WO2012034710A2 - Method and apparatus for producing a piledriving arrangement on the seabed or ocean floor - Google Patents

Method and apparatus for producing a piledriving arrangement on the seabed or ocean floor Download PDF

Info

Publication number
WO2012034710A2
WO2012034710A2 PCT/EP2011/004665 EP2011004665W WO2012034710A2 WO 2012034710 A2 WO2012034710 A2 WO 2012034710A2 EP 2011004665 W EP2011004665 W EP 2011004665W WO 2012034710 A2 WO2012034710 A2 WO 2012034710A2
Authority
WO
WIPO (PCT)
Prior art keywords
jack
unit
ramming
producing
seabed
Prior art date
Application number
PCT/EP2011/004665
Other languages
German (de)
French (fr)
Other versions
WO2012034710A3 (en
Inventor
Ingo De Buhr
Original Assignee
N.Prior Energy Gmbh
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by N.Prior Energy Gmbh filed Critical N.Prior Energy Gmbh
Publication of WO2012034710A2 publication Critical patent/WO2012034710A2/en
Publication of WO2012034710A3 publication Critical patent/WO2012034710A3/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/52Submerged foundations, i.e. submerged in open water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/02Placing by driving
    • E02D7/06Power-driven drivers
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B2017/0056Platforms with supporting legs
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D13/00Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
    • E02D13/005Sound absorbing accessories in piling

Definitions

  • the invention relates to a method for producing a ramming arrangement on the seabed or seabed by means of a jack-up unit (for example jack-up ship or jack-up platform) on which a pile driver for ramming ramming is arranged. Furthermore, the invention relates to an apparatus for producing a ramming arrangement at the sea or seabed with such a jack-up unit and the use of a bubble curtain device for producing a bubble curtain during such pile work.
  • pile driving such as the ramming of piles during which there are sound emissions in the water.
  • bubble veils are created around the pile site.
  • Such bubble veils are described for example in DE 10 2008 017 418 A1 and WO 2009/121336 A2. They reduce the transmission of sound in water through damping, scattering and absorption.
  • the veil is generated by means of gas bubbles consisting of lines, e.g. Hoses or pipes exit.
  • the ducts are routed around the source of the sound emission at the seabed or at a distance therefrom.
  • the gas bubbles are extracted from the ambient air,
  • CONFIRMATION COPY which is pressed into the lines by means of technically suitable devices, eg compressors.
  • the required work of laying the pipes, providing the compressors and their operation and the final recovery of the lines is carried out separately by means of adapted floating units (eg ships, pontoons).
  • adapted floating units eg ships, pontoons.
  • Tube solution e.g. on drums
  • compressors e.g. on winches
  • winches possibly cranes and the like.
  • the ramming is carried out by a so-called jack-up unit.
  • This type of platform has legs, in particular pipe or scaffold legs, which can be moved vertically and thus placed on the seabed.
  • the jack-up unit is usually moved by tugs or self-propelled to the job site and placed there as a so-called jack-up.
  • Jack-Up units are designed to carry even very large loads over long distances, have special cranes and can;
  • Jack-Up units are used to provide a stable connection between the seabed and the work platform by lowering the legs to the seabed and then lifting the working platform of the jack-up unit above the waterline.
  • Jack-up units are used in particular for the erection of offshore structures, above all as a stable working platform for the defined execution of offshore structures.
  • the invention has for its object to provide a method and apparatus for producing a piling arrangement at the sea or seabed, which are cost-effective in connection with sound-minimizing measures compared to known approaches.
  • the method according to the invention for producing a ramming arrangement at the seabed or seabed comprises the steps of providing a jack-up unit with a rammer arranged thereon for ramming the ramming arrangement and providing a bubble veiling device on the jack-up unit during bubble blasting ramming the ram assembly with the rammer.
  • the bubble curtain device is operated according to the invention of the jack-up unit. In particular, the pressure for the operation of the bubble curtain device is generated from the platform or on the platform.
  • Laying and / or recovering at least one conduit means of the bladder device is also preferably carried out from the jack-up unit.
  • the laying and / or recovery can advantageously be carried out solely from the jack-up unit or with an additional floating unit.
  • the means for generating the pressure for the operation of the bubble curtain device are constantly on the jack-up unit and are operated therefrom.
  • the inventive device for manufacturing a ram assembly on the sea or ocean floor comprising a jack-up unit having thereon arrange ⁇ th Rammer for ramming the ram assembly and a Blasenschlei- he means for producing a bubble curtain during driving of the V
  • the bladder curtain device advantageously comprises at least one pressure generating means with which pressure for the operation of the bladder curtain device can be generated from the jack-up unit.
  • the particular advantage of the invention is u.a. is based in that in particular the operation of the pressure generating means of the jack-up unit is done and thus the pressure generating means is no longer exposed to the ships otherwise existing height fluctuations due to wave movements.
  • the pressure generating means used hitherto are generally limited in their permissible acceleration values. This limitation can cause the pressure generating means to be switched off at high waves. Then the costly pile work must be interrupted, because the bubble curtain is then no longer in operation.
  • the pressure generating means thus set up on the jack-up unit can be co-supplied with the power supply of the jack-up unit and it requires no separate generation of drive energy for this. It Therefore, particularly inexpensive pressure generating means can be used.
  • the jack-up unit further preferably comprises at least one bubble curtain installation means, with which at least one conduit means of the bubble curtain device can be laid and / or salvaged from the jack-up unit.
  • the solution according to the invention is further characterized in that a bubble curtain means for producing a bubble curtain on a jack-up unit is used during the ramming of a ram assembly with a jack-up unit rammer.
  • one or more such additional floating units for installation, operation and deinstallation of the bubble curtain can be dispensed with. This eliminates the significant costs of providing such additional floating units in the offshore area.
  • the solution according to the invention is also advantageous that the number of units is reduced at the site. Thus, the safety and ease of shipping traffic can be increased during pile driving and also during the installation, operation and deinstallation of the bubble curtain.
  • FIG. 1 shows a perspective view of an embodiment of an apparatus according to the invention for producing a ramming arrangement on the sea or seabed.
  • FIG. 1 shows a device 10 for producing a piling arrangement 12 on a seabed 14.
  • the apparatus 10 comprises a jack-up unit 18 which has been floating on the water 16 to a location 19 at which the pile assembly 12 is to be formed. Subsequently, the jack-up unit 18 has been lifted out of the water 16 next to the point 19 by means of legs 20 arranged thereon. In this way, the jack-up unit 18 has been brought into its working position, in which it is supported by means of the legs 20 on the seabed or seabed 14.
  • a crane 24 On the jack-up unit 18 is a crane 24, with the loading and miners can be performed, and a crane 26 as a piling device, which is comparatively large and is provided for forming the ram assembly 12.
  • a bubble curtain 28 is disposed on the jack-up unit 18.
  • This bubble curtain device 28 comprises a pressure generating means 30 in the form of a plurality of compressed air compressors and a conduit means 32 in the form of a comparatively long tube in which holes are formed.
  • the conduit means 32 is initially scooped into the water 16 at the point provided for the ramming arrangement and deposited on the seabed or seabed 14 in the form of a ring around the ramming point. Depositing takes place with the crane 24 as bubble veil installation means, a comparable crane on the jack-up unit 18 or by means of a ship, which picks up and lowers the conduit means 32 to the jack-up unit 18 for this purpose. Subsequently, the bubble curtain 28 is operated from the jack-up unit by pumping air from the vicinity of the jack-up unit 18 into the conduit 32 under pressure by the pressure generating means 30.
  • the ram assembly 12 is formed by means of the crane 26.

