WO2010145174A1 - 基于多播广播业务的动态调度信息的处理方法和装置 - Google Patents
基于多播广播业务的动态调度信息的处理方法和装置 Download PDFInfo
- Publication number
- WO2010145174A1 WO2010145174A1 PCT/CN2009/076136 CN2009076136W WO2010145174A1 WO 2010145174 A1 WO2010145174 A1 WO 2010145174A1 CN 2009076136 W CN2009076136 W CN 2009076136W WO 2010145174 A1 WO2010145174 A1 WO 2010145174A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- period
- sub
- information
- sheep
- allocated
- Prior art date
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/30—Resource management for broadcast services
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/12—Wireless traffic scheduling
- H04W72/1263—Mapping of traffic onto schedule, e.g. scheduled allocation or multiplexing of flows
- H04W72/1273—Mapping of traffic onto schedule, e.g. scheduled allocation or multiplexing of flows of downlink data flows
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02D—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
- Y02D30/00—Reducing energy consumption in communication networks
- Y02D30/70—Reducing energy consumption in communication networks in wireless communication networks
Definitions
- Multi-media is required to have multiple users with the same size, the same feeling, and the like.
- 3 PP's S rate information and the high-speed multimedia mediation and Tito's frequency, audio and multimedia pauses have not raised the future of each.
- each of the S modes is multi-mode cas/oadcas O e S ge eec ewo S) mode multi-mode S S each with the same content in the same physical format in the same small format S Small special synchronization in S 2) Support for multiple small S wells 3) Multiple cas a cC ae C ) and multiple control cas Co o C ae CC ) Map to multiple cas C ae C ) in - to many modes 4 S Synchronous SS Reserved Small is configured by operation. How small is the user each se e) to receive multiple content The same SS well to increase the gain of the reception.
- the same physical resource S mode is the same as the size of each S. Intermediary in S
- each S of all S's S There are a number of Ss in each S of all S's S, each of which is S-independent.
- the S-packages are all equipped with the same S-series.
- the physical resources of the system are S. C.
- the multiple resources allocated by C are carried in several resources and multiple resource packets, and several S and S sub-resources.
- the multi-resource set SAP does not configure the multi-resources of the packet allocation mode and the sub-allocation mode S to be divided into multiples to form C or more C.
- C uses the physical resources of SAP for SAP.
- the configuration method of multi-resources with small or multiple CCs is only for SAP.
- the multi-resource configuration method with or with multiple CC configurations is C.
- the configuration set of SA 2 is the same as the indication of multi-C multi-resources.
- the C rate carries a multi-C in a power-dependent manner by passing 2 or 2 C to occupy a part of the core of the nucleon.
- SAP Occaso is used in the SAP concept, which indicates that the C package of the SAP within the same period is all resources.
- SAP Occaso package multiple C and information to package CC information to be carried in AC control part ACCo o ee e ) or carried in sheep
- SAP Occaso is the same period.
- the SAPOccaso in this specification uses 320s s other lengths of SAPOccaso.
- C SAP allocates multiple S and S sub-multi-mode sub- S sub-S contains S. The maximum number of S sub-distributed by SAP Occaso in the inter-period
- the length of the cycle is the same as the cycle of C.
- the number of S sub-packets in SAPOccaso is large. Since there are at most 6 s in the S, the period is 320 s and the maximum S S is the largest.
- the S sub is 92 2).
- S sub-times are 0 2 up to 9 .
- Cycle 2" 320 s then SAPOccaso allocates S sub-up to 6 2" 32. If S sub-times then 0 2 until 6 2" 32- SAPOccaso in C configuration carries information
- the multi-resources indicated by C are multi-seged to refer to the resources of S or S sub-shares with 2 or 2 C.
- Information C to SAP sub-mapping information God mapping information by means of an index within the SAP cycle.
- the information carried in the Sc ed g boc ) information ultimately indicates the index to a specific S sub in SAP
- the Cth occurrence in C is the Cth order of C in the CC. Only need to indicate C that the C that occupies the S sub-C is the multi-resource occupied by the C C.
