WO2012001401A1 - Process for the production of substitute natural gas - Google Patents

Process for the production of substitute natural gas Download PDF

Info

Publication number
WO2012001401A1
WO2012001401A1 PCT/GB2011/051215 GB2011051215W WO2012001401A1 WO 2012001401 A1 WO2012001401 A1 WO 2012001401A1 GB 2011051215 W GB2011051215 W GB 2011051215W WO 2012001401 A1 WO2012001401 A1 WO 2012001401A1
Authority
WO
WIPO (PCT)
Prior art keywords
methanator
bulk
stream
recycle
methanation
Prior art date
Application number
PCT/GB2011/051215
Other languages
French (fr)
Inventor
Philip Henry Donald Eastland
Jonathan Geoffrey Gavin
David Andrew Walker
Original Assignee
Davy Process Technology Limited
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority to JP2013517535A priority Critical patent/JP5813762B2/en
Application filed by Davy Process Technology Limited filed Critical Davy Process Technology Limited
Priority to NZ603500A priority patent/NZ603500A/en
Priority to US13/805,940 priority patent/US8969423B2/en
Priority to AP2012006580A priority patent/AP2012006580A0/en
Priority to EP11730730.6A priority patent/EP2588579B1/en
Priority to UAA201301087A priority patent/UA110483C2/en
Priority to AU2011273136A priority patent/AU2011273136B2/en
Priority to CA2803221A priority patent/CA2803221A1/en
Priority to EA201201442A priority patent/EA023626B1/en
Priority to KR1020127032247A priority patent/KR20130095647A/en
Priority to CN201180031700.1A priority patent/CN102959057B/en
Publication of WO2012001401A1 publication Critical patent/WO2012001401A1/en
Priority to ZA2012/08545A priority patent/ZA201208545B/en

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10LFUELS NOT OTHERWISE PROVIDED FOR; NATURAL GAS; SYNTHETIC NATURAL GAS OBTAINED BY PROCESSES NOT COVERED BY SUBCLASSES C10G, C10K; LIQUEFIED PETROLEUM GAS; ADDING MATERIALS TO FUELS OR FIRES TO REDUCE SMOKE OR UNDESIRABLE DEPOSITS OR TO FACILITATE SOOT REMOVAL; FIRELIGHTERS
    • C10L3/00Gaseous fuels; Natural gas; Synthetic natural gas obtained by processes not covered by subclass C10G, C10K; Liquefied petroleum gas
    • C10L3/06Natural gas; Synthetic natural gas obtained by processes not covered by C10G, C10K3/02 or C10K3/04
    • C10L3/08Production of synthetic natural gas
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01JCHEMICAL OR PHYSICAL PROCESSES, e.g. CATALYSIS OR COLLOID CHEMISTRY; THEIR RELEVANT APPARATUS
    • B01J8/00Chemical or physical processes in general, conducted in the presence of fluids and solid particles; Apparatus for such processes
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10JPRODUCTION OF PRODUCER GAS, WATER-GAS, SYNTHESIS GAS FROM SOLID CARBONACEOUS MATERIAL, OR MIXTURES CONTAINING THESE GASES; CARBURETTING AIR OR OTHER GASES
    • C10J3/00Production of combustible gases containing carbon monoxide from solid carbonaceous fuels
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10JPRODUCTION OF PRODUCER GAS, WATER-GAS, SYNTHESIS GAS FROM SOLID CARBONACEOUS MATERIAL, OR MIXTURES CONTAINING THESE GASES; CARBURETTING AIR OR OTHER GASES
    • C10J2300/00Details of gasification processes
    • C10J2300/16Integration of gasification processes with another plant or parts within the plant
    • C10J2300/164Integration of gasification processes with another plant or parts within the plant with conversion of synthesis gas
    • C10J2300/1656Conversion of synthesis gas to chemicals
    • C10J2300/1662Conversion of synthesis gas to chemicals to methane (SNG)
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10LFUELS NOT OTHERWISE PROVIDED FOR; NATURAL GAS; SYNTHETIC NATURAL GAS OBTAINED BY PROCESSES NOT COVERED BY SUBCLASSES C10G, C10K; LIQUEFIED PETROLEUM GAS; ADDING MATERIALS TO FUELS OR FIRES TO REDUCE SMOKE OR UNDESIRABLE DEPOSITS OR TO FACILITATE SOOT REMOVAL; FIRELIGHTERS
    • C10L2230/00Function and purpose of a components of a fuel or the composition as a whole
    • C10L2230/04Catalyst added to fuel stream to improve a reaction

