WO2011151031A1 - Verfahren und vorrichtung zum anpassen eines produktionsablaufplans für einen produktionsprozess - Google Patents
Verfahren und vorrichtung zum anpassen eines produktionsablaufplans für einen produktionsprozess Download PDFInfo
- Publication number
- WO2011151031A1 WO2011151031A1 PCT/EP2011/002593 EP2011002593W WO2011151031A1 WO 2011151031 A1 WO2011151031 A1 WO 2011151031A1 EP 2011002593 W EP2011002593 W EP 2011002593W WO 2011151031 A1 WO2011151031 A1 WO 2011151031A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- availability
- process steps
- production
- energy
- optimization
- Prior art date
Links
- 238000000034 method Methods 0.000 title claims abstract description 114
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 106
- 238000005457 optimization Methods 0.000 claims description 49
- 230000002123 temporal effect Effects 0.000 claims description 8
- 238000005265 energy consumption Methods 0.000 claims description 4
- 238000004590 computer program Methods 0.000 claims description 2
- 238000012545 processing Methods 0.000 claims description 2
- 230000008707 rearrangement Effects 0.000 claims description 2
- 230000001771 impaired effect Effects 0.000 abstract 1
- 238000001816 cooling Methods 0.000 description 9
- 230000005611 electricity Effects 0.000 description 6
- 239000007795 chemical reaction product Substances 0.000 description 3
- 230000007423 decrease Effects 0.000 description 3
- 230000001419 dependent effect Effects 0.000 description 2
- 239000000047 product Substances 0.000 description 2
- 239000002023 wood Substances 0.000 description 2
- 238000010521 absorption reaction Methods 0.000 description 1
- 238000013459 approach Methods 0.000 description 1
- 239000011093 chipboard Substances 0.000 description 1
- 238000012790 confirmation Methods 0.000 description 1
- 230000000593 degrading effect Effects 0.000 description 1
- 230000003111 delayed effect Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 230000006866 deterioration Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000018109 developmental process Effects 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 239000000543 intermediate Substances 0.000 description 1
- 230000001788 irregular Effects 0.000 description 1
- 239000002244 precipitate Substances 0.000 description 1
- 230000001172 regenerating effect Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06312—Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/004—Generation forecast, e.g. methods or systems for forecasting future energy generation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Definitions
- the invention relates generally to production planning, in particular the control of a production of a production plant, e.g. Energy out
- the amount of electrical energy unsynchronized with the consumption must be taken from the power plant operators or network operators in accordance with a legal provision and fed into the power grid.
- Production plant can be operated with a better use of excess electrical energy.
- the method comprises the following steps:
- predetermined minimum energy availability exists within a given optimization period based on availability information indicating a predicted energy availability during the optimization period;
- One idea of the above method is to implement individual process steps of the production process that can be flexibly executed in time, i. be performed within a first or a second time window to provide for that time window in which a certain or higher energy availability exists or expected. These are first made from a
- the predetermined minimum availability can be determined by an availability threshold, which is in particular an average of the
- the energy availability may indicate the excess of electrical energy in a power grid.
- the energy availability may indicate the excess of electrical energy in a power grid.
- Process step are determined depending on a state variable of the process step, in particular, depending on a current energy availability of the flexible process step is executed immediately.
- the one or more flexible process steps specify those process steps which are executable in a plurality of alternative time windows within the optimization period, without at least one optimization variable being more than one optimization size tolerance value from a value of the optimization variable determined by the optimization variable original
- a production planning system is for adjusting a production schedule for one or more production processes
- the production planning system is configured:
- a production system having one or more production processes and the above production planning system is provided.
- a computer program product having a program code which, when executed on a data processing unit, executes the above process of adjusting a production schedule.
- Figure 1 is a schematic representation of production processes each with a plurality of process steps, controlled by a
- FIG. 2 shows a flowchart for illustrating a method for
- FIG. 1 shows a schematic representation of a production system 1 with a production control unit 2 which monitors and controls one or more production processes 3.
- Each of the production processes 3 comprises a sequence of one or more process steps 4.
- the production processes 3 serve to produce one or more end products from one or more raw products or intermediates.
- the process steps 4 require energy to carry them out, in the present exemplary embodiment electrical energy.
- the production control unit 2 is connected to a production planning system 5, which is the production control unit 2 information about the timing of the individual process steps 4 available.
- the information includes for each process step 4 a start time and default values for the respective process step, so that the production control unit 2 can initiate the respective process step at the predetermined start time and transmits to the process step associated production equipment, the default sizes, derived quantities or the like.