- the received S each needs to be indicated by the S sub in the sub S, that is, in the S sub
- C is C. There are multiple resources allocated in the period or period, that is, C. It is necessary to waste the other S subs in the period or in several periods.
- CC is configured with multiple C. Each has an appearance. C Yes.
- the indicated information CC is configured in the order of C.
- C is occupied by which S sub-bearers are carried in the sub-S content.
- the content is wasteful, and the C that is obtained by C has occupied which S
- the main purpose of presenting the contents of the S is to present the information of the various information in order to solve at least the above.
- the purpose of this book is to mention the various methods of information.
- the multi-resources of the information are distributed in the following manners in the inter-period.
- the multiple configurations are between 2) indicating the degree of the configuration, and the multiple configurations are between the indications.
- the multiple configurations are between 4)
- Many of the assigned sheep have special or no multi-resource information for multiple sub-allocations.
- each of the plurality of sub-users has more than a variety of sheep. It is special for periods that indicate multiple degrees.
- the method package user Before the user controls the content multiple resources in each period, the method package user each pre-determines the multi-control content, and the predetermined multi-control period is Od multi-control period or multi-control remediation period P, where P multi-control period is equal to period or sub-control loop repair period Equal to multiple control cycles. Specially beyond the use of sheep. In the case of many different children, there are many different packages. If the result indicates that there are more than 0, then the indications are more than one. Sheep multi-packs raise more sheep and/or more children and/or sons. Another aspect of the purpose of the present invention is to mention a multi-information device.
- the device package of the present information is allocated to allocate multiple resources, wherein the mediation period is used in the following manner Allocation) More than 2)
- Each of the configurations is instructive to the degree of 2) to the number of configurations.
- 3) There are many configurations in which there are more than 4% of the allocations.
- Multi-resource information with or without multiple children assigned to the root allocation The device is packaged in a collection of information in the information of many sheep.
- the special multi-degree cycle of the sheep multi-segment of the device package is more than the multiple resources allocated in each cycle.
- the C-distributed S sub-segment exceeds the special value of the S-sub-subsequent C.
- SAPOccaso which is a multi-resource
- it is the flow of the instruction of the multi-C multi-resources. It is the device of the information of the information of the information of the information of the information. The way can be summarized in consideration of the number of C in the phase of the intermediation cycle
- the information scheme of each information has the C assigned S sub-exceeds the S sub-special or the C-distributed S sub- or the C-specific configuration indicates the unreached or arrived C configuration
- the C configuration to or to the C configuration indicates that there is a C configuration that indicates that it has not arrived. What needs to be clarified is that in the case of no, the ones in this book are specific to each other. The following is a reference to the unclear.
- the method of this method is based on a variety of information methods.
- 3 is the process of the information processing of the plurality of information.
- Step 302 allocates multiple resources, which are allocated in the following manner in the medium period.
- the "multiple to pass 0" indicating that the degree of each track is different indicates that there is more. Whether each of the multiple paths to f C 0/ ⁇ . Steps need to have multiple resources f C and / or sub and / or sub 0 of each allocation. There is no need to have multiple allocated resources f C , 0 ⁇ What needs to be clear is to indicate whether the multiple channels are in the present form or not, and the information is in the current form of 0" or "). In the inter-period, the C has a multi-resource allocated to C, and the special case of C is more than 6 2" 32-1). The period 2 20) s 5 4 3 - 0 2 3 4
- Step 304 The allocated multi-resource information is described in the mode of allocation.
- the information packet is assigned a special value of C. Hugh special refers to exceeding the value of the S sub- and/or having the assigned S sub- and/or indicating that the degree is not.
- the method includes information
- the S sub-child of C in the information has a special C-step extra for the S-sub-special to indicate the C-degree period with a special C-degree period in the period C of the multi-resource. Is the S sub-segment in the cycle to C, and there is no other S sub-information in the cycle.
