WO2011123912A1 - Water consumption regulator - Google Patents
Water consumption regulator Download PDFInfo
- Publication number
- WO2011123912A1 WO2011123912A1 PCT/BR2011/000078 BR2011000078W WO2011123912A1 WO 2011123912 A1 WO2011123912 A1 WO 2011123912A1 BR 2011000078 W BR2011000078 W BR 2011000078W WO 2011123912 A1 WO2011123912 A1 WO 2011123912A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- programming
- consumption
- water
- manager
- mode
- Prior art date
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01F—MEASURING VOLUME, VOLUME FLOW, MASS FLOW OR LIQUID LEVEL; METERING BY VOLUME
- G01F15/00—Details of, or accessories for, apparatus of groups G01F1/00 - G01F13/00 insofar as such details or appliances are not adapted to particular types of such apparatus
- G01F15/06—Indicating or recording devices
- G01F15/061—Indicating or recording devices for remote indication
- G01F15/063—Indicating or recording devices for remote indication using electrical means
Definitions
- the purpose of the present object is to facilitate the control of water flow through the hydrometer, allowing effective control, with the purpose of reducing the excessive consumption and even detecting possible leaks (resulting from the indication of high consumption), even for large consumers. .
- the objective of the present is to provide an effective, low cost and highly industrially viable water consumption manager.
- the present object was developed, which is part of a sensor system that supervises a hydrometer with pre-fitted watchmaking (essentially: by a pulsed sensor which oversees a suitable meter fitted with pre-fitted watchmaking) and installed, where possible, on the water inlet easel or as close as possible to the easel; by the manager who monitors the meter through the sensor (supervises the sensor); and a water blocking valve installed on the outlet of the meter, which is controlled by the manager, this can be programmed for a certain consumption per cycle of twenty-four hours of consumption and, if the actual consumption is less than the programmed, zero. the counter and display and start a new counting cycle and if the actual consumption is higher than the programmed, this manager activates the valve that closes the piping, allowing the user to check what may be happening.
- This equipment has several benefits, such as: it allows to program the desired monthly consumption; avoids expenses caused by leaks; saving of drinking water by blocking water when there are leaks, avoiding waste; avoids the growth of consumer defaults; among others.
- WATER CONSUMPTION MANAGER is intended for the management of water consumption, in homes, offices, offices and the like. They are essentially comprised of hardware and software, making part of a system composed essentially (fig. 1): of a pulsed sensor 20 which oversees a suitable hydrometer 21 fitted with pre-fitted watch and installed on the water rack 21 ', eg the manager 1 which oversees the sensor 20; and by a water block valve 22 installed in the outlet line of the meter and which is controlled by manager 1.
- the water consumption manager 1 consists of hardware essentially comprised (fig. 2): by CPU 2 and by peripherals comprising: by display 3; by pushbutton consisting of: programming button (P) 4, plus (+) and confirmation button 5, minus (-) and negation button 6; by a flashing switching indication LED 7, which when lit indicates appliance on and off appliance off; and by optical-audible alarm system 8 comprising LED and closed valve indicator beep 22; data maintenance security set 9 comprising charger and internal battery; by terminal strip 10 for connection: from wiring 11 to external power supply 12 (12V); wiring 13 connecting to valve 22; sensor connection wiring 14 and wiring 15 for eventual connection to other devices 200, which may work in conjunction with the manager, such as remote power metering (Reading), all mounted within a housing 16 ( Fig. 3) whose front face constitutes a user interface panel on which are arranged: the display 3; the buttons 4,5,6 and the LEDs 7, 8 and outwardly of said housing extend the wiring 11, 13, 14, 15.
- Consumption manager 1 has dedicated memory resident software 30 which comprises: devices for performing "Operation Mode” comprising at least: sensor triggering device, valve triggering device, display serving device 3 a screen 40 of "Operation Mode”; sensor monitoring device, button monitoring device 4, 5, 6, LED triggering device 7, alarm triggering device 8, water flow meter; one-cycle time counting device; cycle programmed versus actual cycle consumption device and valve switching device 22, and alarm switching device 8.
