WO2010148598A1 - Policy and charging control method and system based on the current time zone of the user - Google Patents

Policy and charging control method and system based on the current time zone of the user Download PDF

Info

Publication number
WO2010148598A1
WO2010148598A1 PCT/CN2009/074188 CN2009074188W WO2010148598A1 WO 2010148598 A1 WO2010148598 A1 WO 2010148598A1 CN 2009074188 W CN2009074188 W CN 2009074188W WO 2010148598 A1 WO2010148598 A1 WO 2010148598A1
Authority
WO
WIPO (PCT)
Prior art keywords
event
user
rules
control
rule
Prior art date
Application number
PCT/CN2009/074188
Other languages
French (fr)
Chinese (zh)
Inventor
周晓云
宗在峰
Original Assignee
中兴通讯股份有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 中兴通讯股份有限公司 filed Critical 中兴通讯股份有限公司
Publication of WO2010148598A1 publication Critical patent/WO2010148598A1/en

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L12/00Data switching networks
    • H04L12/02Details
    • H04L12/14Charging, metering or billing arrangements for data wireline or wireless communications
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L12/00Data switching networks
    • H04L12/02Details
    • H04L12/14Charging, metering or billing arrangements for data wireline or wireless communications
    • H04L12/1485Tariff-related aspects

Definitions

  • CC 3rd Generation Partnership 7
  • policies and controls o cy h g gCo o, CC
  • CC is a functional framework of multiple connections.
  • it can be used in the universal communication system (T te es a RadoAccess ewok, TRA4 ) full communication system (Goba Sysem) O ob eComm ca o , G ) /G enhancement ( G ) connection, and interworking (1-A).
  • CC has major functions, namely, policy control functions and functions. 1 CC's Hugh Frame, each of the CC functions shown in the following 1 and its interface functions.
  • pp ca o F c o provide and use each other, and the resources used by each resource need to be controlled. And each of the information will be controlled by the policy control rule function ( o cy g gR esF c o , ). If the strategies of the various information are consistent, then accept, otherwise, reject, and accept the same in the opposite. , can be returned to each user ( se Eq pme , E). The same interface is the Rx interface.
  • the policy control rule function Hugh ( ) is CC, responsible policy decision And the formulation of rules.
  • the PCRF provides the control rules for each.
  • Control includes and includes ( a gCo o ), each ( a yO e Vce, Qo ) control, and rules based on it.
  • the PCRF implements its policies and rules, PC F, and C requires the rules and user information.
  • the PCRF formulates policies and rules based on the AF and each phase of the message, and the user (S bsc p o of eRepos oy, PR) occupies information about the user policy and the control information PC F bearer phase.
  • PC F ( o cya dCo o E o ceme F c o ) - slightly and 4 s, usually within (G e-Way, GW), carries the policies and rules formulated by the PCRF.
  • the PC F follows the filters in the rules of the PCRF and executes the policies and rules established by the PCRF. In the bearer establishment, PC F follows the rules of PCR Qo ,
  • PC F and system exchange phase information.
  • the same interface of the PC F PCRF is the Gx interface
  • the interface of the C is the Gy interface
  • the interface of the OFC is the Gz interface.
  • GPR support (G) in GPR and acke aG eway (P G) users (PR) in GPR store user policy and control information related to policy control.
  • the same connection between PR and C is the p interface.
  • FC Fianzhong
  • the CCF under the PCRF contains the same indication of the PC F in the installation/CC rule, the deletion/CC rule, and may include the same indication of re-introducing the new CC rule to the PCRF.
  • CC can Different users in Tianzhong.
  • CC has established a PC F under CC rules, instructing PC F to install the rules at 8:00 am, and delete the rules at 22:00.
  • the rule must be the same 8:00 rule, delete the rule at 22:00. Not the same as the one.
  • the new one where C is located is also the strategy and control of the former.
  • Steps, on the strategy and control method, the steps to the PC F user each event include
  • the P-CA setup message contains events to the PC F event, the PC F receives the installation event, and the event or, in the P-CA repair, provides the message in the policy and rules.
  • the event is included in the event handler of PC F, PC F receives the installation event, and the event
  • the fans will re-enact the CC rules under PC rules, PC F, PC F received, installed or re-enacted.
  • the PC F is in the P-CA establishment, and the PC F is in the P-CA establishment message.
  • the PC F receives the next event, and then the P-CA repair process, to the previous user
  • the PC F goes up in the P-CA repair process, the PC F in the next event, and the policy and the rule provide the message in which the user is located before.
  • the steps to the user's various events include
  • the event is included in the event handler that controls the establishment of the message to the BB, and the BB receives the installation event to the event or
  • control and o rules provide messages to the eventor under the BB, and the BB receives the installation event to the event.
  • the user is re-established Qo rules, and the re-established Qo rules are under BB.
  • the CC rules will be installed in the previous P-CA under the redefined CC rules.
  • BB receives, installs or re-installs.
  • Developed Qo rules, PC F received, installed or redefined CC rules.
  • the BB is established in the P-CA, and the user is in the direction of the control establishment instruction message.
  • the BB receives the next event, and the re-control process is directed to the user's previous location.
  • the BB is in the P-CA repair process, and the received event is in the control and o rule providing message.
  • the user's previous user is the same as the previous Green's offset, and the 3GPP users each 3GPP T ezo e AVP.
  • the PC F receives the event installation event, the user's various events, the upstream event and the user's previous location, and the CC rules that are installed or re-established upon receipt of the re-established CC rules.
  • This provides a system for further control and control of the user before, including the policy control rule function, P), policy and execution function, and the load and event function, BB ( )
  • the BB receives the event installation event, the user's various events, the up event and the user's previous location, and the Qo rule that was installed or re-enacted upon receipt of the re-established Qo rule.
  • the PCRF sends events to the PC F or BB RF users C F or BB RF to the user's events, to the PCRF events and the user's previous location. Can be in strategy and control
  • the PCRF can re-establish CC rules for each user.
  • This provides a method for the strategy and control of the PCRF user before it can be used in the CC of Reease 7 and the CC of Reease 8.
  • Step 301 After seeing TRA or - TRA, PC F receives the setup P-CA message. Step 302, C F establishes a message to the PCRF P-CA, where the message is located before.
  • Step 303 If the PC F does not have the user's phase information, the PCRF sends the user phase information PCRF, CRF to the PR message, and the CRF row stores the phase information of the user, and then directly performs step 304, step 304, CRF policy decision.
  • Step 305 the CRF establishes a message to the PC F P-CA, in the message CC rules for policy decision making (including o rules and rules) and events, where the CC rules contain the same indication that the CC rules were installed/or deleted/lived before, and the information in the message sheep "event (ve -T gge AVP) ) "Include Tmezo e Ch ge” event (eve gge ) install / indicate installation or, in CC rules, install, on the PC F predetermined CC rules, then. Delete/indicate delete or, in the CC rule, delete the CC rule scheduled on PC F. In the other, if the PC F is not in the 302, then the PC F receives the T ezo e C ge event in 305, and the P-CA repair process is required to go up.
  • Step 306 if the CC rule does not have the same indication, the PC F can immediately install the /CC rule. If the CC rule has the same indication, then the PC F is in the same installation/CC rule as the indication. Installation with PC F includes Tmezo e Ch ge event, return message to this step, establish P-CA phase and each.
  • Step 307 in, born, and the previous place was born.
  • the PC F receives or events including the instructions of the former and the previous
  • the existing wood has specified the former
  • Step 308 C F direction policy and rule message, message
  • Ve-T gge AVP includes Tmezo e Ch ge event, the same as before
  • Step 309 where the former is re-established CC rules, and the repairs include the CC rules to install / or delete / live the same instructions
  • the repair of CC rules can be repaired, or the repair of the previous strategy.
  • Step 310 returning a policy and rule message to the PC F, repairing CC rules
  • step 311 if the CC rule does not have the same indication, the PC F can immediately install / CC, and the CC rule has the same indication, and the PC F returns the message in the same installation/CC rule as the indication.
  • PCRF P-CA repairs the event to PC F.
  • the PCRF provides messages to the PC F policies and rules, and includes the T ezo e Chage event in the message information ve -T gge AVP of the message.
  • the former PCRF PCRF can be updated on the previous CC revision CC PC F. PC F event, to, on it" Steps 307-31
  • the method includes the following steps
  • Step 401 seeing - TRA or trusted non-3GPP access, BB receives the establishment of P-CA message
  • Step 402 The BB RF establishes an indication message to the PCRF control, where the message is located.
  • Step 403 the PCRF has no user phase information, PCRF to PR The message, PR will save the user's information, and the line C has the user's phase information, then directly execute step 404.
  • Step 404 P policy decision, including formulating CC rules and o rules, and events
  • Step 405 establishing a message to the BB control, the Qo rules and events of the policy decision making in the message
  • the Qo rule contains the same indication that the Qo rule was previously installed/or deleted/lived.
  • the event handler contains a Tmezo e Ch ge event, which is ve -T gge AVP .
  • the Qo rule does not have the same indication, then the BB can immediately install the /Qo rule. If the Qo rule has the same indication, then the BB is in the same installation/Qo rule as the installation, and the Tmezo e Ch ge is installed.
  • step 402 BB does not go up.
  • step 405 BB receives the T ezo e C ge event, and the control flow to be controlled is directed to the previous one.
  • Steps 406, 404 are the same, BB establishes a P-CA message to the PC F. Step 407, C F establishes an indication message to the P-CA.
  • Step 408 the CC rule message PC F will be formulated.
  • the CC rule does not have the same indication, and the PC F can immediately install the /CC rule. If there is a same indication in the CC rule, then the PC F is in the same installation/CC rule as the indication.
  • Step 409 C F returns to BB to establish a P-CA message.
  • Step 410 BB returns to establish a P-CA message.
  • the P-CA phase is established and each.
  • Step 411 where, is born, and the previous place is born, and the BB receives or the event includes the indication that the previous place was born and the previous place
  • Step 412 the BB direction control and QoS message, the event ve -T gge AVP in the message, the AVP includes the Tmezo e C ge event, the same as before At the same time, you can move the GT before the offset to 15 GPP 3GPP--Tmezo eAVP.
  • Step 413 where the former is re-established CC rules and Qo rules, including the CC and Qo rules to install / or delete / live the same instructions, C control and Qo rules message will be repaired Qo rules BB, BB requirements line installation /
  • Step 414 providing a message to the PC F return policy and rule, and repairing the CC rule
  • step 415 if the CC rule does not have the same indication, the PC F can be installed immediately/CC, and the CC rule has the same indication, and the PC F is in the same installation/CC rule as the indication.
  • the PC F in the P-CA, there are no events for the BB users. But in the same, because of the user
  • a message is provided to the PC F control and the Qo rule, and the T ezo e Ch ge event is included in the message information Eve-T gge AVP.
  • the BB install event, in the control and Qo rule provides the message, the previous one. Possibly on the previous CC and Qo rules, PC F and BB are updated respectively.
  • BB in the event to, on the process steps 411-415, the system and control system provided before the user, the system includes the policy control rule function, and the policy and execution function, the PC F), including the policy control rule.
  • Each step or step of the present invention may be a general-purpose device, which may be concentrated on the device of the sheep, or distributed on the same component as the multiple devices. Alternatively, they may use programs executable by the device, but they may be stored in The storage device is executed by the device, or they are separately made into respective integrations, or many or steps of them are integrated into sheep. This is not limited to any specific combination of hardware and software.

