Tuboscope I/P Inc. Method and apparatus for replacing a packer element
US5961094A (en) 1998-06-24 1999-10-05 Tuboscope I/P Inc. Method and apparatus for replacing a packer element
US6164619A (en) 1999-01-07 2000-12-26 Tuboscope I/P, Inc. Bi-directional sealing ram
US6276450B1 (en) 1999-05-02 2001-08-21 Varco International, Inc. Apparatus and method for rapid replacement of upper blowout preventers
US6192680B1 (en) 1999-07-15 2001-02-27 Varco Shaffer, Inc. Subsea hydraulic control system
GB2377719B (en) 2000-02-16 2004-08-25 Performance Res & Drilling Llc Horizontal directional drilling in wells
US6244336B1 (en) 2000-03-07 2001-06-12 Cooper Cameron Corporation Double shearing rams for ram type blowout preventer
US6484808B2 (en) 2000-06-09 2002-11-26 Varco I/P, Inc. Stripper/packer
JP4438203B2 (en) 2000-09-12 2010-03-24 株式会社デンソー Pipe drilling method and apparatus
US6601650B2 (en) 2001-08-09 2003-08-05 Worldwide Oilfield Machine, Inc. Method and apparatus for replacing BOP with gate valve
US6510897B2 (en) 2001-05-04 2003-01-28 Hydril Company Rotational mounts for blowout preventer bonnets
US6530432B2 (en) 2001-07-11 2003-03-11 Coiled Tubing Solutions, Inc. Oil well tubing injection system and method
US6651746B2 (en) 2001-11-26 2003-11-25 Anthony R. Boyd High torque and high capacity rotatable center core and floatable sealed body assemblies with universals ram applications and method
BR0206084B1 (en) 2001-12-17 2013-08-27 "subsea production system, and cutting module adapted to cut pipe in a well."
US6834721B2 (en) 2002-01-14 2004-12-28 Halliburton Energy Services, Inc. System for disconnecting coiled tubing
NO316189B1 (en) 2002-01-16 2003-12-22 Norsk Hydro As Riser control device
WO2003070565A2 (en) 2002-02-19 2003-08-28 Preston Fox Subsea intervention system, method and components thereof
US6742597B2 (en) 2002-05-20 2004-06-01 Varco I/P Safety check valve for coiled tubing
US6719042B2 (en) 2002-07-08 2004-04-13 Varco Shaffer, Inc. Shear ram assembly
US6843463B1 (en) 2002-08-30 2005-01-18 Varco I/P/ Inc. Pressure regulated slip ram on a coil tubing blowout preventer
US20040124380A1 (en) 2002-10-29 2004-07-01 Van Winkle Denzal Wayne Articulated slip ram for tapered coiled tubing
US6857634B2 (en) 2003-02-20 2005-02-22 Varco Shaffer, Inc. BOP assembly with metal inserts
US6974135B2 (en) 2003-07-11 2005-12-13 Varco I/P Inc. Variable bore ram
GB0319317D0 (en) 2003-08-16 2003-09-17 Maris Tdm Ltd Method and apparatus for drilling
US7011159B2 (en) 2003-09-16 2006-03-14 Hydril Company, L.P. Compact mid-grip fastener
GB2411191B (en) 2003-10-09 2006-07-19 Varco Int Variable size coil tubing gripping elements
US7287544B2 (en) 2003-10-21 2007-10-30 Varco I/P, Inc. Triple valve blow out preventer
PL1700001T3 (en) 2003-12-31 2013-12-31 Varco I/P Inc Instrumented internal blowout preventer valve for measuring drill string drilling parameters
US6969042B2 (en) 2004-05-01 2005-11-29 Varco I/P, Inc. Blowout preventer and ram actuator
US7051990B2 (en) 2004-07-01 2006-05-30 Varco I/P, Inc. Blowout preventer and movable bonnet support
MX2007000532A (en) 2004-07-27 2008-03-04 T 3 Property Holdings Inc Shearing sealing ram.
US7354026B2 (en) 2004-08-17 2008-04-08 Cameron International Corporation Unitary blade seal for a shearing blind ram in a ram type blowout preventer
US20060076526A1 (en) 2004-10-13 2006-04-13 Varco I/P, Inc. Anodic Protective Seal in a Blowout Preventer
US7703739B2 (en) 2004-11-01 2010-04-27 Hydril Usa Manufacturing Llc Ram BOP shear device
US7360603B2 (en) 2004-11-30 2008-04-22 Varco I/P, Inc. Methods and apparatuses for wellbore operations
US7055594B1 (en) 2004-11-30 2006-06-06 Varco I/P, Inc. Pipe gripper and top drive systems
US7350587B2 (en) 2004-11-30 2008-04-01 Varco I/P, Inc. Pipe guide
JP2006187817A (en) 2004-12-28 2006-07-20 Fuji Photo Film Co Ltd Guillotine cutter and tape sticking device
US7195224B2 (en) 2005-02-01 2007-03-27 Varco I/P, Inc. Blowout preventer and locking mechanism
US7523644B2 (en) 2005-09-08 2009-04-28 Varco I/P Method and apparatus for verifying the integrity of a joint seal
US7331562B2 (en) 2005-11-07 2008-02-19 Varco I/P, Inc. Blowout preventer with breech assembly
CA2568431C (en) 2005-11-18 2009-07-14 Bj Services Company Dual purpose blow out preventer
US7673674B2 (en) 2006-01-31 2010-03-09 Stream-Flo Industries Ltd. Polish rod clamping device
US20080189954A1 (en) 2006-04-04 2008-08-14 Yung Sheng Lin Pipe cutter
US7401664B2 (en) 2006-04-28 2008-07-22 Varco I/P Top drive systems
US7487848B2 (en) 2006-04-28 2009-02-10 Varco I/P, Inc. Multi-seal for top drive shaft
US7181808B1 (en) 2006-05-31 2007-02-27 Denzal Wayne Van Winkle Buckle or clasp
US20080040070A1 (en) 2006-08-11 2008-02-14 Varco I/P, Inc. Position Indicator for a Blowout Preventer
US7520129B2 (en) 2006-11-07 2009-04-21 Varco I/P, Inc. Subsea pressure accumulator systems
CN200985768Y (en) * 2006-12-18 2007-12-05 辽河石油勘探局 Blowout preventer of slide sealing shutter
US8464525B2 (en) 2007-02-07 2013-06-18 National Oilwell Varco, L.P. Subsea power fluid recovery systems
US7926501B2 (en) 2007-02-07 2011-04-19 National Oilwell Varco L.P. Subsea pressure systems for fluid recovery
US8033338B2 (en) 2008-01-22 2011-10-11 National Oilwell Varco, L.P. Wellbore continuous circulation systems and method
CN201250638Y (en) * 2008-07-31 2009-06-03 河北华北石油荣盛机械制造有限公司 Cutting flashboard of a blowout preventer
US8181697B2 (en) 2008-08-15 2012-05-22 National Oilwell Varco L.P. Multi-function multi-hole drilling rig
US8807219B2 (en) * 2010-09-29 2014-08-19 National Oilwell Varco, L.P. Blowout preventer blade assembly and method of using same