- the CC period is equal to the period of the whole or the entire CC repair period is equal to the whole of the CC period.
- the periodic fixed force is 320 s CC cycle equal to 320 s.
- the S sub-distribution of the C is exceeded by the method of using the special value of the S sub.
- the C has a waste of unnecessary quantities in the period of the period or in several periods in which the other S subsequences are required to be received.
- the description of the conclusion is given below.
- C has more resources allocated in the cycle.
- POccaso is configured with a S 9 of 0 9 .
- the multiple resources of C, that is, the children of C have 0 9
- C is configured with a knot or sub is still 0 9 is C is allocated multiple resources.
- 92 or to find the value of ⁇ or S or S sub is greater than 9 is special. If the S sub of C is greater than 9, then C has more resources allocated in the period. Sub C, which multi-resources are allocated to indicate which S-subsequences are in the multi-resources that are available, that is, the C-distributed S-specific indication information is special indication information to exceed the C-configured S sub- It is a special agreement with the Tao.
- the maximum value of the S sub-module of the 320 s C period is greater than or equal to 92. In the inter-period, there is a C to be allocated to C. The C is allocated more than the special S.
- the excess exceeds 6 2" 32- of the period 2 320) s -5 -4 -3 -2 - 0 2 3 4 or C
- the distribution agreement has been defined as a special medium or more.
- C Multiple resources indicate the S and/or S and/or children of C.
- the resource allocation information of C to the phase S of the C sub-content C has more resources to no longer the information of other sub-items of SAPOccaso.
- the following multi-C configuration multi-resource method package - ode e ode ea ode, etc.) indicates in CC or multi C indicates that C has several S and several different Cs indicate which multiple resources are configured in C.
- the period of C is fixed and fixed for 6 s 320 s 640 s, etc.) CC does not need to configure C.
- the period of period C is not fixed or fixed.
- 320) Configuring the cycle in CC to configure C only determines the package in SAP Occaso.
- the maximum S and S sub Where all the Ss of CC's C are in the form of the C list, the first occurrence of S, the second occurrence of S, the following 2 times, until the occurrence of the most
- the C of other S subs is configured in the S sub of all S sub-distributed by SAP Occaso.
- the period of C is not fixed. It is not fixed.
- the information in the configuration of the 320 s configuration needs to be configured.
- the cycle period of C only determines the maximum S and S sub-objects of the package in SAPOccaso.
- the C-channel configuration has a S-sub-distribution with multiple resources, and the S-sub-configuration of the C-pass configuration has no capacity to allocate multiple resources.
- the way in which C allocates multiple resources is the configuration of S sub- or S sub- or S sub-objects.
- the S or S sub or the S subkey of the configuration is interposed.
- the value of the C configuration is fixed or fixed.
- C is indicated in the formula to indicate that C is the C arrangement indicated by CC, that is, the C occurrence of C in the CC interface, until the C-type indication is the C configuration. Only must be configured with CC's C. Take the method of S The CC gets the mediation or C channel C. Which C's C is configured. 2) The multiple resources allocated by C in the SAPOccaso of C in the intervening period, that is, which multi-resources are allocated by C, which C has allocated multiple resources. Whether the cycle with the same length of the current cycle is configured with the maximum value of the S sub-segment in the current cycle of SAPOccaso. The period is not configured but is configured in the CC.
- the same length of the cycle of the content channel C of the CC is the maximum number of times the S7 is configured by the SAPOccaso to the S sub-cycle.
- the periodic configuration of C is different in configuration or configuration in the CC cycle. If it is configured, it means that the period is different from the current period, and if the period is configured in CC, then CC until all the cycles before the CC is updated, all the cycles are the same. 3) If C allocates multiple resources, then the C-allocated S-sub-C content does not receive and the other S-sub-Cs have multiple resources allocated, and the S S of the period is not received. Whether the C of the content of the re-interval is up to whether or not it is necessary to receive the S sub-segment during that period.