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Revetment (AREA)

Abstract

For producing a piledriving arrangement on the seabed or ocean floor, the invention provides a jack-up unit (18) with a piledriving device (26) arranged on it for the piledriving of the piledriving arrangement (10). Also provided on the jack-up unit (18) itself is a bubble curtain device (28) for producing a bubble curtain during the piledriving of the piledriving arrangement (10) with the piledriving device (26).

Description

Beschreibung  description
Verfahren und Vorrichtung zum Herstellen einer Rammanordnung am See- oder Meeresgrund Method and device for producing a ramming arrangement on the sea or seabed
Hintergrund der Erfindung Background of the invention
Die Erfindung betrifft ein Verfahren zum Herstellen einer Rammanordnung am See- oder Meeresgrund mittels einer Jack-Up-Einheit (z.B. Jack-Up-Schiff oder Jack-Up- Plattform) -, auf der eine Rammeinrichtung zum Rammen der Ramman- Ordnung angeordnet ist. Ferner betrifft die Erfindung eine Vorrichtung zum Herstellen einer Rammanordnung am See- oder Meeresgrund mit einer derartigen Jack-Up-Einheit sowie die Verwendung einer Blasenschleier-Einrichtung zum Herstellen eines Blasenschleiers während derartiger Rammarbeiten. Für die Errichtung von Anlagen im Offshore-Bereich ist es bekannt Fundamente herzustellen, die in den See- oder Meeresboden eingerammt sind. Dazu werden Rammarbeiten, wie z.B. das Rammen von Pfählen durchgeführt, während denen es zu Schallemissionen im Wasser kommt. Um Wasserlebewesen, insbesondere geschützte Arten wie Schweinswale und Robben, vor starken Schallemissionen zu schützen, werden Blasenschleier um die Rammstelle herum erzeugt. Solche Blasenschleier sind beispielsweise in DE 10 2008 017 418 A1 und WO 2009/121336 A2 beschrieben. Sie reduzieren die Übertragung von Schall im Wasser durch Dämpfung, Streuung und Absorption. Der Schleier wird dabei mittels Gasblasen erzeugt, die aus Leitungen, z.B. Schläuche oder Rohre, austreten. Die Leitungen werden um die Quelle der Schallemission herum am Meeresboden oder in einem Abstand davon verlegt. Die Gasblasen werden aus der Umgebungsluft gewonnen, The invention relates to a method for producing a ramming arrangement on the seabed or seabed by means of a jack-up unit (for example jack-up ship or jack-up platform) on which a pile driver for ramming ramming is arranged. Furthermore, the invention relates to an apparatus for producing a ramming arrangement at the sea or seabed with such a jack-up unit and the use of a bubble curtain device for producing a bubble curtain during such pile work. For the construction of facilities in the offshore area, it is known to produce foundations, which are rammed into the sea or seabed. For this purpose pile driving, such as the ramming of piles during which there are sound emissions in the water. In order to protect aquatic life, especially protected species such as harbor porpoises and seals, from strong sound emissions, bubble veils are created around the pile site. Such bubble veils are described for example in DE 10 2008 017 418 A1 and WO 2009/121336 A2. They reduce the transmission of sound in water through damping, scattering and absorption. The veil is generated by means of gas bubbles consisting of lines, e.g. Hoses or pipes exit. The ducts are routed around the source of the sound emission at the seabed or at a distance therefrom. The gas bubbles are extracted from the ambient air,
BESTÄTIGUNGSKOPIE die mittels technisch geeigneten Geräten, z.B. Kompressoren, in die Leitungen gepresst wird. Die dabei erforderlichen Arbeiten des Verlegens der Leitungen, des Bereitstellen der Kompressoren und deren Betrieb sowie des abschließenden Bergens der Leitungen wird separat mittels dazu angepasster schwimmender Ein- heiten (z.B. Schiffe, Pontons) durchgeführt. Auf diesen zusätzlichen schwimmenden Einheiten sind insbesondere zu diesem Zweck die Leitungen (flexible CONFIRMATION COPY which is pressed into the lines by means of technically suitable devices, eg compressors. The required work of laying the pipes, providing the compressors and their operation and the final recovery of the lines is carried out separately by means of adapted floating units (eg ships, pontoons). On these additional floating units in particular for this purpose, the lines (flexible
Schlauchlösung, z.B. auf Trommeln) sowie Kompressoren, Winden, gegebenenfalls Kräne und dergleichen installiert. Das Rammen wird von einer so genannten Jack-Up-Einheit aus durchgeführt.Tube solution, e.g. on drums) as well as compressors, winches, possibly cranes and the like. The ramming is carried out by a so-called jack-up unit.