- Device for performing "Operation Mode” comprising at least: sensor triggering device, valve triggering device, display serving device 3 a screen 40 of "Operation Mode”
- sensor monitoring device button monitoring device 4, 5, 6, LED triggering device 7, alarm triggering device 8, water flow meter
- one-cycle time counting device cycle programmed versus actual cycle consumption device and valve switching device 22, and alarm switching device 8.
- the software 30 is further formed by devices for executing Programming Mode "comprising at least:” Programming Mode "enabling device; new cycle consumption programming device; new programming confirmation (enter) device; and "Operation mode” enabling device with the new programming or without the new and the old programming.
- Manager 1 is activated and: it has default (in "Operation Mode”); triggers sensor 20 to monitor whether water meter 21 has water flow; actuates valve 22 in the open position; enables screen 40 of "Operation Mode”; the system switching state display LED 7 lights up; monitors or waits for signal from sensor 20; monitors or waits for signal from button 4.
- the hydrometer 21 in association with the sensor 20 When there is water flow, the hydrometer 21 in association with the sensor 20 generates a signal for manager 1. This activates the arrows 43 of the screen 40 and counts the signals. When signals corresponding to 1 liter of water are counted, the counter and display 44 of screen 40 are changed by one and the counting continues and the counter and display 44 are modified from a unit each time 1 liter of water is passed through the water meter 21. Simultaneously, the time is contact and when 24 hours elapses the system understands that a counting cycle has passed and enables the programmed consumption comparison device per cycle. versus actual consumption in the cycle. If actual consumption is less than programmed, counter 40 and display 44 of screen 40 are reset and a new cycle begins.
- valve 22 closes valve 22 and triggers alarm 8, alerting the user of possible over consumption or leaks or other problems. Once the occurrence is verified, the valve 22 can be reopened via the manager 1, as described above and the whole system goes back to operation.
Abstract
The present abstract relates to a patent of addition and to the application to the invention "Water consumption regulator" filed on 9 April 2010, with number PI 1001096-3, from the same applicant. The addition was recorded on 6 January 2011 with the number 018110000365, with the title "Addition to the Water Consumption Regulator". Developed to regulate water consumption in private homes, industries or any other water supply system requiring regulation, the regulator pertains to the field of electro-electronic measurement appliances. The present invention aims at making it easier to control the water flow through the hydrometer, ensuring an effective control, with the object of reducing excessive consumption and even of locating possible leaks (from a high consumption reading), even in the case of large consumers.
Description
GERENCIADOR DE CONSUMO DE ÁGUA WATER CONSUMPTION MANAGER
Refere-se o presente a um texto somado da adição e do pedido de patente de invenção "Gerenciador de consumo de água", depositado em 09/04/2010, que recebeu o número PI 1001096-3 , de titularidade do mesmo depositante. A adição foi protocolada em 06/01/2011 com o número 018110000365, com o título de "Aditivo ao Gerenciador de Consumo de água". Desenvolvido para gerenciar o consumo de água, em residências, indústrias ou em qualquer sistema hidráulico que necessite de gerenciamento, pertencente ao campo dos aparelhos eletro-eletrônicos de medição. This text refers to a summation of the addition and the patent application "Water Consumption Manager", filed on 09/09/2010, which received the number PI 1001096-3, owned by the same applicant. The addition was filed on 06/01/2011 with the number 018110000365, with the title of "Additive to the Consumption Manager of water". Developed to manage water consumption, in homes, industries or any hydraulic system that needs management, within the field of electro-electronic measuring devices.
Destina-se o presente objeto a facilitar o controle de vazão de água que passa pelo hidrômetro, permitindo um controle eficaz, com finalidades de reduzir o consumo exagerado e até detectar possíveis vazamentos (advindo da indicação do alto consumo), mesmo para os grandes consumidores. The purpose of the present object is to facilitate the control of water flow through the hydrometer, allowing effective control, with the purpose of reducing the excessive consumption and even detecting possible leaks (resulting from the indication of high consumption), even for large consumers. .