Definitions

  • the present invention relates to a process for the production of fuel gases suitable for use as a substitute natural gas (SNG) from a synthesis gas such as that produced by the partial oxidation of carbonaceous fuels such as oil or coal.
  • SNG substitute natural gas
  • a bulk methanator is one which receives part or all of the carbon monoxide rich feed, i.e. fresh feed to the plant.
  • a trim methanator is one that does not receive any fresh carbon monoxide feed and carries out trim methanation, often at lower temperature than in the bulk methanator.
  • a recycle methanator is one which is contained within the recycle loop and which does not receive fresh carbon monoxide rich feed.
  • Splitting the duty between the two bulk methanators essentially means that less of the overall bulk duty is carried out in the first bulk methanator. As the recycle is only around the first bulk methanator the recycle flowrate need only be sufficient to control the temperature rise across this bed. The lower duty means that there is a lower heat of reaction which must be removed by the recycle gas which in turn results in a lower recycle flowrate.
  • the gas passing forward from first bulk methanator to the second bulk methanator acts as the thermal mass to quench the second stage of the bulk reaction. In the flowsheet described in US 4205961 approximately 70% of the fresh feed is passed to the first bulk methanator with the remainder being passed to the second bulk methanator.
  • the second bulk methanator has the effect of reducing the recycle flowrate by approximately 30% whilst maintaining the same recycle loop pressure drop. This has the benefit in a reduction in the recycle compressor power requirement but is at the expense of a second methanator reactor.
  • the product gas produced by the process described in US 4205961 does not achieve the current requirements for SNG specifications.
  • two bulk methanators are used with a proportion of the feed being passed to the first bulk methanator and the remainder to the second bulk methanator.
  • the entire stream removed from the first bulk methanator is passed to the second bulk methanator and the recycle is taken after the second bulk methanator. Having been passed through a compressor, the recycle stream is passed to the first bulk methanator.
  • the portion of the stream taken from the second bulk methanator which is not used as recycle is passed to trim methanators.
  • more than two bulk methanators are described and the raw feed is split between all of the bulk methanators present. The recycle is then taken from after the last bulk methanator.
  • the nickel based methanation catalyst used in US 4298694 does not operate stably below about 320°C.
  • a shift catalyst comprising at least two of copper, zinc and chromium, is placed above the methanation catalyst. This carries out a partial shift of the feed gas at a low temperature.
  • the exothermic shift reaction is used to preheat the feed to the methanation catalyst and to reduce the amount of shifting that is carried out by the high temperature methanation catalyst.
  • the total duty of the reactor is similar whether or not the shift catalyst is present. However, its presence allows the temperature into the reactor to be lower.
  • the methanation catalyst normally operates at elevated temperatures of from about 500°C to about 800°C while the shift catalyst operates at lower temperatures of from about 250°C to about 350°C.
  • the shift catalyst may become deactivated. If the shift catalyst becomes deactivated the inlet temperature must be raised or the shift catalyst replaced. Raising the inlet temperature due to shift catalyst inactivity negates the advantage of incorporating the shift catalyst and when deactivated, catalyst replacement will require a costly shutdown of the plant and the cost of the shift catalyst replacement.
  • the advantage of this process is to reduce the number of trim methanators required to achieve the required product specification as the reduction in the number of trim methanators will inevitably reduce the plant capital costs.
  • a still further proposal is identified in US 2009/0264542.
  • the aim of the described process is to provide a more cost-effective process by reducing the required power for the recycle compressor. This is achieved by splitting the carbon oxide rich feed to a series of bulk methanators and recycling the product gas from the exit of the first bulk methanator back to the inlet of the first bulk methanator. Increasing the number of bulk methanators decreases the required recycle rate and maintaining the recycle only around a single methanator reduces the pressure differential. The combined effect is to reduce the power of the recycle compressor. Although the compressor power is reduced, this is at the expense of the capital cost of the plant due to the requirement for an increased number of expensive refractory lined methanation reactors and the associated heat exchangers.
  • the recycle is generally added to the first and/or second and/or subsequent bulk mcthanator via introduction into the feed line thereof. However, it may be added directly to the bulk mcthanator in a separate feed line.
  • the process comprises:
  • the process of this first embodiment reduces the power demand of the recycle compressor. Without wishing to be bound by any theory there are two main factors which control the power of the recycle compressor. These are the recycle flowrate and the pressure differential across the recycle compressor.
  • the process of this first embodiment reduces the recycle flowrate by methanating the recycle stream further thus increasing the methane content of the stream and decreasing the carbon monoxide content of the stream.
  • the amount of methanation carried out in the recycle methanator may be removed from the duty of the bulk methanators.
  • the trim methanator train may comprise one or more trim methanators. Where more than one trim methanator is present, they will generally be located in series. Where more than one trim methanator is used, they may be operated at the same temperature or the temperature may be lower in the second and any subsequent trim methanator(s) than in the first trim methanator. Where there are a plurality of trim methanators the temperature may be reduced in each subsequent trim methanator relative to the preceding methanator.
  • a second recycle stream may be removed from the stream exiting the, or the first, trim methanator or a subsequent methanator, said trim recycle stream may be combined with the recycle stream from the second and/or subsequent bulk methanator before it is provided to the compressor.
  • recycle streams may be taken from other trim methanators in the trim methanator train or may be taken from a trim methanator other than the first.
  • the portion of the feed gas fed to the first bulk methanator and the second and/or subsequent bulk methanator may be the same or different.
  • about 40% of the fresh feed gas is fed to the first bulk methanator, with the remainder being fed to the second bulk methanator.
  • the split of feed between the methanators will depend on the number of bulk methantors, the operating conditions and the feed composition.
  • the first and second bulk methanators will be operated at any suitable reaction conditions. Suitable reaction temperatures include those from about 250°C to about 700°C inclusive.
  • the first trim methanator may be operated at a lower temperature than the bulk methanators.
  • the recycle methanator may be operated at a lower temperature than the bulk methanators. Suitable reaction temperatures include those from about 220°C to about 550°C inclusive. In general, the outlet temperature of the recycle and trim methantor will be lower than the outlet temperature of the upstream methanator which provides the feed to the recycle or trim methanator.
  • recycle methanator operates at a lower outlet temperature than the bulk methanators, this converts a high proportion of the remaining carbon monoxide and hydrogen in the recycle stream to methane.
  • the amount of reaction duty carried out by the recycle methanator reduces the duty from the bulk methanation section. A lower bulk methanation duty results in a lower required recycle flowrate.
  • the recycle methanator Whilst the recycle methanator has been described as a separate methanator, it will be understood that the recycle methanator may be located as a stage in the vessel housing the first bulk methanator, and/or the second and/or subsequent bulk methanator if the recycle is to be added there. In this arrangement the feed will be added between the portion of the reactor in which recycle methanation is occurring and the bulk methanator.
  • the process may be arranged such that the position of feed inlet is varied as the catalyst becomes deactivated. In one arrangement, the direction of flow may be reversed such that the catalyst bed which was the recycle methanator becomes the bulk methanator and that which was the bulk methanator becomes the recycle methanator.
  • the method of the present invention may reduce the number of methanators that the plant requires and reduce the size of the equipment in the loop which results in a reduction in the overall capital cost.
  • the bulk methanator size and/or loop pipework are often the factor(s) determining the number of trains required for an overall complex.
  • the inclusion of a recycle methanator reduces the loop throughput and correspondingly reduces the bulk methanator and loop pipework sizes.
  • the recycle methanator has the potential to reduce the number of trains required in an overall complex, which would present an even more significant reduction of the overall capital cost.
  • the process comprises:
  • the process serves to reduce the power demand of the recycle compressor.
  • the recycle flowrate is reduced by removing the recycle downstream of a trim methanator rather than upstream thereof.
  • the stream exiting the trim methanator has been subjected to further methanation which has thereby increased the content of methane in the stream and decreased the carbon monoxide content of the stream.
  • the trim methanator may be one or more trim methanators in series. Where more than one trim methanators are present, the recycle stream may be taken after any trim methanator.
  • the train of subsequent trim methanators may comprise one or more trim methanators. These will generally be located in series. The temperature in the subsequent trim methanator(s) may be lower than that in the first trim methanator(s). Where there are a plurality of trim methanators each methanator may be operated at a temperature which is lower than that of its predecessor.
  • Another advantage of this embodiment of the present invention is that since the methanation is carried out upstream of the compressor then the number of moles of gas and hence the volumetric flowrate through the compressor is greatly reduced.
  • the power and suction volume, which set the size of the compressor is lower than that required in conventional process and in the above first preferred embodiment.
  • Catalyst volumes will generally remain unchanged over prior art systems. Operating costs will be reduced but not at the expense of increased capital costs.
  • Taking the recycle stream from downstream of the first trim methanator reduces the recycle compressor power consumption by 21 to 22% over prior art processes such as that described in US 4133825 operating with two bulk methanation stages and with the recycle being taken from the exit of the second stage and returned upstream of the first stage. This is achieved by greatly reducing the volumetric flowrate at the suction of the compressor.
  • the reduction in bulk methanator duty may reduce the number of methanators required in comparison to prior art processes.
  • a second recycle stream may be taken between the second bulk methanator and the trim methanator.
  • a recycle methanator may be incorporated in the recycle stream between the compressor and the introduction of the recycle stream to the first and/or second and/or subsequent bulk methanator.
  • the recycle methanator may be located as a zone in the same vessel as the first bulk methanator or of any bulk methanator into which the recycle stream is to be introduced.
  • Methanating the recycle stream in the trim methanator before it is passed to the compressor substantially reduces the number of moles that the compressor must compress to achieve the required heat sink for the bulk methanation and hence reduces the power consumption.
  • recycle methanator is present in the recycle loop, more than one recycle methanator may be present.
  • the process comprises:
  • This third embodiment may be used to reduce the effective overall pressure drop of the methanation unit, without adding on costly equipment items, such as an extra compressor or extra methanation stages, which would have been required to pressurise the methanated gas.
  • the configuration of this embodiment also uses the advantages of the increased pressure of operation for the trim methanation section, which will drive the equilibrium to produce more methane at the same temperature conditions.
  • the portion of the feed gas fed to the first bulk methanator, the second bulk methanator may be the same or different.
  • the split of feed between the methanators will depend on the number of bulk methantors, the operating conditions and the feed composition.
  • the recycle will generally be taken downstream of the last bulk methanator and the recycle stream, having been passed through a reactor and a compressor in any order, will be recycled to one or more of the bulk methanators as appropriate.
  • the feed to the bulk methanators may be stoichiometric or may be non- stoichiometric.
  • water may be removed from the recycle stream. Where water is to be removed it will generally be removed prior to the recycle stream being passed to the compressor. Generally water removal will only be required with some feed compositions and operating conditions.
  • the feed from the first bulk methanator to the second bulk methanator may be passed through a catalyst bed located above the catalyst bed over which the bulk methanation occurs and above the point at which the feed is added to the vessel.
  • the stream passing from the first bulk methanator will then be subjected to trim methanation before it is mixed with the new feed and subjected to bulk methanation.
  • the shift reaction will generally be carried out before the feed is supplied to the bulk methanators but in an alternative arrangement, the shift reaction may be carried out in the bulk methanator.
  • Both preferred embodiments of the present invention reduce the overall operating cost of the plant by reducing the power of the recycle compressor.