Dies Art von Plattform hat Beine, insbesondere Rohr- oder Gerüstbeine, die sich vertikal bewegen lassen und so auf den Meeresboden abgestellt werden können. Die Jack-Up-Einheit wird in der Regel mittels Schleppern oder selbstfahrend zum Einsatzort bewegt und dort als so genannte Hubinsel aufgestellt. Jack-Up- Einheiten sind für den Transport auch sehr großer Lasten über große Entfernungen eingerichtet, weisen dazu spezielle Kräne auf und können; Jack-Up-Einheiten werden eingesetzt, um eine standfeste Verbindung zwischen dem Meeresboden und der Arbeitsplattform herzustellen, indem die Beine auf den Meeresboden abgelassen werden, um dann die Arbeitsplattform der Jack-Up-Einheit über die Wasserlinie zu heben. Jack-Up-Einheiten dienen insbesondere der Errichtung von Offshore-Bauwerken, hier vor allem als stabile Arbeitsplattform zur definierten Durchführung von Offshore-Bauwerken. This type of platform has legs, in particular pipe or scaffold legs, which can be moved vertically and thus placed on the seabed. The jack-up unit is usually moved by tugs or self-propelled to the job site and placed there as a so-called jack-up. Jack-Up units are designed to carry even very large loads over long distances, have special cranes and can; Jack-Up units are used to provide a stable connection between the seabed and the work platform by lowering the legs to the seabed and then lifting the working platform of the jack-up unit above the waterline. Jack-up units are used in particular for the erection of offshore structures, above all as a stable working platform for the defined execution of offshore structures.
Zugrundeliegende Aufgabe Underlying task
Der Erfindung liegt die Aufgabe zugrunde, ein Verfahren und eine Vorrichtung zum Herstellen einer Rammanordnung am See- oder Meeresgrund anzugeben, die in Verbindung mit schallminimierenden Maßnahmen im Vergleich zu bekannten Vorgehensweisen kostengünstiger sind. Erfindunasaemäße Lösung The invention has for its object to provide a method and apparatus for producing a piling arrangement at the sea or seabed, which are cost-effective in connection with sound-minimizing measures compared to known approaches. Inventive solution
Diese Aufgabe ist erfindungsgemäß mit einem Verfahren nach Anspruch 1 , einer Vorrichtung nach Anspruch 4 und einer Verwendung nach Anspruch 7 gelöst. Vor- teilhafte Weiterbildungen der erfindungsgemäßen Lösung sind in den abhängigen Ansprüchen beschrieben. This object is achieved by a method according to claim 1, a device according to claim 4 and a use according to claim 7. Advantageous developments of the solution according to the invention are described in the dependent claims.
Das erfindungsgemäße Verfahren zum Herstellen einer Rammanordnung am See- oder Meeresgrund umfasst die Schritte: Bereitstellen einer Jack-Up-Einheit mit einer darauf angeordneten Rammeinrichtung zum Rammen der Rammanordnung und Bereitstellen einer Blasenschleier-Einrichtung auf der Jack-Up-Einheit zum Herstellen eines Blasenschleiers während des Rammens der Rammanordnung mit der Rammeinrichtung. Die Blasenschleier-Einrichtung wird erfindungsgemäß von der Jack-Up-Einheit aus betrieben. Dabei erfolgt insbesondere das Erzeugen des Drucks für den Betrieb der Blasenschleier-Einrichtung von der Plattform aus bzw. auf der Plattform. The method according to the invention for producing a ramming arrangement at the seabed or seabed comprises the steps of providing a jack-up unit with a rammer arranged thereon for ramming the ramming arrangement and providing a bubble veiling device on the jack-up unit during bubble blasting ramming the ram assembly with the rammer. The bubble curtain device is operated according to the invention of the jack-up unit. In particular, the pressure for the operation of the bubble curtain device is generated from the platform or on the platform.
Das Verlegen und/oder Bergen mindestens eines Leitungsmittels der Blasen- schleier-Einrichtung wird bevorzugt ebenfalls von der Jack-Up-Einheit aus durchgeführt. Dabei kann das Verlegen und/oder Bergen vorteilhaft allein von der Jack- Up-Einheit aus erfolgen oder mit einer zusätzlichen schwimmenden Einheit. Die Mittel zum Erzeugen des Drucks für den Betrieb der Blasenschleier-Einrichtung befinden sich währenddessen erfindungsgemäß ständig auf der Jack-Up-Einheit und werden von dieser aus betrieben. Laying and / or recovering at least one conduit means of the bladder device is also preferably carried out from the jack-up unit. The laying and / or recovery can advantageously be carried out solely from the jack-up unit or with an additional floating unit. Meanwhile, according to the invention, the means for generating the pressure for the operation of the bubble curtain device are constantly on the jack-up unit and are operated therefrom.
Die erfindungsgemäße Vorrichtung zum Herstellen einer Rammanordnung am See- oder Meeresgrund umfasst eine Jack-Up-Einheit mit einer darauf angeordne¬ ten Rammeinrichtung zum Rammen der Rammanordnung und eine Blasenschlei- er-Einrichtung zum Herstellen eines Blasenschleiers während des Rammens der V The inventive device for manufacturing a ram assembly on the sea or ocean floor comprising a jack-up unit having thereon arrange ¬ th Rammer for ramming the ram assembly and a Blasenschlei- he means for producing a bubble curtain during driving of the V
-4- -4-
