EP3187681B1 - Shearing sequence for a blowout preventer - Google Patents

Shearing sequence for a blowout preventer Download PDF

Info

Publication number
EP3187681B1
EP3187681B1 EP15307172.5A EP15307172A EP3187681B1 EP 3187681 B1 EP3187681 B1 EP 3187681B1 EP 15307172 A EP15307172 A EP 15307172A EP 3187681 B1 EP3187681 B1 EP 3187681B1
Authority
EP
European Patent Office
Prior art keywords
ram
actuator
tubular string
bore
hydraulic fluid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Not-in-force
Application number
EP15307172.5A
Other languages
German (de)
French (fr)
Other versions
EP3187681A1 (en
Inventor
Regis REY
Florent Vargas
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cameron Technologies Ltd
Original Assignee
Cameron Technologies Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Cameron Technologies Ltd filed Critical Cameron Technologies Ltd
Priority to EP15307172.5A priority Critical patent/EP3187681B1/en
Priority to US15/392,992 priority patent/US20170191337A1/en
Publication of EP3187681A1 publication Critical patent/EP3187681A1/en
Application granted granted Critical
Publication of EP3187681B1 publication Critical patent/EP3187681B1/en
Not-in-force legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/02Surface sealing or packing
    • E21B33/03Well heads; Setting-up thereof
    • E21B33/06Blow-out preventers, i.e. apparatus closing around a drill pipe, e.g. annular blow-out preventers
    • E21B33/061Ram-type blow-out preventers, e.g. with pivoting rams
    • E21B33/062Ram-type blow-out preventers, e.g. with pivoting rams with sliding rams
    • E21B33/063Ram-type blow-out preventers, e.g. with pivoting rams with sliding rams for shearing drill pipes
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/02Surface sealing or packing
    • E21B33/03Well heads; Setting-up thereof
    • E21B33/06Blow-out preventers, i.e. apparatus closing around a drill pipe, e.g. annular blow-out preventers
    • E21B33/061Ram-type blow-out preventers, e.g. with pivoting rams
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/02Surface sealing or packing
    • E21B33/03Well heads; Setting-up thereof
    • E21B33/06Blow-out preventers, i.e. apparatus closing around a drill pipe, e.g. annular blow-out preventers
    • E21B33/064Blow-out preventers, i.e. apparatus closing around a drill pipe, e.g. annular blow-out preventers specially adapted for underwater well heads
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B34/00Valve arrangements for boreholes or wells
    • E21B34/16Control means therefor being outside the borehole
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/06Measuring temperature or pressure
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • E21B17/01Risers

