WO2011121297A1 - Clearing blokcages in a pipe by blowing air through a duct moved in the same pipe prior to fibre installation - Google Patents

Clearing blokcages in a pipe by blowing air through a duct moved in the same pipe prior to fibre installation Download PDF

Info

Publication number
WO2011121297A1
WO2011121297A1 PCT/GB2011/000489 GB2011000489W WO2011121297A1 WO 2011121297 A1 WO2011121297 A1 WO 2011121297A1 GB 2011000489 W GB2011000489 W GB 2011000489W WO 2011121297 A1 WO2011121297 A1 WO 2011121297A1
Authority
WO
WIPO (PCT)
Prior art keywords
duct
adaptor
underground pipe
pipe
location
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/GB2011/000489
Other languages
French (fr)
Inventor
Christopher Nigel Munnings
Mark Edward Scopes
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
British Telecommunications PLC
Original Assignee
British Telecommunications PLC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by British Telecommunications PLC filed Critical British Telecommunications PLC
Priority to GB1218306.7A priority Critical patent/GB2491543A/en
Publication of WO2011121297A1 publication Critical patent/WO2011121297A1/en
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G02OPTICS
    • G02BOPTICAL ELEMENTS, SYSTEMS OR APPARATUS
    • G02B6/00Light guides; Structural details of arrangements comprising light guides and other optical elements, e.g. couplings
    • G02B6/46Processes or apparatus adapted for installing or repairing optical fibres or optical cables
    • G02B6/50Underground or underwater installation; Installation through tubing, conduits or ducts
    • G02B6/52Underground or underwater installation; Installation through tubing, conduits or ducts using fluid, e.g. air
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B9/00Cleaning hollow articles by methods or apparatus specially adapted thereto
    • B08B9/02Cleaning pipes or tubes or systems of pipes or tubes
    • B08B9/027Cleaning the internal surfaces; Removal of blockages
    • B08B9/04Cleaning the internal surfaces; Removal of blockages using cleaning devices introduced into and moved along the pipes
    • B08B9/043Cleaning the internal surfaces; Removal of blockages using cleaning devices introduced into and moved along the pipes moved by externally powered mechanical linkage, e.g. pushed or drawn through the pipes
    • B08B9/0433Cleaning the internal surfaces; Removal of blockages using cleaning devices introduced into and moved along the pipes moved by externally powered mechanical linkage, e.g. pushed or drawn through the pipes provided exclusively with fluid jets as cleaning tools
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B23/00Apparatus for displacing, setting, locking, releasing or removing tools, packers or the like in boreholes or wells
    • E21B23/08Introducing or running tools by fluid pressure, e.g. through-the-flow-line tool systems
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B37/00Methods or apparatus for cleaning boreholes or wells
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/06Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for laying cables, e.g. laying apparatus on vehicle
    • H02G1/08Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for laying cables, e.g. laying apparatus on vehicle through tubing or conduit, e.g. rod or draw wire for pushing or pulling
    • H02G1/086Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for laying cables, e.g. laying apparatus on vehicle through tubing or conduit, e.g. rod or draw wire for pushing or pulling using fluid as pulling means, e.g. liquid, pressurised gas or suction means