Rammanordnung mit der Rammeinrichtung, wobei die Blasenschleier-Einrichtung auf der Jack-Up-Einheit angeordnet ist. Rammanordnung with the rammer, wherein the bubble curtain device is arranged on the jack-up unit.
Die Blasenschleier-Einrichtung umfasst vorteilhaft mindestens ein Druckerzeu- gungsmittel, mit dem von der Jack-Up-Einheit ausgehend Druck für den Betrieb der Blasenschleier-Einrichtung erzeugt werden kann. The bladder curtain device advantageously comprises at least one pressure generating means with which pressure for the operation of the bladder curtain device can be generated from the jack-up unit.
Der besondere Vorteil der Erfindung liegt u.a. darin begründet, dass insbesondere der Betrieb des Druckerzeugungsmittels von der Jack-Up-Einheit aus geschieht und damit das Druckerzeugungsmittel nicht mehr den auf Schiffen sonst bestehenden Höhen-Schwankungen aufgrund von Wellenbewegungen ausgesetzt ist. Die bislang eingesetzten Druckerzeugungsmittel sind im Regelfall in ihren zulässigen Beschleunigungswerten limitiert. Diese Limitierung kann dazu führen, dass die Druckerzeugungsmittel bei hohen Wellen abgeschaltet werden müssen. Dann müssen auch die kostenaufwändigen Rammarbeiten unterbrochen werden, denn der Blasenschleier ist dann nicht mehr in Betrieb. The particular advantage of the invention is u.a. is based in that in particular the operation of the pressure generating means of the jack-up unit is done and thus the pressure generating means is no longer exposed to the ships otherwise existing height fluctuations due to wave movements. The pressure generating means used hitherto are generally limited in their permissible acceleration values. This limitation can cause the pressure generating means to be switched off at high waves. Then the costly pile work must be interrupted, because the bubble curtain is then no longer in operation.
Aufgrund des erfindungsgemäßen Betriebs der Druckerzeugungsmittel auf einer auf dem See- oder Meeresgrund abgestellten Einheit können Rammarbeiten unter definierten Bedingungen auch bei Wellenhöhen durchgeführt werden, bei denen Blasenschleier, die von einer schwimmenden Einheit aus betrieben werden, nicht mehr betrieben werden können. Hierdurch können Unterbrechungen vermieden und so die Kosten für die Rammarbeiten erheblich reduziert werden. Due to the inventive operation of the pressure generating means on a parked on the sea or seabed unit piling work under defined conditions can also be performed at wave heights at which bubble veils that are operated by a floating unit can no longer be operated. As a result, interruptions can be avoided and thus the cost of pile driving can be significantly reduced.
Zusätzlich wird durch die damit einhergehende Verkürzung der Rammzeit die insgesamt benötigte Bauzeit verkürzt, so dass der Eingriff in die Natur minimiert wird. In addition, the concomitant shortening of the pile time shortens the overall construction time required so that the intervention in nature is minimized.
Ferner können die derart auf der Jack-Up-Einheit aufgestellten Druckerzeugungsmittel von der Energie-Versorgung der Jack-Up-Einheit mitversorgt werden und es bedarf für diese keiner gesonderten Erzeugung von Antriebsenergie. Es können daher besonders kostengünstige Druckerzeugungsmittel verwendet werden. Further, the pressure generating means thus set up on the jack-up unit can be co-supplied with the power supply of the jack-up unit and it requires no separate generation of drive energy for this. It Therefore, particularly inexpensive pressure generating means can be used.
Darüber hinaus wird die Anzahl der im jeweiligen Baufeld befindlichen Fahrzeuge, insbesondere Schiffe, erheblich minimiert, was wiederum Kosten spart und die Sicherheit im Baufeld erhöht. In addition, the number of vehicles located in the respective construction field, in particular ships, is considerably minimized, which in turn saves costs and increases safety in the construction field.
Die Jack-Up-Einheit umfasst ferner bevorzugt mindestens ein Blasenschleier- Installationsmittel, mit dem mindestens ein Leitungsmittel der Blasenschleier- Einrichtung von der Jack-Up-Einheit ausgehend verlegt und/oder geborgen werden kann. The jack-up unit further preferably comprises at least one bubble curtain installation means, with which at least one conduit means of the bubble curtain device can be laid and / or salvaged from the jack-up unit.
Die erfindungsgemäße Lösung ist ferner dadurch gekennzeichnet, dass eine Blasenschleier-Einrichtung zum Herstellen eines Blasenschleiers auf einer Jack-Up- Einheit während des Rammens einer Rammanordnung mit einer Rammeinrichtung der Jack-Up-Einheit verwendet wird. The solution according to the invention is further characterized in that a bubble curtain means for producing a bubble curtain on a jack-up unit is used during the ramming of a ram assembly with a jack-up unit rammer.