Abstract

A policy and charging control method based on the current time zone of the user is provided by the invention, which includes that: a Policy and Charging Rules Function (PCRF) subscribes the time zone change event of a user equipment from a Policy and Control Enforcement Function (PCEF) or a Bearer Binding and Event Reporting Function (BBERF); when the user equipment moves to another time zone, the PCEF or BBERF reports the time zone change event and the parameters of the current time zone of the user equipment to the PCRF after detecting that the time zone change event of the user equipment occurs; the PCRF reconstitutes the Policy and Charging Control (PCC) rules for the current time zone of the user equipment, after receiving the reported time zone change event and parameters of the current time zone of the user equipment. Compared with the existing technology, the invention could enable the PCRF to constitute a more exact policy and charging rules according to the different current time zone of the UE.

Description

于用戶 前所在 的策 和 控制方法及 統  The policy and control method and system before the user
木領域 Wood field
本 涉及通信領域, 休 ,涉及第三代合作伙伴 ( dGe e a o e shp Oec, 3GPP)分組 統, 特別地, 涉及到 于用戶 前所在 的策略和 控制方法及 統。  This is related to the communication field, Hugh, involving the third generation of partners (dGe e a o epp Oec, 3GPP) packet system, in particular, the strategy and control methods and systems that the user is in front of.
背景 木 Background
在第三代合作伙伴 7 (3GPP Reease7) 休 中, 策略和 功能由策略和 控制 ( o cy h g gCo o, CC)框架 。 CC 是 介 于多 接 木的功能框架, 例 , 其可以 于通用移 通信 統( ve sa ob eTeecomm ca o s Sysem, T )的 上元 接 ( T Te es a RadoAccess ewok, TRA4 ) 全 通信 統 (Goba Sysem O ob eComm ca o , G ) /G 增強 ( G ) 接 、 以及互通 (1- A )等。 In 3rd Generation Partnership 7 (3GPP Reease7), strategies and functions are governed by policies and controls ( o cy h g gCo o, CC). CC is a functional framework of multiple connections. For example, it can be used in the universal communication system (T te es a RadoAccess ewok, TRA4 ) full communication system (Goba Sysem) O ob eComm ca o , G ) /G enhancement ( G ) connection, and interworking (1-A).
CC主要 了 大功能, 即, 策略控制功能和 功能。 1 CC 的 休框架 , 以下 1所示 CC 中的各 功能 休及其接口功 能 。  CC has major functions, namely, policy control functions and functions. 1 CC's Hugh Frame, each of the CC functions shown in the following 1 and its interface functions.
用功能 休 ( pp ca o F c o , AF) , 提供並各 用的接 , 並各 使用的 資源需要 的策略控制。 在並各 將相 並各信息 策略控制 規則功能 休 ( o cy g gR esF c o , ) 。 果 並各信息 的策略相 致, 則 接受 否則, 拒絕 , 在 反 中同 可接受的並各 。 , 可將 返 用 戶 各 ( se Eq pme , E) 。 其中, 和 同的接口是 Rx接口。  With pp ca o F c o (AF), provide and use each other, and the resources used by each resource need to be controlled. And each of the information will be controlled by the policy control rule function ( o cy g gR esF c o , ). If the strategies of the various information are consistent, then accept, otherwise, reject, and accept the same in the opposite. , can be returned to each user ( se Eq pme , E). The same interface is the Rx interface.
策略控制 規則功能 休 ( )是 CC的 , 責策略決策 和 規則的制定。 PCRF提供了 于並各 的 控制規則, The policy control rule function Hugh ( ) is CC, responsible policy decision And the formulation of rules. The PCRF provides the control rules for each.
控制包括並各 的 、 ( a gCo o ) 、 各 ( a yO e Vce, Qo )控制以及基于 的 規則等。 PCRF將其制定的 策略和 規則 PC F執行, 同 , C 近需要 規則和用戶 的 信息 致。 PCRF制定策略和 規則的依 包括 AF 並各 相 的信, 用戶 (S bsc p o of eRepos oy, PR) 占用戶策略和 控制 信息 PC F 承載相 的信息。 Control includes and includes ( a gCo o ), each ( a yO e Vce, Qo ) control, and rules based on it. The PCRF implements its policies and rules, PC F, and C requires the rules and user information. The PCRF formulates policies and rules based on the AF and each phase of the message, and the user (S bsc p o of eRepos oy, PR) occupies information about the user policy and the control information PC F bearer phase.
 ,
PC F ( o cya dCo o E o ceme F c o ) - 略和 4 休, 通常 于 (G e-Way, GW) 內, 在承載 執行PCRF 制定的策略和 規則。PC F按照PCRF 的規則中的並各 濾 器 並各 , 而 並各 執行PCRF所制定的策略 和 規則。 在承載建立 , PC F按照 PCR 的規則 Qo , PC F ( o cya dCo o E o ceme F c o ) - slightly and 4 s, usually within (G e-Way, GW), carries the policies and rules formulated by the PCRF. The PC F follows the filters in the rules of the PCRF and executes the policies and rules established by the PCRF. In the bearer establishment, PC F follows the rules of PCR Qo ,
AF的執行 控制。 PCRF 的 規則, PC F執行相 的並各 操作, 既可以是在 , 也可以是 。 果是在 , 則PC F需要和在 統 ( eC g gSysem, Execution control of AF. The rules of the PCRF, the PC F execution phase, can be either at or . If it is, then PC F needs to be in the system (eC g gsysem,
C ) 信用管理。 , PC F和 統 ( e C g g Sysem, OFC ) 同交換相 信息。 PC F PCRF 同的接口是Gx接口, C 同的接口是Gy接口, OFC 同的接口 是Gz接口。 PC F 般都 于 的 上, GPR 中的GPR 支持 ( G ) 以及 -W A 中的分組 ( acke aG eway, P G) 用戶 ( PR)存儲了和策略控制 相 的用戶策略和 控制 信息。 PR和 C 同的接 是 p接口。  C) Credit management. , PC F and system (e C g g Sysem, OFC) exchange phase information. The same interface of the PC F PCRF is the Gx interface, the interface of the C is the Gy interface, and the interface of the OFC is the Gz interface. As far as PC F is concerned, GPR support (G) in GPR and acke aG eway (P G) users (PR) in GPR store user policy and control information related to policy control. The same connection between PR and C is the p interface.
在 統 ( C )和 PC F 起 在 方式下用戶信用的控 和管理。  The control and management of user credit in the mode of system (C) and PC F.
統 ( FC ) PC F 起完成 方式下的 操作。 在現有 木中, PCRF在下 的 CC規則包含 PC F在 安裝/ CC規則, 在 刪除/ CC規則的 同指示, 且可以包含在 重新向PCRF 求新的 CC規則的 同指示等。 利用 , CC可以 于 天中的不同 同 用戶 。 System (FC) PC F operates in the completion mode. In the existing wood, the CCF under the PCRF contains the same indication of the PC F in the installation/CC rule, the deletion/CC rule, and may include the same indication of re-introducing the new CC rule to the PCRF. Use, CC can Different users in Tianzhong.