Definitions

  • the present invention relates to optical fibre transmission lines and in particular to a method of installing an optical fibre line.
  • the optical fibres are easily damaged by tensile stress. Such stress may, for example, propagate micro-cracks, leading to fibre breakage in the long term.
  • the pipes must be cleared before a fibre can be installed.
  • a known method of clearing any blockages is called rodding whereby the blockages are removed by pushing a glass fibre reinforced epoxy rod into the pipe to physically unblock the pipe.
  • rods are heavy and bulky, for example an 11mm diameter , 100m long rod weighs about 40kg and takes up significant space.
  • the present invention aims to overcome the above problems associated with rodding and using external specialist firms.
  • the present invention provides a method of installing an optical fibre in a pre-installed underground pipe extending between a first location and a second location, the method comprising: installing a duct through the underground pipe by: attaching an adaptor to one end of said duct; attaching the other end of said duct to a gas compressor; blowing gas through said duct as the duct is mechanically urged along the length of said underground pipe from the first location towards the second location, the gas being blown out of the adaptor at a sufficient pressure so as to dislodge debris within the underground pipe; and once the adaptor arrives at the second location such that the duct extends along the length of the underground pipe, removing the adaptor from the end of the duct and blowing the optical fibre along the length of the newly installed duct between the two locations.
  • the present invention provides an apparatus for dislodging a blockage in a pre- installed underground pipe extending between a first location and a second location, the apparatus comprising: a duct for carrying optical fibre; a nozzle head adaptor attached at a first end of the duct; a fibre blow head attached to a second end of the duct and operable to deliver compressed gas along the length of the duct; wherein, prior to installation of fibre within the duct, in use, gas is blown through the duct as the duct is mechanically urged along the length of said underground pipe, the gas being blown out of an exit port of the nozzle head adaptor at a sufficient pressure so as to dislodge debris within the underground pipe; and once the duct has traversed the underground pipe, the duct is left in place for carrying an optical fibre.
  • Figure 1 shows a blocked underground pipe, running between a customer premises and an exchange junction box, to which the first embodiment can be applied;
  • Figure 2a shows an operation of unblocking the blocked pipe illustrated in Figure 1 using a duct and nozzle arrangement in accordance with a first embodiment;
  • Figure 2b shows the pipe illustrated in Figure 2a which has been unblocked using a duct and nozzle arrangement in accordance with a first embodiment-
  • Figure 3a shows a cross sectional view of a first nozzle adaptor design
  • Figure 3b shows a cross sectional view of a second nozzle adaptor design
  • Figure 3c shows a cross sectional view of a third nozzle adaptor design
  • Figure 4 is a flowchart showing the operation to install an optical fibre in accordance with a first embodiment
  • Figure 5 shows the functional components for clearing a pipe according to a second embodiment
  • Figure 6 shows a nozzle adaptor according to the second embodiment
  • Figure 7 is a flowchart showing the operation to install an optical fibre in accordance with a first embodiment.
  • Figure 1 shows an underground pipe running between a customer premises 3 and an exchange junction box 5.
  • the cross sectional cut out portion of pipe la shows a blockage 7 and there may be several blockages throughout the length of the pipe 1.
  • the blockage may be caused by sand, grit or leaves that have entered the pipe at some point during installation, or after installation due to damage. These blockages must be removed before an optical fibre transmission line can be installed.
  • air is blown down the pipe to remove the blockage.
  • the air is delivered via a duct 11 which will eventually be used to carry the optical fibre.
  • Figures 2a and 2b show the operation of the pipe unblocking.
  • a duct 11 which is smaller than the pipe 1 is attached at one end, to an air pump 13, in this embodiment, the air pump is a fibre blow head as described in co-pending patent application WO2006/103419 incorporated herein by reference.
  • a nozzle adaptor 15 is attached to the other end of the duct 11. The end of the duct which is attached to the nozzle adaptor 15 is fed into the pipe 1 and pushed along until it reaches the customer premises 3.
  • the fibre blow head 13 provides pressurized air along the duct 11 at a pressure of up to six bar and the nozzle adaptor 15 has a forward outlet port 17 to direct the jets of compressed air 18 to dislodge blockages 7.
  • the high pressure blowing action causes the blockage to be removed as the duct and nozzle head assembly is advanced along the duct.
  • Figures 3a to 3c respectively show a first, second and third design of nozzle adaptor 15.
  • Figure 3a shows a simple nozzle adaptor 15a attached at one end to a duct 11.
  • the body 15a of the nozzle adaptor is generally cylindrical with a length of 60.62mm, an outer diameter of 15.12mm and an inner diameter of 10.18mm.
  • the internal diameter is slightly smaller than the external diameter of the duct to enable a tight fit between the two components.
  • the section of the body furthest from the duct port is tapered and 35.80mm in length. This section ends with an air outlet port 17a from which air is expelled in use.
  • Figure 3b shows a second design of nozzle adaptorl5b.
  • an air inlet port 19 is located at the opposed end of the air outlet port 17b.
  • the nozzle adaptor 15b attaches to the duct 11 using a ribbed push-fitting 21a and in contrast to the first nozzle adaptor design 15, the second nozzle adaptor fits to the internal diameter of the duct 11 via push-fitting 21a.
  • the second nozzle adaptor 15b also includes reverse facing vents 23a. These vents are reverse facing as they face opposite to the direction of travel of the duct 11 along the pipe 1.
  • the reverse facing vents 23a help to clear debris within the pipe 11 which has been dislodged by the air leaving the air outlet port 17.
  • the cross sectional view shown in Figure 3b shows two diametrically opposed reverse facing vents.
  • Figure 3c shows a third design of nozzle adaptor 15c.