  • steam may be introduced into the system stream via a feed saturator placed upstream of the bulk methanators.
  • the steam can be added without using direct steam addition.
  • the fresh feed to the first and/or second and/or subsequent bulk methanators of the present invention may be stoichiometric with respect to the methanation reaction or non- stoichiometric.
  • Figure 1 is a block flow diagram of a first embodiment of the present invention
  • Figure 2 is a block flow diagram of a second embodiment of the present invention.
  • Figure 3 is a schematic representation of the arrangement in which the recycle methanator is combined in the same vessel as the first bulk methanator;
  • Figure 4 is a schematic representation of the third embodiment of the present invention.
  • Desulphurised feed gas rich in carbon monoxide is fed in line 1 to the bulk methanation section which consists of two bulk methanators, the first bulk methanator 2 and the second bulk methanator 3.
  • the feed is split with a portion being fed in line l a to the first bulk methanator 2 and a portion via line l b to the second bulk methanator 3.
  • the product stream from the first bulk methanator 2 is passed in line 4 to the second bulk methanator 3. It will generally be cooled in heat exchanger 5 before being added to the second bulk methanator 3.
  • the product stream from the second bulk methanator 3 is passed in line 6 to heat exchanger 7 where it is cooled.
  • a portion of the stream from the heat exchanger is passed in line 8 to a first trim methanator 9.
  • the remainder of the stream from the heat exchanger 7 is passed in line 10, via heat exchanger 1 1 and line 12 to the compressor 13.
  • heat exchanger 1 1 the recycle stream is cooled before compression in compressor 13.
  • the gas from the compressor is passed in line 14 via heat exchanger 15 where it is heated to recycle methanation operating temperatures and line 16 to the recycle methanator 17 where it is subjected to further methanation reaction.
  • the gas from the recycle methanator is removed from the recycle methanator in line 18, passed through heat exchanger 19 and returned via line 20 to the first methanator 2. Generally this return to the first methanator 2 will be via the feed line la.
  • the product from the trim methanator 9 is removed in line 21 and passed through heat exchanger 22 where it is cooled. It is then passed in line 23 to one or more subsequent trim methanators 24. The product is withdrawn in line 25 and then is cooled and dried at 26. The SNG is then removed in line 27.
  • the bulk methanators may be operated such that the feed thereto is at about 320°C. After the reaction and subsequent heat exchange the feed to the first trim methanator 9 will be at about 280°C. The feed to the recycle methanator 1 7 will also be about 280°C. The feed to the subsequent trim methanators 24 will generally be about 250°C.
  • a portion of the stream removed from the first trim methanator 9 can be added in line 28 to the recycle stream fed to the compressor 13 and hence to the recycle methanator 17.
  • Stream may be added in line 30. This will only be required with some feed compositions and operating conditions.
  • a second embodiment of the present invention is illustrated in Figure 2.
  • Desulphurised feed gas rich in carbon monoxide is fed in line 31 to the bulk methanation section which consists of two bulk methanators, the first bulk methanator 32 and the second bulk methanator 33.
  • the feed is split with a portion being fed in line 3 la to the first bulk methanator 32 and a portion via line 31 b to the second bulk methanator 33.
  • the product stream from the first bulk methanator 32 is passed in line 34 to the second bulk methanator 33. It will generally be cooled in heat exchanger 35 before being added to the second bulk methanator 33.
  • the product stream from the second methanator 33 is passed in line 36 to heat exchanger 37 where it is cooled.
  • the stream from the heat exchanger 37 is passed in line 38 to a first trim methanator 39.
  • the stream is removed in line 40 with a portion being passed in line 41 via heat exchanger 42 and line 43 to the compressor 44.
  • heat exchanger 42 the recycle stream is cooled in order to achieve the required steam to carbon ratio in the bulk methanation section. Since the stream taken from the trim methanator 39 has been methanated further and at lower temperature it has a lower carbon monoxide and hydrogen content and a higher methane content than the gas exiting the second bulk methanator 33.
  • the gas from the compressor is passed in line 45 via heat exchanger 46 where it is heated before being passed in line 47 to the bulk methanator 32. Generally this return to the first methanator 32 will be via the feed line 3 la.
  • the portion of the stream from the trim methanator 39 which is not passed to the compressor 44 is removed in line 48 and passed through heat exchanger 49 where it is cooled. It is then passed in line 50 to one or more subsequent trim methanators 51. The product is withdrawn in line 52 and then is cooled and dried at 53. The SNG is then removed in line 54.
  • the bulk methanators may be operated such that the feed thereto is at about 320°C. After the reaction and subsequent heat exchange the feed to the first trim methanator 39 will be at about 280°C. The feed to the subsequent trim methanators 51 will generally be about 250°C.
  • a portion of the stream removed from the heat exchanger 37 may be removed and having by-passed the first trim methanator 39 can be added in line 55 to the recycle stream fed to the compressor 44 and hence to the bulk methanator 32.
  • a recycle methanator 58 and subsequent heat exchanger 59 may be located in the recycle loop after the compressor 44.
  • the bulk methanators may be operated such that the feed thereto is at about 320°C. After the reaction and subsequent heat exchange the feed to the first trim methanator 39 will be at about 280°C. The feed to the recycle methanator 58, where present, will also be about 280°C. The feed to the subsequent trim methanators 51 will generally be about 250°C.
  • the recycle methanator may be combined within the same vessel as the bulk methanator into which the recycle stream is to be added.
  • This is illustrated schematically in Figure 3.
  • the arrangement illustrated in Figure 3 also includes the possibility that the second bulk methanator also has a pre-reactor for the methanation of cooling gas located in the upper portion of the vessel. It will however be understood that these two arrangement may be used alone or in combination.
  • the fresh feed is fed in line 100. This is split and added to vessels 101 and 102 respectively via lines 103 and 104. Vessel 101 comprises two reaction zones 105 and 106 and the feed is added between these two zones. Since flow is downwardly the feed added in line 103 will flow through reaction zone 106 where it is contacted with the methanation catalyst at the required temperature for bulk methanation.
  • Recycle from the compressor (not shown in this figure) is added to the vessel 101 in line 107. It flows downwardly through reaction zone 105 which acts as the recycle methanator and undergoes methanation before being mixed with the gaseous feed added in line 103.
  • Product from the bulk methanation is removed in line 1 08 and passed to heat exchanger 109 where it is cooled before being passed to the second bulk methanator.
  • This may be a conventional bulk methanator or may be the vessel 102 illustrated in Figure 3.
  • the stream from the first bulk methanator is added in line 1 10 to the top of the vessel where it is passed through a catalyst bed 1 1 1 and undergoes methanation before being mixed with the fresh feed added in line 104 before being passed to catalyst bed 1 12 where bulk methanation occurs.
  • the product is then removed in line 1 13 before being removed for treatment in accordance with the present invention.
  • Desulpharised feed rich in carbon monoxide is fed in line 201 to the bulk methanation section which consists of two bulk methanators, the first bulk methanator 202 and the second bulk methanator 203.
  • the feed is split with a portion being fed in line 201 a to the first bulk methanator 202 and a portion via line 201 b to the second bulk methanator 203.
  • this is not fed directly to the second methanator 203 but is first mixed with a product stream from the first methanator 201
  • the product stream from the first bulk methanator 202 is passed in line 204 to heat exchange 205 where it is cooled. This is then passed in line 206 to the second methanator 203. Prior to being added to the methanator, the stream is mixed with feed added in line 201 b.
  • the product stream from the second methanator 203 is passed in line 207 to heat exchanger 208 where it is cooled.
  • the stream from the heat exchanger is passed in line 209 to compressor 210 where it is compressed.
  • the gas from the compressor is passed in line 21 1 to heater 212 where it is heated to recycle methanation operating temperatures before being passed in line 213 to recycle methanator 214 where it is subjected to further methanation reaction.
  • the product stream from the recycled methanator 214 is removed in line 215 to cooler 216.
  • the cooled stream is removed in line 217 before being split into lines 218 and 219.
  • the portion in line 218 is recycled to the first methanator 202.
  • the portion of the cooled stream in line 219 is passed to first trim methanator 220.
  • the product from the first trim methanator 220 is passed in line 22 1 to cooler 222.
  • the cooled stream is then passed in line 223 to the second trim methanator 224 before being passed in line 225 to dryer 226.
  • the SNG is then removed in line 227.
  • the 'Base Case' flowsheet has two bulk methanators within the recycle loop followed by two stages of trim methanation which are not included in the recycle loop.
  • the flowsheet uses a near stoichiometric feed and is designed to produce a product containing 96% methane.
  • Table 1 summarises the main operating parameters for the flowsheet and gives details of the recycle flow, loop pressure drop and expected compressor power for this case.
  • a recycle methanator has been added into the loop downstream of the recycle compressor.
  • Two additional heat exchangers are also added into the recycle loop, the first to heat the feed to the recycle methanator to the correct temperature, and the second to cool the recycle methanator product.
  • the flowsheet is designed to produce a product containing 96% methane.
  • Table 2 summarises the main operating parameters for the flowsheet and gives details of the recycle flow, loop pressure drop and expected compressor power for this case.
  • trim methanator 1 is now included in the recycle loop.
  • trim methanator 2 is included outside of the recycle loop giving the same number of bulk and trim methanators overall as for the comparative example.
  • the flowsheet is designed to produce a product containing 96% methane. Table 3 summarises the main operating parameters for the flowsheet and gives details of the recycle flow, loop pressure drop and expected compressor power for this case.
  • Example A1 shows that, despite the addition of the trim methanator 1 into the recycle loop, the overall compressor power for this case is lower than for the base case flowsheet by over 20%.
  • This example also shows a significant improvement over Example A1 .
  • the overall bulk methanation duty has been reduced (this time as a part of it has been carried out in trim methanator 1 ).
  • the bulk methanation section then requires a lower recycle flowrate than the flowsheet of Comparative Example A.
  • fewer equipment items are added to the loop which results in a lower pressure differential across the recycle compressor.
  • This 'Base Case' flowsheet has two bulk methanators within the recycle loop followed by two stages of trim methanation which are not included in the recycle loop.
  • the flowsheet uses a non-stoichiometric, carbon rich, feed and is designed to produce a product containing 97.5% methaneafter downstream OSBL C0 2 removal.
  • Table 4 summarises the main operating parameters for the flowsheet and gives details of the recycle flow, loop pressure drop and expected compressor power for this case.
  • a recycle methanator has been added into the loop downstream of the recycle compressor.
  • One additional heat exchanger is also added into the recycle loop, to cool the recycle methanator product.
  • this unit has allowed for the deletion of an exchanger upstream of the loop, consequently the loop and the product are at a higher pressure.
  • the flowsheet is designed to produce a product containing 97.5% methane. Table 5 summarises the main operating parameters for the flowsheet and gives details of the recycle flow loop pressure drop and expected compressor power for this case.
  • Example A l shows that, despite the addition of the recycle methanator and associated heat exchangers into the recycle loop; the overall compressor power for this case is lower than for the base case flowsheet by approximately 7%.
  • Example A l some of the methanation duty that would normally be occurring in the bulk methanators has been transferred to the recycle methanator, the recycle rate that is required to control the temperature at the outlet of the bulk methanators is significantly reduced, resulting in the improvement in compressor power.
  • Example B l shows that, despite the addition of the trim methanator 1 into the recycle loop, the overall compressor power for this is lower than for the base case flowsheet by over 10%.
  • Example B l shows an improvement over Example B l .
  • the recycle methanator flowsheet the overall bulk methanation duty has been reduced (this time as part of it has been carried out in trim methanator 1).
  • the bulk methanation section then requires a lower recycle flowrate than the flowsheet of Comparative Example B.
  • Example A2 another major advantage of this arrangement is that the methanation in the trim methanator 1 is carried out upstream of the compressor so that the number of moles of gas and hence the volumetric flowrate into the compressor is greatly reduced (3 Ho + CO -> CH 4 + H 2 0). Hence the power and suction volume (which set the compressor size) for this design is lower than both Comparative Example B and Example B 1 .
  • the flowsheet uses a near stoichiometric feed and is designed to produce a product containing 96% methane as in Example A l .
  • the flowsheet has been changed to include the full recycle flow through the recycle methanator.
  • Table 7 summarises the main operating parameters for the flowsheet and gives details of the recycle flow loop pressure drop and expected compressor power for this case.