- the mediation period C there is a S sub-distribution. If there is a CC, it is a C. If there is a C, or a C is assigned, the C is assigned a special 0 in the C configuration, indicating that C is there. Sub C, which multiple resource instance indications are assigned The C that is occupied by the S-subsequent to the multi-resources that are allocated is not able to allocate the S-sub. The method allocates which resources are allocated by way of C or which C has allocated multiple resources. However, the resource allocation information of the root C to the phase S
- the C of the C content has more resources than the other sub-information of SAPOccaso.
- all the Ss of CC's C are in the form of the C list, the first occurrence of S, the second occurrence of S, the following 2 times, until the occurrence of the most
- S is assigned to be all or 0 times. All of the Cs of C are assigned to each other, or are required to be S or different or need to be unique.
- the period of C is fixed and fixed for 6 s 320 s 640 s, etc.) CC does not need to configure C.
- the period of period C is not fixed or fixed.
- 320) Configuring the cycle in CC to configure C only determines the package in SAP Occaso. The maximum S and S sub. 2) A multi-resource of C in the C-period indicating the core C mapping in the period of C. Which needs to be the first to decide what S is to take its S or decide not to be in this
- the C of other S subs is configured in the S sub of all S sub-distributed by SAP Occaso.
- the information in which C is fixed at a fixed 6 s 320 s or 640 s, etc.) does not require the configuration of C cycles.
- the period of C is not fixed. It is not fixed.
- the information in the configuration of 320 s needs to be configured.
- the period of C only determines the maximum S and S of the packet in SAPOccaso.
- the C-pass configuration has a S sub-distribution of multiple resources, and if there is a C, it does not configure the S-sub-C or C to the C-C to indicate whether it is the degree or not.
- the C will be C to indicate whether it is the degree of 0.
- the C will be C to indicate whether it is the degree or the C to the C will be C to indicate whether it is the degree.
- the way in which C allocates multiple resources is that it is configured with S or S or S.
- the S or S sub or the S sub of the configuration is interposed.
- the value of the C configuration is fixed or fixed.
- the multiple resources allocated by C in SAPOccaso, ie, which resources are allocated by way C C has multiple resources allocated.
- the cycle with the same length of the current cycle is configured with the maximum value of the S sub-segment in the current cycle of SAPOccaso.
- the period is not configured but is configured in the CC.
- the same length of the cycle of the content channel C of the CC is the maximum number of times the S7 is configured by the SAPOccaso to the S sub-cycle.
- the periodic configuration of C is different in configuration or configuration in the CC cycle. If it is configured, it means that the period is different from the current period, and if the period is configured in CC, then CC until all the cycles before the CC is updated, all the cycles are the same. 3) C is allocated multiple resources, then the C-allocated S-sub-C content does not receive and fetch the other S-sub-C. If there are multiple resources allocated, then the S S of the period is not received. In the next period of the re-interval, the content of C is determined whether it is necessary to receive the S sub-period.
- SAPOccaso allocates multiple resources.
- the multiple resources allocated by C first need CC to get the common C mapping to C.
- This example shows how to configure the CC or CC CC cycle of the CC CC cycle with or without the CC repair cycle.
- the method of configuring the CC cycle in the message is the system message configuration in which the CC cycle period is fixed.
- the force is 320 s.
- the CC cycle is 320 s or 320 s / represents the minimum or maximum of the CC content in 320 s. Configuration value.
- the CC cycle has a CC cycle and the CC cycle has a CC cycle CC cycle.
- the method of configuring the CC cycle of the outer CC's periodic packet CC repair cycle is in the system message configuration CC repair cycle CC cycle represents the minimum of the CC content in the CC cycle with the maximum uncertainty required.
- the CC content method force is configured in the CC content of the following S od CC cycle PP).
- the CC repair cycle is configured in the full-size S od CC repair cycle P.
- the content of CC In the CC cycle to the CC content, since the CC content in the CC cycle is the same, the complete CC content does not need to take the CC content of the other CC cycle in the CC revision cycle to re-CC content.