  • the nozzle adaptor 15c has reverse facing vents 23b arranged in pairs. As with the second design, these help to remove dislodged debris from around the outlet port 17c of the nozzle adaptor 15c. As a secondary effect, they also provide slight propulsion of the duct 11 along the pipe.
  • FIG. 4 is a flowchart showing the operation to install an optical fibre into an underground pipe in accordance with the first embodiment.
  • the physical steps are performed by a cable installer/engineer.
  • the nozzle adaptor 15 is attached to one end of the duct 11 which will be used to carry an optical fibre.
  • the blow head 13 is attached to the other end of the duct in step s3 and turned on it step s5 to provide a jet of compressed air along the duct.
  • This operation is the same as a conventional fibre installation operation and will not be described.
  • step s7 the nozzle adaptor 15 end of the duct is 11 fed, i.e. pushed by the cable installer into the underground pipe and the nozzle adapter 15 end and joined duct 11 assembly is fed along the pipe to clear it of blockages in step s9. This process continues until the duct 11 has traversed the length of the pipe 1 to reach the user premises 3.
  • step sll the blow head is switched off and in step sl3 the nozzle adaptor is removed from the duct 11, in this case by cutting the attached section of duct 11. Having cleared the pipe 1 of blockages to such an extent that the duct 11 now extends the length of the pipe 1, the same duct 11 can now be used to carry fibre. Therefore in step sl5, optical fibre is blown into the duct 11 as is known in the art.
  • the first embodiment provides an improved method of installing optical fibre within existing underground pipes. Blockages are common and existing methods of rodding or calling specialists to unblock the pipe are cumbersome, time -consuming and add to the expense of fibre deployment. Using the method of the first embodiment, a fibre installer does not need much extra equipment over the standard fibre installation inventory to be able to clear the pipe and lay the duct 11 in a single operation, This results in cheaper, faster and more convenient fibre installation.
  • Second embodiment In the first embodiment, compressed air is blown along the duct and out of a nozzle adaptor to dislodge debris and unblock a pipe. Using air is very effective where the blockage is due to dry particles such as gravel or dust. However, where moisture has entered the pipe due to water damage, jets of high pressure air alone is not sufficient to unblock the pipe.
  • a mixture of air and water is blown out of the nozzle adaptor to break up wet silt or mud that has accumulated within the underground pipe.
  • the aim is to clear a path through the blockage, rather than try to completely remove the blockage as in the first embodiment.
  • FIG. 5 shows the functional components according to the second embodiment.
  • a pipe 101 has a blockage 103, The components required to run a duct 105 through the pipe 101 include a blow head 107 as already explained in the first embodiment and a modified nozzle adaptor 109 which is similar to the nozzle adaptors of the first embodiment. However, in order to provide a high pressure water spray 110, further components are required.
  • a water tank 111 contains a supply of about ten litres of water.
  • a water tube 113 having a diameter which is smaller than the internal diameter of the duct extends from the water tank along the length of the duct to the nozzle adaptor 109.
  • a T joint adaptor 115 provides the connection between the water tank 111 and the blow head 107 so that the water tube 113 is carried with the compressed air in the duct 105.
  • Figure 6 shows the structure of the modified nozzle adaptor 109.
  • the duct 105 and water tube 113 are attached to one of the nozzle adaptor 109.
  • a water adaptor 116 is first attached to the free end of the water tube 113.
  • the water adaptor 116 is shaped to hold the end of the water tube 113 in place within the nozzle adaptor 109 but still allow air to flow to the end of the nozzle adaptor 109.
  • the water adaptor 116 has a water outlet 117 around which high pressure air can flow. Water flows out of the water tube 113 and is accelerated out of the water outlet 117 by the surrounding high pressure air towards the outlet port 117 of the nozzle adaptor 109, thereby creating a water/air spray which can create a path through the blockage 103 as shown in Figure 5. As with the first embodiment, once the nozzle adaptor 109 and duct assembly has travelled the length of the pipe 101, the duct 105 can be left in place as a conduit for a blown optical fibre.
  • FIG. 7 is a flowchart showing the operation to install an optical fibre into an underground pipe in accordance with the second embodiment.
  • step slOl the water tube 113 is passed through the T joint adaptor 115 and then fed through the length of the duct 105 until it reaches the end of the duct 105.
  • step sl03 the water adaptor 116 is fitted to the water tube 113.
  • step sl05 the nozzle adaptor 109 is attached to the water adaptor 116 and the duct 105 which will be used to carry an optical fibre.
  • the blow head 107 is attached to the other end of the duct 105 in step sl07 and turned on it step sl09 to provide a jet of compressed air along the duct 105 and around the water tube 116.
  • This operation is the same as a conventional fibre installation operation and will not be described.
  • step sill the nozzle adaptor end of the duct 105 is fed, i.e. pushed by a cable installer into the underground pipe and moved along the pipe 101 to clear it of blockages in step sll3. This process continues until the duct 105 has traversed the pipe 103.
  • step sll5 the blow head 107 is switched off and in step sll7 the nozzle adaptor is removed from the duct 105, in this case by cutting the attached section of duct 105.
  • step sll9 the water adaptor 116 and water tube 113 are removed from the duct 105.
  • step sl21 optical fibre is blown into the duct 105 as is known in the art.
  • the second embodiment provides an improved method of installing optical fibre within existing underground pipes where a wet blockage has occurred although it is equally applicable to dry blockages.
  • the pipes connected a customer premises to a local exchange. It will be understood that the invention is applicable to any fibre deployment between two locations such as fibre-to-the-home, fibre-to-the-curb or fibre-to-the-exchange where a pipe blockage may be present.
  • a number of nozzle adaptors were described. It will be readily apparent to the skilled reader that the examples are non-limiting and other designs are possible with the same effects.
  • compressed air was blown down the duct.
  • inert gases could be used such as nitrogen.
  • other fluids could be used instead of water in the second embodiment.