Definitions

  • US 2010/155086 discloses a blowout preventer system.
  • US 6006647 describes an actuator with a free-floating piston for a blowout preventer and ensures that the actuator locking mechanism remains in a locked position if no hydraulic pressure is applied to the hydraulic fluid of the actuator.
  • US9022104 describes a blowout preventer with a blade assembly including a ram block movable between a non-engagement position and an engagement position about the tubular, a blade carried by the ram block for cuttingly engaging the tubular, and a retractable guide carried by the ram block for urging the tubular into a desired location in the blowout preventer as the ram block moves to the engagement position.
  • the present invention resides in d a blowout preventer system as defined in claim 1, a method as defined in claim 9 and a system as defined in claimed 12.
  • a blowout preventer (BOP) stack may be installed on a wellhead to seal and control an oil and gas well during drilling operations.
  • a tubular string may be suspended inside a drilling riser and extend through the BOP stack into the wellhead.
  • a drilling fluid may be delivered through the tubular string and returned through a bore between the tubular string and a casing of the drilling riser.
  • the BOP stack may be actuated to seal the drilling riser from the wellhead and to control a fluid pressure in the bore, thereby protecting well equipment disposed above the BOP stack.
  • Embodiments of the present disclosure relate to a blowout preventer (“BOP") system that may completely shear (e.g., cut) a tubular string to enhance a seal of a wellbore when blowout conditions are detected.
  • BOP blowout preventer
  • a BOP may be included at a wellhead to block a fluid from inadvertently flowing from the wellhead to a drilling platform (e.g., through a drilling riser). For example, pressures may fluctuate within a natural reservoir, which may lead to a surge in fluid flow from the wellhead toward the drilling platform when the pressure reaches a threshold value.
  • the BOP may be actuated to cut the tubular string and seal the drilling riser from the wellhead (e.g., by covering a bore in the BOP coupling the wellhead to the drilling riser).
  • at least one BOP of a BOP stack may include shearing rams that may be configured to cut the tubular string and enhance a seal of the bore extending through the BOP.
  • a BOP system may be operated utilizing an enhanced shearing sequence to enhance a seal between the wellhead and the drilling riser during blowout.
  • the BOP system may be configured to actuate a first ram of the BOP from an open position toward the tubular string and into the bore of the BOP.
  • the first ram may contact the tubular string and align the tubular string with a shearing portion of a second ram of the BOP before the second ram is actuated.
  • the second ram may then be actuated such that shearing portions of both the first and second rams fully contact the tubular string and perform a cut (e.g., a complete cut) of the tubular string.
  • Completely cutting or shearing the tubular string may enable the first and second rams to completely cover the bore of the BOP, and thus, form an enhanced seal between the wellhead and the drilling riser.
  • FIG. 1 is a schematic of an embodiment of a mineral extraction system 10.
  • the mineral extraction system 10 includes a vessel or platform 12 at a surface 14.
  • a BOP stack assembly 16 is mounted to a wellhead 18 at a floor 20 (e.g., a sea floor for offshore operations).
  • a tubular drilling riser 22 extends from the platform 12 to the BOP stack assembly 16.
  • the riser 22 may return drilling fluid or mud to the platform 12 during drilling operations.
  • Downhole operations are carried out by a tubular string 24 (e.g., drill string, production tubing string, or the like) that extends from the platform 12, through the riser 22, through a bore 25 of the BOP stack assembly 16, and into a well bore 26.
  • a tubular string 24 e.g., drill string, production tubing string, or the like
  • the BOP stack assembly 16 and its components may be described with reference to an axial axis or direction 30, a longitudinal axis or direction 32, and a lateral axis or direction 34.
  • the BOP stack assembly 16 includes a BOP stack 38 having multiple BOPs 40 (e.g., ram BOPs) axially stacked (e.g., along the axial axis 30) relative to one another.
  • each BOP 40 includes a pair of longitudinally opposed rams and corresponding actuators 42 that actuate and drive the rams toward and away from one another along the longitudinal axis 32.
  • the BOP stack 38 may include any suitable number of BOPs (e.g., 1, 2, 3, 4, 5, 6, 7, 8, 9, 10 or more). Additionally, the BOP stack 38 may include any of a variety of different types of rams. For example, in certain embodiments, the BOP stack 38 may include one or more BOPs 40 having opposed shear rams or blades configured to sever the tubular string 24 and seal off the wellbore 26 from the riser 22 and/or one or more BOPs 40 having opposed pipe rams configured to engage the tubular string 24 and to seal the bore 25 (e.g., an annulus around the tubular string 24).
  • the BOP stack 38 may include one or more BOPs 40 having opposed shear rams or blades configured to sever the tubular string 24 and seal off the wellbore 26 from the riser 22 and/or one or more BOPs 40 having opposed pipe rams configured to engage the tubular string 24 and to seal the bore 25 (e.g., an annulus around the tubular string 24).
  • FIG. 2 is a perspective view of an embodiment of the BOP stack assembly 16.
  • the BOP stack 38 includes multiple BOPs 40 axially stacked (e.g., along the axial axis 30) relative to one another.
  • the BOP stack 38 also includes one or more hydraulic accumulators 45.
  • the hydraulic accumulators 45 may store and/or supply (e.g., via one or more pumps) hydraulic pressure to the actuators 42 that are configured to drive the rams of the BOPs 40.
  • the hydraulic accumulators 45 and/or the actuators 42 may be communicatively coupled to a controller 46.
  • the controller 46 may be configured to send signals to the hydraulic accumulators 45, the actuators 42, and/or one or more pumps to drive the rams of the BOPs 40 when blowout conditions exist.
  • the controller 46 may receive feedback from one or more sensors 47 (e.g., pressure sensors and/or flow sensors) that may monitor conditions of the wellbore 26 (e.g., a pressure of the fluid in the wellbore 26).
  • the controller 46 may include memory 48 that stores threshold values indicative of blowout conditions. Accordingly, a processor 49 of the controller 46 may send a signal instructing the hydraulic accumulators 45, the actuators 42, and/or the one or more pumps to drive and/or actuate the rams when measured feedback received from the controller 46 meets or exceeds such threshold values.
  • FIG. 3 is a cross-sectional top view of a portion of one BOP 40 with a first ram 50 and a second ram 52 in an open position 54.
  • the first ram 50 and the second ram 52 are withdrawn or retracted from the bore 25, do not contact the tubular string 24, and/or do not contact the corresponding opposing ram 50, 52.
  • the BOP 40 includes a body 56 (e.g., housing) surrounding the bore 25.
  • the body 56 is generally rectangular in the illustrated embodiment, although the body 56 may have any cross-sectional shape, including any polygonal shape or an annular shape.
  • a bonnet assembly 60 is mounted to the body 56 (e.g., via threaded fasteners).
  • the bonnet assembly 60 may support the actuators 42, which each include a piston 62 and a connecting rod 63. As shown in the illustrated embodiment, when in the open position 54, the first ram 50 is generally adjacent to a first end 64 of the body 56 and the second ram 52 is generally adjacent to a second end 65 opposite the first end 64 of the body 56.
  • the actuators 42 may drive the first and second rams 50, 52 toward and away from one another along the longitudinal axis 32 and through the bore 25 to shear the tubular string 24 and/or to seal the bore 25 (e.g., the annulus about the tubular string 24).
  • the first ram 50 may include a first shearing portion 66
  • the second ram 52 may include a second shearing portion 68.
  • the first shearing portion 66 may include a first width 70 that is greater than a diameter 72 of the tubular string 24, such that the first shearing portion 66 may cut through the entire tubular string 24.
  • the second shearing portion 68 may include a second width 74 that is greater than the diameter 72 of the tubular string 24. Accordingly, when the first and second shearing portions 66, 68 are aligned with the tubular string 24 and are directed toward one another, the tubular string 24 may be completely cut to seal the bore 25.
  • the first and second shearing portions 66, 68 may not extend across an entire diameter 76 of the bore 25.
  • the bore 25 may include an annular opening 78 that surrounds the tubular string 24.
  • the first and second rams 50, 52 may include non-shearing portions 80, 82, respectively, that are configured to cover portions of the bore 25 that may be left uncovered by the shearing portions 66, 68. Accordingly, during blowout conditions, the first and second rams 50, 52 may be moved along the longitudinal axis 32 toward one another to seal the bore 25. To completely seal the bore 25, the first and second rams 50, 52 may cut through the tubular string 24.
  • the shearing portions 66, 68 may include different geometries.
  • the first shearing portion 66 may include a substantially linear (e.g., a generally straight line) geometry.
  • the second shearing portion 68 may include an indented (e.g., two lines forming an obtuse angle with respect to a joint 83) geometry.
  • the first and second shearing portions 66, 68 may include any suitable geometry for cutting the tubular string 24 and sealing the bore 25.
  • the first shearing portion 66 and the second shearing portion 68 may be offset with respect to the axial axis 30 (see FIG. 5 ).
  • first shearing portion 66 may be at a first position along the axial axis 30 such that the second shearing portion 68 may be configured to be positioned above or below (e.g., with respect to the axial axis 30) the first shearing portion 66 (e.g., the first and second shearing portions 66, 68 may not directly contact one another) when both the first and second shearing portions 66, 68 are in a second position (see FIG. 6 ).
  • Such a configuration may enable both the first and second shearing portions 66, 68 to completely pass through the tubular string 24 when blowout conditions exist.
  • the tubular string 24 may not be positioned in a center of the bore 25 with respect to the rams 50, 52.
  • the tubular string 24 may not be aligned with the first shearing portion 66 of the first ram 50 and/or the second shearing portion 68 of the second ram 52. Accordingly, driving the first and second rams 50, 52 toward one another along the longitudinal axis 32 simultaneously may not enable both the first shearing portion 66 and the second shearing portion 68 to contact a complete circumference 84 (e.g., outer surface) of the tubular string 24.
  • a complete circumference 84 e.g., outer surface
  • the first ram 50 may apply a first force to the tubular string 24 in a first direction 86
  • the second ram 52 may apply a second force to the tubular string 24 in a second direction 88 opposite the first direction 86.
  • the first force and the second force applied in opposing directions 86, 88 may be substantially equal, such that the tubular string 24 may remain substantially stationary when the first and second rams 50, 52 are simultaneously driven toward the tubular string 24 and contact the tubular string 24 at approximately the same time.
  • the tubular string 24 may be cut as the first and second shearing portions 66, 68 contact the circumference 84 of the tubular string 24. However, because the first shearing portion 66 and/or the second shearing portion 68 may not be aligned with the entire circumference 84 of the tubular string 24, a portion 90 of the tubular string 24 may not be cut by the rams 50, 52. The portion 90 of the tubular string 24 left uncut may block the rams 50, 52 (e.g., the non-shearing portions 80, 82) from completely contacting one another, such that the bore 25 includes a gap or opening that may enable fluid to flow from the wellbore 26 (e.g., wellhead) and into the drilling riser 22 when blowout conditions occur.
  • the rams 50, 52 e.g., the non-shearing portions 80, 82
  • the bore 25 may not be completely sealed by the BOP 40 as a result of the uncut portion 90 of the tubular string 24. Therefore, it is now recognized that an enhanced sequence of actuating the rams 50, 52 is desired to enhance the seal of the bore 25.