例 , 在深夜或凌晨, PC F 下 的 CC規則中的指示, 安 裝/ 具有較低 率的 CC規則, 用戶 策略和 控制。 在 , PC F刪除/ CC規則, 而安裝/ 具有較高 率的 CC規則。 由于 是不 , 到不同 , 就不能 其 身所 在的 制定規則了。 譬 , 占用戶 前所在 身所在的  For example, in the middle of the night or early morning, the instructions in the CC rules under PC F, install / have lower rate CC rules, user policies and controls. In , PC F removes / CC rules, while installing / has a higher rate of CC rules. Since it is not, it is not possible to make rules in the body.譬 , which occupies the user’s former location
同 介 , CC制定了 介 CC規則下 PC F, 指示PC F在 地上午8:00安裝 規則, 且在晚上22:00刪除 規則。 生了 , 不在同 介 , 規則必須是 所在的 同的 8:00 規則,22:00刪除規則。而不是 所在 的 同。在現有 木中, C 所在的新的 ,也就 于 前所在 策略和 控制。 In the same vein, CC has established a PC F under CC rules, instructing PC F to install the rules at 8:00 am, and delete the rules at 22:00. Born, not in the same, the rule must be the same 8:00 rule, delete the rule at 22:00. Not the same as the one. In the existing wood, the new one where C is located is also the strategy and control of the former.
2 Reease8的 CC , Gxx接口向承載 和事件 功能 休( eae B d ga dEve Repo gF c o , BB RF) P連接接 ( P-CA ) 相 的Qo 規則, 通 Gx接口向PC F P-CA 相 的 CC規則。 BB 功能包括承載 、上行承載 的 、 以及事件 , 通常存在于 中, P ( voved acke Sysem, 的分組 統)中的 e V gG eway( 各 ) 、 eP G( voved acke a G eway 的分組教 )和 于接 P 統的非 3GPP接 等。 在Re-8的 下, 同 不能 前所在 ,  2 Reease8 CC, Gxx interface to bearer and event function (eae B d ga dEve Repo gF co, BB RF) P connection (P-CA) phase Qo rule, through Gx interface to PC F P-CA phase CC rules. The BB functions include bearers, uplink bearers, and events, usually present in the middle, P V (voved acke Sysem), e V gG eway (each), eP G (voved acke a G eway group teaching) and Non-3GPP connection to the P system. Under the Re-8, the same can not be where,
前所在 策略和 控制。  Pre-policy and control.
內容 Content
解決現有 木 , 本 提供 于用戶 前所在 的策略和 控制方法及 統。  Solve the existing wood, this is the strategy and control method and system that the user is in front of.
本 提供了 于用戶 前所在 的策略和 控制方法,包括
Figure imgf000005_0001
用戶 各 到另 , PC F或 到有所 用戶 各的 事件 , 向 上 事件和 用戶 各 前所在 的
This provides the strategies and control methods that the user is in front of, including
Figure imgf000005_0001
Each user goes to another, PC F or to each user's event, the up event and the user's previous location
收到上 的 事件和 用戶 各 前所在 的 , 用戶 各 前所在 重新制定策略和 控制 PCC)規則。  The received events and the user's previous location, the user's previous location, re-strategize and control the PCC) rules.
步 , 上 策略和 控制方法中, 向PC F 用戶 各的 事件的步驟包括  Steps, on the strategy and control method, the steps to the PC F user each event include
在 P連接接 P-CA 建立 中, 在 P-CA 建立 消息向 PC F 的事件 器中包含 事件 , PC F接收 安裝 事件 , 而 事件 的 或者, 在 P-CA 修 中, 在 策略和 規則提供消息向 PC F 的事件 器中包含 事件 , PC F接收 安裝 事件 , 而 事件 的  In the P-connected P-CA setup, the P-CA setup message contains events to the PC F event, the PC F receives the installation event, and the event or, in the P-CA repair, provides the message in the policy and rules. The event is included in the event handler of PC F, PC F receives the installation event, and the event
方法近包括  Method includes
所迷 將重新制定 的 CC規則下 PC F, PC F收 到 , 安裝或 重新制定 的 CC規則。  The fans will re-enact the CC rules under PC rules, PC F, PC F received, installed or re-enacted.
步 , 上 策略和 控制方法中, PC F向 上 在所 P-CA 建立 中, PC F在向 的 P-CA 建立 消息中 前所在 的 或者 In the step, the upper policy and the control method, the PC F is in the P-CA establishment, and the PC F is in the P-CA establishment message.
PC F在收到 下 的 事件 , 再 P-CA 的修 流程, 向 上 用戶 各 前所在 的  The PC F receives the next event, and then the P-CA repair process, to the previous user
步 , 上 策略和 控制方法中, PC F向 上 在所 P-CA 修 流程 , PC F在 下 的 事件 , 在策略和 規則提供 消息中 用戶 各 前 所在 的 。 步 , 上 策略和 控制方法中, 向 用戶 各 的 事件的步驟包括 In the step, on the policy and control method, the PC F goes up in the P-CA repair process, the PC F in the next event, and the policy and the rule provide the message in which the user is located before. Steps, on the policy and control method, the steps to the user's various events include
在 P-CA 建立 中, 在 控制 建立 消息向 BB 下 的事件 器中包含 事件 , BB 接收 安裝 事件 , 以 事件的 或者,  In the P-CA establishment, the event is included in the event handler that controls the establishment of the message to the BB, and the BB receives the installation event to the event or
在 P-CA 修 中, 在 控制和 o 規則提 供消息向 BB 下 的事件 器中包含 事件 , BB 接收 安裝 事件 ,以 事件的  In the P-CA revision, the control and o rules provide messages to the eventor under the BB, and the BB receives the installation event to the event.
方法近包括  Method includes
所迷 用戶 各 前所在 重新制定Qo 規則 , 將重 新制定 的 Qo 規則下 BB , 將重新制定 的 CC規則下 在 前的 P-CA 建立 中安裝了 CC規則的PC F, BB 收到 , 安裝或 重新制定 的Qo 規則, PC F收到 , 安裝 或 重新制定 的 CC規則。  The user is re-established Qo rules, and the re-established Qo rules are under BB. The CC rules will be installed in the previous P-CA under the redefined CC rules. BB receives, installs or re-installs. Developed Qo rules, PC F received, installed or redefined CC rules.
步 , 上 策略和 控制方法中, BB 向 上 在所 P-CA 建立 , 在向 的 控制 建立指示消息中 用戶 各 前所在 的  In the step, the upper policy and the control method, the BB is established in the P-CA, and the user is in the direction of the control establishment instruction message.
或者, BB 收到 下 的 事件 ,再 控制 的修 流程向 上 用戶 各 前所在 的 。  Or, the BB receives the next event, and the re-control process is directed to the user's previous location.
步 , 上 策略和 控制方法中, BB 向 上 在所 P-CA 修 流程 , 在收到 下 的 事件 , 在 控制和 o 規則提供 消息中  In the step, the upper strategy and the control method, the BB is in the P-CA repair process, and the received event is in the control and o rule providing message.
各 前所在 的 。  Each of the previous ones.