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Mining & Mineral Resources (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Fluid Mechanics (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Optics & Photonics (AREA)
  • General Physics & Mathematics (AREA)
  • Mechanical Engineering (AREA)
  • Light Guides In General And Applications Therefor (AREA)
  • Electric Cable Installation (AREA)
  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

A method of installing an optical fibre in a pre-installed underground pipe (1) extending between a first location and a second location, the method comprising: installing a duct (11) through the underground pipe (1) by: attaching an adaptor (15) to one end of said duct (11); attaching the other end of said duct (11) to a gas compressor (13); blowing gas through said duct (11) as the duct (11) is mechanically urged along the length of said underground pipe (1) from the first location towards the second location, the gas being blown out of the adaptor (15) at a sufficient pressure so as to dislodge debris within the underground pipe (1); and once the adaptor (15) arrives at the second location such that the duct (11) extends along the length of the underground pipe (1), removing the adaptor (15) from the end of the duct (11) and blowing the optical fibre along the length of the newly installed duct (11) between the two locations.

Description

CLEARING BLOKCAGES IN A PIPE BY BLOWING AIR THROUGH
A DUCT MOVED IN THE SAME PIPE PRIOR TO FIBRE INSTALLATION
The present invention relates to optical fibre transmission lines and in particular to a method of installing an optical fibre line.
Background Optical fibre cables carrying optical fibre transmission lines were originally installed by the same methods as conventional metal conductor cables, those methods using involve pulling the cable with a pulling rope through a previously laid cable duct.
However, unlike the metal conductors of a conventional cable, the optical fibres are easily damaged by tensile stress. Such stress may, for example, propagate micro-cracks, leading to fibre breakage in the long term.
To overcome this problem; a method and apparatus to install optical fibre transmission lines into optical fibre tubes or ducts using a "blowing" technique in which the viscous drag provided by the high speed flow of a fluid medium, often air or nitrogen, is known from EP108590 and subsequent publications. Whether by rope pulling or blowing, the optical fibres and their optical fibre ducts are installed within existing ducts/pipes which used to carry copper cable. These pipes typically have a diameter of 4-inch (100mm) and may be several hundred meters long, for example from an exchange to a customer's premises. Often these existing pipes have been in place for a long time and therefore may contain blockages of dust or gravel. Furthermore if water seeps into the pipe then this mixes with the dust to create mud blockages.
The pipes must be cleared before a fibre can be installed. A known method of clearing any blockages is called rodding whereby the blockages are removed by pushing a glass fibre reinforced epoxy rod into the pipe to physically unblock the pipe. However rods are heavy and bulky, for example an 11mm diameter , 100m long rod weighs about 40kg and takes up significant space. The present invention aims to overcome the above problems associated with rodding and using external specialist firms.
In one aspect, the present invention provides a method of installing an optical fibre in a pre-installed underground pipe extending between a first location and a second location, the method comprising: installing a duct through the underground pipe by: attaching an adaptor to one end of said duct; attaching the other end of said duct to a gas compressor; blowing gas through said duct as the duct is mechanically urged along the length of said underground pipe from the first location towards the second location, the gas being blown out of the adaptor at a sufficient pressure so as to dislodge debris within the underground pipe; and once the adaptor arrives at the second location such that the duct extends along the length of the underground pipe, removing the adaptor from the end of the duct and blowing the optical fibre along the length of the newly installed duct between the two locations.
In another aspect, the present invention provides an apparatus for dislodging a blockage in a pre- installed underground pipe extending between a first location and a second location, the apparatus comprising: a duct for carrying optical fibre; a nozzle head adaptor attached at a first end of the duct; a fibre blow head attached to a second end of the duct and operable to deliver compressed gas along the length of the duct; wherein, prior to installation of fibre within the duct, in use, gas is blown through the duct as the duct is mechanically urged along the length of said underground pipe, the gas being blown out of an exit port of the nozzle head adaptor at a sufficient pressure so as to dislodge debris within the underground pipe; and once the duct has traversed the underground pipe, the duct is left in place for carrying an optical fibre.
The present invention will now be described by way of example and with reference to the following figures in which:
Figure 1 shows a blocked underground pipe, running between a customer premises and an exchange junction box, to which the first embodiment can be applied; Figure 2a shows an operation of unblocking the blocked pipe illustrated in Figure 1 using a duct and nozzle arrangement in accordance with a first embodiment;