Mit der Lösung gemäß der Erfindung ist es möglich, dass alle Arbeiten von der, die Rammarbeiten ausführenden Jack-Up-Einheit aus durchgeführt werden kön- nen. Für die Versorgung des Blasenschleiers mit Druckluft wird bisher hingegen eine weitere schwimmende Einheit eingesetzt, auf der für diesen Zweck insbesondere Kompressoren montiert sind. Teilweise ist bisher eine weitere schwimmende Einheit notwendig, von der aus dann die weiteren Komponenten des Blasenschleiers, insbesondere dessen Leitungsmittel, verlegt und geborgen werden. With the solution according to the invention, it is possible that all work can be carried out by the jack-up unit carrying out the pile driving. For the supply of bubble bladder with compressed air, however, yet another floating unit is used, are mounted on the particular compressors for this purpose. Partly so far, another floating unit is necessary, from which then the other components of the bubble curtain, in particular its conduit, laid and recovered.
Erfindungsgemäß kann hingegen auf eine oder mehrere solcher zusätzlichen schwimmenden Einheiten für Installation, Betrieb und Deinstallation des Blasenschleiers verzichtet werden. Dadurch entfallen die im Offshore-Bereich erheblichen Kosten für die Bereitstellung solcher zusätzlichen, schwimmenden Einheiten. An der erfindungsgemäßen Lösung ist ferner vorteilhaft, dass die Anzahl an Einheiten am Einsatzort verringert ist. Damit kann die Sicherheit und Leichtigkeit des Schiffsverkehrs während der Rammarbeiten und auch während der Installation, des Betriebs und der Deinstallation des Blasenschleiers vergrößert werden. In contrast, according to the invention, one or more such additional floating units for installation, operation and deinstallation of the bubble curtain can be dispensed with. This eliminates the significant costs of providing such additional floating units in the offshore area. In the solution according to the invention is also advantageous that the number of units is reduced at the site. Thus, the safety and ease of shipping traffic can be increased during pile driving and also during the installation, operation and deinstallation of the bubble curtain.
Zusätzlich entfällt mit dem Verzicht auf schwimmende Einheiten, die im Regelfall am Einsatzort verankert werden müssen, die Gefahr, dass im Baufeld bestehende Leitungen zerstört werden. Auch damit ergibt sich eine Verbesserung der Sicherheit. In addition, eliminating the need for floating units, which usually have to be anchored at the place of use, eliminates the danger that existing lines in the construction field will be destroyed. This also results in an improvement in safety.
Kurzbeschreibuna der Zeichnungen Brief description of the drawings
Nachfolgend wird ein Ausführungsbeispiel der erfindungsgemäßen Lösung anhand der beigefügten schematischen Zeichnungen näher erläutert. Es zeigt die Figur eine perspektivische Ansicht eines Ausführungsbeispiels einer erfindungsgemäßen Vorrichtung zum Herstellen einer Rammanordnung am See- oder Meeresgrund. An exemplary embodiment of the solution according to the invention will be explained in more detail below with reference to the attached schematic drawings. The figure shows a perspective view of an embodiment of an apparatus according to the invention for producing a ramming arrangement on the sea or seabed.
Detaillierte Beschreibung des Ausführunosbeispiels Detailed Description of the Embodiment Example
In der Fig. ist eine Vorrichtung 10 zum Herstellen einer Rammanordnung 12 auf einem See- oder Meeresgrund 14 dargestellt. Über dem See- oder Meeresgrund 14 befindet sich Wasser 16. Die Vorrichtung 10 umfasst eine Jack-Up-Einheit 18, die auf dem Wasser 16 schwimmend zu einer Stelle 19 transportiert worden ist, an der die Rammanordnung 12 ausgebildet werden soll. Nachfolgend ist die Jack-Up-Einheit 18 neben der Stelle 19 mit Hilfe von an ihr angeordneten Beinen 20 aus dem Wasser 16 gehoben worden. Auf diese Weise ist die Jack-Up-Einheit 18 in ihre Arbeitspositi- on gebracht worden, in der sie sich mit Hilfe der Beine 20 auf dem See- oder Meeresgrund 14 abstützt. Auf der Jack-Up-Einheit 18 befindet sich ein Kran 24, mit dem Lade- und Bergearbeiten durchgeführte werden können, sowie ein Kran 26 als Rammeinrichtung, der vergleichsweise groß ist und zum Ausbilden der Rammanordnung 12 vorge- sehen ist. FIG. 1 shows a device 10 for producing a piling arrangement 12 on a seabed 14. Above the sea or seabed 14 is water 16. The apparatus 10 comprises a jack-up unit 18 which has been floating on the water 16 to a location 19 at which the pile assembly 12 is to be formed. Subsequently, the jack-up unit 18 has been lifted out of the water 16 next to the point 19 by means of legs 20 arranged thereon. In this way, the jack-up unit 18 has been brought into its working position, in which it is supported by means of the legs 20 on the seabed or seabed 14. On the jack-up unit 18 is a crane 24, with the loading and miners can be performed, and a crane 26 as a piling device, which is comparatively large and is provided for forming the ram assembly 12.