O consumidor residencial, não dispõe de facilidades para contrc!ar de forma fácil e efetiva o seu consumo de água potável. Assim, se suas instalações tiverem, por exemplo, um vazamento, a sua detecção será difícil e, normalmente, só ocorre quando da chegada da conta de consumo e a constatação de volumes exagerados que passaram pelo hidrômetro. Residential consumers do not have the facilities to easily and effectively control their drinking water consumption. Thus, if your facility has, for example, a leak, its detection will be difficult and usually only occurs when the consumption bill arrives and when excessive volumes have passed through the water meter.
Assim, o objetivo da presente, é prover um gerenciador de consumo de água eficaz, de baixo custo e de grande exequibilidade industrial. Thus, the objective of the present is to provide an effective, low cost and highly industrially viable water consumption manager.
Tendo em vista, portanto, os problemas acima referidos e no propósito de superá-los e visando atender aos objetivos relacionados, foi desenvolvido objeto do presente o qual faz parte de um sistema compreendido por sensor que supervisiona um hidrômetro com
relojoaria pré-equipada (essencialmente: por sensor pulsado que supervisiona um hidrometro adequado dotado de relojoaria pré- equipada) e instalado, sempre que possível, no cavalete de entrada de água ou mais próximo que puder do cavalete; pelo gerenciador que monitora o hidrometro através do sensor (supervisiona o sensor); e válvula para bloqueio de água instalada na tubulação de saída do hidrometro e que é comandada pelo gerenciador, este pode ser programado para um determinado consumo por ciclo de vinte e quadro horas de consumo e, caso o consumo real seja menor que o programado, zera o contador e visor e inicia novo ciclo de contagem e caso o consumo real seja maior que o programado, dito gerenciador aciona a válvula que fecha a tubulação, dando condição do usuário verificar o que pode estar acontecendo. Therefore, in view of the above-mentioned problems and in order to overcome them and in order to meet the related objectives, the present object was developed, which is part of a sensor system that supervises a hydrometer with pre-fitted watchmaking (essentially: by a pulsed sensor which oversees a suitable meter fitted with pre-fitted watchmaking) and installed, where possible, on the water inlet easel or as close as possible to the easel; by the manager who monitors the meter through the sensor (supervises the sensor); and a water blocking valve installed on the outlet of the meter, which is controlled by the manager, this can be programmed for a certain consumption per cycle of twenty-four hours of consumption and, if the actual consumption is less than the programmed, zero. the counter and display and start a new counting cycle and if the actual consumption is higher than the programmed, this manager activates the valve that closes the piping, allowing the user to check what may be happening.
Este equipamento tem vários benefícios, tais como: permite programar o consumo desejado mensal; evita gastos ocasionados por vazamentos; economia de água potável, por bloquear á água quando há vazamentos, evitando o desperdício; evita o crescimento de inadimplentes do sistema de consumo; dentre outros. This equipment has several benefits, such as: it allows to program the desired monthly consumption; avoids expenses caused by leaks; saving of drinking water by blocking water when there are leaks, avoiding waste; avoids the growth of consumer defaults; among others.
O GERENCIADOR DE CONSUMO DE ÁGUA", de acordo com as ilustrações e em seus pormenores, destina-se ao gerenciamento de consumo de água, em residências, escritórios, consultórios e similares, são compreendidos, essencialmente, por um hardware e um software, fazendo parte de um sistema composto, essencialmente (fig. 1 ): por sensor pulsado 20 que supervisiona um hidrometro adequado 21 dotado de relojoaria pré-equipada e instalado no cavalete de água 21 '; pe!c gerenciador 1 , que supervisiona o sensor 20; e por válvula para bloqueio de água 22 instalada na tubulação de saída do hidrometro e que é comandada pelo gerenciador 1. WATER CONSUMPTION MANAGER ", according to the illustrations and their details, is intended for the management of water consumption, in homes, offices, offices and the like. They are essentially comprised of hardware and software, making part of a system composed essentially (fig. 1): of a pulsed sensor 20 which oversees a suitable hydrometer 21 fitted with pre-fitted watch and installed on the water rack 21 ', eg the manager 1 which oversees the sensor 20; and by a water block valve 22 installed in the outlet line of the meter and which is controlled by manager 1.