- the production planning system 5 creates a production schedule depending on known production parameters of the individual process steps 4 and on the basis of an optimization function that optimizes the production processes 3 with regard to one or more specific variables.
- the optimization takes place by suitable temporal arrangement of the individual process steps 4, so that the
- End product according to a predetermined optimization goal for example, in the given time and / or in the specified quantity and / or quality are produced can.
- the optimization takes place with regard to the production time of a product to be produced, which is to be minimized. Optimization is performed by known optimization techniques known in the art.
- the individual process steps 4 require electrical energy for their execution, the amount of which depends considerably on the type of process step in question.
- a process step 4 may u.U. be performed in multiple, overlapping or non-overlapping alternative time slots without the
- Result of the production process 3 or the plurality of production processes 3 is affected in terms of one or more optimization variables.
- availability information on how the availability of electrical energy is currently, ie an indication of the local volume and amount of excess electrical energy.
- availability information may also include information on how, in the near future, ie, for example, within the next 24 to 28 hours, the availability of electrical energy in the power grid will develop both temporally and locally, and in what amount each will be present.
- the availability information also includes an indication of the period of time and for which period of time there is an excess of electrical energy, or this information can be derived therefrom.
- the Availability Information Provides information about the probabilities of having a predicted availability at a time or in a future period. These details may be for example
- the availability information is provided to the production planning system 5.
- the availability information can be obtained via the smart grid itself or from other sources.
- the availability information may include the information about the instantaneous availability of electrical energy and the predicted availability of the electrical energy in the form of a current or predicted price for electrical energy, e.g. for specify in price per kWh. In particular, this price is variable and depends heavily on the availability and likelihood that the forecasts for the availability of electrical energy will apply.
- FIG. 2 shows a method for adjusting a production sequence plan for one or more production processes on the basis of a flowchart.
- the production schedule is made using the production control unit 2
- step S1 availability information about the availability of electrical energy is received via the power grid or the Internet or other source of information.
- the availability information includes information on a current availability of electrical energy as well as on the predicted availability of electrical energy during a future one
- the reliability of the indication of the predicted availability of electrical energy in the optimization period may be based on probabilities that have been established, for example, based on weather forecasts and the like.
- certain time windows are determined in step S2 within the observation period in which the absorption of electrical energy can be increased, since there the price of electrical energy is low, or in which a surplus
- the time windows can be determined, for example, by comparing the availability information contained in the availability information for the relevant time window with an availability threshold value and determining the time windows as the time periods in which the
- the availability threshold is undershot.
- the availability threshold may be fixed or determined based on the predicted availability of electrical energy. For example, the
- Availability Threshold may be equal to or dependent on an average of the energy availability in the optimization period. Other possibilities are also conceivable with which the time windows can be determined.
- Time windows the energy availability is highest.
- a shift of individual process steps into these time windows can be the times of the
- step S3 based on the production schedule for the specific optimization period, which is specified by the production planning system 5, the process steps 4, which have a temporal flexibility, as flexible
- Process steps determined i. Process steps that can be performed in alternative time slots without deviating from the optimization objective underlying the production schedule, i. E. without degrading the amount of optimization that has been determined based on an optimization process underlying the initial production schedule.
- the process steps 4 are determined, which can be performed in alternative time windows, without the entire production time of the Endagess or the throughput of the production process changes or deteriorates.
- the flexible process steps can specify those process steps that are in several alternative time windows within the
- Optimization period are executable, without at least one
- Optimization size tolerance value from a value of the optimization size obtained by implementing the original (initial)
- step S4 the alternative time windows in which process steps can alternatively be performed are compared with the time slots of a high energy availability determined in step S2, and those in step S5 are flexible
- Production schedule can be moved to one of the time slots with high energy availability.
- a decision on those process steps 4, the implementation of which can be shifted flexibly between alternative time windows, can also take into account whether the process steps can be interrupted during the course of the individual process step, e.g. in the event that the availability of electrical energy suddenly decreases and the
- a modified production flow plan is created, in which the flexible process steps previously identified in step S5 are shifted to the corresponding alternative time windows, if there is a lower availability of electrical energy in the original time window of one of the identified process steps than in the alternative time window , which is assigned to the relevant process step according to step S5.
- the temporal rearrangement of the corresponding flexible process steps can be carried out depending on a probability associated with each predicted availability of electrical energy.