  • FIG. 4 is a cross-sectional top view of a portion of the BOP 40 of the BOP stack 38, illustrating the first ram 50 in a second position 100 and the second ram 52 in the open position 54. Accordingly, FIG. 4 illustrates the BOP 40 operating with an enhanced sequence that includes driving the first ram 50 into the second position 100 before driving the second ram 52 toward the tubular string 24 (and the first ram 50). It should be noted that in other embodiments, the second ram 52 may be actuated before the first ram 50 to align the tubular string 24, and then the first ram 50 may be actuated to cut the tubular string 24.
  • the first ram 50 aligns the tubular string 24, the first shearing portion 66, and the second shearing portion 68 of the second ram 52 along an axis 101.
  • the first ram 50 may align the tubular string 24 by contacting the tubular string 24 and directing the tubular string 24 in the first direction 86. As the tubular string 24 moves in the direction 86, it may be guided along an inner diameter 102 of the bore 25 (e.g., in a direction 104 about the axial axis 30).
  • the tubular string 24 may contact a portion 106 of the inner diameter 102 closest to the second shearing portion 68 of the second ram 52, and thus be substantially aligned with the second shearing portion 68 along the axis 101.
  • the position of the tubular string 24 within the bore 25 may be adjusted by the first ram 50 and/or the second ram 52 (e.g., the tubular string 24 is not substantially fixed with respect to the bore 25). Therefore, actuating the first ram 50 before the second ram 52 (or vice versa) enables the tubular string 24 to be guided along the inner diameter 102 of the bore 25 to a position that substantially aligns the entire diameter 72 of the tubular string 24 with the first shearing portion 66 and the second shearing portion 68 along the axis 101.
  • FIG. 5 is a schematic of the of a portion of the BOP 40, illustrating the first ram 50 in the second position 100 and the second ram 52 in the open position 54.
  • the illustrated embodiment of FIG. 5 shows a hydraulic circuit 122 that may direct hydraulic fluid 124 from one or more of the hydraulic accumulators 45 to the actuators 42 via a first pump 125.
  • the actuators 42 may be pneumatic such that the BOP 40 includes a pneumatic circuit (e.g., that includes a compressor) instead of the hydraulic circuit 122.
  • the hydraulic circuit 122 may include the sequencing valve 120 to perform the enhanced shearing sequence.
  • the sequencing valve 120 may be configured to direct the hydraulic fluid 124 toward a first hydraulic chamber 126 of a first actuator 127 that drives the first ram 50 along the longitudinal axis 32 (e.g., the hydraulic fluid 124 directs the first actuator 127 along the longitudinal axis 32 by increasing the pressure in the first hydraulic chamber 126 to drive the first actuator in the direction 86).
  • the sequencing valve 120 may be configured to block the hydraulic fluid 124 from flowing toward a first hydraulic chamber 128 of a second actuator 129 configured to drive the second ram 52 along the longitudinal axis 32. Therefore, the sequencing valve 120 enables the first ram 50 to be actuated along the longitudinal axis 32, while generally maintaining the second ram 52 in the open position 54.
  • a second hydraulic fluid 130 may flow from a second hydraulic chamber 131 of the first actuator 127 toward one or more of the hydraulic accumulators 45.
  • pressure may increase in the second hydraulic chamber 131 as the first actuator 127 moves in the direction 86 (e.g., as a result of a reduction of a volume of the second hydraulic chamber 131 caused by the piston 62). Accordingly, the pressure within the second hydraulic chamber 131 may urge the second hydraulic fluid 130 through an outlet 132 of the second hydraulic chamber 131 and toward one or more of the hydraulic accumulators 45.
  • the sequencing valve 120 may include a mechanism (e.g., a spring or other biasing member) that blocks an outlet 134 of the sequencing valve 120 coupled to the second actuator 129 until a threshold pressure of the hydraulic fluid 124 is reached. Accordingly, the sequencing valve 120 may direct hydraulic fluid 124 toward the first actuator 127 and block the hydraulic fluid 124 from flowing toward the second actuator 129 until the first ram 50 is in the second position 100.
  • the threshold pressure of the sequencing valve 120 may be set (e.g., manually or electronically via the controller 46) at a pressure corresponding to the hydraulic fluid 124 when the first ram 50 is in second position 100. When the threshold pressure is met and/or exceeded, the outlet 134 of the sequencing valve 120 may be configured to open such that the hydraulic fluid 124 is directed toward the second actuator 129.
  • FIG. 6 is a cross-sectional top view of the BOP 40, illustrating the first ram 50 in the second position 100 and the second ram 52 in a second position 140.
  • the second ram 52 contacts the tubular string 24 as it moves toward the second position 140 and applies a force in the direction 88 such that the tubular string 24 is cut.
  • the first ram 50 remains substantially stationary in the second position 100 and may apply an opposing force (e.g., reactive force) to the tubular string 24 in the direction 86 to keep the tubular string 24 substantially stationary with respect to the bore 25 as the second ram 52 moves toward the second position 140. Accordingly, as the second ram 52 moves toward the second position 140, the second shearing portion 68 and/or the first shearing portion 66 of the first ram 50 may cut through the tubular string 24, thereby sealing the bore 25.
  • an opposing force e.g., reactive force
  • FIG. 7 is a schematic of the portion of the BOP 40, illustrating the first ram 50 in the second position 100 and the second ram 52 in the second position 140.
  • the hydraulic fluid 124 flows toward the second actuator 129, thereby driving the second ram 52 in the second direction 88 toward the tubular string 24 and the first ram 50.
  • the second shearing portion 68 may contact the tubular string 24 and cut the tubular string 24, thereby sealing the bore 25.
  • the first shearing portion 66 and the second shearing portion 68 may be offset from one another with respect to the axial axis 30.
  • the first shearing portion 66 may form a ledge 160 at a first distance 162 from a bottom surface 164 of the BOP 40.
  • the second shearing portion 68 may include a surface 166 that is a second distance 168 from the bottom surface 164 of the BOP 40.
  • the second distance 168 is slightly larger than the first distance 162 such that a gap 170 is formed between the surface 166 of the second shearing portion 68 and the ledge 160 of the first shearing portion 66. Accordingly, the first ram 50 and the second ram 52 may each extend through the tubular string 24 to completely cut the tubular string 24, and thus seal the bore 25.
  • the second hydraulic fluid 130 may flow from a second hydraulic chamber 142 of the second actuator 129 toward one or more of the hydraulic accumulators 45.
  • a pressure may increase in the second hydraulic chamber 142 as the second actuator 129 moves in the direction 88 (e.g., as a result of a reduction in volume of the second hydraulic chamber 142 caused by the piston 62). Accordingly, the pressure within the second hydraulic chamber 142 may urge the second hydraulic fluid 130 through an outlet 144 of the second hydraulic chamber 142 and toward one or more of the hydraulic accumulators 45.
  • the hydraulic fluid 124 flows toward the first hydraulic chamber 128 of the second actuator 129 through a piloted check valve 172.
  • the piloted check valve 172 may include a default position 174 configured to enable the hydraulic fluid 124 to flow in a first direction 176 toward the second actuator 129.
  • the piloted check valve 172 may additionally block flow of the hydraulic fluid 124 in a second direction 178 (e.g., from the second actuator 129 toward the piloted check valve 172 and/or the sequencing valve 120).
  • the piloted check valve 172 may be fluidly coupled to the second hydraulic chamber 142 of the second actuator 129.
  • the piloted check valve 172 may be configured to trigger, thereby enabling flow of the hydraulic fluid 124 in the second direction 178 and blocking flow of the hydraulic fluid in the first direction 176.
  • the second ram 52 may be driven toward the open position 54 by the second actuator 129 (e.g., via the second hydraulic fluid 130 being pumped into the second hydraulic chamber 142 via a second pump 180).
  • FIG. 8 is a schematic of a portion of the BOP 40, illustrating the hydraulic circuit 122 directing the hydraulic fluid 124 such that the rams 50, 52 are driven to the open position 54.
  • the piloted check valve 172 is triggered, thereby enabling flow of the hydraulic fluid 124 in the second direction 178 (e.g., from the second actuator 129 toward the sequencing valve 120).
  • the hydraulic fluid 124 may drain from both the first hydraulic chamber 126 of the first actuator 127 and the first hydraulic chamber 128 of the second actuator 129 toward a hydraulic fluid reservoir (e.g., one or more of the hydraulic accumulators 45).
  • the second pump 180 may direct the second hydraulic fluid 130 from one or more of the hydraulic accumulators 45 toward the second hydraulic chamber 131 of the first actuator 127 and toward the second hydraulic chamber 142 of the second actuator 129. Therefore, pressures within the second hydraulic chambers 131, 142 may increase, thereby driving the first and second actuators 127, 129 toward the open position 54 (e.g., the first actuator 127 is driven in the direction 88 and the second actuator is driven in the direction 86).
  • the first pump 125 and/or the second pump 180 may be coupled to the controller 46, which may be configured to adjust a speed of the first and second pumps 125, 180 to control movement of the actuators 127, 129.
  • the controller 46 may be communicatively coupled to motors of the first and second pumps 125, 180 such that the controller 46 may adjust the speed of the motors, and thus, the amount of the hydraulic fluid 124, 139 directed toward the actuators 127, 129.
  • Moving the rams 50, 52 to the second positions 100, 140, respectively, may be performed in the sequence described above (e.g., driving the first ram 50 to the second position 100 before driving the second ram 52 into the second position 140).
  • directing the rams 50, 52 to the open position 54 e.g., from the second positions 100, 140
  • the bore 25 may be opened in a single step, whereas sealing the bore 25 may occur utilizing the multi-step, enhanced shearing sequence.
  • valves and conduits may be utilized to direct the first ram 50 to the second position 100, while leaving the second ram 52 substantially stationary as a first step, and then directing the second ram 52 to the second position 140 after the first ram 50 reaches the second position 100 as a second step.
  • FIG. 9 is a block diagram 200 of a process for performing the enhanced shearing sequence to enhance a seal of the bore 25 when blowout conditions exist.
  • the controller 46 may be configured to actuate the first ram 50 toward the tubular string 24 disposed in the bore 25 of the riser 22.
  • the first ram 50 may be positioned adjacent to the first end 64 of the body 56 of the BOP 40 (e.g., on a first side of the bore 25).
  • the first ram may be actuated toward the tubular string 24 by directing the hydraulic fluid 124 through the sequencing valve 120 toward the first hydraulic chamber 126 of the first actuator 127.
  • the hydraulic fluid 124 may be blocked from flowing toward the second actuator 129 by the sequencing valve 120 when the pressure of the hydraulic fluid 120 is below the threshold pressure, thereby maintaining the second ram 52 in the open position 54.
  • the first ram 50 may guide the tubular string 24 along the inner diameter 102 of the bore 25 such that the tubular string 24 is generally aligned with the first shearing portion 66 and the second shearing portion 68 of the first and second rams 50, 52 along the axis 101.
  • the second ram 50 may be positioned adjacent to the second end 65 of the body 56 of the BOP 40 (e.g., on a second side of the bore 25 opposite the first side).
  • the controller 46 may be configured to actuate the second ram 52 toward the tubular string 24 and toward the first ram 52.
  • the sequencing valve 120 may trigger when the pressure of the hydraulic fluid 124 meets or exceeds the threshold pressure, thereby opening the outlet 134 coupled to the second actuator 129. Therefore, the second ram 52 may be directed toward the tubular string 24 and the first ram 50 as the hydraulic fluid 124 flows toward the first hydraulic chamber 128 of the second actuator 129. Additionally, the first ram 52 may remain substantially stationary such that opposing forces are applied to the tubular string 24 by the first ram 50 and the second ram 52. Accordingly, the first ram 50 and the second ram 52 may cut through the entire tubular string 24 such that the bore 25 may be sealed when blowout conditions are experienced at the wellhead.