Figure 2b shows the pipe illustrated in Figure 2a which has been unblocked using a duct and nozzle arrangement in accordance with a first embodiment- Figure 3a shows a cross sectional view of a first nozzle adaptor design, Figure 3b shows a cross sectional view of a second nozzle adaptor design; Figure 3c shows a cross sectional view of a third nozzle adaptor design;
Figure 4 is a flowchart showing the operation to install an optical fibre in accordance with a first embodiment;
Figure 5 shows the functional components for clearing a pipe according to a second embodiment; Figure 6 shows a nozzle adaptor according to the second embodiment; and
Figure 7 is a flowchart showing the operation to install an optical fibre in accordance with a first embodiment.
Description Figure 1 shows an underground pipe running between a customer premises 3 and an exchange junction box 5. The cross sectional cut out portion of pipe la, shows a blockage 7 and there may be several blockages throughout the length of the pipe 1. The blockage may be caused by sand, grit or leaves that have entered the pipe at some point during installation, or after installation due to damage. These blockages must be removed before an optical fibre transmission line can be installed. In this embodiment, air is blown down the pipe to remove the blockage. In particular, the air is delivered via a duct 11 which will eventually be used to carry the optical fibre. Figures 2a and 2b show the operation of the pipe unblocking. A duct 11 which is smaller than the pipe 1 is attached at one end, to an air pump 13, in this embodiment, the air pump is a fibre blow head as described in co-pending patent application WO2006/103419 incorporated herein by reference. A nozzle adaptor 15 is attached to the other end of the duct 11. The end of the duct which is attached to the nozzle adaptor 15 is fed into the pipe 1 and pushed along until it reaches the customer premises 3. The fibre blow head 13 provides pressurized air along the duct 11 at a pressure of up to six bar and the nozzle adaptor 15 has a forward outlet port 17 to direct the jets of compressed air 18 to dislodge blockages 7. As shown in Figure 2b, the high pressure blowing action causes the blockage to be removed as the duct and nozzle head assembly is advanced along the duct.
Figures 3a to 3c respectively show a first, second and third design of nozzle adaptor 15.
Figure 3a shows a simple nozzle adaptor 15a attached at one end to a duct 11. The body 15a of the nozzle adaptor is generally cylindrical with a length of 60.62mm, an outer diameter of 15.12mm and an inner diameter of 10.18mm. The internal diameter is slightly smaller than the external diameter of the duct to enable a tight fit between the two components. The section of the body furthest from the duct port is tapered and 35.80mm in length. This section ends with an air outlet port 17a from which air is expelled in use.
Figure 3b shows a second design of nozzle adaptorl5b. In this design an air inlet port 19 is located at the opposed end of the air outlet port 17b. The nozzle adaptor 15b attaches to the duct 11 using a ribbed push-fitting 21a and in contrast to the first nozzle adaptor design 15, the second nozzle adaptor fits to the internal diameter of the duct 11 via push-fitting 21a.
The second nozzle adaptor 15b also includes reverse facing vents 23a. These vents are reverse facing as they face opposite to the direction of travel of the duct 11 along the pipe 1. The reverse facing vents 23a help to clear debris within the pipe 11 which has been dislodged by the air leaving the air outlet port 17. The cross sectional view shown in Figure 3b shows two diametrically opposed reverse facing vents.
Figure 3c shows a third design of nozzle adaptor 15c. In this design, the nozzle adaptor 15c has reverse facing vents 23b arranged in pairs. As with the second design, these help to remove dislodged debris from around the outlet port 17c of the nozzle adaptor 15c. As a secondary effect, they also provide slight propulsion of the duct 11 along the pipe.
Figure 4 is a flowchart showing the operation to install an optical fibre into an underground pipe in accordance with the first embodiment. In this embodiment, the physical steps are performed by a cable installer/engineer. In step si the nozzle adaptor 15 is attached to one end of the duct 11 which will be used to carry an optical fibre. To provide the air source, the blow head 13 is attached to the other end of the duct in step s3 and turned on it step s5 to provide a jet of compressed air along the duct. This operation is the same as a conventional fibre installation operation and will not be described.
In step s7, the nozzle adaptor 15 end of the duct is 11 fed, i.e. pushed by the cable installer into the underground pipe and the nozzle adapter 15 end and joined duct 11 assembly is fed along the pipe to clear it of blockages in step s9. This process continues until the duct 11 has traversed the length of the pipe 1 to reach the user premises 3.
In step sll the blow head is switched off and in step sl3 the nozzle adaptor is removed from the duct 11, in this case by cutting the attached section of duct 11. Having cleared the pipe 1 of blockages to such an extent that the duct 11 now extends the length of the pipe 1, the same duct 11 can now be used to carry fibre. Therefore in step sl5, optical fibre is blown into the duct 11 as is known in the art.