- those flexible process steps are timed into corresponding time windows where the probability of energy availability is highest above the availability threshold.
- step S7 it is checked whether the shift of the process steps 4 in step S6 interferes with the entire production process such that an amount of optimization (e.g., throughput, production time, etc.) has deteriorated. This is done for each process step previously shifted in step S6, and the shift is not made if the deterioration of the
- Availability of electrical energy indicates, for example, in a
- Particleboard plant can be used.
- 30% of the electrical energy is used for mechanical woodworking, where wood chips are made from tree trunks. Due to predicted night storms, which can lead to high energy availability due to wind turbines connected to the power grid, this can be used.
- Production planning system 5 on the basis of the provided forecast data and process parameters decide whether there is an advantage to move the production of wood chips in an alternative time window and, for. during the night
- Production planning system 5 can then adapt the production process 3 or the production processes 3 accordingly.
- the above method of adjusting a production schedule may involve large cold stores where cooling to a particular temperature is very energy intensive. In this case, that can
- a control system may use the availability of electrical energy prediction to start the cooling process.
- cooling processes are controlled by means of a two-point control. That is, the cooling device for cooling the building is turned on when the temperature exceeds a first temperature threshold, and
- both the first temperature threshold and the second temperature threshold can be adjusted if there is high availability of electrical energy and, conversely, if there is low availability of electrical energy. Shifting the temperature thresholds results in a relative shift of the time slots in which the cooling is turned on. The fact that the cooling in the case of high availability of electrical energy cools the cold room to a lower temperature, more flexibility can be gained. That if the energy availability decreases, can be waited longer until the cooling is switched on again, since the temperature of the cold room only later the critical temperature
- Another example would be the charging of batteries needed in the production process, e.g. for operating forklifts or others
- the time windows for charging the batteries can also be selected depending on the energy availability. For example, charging batteries from forklifts may be performed during the night or during the weekend when power availability is high.
- the present invention also encompasses any combinations of preferred embodiments as well as individual design features or developments, provided that they are not mutually exclusive. LIST OF REFERENCES
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Marketing (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Tourism & Hospitality (AREA)
- Health & Medical Sciences (AREA)
- Power Engineering (AREA)
- Educational Administration (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Game Theory and Decision Science (AREA)
- Development Economics (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
Description
Claims
Priority Applications (6)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201180026954.4A CN102918733B (zh) | 2010-06-02 | 2011-05-25 | 用于对生产过程调节生产流程计划的方法和装置 |
CA2800842A CA2800842C (en) | 2010-06-02 | 2011-05-25 | Method and system for adapting a production flow schedule for a production process |
EP11723877.4A EP2577829B1 (de) | 2010-06-02 | 2011-05-25 | Verfahren und vorrichtung zum anpassen eines produktionsablaufplans für einen produktionsprozess |
AU2011260643A AU2011260643B2 (en) | 2010-06-02 | 2011-05-25 | Method and system for adapting a production flow schedule for a production process |
ZA2012/08685A ZA201208685B (en) | 2010-06-02 | 2012-11-19 | Method and system for adapting a production flow schedule for a production process |
US13/690,811 US8635096B2 (en) | 2010-06-02 | 2012-11-30 | Method and system for adapting a production flow schedule for a production process |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102010022462.6 | 2010-06-02 | ||