Landscapes

  • Chemical & Material Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Organic Chemistry (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Engineering & Computer Science (AREA)
  • General Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Organic Low-Molecular-Weight Compounds And Preparation Thereof (AREA)
  • Separation By Low-Temperature Treatments (AREA)

Abstract

A process for the production of substitute natural gas comprising: providing a feed gas to a first and/or second and/or subsequent bulk methanator; subjecting that feed gas to methanation in the presence of a suitable catalyst; removing an at least partially reacted stream from the first bulk methanator and supplying it to the second and/or subsequent bulk methanator where it is subjected to further methanation; passing a product stream from the final bulk methanator to a trim methanator train where it is subjected to further methanation; removing a recycle stream downstream of the first, second or subsequent bulk methanator, and, in any order, passing it through a compressor, subjecting it to cooling and then supplying to a trim and/or recycle methanator for further methanation before being recycled to the first and/or second and/or subsequent methanator.

Description

PROCESS FOR THE PRODUCTION OF SUBSTITUTE NATURAL GAS
The present invention relates to a process for the production of fuel gases suitable for use as a substitute natural gas (SNG) from a synthesis gas such as that produced by the partial oxidation of carbonaceous fuels such as oil or coal.
Various processes are known for producing SNG. One such process is described in US 4016189. Here the feed gas is treated in a single high temperature bulk methanator followed by treatment in a single low temperature trim methanator. In this process all of the fresh feed is fed to the bulk methanator where a large proportion of the carbon oxides are methanated to methane. Since the reaction is highly exothermic, a thermal mass is required to limit the temperature rise across the bulk methanator to an acceptable level. This thermal mass is supplied in the form of a recycle gas which is taken from downstream of the bulk methanator but prior to the trim methanator. The recycle stream is compressed prior to being fed upstream of the bulk methanator.
The single stage of trim methanation described in US 4016189 is adequate to produce a low calorific gas with a methane content of 60%. This is below the required methane level for current SNG product specifications.
In general it should be noted that a bulk methanator is one which receives part or all of the carbon monoxide rich feed, i.e. fresh feed to the plant. A trim methanator is one that does not receive any fresh carbon monoxide feed and carries out trim methanation, often at lower temperature than in the bulk methanator. For the purposes of the present invention, a recycle methanator is one which is contained within the recycle loop and which does not receive fresh carbon monoxide rich feed.
An alternate process is suggested in US 4205961. This process aims to optimise the plant by reducing the operating costs thereof. This is achieved by increasing the number of bulk methanators. Specifically, the bulk methanation duty is split between two reactors. Fresh feed is fed to both the first and the second bulk methanator. The stream taken from the first bulk methanator is split with a portion being recycled via a compressor to the first bulk methanator with the remainder being passed to the second bulk methanator. The stream removed from the second bulk methanator is passed to the trim methanator.
Splitting the duty between the two bulk methanators essentially means that less of the overall bulk duty is carried out in the first bulk methanator. As the recycle is only around the first bulk methanator the recycle flowrate need only be sufficient to control the temperature rise across this bed. The lower duty means that there is a lower heat of reaction which must be removed by the recycle gas which in turn results in a lower recycle flowrate. The gas passing forward from first bulk methanator to the second bulk methanator acts as the thermal mass to quench the second stage of the bulk reaction. In the flowsheet described in US 4205961 approximately 70% of the fresh feed is passed to the first bulk methanator with the remainder being passed to the second bulk methanator. The second bulk methanator has the effect of reducing the recycle flowrate by approximately 30% whilst maintaining the same recycle loop pressure drop. This has the benefit in a reduction in the recycle compressor power requirement but is at the expense of a second methanator reactor. The product gas produced by the process described in US 4205961 does not achieve the current requirements for SNG specifications.
Various alternative processes are described in US 4133825. Unlike other processes where a shift section was included upstream of the methanation unit, the process described here introduced the concept of shifting and methanating the raw gas over the methanation catalyst and within the methanation unit. This does result in an excess of carbon dioxide in the product and it is therefore necessary to include a carbon dioxide removal unit downstream of the methanation unit. Carrying out the shift reaction within the methanation unit requires large quantities of steam. It is therefore proposed to include a saturator upstream of the methanation section in order to simultaneously saturate and heat the feed stream with steam prior to bulk methanation. This not only provides the required steam for the shift reaction over the methanation catalyst but also prevents carbon formation on the catalyst. In one arrangement, two bulk methanators are used with a proportion of the feed being passed to the first bulk methanator and the remainder to the second bulk methanator. The entire stream removed from the first bulk methanator is passed to the second bulk methanator and the recycle is taken after the second bulk methanator. Having been passed through a compressor, the recycle stream is passed to the first bulk methanator. The portion of the stream taken from the second bulk methanator which is not used as recycle is passed to trim methanators. In alternative processes, more than two bulk methanators are described and the raw feed is split between all of the bulk methanators present. The recycle is then taken from after the last bulk methanator.
Carrying out the shift reaction within the methanation unit negates the need for a separate shift section. However, as the flowrate through the methanation unit is much larger, as there is a large mass of carbon dioxide which passes from the feed to the product without undergoing any reaction, the amount of catalyst required is increased and the size of all of the equipment items except the compressor is also increased. This is because the carbon dioxide provides a large thermal mass to remove heat from the bulk system and hence a large recycle is not required.
A still further alternative process is described in US 4298694. In this process a dual catalyst is used to reduce the operating cost of the SNG plant by reducing the compressor recycle power. This is achieved by reducing the temperature of the inlet to the bulk methanator and so for the same bulk methanator outlet temperature, a larger temperature rise across the bed is allowed. This means that more of the heat of reaction can be used to increase the bed temperature. This results in a lower required thermal mass of gas to soak up the heat released through reaction and hence a lower recycle flowrate.
The nickel based methanation catalyst used in US 4298694 does not operate stably below about 320°C. Hence, in order to reduce the inlet temperature to the methanator a shift catalyst, comprising at least two of copper, zinc and chromium, is placed above the methanation catalyst. This carries out a partial shift of the feed gas at a low temperature. The exothermic shift reaction is used to preheat the feed to the methanation catalyst and to reduce the amount of shifting that is carried out by the high temperature methanation catalyst. The total duty of the reactor is similar whether or not the shift catalyst is present. However, its presence allows the temperature into the reactor to be lower.
Thus loading a shift catalyst on top of the methanation catalyst has a massive impact on reducing the recycle flowrate and ultimately the power requirement of the recycle compressor as the allowable temperature rise across the combined catalyst bed is higher.
Whilst at initial running this process offers various advantages, the methanation catalyst normally operates at elevated temperatures of from about 500°C to about 800°C while the shift catalyst operates at lower temperatures of from about 250°C to about 350°C. Thus at high temperatures, such as the equilibrium temperatures at which the methanation catalyst operates, the shift catalyst may become deactivated. If the shift catalyst becomes deactivated the inlet temperature must be raised or the shift catalyst replaced. Raising the inlet temperature due to shift catalyst inactivity negates the advantage of incorporating the shift catalyst and when deactivated, catalyst replacement will require a costly shutdown of the plant and the cost of the shift catalyst replacement.
A still further process is discussed in US2009/0247653. This suggests that methanation is favoured by lower temperatures and reduced water content. The proposed arrangement, which has two bulk methanators, is to reduce the temperature of the gas stream at the exit of the second bulk methanator in order to condense out a portion of the water in the stream. The partially dried gas stream is then split between the recycle stream, which is compressed and recycled back to the inlet of the first bulk methanator, and the stream to the trim methanator section.
It is suggested that the advantage of this process is to reduce the number of trim methanators required to achieve the required product specification as the reduction in the number of trim methanators will inevitably reduce the plant capital costs. There is also a slight saving on power demand due to the lower recycle compressor inlet temperature and lower recycle rate due to the lower water content. However, in order to prevent carbon laydown on the catalyst in the bulk methanation section, there is a required minimum water content in the stream exiting the bulk methanators. Decreasing the temperature into the recycle compressor decreases the water content in the recycle stream and hence the composition of the gas exiting the bulk methanator is in the carbon forming region.
In order to prevent carbon laydown on the catalyst, steam is added to the recycle stream upstream of the bulk methanator. The large quantity of steam addition that is required impacts on the steam export from the plant which has a substantial effect on the economics there. In addition, reducing the temperature of the stream leaving the bulk methanator unit to condense out water only to then reheat the stream and add water is thermally inefficient.
A still further proposal is identified in US 2009/0264542. The aim of the described process is to provide a more cost-effective process by reducing the required power for the recycle compressor. This is achieved by splitting the carbon oxide rich feed to a series of bulk methanators and recycling the product gas from the exit of the first bulk methanator back to the inlet of the first bulk methanator. Increasing the number of bulk methanators decreases the required recycle rate and maintaining the recycle only around a single methanator reduces the pressure differential. The combined effect is to reduce the power of the recycle compressor. Although the compressor power is reduced, this is at the expense of the capital cost of the plant due to the requirement for an increased number of expensive refractory lined methanation reactors and the associated heat exchangers.
It can therefore be seen that the basic technology has remained substantially unchanged since the 1970s. The technology is well understood and the main proposals for improvements seen in recent years have centered on improving the economics of the process both in terms of capital costs and operating costs. Capital cost savings are achieved by reducing the number of methanators and catalyst volumes required to produce the desired product. Operational cost savings are achieved by reducing the power demand of the recycle compressor and increasing the heat recovery. Improved heat recovery increases the export steam from the plant and hence improves the economics of the plant.
Whilst some proposals successfully decrease the operational costs of the plant, this is at the expense of substantially increasing the capital costs thereof. Other proposals have decreased capital costs but at the expense of increased operational costs.
There is therefore a need for a process which has reduced operating costs, particularly in terms of the recycle compressor size and power, while not significantly increasing the amount of catalyst required and the number of reactors and which preferably also has low capital costs.
It has now been found that an improved process can be provided if the feed to a first and/or second and/or subsequent bulk methanator is cooled with a recycle gas which has been subjected to reaction in a trim and/or recycle methanator.
Thus according to the present invention there is provided a process for the production of substitute natural gas comprising:
providing a feed gas to a first and/or second and/or subsequent bulk methanator; subjecting that feed gas to methanation in the presence of a suitable catalyst; removing an at least partially reacted stream from the first bulk methanator and supplying it to the second and/or subsequent bulk methanator where it is subjected to further methanation;
passing a product stream from the final bulk methanator to a trim methanator train where it is subjected to further methanation;
removing a recycle stream downstream of the first, second or subsequent bulk methanator, and, in any order, passing it through a compressor, subjecting it to cooling and then supplying to a trim and/or recycle methanator for further methanation before being recycled to the first and/or second and/or subsequent methanator. The recycle is generally added to the first and/or second and/or subsequent bulk mcthanator via introduction into the feed line thereof. However, it may be added directly to the bulk mcthanator in a separate feed line.
In a first embodiment of the present invention, the process comprises:
providing a feed gas to a first and second bulk methanator;
subjecting that feed gas to methanation in the presence of a suitable catalyst; removing an at least partially reacted stream from the first bulk methanator and supplying it to the second bulk mcthanator where it is subjected to further methanation; removing a gas stream from the second bulk methanator and cooling said stream; splitting said cooled gas stream and supplying a portion to a trim methanator train where further methanation occurs and a portion to a recycle stream;
passing said recycle stream to a compressor;
passing said compressed stream from the compressor to a recycle methanator operated at a lower outlet temperature than the first and second bulk methanators and subjecting said compressed stream to further methanation; and
recycling said stream from the recycle methanator to the first and/or second bulk methanator.
The process of this first embodiment reduces the power demand of the recycle compressor. Without wishing to be bound by any theory there are two main factors which control the power of the recycle compressor. These are the recycle flowrate and the pressure differential across the recycle compressor. The process of this first embodiment reduces the recycle flowrate by methanating the recycle stream further thus increasing the methane content of the stream and decreasing the carbon monoxide content of the stream. The amount of methanation carried out in the recycle methanator may be removed from the duty of the bulk methanators.