- the CC content is packaged in C for several CCs. What is needed is the use of the sum or the knot for sheep.
- a device of the device that mentions a plurality of pieces of information.
- the device package shown in Fig. 4, which is the device of the present information, is described below with the assignments 2 and 4.
- Assignment 2 in the mediation period is configured in the following way.) Each configuration is between indicating whether it is a degree or not.
- each step or step of the present description of the art uses a general-purpose device to store them in a storage device without the devices that are concentrated in the sheep or distributed to the devices that are used by the devices. It is not made by the device either separately to make each integration or to make more or more of them into a sheep integration. This is not a specific piece of software and software. In the case of the force, it is not used in this book. The wood of the field has nothing to do with each. What is done in the spirit and principles of this book, equivalent replacement, etc. are included in this warranty.
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Mobile Radio Communication Systems (AREA)
- Data Exchanges In Wide-Area Networks (AREA)
Abstract
Description
Claims
Priority Applications (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP09846088.4A EP2445285B1 (en) | 2009-06-17 | 2009-12-28 | Processing of dynamic scheduling information based on multicast broadcast service |
JP2012515311A JP5559318B2 (ja) | 2009-06-17 | 2009-12-28 | マルチキャスト放送サービスに基づく動的スケジューリング情報の処理方法および装置 |
RU2012101321/07A RU2515476C2 (ru) | 2009-06-17 | 2009-12-28 | Способ и устройство для обработки информации динамического планирования на основе служб многоадресной/широковещательной передачи |
US13/259,696 US20120076064A1 (en) | 2009-06-17 | 2009-12-28 | method and apparatus for processing dynamic scheduling information based on multicast broadcast services |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200910149083.XA CN101925004B (zh) | 2009-06-17 | 2009-06-17 | 基于多播广播业务的动态调度信息的处理方法和装置 |
CN200910149083.X | 2009-06-17 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2010145174A1 true WO2010145174A1 (zh) | 2010-12-23 |
Family
ID=43339582
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/CN2009/076136 WO2010145174A1 (zh) | 2009-06-17 | 2009-12-28 | 基于多播广播业务的动态调度信息的处理方法和装置 |
Country Status (6)
Country | Link |
---|---|
US (1) | US20120076064A1 (zh) |
EP (1) | EP2445285B1 (zh) |
JP (1) | JP5559318B2 (zh) |
CN (1) | CN101925004B (zh) |
RU (1) | RU2515476C2 (zh) |
WO (1) | WO2010145174A1 (zh) |
Families Citing this family (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP5027906B2 (ja) * | 2009-06-08 | 2012-09-19 | 創新音▲速▼股▲ふん▼有限公司 | Mbms動的スケジューリング情報を処理する方法および装置 |
EP2946576B1 (en) * | 2013-01-18 | 2016-09-28 | Telefonaktiebolaget LM Ericsson (publ) | Transmitting embms control information to wireless devices in a wireless telecommunications network |
JP6705809B2 (ja) * | 2014-08-25 | 2020-06-03 | コーヒレント・ロジックス・インコーポレーテッド | 放送及び双方向パケット交換通信のための共有スペクトルアクセス |