DE102010022462A DE102010022462A1 (de) | 2010-06-02 | 2010-06-02 | Verfahren und Vorrichtung zum Anpassen eines Produktionsablaufplans für einen Produktionsprozess |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US13/690,811 Continuation US8635096B2 (en) | 2010-06-02 | 2012-11-30 | Method and system for adapting a production flow schedule for a production process |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2011151031A1 true WO2011151031A1 (de) | 2011-12-08 |
Family
ID=44343662
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/EP2011/002593 WO2011151031A1 (de) | 2010-06-02 | 2011-05-25 | Verfahren und vorrichtung zum anpassen eines produktionsablaufplans für einen produktionsprozess |
Country Status (8)
Country | Link |
---|---|
US (1) | US8635096B2 (de) |
EP (1) | EP2577829B1 (de) |
CN (1) | CN102918733B (de) |
AU (1) | AU2011260643B2 (de) |
CA (1) | CA2800842C (de) |
DE (1) | DE102010022462A1 (de) |
WO (1) | WO2011151031A1 (de) |
ZA (1) | ZA201208685B (de) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102011081547A1 (de) * | 2011-08-25 | 2013-02-28 | Siemens Aktiengesellschaft | Einstellung einer industriellen Anlage |
WO2013091673A1 (en) * | 2011-12-19 | 2013-06-27 | Abb Technology Ag | Systems and methods for optimized operation of an industrial production or manufacturing facility |
WO2014032743A1 (en) * | 2012-09-03 | 2014-03-06 | Abb Technology Ag | Systems and methods for optimized operation of an energy-intensive industrial batch production facility |
US20140365023A1 (en) * | 2013-06-10 | 2014-12-11 | Sap Ag | Systems and Methods for Computer Implemented Energy Management |
EP2894426A1 (de) * | 2014-01-14 | 2015-07-15 | ABB Technology AG | Verfahren zur Planung eines Herstellungsprozesses |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1263108A1 (de) * | 2001-06-01 | 2002-12-04 | Roke Manor Research Limited | Energieverwaltungssystem für eine Gemeinschaft |
US20030041017A1 (en) * | 2001-05-10 | 2003-02-27 | Spool Peter R. | Business management system and method for a deregulated electric power market using consumer selected special offers |
US20050258154A1 (en) * | 2004-05-20 | 2005-11-24 | Lincoln Global, Inc., A Delaware Corporation | System and method for monitoring and controlling energy usage |
EP1748529A1 (de) * | 2005-07-29 | 2007-01-31 | TechniData AG | Verfahren und System zur Prognose der benötigten Energiemengen eines, insbesondere industriellen Verbrauchers von einem Energieversorger oder Energielieferanten sowie Vorrichtung zur Energiebedarfsprognose |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0891472A1 (de) * | 1996-04-03 | 1999-01-20 | Siemens Aktiengesellschaft | Verfahren zum betrieb eines blockheizkraftwerkes sowie anlage zur durchführung des verfahrens |
JP2006301700A (ja) * | 2005-04-15 | 2006-11-02 | Toshiba Corp | 需給計画作成方法と装置、プログラム |
US7274975B2 (en) * | 2005-06-06 | 2007-09-25 | Gridpoint, Inc. | Optimized energy management system |
US8214249B2 (en) * | 2008-06-09 | 2012-07-03 | Oracle International Corporation | Resource planning system with carbon emission input |
CN101640417B (zh) * | 2008-07-29 | 2012-07-04 | 西门子公司 | 一种负荷管理的方法及装置 |
US8041467B2 (en) * | 2008-10-31 | 2011-10-18 | General Electric Company | Optimal dispatch of demand side electricity resources |
-
2010
- 2010-06-02 DE DE102010022462A patent/DE102010022462A1/de not_active Withdrawn
-
2011
- 2011-05-25 AU AU2011260643A patent/AU2011260643B2/en not_active Ceased
- 2011-05-25 CA CA2800842A patent/CA2800842C/en not_active Expired - Fee Related
- 2011-05-25 WO PCT/EP2011/002593 patent/WO2011151031A1/de active Application Filing
- 2011-05-25 EP EP11723877.4A patent/EP2577829B1/de active Active
- 2011-05-25 CN CN201180026954.4A patent/CN102918733B/zh not_active Expired - Fee Related
-
2012
- 2012-11-19 ZA ZA2012/08685A patent/ZA201208685B/en unknown
- 2012-11-30 US US13/690,811 patent/US8635096B2/en not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20030041017A1 (en) * | 2001-05-10 | 2003-02-27 | Spool Peter R. | Business management system and method for a deregulated electric power market using consumer selected special offers |
EP1263108A1 (de) * | 2001-06-01 | 2002-12-04 | Roke Manor Research Limited | Energieverwaltungssystem für eine Gemeinschaft |
US20050258154A1 (en) * | 2004-05-20 | 2005-11-24 | Lincoln Global, Inc., A Delaware Corporation | System and method for monitoring and controlling energy usage |