The trim methanator train may comprise one or more trim methanators. Where more than one trim methanator is present, they will generally be located in series. Where more than one trim methanator is used, they may be operated at the same temperature or the temperature may be lower in the second and any subsequent trim methanator(s) than in the first trim methanator. Where there are a plurality of trim methanators the temperature may be reduced in each subsequent trim methanator relative to the preceding methanator.
In one arrangement of this embodiment, a second recycle stream may be removed from the stream exiting the, or the first, trim methanator or a subsequent methanator, said trim recycle stream may be combined with the recycle stream from the second and/or subsequent bulk methanator before it is provided to the compressor. In alternative arrangements, recycle streams may be taken from other trim methanators in the trim methanator train or may be taken from a trim methanator other than the first.
The portion of the feed gas fed to the first bulk methanator and the second and/or subsequent bulk methanator may be the same or different. In one arrangement with two bulk methanators about 40% of the fresh feed gas is fed to the first bulk methanator, with the remainder being fed to the second bulk methanator. However, it will be understood that the split of feed between the methanators will depend on the number of bulk methantors, the operating conditions and the feed composition.
The first and second bulk methanators will be operated at any suitable reaction conditions. Suitable reaction temperatures include those from about 250°C to about 700°C inclusive.
The first trim methanator may be operated at a lower temperature than the bulk methanators.
The recycle methanator may be operated at a lower temperature than the bulk methanators. Suitable reaction temperatures include those from about 220°C to about 550°C inclusive. In general, the outlet temperature of the recycle and trim methantor will be lower than the outlet temperature of the upstream methanator which provides the feed to the recycle or trim methanator.
As the recycle methanator operates at a lower outlet temperature than the bulk methanators, this converts a high proportion of the remaining carbon monoxide and hydrogen in the recycle stream to methane. The amount of reaction duty carried out by the recycle methanator reduces the duty from the bulk methanation section. A lower bulk methanation duty results in a lower required recycle flowrate.
Whilst the recycle methanator has been described as a separate methanator, it will be understood that the recycle methanator may be located as a stage in the vessel housing the first bulk methanator, and/or the second and/or subsequent bulk methanator if the recycle is to be added there. In this arrangement the feed will be added between the portion of the reactor in which recycle methanation is occurring and the bulk methanator. The process may be arranged such that the position of feed inlet is varied as the catalyst becomes deactivated. In one arrangement, the direction of flow may be reversed such that the catalyst bed which was the recycle methanator becomes the bulk methanator and that which was the bulk methanator becomes the recycle methanator.
Placing the recycle methanator into the recycle loop may reduce the recycle compressor power consumption by 4 to 5% over prior art processes such as that described in US 4133825 in which two bulk methanation stages are used and with the recycle being taken from the exit of the second stage and returned upstream of the first stage.
In prior art processes, two sets of two parallel bulk methanators may be used due to vessel shipping restrictions. The method of the present invention may reduce the number of methanators that the plant requires and reduce the size of the equipment in the loop which results in a reduction in the overall capital cost. The bulk methanator size and/or loop pipework are often the factor(s) determining the number of trains required for an overall complex. The inclusion of a recycle methanator reduces the loop throughput and correspondingly reduces the bulk methanator and loop pipework sizes. The recycle methanator has the potential to reduce the number of trains required in an overall complex, which would present an even more significant reduction of the overall capital cost.
It is acknowledged that adding the recycle methanator, associated heat exchanger and lines increases the pressure drop of the recycle loop. However, the increase in pressure ratio is only slight and when compared with the saving in recycle flowrate results in a decrease in recycle compressor power.
In a second embodiment, the process comprises:
providing a feed gas to a first and second bulk methanator;
subjecting the feed gas to methanation in the presence of a suitable catalyst;
removing an at least partially reacted stream from the first bulk methanator and supplying it to the second bulk methanator where it is subjected to further methanation; removing a gas stream from the second bulk methanator and cooling said stream; supplying said cooled gas stream to a trim methanator where further methanation occurs, said trim methanator operating at a lower outlet temperature than the bulk methanators;
splitting the product stream from the trim methanator and passing a portion thereof to a train of subsequent trim methanators and a portion to a recycle stream;
passing said recycle stream to a compressor; and
recycling said stream to the first and/or second bulk methanator.
This is a variation on the above first embodiment. Again the process serves to reduce the power demand of the recycle compressor. In this arrangement, the recycle flowrate is reduced by removing the recycle downstream of a trim methanator rather than upstream thereof. The stream exiting the trim methanator has been subjected to further methanation which has thereby increased the content of methane in the stream and decreased the carbon monoxide content of the stream. The trim methanator may be one or more trim methanators in series. Where more than one trim methanators are present, the recycle stream may be taken after any trim methanator. The train of subsequent trim methanators may comprise one or more trim methanators. These will generally be located in series. The temperature in the subsequent trim methanator(s) may be lower than that in the first trim methanator(s). Where there are a plurality of trim methanators each methanator may be operated at a temperature which is lower than that of its predecessor.
In this second embodiment the overall bulk methanation duty is reduced as a part of it has been carried out in the trim methanator from which the recycle stream is taken. This therefore requires a lower recycle flowrate than conventional processes such as that described in US 4133825. This process may also require fewer equipment items added to the recycle loop which results in a lower pressure differential across the compressor when compared to the above first embodiment for the same flowrate.
Another advantage of this embodiment of the present invention is that since the methanation is carried out upstream of the compressor then the number of moles of gas and hence the volumetric flowrate through the compressor is greatly reduced. Thus the power and suction volume, which set the size of the compressor, is lower than that required in conventional process and in the above first preferred embodiment. Catalyst volumes will generally remain unchanged over prior art systems. Operating costs will be reduced but not at the expense of increased capital costs.
Taking the recycle stream from downstream of the first trim methanator reduces the recycle compressor power consumption by 21 to 22% over prior art processes such as that described in US 4133825 operating with two bulk methanation stages and with the recycle being taken from the exit of the second stage and returned upstream of the first stage. This is achieved by greatly reducing the volumetric flowrate at the suction of the compressor. The reduction in bulk methanator duty may reduce the number of methanators required in comparison to prior art processes. In one arrangement of this embodiment a second recycle stream may be taken between the second bulk methanator and the trim methanator.
Optionally, a recycle methanator may be incorporated in the recycle stream between the compressor and the introduction of the recycle stream to the first and/or second and/or subsequent bulk methanator. As discussed above in connection with the first embodiment of the present invention, the recycle methanator may be located as a zone in the same vessel as the first bulk methanator or of any bulk methanator into which the recycle stream is to be introduced.
Methanating the recycle stream in the trim methanator before it is passed to the compressor substantially reduces the number of moles that the compressor must compress to achieve the required heat sink for the bulk methanation and hence reduces the power consumption.
Where a recycle methanator is present in the recycle loop, more than one recycle methanator may be present.
In a third embodiment, the process comprises:
providing a feed gas to a first and second bulk methanator;
subjecting the feed gas to methanation in the presence of a suitable catalyst;
removing an at least partially reacted stream from the first bulk methanator and supplying it to the second bulk methanator where it is subjected to further methanation; removing a gas stream from the second bulk methanator and cooling said stream; passing at least a portion of the cooled stream to a compressor;
supplying said compressed stream to a recycle methanator where further methanation occurs;
splitting the product stream from the recycle methanator and passing a portion thereof to a trim methanator train where it is subjected to further methanation; and
recycling the balance of said product stream to the first and/or second bulk methanator. This arrangement is a variation of the first embodiment described above. Although in this arrangement, the power demand of the recycle compressor is not reduced, it does enable the overall equipment count of the flowsheet to be reduced and hence reduce the overall capital costs. In this embodiment, the stream exiting the recycle methanator has been subjected to compression as well as the further methanation discussed above in connection with the first embodiment.
This third embodiment may be used to reduce the effective overall pressure drop of the methanation unit, without adding on costly equipment items, such as an extra compressor or extra methanation stages, which would have been required to pressurise the methanated gas. The configuration of this embodiment also uses the advantages of the increased pressure of operation for the trim methanation section, which will drive the equilibrium to produce more methane at the same temperature conditions.
In the above processes, the portion of the feed gas fed to the first bulk methanator, the second bulk methanator may be the same or different. In one arrangement with two bulk methanators about 40% of the fresh feed gas is fed to the first bulk methanator, with the remainder being fed to the second bulk methanator. However, it will be understood that the split of feed between the methanators will depend on the number of bulk methantors, the operating conditions and the feed composition.
Features described in connection with the above first or second embodiment may be combined with this embodiment as appropriate.
Whilst the above processes have been discussed with reference to there being two bulk methanators, it will be understood that in certain circumstances it may be appropriate to use more than two bulk methanators. In this arrangement, the recycle will generally be taken downstream of the last bulk methanator and the recycle stream, having been passed through a reactor and a compressor in any order, will be recycled to one or more of the bulk methanators as appropriate. The feed to the bulk methanators may be stoichiometric or may be non- stoichiometric.
In any embodiment of the present invention, water may be removed from the recycle stream. Where water is to be removed it will generally be removed prior to the recycle stream being passed to the compressor. Generally water removal will only be required with some feed compositions and operating conditions.
In one arrangement of either preferred embodiment of the present invention the feed from the first bulk methanator to the second bulk methanator may be passed through a catalyst bed located above the catalyst bed over which the bulk methanation occurs and above the point at which the feed is added to the vessel. The stream passing from the first bulk methanator will then be subjected to trim methanation before it is mixed with the new feed and subjected to bulk methanation.
The shift reaction will generally be carried out before the feed is supplied to the bulk methanators but in an alternative arrangement, the shift reaction may be carried out in the bulk methanator.
Both preferred embodiments of the present invention reduce the overall operating cost of the plant by reducing the power of the recycle compressor.
With the processes of the present invention it is possible to move more of the catalyst to the trim methanators from the bulk methanators which is advantageous as catalyst life is generally longer here since there is reduced poisoning and the lower temperatures reduce the risk of sintering.
Whichever embodiment of the present invention is used, it may be desirable to add a small amount of steam into the recycle flow upstream of the bulk methanation stages to prevent carbon lay down on the catalyst. However, even when present this flowrate is small when compared to the overall steam production in the bulk methanators and is typically less than 5% of the total steam produced.
In one arrangement, steam may be introduced into the system stream via a feed saturator placed upstream of the bulk methanators. Thus the steam can be added without using direct steam addition.
The fresh feed to the first and/or second and/or subsequent bulk methanators of the present invention may be stoichiometric with respect to the methanation reaction or non- stoichiometric.
The present invention will now be described by way of example with reference to the accompanying drawings in which:
Figure 1 is a block flow diagram of a first embodiment of the present invention;
Figure 2 is a block flow diagram of a second embodiment of the present invention;
Figure 3 is a schematic representation of the arrangement in which the recycle methanator is combined in the same vessel as the first bulk methanator; and
Figure 4 is a schematic representation of the third embodiment of the present invention.
It will be understood by those skilled in the art that the drawings are diagrammatic and that further items of equipment such as feedstock drums, pumps, vacuum pumps, compressors, gas recycling compressors, temperature sensors, pressure sensors, pressure relief valves, control valves, flow controllers, level controllers, holding tanks, storage tanks and the like may be required in a commercial plant. Provision of such ancillary equipment forms no part of the present invention and is in accordance with conventional chemical engineering practice.
One embodiment of the present invention is illustrated in Figure 1. Desulphurised feed gas rich in carbon monoxide is fed in line 1 to the bulk methanation section which consists of two bulk methanators, the first bulk methanator 2 and the second bulk methanator 3. Thus the feed is split with a portion being fed in line l a to the first bulk methanator 2 and a portion via line l b to the second bulk methanator 3. The product stream from the first bulk methanator 2 is passed in line 4 to the second bulk methanator 3. It will generally be cooled in heat exchanger 5 before being added to the second bulk methanator 3.
The product stream from the second bulk methanator 3 is passed in line 6 to heat exchanger 7 where it is cooled. A portion of the stream from the heat exchanger is passed in line 8 to a first trim methanator 9. The remainder of the stream from the heat exchanger 7 is passed in line 10, via heat exchanger 1 1 and line 12 to the compressor 13. In heat exchanger 1 1 the recycle stream is cooled before compression in compressor 13.