步 , 上 策略和 控制方法 , 用戶 各 前所在 的 用戶 各 前所在 格林 同的偏移 ,通 "3GPP用戶 各 3GPP T ezo e AVP 。 Steps, strategies and control methods, The user's previous user is the same as the previous Green's offset, and the 3GPP users each 3GPP T ezo e AVP.
本 近提供 于用戶 前所在 策略和 控制的 統, 包括策略控制 規則功能 休 P )和策略和 執行功能 休 PC F), 其中  This is provided near the user's strategy and control system, including the policy control rule function, and the policy and execution function, PC F).
在向 PC F 的事件 器中包含 事 件 , 以及在收到所述PC F上 的 事件和用戶 各 前所在 的 , 用戶 各 前所在 重新制定策略和 控制 PCC)規則, 將重新制定 的 CC規則下 PC F Including the event in the event device of PC F, and receiving the PC F rule on the PC F and the user before the user, the user re-establishes the policy and controls the PCC) rules, and will re-establish the CC rule under the PC. F
PC F 在收到 下 的 事件 安裝 事件 , 到有所 用戶 各的 事件 , 向 上 事件和 用戶 各 前所在 的 以 及在收到 重新制定 的 CC規則 ,安裝或 重新制定 的 CC 規則。  The PC F receives the event installation event, the user's various events, the upstream event and the user's previous location, and the CC rules that are installed or re-established upon receipt of the re-established CC rules.
本 近提供另 于用戶 前所在 策略和 控制的 統, 包括策略控制 規則功能 休P )、 策略和 執行功能 休 PC F)和承載 和事件 功能 休BB ), 其中  This provides a system for further control and control of the user before, including the policy control rule function, P), policy and execution function, and the load and event function, BB ( )
向 PC F下 策略和 控制 PCC)規則、 向 BB 下 各 (Qo )規則, 向 BB 下 事件 且其 中包含 事件 以及在收到 BB 上 的 事件和 用戶 各 前所在 的 , 用戶 各 前所在 重新制定 CC規則和Qo 規則, 將重新制定 的 Qo 規則下 BB , 將重 新制定 的 CC規則下 PC F To the PC F policy and control PCC) rules, to the BB under each (Qo) rule, to the BB event and which contains the event and the event on the BB and the user's previous location, the user re-established the CC Rules and Qo rules, will be re-defined under the Qo rule BB, will be re-established under the CC rules PC F
BB 在收到 下 的 事件 安 裝 事件 , 到有所 用戶 各的 事件 , 向 上 事件和 用戶 各 前所在 的 以及在收到 重新制定 的 Qo 規則 , 安裝或 重新制定 的 Qo 規則 PC F 安裝或 下 的 CC規則。 本 近提供 神在策略和 控制中 用戶 前所在 的方法 The BB receives the event installation event, the user's various events, the up event and the user's previous location, and the Qo rule that was installed or re-enacted upon receipt of the re-established Qo rule. CC rules for PC F installation or under. This method provides God's approach to the user in strategy and control.
Figure imgf000009_0001
Figure imgf000009_0001
用戶 各 到另 , PC F或 到有所 用戶 各的 事件 , 向 上 事件和 用戶 各 前所在 的 。  Each user goes to another, PC F or to the user's various events, the event and the user's previous location.
上 提供的方案, 通 向PC F或BB 的 事 , PC F或BB 到 的 事件 , 向 C 上 前所在 。 就可以 前所在 , 修 CC或 o 規則中包含的安裝/ 或刪除/ CC或Qo 規則的 同指示。 相比于現有 木, 可以使得 可以 前所在的不同 , 制定 更 的策略 規則。  The solution provided on PC F or BB, PC F or BB event, goes to C. You can do the same as before, repair the CC or o rules included in the installation / or delete / CC or Qo rules with the same instructions. Compared with the existing wood, it can make more strategic rules than before.
本 的其它特 和 將在 的說明 中 , 且, 部分 說 明 中 得 而易 , 或者 本 而了解。 本 的目的和其他 可 在所 的說明 、 要求 、 以及附 中 特別指出的 和 得。  The other features of this book will be explained in the description, and some of the explanations are easy, or understand. The purpose and other details of this document can be found in the descriptions, requirements, and attachments.
提供 本 的 步理解, 且 成說明 的 部分, 本 的 起用于解釋本 , 不 本 的限制。 在 中 1是 相 木的Reease7的 CCThe understanding of this step is provided, and the part of the description is used to explain the limitations of this and the present. In 1 is the phase of the Reease7 CC
2是 相 木的Reease8的 CC 2 is the phase of the Reease8 CC
3是 本 的流程 3 is the process of this
4是 本 的流程 。 本 的較佳 方式4 is the process of this. Preferred way of the present
PCRF向PC F或BB RF 用戶 各的 事件 C F或 BB RF 到用戶 各的 事件 , 向PCRF上 事 件和 用戶 各 前所在 的 。 就可以在策略和 控制中  The PCRF sends events to the PC F or BB RF users C F or BB RF to the user's events, to the PCRF events and the user's previous location. Can be in strategy and control
前所在 , 而 PCRF可以 用戶 各 前所在 重新制定 CC規則。  Where the former is, and the PCRF can re-establish CC rules for each user.
下面將結合 本 的 休 。  The following will be combined with this Hugh.
本 提供了 PCRF 用戶 前所在 策略和 控制 的方法, 可 于Reease 7的 CC 和Reease 8的 CC 中,This provides a method for the strategy and control of the PCRF user before it can be used in the CC of Reease 7 and the CC of Reease 8.
TRA 或 - TRA ( TRA Reease 7, E- TRA Reease 8接 且 -GW和P-GW 同 GTP 。 ) 本 中, PCRF T 事件 ve gge), C F上 事件和 前所在 的 的流程 , 3所示, 方法 以下步驟  TRA or - TRA (TRA Reease 7, E- TRA Reease 8 and -GW and P-GW with GTP.), PCRF T event ve gge), CF event and previous process, 3, Method following steps
步驟 301, 看到 TRA 或 - TRA ,PC F收到建立 P-CA 消息 步驟 302, C F向PCRF P-CA 建立 消息, 在消息中 前所在 的 。  Step 301: After seeing TRA or - TRA, PC F receives the setup P-CA message. Step 302, C F establishes a message to the PCRF P-CA, where the message is located before.
在 ,可以 前所在 格林 同 (G T Gee wch ea Tm )的偏移 ,以 15 介羊 建立 消息中的信息羊 "3GPP用戶 各 3GPP- -Tmezo eAVP 。  In the previous offset of G T Gee wch ea Tm, the information in the message was established by the 15th sheep "3GPP users each 3GPP--Tmezo eAVP.
步驟 303, 果PC F沒有用戶 的相 信息, PCRF向 PR 消息, PR將用戶相 的 信息 PCRF, CRF 行保存 果 C 有用戶 的相 信息, 則直接執行步驟304 步驟 304, CRF 策略決策  Step 303: If the PC F does not have the user's phase information, the PCRF sends the user phase information PCRF, CRF to the PR message, and the CRF row stores the phase information of the user, and then directly performs step 304, step 304, CRF policy decision.