O gerenciador de consumo de água 1 é constituído por
hardware compreendido essencialmente (fig. 2): por CPU 2 e por periféricos compreendidos: por visor 3; por botoeira composta por: botão de programação (P) 4, botão de adição (+) e confirmação 5, botão de subtração (-) e negação 6; por LED piscante de indicação de comutação 7, que quando aceso indica aparelho ligado e apagado aparelho desligado; e por sistema de alarme óptico-sonoro 8 compreendendo LED e emissor de bip sonoro indicador de válvula 22 fechada; por conjunto de segurança de manutenção de dados 9 compreendido por carregador e bateria interna; por régua de terminais 10 para conexão: de fiação 11 de ligação a alimentação elétrica externa 12 (12V); de fiação 13 ligação à válvula 22; de fiação 14 de ligação ao sensor 20 e de fiação 15 para eventual ligação a outros aparelhos 200, que podem trabalhar associados ao gerenciador, como telemetria (medição (Leitura) do consumo à distância - remota), todos montados dentro de uma carcaça 16 (fig. 3) cuja face frontal constitui um painel de interface com o usuário, no qual ficam dispostos: o visor 3; os botões 4,5,6 e os LEDs 7, 8 e para fora de lateral de dita carcaça estendem-se as fiações 11 , 13, 14, 15. The water consumption manager 1 consists of hardware essentially comprised (fig. 2): by CPU 2 and by peripherals comprising: by display 3; by pushbutton consisting of: programming button (P) 4, plus (+) and confirmation button 5, minus (-) and negation button 6; by a flashing switching indication LED 7, which when lit indicates appliance on and off appliance off; and by optical-audible alarm system 8 comprising LED and closed valve indicator beep 22; data maintenance security set 9 comprising charger and internal battery; by terminal strip 10 for connection: from wiring 11 to external power supply 12 (12V); wiring 13 connecting to valve 22; sensor connection wiring 14 and wiring 15 for eventual connection to other devices 200, which may work in conjunction with the manager, such as remote power metering (Reading), all mounted within a housing 16 ( Fig. 3) whose front face constitutes a user interface panel on which are arranged: the display 3; the buttons 4,5,6 and the LEDs 7, 8 and outwardly of said housing extend the wiring 11, 13, 14, 15.
O gerenciador de consumo 1 tem software dedicado 30, residente em memória adequada, que compreende: dispositivos para execução de "Modo de Operação" compreendendo, pelo menos: dispositivo de acionamento do sensor, dispositivo de acionamento da válvula, dispositivo para veicular no visor 3 uma tela 40 do "Modo de Operação"; dispositivo de monitoração do sensor, dispositivo de monitoração dos botões 4, 5, 6, dispositivo de acionamento do LED 7, dispositivo de acionamento do alarme 8, dispositivo de contagem do volume de água; dispositivo de contagem de tempo de um ciclo; dispositivo de comparação do consumo programado por ciclo versus consumo real por ciclo e dispositivo de comutação da válvula 22, e
dispositivo de comutação do alarme 8. Referido "Modo de Operação" conta com a participação de todo o sistema: o gerenciador 1 , o sensor 20 e a válvula de bloqueio 22. Consumption manager 1 has dedicated memory resident software 30 which comprises: devices for performing "Operation Mode" comprising at least: sensor triggering device, valve triggering device, display serving device 3 a screen 40 of "Operation Mode"; sensor monitoring device, button monitoring device 4, 5, 6, LED triggering device 7, alarm triggering device 8, water flow meter; one-cycle time counting device; cycle programmed versus actual cycle consumption device and valve switching device 22, and alarm switching device 8. Referred to as "Operation Mode" is the participation of the entire system: manager 1, sensor 20 and shut-off valve 22.