EP1748529A1 (de) * | 2005-07-29 | 2007-01-31 | TechniData AG | Verfahren und System zur Prognose der benötigten Energiemengen eines, insbesondere industriellen Verbrauchers von einem Energieversorger oder Energielieferanten sowie Vorrichtung zur Energiebedarfsprognose |
Also Published As
Publication number | Publication date |
---|---|
DE102010022462A1 (de) | 2011-12-08 |
ZA201208685B (en) | 2013-07-31 |
US8635096B2 (en) | 2014-01-21 |
US20130096975A1 (en) | 2013-04-18 |
CN102918733B (zh) | 2015-09-02 |
CN102918733A (zh) | 2013-02-06 |
CA2800842A1 (en) | 2011-12-08 |
CA2800842C (en) | 2018-03-13 |
EP2577829B1 (de) | 2020-01-08 |
AU2011260643B2 (en) | 2015-03-12 |
AU2011260643A1 (en) | 2013-01-10 |
EP2577829A1 (de) | 2013-04-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2577829A1 (de) | Verfahren und vorrichtung zum anpassen eines produktionsablaufplans für einen produktionsprozess | |
EP2901538B1 (de) | Verfahren und system zum betreiben eines elektrischen energieversorgungsnetzes | |
WO2012048808A1 (de) | Verfahren und vorrichtung zur optimierung eines produktionsprozesses | |
DE102018001763A1 (de) | Verfahren und System zum Warten einer Windenergieanlage aus einer Gruppe von Windenergieanlagen | |
DE102018129810A1 (de) | Verfahren und Vorrichtung zur Steuerung einer Anzahl von energieeinspeisenden und/oder energieverbrauchender Einheiten | |
EP3635651B1 (de) | Verfahren zum betreiben einer vielzahl von technischen einheiten als verbund an einem elektrischen verteilungsnetz sowie steuervorrichtung und elektrische vorrichtung | |
EP3331722B1 (de) | Verfahren zur steuerung von ladevorgängen | |
DE102012104493A1 (de) | Verfahren zum Betrieb von Produktionsmaschinen/Kunststoff verarbeitenden Maschinen | |
DE102018213862A1 (de) | Verfahren zum Steuern eines Austauschs von Energie zwischen Energiesubsystemen zu angeglichenen Konditionen; Steuerungszentrale; Energiesystem; Computerprogramm sowie Speichermedium | |
EP3719737A1 (de) | Computergestütztes energiemanagementverfahren und energiemanagementsystem | |
DE102013220300A1 (de) | Steuerung einer Anlage mit gleichartigen Anlagenteilen | |
EP2834898B1 (de) | Verfahren zur bestimmung von messstellen in niederspannungsnetzen und netzmanagementsubsystem zur durchführung des verfahrens. | |
EP2529185B1 (de) | Verfahren zur identifikation von verbrauchern bzw. erzeugern in einem pneumatischen, hydraulischen oder elektrischen netz | |
DE102022105138A1 (de) | Verfahren und System zum Überwachen eines Spannungsnetzes, Verfahren zum Trainieren einer künstlichen Intelligenz zur Prognose eines zukünftigen Zustands eines Spannungsnetzes, Computerprogramm sowie computerlesbarer Datenträger | |
EP3356834B1 (de) | Verfahren zum rechnergestützten ermitteln von parametern eines elektrochemischen energiespeichers | |
DE102014010019B4 (de) | Verfahren zum Schalten von dezentralen Energiewandlern | |
DE102017212659A1 (de) | Verfahren zum Betreiben eines elektrischen Gesamtbordnetzes, Steuereinheit und Kraftfahrzeug | |
WO2016050599A1 (de) | Verfahren zum ermitteln des energiebedarfs einer produktionsmaschine oder eines aus mehreren produktionsmaschinen bestehenden produktionssystems sowie zur durchführung des verfahrens geeignetes messgerät | |
DE102020203853A1 (de) | Verfahren zur Steuerung eines Energiesystems sowie zugehörige Vorrichtung | |
WO2019096424A1 (de) | Steuerung von microgrids | |
EP3981053B1 (de) | Verfahren und steuereinrichtung zum betreiben einer umrichterbasierten netzeinheit | |
DE102018219157A1 (de) | Energiemanagementverfahren und Energiemanagementsystem | |
DE102018118132B4 (de) | Stromrichteranordnung und Verfahren zum Betrieb einer derartigen Stromrichteranordnung | |
DE102020104390A1 (de) | Versorgung einer Industrieanlage mit elektrischer Energie | |
DE102019217962A1 (de) | System zur Überwachung des Energie- und Rohstoffbedarfs eines Backofens |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
WWE | Wipo information: entry into national phase |
Ref document number: 201180026954.4 Country of ref document: CN |
|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 11723877 Country of ref document: EP Kind code of ref document: A1 |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2011723877 Country of ref document: EP |
|
ENP | Entry into the national phase |
Ref document number: 2800842 Country of ref document: CA |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
ENP | Entry into the national phase |
Ref document number: 2011260643 Country of ref document: AU Date of ref document: 20110525 Kind code of ref document: A |