步驟 305, CRF向PC F P-CA 建立 消息, 消息中 策略決策制定的 CC規則(包括 o 規則和 規則 )和事件 , 其中 CC規則中包含 CC規則在 前所在 安裝/ 或刪除/ 活 的 同指示, 在消息中的信息羊 "事件 ( ve -T gge AVP) " 中包含 Tmezo e Ch ge)事件 (eve gge ) 安裝/ 表示安裝或 , 于 CC規則, 則安裝, 于在PC F 上預定 的 CC規則, 則 。 刪除/ 表示刪除或 , 于 CC規則, 則刪除, 于在PC F上預定 的 CC規則, 則 。 在另 中, 若302 中, PC F沒有上 前所在 , 那 在305 中 PC F收到T ezo e C ge事件 ,需要 P-CA 祐的修 流程向 上 前所在 的 。 Step 305, the CRF establishes a message to the PC F P-CA, in the message CC rules for policy decision making (including o rules and rules) and events, where the CC rules contain the same indication that the CC rules were installed/or deleted/lived before, and the information in the message sheep "event (ve -T gge AVP) ) "Include Tmezo e Ch ge" event (eve gge ) install / indicate installation or, in CC rules, install, on the PC F predetermined CC rules, then. Delete/indicate delete or, in the CC rule, delete the CC rule scheduled on PC F. In the other, if the PC F is not in the 302, then the PC F receives the T ezo e C ge event in 305, and the P-CA repair process is required to go up.
步驟306,若 CC規則沒有 同指示,那 PC F可立即安裝/ CC 規則, 若 CC規則中有 同指示, 那 PC F在指示的 同安裝/ CC 規則。 同 PC F安裝包括Tmezo e Ch ge事件 , 返 消息 此步驟 , 建立 P-CA 相 並各。  Step 306, if the CC rule does not have the same indication, the PC F can immediately install the /CC rule. If the CC rule has the same indication, then the PC F is in the same installation/CC rule as the indication. Installation with PC F includes Tmezo e Ch ge event, return message to this step, establish P-CA phase and each.
步驟307, 在 的 , 生了 , 且 前所在 生了 。 PC F收到的 或事件 中 包括 占前所在 生了 的指示以及 前所在 的  Step 307, in, born, and the previous place was born. The PC F receives or events including the instructions of the former and the previous
現有 木中規定了 前所在 通 PC  The existing wood has specified the former
步驟308, C F向 策略和 規則 消息, 消息中 Step 308, C F direction policy and rule message, message
ve -T gge AVP, AVP中包括Tmezo e Ch ge事件 , 同 近 前所在 的  Ve-T gge AVP, AVP includes Tmezo e Ch ge event, the same as before
同 , 在 , 可以 前所在 G T的偏移 , 以 15 介羊 PP- -Tmezo eAVP  Same as , in , can be before the offset of G T , to 15 介 sheep PP- -Tmezo eAVP
步驟309, 前所在 重新制定 CC規則,其中的修 包括 CC規則安裝/ 或刪除/ 活的 同指示 Step 309, where the former is re-established CC rules, and the repairs include the CC rules to install / or delete / live the same instructions
CC規則的修 , 譬 可以是 收 的修 , 或者是 前所 在 相 的策略的修 等等。  The repair of CC rules can be repaired, or the repair of the previous strategy.
步驟310, 向PC F返 策略和 規則 消息, 修 的 CC規則 Step 310, returning a policy and rule message to the PC F, repairing CC rules
步驟311,若 CC規則沒有 同指示,那 PC F可立即安裝/ CC, CC規則中有 同指示, 那 PC F在指示的 同安裝/ CC規則, 返 消息。  In step 311, if the CC rule does not have the same indication, the PC F can immediately install / CC, and the CC rule has the same indication, and the PC F returns the message in the same installation/CC rule as the indication.
在其他 中, 也可以是在 P-CA 建立 , PCRF沒有向PC F 用戶 各的 事件。 而是在 的 同 , 由于用戶  In other cases, it can also be established in P-CA, and PCRF has no events to PC F users. But in the same, because of the user
或 策略 等原因,PCRF P-CA 修 流程向PC F 的 事件。 PCRF向PC F 策略和 規則提供消息, 在 消息的信息羊 ve -T gge AVP 中包含 T ezo e Cha ge事件 。 C F安裝 事件 , 在策略和 規則提供 消息中,  For reasons such as strategy or strategy, PCRF P-CA repairs the event to PC F. The PCRF provides messages to the PC F policies and rules, and includes the T ezo e Chage event in the message information ve -T gge AVP of the message. C F installation event, in the policy and rule provision message,
前所在 的 PCRF PCRF可" 上 的 前所在 的 修 CC規則井下 PC F 于更新。 PC F 事件, 到, 其上" 步驟307-31 The former PCRF PCRF can be updated on the previous CC revision CC PC F. PC F event, to, on it" Steps 307-31
本 提供了另 PCRF 用戶 前所在 策略和 控 制的方法, 于Reease8的 CC 中, J - TR 接 且 -GW 和 P-GW 同 P Pv6 或 可信任非 3GPP接This provides the strategy and control method for the other PCRF users. In the CC of Reease8, J-TR is connected and -GW and P-GW are connected to P Pv6 or trusted non-3GPP.
Pv6或P Pv6 。  Pv6 or P Pv6.
本 中, PCRF 事件 , BB RF上 事 器和 前所在 的 的流程 , 4所示, 方法包括以 下步驟  In this, the PCRF event, the BB RF server and the previous process, 4, the method includes the following steps
步驟 401, 看到 - TRA 或可信任非 3GPP接 , BB 收到建立 P-CA 消息  Step 401, seeing - TRA or trusted non-3GPP access, BB receives the establishment of P-CA message
步驟 402, BB RF向PCRF 控制 建立指示消息, 在消息 中 前所在 的  Step 402: The BB RF establishes an indication message to the PCRF control, where the message is located.
在 , 可以 前所在 G T的偏移 , 以 15 介羊 PP- -Tmezo eAVP 。  In , you can get the offset of the G T before the 15 - puppies PP--Tmezo eAVP.
步驟 403, 果PCRF沒有用戶 的相 信息, PCRF向 PR 消息, PR將用戶相 的 信息 , 行保存 果 C 有用戶 的相 信息, 則直接執行步驟404 Step 403, the PCRF has no user phase information, PCRF to PR The message, PR will save the user's information, and the line C has the user's phase information, then directly execute step 404.
步驟 404,P 策略決策,包括制定 CC規則和 的 o 規則, 以及事件  Step 404, P policy decision, including formulating CC rules and o rules, and events
步驟 405, 向BB 控制 建立 消息, 消息中 策略決策制定的Qo 規則和事件  Step 405, establishing a message to the BB control, the Qo rules and events of the policy decision making in the message
其中 Qo 規則中包含Qo 規則在 前所在 安裝/ 或刪除/ 活的 同指示。事件 器中包含 Tmezo e Ch ge)事件 , 其 ve -T gge AVP 。 Qo 規則沒有 同指示, 那 BB 可 立即安裝/ Qo 規則, 若Qo 規則中有 同指示, 那 BB 在指示 的 同安裝/ Qo 規則, 同 安裝Tmezo e Ch ge等事件 。  The Qo rule contains the same indication that the Qo rule was previously installed/or deleted/lived. The event handler contains a Tmezo e Ch ge event, which is ve -T gge AVP . The Qo rule does not have the same indication, then the BB can immediately install the /Qo rule. If the Qo rule has the same indication, then the BB is in the same installation/Qo rule as the installation, and the Tmezo e Ch ge is installed.
在另 中, 步驟402中BB 沒有上 前所在 , 在步 驟405中 BB 收到T ezo e C ge事件 ,需要 控制 的修 流程向 上 前所在 的 。  In the other part, in step 402, BB does not go up. In step 405, BB receives the T ezo e C ge event, and the control flow to be controlled is directed to the previous one.