The first embodiment provides an improved method of installing optical fibre within existing underground pipes. Blockages are common and existing methods of rodding or calling specialists to unblock the pipe are cumbersome, time -consuming and add to the expense of fibre deployment. Using the method of the first embodiment, a fibre installer does not need much extra equipment over the standard fibre installation inventory to be able to clear the pipe and lay the duct 11 in a single operation, This results in cheaper, faster and more convenient fibre installation.
Second embodiment In the first embodiment, compressed air is blown along the duct and out of a nozzle adaptor to dislodge debris and unblock a pipe. Using air is very effective where the blockage is due to dry particles such as gravel or dust. However, where moisture has entered the pipe due to water damage, jets of high pressure air alone is not sufficient to unblock the pipe.
In the second embodiment, a mixture of air and water is blown out of the nozzle adaptor to break up wet silt or mud that has accumulated within the underground pipe. In this case, the aim is to clear a path through the blockage, rather than try to completely remove the blockage as in the first embodiment.
Figure 5 shows the functional components according to the second embodiment. A pipe 101 has a blockage 103, The components required to run a duct 105 through the pipe 101 include a blow head 107 as already explained in the first embodiment and a modified nozzle adaptor 109 which is similar to the nozzle adaptors of the first embodiment. However, in order to provide a high pressure water spray 110, further components are required. A water tank 111 contains a supply of about ten litres of water. A water tube 113 having a diameter which is smaller than the internal diameter of the duct extends from the water tank along the length of the duct to the nozzle adaptor 109. A T joint adaptor 115 provides the connection between the water tank 111 and the blow head 107 so that the water tube 113 is carried with the compressed air in the duct 105.
Figure 6 shows the structure of the modified nozzle adaptor 109. The duct 105 and water tube 113 are attached to one of the nozzle adaptor 109. A water adaptor 116 is first attached to the free end of the water tube 113. The water adaptor 116 is shaped to hold the end of the water tube 113 in place within the nozzle adaptor 109 but still allow air to flow to the end of the nozzle adaptor 109.
The water adaptor 116 has a water outlet 117 around which high pressure air can flow. Water flows out of the water tube 113 and is accelerated out of the water outlet 117 by the surrounding high pressure air towards the outlet port 117 of the nozzle adaptor 109, thereby creating a water/air spray which can create a path through the blockage 103 as shown in Figure 5. As with the first embodiment, once the nozzle adaptor 109 and duct assembly has travelled the length of the pipe 101, the duct 105 can be left in place as a conduit for a blown optical fibre.
Figure 7 is a flowchart showing the operation to install an optical fibre into an underground pipe in accordance with the second embodiment. In step slOl the water tube 113 is passed through the T joint adaptor 115 and then fed through the length of the duct 105 until it reaches the end of the duct 105. In step sl03, the water adaptor 116 is fitted to the water tube 113. In step sl05, the nozzle adaptor 109 is attached to the water adaptor 116 and the duct 105 which will be used to carry an optical fibre. As in the first embodiment, to provide the air source, the blow head 107 is attached to the other end of the duct 105 in step sl07 and turned on it step sl09 to provide a jet of compressed air along the duct 105 and around the water tube 116. This operation is the same as a conventional fibre installation operation and will not be described.
In step sill, the nozzle adaptor end of the duct 105 is fed, i.e. pushed by a cable installer into the underground pipe and moved along the pipe 101 to clear it of blockages in step sll3. This process continues until the duct 105 has traversed the pipe 103.
In step sll5 the blow head 107 is switched off and in step sll7 the nozzle adaptor is removed from the duct 105, in this case by cutting the attached section of duct 105.
Then in step sll9 the water adaptor 116 and water tube 113 are removed from the duct 105.
Having created a path through any blockages in the pipe 101 so that the duct 105 now extends the length of the pipe 101, the same duct 105 can now be used to carry an optical fibre. Therefore in step sl21, optical fibre is blown into the duct 105 as is known in the art.
The second embodiment provides an improved method of installing optical fibre within existing underground pipes where a wet blockage has occurred although it is equally applicable to dry blockages. Alternatives and modifications
In the embodiments the pipes connected a customer premises to a local exchange. It will be understood that the invention is applicable to any fibre deployment between two locations such as fibre-to-the-home, fibre-to-the-curb or fibre-to-the-exchange where a pipe blockage may be present. In the embodiments a number of nozzle adaptors were described. It will be readily apparent to the skilled reader that the examples are non-limiting and other designs are possible with the same effects.
In the embodiments, compressed air was blown down the duct. Other inert gases could be used such as nitrogen. Similarly, other fluids could be used instead of water in the second embodiment.