O software 30 é formado ainda por dispositivos para execução de Modo de Programação" compreendendo, pelo menos: dispositivo de habilitação do "Modo de Programação"; dispositivo de programação de novo consumo por ciclo; dispositivo de confirmação da nova programação (enter); e dispositivo de habilitação do "Modo de operação" com a nova programação ou sem a nova e com a antiga programação. The software 30 is further formed by devices for executing Programming Mode "comprising at least:" Programming Mode "enabling device; new cycle consumption programming device; new programming confirmation (enter) device; and "Operation mode" enabling device with the new programming or without the new and the old programming.
Uma vez instalado e energizado o sistema compreendido pelo gerenciador 1 , sensor 20 no hidrômetro 21 e válvula 22 na saída do hidrômetro 21 o seu funcionamento compreende: O gerenciador 1 é acionado e: dispões (default) no "Modo de Operação"; aciona o sensor 20 que passa a monitorar se o hidrômetro 21 tem fluxo de água; aciona a válvula 22 na posição aberta; habilita a tela 40 do "Modo de Operação"; acende o LED 7 de visualização do estado de comutação do sistema; monitora ou fica a espera de sinal do sensor 20; monitora ou fica a espera de sinal do botão 4. Once installed and energized the system comprised by manager 1, sensor 20 on meter 21 and valve 22 on the output of meter 21 its operation comprises: Manager 1 is activated and: it has default (in "Operation Mode"); triggers sensor 20 to monitor whether water meter 21 has water flow; actuates valve 22 in the open position; enables screen 40 of "Operation Mode"; the system switching state display LED 7 lights up; monitors or waits for signal from sensor 20; monitors or waits for signal from button 4.
Quando o usuário aciona o botão de programação (P) 4, o "Modo de Programação" é habilitado e a programação e a volta ao "Modo de Operação" é conforme descrições acima. When the user presses programming button (P) 4, "Programming Mode" is enabled and programming and return to "Operation Mode" is as described above.
Assim, quando não há fluxo de água no hidrômetro 21 todo o sistema fica de prontidão (standby). Thus, when there is no water flow in meter 21 the entire system is standby.
Quando há fluxo de água, o hidrômetro 21 em associação com o sensor 20 faz gerar sinal para o gerenciador 1. Este aciona as setas 43 da tela 40 e conta os sinais. Quando são contados sinais em correspondência a 1 litro de água, o contador e visor 44 da tela 40 são mudados em uma unidade e a contagem continua e o contador e visor
44 vão sendo modificados de uma unidade sempre que passa 1 litro de água pelo hidrômetro 21. Simultaneamente, o tempo é contato e quando transcorrem 24 horas o sistema entende que se passou um ciclo de contagem e habilita o dispositivo de comparação do consumo programado por ciclo versus consumo real no ciclo. Se o consumo real for menor que o programado, o contador e o visor 44 da tela 40 são zerados e um novo ciclo se inicia. Se, entretanto, o consumo real for maior que o programado, o gerenciador fecha a válvula 22 e aciona o alarme 8, alertando o usuário de possível consumo exagerado ou vazamentos ou outros problemas. Verificada a ocorrência, a válvula 22 pode ser reaberta via o gerenciador 1 , conforme descrição já feita acima e todo o sistema volta a operar.