步驟406, 404 同 , BB 向PC F 建立 P-CA 消息 步驟407, C F向 P-CA 建立指示消息  Steps 406, 404 are the same, BB establishes a P-CA message to the PC F. Step 407, C F establishes an indication message to the P-CA.
步驟408, 將制定的 CC規則 消息 PC F。 CC 規則沒有 同指示, 那 PC F可立即安裝/ CC規則, 若 CC規則 中有 同指示, 那 PC F在指示的 同安裝/ CC規則  Step 408, the CC rule message PC F will be formulated. The CC rule does not have the same indication, and the PC F can immediately install the /CC rule. If there is a same indication in the CC rule, then the PC F is in the same installation/CC rule as the indication.
步驟409, C F向BB 返 建立 P-CA 消息  Step 409, C F returns to BB to establish a P-CA message.
步驟410, BB 返 建立 P-CA 消息  Step 410, BB returns to establish a P-CA message.
此步驟 , 建立 P-CA 相 並各。  In this step, the P-CA phase is established and each.
步驟411, 在 的 , 生了 , 且 前所在 生了 , BB 收到的 或事件 中 包括 前所在 生了 奕 的指示以及 前所在 的  Step 411, where, is born, and the previous place is born, and the BB receives or the event includes the indication that the previous place was born and the previous place
步驟412, BB 向 控制和QoS 則 消息, 消息中 事件 ve -T gge AVP, AVP 中 包括 Tmezo e C ge事件 , 同 近 前所在 的 同 在 , 可以 前所在 G T的偏移 , 以 15 介羊 3GPP- -Tmezo eAVP 。 Step 412, the BB direction control and QoS message, the event ve -T gge AVP in the message, the AVP includes the Tmezo e C ge event, the same as before At the same time, you can move the GT before the offset to 15 GPP 3GPP--Tmezo eAVP.
步驟413, 前所在 重新制定 CC規則和Qo 規則, 其中的修 包括 CC和Qo 規則安裝/ 或刪除/ 活的 同指示, C 控制和Qo 規則 消息將修 的Qo 規則 BB , BB 要求 行安裝/  Step 413, where the former is re-established CC rules and Qo rules, including the CC and Qo rules to install / or delete / live the same instructions, C control and Qo rules message will be repaired Qo rules BB, BB requirements line installation /
步驟414, 向PC F返 策略和 規則提供消息, 修 的 CC規則  Step 414, providing a message to the PC F return policy and rule, and repairing the CC rule
步驟415,若 CC規則沒有 同指示,那 PC F可立即安裝/ CC, CC規則中有 同指示, 那 PC F在指示的 同安裝/ CC規則。 在其他 中, 在 P-CA 建立 , 沒有向BB 用 戶 各的 事件。 而是在 的 同 , 由于用戶  In step 415, if the CC rule does not have the same indication, the PC F can be installed immediately/CC, and the CC rule has the same indication, and the PC F is in the same installation/CC rule as the indication. In other cases, in the P-CA, there are no events for the BB users. But in the same, because of the user
或 策略 等原因, P-CA 修 流程向BB Or strategy, etc., P-CA repair process to BB
用戶 各的 事件。 向 PC F 控制和Qo 規則提供 消息, 在消息的信息羊 Eve -T gge AVP中包含T ezo e Ch ge事件 。BB 安裝 事件 ,在 控制和Qo 規則提供 消息中, 前所在 的 。 可能 上 的 前所在 的 修 CC和Qo 規則, 分別下 PC F和BB 于更新。 BB 在 事件, 到, 其上 流程 步驟411-415 本 近提供 于用戶 前所在 策略和 控制的 統, 統 包括策略控制 規則功能 休P )和策略和 執行功能 休 PC F), 統 包括策略控制 規則功能 休P )和策略、 執行 功能 休PC F)和承載 和事件 功能 休BB ), 其中,  User events. A message is provided to the PC F control and the Qo rule, and the T ezo e Ch ge event is included in the message information Eve-T gge AVP. The BB install event, in the control and Qo rule provides the message, the previous one. Probably on the previous CC and Qo rules, PC F and BB are updated respectively. BB in the event, to, on the process steps 411-415, the system and control system provided before the user, the system includes the policy control rule function, and the policy and execution function, the PC F), including the policy control rule. Function Hugh P) and strategy, executive function Hugh PC F) and bearer and event function Hugh BB), where
向 PC F或BB 下 策略和 控制 PCC) 規則, 向 BB 下 各 (Qo )規則, 向 PC F或BB 下 事件 且其中包含 事件 以及在收到 PC F或 BB 上 的 事件和用戶 各 前所在 的參數 , 用 戶 各 前所在 重新制定 CC規則和Qo 規則, 將重新制定 的 Qo 規則下 , 將重新制定 的 CC規則下 PC F PC F 在收到 下 的 事件 安 裝 事件 , 到有用戶 各的 事件 , 向 上 事件和 用戶 各 前所在 的 以及 在收到重新制定 的 CC規則 , 安裝或 重新制定 的 CC規則。Go to the PC F or BB policy and control PCC) rules, go to the BB under each (Qo) rule, go to the PC F or BB and include the event and the event on the PC F or BB and the user's previous Parameters, the user's previous location re-established CC rules and Qo rules, will be re-defined Qo Under the rules, the CC rules will be re-established under the PC F PC F under the event installation event, to the user with each event, the up event and the user before the previous and in the re-established CC rules, installed or Re-established CC rules.
BB 在收到 下 的 事件 安 裝 事件 , 到有用戶 各的 事件 , 向 上 事件和 用戶 各 前所在 的 以及 在收到重新制定 的 o 規則 , 安裝或 重新制定 的 o 規則 然, 本領域的 木 , 上 的本 的各 或各步驟可 以用通用的 裝置 , 它們可以集中在羊 的 裝置上, 或者分布 在多 裝置所組成的同 上, 可 , 它們可以用 裝置可執行的程 序 , 而, 可以將它們存儲在存儲裝置中由 裝置 執行, 或 者將它們分別制作成各 集成 , 或者將它們中的多 或步驟 作成羊 集成 。 , 本 不限制于任何特定的硬件和軟 件結合。  BB receives the event installation event, has the user's various events, the up event and the user's previous location, and after receiving the re-established o rule, the installation or re-enactment of the o rule, the field of wood, on Each step or step of the present invention may be a general-purpose device, which may be concentrated on the device of the sheep, or distributed on the same component as the multiple devices. Alternatively, they may use programs executable by the device, but they may be stored in The storage device is executed by the device, or they are separately made into respective integrations, or many or steps of them are integrated into sheep. This is not limited to any specific combination of hardware and software.
以上 力本 的 而已, 不用于限制本 , 于本 領域的 木 東說, 本 可以有各 更 和 。 凡在本 的精神和 原則 內, 所作的任何修改、 等同替換、 等, 包含在本 的保 內。 , 相比于現有 木, 本 可以使得PCRF可以 前所在的不同 , 制定更 的策略 規則。  The above is not used to limit the book. In this field, Mudong said that there can be more and more. Any modifications, equivalent substitutions, etc. made within the spirit and principles of this article are included in this warranty. Compared with the existing wood, this can make the PCRF different from the previous one, and formulate more strategic rules.