Ferner ist auf der Jack-Up-Einheit 18 eine Blasenschleier-Einrichtung 28 angeordnet. Diese Blasenschleier-Einrichtung 28 umfasst ein Druckerzeugungsmittel 30 in Form mehrerer Druckluft-Kompressoren sowie ein Leitungsmittel 32 in Form eines vergleichsweise langen Schlauches, in dem Löcher ausgebildet sind. Further, a bubble curtain 28 is disposed on the jack-up unit 18. This bubble curtain device 28 comprises a pressure generating means 30 in the form of a plurality of compressed air compressors and a conduit means 32 in the form of a comparatively long tube in which holes are formed.
Mit der derart vorbereiteten Jack-Up-Einheit 18 wird an der für die Rammanordnung vorgesehenen Stelle zunächst das Leitungsmittel 32 in das Wasser 16 abgesengt und in Gestalt eines Ringes um die Rammstelle herum auf dem See- oder Meeresgrund 14 abgelegt. Das Ablegen erfolgt mit dem Kran 24 als Blasen- schleier-lnstallationsmittel, einem vergleichbaren Kran auf der Jack-Up-Einheit 18 oder mittels eines Schiffes, das das Leitungsmittel 32 dazu an der Jack-Up-Einheit 18 abholt und absenkt. Nachfolgend wird die Blasenschleier-Einrichtung 28 von der Jack-Up-Einheit aus betrieben, indem mittels des Druckerzeugungsmittels 30 Luft aus der Umgebung der Jack-Up-Einheit 18 in das Leitungsmittel 32 unter Druck hineingepumpt wird. With the jack-up unit 18 prepared in this way, the conduit means 32 is initially scooped into the water 16 at the point provided for the ramming arrangement and deposited on the seabed or seabed 14 in the form of a ring around the ramming point. Depositing takes place with the crane 24 as bubble veil installation means, a comparable crane on the jack-up unit 18 or by means of a ship, which picks up and lowers the conduit means 32 to the jack-up unit 18 for this purpose. Subsequently, the bubble curtain 28 is operated from the jack-up unit by pumping air from the vicinity of the jack-up unit 18 into the conduit 32 under pressure by the pressure generating means 30.
Zugleich wird mit Hilfe des Kranes 26 die Rammanordnung 12 ausgebildet. Wäh- rend dieser Arbeiten kommt es zu Schallemissionen im Wasser 16, die mittels der Blasenschleier-Einrichtung 28 und der dort aus dem Leitungsmittel 32 austretenden Luftblasen gedämpft, gestreut und absorbiert werden. At the same time the ram assembly 12 is formed by means of the crane 26. During this work, there are sound emissions in the water 16, which are attenuated, scattered and absorbed by means of the bubble curtain device 28 and the air bubbles exiting there from the conduit means 32.
Nach Beendigung der Rammarbeiten wird das Leitungsmittel 32 der Blasen- schleier-Einrichtung 28 mit Hilfe des genannten Schiffes oder vorzugsweise mit Hilfe des Kranes 24 oder eines vergleichbaren Kranes auf der Jack-Up-Einheit 18 eingeholt und auf der Jack-Up-Einheit 18 gelagert. Die Jack-Up-Einheit 18 führt je nach Bedarf weitere Arbeiten durch oder wird wieder schwimmend von der Stelle 19 der Rammanordnung 12 entfernt. Mit der Vorgehensweise können sowohl der Blasenschleier als auch die Rammarbeiten mit nur einer einzigen Jack-Up-Einheit 18 ausgeführt werden, ohne dass es einer weiteren schwimmenden Einheit für Installation, Betrieb und Deinstallation der Blasenschleier-Einrichtung 28 bedürfte. Abschließend sei angemerkt, dass sämtlichen Merkmalen, die in den Anmeldungsunterlagen und insbesondere in den abhängigen Ansprüchen genannt sind, trotz dem vorgenommenen formalen Rückbezug auf einen oder mehrere bestimmte Ansprüche, auch einzeln oder in beliebiger Kombination eigenständiger Schutz zukommen soll. After completion of the pile driving the conduit means 32 of the bladder device 28 by means of said ship or preferably by means of the crane 24 or a similar crane on the jack-up unit 18th obtained and stored on the jack-up unit 18. The jack-up unit 18 performs further work as needed or is again removed floating from the point 19 of the ram assembly 12. With the procedure, both the bubble curtain and the pile work can be performed with only a single jack-up unit 18, without the need for another floating unit for installation, operation and de-installation of the bubble curtain 28. Finally, it should be noted that all the features that are mentioned in the application documents and in particular in the dependent claims, in spite of the formal reference back to one or more specific claims, even individually or in any combination should receive independent protection.
Bezugszeichenliste LIST OF REFERENCE NUMBERS
10 Vorrichtung zum Herstellen einer Rammanordnung10 Apparatus for producing a pile driver
12 Rammanordnung 12 piling arrangement
14 See- oder Meeresgrund  14 sea or ocean floor
16 Wasser  16 water
18 Jack-Up-Einheit  18 Jack-Up Unit
19 Stelle der Rammanordnung  19 position of the ram assembly
20 Bein  20 leg
22 Aufbauten  22 superstructures
24 Kran bzw. Blasenschleier-Installationsmittel 24 crane or bubble curtain installation agent
26 Kran bzw. Rammeinrichtung 26 crane or piling device
28 Blasenschleier-Einrichtung  28 bubble curtain device
30 Druckerzeugungsmittel  30 pressure generating means
32 Leitungsmittel  32 conduit means