Claims

Claims
1. A method of installing an optical fibre in a pre-installed underground pipe (1) extending between a first location and a second location, the method comprising: installing a duct (11) through the underground pipe (1) by: attaching an adaptor (15) to one end of said duct (11); attaching the other end of said duct (11) to a gas compressor (13); blowing gas through said duct (11) as the duct (11) is mechanically urged along the length of said underground pipe (1) from the first location towards the second location, the gas being blown out of the adaptor (15) at a sufficient pressure so as to dislodge debris within the underground pipe (1); and once the adaptor (15) arrives at the second location such that the duct (11) extends along the length of the underground pipe (1), removing the adaptor (15) from the end of the duct (11) and blowing the optical fibre along the length of the newly installed duct (11) between the two locations.
2. A method according to claim 1, further comprising: installing a liquid carrying sub-duct (113) along the length of the duct (11); and delivering liquid via said liquid carrying sub-duct at the same time as the compressed gas is blown through the duct (11) so that the liquid mixes with the gas so as to improve the ability to dislodge debris within the underground pipe( 1).
3. Apparatus for dislodging a blockage in a pre-installed underground pipe (1) extending between a first location and a second location, the apparatus comprising: a duct (11) for carrying optical fibre; a nozzle head adaptor (15) attached at a first end of the duct (11); a fibre blow head (13) attached to a second end of the duct (11) and operable to deliver compressed gas along the length of the duct (11); wherein, prior to installation of fibre within the duct (11), in use, gas is blown through the duct (11) as the duct (11) is mechanically urged along the length of said underground pipe (1), the gas being blown out of an exit port (17) of the nozzle head adaptor ( 15) at a sufficient pressure so as to dislodge debris within the underground pipe (1); and once the duct (11) has traversed the underground pipe (1), the duct (11) is left in place for carrying an optical fibre.
4. Apparatus according to claim 4, further comprising: a liquid carrying sub-duct (113) extending along the length of the duct (11); and a liquid tank (111); wherein the nozzle head adaptor (15) has a liquid and gas mixer such that liquid mixes with the compressed gas in the vicinity of the exit port (17) of the nozzle head adaptor (15).
PCT/GB2011/000489 2010-03-31 2011-03-30 Clearing blokcages in a pipe by blowing air through a duct moved in the same pipe prior to fibre installation Ceased WO2011121297A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
GB1218306.7A GB2491543A (en) 2010-03-31 2011-03-30 Clearing blockges in a pipe by blowing air through a duct moved in the same pipe prior to fibre installation

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
EP10250689.6 2010-03-31
EP10250689A EP2372424A1 (en) 2010-03-31 2010-03-31 Clearing blockages in a pipe by blowing air through a duct moved in the same pipe prior to fibre installation

Publications (1)

Publication Number Publication Date
WO2011121297A1 true WO2011121297A1 (en) 2011-10-06

Family

ID=42668848

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/GB2011/000489 Ceased WO2011121297A1 (en) 2010-03-31 2011-03-30 Clearing blokcages in a pipe by blowing air through a duct moved in the same pipe prior to fibre installation

Country Status (3)

Country Link
EP (1) EP2372424A1 (en)
GB (1) GB2491543A (en)
WO (1) WO2011121297A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106733963A (en) * 2016-12-05 2017-05-31 四川战奇科技有限公司 A kind of dissolving tube cleaning device people certainly

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018037323A1 (en) * 2016-08-23 2018-03-01 Paul Barton The hose centurian
US11802645B2 (en) 2020-07-08 2023-10-31 Saudi Arabian Oil Company Flow management systems and related methods for oil and gas applications
US11274501B2 (en) * 2020-07-08 2022-03-15 Saudi Arabian Oil Company Flow management systems and related methods for oil and gas applications

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3343822A (en) * 1964-06-11 1967-09-26 Schlumberger Technology Corp Spray-type dust reducer
EP0108590A1 (en) 1982-11-08 1984-05-16 BRITISH TELECOMMUNICATIONS public limited company Optical fibre transmission lines
JPH03145604A (en) * 1989-11-01 1991-06-20 Sumitomo Electric Ind Ltd Cable laying and recovery method
JPH03274005A (en) * 1990-03-23 1991-12-05 Sumitomo Electric Ind Ltd Tip jig for installing hollow pipes inside pipelines
US5423917A (en) * 1993-02-12 1995-06-13 Garcia, Jr.; Ralph Method for cleaning heat exchanger tubes by creating shock wave and mixing the liquid with injected air
US5795402A (en) * 1995-07-25 1998-08-18 Hargett, Sr.; Daniel Apparatus and method for removal of paraffin deposits in pipeline systems
US6315498B1 (en) * 1997-11-21 2001-11-13 Superior Energy Services, Llc Thruster pig apparatus for injecting tubing down pipelines
US6382875B1 (en) * 2000-03-22 2002-05-07 Plumettaz Sa Process for laying a tube in a duct and device for pressurizing a tube during laying
US20030106199A1 (en) * 2001-11-02 2003-06-12 Joseph Sylvia Apparatus and methods for applying media to a conduit
WO2006103419A1 (en) 2005-03-31 2006-10-05 British Telecommunications Public Limited Company Optical fibre installation apparatus