Description

    BACKGROUND
  • This section is intended to introduce the reader to various aspects of art that may be related to various aspects of the present disclosure, which are described and/or claimed below. This discussion is believed to be helpful in providing the reader with background information to facilitate a better understanding of the various aspects of the present disclosure. Accordingly, it should be understood that these statements are to be read in this light, and not as admissions of prior art.
  • US 2010/155086 discloses a blowout preventer system. US 6006647 describes an actuator with a free-floating piston for a blowout preventer and ensures that the actuator locking mechanism remains in a locked position if no hydraulic pressure is applied to the hydraulic fluid of the actuator. US9022104 describes a blowout preventer with a blade assembly including a ram block movable between a non-engagement position and an engagement position about the tubular, a blade carried by the ram block for cuttingly engaging the tubular, and a retractable guide carried by the ram block for urging the tubular into a desired location in the blowout preventer as the ram block moves to the engagement position.
  • The present invention resides in d a blowout preventer system as defined in claim 1, a method as defined in claim 9 and a system as defined in claimed 12.
  • A blowout preventer (BOP) stack may be installed on a wellhead to seal and control an oil and gas well during drilling operations. A tubular string may be suspended inside a drilling riser and extend through the BOP stack into the wellhead. During drilling operations, a drilling fluid may be delivered through the tubular string and returned through a bore between the tubular string and a casing of the drilling riser. In the event of a rapid invasion of formation fluid in the bore, commonly known as a "kick," the BOP stack may be actuated to seal the drilling riser from the wellhead and to control a fluid pressure in the bore, thereby protecting well equipment disposed above the BOP stack.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • Various features, aspects, and advantages of the present disclosure will become better understood when the following detailed description is read with reference to the accompanying figures in which like characters represent like parts throughout the figures, wherein:
    • FIG. 1 is a schematic diagram of a mineral extraction system, in accordance with an embodiment of the present disclosure;
    • FIG. 2 is a perspective view of an embodiment of a BOP stack assembly that may be used in the mineral extraction system of FIG. 1, in accordance with an embodiment of the present disclosure;
    • FIG. 3 is a cross-sectional top view of a portion of a BOP of the BOP stack assembly of FIG. 2, illustrating first and second rams in an open position, in accordance with an embodiment of the present disclosure;
    • FIG. 4 is a cross-sectional top view of the portion of the BOP of the BOP stack assembly of FIG. 3, illustrating the first ram in a second position and the second ram in the open position, in accordance with an embodiment of the present disclosure;
    • FIG. 5 is a schematic of a portion of the BOP of FIG. 4, illustrating a hydraulic circuit that may be utilized to direct the first ram into the second position, in accordance with an embodiment of the present disclosure;
    • FIG. 6 is a cross-sectional top view of the portion of the BOP of FIGS. 3-5, illustrating both first and second rams in a second position, in accordance with an embodiment of the present disclosure;
    • FIG. 7 is a schematic of the portion of the BOP of FIG. 5, illustrating the hydraulic circuit of FIG. 5 that may be utilized to direct the second ram into the second position, in accordance with an embodiment of the present disclosure;
    • FIG. 8 is a schematic of the portion of the BOP of FIGS. 5 and 7, illustrating the hydraulic circuit of FIGS. 5 and 7 that may be utilized to direct the first and second rams back into the open position, in accordance with an embodiment of the present disclosure; and
    • FIG. 9 is a block diagram of a process that for the BOP of FIGS. 1-8 that may be utilized to carry out an enhanced shearing sequence, in accordance with an embodiment of the present disclosure.
    DETAILED DESCRIPTION OF SPECIFIC EMBODIMENTS
  • One or more specific embodiments of the present disclosure will be described below. These described embodiments are only exemplary of the present disclosure. Additionally, in an effort to provide a concise description of these exemplary embodiments, all features of an actual implementation may not be described in the specification. It should be appreciated that in the development of any such actual implementation, as in any engineering or design project, numerous implementation-specific decisions must be made to achieve the developers' specific goals, such as compliance with system-related and business-related constraints, which may vary from one implementation to another. Moreover, it should be appreciated that such a development effort might be complex and time consuming, but would nevertheless be a routine undertaking of design, fabrication, and manufacture for those of ordinary skill having the benefit of this disclosure.
  • Embodiments of the present disclosure relate to a blowout preventer ("BOP") system that may completely shear (e.g., cut) a tubular string to enhance a seal of a wellbore when blowout conditions are detected.. A BOP may be included at a wellhead to block a fluid from inadvertently flowing from the wellhead to a drilling platform (e.g., through a drilling riser). For example, pressures may fluctuate within a natural reservoir, which may lead to a surge in fluid flow from the wellhead toward the drilling platform when the pressure reaches a threshold value. To block fluid from flowing toward the drilling platform during blowout conditions, the BOP may be actuated to cut the tubular string and seal the drilling riser from the wellhead (e.g., by covering a bore in the BOP coupling the wellhead to the drilling riser). In accordance with embodiments of the present disclosure, at least one BOP of a BOP stack may include shearing rams that may be configured to cut the tubular string and enhance a seal of the bore extending through the BOP.
  • In accordance with present embodiments, a BOP system may be operated utilizing an enhanced shearing sequence to enhance a seal between the wellhead and the drilling riser during blowout. For example, the BOP system may be configured to actuate a first ram of the BOP from an open position toward the tubular string and into the bore of the BOP. The first ram may contact the tubular string and align the tubular string with a shearing portion of a second ram of the BOP before the second ram is actuated. The second ram may then be actuated such that shearing portions of both the first and second rams fully contact the tubular string and perform a cut (e.g., a complete cut) of the tubular string. Completely cutting or shearing the tubular string may enable the first and second rams to completely cover the bore of the BOP, and thus, form an enhanced seal between the wellhead and the drilling riser.
  • With the foregoing in mind, FIG. 1 is a schematic of an embodiment of a mineral extraction system 10. The mineral extraction system 10 includes a vessel or platform 12 at a surface 14. A BOP stack assembly 16 is mounted to a wellhead 18 at a floor 20 (e.g., a sea floor for offshore operations). A tubular drilling riser 22 extends from the platform 12 to the BOP stack assembly 16. The riser 22 may return drilling fluid or mud to the platform 12 during drilling operations. Downhole operations are carried out by a tubular string 24 (e.g., drill string, production tubing string, or the like) that extends from the platform 12, through the riser 22, through a bore 25 of the BOP stack assembly 16, and into a well bore 26.
  • To facilitate discussion, the BOP stack assembly 16 and its components may be described with reference to an axial axis or direction 30, a longitudinal axis or direction 32, and a lateral axis or direction 34. As shown, the BOP stack assembly 16 includes a BOP stack 38 having multiple BOPs 40 (e.g., ram BOPs) axially stacked (e.g., along the axial axis 30) relative to one another. As discussed in more detail below, each BOP 40 includes a pair of longitudinally opposed rams and corresponding actuators 42 that actuate and drive the rams toward and away from one another along the longitudinal axis 32. Although four BOPs 40 are shown, the BOP stack 38 may include any suitable number of BOPs (e.g., 1, 2, 3, 4, 5, 6, 7, 8, 9, 10 or more). Additionally, the BOP stack 38 may include any of a variety of different types of rams. For example, in certain embodiments, the BOP stack 38 may include one or more BOPs 40 having opposed shear rams or blades configured to sever the tubular string 24 and seal off the wellbore 26 from the riser 22 and/or one or more BOPs 40 having opposed pipe rams configured to engage the tubular string 24 and to seal the bore 25 (e.g., an annulus around the tubular string 24).
  • FIG. 2 is a perspective view of an embodiment of the BOP stack assembly 16. As discussed above, the BOP stack 38 includes multiple BOPs 40 axially stacked (e.g., along the axial axis 30) relative to one another. As shown, the BOP stack 38 also includes one or more hydraulic accumulators 45. The hydraulic accumulators 45 may store and/or supply (e.g., via one or more pumps) hydraulic pressure to the actuators 42 that are configured to drive the rams of the BOPs 40. In certain embodiments, the hydraulic accumulators 45 and/or the actuators 42 may be communicatively coupled to a controller 46. The controller 46 may be configured to send signals to the hydraulic accumulators 45, the actuators 42, and/or one or more pumps to drive the rams of the BOPs 40 when blowout conditions exist. For example, the controller 46 may receive feedback from one or more sensors 47 (e.g., pressure sensors and/or flow sensors) that may monitor conditions of the wellbore 26 (e.g., a pressure of the fluid in the wellbore 26). The controller 46 may include memory 48 that stores threshold values indicative of blowout conditions. Accordingly, a processor 49 of the controller 46 may send a signal instructing the hydraulic accumulators 45, the actuators 42, and/or the one or more pumps to drive and/or actuate the rams when measured feedback received from the controller 46 meets or exceeds such threshold values.