When there is water flow, the hydrometer 21 in association with the sensor 20 generates a signal for manager 1. This activates the arrows 43 of the screen 40 and counts the signals. When signals corresponding to 1 liter of water are counted, the counter and display 44 of screen 40 are changed by one and the counting continues and the counter and display 44 are modified from a unit each time 1 liter of water is passed through the water meter 21. Simultaneously, the time is contact and when 24 hours elapses the system understands that a counting cycle has passed and enables the programmed consumption comparison device per cycle. versus actual consumption in the cycle. If actual consumption is less than programmed, counter 40 and display 44 of screen 40 are reset and a new cycle begins. If, however, actual consumption is greater than programmed, the manager closes valve 22 and triggers alarm 8, alerting the user of possible over consumption or leaks or other problems. Once the occurrence is verified, the valve 22 can be reopened via the manager 1, as described above and the whole system goes back to operation.
Claims
R E I V I N D I C A Ç Õ E S R E I V I N D I C A C E S
1a) GERENCIADOR DE CONSUMO DE ÁGUA", usado em consumidores, como: residências e similares e constituído por hardware que possibilita o envio de aviso de bloqueio por mensagem SMS e, ou uma programação já estabelecida em fábrica para controle pré-determinado de consumo de água além de poder também ser programado pelo próprio usuário e software que gerência os dados recebidos e programados para possibilitar o seu correto funcionamento, caracterizado por fazer parte de sistema composto, essencialmente: por sensor pulsado óptico foto-elétrico (20), que supervisiona um hidrômetro adequado equipado com relojoaria pré- equipada (21 ) instalado no cavalete (21 )'; peio gerenciador (1 ), que monitora o sensor (20); e por válvula para bloqueio de água (22) instalada na tubulação de saída do hidrômetro e controlada pelo gerenciador (1 ), este compreendido essencialmente: por CPU processador (2) e por periféricos compréendidos: por visor (3) que mostra alternadamente tela (40) do "Modo de Operação" e telas (50) e (60) d "Modo de Programação"; por botoeira composta por: botão de programação (P) (4), botão de adição (+) e confirmação (5), botão de subtração (-) e negação (6); por LED piscante de indicação de funcionamento comutação (7); e por sistema de alarme óptico-sonoro (8) compreendendo LED e emissor de bip sonoro indicador de válvula (22) fechada; por conjunto de segurança de manutenção de dados (9) compreendido por carregador e bateria interna; por régua de terminais (10) para conexão: de fiações (11 ) energia 12V para alimentação do gerênciador, (13) energia para abrir a válvula de bloqueio, (14) sinal do sensor óptico foto-elétrico, (15) saída de sinal gerado pelo sensor ópticc para adição de aparelho de telemetria que se utiliza do mesmo
sina! para oferecer a possibilidade de leitura/medição de consumo a distância, de ligação a alimentação elétrica externa (12) (12V); à válvula (22); ao sensor (20) e a eventual outro aparelho de telemetria (200) associado ao gerenciador, respectivamente, todos montados dentro de uma carcaça vedada contra infiltração de água (16) cuja face frontal constitui um painel de interface com o usuário, no qual ficam dispostos: o visor (3); os botões (4) de programação (P),(5) de adição (+) e confirmação, (6) de subtração(-) e negação e os LEDs (7) piscante que indica equipamento em funcionamento, (8) quando aceso indica o bloqueio da água e para fora de lateral de dita carcaça estcndem-se as fiações (11 ), (13), (14), (15). 1 a ) WATER CONSUMPTION MANAGER ", used in consumers, such as: homes and the like and made of hardware that enables the sending of blockage warning by SMS message and, or a factory-established schedule for predetermined consumption control. It can also be programmed by the user himself and software that manages the data received and programmed to enable its correct operation, characterized by being part of a system composed essentially by a photoelectric optical pulsed sensor (20), which supervises a suitable water meter equipped with pre-fitted watch (21) installed on the easel (21) ', by the managerial handle (1), which monitors the sensor (20), and by a water block valve (22) installed on the outlet pipe of the controlled by the manager (1), which is essentially comprised of: CPU processor (2) and extended peripherals: display (3) alternately showing la (40) of "Operation Mode" and screens (50) and (60) d "Programming Mode"; by pushbutton consisting of: programming button (P) (4), plus (+) and confirmation (5), minus (-) and negation (6) buttons; by flashing operation indication LED switching (7); and by optical-audible alarm system (8) comprising LED and closed valve indicator beep (22); data maintenance security set (9) comprising charger and internal battery; per terminal strip (10) for connection: wiring (11) 12V power to manager power, (13) power to open shut-off valve, (14) photoelectric optical sensor signal, (15) signal output generated by the optical sensor for the addition of a telemetry device that uses the same fate! to offer the possibility of reading / measuring remote consumption, connecting to external power supply (12) (12V); the valve (22); to the sensor (20) and any other telemetry apparatus (200) associated with the manager respectively, all mounted within a sealed water infiltration housing (16) whose front face forms a user interface panel on which arranged: the display (3); programming (P) (4), (5) plus (and confirmation), (6) minus (-) and negative (6) and flashing LEDs (7) indicating equipment in operation, (8) when lit indicates blockage of water and outwardly of said housing extend the wiring (11), (13), (14), (15).