Claims

Ansprüche claims
1 . Verfahren zum Herstellen einer Rammanordnung (10) am See- oder Meeresgrund mit den Schritten: 1 . Method for producing a ramming arrangement (10) on the lake or seabed, comprising the steps of:
Bereitstellen einer Jack-Up-Einheit (18) mit einer darauf angeordneten Rammeinrichtung (26) zum Rammen der Rammanordnung (10) und  Providing a jack-up unit (18) with a rammer (26) arranged thereon for ramming the ramming arrangement (10) and
Bereitstellen einer Blasenschleier-Einrichtung (28) auf der Jack-Up-Einheit (18) zum Herstellen eines Blasenschleiers während des Rammens der Rammanordnung (12) mit der Rammeinrichtung (26). Providing bubble bladder means (28) on said jack-up unit (18) for producing bladder fog during ramming of said piling assembly (12) with said piling means (26).
2. Verfahren nach Anspruch 1 , 2. The method according to claim 1,
mit dem Schritt: Betreiben der Blasenschleier-Einrichtung (28) von der Jack-Up- Einheit (18) ausgehend. with the step of operating the bubble curtain means (28) from the jack-up unit (18).
3. Verfahren nach Anspruch 1 oder 2, 3. The method according to claim 1 or 2,
mit dem Schritt: Verlegen und/oder Bergen mindestens eines Leitungsmittels (32) der Blasenschleier-Einrichtung (28) von der Jack-Up-Einheit (18) ausgehend. with the step of laying and / or recovering at least one line means (32) of the bubble curtain device (28) from the jack-up unit (18).
4. Vorrichtung (10) zum Herstellen einer Rammanordnung (12) am See- oder Meeresgrund mit 4. Device (10) for producing a piling arrangement (12) on the sea or seabed with
einer Jack-Up-Einheit (18) mit einer darauf angeordneten Rammeinrichtung (26) zum Rammen der Rammanordnung (12) und a jack-up unit (18) with a rammer (26) arranged thereon for ramming the ramming arrangement (12) and
einer Blasenschleier-Einrichtung (28) zum Herstellen eines Blasenschleiers während des Rammens der Rammanordnung (12) mit der Rammeinrichtung (26), wobei die Blasenschleier-Einrichtung (28) auf der Jack-Up-Einheit (18) angeordnet ist. bladder veil means (28) for producing a bladder veil during ramming of the piling assembly (12) with the piling means (26), the bladder veil means (28) being disposed on the jack-up unit (18).
5. Vorrichtung nach Anspruch 4, 5. Apparatus according to claim 4,
bei der die Blasenschleier-Einrichtung (28) mindestens ein Druckerzeugungsmittel (30) umfasst, mit dem von der Jack-Up-Einheit (18) ausgehend Druck für den Betrieb der Blasenschleier-Einrichtung (28) erzeugt werden kann. wherein the bubble curtain means (28) comprises at least one pressure generating means (30), by means of which pressure can be generated from the jack-up unit (18) for the operation of the bubble curtain device (28).
6. Vorrichtung nach Anspruch 4 oder 5, 6. Apparatus according to claim 4 or 5,
bei dem die Jack-Up-Einheit (18) mindestens ein Blasenschleier-Installationsmittel (24) umfasst, mit dem mindestens ein Leitungsmittel (32) der Blasenschleier- Einrichtung (28) von der Jack-Up-Einheit (18) ausgehend verlegt und/oder geborgen werden kann. in which the jack-up unit (18) comprises at least one bubble curtain installation means (24) with which at least one conduit means (32) relocates the bubble curtain device (28) from the jack-up unit (18) and / or can be recovered.
7. Verwendung einer Blasenschleier-Einrichtung (28) zum Herstellen eines Blasenschleiers auf einer Jack-Up-Einheit (18) während des Rammens einer Rammanordnung (12) mit einer Rammeinrichtung (26) der Jack-Up-Einheit (18). Use of a bubble curtain means (28) for producing a bubble curtain on a jack-up unit (18) while ramming a pile driver (12) with a rammer (26) of the jack-up unit (18).
PCT/EP2011/004665 2010-09-17 2011-09-16 Method and apparatus for producing a piledriving arrangement on the seabed or ocean floor WO2012034710A2 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
EP10009836A EP2431531A1 (en) 2010-09-17 2010-09-17 Method and device for producing a ramming assembly on a sea or lake bed
EP10009836.7 2010-09-17

Publications (2)

Publication Number Publication Date
WO2012034710A2 true WO2012034710A2 (en) 2012-03-22
WO2012034710A3 WO2012034710A3 (en) 2012-06-07

Family

ID=43618795

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/EP2011/004665 WO2012034710A2 (en) 2010-09-17 2011-09-16 Method and apparatus for producing a piledriving arrangement on the seabed or ocean floor

Country Status (2)

Country Link
EP (1) EP2431531A1 (en)
WO (1) WO2012034710A2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102016220813A1 (en) 2016-10-24 2018-04-26 Contitech Schlauch Gmbh Elongated hollow body, in particular hose
DE102020117509A1 (en) 2020-07-02 2022-01-05 Offcon GmbH SEDIMENT AND / OR SEDIMENT ROCK WATER DISPOSAL CONTROL SYSTEM FOR CONTROLLING THE DISPOSAL OF SEDIMENTS AND / OR SEDIMENT ROCKS OF BODY MIXTURES AND THEIR APPROPRIATE VEHICLES