  • FIG. 3 is a cross-sectional top view of a portion of one BOP 40 with a first ram 50 and a second ram 52 in an open position 54. In the open position 54, the first ram 50 and the second ram 52 are withdrawn or retracted from the bore 25, do not contact the tubular string 24, and/or do not contact the corresponding opposing ram 50, 52. As shown, the BOP 40 includes a body 56 (e.g., housing) surrounding the bore 25. The body 56 is generally rectangular in the illustrated embodiment, although the body 56 may have any cross-sectional shape, including any polygonal shape or an annular shape. A bonnet assembly 60 is mounted to the body 56 (e.g., via threaded fasteners). The bonnet assembly 60 may support the actuators 42, which each include a piston 62 and a connecting rod 63. As shown in the illustrated embodiment, when in the open position 54, the first ram 50 is generally adjacent to a first end 64 of the body 56 and the second ram 52 is generally adjacent to a second end 65 opposite the first end 64 of the body 56. The actuators 42 may drive the first and second rams 50, 52 toward and away from one another along the longitudinal axis 32 and through the bore 25 to shear the tubular string 24 and/or to seal the bore 25 (e.g., the annulus about the tubular string 24).
  • The first ram 50 may include a first shearing portion 66, and the second ram 52 may include a second shearing portion 68. The first shearing portion 66 may include a first width 70 that is greater than a diameter 72 of the tubular string 24, such that the first shearing portion 66 may cut through the entire tubular string 24. Similarly, the second shearing portion 68 may include a second width 74 that is greater than the diameter 72 of the tubular string 24. Accordingly, when the first and second shearing portions 66, 68 are aligned with the tubular string 24 and are directed toward one another, the tubular string 24 may be completely cut to seal the bore 25. However, in certain embodiments, the first and second shearing portions 66, 68 may not extend across an entire diameter 76 of the bore 25. For example, the bore 25 may include an annular opening 78 that surrounds the tubular string 24. Although the first and second shearing portions 66, 68 may not extend across the entire diameter 76 of the bore 25, the first and second rams 50, 52 may include non-shearing portions 80, 82, respectively, that are configured to cover portions of the bore 25 that may be left uncovered by the shearing portions 66, 68. Accordingly, during blowout conditions, the first and second rams 50, 52 may be moved along the longitudinal axis 32 toward one another to seal the bore 25. To completely seal the bore 25, the first and second rams 50, 52 may cut through the tubular string 24.
  • In some embodiments, the shearing portions 66, 68 may include different geometries. For example, as shown in the illustrated embodiment of FIG. 3, the first shearing portion 66 may include a substantially linear (e.g., a generally straight line) geometry. The second shearing portion 68 may include an indented (e.g., two lines forming an obtuse angle with respect to a joint 83) geometry. It should be noted that in other embodiments, the first and second shearing portions 66, 68 may include any suitable geometry for cutting the tubular string 24 and sealing the bore 25. In some embodiments, the first shearing portion 66 and the second shearing portion 68 may be offset with respect to the axial axis 30 (see FIG. 5). For example, the first shearing portion 66 may be at a first position along the axial axis 30 such that the second shearing portion 68 may be configured to be positioned above or below (e.g., with respect to the axial axis 30) the first shearing portion 66 (e.g., the first and second shearing portions 66, 68 may not directly contact one another) when both the first and second shearing portions 66, 68 are in a second position (see FIG. 6). Such a configuration may enable both the first and second shearing portions 66, 68 to completely pass through the tubular string 24 when blowout conditions exist.
  • As shown in the illustrated embodiment of FIG. 3, the tubular string 24 may not be positioned in a center of the bore 25 with respect to the rams 50, 52. In other words, the tubular string 24 may not be aligned with the first shearing portion 66 of the first ram 50 and/or the second shearing portion 68 of the second ram 52. Accordingly, driving the first and second rams 50, 52 toward one another along the longitudinal axis 32 simultaneously may not enable both the first shearing portion 66 and the second shearing portion 68 to contact a complete circumference 84 (e.g., outer surface) of the tubular string 24. As the first and second rams 50, 52 are driven toward the tubular string 24, the first ram 50 may apply a first force to the tubular string 24 in a first direction 86, and the second ram 52 may apply a second force to the tubular string 24 in a second direction 88 opposite the first direction 86. In some embodiments, the first force and the second force applied in opposing directions 86, 88 may be substantially equal, such that the tubular string 24 may remain substantially stationary when the first and second rams 50, 52 are simultaneously driven toward the tubular string 24 and contact the tubular string 24 at approximately the same time.
  • The tubular string 24 may be cut as the first and second shearing portions 66, 68 contact the circumference 84 of the tubular string 24. However, because the first shearing portion 66 and/or the second shearing portion 68 may not be aligned with the entire circumference 84 of the tubular string 24, a portion 90 of the tubular string 24 may not be cut by the rams 50, 52. The portion 90 of the tubular string 24 left uncut may block the rams 50, 52 (e.g., the non-shearing portions 80, 82) from completely contacting one another, such that the bore 25 includes a gap or opening that may enable fluid to flow from the wellbore 26 (e.g., wellhead) and into the drilling riser 22 when blowout conditions occur. Accordingly, the bore 25 may not be completely sealed by the BOP 40 as a result of the uncut portion 90 of the tubular string 24. Therefore, it is now recognized that an enhanced sequence of actuating the rams 50, 52 is desired to enhance the seal of the bore 25.
  • For example, FIG. 4 is a cross-sectional top view of a portion of the BOP 40 of the BOP stack 38, illustrating the first ram 50 in a second position 100 and the second ram 52 in the open position 54. Accordingly, FIG. 4 illustrates the BOP 40 operating with an enhanced sequence that includes driving the first ram 50 into the second position 100 before driving the second ram 52 toward the tubular string 24 (and the first ram 50). It should be noted that in other embodiments, the second ram 52 may be actuated before the first ram 50 to align the tubular string 24, and then the first ram 50 may be actuated to cut the tubular string 24.
  • As shown in the illustrated embodiment of FIG. 4, as the first ram 50 is driven into the second position 100, the first ram 50 aligns the tubular string 24, the first shearing portion 66, and the second shearing portion 68 of the second ram 52 along an axis 101. In some embodiments, the first ram 50 may align the tubular string 24 by contacting the tubular string 24 and directing the tubular string 24 in the first direction 86. As the tubular string 24 moves in the direction 86, it may be guided along an inner diameter 102 of the bore 25 (e.g., in a direction 104 about the axial axis 30). Accordingly, when the first ram 50 is in the second position 100, the tubular string 24 may contact a portion 106 of the inner diameter 102 closest to the second shearing portion 68 of the second ram 52, and thus be substantially aligned with the second shearing portion 68 along the axis 101.
  • Therefore, the position of the tubular string 24 within the bore 25 may be adjusted by the first ram 50 and/or the second ram 52 (e.g., the tubular string 24 is not substantially fixed with respect to the bore 25). Therefore, actuating the first ram 50 before the second ram 52 (or vice versa) enables the tubular string 24 to be guided along the inner diameter 102 of the bore 25 to a position that substantially aligns the entire diameter 72 of the tubular string 24 with the first shearing portion 66 and the second shearing portion 68 along the axis 101.
  • In some embodiments, to actuate the first ram 50 without actuating the second ram 52, a sequencing valve 120 may be utilized. For example, FIG. 5 is a schematic of the of a portion of the BOP 40, illustrating the first ram 50 in the second position 100 and the second ram 52 in the open position 54. The illustrated embodiment of FIG. 5 shows a hydraulic circuit 122 that may direct hydraulic fluid 124 from one or more of the hydraulic accumulators 45 to the actuators 42 via a first pump 125. It should be noted that in other embodiments, the actuators 42 may be pneumatic such that the BOP 40 includes a pneumatic circuit (e.g., that includes a compressor) instead of the hydraulic circuit 122. In some embodiments, the hydraulic circuit 122 may include the sequencing valve 120 to perform the enhanced shearing sequence. For example, the sequencing valve 120 may be configured to direct the hydraulic fluid 124 toward a first hydraulic chamber 126 of a first actuator 127 that drives the first ram 50 along the longitudinal axis 32 (e.g., the hydraulic fluid 124 directs the first actuator 127 along the longitudinal axis 32 by increasing the pressure in the first hydraulic chamber 126 to drive the first actuator in the direction 86). Additionally, the sequencing valve 120 may be configured to block the hydraulic fluid 124 from flowing toward a first hydraulic chamber 128 of a second actuator 129 configured to drive the second ram 52 along the longitudinal axis 32. Therefore, the sequencing valve 120 enables the first ram 50 to be actuated along the longitudinal axis 32, while generally maintaining the second ram 52 in the open position 54.
  • As the hydraulic fluid 124 enters the first hydraulic chamber 126 and directs the first actuator 127 in the direction 86, a second hydraulic fluid 130 may flow from a second hydraulic chamber 131 of the first actuator 127 toward one or more of the hydraulic accumulators 45. In some embodiments, pressure may increase in the second hydraulic chamber 131 as the first actuator 127 moves in the direction 86 (e.g., as a result of a reduction of a volume of the second hydraulic chamber 131 caused by the piston 62). Accordingly, the pressure within the second hydraulic chamber 131 may urge the second hydraulic fluid 130 through an outlet 132 of the second hydraulic chamber 131 and toward one or more of the hydraulic accumulators 45.
  • In some embodiments, the sequencing valve 120 may include a mechanism (e.g., a spring or other biasing member) that blocks an outlet 134 of the sequencing valve 120 coupled to the second actuator 129 until a threshold pressure of the hydraulic fluid 124 is reached. Accordingly, the sequencing valve 120 may direct hydraulic fluid 124 toward the first actuator 127 and block the hydraulic fluid 124 from flowing toward the second actuator 129 until the first ram 50 is in the second position 100. The threshold pressure of the sequencing valve 120 may be set (e.g., manually or electronically via the controller 46) at a pressure corresponding to the hydraulic fluid 124 when the first ram 50 is in second position 100. When the threshold pressure is met and/or exceeded, the outlet 134 of the sequencing valve 120 may be configured to open such that the hydraulic fluid 124 is directed toward the second actuator 129.