The gas from the compressor is passed in line 14 via heat exchanger 15 where it is heated to recycle methanation operating temperatures and line 16 to the recycle methanator 17 where it is subjected to further methanation reaction. The gas from the recycle methanator is removed from the recycle methanator in line 18, passed through heat exchanger 19 and returned via line 20 to the first methanator 2. Generally this return to the first methanator 2 will be via the feed line la.
The product from the trim methanator 9 is removed in line 21 and passed through heat exchanger 22 where it is cooled. It is then passed in line 23 to one or more subsequent trim methanators 24. The product is withdrawn in line 25 and then is cooled and dried at 26. The SNG is then removed in line 27. In one specific example the bulk methanators may be operated such that the feed thereto is at about 320°C. After the reaction and subsequent heat exchange the feed to the first trim methanator 9 will be at about 280°C. The feed to the recycle methanator 1 7 will also be about 280°C. The feed to the subsequent trim methanators 24 will generally be about 250°C.
In the flow sheet illustrated in Figure 1 , a portion of the stream removed from the first trim methanator 9 can be added in line 28 to the recycle stream fed to the compressor 13 and hence to the recycle methanator 17.
Depending on the feed composition and the operating conditions, it may be necessary or desirable to remove water. This can be conveniently done before the compressor in line 29.
Stream may be added in line 30. This will only be required with some feed compositions and operating conditions.
A second embodiment of the present invention is illustrated in Figure 2. Desulphurised feed gas rich in carbon monoxide is fed in line 31 to the bulk methanation section which consists of two bulk methanators, the first bulk methanator 32 and the second bulk methanator 33. Thus the feed is split with a portion being fed in line 3 la to the first bulk methanator 32 and a portion via line 31 b to the second bulk methanator 33. The product stream from the first bulk methanator 32 is passed in line 34 to the second bulk methanator 33. It will generally be cooled in heat exchanger 35 before being added to the second bulk methanator 33.
The product stream from the second methanator 33 is passed in line 36 to heat exchanger 37 where it is cooled. The stream from the heat exchanger 37 is passed in line 38 to a first trim methanator 39. Following methanation in the trim methanator 39, the stream is removed in line 40 with a portion being passed in line 41 via heat exchanger 42 and line 43 to the compressor 44. In heat exchanger 42 the recycle stream is cooled in order to achieve the required steam to carbon ratio in the bulk methanation section. Since the stream taken from the trim methanator 39 has been methanated further and at lower temperature it has a lower carbon monoxide and hydrogen content and a higher methane content than the gas exiting the second bulk methanator 33.
The gas from the compressor is passed in line 45 via heat exchanger 46 where it is heated before being passed in line 47 to the bulk methanator 32. Generally this return to the first methanator 32 will be via the feed line 3 la.
The portion of the stream from the trim methanator 39 which is not passed to the compressor 44 is removed in line 48 and passed through heat exchanger 49 where it is cooled. It is then passed in line 50 to one or more subsequent trim methanators 51. The product is withdrawn in line 52 and then is cooled and dried at 53. The SNG is then removed in line 54.
In one specific example the bulk methanators may be operated such that the feed thereto is at about 320°C. After the reaction and subsequent heat exchange the feed to the first trim methanator 39 will be at about 280°C. The feed to the subsequent trim methanators 51 will generally be about 250°C.
In the flow sheet illustrated in Figure 2, a portion of the stream removed from the heat exchanger 37 may be removed and having by-passed the first trim methanator 39 can be added in line 55 to the recycle stream fed to the compressor 44 and hence to the bulk methanator 32.
Depending on the feed composition and the operating conditions, it may be necessary or desirable to remove water. This can be conveniently done before the compressor 44 in line 56.
Steam may be added in line 57. This will only be required with some feed compositions and operating conditions. Optionally, a recycle methanator 58 and subsequent heat exchanger 59 may be located in the recycle loop after the compressor 44.
In one specific example of this embodiment the bulk methanators may be operated such that the feed thereto is at about 320°C. After the reaction and subsequent heat exchange the feed to the first trim methanator 39 will be at about 280°C. The feed to the recycle methanator 58, where present, will also be about 280°C. The feed to the subsequent trim methanators 51 will generally be about 250°C.
Optionally, the recycle methanator, where present, may be combined within the same vessel as the bulk methanator into which the recycle stream is to be added. This is illustrated schematically in Figure 3. The arrangement illustrated in Figure 3 also includes the possibility that the second bulk methanator also has a pre-reactor for the methanation of cooling gas located in the upper portion of the vessel. It will however be understood that these two arrangement may be used alone or in combination.
As illustrated in Figure 3, the fresh feed is fed in line 100. This is split and added to vessels 101 and 102 respectively via lines 103 and 104. Vessel 101 comprises two reaction zones 105 and 106 and the feed is added between these two zones. Since flow is downwardly the feed added in line 103 will flow through reaction zone 106 where it is contacted with the methanation catalyst at the required temperature for bulk methanation.
Recycle from the compressor (not shown in this figure) is added to the vessel 101 in line 107. It flows downwardly through reaction zone 105 which acts as the recycle methanator and undergoes methanation before being mixed with the gaseous feed added in line 103.
Product from the bulk methanation is removed in line 1 08 and passed to heat exchanger 109 where it is cooled before being passed to the second bulk methanator. This may be a conventional bulk methanator or may be the vessel 102 illustrated in Figure 3. In this arrangement the stream from the first bulk methanator is added in line 1 10 to the top of the vessel where it is passed through a catalyst bed 1 1 1 and undergoes methanation before being mixed with the fresh feed added in line 104 before being passed to catalyst bed 1 12 where bulk methanation occurs. The product is then removed in line 1 13 before being removed for treatment in accordance with the present invention.
An alternative arrangement of the present invention is illustrated in Figure 4. Desulpharised feed rich in carbon monoxide is fed in line 201 to the bulk methanation section which consists of two bulk methanators, the first bulk methanator 202 and the second bulk methanator 203. Thus the feed is split with a portion being fed in line 201 a to the first bulk methanator 202 and a portion via line 201 b to the second bulk methanator 203. As discussed below, this is not fed directly to the second methanator 203 but is first mixed with a product stream from the first methanator 201
The product stream from the first bulk methanator 202 is passed in line 204 to heat exchange 205 where it is cooled. This is then passed in line 206 to the second methanator 203. Prior to being added to the methanator, the stream is mixed with feed added in line 201 b.
The product stream from the second methanator 203 is passed in line 207 to heat exchanger 208 where it is cooled. The stream from the heat exchanger is passed in line 209 to compressor 210 where it is compressed. The gas from the compressor is passed in line 21 1 to heater 212 where it is heated to recycle methanation operating temperatures before being passed in line 213 to recycle methanator 214 where it is subjected to further methanation reaction.
The product stream from the recycled methanator 214 is removed in line 215 to cooler 216. The cooled stream is removed in line 217 before being split into lines 218 and 219. The portion in line 218 is recycled to the first methanator 202. The portion of the cooled stream in line 219 is passed to first trim methanator 220. The product from the first trim methanator 220 is passed in line 22 1 to cooler 222. The cooled stream is then passed in line 223 to the second trim methanator 224 before being passed in line 225 to dryer 226. The SNG is then removed in line 227.
The present invention will now be illustrated with reference to the following examples.
Comparative Example A
The 'Base Case' flowsheet has two bulk methanators within the recycle loop followed by two stages of trim methanation which are not included in the recycle loop. The flowsheet uses a near stoichiometric feed and is designed to produce a product containing 96% methane. Table 1 summarises the main operating parameters for the flowsheet and gives details of the recycle flow, loop pressure drop and expected compressor power for this case.
Table 1
Figure imgf000022_0001
Example Al
A recycle methanator has been added into the loop downstream of the recycle compressor. Two additional heat exchangers are also added into the recycle loop, the first to heat the feed to the recycle methanator to the correct temperature, and the second to cool the recycle methanator product. Again the flowsheet is designed to produce a product containing 96% methane. Table 2 summarises the main operating parameters for the flowsheet and gives details of the recycle flow, loop pressure drop and expected compressor power for this case.
Table 2
Figure imgf000023_0001
This example shows that, despite the addition of the recycle methanator and associated heat exchangers into the recycle loop, the overall compressor power for this case is lower than for the base case flowsheet by approximately 5%. As some of the methanation duty that would normally be occurring in the bulk methanators has been transferred to the recycle methanator, the recycle rate that is required to control the temperature at the outlet of the bulk methanators is significantly reduced, resulting in the improvement in compressor power. Example A2
In this example, there are no additional methanators or other items of equipment added to the flowsheet, but the point at which the recycle is removed has been moved from the outlet of bulk methanator 2 to the outlet of trim methanator 1. i.e. trim methanator 1 is now included in the recycle loop. An additional trim methanator (trim methanator 2) is included outside of the recycle loop giving the same number of bulk and trim methanators overall as for the comparative example. The flowsheet is designed to produce a product containing 96% methane. Table 3 summarises the main operating parameters for the flowsheet and gives details of the recycle flow, loop pressure drop and expected compressor power for this case.
Table 3
Figure imgf000024_0001
This example shows that, despite the addition of the trim methanator 1 into the recycle loop, the overall compressor power for this case is lower than for the base case flowsheet by over 20%. This example also shows a significant improvement over Example A1 . As with the recycle methanator flowsheet of Example A l , the overall bulk methanation duty has been reduced (this time as a part of it has been carried out in trim methanator 1 ). The bulk methanation section then requires a lower recycle flowrate than the flowsheet of Comparative Example A. In addition, as an improvement on the design of Example A 1 , fewer equipment items are added to the loop which results in a lower pressure differential across the recycle compressor. Another major advantage of this arrangement is that the methanation in the trim methanator 1 is carried out upstream of the compressor so that the number of moles of gas and hence the volumetric flowrate into the compressor is greatly reduced (3H2 + CO -> CI + H20). Hence the power and suction volume (which set the compressor size) for this design is lower than both Comparative Example A and Example Al .
Comparative Example B
This 'Base Case' flowsheet has two bulk methanators within the recycle loop followed by two stages of trim methanation which are not included in the recycle loop. The flowsheet uses a non-stoichiometric, carbon rich, feed and is designed to produce a product containing 97.5% methaneafter downstream OSBL C02 removal. Table 4 summarises the main operating parameters for the flowsheet and gives details of the recycle flow, loop pressure drop and expected compressor power for this case.
Table 4
Figure imgf000025_0001
Example Bl
A recycle methanator has been added into the loop downstream of the recycle compressor. One additional heat exchanger is also added into the recycle loop, to cool the recycle methanator product. However the addition of this unit has allowed for the deletion of an exchanger upstream of the loop, consequently the loop and the product are at a higher pressure. Again the flowsheet is designed to produce a product containing 97.5% methane. Table 5 summarises the main operating parameters for the flowsheet and gives details of the recycle flow loop pressure drop and expected compressor power for this case.
Table 5
Figure imgf000026_0001
This example shows that, despite the addition of the recycle methanator and associated heat exchangers into the recycle loop; the overall compressor power for this case is lower than for the base case flowsheet by approximately 7%. As in Example A l , some of the methanation duty that would normally be occurring in the bulk methanators has been transferred to the recycle methanator, the recycle rate that is required to control the temperature at the outlet of the bulk methanators is significantly reduced, resulting in the improvement in compressor power.
Example B2
In this example, there are no additional methanators or other items of equipment added to, or removed from, the flowsheet. However the point at which the recycle is removed has been moved from the outlet of bulk methanator 2 to the outlet of trim methanator 1 , i.e. trim methanator 1 is now included in the recycle loop. Trim methanator 2 is included outside of the recycle loop giving the same number of bulk and trim methanators overall as for the comparative example. The flowsheet is designed to produce a product containing 97.5% methane. Table 6 summarises the main operating parameters for the flowsheet and gives details of the recycle flow, loop pressure drop and expected compressor power for this case.
Table 6
Figure imgf000027_0001
This example shows that, despite the addition of the trim methanator 1 into the recycle loop, the overall compressor power for this is lower than for the base case flowsheet by over 10%. This example also shows an improvement over Example B l . Again, as in Example A2, the recycle methanator flowsheet, the overall bulk methanation duty has been reduced (this time as part of it has been carried out in trim methanator 1). The bulk methanation section then requires a lower recycle flowrate than the flowsheet of Comparative Example B.
As with Example A2, another major advantage of this arrangement is that the methanation in the trim methanator 1 is carried out upstream of the compressor so that the number of moles of gas and hence the volumetric flowrate into the compressor is greatly reduced (3 Ho + CO -> CH4 + H20). Hence the power and suction volume (which set the compressor size) for this design is lower than both Comparative Example B and Example B 1 .
Comparative Example C
The flowsheet uses a near stoichiometric feed and is designed to produce a product containing 96% methane as in Example A l . The flowsheet has been changed to include the full recycle flow through the recycle methanator. Table 7 summarises the main operating parameters for the flowsheet and gives details of the recycle flow loop pressure drop and expected compressor power for this case.
Table 7
Figure imgf000028_0001
This example shows that, due to the addition of the recycle methanator and associated heat exchangers into the recycle loop, with the full recycle flow entering the compressor; the overall compressor power for this case is higher than for the base case flowsheet. However, this example demonstrates the application for this embodiment, increasing the product pressure and methane content without adding on any extra equipment items.