US11234288B2 (en) | 2014-08-25 | 2022-01-25 | Coherent Logix, Incorporated | Shared spectrum access for broadcast and bi-directional, packet-switched communications |
CN105517173B (zh) * | 2014-10-17 | 2019-01-04 | 中国移动通信集团公司 | 业务隔离区调度资源确定及共享方法、装置、系统和基站 |
US9872276B2 (en) * | 2015-01-12 | 2018-01-16 | Google Llc | Scheduling of software package transmissions on a multimedia broadcast multicast service channel |
CN110225466B (zh) * | 2015-08-14 | 2021-12-28 | 华为技术有限公司 | 一种多播业务读取、发送方法及相关设备 |
CN109413590B (zh) * | 2017-08-16 | 2022-04-29 | 中兴通讯股份有限公司 | 业务调度方法及装置 |
CN112640492B (zh) * | 2018-10-30 | 2022-05-10 | 华为技术有限公司 | 传输多播业务的方法和装置 |
EP3881618B1 (en) * | 2018-11-12 | 2023-05-10 | Coherent Logix, Inc. | Shared spectrum access for broadcast and bi-directional, packet-switched communications |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2007052968A1 (en) * | 2005-11-02 | 2007-05-10 | Samsung Electronics Co., Ltd. | Method and apparatus for assigning temporary id and scrambling code of ue through initial access procedure in wireless system |
WO2007129597A1 (ja) * | 2006-05-01 | 2007-11-15 | Ntt Docomo, Inc. | 基地局、移動局および通信方法 |
CN101262626A (zh) * | 2007-03-05 | 2008-09-10 | 大唐移动通信设备有限公司 | Mbms的信道传输方法及系统、网络侧和终端 |
CN101296102A (zh) * | 2007-04-27 | 2008-10-29 | 中兴通讯股份有限公司 | 多媒体广播组播业务调度方法及系统 |
Family Cites Families (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1467586B1 (en) * | 2003-04-09 | 2010-05-19 | Samsung Electronics Co., Ltd. | Method for cell reselection in an MBMS mobile communication system |
US7660275B2 (en) * | 2003-10-24 | 2010-02-09 | Qualcomm Incorporated | Local and wide-area transmissions in a wireless broadcast network |
EP1608194B1 (en) * | 2004-06-15 | 2008-01-02 | Matsushita Electric Industrial Co., Ltd. | Priority-handling for data transmissions |
KR101084142B1 (ko) * | 2005-08-25 | 2011-11-17 | 엘지전자 주식회사 | 하향공유채널의 데이터 송수신 방법 |
CN101291512B (zh) * | 2007-04-18 | 2012-05-23 | 华为技术有限公司 | 一种下行资源指示方法及装置 |
JP4928633B2 (ja) * | 2007-06-15 | 2012-05-09 | エルジー エレクトロニクス インコーポレイティド | 単一周波数ネットワークモードにおける1対多サービスのためのネットワークシグナリング |
US9386557B2 (en) * | 2007-08-13 | 2016-07-05 | Qualcomm Incorporated | Method and apparatus for supporting broadcast and multicast services in a wireless communication system |
BRPI0912185A2 (pt) * | 2008-05-02 | 2015-10-06 | Ntt Docomo Inc | estação rádio base e método de controle de comunicação |
KR101227740B1 (ko) * | 2008-10-01 | 2013-01-29 | 엘지전자 주식회사 | 서브프레임의 무선자원 할당 방법 및 장치 |
AU2009332075B2 (en) * | 2008-12-26 | 2014-05-01 | Sharp Kabushiki Kaisha | Mobile station apparatus, management method in a mobile station apparatus, processing section, base station apparatus and communication system |
CN101854589B (zh) * | 2009-04-03 | 2013-12-04 | 中兴通讯股份有限公司 | 多媒体广播多播业务控制信令的传输方法和系统 |
JP5027906B2 (ja) * | 2009-06-08 | 2012-09-19 | 創新音▲速▼股▲ふん▼有限公司 | Mbms動的スケジューリング情報を処理する方法および装置 |
-
2009
- 2009-06-17 CN CN200910149083.XA patent/CN101925004B/zh active Active
- 2009-12-28 EP EP09846088.4A patent/EP2445285B1/en active Active
- 2009-12-28 JP JP2012515311A patent/JP5559318B2/ja active Active
- 2009-12-28 WO PCT/CN2009/076136 patent/WO2010145174A1/zh active Application Filing
- 2009-12-28 US US13/259,696 patent/US20120076064A1/en not_active Abandoned