  • When the sequencing valve 120 is triggered (e.g., the threshold pressure is met and/or exceeded to open the outlet 134), the second ram 52 may be directed toward the first ram 50 (and the tubular string 24) by the second actuator 129. For example, FIG. 6 is a cross-sectional top view of the BOP 40, illustrating the first ram 50 in the second position 100 and the second ram 52 in a second position 140. As shown in the illustrated embodiments, the second ram 52 contacts the tubular string 24 as it moves toward the second position 140 and applies a force in the direction 88 such that the tubular string 24 is cut. The first ram 50 remains substantially stationary in the second position 100 and may apply an opposing force (e.g., reactive force) to the tubular string 24 in the direction 86 to keep the tubular string 24 substantially stationary with respect to the bore 25 as the second ram 52 moves toward the second position 140. Accordingly, as the second ram 52 moves toward the second position 140, the second shearing portion 68 and/or the first shearing portion 66 of the first ram 50 may cut through the tubular string 24, thereby sealing the bore 25.
  • To actuate the second ram 52, the outlet 134 of the sequencing valve 120 coupled to the second actuator 129 may be opened. For example, FIG. 7 is a schematic of the portion of the BOP 40, illustrating the first ram 50 in the second position 100 and the second ram 52 in the second position 140. As shown in the illustrated embodiment of FIG. 7, the hydraulic fluid 124 flows toward the second actuator 129, thereby driving the second ram 52 in the second direction 88 toward the tubular string 24 and the first ram 50.
  • When the second ram 52 moves in the direction 88, the second shearing portion 68 may contact the tubular string 24 and cut the tubular string 24, thereby sealing the bore 25. As discussed above, the first shearing portion 66 and the second shearing portion 68 may be offset from one another with respect to the axial axis 30. For example, the first shearing portion 66 may form a ledge 160 at a first distance 162 from a bottom surface 164 of the BOP 40. Additionally, the second shearing portion 68 may include a surface 166 that is a second distance 168 from the bottom surface 164 of the BOP 40. In some embodiments, the second distance 168 is slightly larger than the first distance 162 such that a gap 170 is formed between the surface 166 of the second shearing portion 68 and the ledge 160 of the first shearing portion 66. Accordingly, the first ram 50 and the second ram 52 may each extend through the tubular string 24 to completely cut the tubular string 24, and thus seal the bore 25.
  • Similar to movement of the first ram 50, as the hydraulic fluid 124 enters the first hydraulic chamber 128 and directs the second actuator 129 in the direction 88, the second hydraulic fluid 130 may flow from a second hydraulic chamber 142 of the second actuator 129 toward one or more of the hydraulic accumulators 45. In some embodiments, a pressure may increase in the second hydraulic chamber 142 as the second actuator 129 moves in the direction 88 (e.g., as a result of a reduction in volume of the second hydraulic chamber 142 caused by the piston 62). Accordingly, the pressure within the second hydraulic chamber 142 may urge the second hydraulic fluid 130 through an outlet 144 of the second hydraulic chamber 142 and toward one or more of the hydraulic accumulators 45.
  • In some embodiments, the hydraulic fluid 124 flows toward the first hydraulic chamber 128 of the second actuator 129 through a piloted check valve 172. The piloted check valve 172 may include a default position 174 configured to enable the hydraulic fluid 124 to flow in a first direction 176 toward the second actuator 129. The piloted check valve 172 may additionally block flow of the hydraulic fluid 124 in a second direction 178 (e.g., from the second actuator 129 toward the piloted check valve 172 and/or the sequencing valve 120). As shown in the illustrated embodiment of FIG. 7, the piloted check valve 172 may be fluidly coupled to the second hydraulic chamber 142 of the second actuator 129. When the pressure within the second hydraulic chamber 142 of the second actuator 129 increases to a value that meets or exceeds a threshold pressure (e.g., as a result of a reduction in volume of the second hydraulic chamber 142 as the second actuator 129 moves in the direction 88), the piloted check valve 172 may be configured to trigger, thereby enabling flow of the hydraulic fluid 124 in the second direction 178 and blocking flow of the hydraulic fluid in the first direction 176. In some embodiments, when the hydraulic fluid 124 flows in the second direction 178, the second ram 52 may be driven toward the open position 54 by the second actuator 129 (e.g., via the second hydraulic fluid 130 being pumped into the second hydraulic chamber 142 via a second pump 180).
  • When blowout conditions subside (e.g., the pressure of fluid in the well decreases below a threshold pressure), the rams 50, 52 may both be driven to the open position 54 to unseal the bore 25. For example, it may be desirable to open the bore 25 and enable fluid to flow toward the platform 12 when blowout conditions no longer exist. FIG. 8 is a schematic of a portion of the BOP 40, illustrating the hydraulic circuit 122 directing the hydraulic fluid 124 such that the rams 50, 52 are driven to the open position 54. As shown in the illustrated embodiment, the piloted check valve 172 is triggered, thereby enabling flow of the hydraulic fluid 124 in the second direction 178 (e.g., from the second actuator 129 toward the sequencing valve 120). Accordingly, the hydraulic fluid 124 may drain from both the first hydraulic chamber 126 of the first actuator 127 and the first hydraulic chamber 128 of the second actuator 129 toward a hydraulic fluid reservoir (e.g., one or more of the hydraulic accumulators 45).
  • For example, the second pump 180 may direct the second hydraulic fluid 130 from one or more of the hydraulic accumulators 45 toward the second hydraulic chamber 131 of the first actuator 127 and toward the second hydraulic chamber 142 of the second actuator 129. Therefore, pressures within the second hydraulic chambers 131, 142 may increase, thereby driving the first and second actuators 127, 129 toward the open position 54 (e.g., the first actuator 127 is driven in the direction 88 and the second actuator is driven in the direction 86).
  • In some embodiments, the first pump 125 and/or the second pump 180 may be coupled to the controller 46, which may be configured to adjust a speed of the first and second pumps 125, 180 to control movement of the actuators 127, 129. For example, the controller 46 may be communicatively coupled to motors of the first and second pumps 125, 180 such that the controller 46 may adjust the speed of the motors, and thus, the amount of the hydraulic fluid 124, 139 directed toward the actuators 127, 129.
  • Moving the rams 50, 52 to the second positions 100, 140, respectively, may be performed in the sequence described above (e.g., driving the first ram 50 to the second position 100 before driving the second ram 52 into the second position 140). However, directing the rams 50, 52 to the open position 54 (e.g., from the second positions 100, 140) may occur simultaneously or sequentially. Therefore, the bore 25 may be opened in a single step, whereas sealing the bore 25 may occur utilizing the multi-step, enhanced shearing sequence.
  • It should be noted that, in other embodiments, other components (e.g., instead of the sequencing valve 120 and the piloted check valve 172) may be utilized to perform the enhanced shearing sequence. For example, any suitable combination of valves and conduits may be utilized to direct the first ram 50 to the second position 100, while leaving the second ram 52 substantially stationary as a first step, and then directing the second ram 52 to the second position 140 after the first ram 50 reaches the second position 100 as a second step.
  • FIG. 9 is a block diagram 200 of a process for performing the enhanced shearing sequence to enhance a seal of the bore 25 when blowout conditions exist. At block 202, the controller 46 may be configured to actuate the first ram 50 toward the tubular string 24 disposed in the bore 25 of the riser 22. As discussed above, the first ram 50 may be positioned adjacent to the first end 64 of the body 56 of the BOP 40 (e.g., on a first side of the bore 25). In some embodiments, the first ram may be actuated toward the tubular string 24 by directing the hydraulic fluid 124 through the sequencing valve 120 toward the first hydraulic chamber 126 of the first actuator 127. Additionally, the hydraulic fluid 124 may be blocked from flowing toward the second actuator 129 by the sequencing valve 120 when the pressure of the hydraulic fluid 120 is below the threshold pressure, thereby maintaining the second ram 52 in the open position 54.
  • At block 204, the first ram 50 may guide the tubular string 24 along the inner diameter 102 of the bore 25 such that the tubular string 24 is generally aligned with the first shearing portion 66 and the second shearing portion 68 of the first and second rams 50, 52 along the axis 101. As discussed above, the second ram 50 may be positioned adjacent to the second end 65 of the body 56 of the BOP 40 (e.g., on a second side of the bore 25 opposite the first side).
  • At block 206, the controller 46 may be configured to actuate the second ram 52 toward the tubular string 24 and toward the first ram 52. As discussed above, the sequencing valve 120 may trigger when the pressure of the hydraulic fluid 124 meets or exceeds the threshold pressure, thereby opening the outlet 134 coupled to the second actuator 129. Therefore, the second ram 52 may be directed toward the tubular string 24 and the first ram 50 as the hydraulic fluid 124 flows toward the first hydraulic chamber 128 of the second actuator 129. Additionally, the first ram 52 may remain substantially stationary such that opposing forces are applied to the tubular string 24 by the first ram 50 and the second ram 52. Accordingly, the first ram 50 and the second ram 52 may cut through the entire tubular string 24 such that the bore 25 may be sealed when blowout conditions are experienced at the wellhead.
  • While the present disclosure may be susceptible to various modifications and alternative forms, specific embodiments have been shown by way of example in the drawings and have been described in detail herein. However, it should be understood that the present disclosure is not intended to be limited to the particular forms disclosed. Rather, the present disclosure is defined by the following appended claims.