Claims

Claims
1 A process for the production of substitute natural gas comprising:
providing a feed gas to a first and/or second and/or subsequent bulk methanator;
subjecting that feed gas to methanation in the presence of a suitable catalyst;
removing an at least partially reacted stream from the first bulk methanator and supplying it to the second and/or subsequent bulk methanator where it is subjected to further methanation;
passing a product stream from the final bulk methanator to a trim methanator train where it is subjected to further methanation;
removing a recycle stream downstream of the first, second or subsequent bulk methanator, and, in any order, passing it through a compressor, subjecting it to cooling and then supplying to a trim and/or recycle methanator for further methanation before being recycled to the first and/or second and/or subsequent methanator.
2. A process according to Claim 1 wherein the process comprises:
providing a feed gas to a first and second bulk methanator; subjecting that feed gas to methanation in the presence of a suitable catalyst;
removing an at least partially reacted stream from the first bulk methanator and supplying it to the second bulk methanator where it is subjected to further methanation;
removing a gas stream from the second bulk methanator and cooling said stream;
splitting said cooled gas stream and supplying a portion to a trim methanator train where further methanation occurs and a portion to a recycle stream;
passing said recycle stream to a compressor; passing said compressed stream from the compressor to a recycle methanator operated at a lower outlet temperature than the first and second bulk methanators and subjecting said compressed stream to further methanation; and recycling said stream from the recycle methanator to the first and/or second bulk methanator.
3. A process according to Claim 2 wherein a second recycle stream is removed from the stream exiting the, or the first, trim methanator or a subsequent methanator.
4. A process according to Claim 2 or 3 wherein the recycle methanator is located as a zone in the vessel housing the first bulk methanator, and/or the second bulk methanator.
5. A process according to Claim 1 wherein the process comprises:
providing a feed gas to a first and second bulk methanator; subjecting the feed gas to methanation in the presence of a suitable catalyst;
removing an at least partially reacted stream from the first bulk methanator and supplying it to the second bulk methanator where it is subjected to further methanation;
removing a gas stream from the second bulk methanator and cooling said stream;
supplying said cooled gas stream to a trim methanator where further methanation occurs, said trim methanator operating at a lower outlet temperature than the bulk methanators;
splitting the product stream from the trim methanator and passing a portion thereof to a train of subsequent trim methanators and a portion to a recycle stream;
passing said recycle stream to a compressor; and
recycling said stream to the first and/or second bulk methanator.
6. A process according to Claim 5 wherein a second recycle stream is taken between the second bulk methanator and the trim methanator.
7. A process according to Claim 5 or 6 wherein a recycle methanator is incorporated in the recycle stream between the compressor and the introduction of the recycle stream to the first and/or second bulk methanator.
8. A process according to Claim 7 wherein the recycle methanator is located as a zone in the vessel housing the first bulk methanator, and/or the second bulk methanator
9. A process according to Claim 1 comprising:
providing a feed gas to a first and second bulk methanator; subjecting the feed gas to methanation in the presence of a suitable catalyst;
removing an at least partially reacted stream from the first bulk methanator and supplying it to the second bulk methanator where it is subjected to further methanation;
removing a gas stream from the second bulk methanator and cooling said stream;
passing at least a portion of the cooled stream to a compressor;
supplying said compressed stream to a recycle methanator where further methanation occurs;
splitting the product stream from the recycle methanator and passing a portion thereof to a trim methanator train where it is subjected to further methanation; and
recycling the balance of said product stream to the first and/or second bulk methanator.
10. A process according to any one of Claims 1 to 9 wherein water is removed from the recycle stream.
1 1. A process according to any one of Claims 1 to 10 wherein the feed from the first bulk methanator to the second and/or subsequent bulk methanator is passed through a catalyst bed located above the catalyst bed over which the bulk methanation occurs and above the point at which the fresh feed is added to the vessel.
12. A process according to any one of Claims 1 to 1 1 wherein the fresh feed to the first and/or second and/or subsequent bulk methanators is stoichiometric with respect to the methanation reaction or non-stoichiometric.
PCT/GB2011/051215 2010-07-01 2011-06-27 Process for the production of substitute natural gas WO2012001401A1 (en)