Claims

要 求 Claim
1、 于用戶 前所在 的策略和 控制方法, 包括  1. The strategy and control method before the user, including
策略控制 規則功能 休 向策略和 執行功能 休 PC F 用戶 各 到另 , PC F或 到有所 用戶 各的 事件 , 向 上 事件和 用戶 各 前所在 的  Policy control rule function Hid strategy and execution function Hugh PC F users each to another, PC F or to the user's various events, the event and the user's previous
收到上 的 事件和 用戶 各 前所在 的 , 用戶 各 前所在 重新制定策略和 控制 CC規則。  The received event and the user's previous location, the user's previous location, re-strategize and control the CC rules.
2、 要求1 的策略和 控制方法, 其中 2. The strategy and control method of Requirement 1, wherein
向PC F 用戶 各的 事件的步驟包括  The steps to each PC F user event include
在 P連接接 P-CA 建立 中, 在 P-CA 建立 消息向 PC F 的事件 器中包含 事件 , PC F接收 安裝 事件 , 而 事件 的 或者  In the P-connected P-CA setup, the P-CA establishes a message to the PC F event that contains the event, and the PC F receives the install event, and the event or
在 P-CA 修 中, 在 策略和 規則提供消 息向 PC F 的事件 器中包含 事件 , PC F 接收 安裝 事件 , 而 事件的  In the P-CA revision, the policy and rules provide messages to the PC F's event handler, the PC F receives the installation event, and the event
方法近包括  Method includes
將重新制定的 CC規則下 PC F, PC F收到 , 安裝或 重新制定的 CC規則。  Will re-enact the CC rules under PC F, PC F received, installed or re-established CC rules.
3、 要求2 的策略和 控制方法, 其中 的 的步驟包括  3. The strategy and control method of Requirement 2, the steps of which include
在 P-CA 建立 , PC F在向 的 P-CA 建立 消息中 用戶 各 前所在 的 或者  In the P-CA establishment, the PC F is in the P-CA establishment message to the user.
在 P-CA 建立 , PC F在收到 下 的 事件 , 再 P-CA 的修 流程, 向 PCRF上 用戶 各 前所在 的 。 Established in P-CA, PC F is received The event, then the P-CA repair process, to the PCRF on the user's previous location.
4、 要求2 的策略和 控制方法, 其中  4. The strategy and control method of requirement 2, where
5 的 的步驟包括 The steps of 5 include
在所 P-CA 修 流程中, PC F在收到 PCRF下 的 事件 , 在策略和 規則提供 消息中 用戶 各 前所在 的 。  In the P-CA repair process, the PC F receives the events under the PCRF, and the users and the rules provide the messages in the previous messages.
5、 要求1 的策略和 控制方法, 其中 5. The strategy and control method of requirement 1, where
CRF向 RF 用戶 各的 事件的步驟包括  The steps of the CRF to the RF user's events include
在 P-CA 建立 中, PCRF在 控制 建立 消息向 BB RF 的事件 器中包含 事件 , BB RF接收 安裝 事件 , 而 事件的 或者 In the P-CA setup, the PCRF contains events in the event handler that controls the establishment of the message to the BB RF, and the BB RF receives the installation event, and the event or
5 在 P-CA 修 中, PCRF在 控制和 o 規則提 供消息向 BB RF 的事件 器中包含 事件 , BB RF接收 安裝 事件 , 而 事件的 . 方法近包括5 In the P-CA revision, the PCRF provides the event in the control and o-rules to the event in the BB RF event, and the BB RF receives the installation event, and the event. Method includes
0 PCRF 用戶 各 前所在 重新制定Qo 規則, 然 將 重新制定的 Qo 規則下 BB RF, 將重新制定的 CC規則下 在 前的 P-CA 建立 中安裝了 CC規則的PC F, BB RF收到 , 安裝或 重新制定的Qo 規則, PC F收到 , 安裝或 重新制定的 CC規則。0 The PCRF user re-defines the Qo rule before the re-established Qo rule, and the PC F is installed in the P-CA establishment under the re-established CC rule, and the BB RF receives it. Installed or redefined Qo rules, PC F received, installed or redefined CC rules.
5 6、 要求5 的策略和 控制方法, 其中 5 6. The strategy and control method of requirement 5, where
的參數的步驟包括 在所 P-CA 建立 , BB 在向 的 控制 建立指示消息中 用戶 各 前所在 的 或者 The steps of the parameters include Established in the P-CA, the BB is in the control establishment indication message to the user in the previous
在所 P-CA 建立 中, BB 收到 下 的 事件 , 再 控制 的修 流程向 上 用戶 各 前所在 的 。  In the establishment of the P-CA, the BB receives the next event, and the re-control process is directed to the previous user.
7、 要求5 的策略和 控制方法, 其中  7. The strategy and control method of requirement 5, where
BB 向 上 事件和 用戶 各 前所在 的 的步驟包括  The BB up event and the user's previous steps include
在 P-CA 修 流程中, BB 在收到 下 的 事件 , 在 控制和Qo 規則提供 消息中 用戶 各 前所在 的 。  In the P-CA repair process, the BB receives the next event, and the user and the Qo rule provide the message in the previous message.
8、 要求1至7中任 要求 的策 和 控制方法,其中 所迷用戶 各 前所在 的 用戶 各 前所在 格林  8. The requirements and control methods required by the requirements of 1 to 7 are the users of the former users.
同的偏移 ,通 "3 PP用戶 各 3GPP_ _Tmezo eAVP 。  The same offset, pass "3 PP users each 3GPP_ _Tmezo eAVP.
9、 于用戶 前所在 策略和 控制的 統, 包括策略控 制 規則功能 休 和策略和 執行功能 休PC F, 其中  9. The system and control system before the user, including the policy control rule function Hugh and the strategy and execution function Hugh PC F, where
在向 PC F 的事件 器中包含  Included in the event to PC F
事件 , 以及在收到 PC F上 的 事件和用戶 各 前所 在 的 , 用戶 各 前所在 重新制定策略和 控制 CC規則, 將重新制定的 CC規則下 所述PC FThe event, as well as the event on the PC F and the user's previous presence, the user's respective location re-strategizes and controls the CC rules, which will be redefined under the CC rules.
PC F 在收到 下 的 事件 安 裝 事件 , 到有所 用戶 各的 事件 , 向 上 事件和 用戶 各 前所在 的 以及在收到重新制定的 CC規則 , 安裝或 重新制定的 CC規則。  The PC F receives the event installation event, the user's various events, the upstream event, and the user's previous location, as well as the re-established CC rules, installed or re-established CC rules.
10、 于用戶 前所在 策略和 控制的 統, 包括策略 控制 規則功能 休 、策略和 執行功能 休PC F和承載 和事件 功能 休BB , 其中 PCRF 向 PC F下 策略和 控制 CC規則、 向 包含 事件 以及在收到 BB 上 的 事件和用 戶 各 前所在 的 , 用戶 各 前所在 重新制定 CC規則和 o 規則, 將重新制定的 o 規則下 BB , 將重新 制定的 CC規則下 PC F10. The system of policies and controls before the user, including the policy control rule function, the policy and the execution function, the PC F and the bearer and event functions, BB. The PCRF goes to the PC F to control the CC rules, to include the events, and to receive the events on the BB and the user's previous location. The user re-establishes the CC rules and o rules, and the re-established o rules are BB. Will re-enact the CC rules under PC F
BB 在收到 下 的 事件 安 裝 事件 , 到有所 用戶 各的 事件 , 向 上 事件和 用戶 各 前所在 的 以及在收到重新制定的Qo 規則 , 安裝或 重新制定的Qo 規則 The BB receives the event installation event, the user's event, the event and the user's previous location, and the Qo rule that was installed or re-enacted after receiving the re-enacted Qo rule.
PC F 安裝或 下 的 CC規則。  CC rules installed or under PC F.
11、 神在策略和 控制中 用戶 前所在 的方法, 包括 策略控制 規則功能 休 向策略和 執行功能 休 PC F 或承載 和事件 功能 休BB 用戶 各的 事件  11. God's methods in the strategy and control of the user, including the policy control rule function, the escape strategy and the execution function, the rest of the PC F or the bearer and the event function, the rest of the BB users.
用戶 各 到另 , PC F或 BB 到有所 用戶 各的 事件 , 向 PCRF 事件和 用戶 各 前所在 的 。  Each user goes to another, PC F or BB to the user's various events, to the PCRF event and the user's previous location.
PCT/CN2009/074188 2009-06-26 2009-09-24 Policy and charging control method and system based on the current time zone of the user WO2010148598A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN200910152374A CN101730041A (en) 2009-06-26 2009-06-26 Policy and charging control method and system based on current time zone of user
CN200910152374.4 2009-06-26

Publications (1)

Publication Number Publication Date
WO2010148598A1 true WO2010148598A1 (en) 2010-12-29

Family

ID=42450075

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2009/074188 WO2010148598A1 (en) 2009-06-26 2009-09-24 Policy and charging control method and system based on the current time zone of the user

Country Status (2)