2a) "GERENCIADOR DE CONSUMO DE ÁGUA", de acordo com a reivindicação 1 , caracterizado por software dedicado (30), residente em memória adequada eeprom, que compreende: dispositivos para execução de "Modo de Operação" compreendendo, pelo menos: dispositivo de acionamento do sensor óptico, dispositivo de acionamento da válvula de bloqueio, dispositivo para veicular no visor (3) uma tela (40) do "Modo de Operação"; dispositivo de monitoração do sensor, dispositivo de monitoração dos botões (4), (5), (6), dispositivo de acionamento do LED (7), dispositivo de acionamento do alarme (8), dispositivo de contagem do volume de água; dispositivo de contagem de tempo de um ciclo; dispositivo de comparação do consumo programado por ciclo versus consumo real por ciclo e dispositivo de comutação da válvula (22), e dispositivo de comutação do alarme (8); dito software (30) é formado ainda por dispositivos para execução de "Modo de Programação" compreendendo, pelo menos: dispositivo de habilitação do "Modo de Programação"; dispositivo de programação de novo consumo por ciclo; dispositivo de confirmação da nova programação (enter); e
dispositivo de habilitação do "Modo de operação" com a nova programação ou com a última programação sem a nova e com a antiga programação; ditos dispositivos que realizam rotinas específicas dos modos de operação e programação. A ) "WATER CONSUMPTION MANAGER" according to claim 1, characterized by dedicated memory-resident software (30) eeprom comprising: devices for performing "Mode of Operation" comprising at least: device optical sensor actuation device, shut-off valve actuation device, display device (3) a "Operation Mode" screen (40); sensor monitoring device, button monitoring device (4), (5), (6), LED triggering device (7), alarm triggering device (8), water flow meter; one-cycle time counting device; cycle programmed versus actual cycle consumption device and valve switching device (22), and alarm switching device (8); said software (30) is further formed by devices for performing "Programming Mode" comprising at least: "Programming Mode" enabling device; new consumption programming device per cycle; new programming confirmation device (enter); and "Operation mode" enabling device with the new programming or the last programming without the new and the old programming; said devices that perform specific routines of operating and programming modes.
3a) "GERENCIADOR DE CONSUMO DE ÁGUA", de acordo com a reivindicação 1 ou 2, caracterizado pela tela (40) conter: primeira mensagem fixa (41 ), indicadora do modo que está em execução - "Modo de Operação"; segunda mensagem fixa (42) (fixa, mas que pode ser re-programada no modo de programação), de indicação do consumo programado para um ciclo de medição; primeira mensagem mutável (43), composta por conjunto de setas intermitentes, indicadoras de fluxo de água e de recebimento de correspondentes sinais gerados pelo sensor óptico; e segunda mensagem mutável (44), compreendida por número indicador de litros de água computados.