- 2009-12-28 RU RU2012101321/07A patent/RU2515476C2/ru active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2007052968A1 (en) * | 2005-11-02 | 2007-05-10 | Samsung Electronics Co., Ltd. | Method and apparatus for assigning temporary id and scrambling code of ue through initial access procedure in wireless system |
WO2007129597A1 (ja) * | 2006-05-01 | 2007-11-15 | Ntt Docomo, Inc. | 基地局、移動局および通信方法 |
CN101262626A (zh) * | 2007-03-05 | 2008-09-10 | 大唐移动通信设备有限公司 | Mbms的信道传输方法及系统、网络侧和终端 |
CN101296102A (zh) * | 2007-04-27 | 2008-10-29 | 中兴通讯股份有限公司 | 多媒体广播组播业务调度方法及系统 |
Non-Patent Citations (1)
Title |
---|
See also references of EP2445285A4 * |
Also Published As
Publication number | Publication date |
---|---|
EP2445285A4 (en) | 2014-08-27 |
CN101925004B (zh) | 2016-12-07 |
US20120076064A1 (en) | 2012-03-29 |
EP2445285A1 (en) | 2012-04-25 |
EP2445285B1 (en) | 2017-04-12 |
RU2515476C2 (ru) | 2014-05-10 |
RU2012101321A (ru) | 2013-08-10 |
CN101925004A (zh) | 2010-12-22 |
JP5559318B2 (ja) | 2014-07-23 |
JP2012530415A (ja) | 2012-11-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2010145174A1 (zh) | 基于多播广播业务的动态调度信息的处理方法和装置 | |
JP5755335B2 (ja) | アップリンク・サウンディング・リファレンス信号をトリガし送信する方法および装置 | |
WO2010145185A1 (zh) | 一种多媒体广播组播业务动态复用的资源分配方法 | |
WO2010012232A1 (zh) | 一种上行调度请求的配置方法和装置 | |
CN104247541A (zh) | 传输数据处理方法及设备 | |
WO2010148666A1 (zh) | 控制信道单元的分配方法及装置 | |
CN106413105A (zh) | 一种资源传输的指示方法、装置、网络侧设备及终端 | |
CN100579078C (zh) | 实现上行资源调度的方法、基站和用户终端 | |
US20140233515A1 (en) | Method of resource scheduling used for machine type communications | |
WO2009059460A1 (en) | Method and device for scheduling resource between different tdd systems | |
CN106488560A (zh) | 一种资源选择方法及装置 | |
WO2017161494A1 (zh) | D2d通信方法及设备 | |
JP2012138809A5 (zh) | ||
CN103687034A (zh) | 一种组调度方法及装置 | |
KR20120019951A (ko) | 저속 wpan에서 gts 할당 및 관리방법 | |
CN101771942B (zh) | 多媒体广播组播业务分组的方法,设备及系统 | |
Ho et al. | Dynamic GTS allocation scheme in IEEE 802.15. 4 by multi-factor | |
WO2010145223A1 (zh) | 一种mbms的调制和编码方案确定方法和一种mce | |
CN101640843A (zh) | 一种传输多媒体广播和组播业务资源配置信息的方法 | |
CN101466080B (zh) | 信道资源分配方法和装置 | |
WO2010142130A1 (zh) | 一种多媒体广播组播业务调制编码方案确定方法和系统 | |
CN101505534A (zh) | 用于移动通信系统的资源管理方法 | |
CN109413590B (zh) | 业务调度方法及装置 | |
JP5210462B2 (ja) | Mbmsサービスを伝送する方法および装置 | |
KR101343750B1 (ko) | 휴대인터넷에서 무선자원 할당 테이블 구성 방법 및 그를이용한 무선자원 할당 방법 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 09846088 Country of ref document: EP Kind code of ref document: A1 |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2012515311 Country of ref document: JP |
|
WWE | Wipo information: entry into national phase |
Ref document number: 13259696 Country of ref document: US |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
WWE | Wipo information: entry into national phase |
Ref document number: 84/MUMNP/2012 Country of ref document: IN |
|
REEP | Request for entry into the european phase |
Ref document number: 2009846088 Country of ref document: EP |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2009846088 Country of ref document: EP |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2012101321 Country of ref document: RU |