Country Link
CN (1) CN101730041A (en)
WO (1) WO2010148598A1 (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8486979B2 (en) 2006-12-12 2013-07-16 Abbvie Inc. 1,2,4 oxadiazole compounds and methods of use thereof
US8546401B2 (en) 2007-12-07 2013-10-01 AbbVie Deutschland GmbH & Co. KG 5,6-disubstituted oxindole-derivatives and use thereof for treating vasopressin-dependent diseases
US8580842B2 (en) 2003-09-30 2013-11-12 Abbott Gmbh & Co. Kg Heteroaryl-substituted 1,3-dihydroindol-2-one derivatives and medicaments containing them
US8703774B2 (en) 2007-12-07 2014-04-22 AbbVie Deutschland GmbH & Co. KG Carbamate-substituted oxindole derivatives and use thereof for the treatment of vasopressin-dependent diseases
US8703775B2 (en) 2007-12-07 2014-04-22 AbbVie Deutschland GmbH & Co. KG Amidomethyl-substituted oxindole derivatives and the use thereof for the treatment of vasopressin-dependent illnesses
US8815868B2 (en) 2006-12-30 2014-08-26 Abbott Gmbh & Co. Kg Substituted oxindole derivatives and their use as vasopressin receptor ligands
US9023854B2 (en) 2007-12-07 2015-05-05 AbbVie Deutschland GmbH & Co. KG 5-halogen-substituted oxindole derivatives and use thereof for treating vasopressin-dependent diseases
US9040568B2 (en) 2009-05-29 2015-05-26 Abbvie Inc. Pharmaceutical compositions for the treatment of pain
US9186407B2 (en) 2006-12-12 2015-11-17 Abbvie Inc. Pharmaceutical compositions and their methods of use

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101374055B (en) 2007-08-20 2012-12-12 华为技术有限公司 Method for processing charging and network system, packet data network gateway and charging system
CN104010332B (en) * 2013-02-21 2019-03-15 中兴通讯股份有限公司 Bearing binding method and system
CN105682017B (en) * 2014-11-19 2019-06-28 中国联合网络通信集团有限公司 Determine the method and system of user terminal location
CN106332035B (en) * 2015-06-19 2019-10-01 华为软件技术有限公司 A kind of roam charging method and relevant device
CN106921954B (en) * 2015-12-25 2021-02-19 中兴通讯股份有限公司 Processing method and device for in-out area monitoring
CN108012260B (en) * 2016-10-31 2019-10-25 华为技术有限公司 Position change reporting method, equipment and system
CN111447606B (en) * 2019-12-26 2023-03-03 润建股份有限公司 Management and control method for limiting student to surf internet

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1708144A (en) * 2004-06-08 2005-12-14 华为技术有限公司 Universal group wireless business service supporting node routing area update method
CN101039195A (en) * 2007-03-09 2007-09-19 华为技术有限公司 Charging method, system and network appliance
CN101127613A (en) * 2006-08-16 2008-02-20 华为技术有限公司 Method for obtaining circuit domain information in IP multimedia subsystem and its application
CN101355438A (en) * 2007-07-25 2009-01-28 华为技术有限公司 Method, equipment and system for implementing policy charging control

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1708144A (en) * 2004-06-08 2005-12-14 华为技术有限公司 Universal group wireless business service supporting node routing area update method
CN101127613A (en) * 2006-08-16 2008-02-20 华为技术有限公司 Method for obtaining circuit domain information in IP multimedia subsystem and its application
CN101039195A (en) * 2007-03-09 2007-09-19 华为技术有限公司 Charging method, system and network appliance
CN101355438A (en) * 2007-07-25 2009-01-28 华为技术有限公司 Method, equipment and system for implementing policy charging control

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9487505B2 (en) 2003-09-30 2016-11-08 AbbVie Deutschland GmbH & Co. KG Heteroaryl-substituted 1,3-dihydroindol-2-one derivatives and medicaments containing them
US8580842B2 (en) 2003-09-30 2013-11-12 Abbott Gmbh & Co. Kg Heteroaryl-substituted 1,3-dihydroindol-2-one derivatives and medicaments containing them
US8486979B2 (en) 2006-12-12 2013-07-16 Abbvie Inc. 1,2,4 oxadiazole compounds and methods of use thereof
US9186407B2 (en) 2006-12-12 2015-11-17 Abbvie Inc. Pharmaceutical compositions and their methods of use
US8859557B2 (en) 2006-12-30 2014-10-14 Abbott Gmbh & Co. Kg Substituted oxindole derivatives and their use as vasopressin receptor ligands
US8815868B2 (en) 2006-12-30 2014-08-26 Abbott Gmbh & Co. Kg Substituted oxindole derivatives and their use as vasopressin receptor ligands
US8703775B2 (en) 2007-12-07 2014-04-22 AbbVie Deutschland GmbH & Co. KG Amidomethyl-substituted oxindole derivatives and the use thereof for the treatment of vasopressin-dependent illnesses
US9023854B2 (en) 2007-12-07 2015-05-05 AbbVie Deutschland GmbH & Co. KG 5-halogen-substituted oxindole derivatives and use thereof for treating vasopressin-dependent diseases
US8703774B2 (en) 2007-12-07 2014-04-22 AbbVie Deutschland GmbH & Co. KG Carbamate-substituted oxindole derivatives and use thereof for the treatment of vasopressin-dependent diseases
US9403796B2 (en) 2007-12-07 2016-08-02 AbbVie Deutschland GmbH & Co. KG Amidomethyl-substituted oxindole derivatives and the use thereof for the treatment of vasopressin-dependent illnesses
US9422264B2 (en) 2007-12-07 2016-08-23 AbbVie Deutschland GmbH & Co. KG Carbamate-substituted oxindole derivatives and use thereof for the treatment of vasopressin-dependent diseases
US9434713B2 (en) 2007-12-07 2016-09-06 AbbVie Deutschland GmbH & Co. KG 5,6-disubstituted oxindole-derivatives and use thereof for treating vasopressin-dependent diseases
US8546401B2 (en) 2007-12-07 2013-10-01 AbbVie Deutschland GmbH & Co. KG 5,6-disubstituted oxindole-derivatives and use thereof for treating vasopressin-dependent diseases
US9040568B2 (en) 2009-05-29 2015-05-26 Abbvie Inc. Pharmaceutical compositions for the treatment of pain

Also Published As

Publication number Publication date
CN101730041A (en) 2010-06-09

Similar Documents

Publication Publication Date Title
WO2010148598A1 (en) Policy and charging control method and system based on the current time zone of the user
JP6025926B2 (en) Method, apparatus and system for controlling services
CN102547640B (en) A kind ofly consume the signing of limit service and manner of execution and system
WO2010148857A1 (en) Method and system for policy and charging control based on a period of time
US9184924B2 (en) Nodes for communicating credit related information
CN105103591A (en) Reporting of user plane congestion (upcon) using a upcon container
WO2010145124A1 (en) Policy and charging control method and system for multi-pdn connections of single apn
CN102625272A (en) Usage monitoring method supporting traffic detection function and usage monitoring system
WO2016206354A1 (en) Policy control method for third party application, scef and pcrf
WO2010149061A1 (en) Policy control architecture of converged network and method for implementing policy control and fixed network policy decision entity
CN101771986A (en) Strategic charging control method, device and system based on multiple access technology
JP5744325B2 (en) Service response method, apparatus and system
CN109076424A (en) The transmission method and device of information
CN102056117A (en) Policy and charging control (PCC) framework-based charging method and system
CN101742471A (en) Method for binding data stream and access network connection
WO2010148621A1 (en) Method and system for updating service information in subscriber profile repository
EP2294755B1 (en) Improved credit authorization in a core network
EP2800407B1 (en) Method and system for identifying application detection control function mode
CN102791042A (en) Method and system for establishing S9 subsession and policy and charging rules function (PCRF)
WO2010148764A1 (en) Roaming charging method and system
CN105721330A (en) Method and device for business chain strategy making, updating and state cooperation
CN103929756B (en) A kind of web information processing method, device and system
EP3755022B1 (en) Rule management method and apparatus
CN102137370A (en) Method and device for realizing unified charging on users
WO2016029674A1 (en) Access network congestion status reporting method, congestion information update processing method, and device

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 09846398

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 09846398

Country of ref document: EP

Kind code of ref document: A1