WO2010087898A1 - Procédé et système d'amélioration d'un processus de récupération employant un ou plusieurs trous de forage horizontaux - Google Patents

Procédé et système d'amélioration d'un processus de récupération employant un ou plusieurs trous de forage horizontaux Download PDF

Info

Publication number
WO2010087898A1
WO2010087898A1 PCT/US2009/067010 US2009067010W WO2010087898A1 WO 2010087898 A1 WO2010087898 A1 WO 2010087898A1 US 2009067010 W US2009067010 W US 2009067010W WO 2010087898 A1 WO2010087898 A1 WO 2010087898A1
Authority
WO
WIPO (PCT)
Prior art keywords
reservoir
permeability
impediment
conduit
recovery process
Prior art date
Application number
PCT/US2009/067010
Other languages
English (en)
Inventor
Thomas J. Boone
Ivan J. Kosik
Original Assignee
Exxonmobil Upstream Research Company
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Exxonmobil Upstream Research Company filed Critical Exxonmobil Upstream Research Company
Priority to US13/132,868 priority Critical patent/US20110272153A1/en
Publication of WO2010087898A1 publication Critical patent/WO2010087898A1/fr

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • E21B43/24Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection
    • E21B43/2406Steam assisted gravity drainage [SAGD]

Definitions

  • the present invention relates generally to a system and method for enhancing a hydrocarbon recovery process. More particularly, the present invention relates to a system and method for enhancing a recovery process employing one or more horizontal wellbores by selectively altering vertical permeability in a reservoir.
  • Oil and gas are nonrenewable natural resources relied upon heavily in the industrialized world.
  • the rising demand for oil and gas, combined with declining conventional resources, has necessitated the development of alternative sources of oil, as well as methods of enhancing recovery from both conventional and alternative resources.
  • Bitumen is classified as an extra heavy oil, with an API gravity of about 10° or less, referring to its gravity as measured in degrees on the American Petroleum Institute (API) Scale. Heavy oil has an API gravity in the range of about 22.3° to about 10°.
  • API gravity is measured in degrees on the American Petroleum Institute
  • Heavy oil can be recovered from oil sands by various methods, including in-situ oil recovery methods.
  • In-situ heavy oil recovery methods are typically applied when a deposit cannot be mined economically due to the depth of overburden.
  • the aim of most in-situ heavy oil recovery processes is to reduce the viscosity of heavy oil in the reservoir to enable it to flow into a well and be produced therefrom.
  • Thermal in-situ heavy oil recovery processes utilize heat, typically provided by steam injection, to mobilize the bitumen.
  • Hydrocarbon solvents and may also be utilized.
  • Such processes frequently employ one or more horizontal wellbores and typically utilize gravity drainage as a fluid drive mechanism.
  • Horizontal wellbores can also be employed in conventional oil or gas recovery processes, including sweeping and flooding processes that utilize displacement as a fluid drive mechanism, and have been shown to offer significant potential to maximize production or injection rates.
  • Reservoir permeability generally refers to the capacity of formation material to permit the passage of fluid through it.
  • the customary unit of measurement is the darcy (D) or millidarcy
  • a known method of increasing reservoir permeability in general involves hydraulic fracturing of a formation with viscous fracturing fluid containing a proppant material. Such fractures are typically induced from a production or injection well.
  • attempts to propagate fractures through compartmentalized or stratified formations have historically yielded unpredictable and poor results, such as insufficient fracture extension and inadequate propping of fractures adjacent to less permeable areas of the formation.
  • a method of stimulating and producing a stratified reservoir by fracturing a horizontal injection well such that a vertical fracture extends through multiple layers of the formation and connects the injection well to a horizontal well below, thereby providing a passage for the flow of hydrocarbons.
  • the lower well is sloped downward and intersects a vertical well that serves as a sump and a production well.
  • Such a system is not designed for gravity drainage and is not suited for reservoirs where fracture extension occurs in a horizontal versus a vertical orientation.
  • a thick or substantially impermeable impediment, such as shale may not be effectively propped open.
  • U.S. 2,280,851 (1942) to Ranney discloses early methods of drilling deviated wellbores for collection of oil.
  • the wellbore may be undulating and may cross and re-cross a layer of impermeable material such that portions of the wellbore lie in productive stratum on either side of the impermeable layer in order to tap into both zones.
  • the fluids that collect in the wellbore are vacuum pumped to the surface.
  • U.S. 6,708,764 to Zupanick discloses a drainage pattern of wellbores, which may include one or more undulating wellbores, extending from a main articulated wellbore to provide access to a large subterranean area from the surface.
  • An undulating drainage wellbore may provide access to multiple layers of subterranean gas deposits separated by layers of impermeable material, such as a coal seam.
  • the drainage pattern connects to a vertical wellbore having an enlarged cavity that can act as a sump.
  • the system and method of the invention are particularly useful in reservoirs having one or more vertical permeability impediments.
  • a method of enhancing a hydrocarbon recovery process employs one or more substantially horizontal wellbores.
  • the method comprises providing a zone of increased permeability in a hydrocarbon reservoir to facilitate movement of flowable materials through the reservoir to thereby enhance the recovery process.
  • the zone of increased permeability is preferably provided in a region substantially above or below the one or more horizontal wellbores.
  • the zone of increased permeability extends generally in a direction substantially parallel the horizontal axis of the one or more horizontal wellbores along at least a portion of the length thereof.
  • the zone of increased permeability may be provided by an accessory conduit in the reservoir.
