WO2011143531A3 - Turbine-to-turbine prognostics technique for wind farms - Google Patents
Turbine-to-turbine prognostics technique for wind farms Download PDFInfo
- Publication number
- WO2011143531A3 WO2011143531A3 PCT/US2011/036402 US2011036402W WO2011143531A3 WO 2011143531 A3 WO2011143531 A3 WO 2011143531A3 US 2011036402 W US2011036402 W US 2011036402W WO 2011143531 A3 WO2011143531 A3 WO 2011143531A3
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- wind turbine
- turbine
- wind
- wind turbines
- peer
- Prior art date
Links
- 230000007613 environmental effect Effects 0.000 abstract 2
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F05—INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
- F05B—INDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
- F05B2260/00—Function
- F05B2260/80—Diagnostics
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F05—INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
- F05B—INDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
- F05B2260/00—Function
- F05B2260/82—Forecasts
- F05B2260/821—Parameter estimation or prediction
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Theoretical Computer Science (AREA)
- Entrepreneurship & Innovation (AREA)
- General Physics & Mathematics (AREA)
- Marketing (AREA)
- General Business, Economics & Management (AREA)
- Physics & Mathematics (AREA)
- Tourism & Hospitality (AREA)
- Health & Medical Sciences (AREA)
- Development Economics (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Public Health (AREA)
- Primary Health Care (AREA)
- Water Supply & Treatment (AREA)
- Educational Administration (AREA)
- General Health & Medical Sciences (AREA)
- Wind Motors (AREA)
Abstract
Methods and systems for predicting an end of life of a wind turbine component including receiving environmental conditions indicative of natural surroundings of wind turbines within a wind turbine farm, receiving component performance metrics indicative of an operation of wind turbines within a wind turbine farm, and distributing the wind turbines into peer-clusters such that the wind turbines within each of the peer-clusters have similar environmental conditions. The methods and systems further include identifying a low performing wind turbine and a remaining portion of wind turbines within one of the peer-clusters based upon a predicted performance model, processing the component performance metrics of the low performing wind turbine, identifying a critical component of the low performing wind turbine and predicting the end of life of the critical component of the low performing wind turbine.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US13/674,200 US8924162B2 (en) | 2010-05-13 | 2012-11-12 | Turbine-to-turbine prognostics technique for wind farms |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US33430210P | 2010-05-13 | 2010-05-13 | |
US61/334,302 | 2010-05-13 |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US13/674,200 Continuation US8924162B2 (en) | 2010-05-13 | 2012-11-12 | Turbine-to-turbine prognostics technique for wind farms |
Publications (2)
Publication Number | Publication Date |
---|---|
WO2011143531A2 WO2011143531A2 (en) | 2011-11-17 |
WO2011143531A3 true WO2011143531A3 (en) | 2012-04-05 |
Family
ID=44914995
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/US2011/036402 WO2011143531A2 (en) | 2010-05-13 | 2011-05-13 | Turbine-to-turbine prognostics technique for wind farms |
Country Status (1)
Country | Link |
---|---|
WO (1) | WO2011143531A2 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105041571A (en) * | 2015-08-20 | 2015-11-11 | 沈阳华创风能有限公司 | Intelligent control system and method for predicting wind speed and wind direction |
Families Citing this family (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB201110048D0 (en) * | 2011-06-15 | 2011-07-27 | Romax Technology Ltd | Vibration monitoring |
JP5567044B2 (en) | 2012-02-21 | 2014-08-06 | 三菱重工業株式会社 | Wind farm operation method and wind farm operation control system |
DE102012015485A1 (en) * | 2012-08-07 | 2014-05-15 | Prüftechnik Dieter Busch AG | Method for monitoring rotating machines |
DE102013210090A1 (en) * | 2013-05-29 | 2014-12-04 | Senvion Se | Method for operating a wind energy plant park |
WO2015011301A1 (en) * | 2013-07-22 | 2015-01-29 | Nabla Wind Power, S.L. | Method for determining the life of components of a wind turbine or similar according to its location |
US20150039374A1 (en) * | 2013-08-02 | 2015-02-05 | International Business Machines Corporation | Planning periodic inspection of geo-distributed infrastructure systems |
CN104764603B (en) * | 2015-04-17 | 2018-01-05 | 上海电机学院 | The appraisal procedure that a kind of environmental factor influences on wind power equipment failure evolution degree |
US10975846B2 (en) | 2015-07-29 | 2021-04-13 | General Electric Company | Method and system to optimize availability, transmission, and accuracy of wind power forecasts and schedules |
US11315062B2 (en) * | 2016-09-16 | 2022-04-26 | General Electric Company | System and method for autonomous service operation validation |
US10671039B2 (en) | 2017-05-03 | 2020-06-02 | Uptake Technologies, Inc. | Computer system and method for predicting an abnormal event at a wind turbine in a cluster |
JP6759157B2 (en) * | 2017-06-14 | 2020-09-23 | 三菱重工業株式会社 | Wind farm anomaly monitoring device and anomaly monitoring method |