Priority Applications (12)

Application Number Priority Date Filing Date Title
UAA201301087A UA110483C2 (en) 2010-07-01 2011-06-27 Process for the production of substitute natural gas
NZ603500A NZ603500A (en) 2010-07-01 2011-06-27 Process for the production of substitute natural gas
US13/805,940 US8969423B2 (en) 2010-07-01 2011-06-27 Process for the production of substitute natural gas
AP2012006580A AP2012006580A0 (en) 2010-07-01 2011-06-27 Process for the production of substitute natural gas
EP11730730.6A EP2588579B1 (en) 2010-07-01 2011-06-27 Process for the production of substitute natural gas
JP2013517535A JP5813762B2 (en) 2010-07-01 2011-06-27 Process for the production of alternative natural gas
AU2011273136A AU2011273136B2 (en) 2010-07-01 2011-06-27 Process for the production of substitute natural gas
KR1020127032247A KR20130095647A (en) 2010-07-01 2011-06-27 Process for the production of substitute natural gas
EA201201442A EA023626B1 (en) 2010-07-01 2011-06-27 Process for the production of substitute natural gas
CA2803221A CA2803221A1 (en) 2010-07-01 2011-06-27 Process for the production of substitute natural gas
CN201180031700.1A CN102959057B (en) 2010-07-01 2011-06-27 Process for the production of substitute natural gas
ZA2012/08545A ZA201208545B (en) 2010-07-01 2012-11-13 Process for the production of substitute natural gas

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
GB1011063.3 2010-07-01
GBGB1011063.3A GB201011063D0 (en) 2010-07-01 2010-07-01 Process

Publications (1)

Publication Number Publication Date
WO2012001401A1 true WO2012001401A1 (en) 2012-01-05

Family

ID=42669017

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/GB2011/051215 WO2012001401A1 (en) 2010-07-01 2011-06-27 Process for the production of substitute natural gas

Country Status (17)

Country Link
US (1) US8969423B2 (en)
EP (1) EP2588579B1 (en)
JP (1) JP5813762B2 (en)
KR (1) KR20130095647A (en)
CN (1) CN102959057B (en)
AP (1) AP2012006580A0 (en)
AR (1) AR082071A1 (en)
AU (1) AU2011273136B2 (en)
CA (1) CA2803221A1 (en)
CL (1) CL2012003699A1 (en)
EA (1) EA023626B1 (en)
GB (1) GB201011063D0 (en)
MY (1) MY160744A (en)
NZ (1) NZ603500A (en)
UA (1) UA110483C2 (en)
WO (1) WO2012001401A1 (en)
ZA (1) ZA201208545B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104312651A (en) * 2014-10-30 2015-01-28 北京华福工程有限公司 Circulation-free methanation system
WO2015159044A1 (en) * 2014-04-16 2015-10-22 Johnson Matthey Public Limited Company Process
GB2537219A (en) * 2015-03-03 2016-10-12 Johnson Matthey Davy Technologies Ltd Process

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101576206B1 (en) 2014-08-18 2015-12-11 한국에너지기술연구원 System and method for preventing catalyst overheating
CN105838461A (en) * 2015-01-13 2016-08-10 中国科学院大连化学物理研究所 Methanation technology of synthetic gas for synthetic natural gas
EP3447616B1 (en) * 2016-04-19 2021-06-09 Alps Alpine Co., Ltd. Capacitive sensor

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4016189A (en) 1974-07-27 1977-04-05 Metallgesellschaft Aktiengesellschaft Process for producing a gas which can be substituted for natural gas
US4133825A (en) 1976-05-21 1979-01-09 British Gas Corporation Production of substitute natural gas
US4205961A (en) 1977-07-02 1980-06-03 Metallgesellschaft Process of producing a natural gas substitute
US4298694A (en) 1978-12-12 1981-11-03 Haldor Topsoe A/S Process and a plant for preparing a gas rich in methane
US20090247653A1 (en) 2006-04-06 2009-10-01 Fluor Technologies Corporation Configurations And Methods of SNG Production
US20090264542A1 (en) 2008-04-16 2009-10-22 Methanol Casale S.A. Process and Plant for Substitute Natural Gas
WO2010033848A2 (en) * 2008-09-19 2010-03-25 Greatpoint Energy, Inc. Processes for gasification of a carbonaceous feedstock
CN101812339A (en) * 2010-04-15 2010-08-25 大唐国际化工技术研究院有限公司 Method and device for producing synthetic natural gas, and natural gas product thereof

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101508922B (en) * 2009-03-16 2012-10-03 西南化工研究设计院 Methanation reaction process using oven gas to prepare substitute natural gas
CN101560134B (en) * 2009-05-21 2014-01-15 新奥新能(北京)科技有限公司 Novel process for preparing methane from high energy-efficiency synthetic gas
CN101705128B (en) * 2009-07-14 2013-03-06 上海国际化建工程咨询公司 Adiabatic methanation process and device for preparing synthetic natural gas

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4016189A (en) 1974-07-27 1977-04-05 Metallgesellschaft Aktiengesellschaft Process for producing a gas which can be substituted for natural gas
US4133825A (en) 1976-05-21 1979-01-09 British Gas Corporation Production of substitute natural gas
US4205961A (en) 1977-07-02 1980-06-03 Metallgesellschaft Process of producing a natural gas substitute
US4298694A (en) 1978-12-12 1981-11-03 Haldor Topsoe A/S Process and a plant for preparing a gas rich in methane
US20090247653A1 (en) 2006-04-06 2009-10-01 Fluor Technologies Corporation Configurations And Methods of SNG Production
US20090264542A1 (en) 2008-04-16 2009-10-22 Methanol Casale S.A. Process and Plant for Substitute Natural Gas
WO2010033848A2 (en) * 2008-09-19 2010-03-25 Greatpoint Energy, Inc. Processes for gasification of a carbonaceous feedstock
CN101812339A (en) * 2010-04-15 2010-08-25 大唐国际化工技术研究院有限公司 Method and device for producing synthetic natural gas, and natural gas product thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015159044A1 (en) * 2014-04-16 2015-10-22 Johnson Matthey Public Limited Company Process
US9840446B2 (en) 2014-04-16 2017-12-12 Johnson Matthey Public Limited Company Process for production of methane-containing gas mixture
CN104312651A (en) * 2014-10-30 2015-01-28 北京华福工程有限公司 Circulation-free methanation system
GB2537219A (en) * 2015-03-03 2016-10-12 Johnson Matthey Davy Technologies Ltd Process
GB2537219B (en) * 2015-03-03 2017-04-26 Johnson Matthey Davy Technologies Ltd Process for producing substitute natural gas

Also Published As

Publication number Publication date
MY160744A (en) 2017-03-15
US20130210938A1 (en) 2013-08-15
JP2013531719A (en) 2013-08-08
CL2012003699A1 (en) 2013-03-08
ZA201208545B (en) 2013-07-31
AP2012006580A0 (en) 2012-12-31
NZ603500A (en) 2014-02-28
US8969423B2 (en) 2015-03-03
UA110483C2 (en) 2016-01-12
GB201011063D0 (en) 2010-08-18
EP2588579A1 (en) 2013-05-08
AU2011273136A1 (en) 2012-11-29
CN102959057A (en) 2013-03-06
CN102959057B (en) 2014-12-24
JP5813762B2 (en) 2015-11-17
CA2803221A1 (en) 2012-01-05
EP2588579B1 (en) 2016-12-07
EA201201442A1 (en) 2013-05-30
AR082071A1 (en) 2012-11-07
KR20130095647A (en) 2013-08-28
AU2011273136B2 (en) 2014-10-23
EA023626B1 (en) 2016-06-30

Similar Documents

Publication Publication Date Title
EP2588579B1 (en) Process for the production of substitute natural gas
EP2024521B1 (en) Method and apparatus for producing direct reduced iron
TWI732818B (en) A process for producing an ammonia synthesis gas, a process for producing ammonia from such gas, and a plant arranged to carry out such process
CN113795460A (en) ATR-based hydrogen process and apparatus
EP3983365B1 (en) Process for synthesising methanol
EA005783B1 (en) Process for the production of hydrocarbons
CN102517108A (en) Technology for preparing liquefied natural gas and liquid ammonia by using coke oven gas
EP3983366B1 (en) Process for synthesising methanol
CN101892104A (en) Method for preparing liquefied natural gas by utilizing relief gas of methanol
WO2019008317A1 (en) Methanol synthesis process
CN107406780B (en) Process for producing substitute natural gas
CN114555516A (en) ATR-based hydrogen production method and apparatus
TWI522172B (en) Process for the production of substitute natural gas
US5069891A (en) Process for independent control of methane and rare gas contents of an ammonia-hydrogen recovery-rare gas plant complex
CN109593579B (en) One-time-pass methanation process
WO2019043875A1 (en) Method for producing ammonia by using high nitrogen-containing natural gas
EA042869B1 (en) METHANOL SYNTHESIS METHOD

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 201180031700.1

Country of ref document: CN

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 11730730

Country of ref document: EP

Kind code of ref document: A1

REEP Request for entry into the european phase

Ref document number: 2011730730

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 2011730730

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 3478/KOLNP/2012

Country of ref document: IN

WWE Wipo information: entry into national phase

Ref document number: 201201442

Country of ref document: EA

ENP Entry into the national phase

Ref document number: 2011273136

Country of ref document: AU

Date of ref document: 20110627

Kind code of ref document: A

ENP Entry into the national phase

Ref document number: 20127032247

Country of ref document: KR

Kind code of ref document: A

ENP Entry into the national phase

Ref document number: 2803221

Country of ref document: CA

WWE Wipo information: entry into national phase

Ref document number: 2012003699

Country of ref document: CL

ENP Entry into the national phase

Ref document number: 2013517535

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

WWE Wipo information: entry into national phase

Ref document number: 13805940

Country of ref document: US