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NO20121076A1 (en) * 2012-09-21 2014-03-17 Mobico Shipping As Procedure for shielding underwater noise in a body of water, and equipment thereof
DE102017117552B4 (en) * 2017-08-02 2023-06-29 Karl-Heinz ELMER Watercraft and compressed air distribution device
DE102018104329B4 (en) * 2018-02-26 2022-09-29 Overdick Gmbh & Co. Kg Method for the foundation of a substation and substation with at least four piles
CN111155477B (en) * 2019-12-27 2021-04-06 浙江大学 Air curtain noise reduction device for offshore wind power pasture
PL4141173T3 (en) 2021-08-23 2024-02-26 Arnold Jäger Holding GmbH Hose arrangement for creating a bubble curtain in water
PL4141172T3 (en) * 2021-08-23 2024-02-26 Arnold Jäger Holding GmbH Hose arrangement for creating a bubble curtain in water

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2009121336A2 (en) 2008-04-03 2009-10-08 Karl-Heinz Elmer Device for damping and scattering hydrosound in a liquid

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102004043128A1 (en) * 2004-09-03 2006-03-09 Menck Gmbh Post guiding device for ramming offshore windmill foundation, has nozzle assembly of blowing device, which can be lowered from upper standby position underneath frame into operating position at benthic division, is attached at frame

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2009121336A2 (en) 2008-04-03 2009-10-08 Karl-Heinz Elmer Device for damping and scattering hydrosound in a liquid
DE102008017418A1 (en) 2008-04-03 2009-10-29 Gottfried Wilhelm Leibniz Universität Hannover Device for reducing the transmission and propagation of sound and / or wave motions in a liquid

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102016220813A1 (en) 2016-10-24 2018-04-26 Contitech Schlauch Gmbh Elongated hollow body, in particular hose
DE102020117509A1 (en) 2020-07-02 2022-01-05 Offcon GmbH SEDIMENT AND / OR SEDIMENT ROCK WATER DISPOSAL CONTROL SYSTEM FOR CONTROLLING THE DISPOSAL OF SEDIMENTS AND / OR SEDIMENT ROCKS OF BODY MIXTURES AND THEIR APPROPRIATE VEHICLES

Also Published As

Publication number Publication date
WO2012034710A3 (en) 2012-06-07
EP2431531A1 (en) 2012-03-21

Similar Documents

Publication Publication Date Title
WO2012034710A2 (en) Method and apparatus for producing a piledriving arrangement on the seabed or ocean floor
EP2417303B1 (en) Method and device for creating an underwater foundation of a building
EP2831342B1 (en) Method for handling a hydro sound absorber, and device for reducing underwater noise
EP2657410B2 (en) Device for reducing the propagation of sound, vibration and pressure shocks in a liquid
WO2013152757A1 (en) Method for producing a foundation for offshore wind energy plants
DE10109428A1 (en) Off-shore wind turbine
EP2208825B1 (en) Method for installing an offshore foundation structure on the sea bed and offshore foundation structure
DE102011112026A1 (en) Method for installing a steel jacket foundation on a seabed by means of a pile, drilling or screw template and screw or ram template for the installation of steel jacket foundations
EP2796620B1 (en) Method for constructing a foundation pile for offshore constructions and foundation pile for offshore structures
DE102010046732A1 (en) Method for installing heavy-weight foundation for wind turbine, involves partially or completely sinking base part into bottom of sea by fluidizing and suctioning off of bottom by suction and pressure pumps underneath sole of base part
WO2021008795A1 (en) Method for the disassembly of tower of a wind power plant
DE102011102546A1 (en) Foundation for off-shore wind energy plant, has body designed as annular body, and shaft designed as lattice construction, where body has passages that are opened toward sole of body and chambers for collecting sand
DE102011012450A1 (en) Method for installing heavyweight foundation system for offshore-wind energy plant, involves prestressing heavyweight foundation in laterally limited manner by ballast bodies before tower and/or housing of tower is mounted
EP2020463A1 (en) Coffer dam and method for shielding an offshore structure from surrounding water by using same
EP3542000B1 (en) Method for dismantling offshore foundation structures
DE102012218285A1 (en) Device and method for creating a foundation and foundation
EP3661842B1 (en) Vessel
DE102012016692A1 (en) Method for installation of heavyweight foundation system for off-shore wind energy plant, involves countersinking base body into seabed, and temporarily preloading foundation by ballast bodies engaged at foundation in limited manner
EP2873775B1 (en) Method for the construction of a foundation for an offshore structure and foundation pile for use in carrying out the process
EP3950487A1 (en) Anchoring system for anchoring an offshore structure
EP2208824A1 (en) Method and aquatic vehicle for installing an offshore structure on the sea bed
EP2674532A1 (en) Method and system for providing a foundation for an offshore structure
EP3255211A1 (en) Jack-up bridge structure
EP2650445A2 (en) Base element for fixed installations which can be lowered to the seabed
DE102011102551A1 (en) Method for installing gravity foundation for offshore arrangement, particularly wind energy plant, involves transporting foundation body in floating manner to installation location

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 11787595

Country of ref document: EP

Kind code of ref document: A2

NENP Non-entry into the national phase in:

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 11787595

Country of ref document: EP

Kind code of ref document: A2