A ) "WATER CONSUMPTION MANAGER" according to claim 1 or 2, characterized in that the screen (40) contains: first fixed message (41), indicating the mode that is running - "Operation Mode"; second fixed message (42) (fixed but can be re-programmed in programming mode) indicating the consumption programmed for a measuring cycle; first changeable message (43), consisting of a set of intermittent arrows indicating water flow and receiving corresponding signals generated by the optical sensor; and second changeable message (44), comprised of indicator number of liters of water computed.
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
BRC11001096-3A BRPI1001096C1 (en) | 2010-04-09 | 2010-04-09 | additive to water consumption manager |
BRPI1001096-3 | 2010-04-09 | ||
BR018110000365 | 2011-01-06 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2011123912A1 true WO2011123912A1 (en) | 2011-10-13 |
Family
ID=44761940
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/BR2011/000078 WO2011123912A1 (en) | 2010-04-09 | 2011-03-22 | Water consumption regulator |
Country Status (2)
Country | Link |
---|---|
BR (1) | BRPI1001096C1 (en) |
WO (1) | WO2011123912A1 (en) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2030720U (en) * | 1988-02-24 | 1989-01-11 | 北京大学无线电系 | Digital hydrometer |
GB2250597A (en) * | 1990-10-16 | 1992-06-10 | Luciano Ceresa | Buoyant hydrometer |
CN201392303Y (en) * | 2009-02-04 | 2010-01-27 | 上海理工大学 | On-line electronic hydrometer |
-
2010
- 2010-04-09 BR BRC11001096-3A patent/BRPI1001096C1/en not_active IP Right Cessation
-
2011
- 2011-03-22 WO PCT/BR2011/000078 patent/WO2011123912A1/en active Application Filing
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2030720U (en) * | 1988-02-24 | 1989-01-11 | 北京大学无线电系 | Digital hydrometer |
GB2250597A (en) * | 1990-10-16 | 1992-06-10 | Luciano Ceresa | Buoyant hydrometer |
CN201392303Y (en) * | 2009-02-04 | 2010-01-27 | 上海理工大学 | On-line electronic hydrometer |
Also Published As
Publication number | Publication date |
---|---|
BRPI1001096C1 (en) | 2011-12-20 |
BRPI1001096A2 (en) | 2011-11-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7969318B2 (en) | Flow detector with alarm features | |
US11378235B2 (en) | Method and apparatus for detecting leaks in a building water system | |
US10966379B2 (en) | Smart irrigation system for monitoring and controlling water flow | |
US20190025150A1 (en) | System and method for water leak detection | |
US20110050395A1 (en) | Utility monitoring system | |
US8606413B2 (en) | Water management system | |
US20210381207A1 (en) | Water meter system and method | |
US20110035063A1 (en) | Water Management System | |
US20140343736A1 (en) | Substance Control System | |
US20140343734A1 (en) | Substance control system | |
US20050126635A1 (en) | Smart flow anomaly detector | |
KR102296295B1 (en) | Digital water meter and digital water meter management system with remote meter reading function | |
US20240003774A1 (en) | Periodic water leak detection | |
US10054334B2 (en) | Water pressure alarm | |
WO2011123912A1 (en) | Water consumption regulator | |
CN114719922A (en) | Gas leakage detection method and intelligent gas meter | |
TWM575134U (en) | Remote monitoring device for water equipment | |
JPH0128293B2 (en) | ||
BRMU9100386U2 (en) | arrangement applied to water consumption manager for water meters and the like | |
CN213979148U (en) | Secondary water supply system with water leakage monitoring function | |
CN212749602U (en) | Water flow metering switch | |
JP2017129392A (en) | Gas meter | |
Philip et al. | Electronic water supply management system for educational institutions | |
KR20170093298A (en) | Measuring device for inspection of leaking gas | |
JPH02600B2 (en) |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 11764963 Country of ref document: EP Kind code of ref document: A1 |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 11764963 Country of ref document: EP Kind code of ref document: A1 |