Claims (12)

  1. A blowout preventer system (40), comprising:
    a body (56) surrounding a bore (25) configured to enable fluid flow between a wellhead and a drilling riser;
    a first ram (50) disposed adjacent a first end (64) of the body (56), wherein the first ram (50) is coupled to a first actuator (127);
    a second ram (52) disposed adjacent to a second end (65) opposite the first end (64) of the body (56), wherein the second ram (52) is coupled to a second actuator (129);
    a controller (46) communicatively coupled to the first actuator (127) and the second actuator (129),
    wherein the controller (46) is configured to actuate the first actuator (127) to direct the first ram (50) toward a tubular string (24) disposed in the bore (25), such that the first ram (50) aligns the tubular string (24) with a first shearing portion (68) of the second ram when the first ram (50) is in an actuated position, and wherein the controller (46) is configured to actuate the second actuator (129), after actuating the first actuator (127), to direct the second ram (52) toward the tubular string (24) such that the first ram (50) and the second ram (52) completely cut the tubular string (24) to seal the bore (25); and characterized by
    a sequencing valve (120) configured to direct hydraulic fluid (124) oward the first actuator (127) and configured to block a flow of hydraulic fluid (124) toward the second actuator (129) when a first pressure of the hydraulic fluid in the first actuator is below a first threshold pressure.
  2. The blowout prevention system (40) of claim 1, wherein the first threshold pressure corresponds to a second pressure of the hydraulic fluid (124) in the first actuator (127) when the first actuator (127) is in the actuated position.
  3. The blowout prevention system (40) of claim 1, comprising a piloted check valve (172) configured to direct the hydraulic fluid (124) from the sequencing valve (120) toward the second actuator (129) and configured to block the hydraulic fluid from flowing toward the sequencing valve (120) from the second actuator (129) when a third pressure of the hydraulic fluid (124) in the first actuator (127) meets or exceeds the first threshold pressure.
  4. The blowout prevention system (40) of claim 3, wherein the piloted check valve (172) is configured to direct the hydraulic fluid (124) from the second actuator (129) toward the sequencing valve (120) when a fourth pressure of the hydraulic fluid (124) in the second actuator (129) reaches a second threshold pressure.
  5. The blowout prevention system (40) of claim 1, comprising a pump (125) configured to drive the hydraulic fluid (124) through the sequencing valve (120).
  6. The blowout prevention system (40) of claim 1, comprising a sensor (47) configured to send feedback to the controller (46) pertaining to a pressure of a fluid at the wellhead, wherein the controller (46) is configured to compare the feedback to a threshold value.
  7. The blowout prevention system (40) of claim 6, wherein the controller (46) is configured to actuate one or both of the first and second actuators (127, 129) only when the feedback meets or exceeds the threshold value.
  8. The blowout prevention system (40) of claim 1, wherein the first ram (50) comprises a second shearing portion (66) comprising a linear geometry and the first shearing portion (68) of the second ram comprises (52) an indented geometry.
  9. A method, comprising:
    actuating a first ram of a blowout preventer (40) toward a tubular string (24) disposed in a bore (25) of the blowout preventer, wherein the first ram (50) is disposed on a first side of the bore;
    aligning the tubular string (24) with a first shearing portion (68) of a second ram (52) disposed on a second side of the bore (25) opposite the first side; and
    actuating the second ram toward the tubular string (24) and the first ram (50), such that the first ram (50) and the second ram (52) cut the tubular string (24) to seal the bore (25), and characterized in that actuating the first ram (50) of the blowout preventer (40) toward a tubular string (24) disposed in the bore (25) of the drilling riser comprises directing hydraulic fluid (124) through a sequencing valve (120) and toward a first actuator (127) coupled to the first ram (50) and comprises blocking the hydraulic fluid (124) from flowing toward a second actuator (129) coupled to the second ram (52) when a pressure of the hydraulic fluid (124) in the first actuator (127) is below a threshold pressure.
  10. The method of claim 9, wherein actuating the second ram (52) toward the tubular string (24) and the first ram (50) such that the first ram (50) and the second ram (52) completely cut the tubular string (24) to seal the bore (25) comprises directing the hydraulic fluid (124) through the sequencing valve (120) toward the second actuator (129) coupled to the second ram (52) when the pressure of the hydraulic fluid (124) in the first actuator (127) meets or exceeds the threshold pressure.
  11. The method of claim 9, wherein aligning the tubular string (24) with the first shearing portion (68) of the second ram (52) disposed on the second side of the bore (25) opposite the first side comprises guiding the tubular string (24) along an inner diameter (76) of the bore (25), such that the tubular string (24) is aligned with the first shearing portion (68) and a second shearing portion (66) of the first ram (50) with respect to a longitudinal axis.
  12. A system comprising:
    a bore (25) extending between a wellhead (18) and a drilling riser (22);
    a tubular string (24) disposed in the bore (25) and configured to direct a fluid between the wellhead (18) and the drilling riser (22); and
    a blowout prevention system (40) as defined in any of claims 1 to 8.
EP15307172.5A 2015-12-30 2015-12-30 Shearing sequence for a blowout preventer Not-in-force EP3187681B1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
EP15307172.5A EP3187681B1 (en) 2015-12-30 2015-12-30 Shearing sequence for a blowout preventer
US15/392,992 US20170191337A1 (en) 2015-12-30 2016-12-28 Shearing sequence for a blowout preventer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
EP15307172.5A EP3187681B1 (en) 2015-12-30 2015-12-30 Shearing sequence for a blowout preventer