Patent Citations (37)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2752119A (en) 1952-03-24 1956-06-26 Cameron Iron Works Inc Blowout preventer
US3272222A (en) 1963-10-28 1966-09-13 Cameron Iron Works Inc Blowout preventer
US3554278A (en) 1969-07-31 1971-01-12 Exxon Production Research Co Pipe alignment apparatus
US3744749A (en) 1971-05-18 1973-07-10 Hydril Co Blowout preventer with ram support and guide means
US3946806A (en) 1972-06-16 1976-03-30 Cameron Iron Works, Inc. Ram-type blowout preventer
US3863667A (en) 1973-03-21 1975-02-04 Pipe Line Development Co Combined shear head and housing plug
US4057887A (en) 1974-05-06 1977-11-15 Cameron Iron Works, Inc. Pipe disconnecting apparatus
US3955622A (en) 1975-06-09 1976-05-11 Regan Offshore International, Inc. Dual drill string orienting apparatus and method
US4043389A (en) 1976-03-29 1977-08-23 Continental Oil Company Ram-shear and slip device for well pipe
US4132267A (en) 1978-04-06 1979-01-02 Cameron Iron Works, Inc. Pipe shearing ram assembly for blowout preventer
US4313496A (en) 1980-04-22 1982-02-02 Cameron Iron Works, Inc. Wellhead shearing apparatus
US4647002A (en) 1983-09-23 1987-03-03 Hydril Company Ram blowout preventer apparatus
US4523639A (en) 1983-11-21 1985-06-18 Koomey Blowout Preventers, Inc. Ram type blowout preventers
US4537250A (en) 1983-12-14 1985-08-27 Cameron Iron Works, Inc. Shearing type blowout preventer
US5013005A (en) 1986-04-18 1991-05-07 Cameron Iron Works, Inc. Blowout preventer
US4923005A (en) 1989-01-05 1990-05-08 Otis Engineering Corporation System for handling reeled tubing
US5025708A (en) 1990-01-30 1991-06-25 Baroid Technology, Inc. Actuator with automatic lock
US5056418A (en) 1990-10-18 1991-10-15 Granger Stanley W Self-adjusting automatic locking piston for RAM blowout preventers
US5360061A (en) 1992-10-14 1994-11-01 Womble Lee M Blowout preventer with tubing shear rams
US5400857A (en) 1993-12-08 1995-03-28 Varco Shaffer, Inc. Oilfield tubular shear ram and method for blowout prevention
US5515916A (en) 1995-03-03 1996-05-14 Stewart & Stevenson Services, Inc. Blowout preventer
US5505426A (en) 1995-04-05 1996-04-09 Varco Shaffer, Inc. Hydraulically controlled blowout preventer
US5575452A (en) 1995-09-01 1996-11-19 Varco Shaffer, Inc. Blowout preventer with ram wedge locks
US5735502A (en) 1996-12-18 1998-04-07 Varco Shaffer, Inc. BOP with partially equalized ram shafts
US5897094A (en) 1996-12-27 1999-04-27 Varco Shaffer, Inc. BOP with improved door connectors
US5918851A (en) 1998-03-03 1999-07-06 Cooper Cameron Corporation Blowout preventer ram automatic locking system
US6173770B1 (en) 1998-11-20 2001-01-16 Hydril Company Shear ram for ram-type blowout preventer
US6158505A (en) 1999-08-30 2000-12-12 Cooper Cameron Corporation Blade seal for a shearing blind ram in a ram type blowout preventer
US6374925B1 (en) 2000-09-22 2002-04-23 Varco Shaffer, Inc. Well drilling method and system
US7051989B2 (en) 2004-04-30 2006-05-30 Varco I/P, Inc. Blowout preventer and movable ram block support
US7234530B2 (en) 2004-11-01 2007-06-26 Hydril Company Lp Ram BOP shear device
US7243713B2 (en) 2004-11-29 2007-07-17 National-Oilwell Dht, L.P. Shear/seal ram assembly for a ram-type blowout prevention system
US7464765B2 (en) 2005-08-24 2008-12-16 National-Oilwell Dht, L.P. Inner guide seal assembly and method for a ram type BOP system
US7367396B2 (en) 2006-04-25 2008-05-06 Varco I/P, Inc. Blowout preventers and methods of use
US7814979B2 (en) 2006-04-25 2010-10-19 National Oilwell Varoo, L.P. Blowout preventers and methods of use
US7798466B2 (en) 2007-04-27 2010-09-21 Varco I/P, Inc. Ram locking blowout preventer
US20090056132A1 (en) 2007-08-28 2009-03-05 Darwell Industries Ltd. Method of forming a blowout preventer body