CN111164305A (en) * | 2018-01-18 | 2020-05-15 | Abb瑞士股份有限公司 | Method, device and system for wind power converter management |
JP2019210811A (en) * | 2018-05-31 | 2019-12-12 | 株式会社日立製作所 | Wind power generation system |
CN109653961B (en) * | 2018-12-14 | 2020-05-19 | 三一重能有限公司 | Monitoring method and device for wind driven generator |
EP4081837A1 (en) * | 2019-12-26 | 2022-11-02 | Vestas Wind Systems A/S | Calculating a return period wind speed |
CN112926273B (en) * | 2021-04-13 | 2023-04-18 | 中国人民解放军火箭军工程大学 | Method for predicting residual life of multivariate degradation equipment |
CN113204847B (en) * | 2021-05-11 | 2022-10-18 | 三门核电有限公司 | Comparison method for nuclear turbine performance test |
CN115434878B (en) * | 2022-11-09 | 2023-02-03 | 东方电气风电股份有限公司 | Wind generating set temperature cluster control method, device, equipment and medium |
CN117117858B (en) * | 2023-10-18 | 2024-01-30 | 中国华能集团清洁能源技术研究院有限公司 | Wind turbine generator power prediction method, device and storage medium |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20070140847A1 (en) * | 2003-11-14 | 2007-06-21 | Martinez De Lizarduy Romo Mari | Monitoring and data processing equipment for wind turbines and predictive maintenance system for wind power stations |
US20080140349A1 (en) * | 2006-12-08 | 2008-06-12 | General Electric Company | Method and system for estimating life of a gearbox |
US20090257873A1 (en) * | 2008-04-15 | 2009-10-15 | Per Egedal | Method and apparatus for prediction-based wind turbine control |
KR100954090B1 (en) * | 2009-10-27 | 2010-04-23 | 주식회사 위다스 | Health and usage monitoring system for wind turbine |
-
2011
- 2011-05-13 WO PCT/US2011/036402 patent/WO2011143531A2/en active Application Filing
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20070140847A1 (en) * | 2003-11-14 | 2007-06-21 | Martinez De Lizarduy Romo Mari | Monitoring and data processing equipment for wind turbines and predictive maintenance system for wind power stations |
US20080140349A1 (en) * | 2006-12-08 | 2008-06-12 | General Electric Company | Method and system for estimating life of a gearbox |
US20090257873A1 (en) * | 2008-04-15 | 2009-10-15 | Per Egedal | Method and apparatus for prediction-based wind turbine control |
KR100954090B1 (en) * | 2009-10-27 | 2010-04-23 | 주식회사 위다스 | Health and usage monitoring system for wind turbine |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105041571A (en) * | 2015-08-20 | 2015-11-11 | 沈阳华创风能有限公司 | Intelligent control system and method for predicting wind speed and wind direction |
Also Published As
Publication number | Publication date |
---|---|
WO2011143531A2 (en) | 2011-11-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2011143531A3 (en) | Turbine-to-turbine prognostics technique for wind farms | |
EP2434127A3 (en) | Methods and systems for modeling turbine operation | |
EP2525087A3 (en) | Condition monitoring of windturbines | |
EP2772643A3 (en) | System and method for controlling a wind turbine based on identified surface conditions of the rotor blades | |
EP2241726A3 (en) | A method for the repair of an engine and corresponding systems for monitoring this engine | |
EP2644888A3 (en) | Control system and method for avoiding overspeed of a wind turbine | |
WO2012125842A3 (en) | Load shape control of wind turbines | |
WO2012089211A3 (en) | Control network for wind turbine park | |
EP2631472A3 (en) | Method for operating wind farm and operation control system for wind farm | |
MX2012012150A (en) | Method for the operation of a wind turbine. | |
IN2013MN02382A (en) | ||
BRPI1005505A2 (en) | hydraulic pump structure for a wind turbine generator or tidal current generator, and method for mounting a hydraulic pump from the wind turbine generator or tidal current generator. | |
EP2487553A3 (en) | Turbine fault analysis | |
EP2724021A4 (en) | A self-propelled offshore wind farm installation vessel, and method of installation used in the construction of an offshore wind turbine farm | |
EP2412924A3 (en) | A disk spacer for a gas engine turbine and a method for providing a rotor assembly | |
EP2397652A3 (en) | Multiple airfoil vane for a turbocharger | |
EP2378085A3 (en) | Automatic system and method for monitoring the primary frequency response contribution in a turbo generator | |
EP2577051A4 (en) | Segmented wind turbine blades with truss connection regions, and associated systems and methods | |
EP3690236A4 (en) | Tower portion, tower, wind turbine generator assembly and method for manufacturing tower portion | |
EP2392983A3 (en) | Method, system and computer program product for life management of a gas turbine | |
EP3001029A8 (en) | Counterweight systems for a wind turbine and methods | |
WO2012019675A3 (en) | Method and device for determining a bending angle of a rotor blade of a wind turbine system | |
EP2400118A3 (en) | Turbomachine airfoil life management system and method | |
EP2762720A3 (en) | Method for optimizing the operation of a wind turbine | |
EP2653273A4 (en) | Wind turbine assembly and management robot and wind turbine system including same |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 11781335 Country of ref document: EP Kind code of ref document: A2 |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 11781335 Country of ref document: EP Kind code of ref document: A2 |