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3343822A (en) * 1964-06-11 1967-09-26 Schlumberger Technology Corp Spray-type dust reducer
EP0108590A1 (en) 1982-11-08 1984-05-16 BRITISH TELECOMMUNICATIONS public limited company Optical fibre transmission lines
JPH03145604A (en) * 1989-11-01 1991-06-20 Sumitomo Electric Ind Ltd Cable laying and recovery method
JPH03274005A (en) * 1990-03-23 1991-12-05 Sumitomo Electric Ind Ltd Tip jig for installing hollow pipes inside pipelines
US5423917A (en) * 1993-02-12 1995-06-13 Garcia, Jr.; Ralph Method for cleaning heat exchanger tubes by creating shock wave and mixing the liquid with injected air
US5795402A (en) * 1995-07-25 1998-08-18 Hargett, Sr.; Daniel Apparatus and method for removal of paraffin deposits in pipeline systems
US6315498B1 (en) * 1997-11-21 2001-11-13 Superior Energy Services, Llc Thruster pig apparatus for injecting tubing down pipelines
US6382875B1 (en) * 2000-03-22 2002-05-07 Plumettaz Sa Process for laying a tube in a duct and device for pressurizing a tube during laying
US20030106199A1 (en) * 2001-11-02 2003-06-12 Joseph Sylvia Apparatus and methods for applying media to a conduit
WO2006103419A1 (en) 2005-03-31 2006-10-05 British Telecommunications Public Limited Company Optical fibre installation apparatus

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106733963A (en) * 2016-12-05 2017-05-31 四川战奇科技有限公司 A kind of dissolving tube cleaning device people certainly
CN106733963B (en) * 2016-12-05 2023-04-07 四川中匠科技有限公司 Self-dissolving pipeline cleaning robot

Also Published As

Publication number Publication date
GB201218306D0 (en) 2012-11-28
EP2372424A1 (en) 2011-10-05
GB2491543A (en) 2012-12-05

Similar Documents

Publication Publication Date Title
CZ20004514A3 (en) Process of laying data cables
US6619697B2 (en) Y-branch splittable connector
CN103181043B (en) Lay the method that multiple continuous print cable section connects with the cable forming long length
EP2372424A1 (en) Clearing blockages in a pipe by blowing air through a duct moved in the same pipe prior to fibre installation
KR101030055B1 (en) Water and sediment dredging equipment and method inside the water and sewage pipe
JP2001508885A (en) Fiber optic cable network
EP3676478B1 (en) Removing debris from a hydrocarbon fluid
JP2004504793A (en) Underground duct installation method and apparatus
EP2839330B1 (en) Optical fiber cable installation in a pressure sewerage
WO2004109343A2 (en) Methods for installing fiber optic cable in a building
CN102825038B (en) Device and method for dredging a cable duct
JPH0774849B2 (en) Wire laying / collecting device and laying / collecting method
KR100904609B1 (en) Apparatus and method for installing an optical cable traction ship for installing an additional optical cable in an inner pipe installed with pneumatic cable
EP4038709B1 (en) Introducing an elongated element into a submarine duct
JP2943858B2 (en) How to insert a hose with nozzle in a pipe
JP6382053B2 (en) Intake system
CN112787268A (en) Comprehensive wiring construction method for visual equipment
JP2000102129A (en) Cable routing method
CN219910857U (en) Water-discharging slag removing device for gas pipeline
CN217903861U (en) Protector is used in communication facility construction
Griffioen et al. A new fiber optic life for old ducts
KR100866116B1 (en) Communication mandrel
US6691728B2 (en) Methods and systems for installing a pipeline within a pipeline
Griffioen Understanding of cable in duct installation: dos and donts
Mayhew et al. Cost-reduced cable delivery for the 21st century

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 11713336

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 1218306

Country of ref document: GB

Kind code of ref document: A

Free format text: PCT FILING DATE = 20110330

WWE Wipo information: entry into national phase

Ref document number: 1218306.7

Country of ref document: GB

122 Ep: pct application non-entry in european phase

Ref document number: 11713336

Country of ref document: EP

Kind code of ref document: A1