Publications (2)

Publication Number Publication Date
EP3187681A1 EP3187681A1 (en) 2017-07-05
EP3187681B1 true EP3187681B1 (en) 2019-05-22

Family

ID=55070819

Family Applications (1)

Application Number Title Priority Date Filing Date
EP15307172.5A Not-in-force EP3187681B1 (en) 2015-12-30 2015-12-30 Shearing sequence for a blowout preventer

Country Status (2)

Country Link
US (1) US20170191337A1 (en)
EP (1) EP3187681B1 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108180012A (en) * 2017-12-21 2018-06-19 黄明道 Deepwater drilling platform IBOP valves and preventer joint pressure test tool and pressure-measuring method
CN112004987B (en) * 2018-04-10 2022-09-09 海德里尔美国配送有限责任公司 Blind cable shearing flashboard
US20220213757A1 (en) * 2019-04-21 2022-07-07 Schlumberger Technology Corporation Blowout preventer with multiple application ram blades
EP4337841A1 (en) * 2021-05-13 2024-03-20 Services Pétroliers Schlumberger Lock sequencing system for a blowout preventer
WO2023107596A1 (en) * 2021-12-08 2023-06-15 Schlumberger Technology Corporation Pressure sensing blowout preventer control system

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9022104B2 (en) * 2010-09-29 2015-05-05 National Oilwell Varco, L.P. Blowout preventer blade assembly and method of using same

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3955622A (en) * 1975-06-09 1976-05-11 Regan Offshore International, Inc. Dual drill string orienting apparatus and method
US4540046A (en) * 1983-09-13 1985-09-10 Nl Industries, Inc. Shear ram apparatus
US5062349A (en) * 1990-03-19 1991-11-05 Baroid Technology, Inc. Fluid economizer control valve system for blowout preventers
US6006647A (en) * 1998-05-08 1999-12-28 Tuboscope I/P Inc. Actuator with free-floating piston for a blowout preventer and the like
US6244336B1 (en) * 2000-03-07 2001-06-12 Cooper Cameron Corporation Double shearing rams for ram type blowout preventer
ITMI20051256A1 (en) * 2005-07-04 2007-01-05 Auramo Oy HYDRAULIC GROUP TO CONTROL THE ARMS OF A CALIPER AND THE CALIPER INCLUDING THE HYDRAULIC GROUP
US7926501B2 (en) * 2007-02-07 2011-04-19 National Oilwell Varco L.P. Subsea pressure systems for fluid recovery
US7975761B2 (en) * 2008-12-18 2011-07-12 Hydril Usa Manufacturing Llc Method and device with biasing force for sealing a well
US20150322978A1 (en) * 2014-05-08 2015-11-12 Hydril Usa Manufacturing Llc Subsea force generating device and method

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9022104B2 (en) * 2010-09-29 2015-05-05 National Oilwell Varco, L.P. Blowout preventer blade assembly and method of using same

Also Published As

Publication number Publication date
US20170191337A1 (en) 2017-07-06
EP3187681A1 (en) 2017-07-05

Similar Documents

Publication Publication Date Title
EP3187681B1 (en) Shearing sequence for a blowout preventer
EP2825721B1 (en) Blowout preventer assembly
US8448915B2 (en) Increased shear power for subsea BOP shear rams
EP3063364B1 (en) Downhole tool method and device
US20070204998A1 (en) Pressure Protection for a Control Chamber of a Well Tool
EP3209854B1 (en) Valve assembly and control method for extraction wells under emergency conditions
US10156113B2 (en) BOP control system circuit to reduce hydraulic flow/water hammer
EP3209853B1 (en) Safety valve for production wells
WO2015142183A1 (en) Vertical xmas tree and workover assembly
US10954738B2 (en) Dual compact cutting device intervention system
US20230366286A1 (en) Valve and method for closing extraction wells under emergency conditions
US20230075775A1 (en) Automatic choking hydraulic shock reduction valve
EP3839198A1 (en) Lock system for a blowout preventer
WO2022094569A1 (en) Bi-directional ram for a blowout preventer

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION HAS BEEN PUBLISHED

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20180102

RBV Designated contracting states (corrected)

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: EXAMINATION IS IN PROGRESS

17Q First examination report despatched

Effective date: 20180712

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTG Intention to grant announced

Effective date: 20181213

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: CAMERON TECHNOLOGIES LIMITED

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602015030701

Country of ref document: DE

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 1136328

Country of ref document: AT

Kind code of ref document: T

Effective date: 20190615

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20190522

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

REG Reference to a national code

Ref country code: NO

Ref legal event code: T2

Effective date: 20190522

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190522

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190522

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190922

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190522

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190522

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190522

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190522

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190522

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190823

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190522

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190822

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190522

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 1136328

Country of ref document: AT

Kind code of ref document: T

Effective date: 20190522

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190522

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190522

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190522

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190522

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190522

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190522

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NO

Payment date: 20191210

Year of fee payment: 5

Ref country code: DE

Payment date: 20191217

Year of fee payment: 5

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602015030701

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190522

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190522

26N No opposition filed

Effective date: 20200225

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190522

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20191224

Year of fee payment: 5

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190522

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20191231

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190522

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20191230

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20191230

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20191231

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20191231

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20191231

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: IT

Payment date: 20201110

Year of fee payment: 6

Ref country code: FR

Payment date: 20201112

Year of fee payment: 6

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190522

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190922

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602015030701

Country of ref document: DE

REG Reference to a national code

Ref country code: NO

Ref legal event code: MMEP

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190522

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20151230

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20201230

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20201230

Ref country code: NO

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20201231

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210701

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190522

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20211231

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20211230

P01 Opt-out of the competence of the unified patent court (upc) registered

Effective date: 20231208