Also Published As

Publication number Publication date
WO2012042269A3 (en) 2013-03-14
WO2012042268A3 (en) 2013-03-14
KR20130108375A (en) 2013-10-02
BR112013007713A2 (en) 2016-08-09
SG189080A1 (en) 2013-05-31
EP2622172B1 (en) 2014-09-17
US20120073815A1 (en) 2012-03-29
BR112013007701A2 (en) 2016-08-09
US8807219B2 (en) 2014-08-19
CA2812648A1 (en) 2012-04-05
CA2812646A1 (en) 2012-04-05
CN103249907A (en) 2013-08-14
BR112013007701A8 (en) 2021-02-23
CN103249907B (en) 2016-02-17
CN103228866A (en) 2013-07-31
EP2622172A2 (en) 2013-08-07
US9022104B2 (en) 2015-05-05
KR101523152B1 (en) 2015-05-26
EP2622171A2 (en) 2013-08-07
BR112013007713B1 (en) 2020-11-24
KR20130101065A (en) 2013-09-12
US20120073816A1 (en) 2012-03-29
BR112013007701B1 (en) 2021-03-02
WO2012042269A2 (en) 2012-04-05
SG189079A1 (en) 2013-05-31
KR101523858B1 (en) 2015-05-28
CA2812648C (en) 2015-11-24
CA2812646C (en) 2015-11-03
EP2622171B1 (en) 2014-09-17

Similar Documents

Publication Publication Date Title
CA2812646C (en) Blowout preventer blade assembly with retractable guide
US8424607B2 (en) System and method for severing a tubular
EP2726699B1 (en) Blowout preventer seal assembly and method of using same
EP2809875B1 (en) Blowout preventer and method of using same
CA2801036C (en) System and method for severing a tubular
US10883331B2 (en) Blowout preventer with interlocking ram assembly and method of using same
US20130008670A1 (en) Safety system for oil and gas drilling operations

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 201180057397.2

Country of ref document: CN

ENP Entry into the national phase

Ref document number: 2812646

Country of ref document: CA

WWE Wipo information: entry into national phase

Ref document number: 2011770144

Country of ref document: EP

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 20137010718

Country of ref document: KR

Kind code of ref document: A

ENP Entry into the national phase

Ref document number: 112013007701

Country of ref document: BR

Kind code of ref document: A2

Effective date: 20130328

REG Reference to national code

Ref country code: BR

Ref legal event code: B01E

Ref document number: 112013007718

Country of ref document: BR

ENP Entry into the national phase

Ref document number: 112013007718

Country of ref document: BR

Kind code of ref document: A2

Effective date: 20130328