  • the reservoir has one or more vertical permeability impediments.
  • a method of enhancing a recovery process employing one or more substantially horizontal wellbores in a hydrocarbon reservoir having at least one vertical permeability impediment.
  • the method comprises providing at least one accessory conduit in a region substantially above or below at least one said one or more substantially horizontal wellbores.
  • the at least one conduit extends generally in a direction substantially parallel to the horizontal axis of the one or more horizontal wellbores along at least a portion of the length thereof.
  • a method of recovering hydrocarbons from a reservoir having at least one vertical permeability impediment comprises providing a production well having a substantially horizontal portion for collection of production material comprising hydrocarbons and providing an injection well having a substantially horizontal portion for injection of injection material.
  • the method further comprises providing at least one accessory conduit in the reservoir in a region substantially above or below the production well and/or the injection well and extending generally in a direction parallel to the production well and/or the injection well along at least a portion of its length.
  • the conduit has one or more portions that extend through the vertical permeability impediment to facilitate movement of the production material and/or the injection material through the reservoir.
  • the method further comprises recovering the hydrocarbons from the production material.
  • the method comprises providing at least one accessory conduit in the reservoir in a region substantially above or below the one or more horizontal wellbores.
  • the conduit has one or more portions that extend through the at least one vertical permeability impediment to facilitate movement of flowable material therethrough to enhance the recovery process.
  • a method of enhancing a hydrocarbon recovery process employing one or more horizontal wellbores in a reservoir having at least one vertical permeability impediment.
  • the method comprises increasing the effective permeability of the at least one vertical permeability impediment in a region substantially above or below the one or more horizontal wellbores to facilitate the movement of flowable materials through the at least one vertical permeability impediment to enhance the recovery process.
  • a method of enhancing recovery process performance in a hydrocarbon reservoir having at least one vertical permeability impediment comprises providing a first wellbore having a substantially horizontal portion for collection of hydrocarbons.
  • the method further comprises providing at least one accessory conduit extending through the reservoir in a region substantially above or below the first wellbore.
  • the accessory conduit has one or more portions that extend through the vertical permeability impediment to facilitate movement of flowable materials therethrough to enhance recovery.
  • an in situ heavy oil recovery process for recovering hydrocarbons from a reservoir having one or more vertical permeability impediments.
  • the method comprised providing one or more horizontal wellbores in the reservoir, including a production wellbore, and increasing the effective permeability of the one or more vertical permeability impediments above the production wellbore in a region extending along at least a portion of the length of the production wellbore to facilitate the movement of flowable materials through the one or more vertical permeability impediments and toward the production wellbore.
  • a system for recovering hydrocarbons from a reservoir comprises one or more substantially horizontal wellbores, including a production wellbore, and at least one accessory conduit located substantially above or below the one or more substantially horizontal wellbores for enhancing movement of flowable materials through the reservoir to thereby enhance recovery.
  • the reservoir has at least one vertical permeability impediment and the accessory conduit has one or more portions that extend through the at least one vertical permeability impediment to facilitate movement of flowable materials therethrough.
  • the recovery process is a conventional oil recovery process or a gas recovery process.
  • the recovery process is a heavy oil recovery process.
  • the heavy oil recovery process is steam assisted gravity drainage (SAGD), cyclic steam stimulation (CSS), steam flooding or a derivative thereof.
  • SAGD steam assisted gravity drainage
  • CSS cyclic steam stimulation
  • steam flooding or a derivative thereof.
  • FIG. 1 is an end view of a typical SAGD system in a reservoir
  • FIG. 2 is an end view of a typical SAGD system in a partitioned reservoir having two vertical permeability impediments
  • FIG. 3 is an end view showing multiple SAGD well pairs in a partitioned reservoir having two vertical permeability impediments
  • FIG. 4 is an end view of a SAGD system in a partitioned reservoir having two vertical permeability impediments, wherein a zone of increased permeability is created in a region substantially above the SAGD well pair that extends through the vertical permeability impediments to facilitate movement of flowable material through the reservoir to enhance the recovery process, in accordance with an embodiment of the invention;
  • FIG. 5 is a side (a), top (b) and end (c) view of a partitioned reservoir showing an undulating accessory conduit that intersects two vertical permeability impediments to thereby create a zone of increased permeability to facilitate movement of flowable material through the reservoir to enhance the recovery process, in accordance with an embodiment of the invention
  • FIG. 6 is a side (a), top (b) and end (c) view of a partitioned reservoir showing a pair of laterally offset undulating accessory conduits that intersect two vertical permeability impediments, in accordance with an embodiment of the invention
  • FIG. 7 is a side (a), top (b) and end (c) view of a partitioned reservoir showing a pair of stacked undulating accessory conduits each intersecting a vertical permeability impediment, in accordance with an embodiment of the invention
  • FIG. 8 is a side (a), top (b) and end (c) view of a partitioned reservoir showing a main lateral accessory conduit having lateral offshoots that intersect two vertical permeability impediments, in accordance with an embodiment of the invention
  • FIG. 9 is a side (a), top (b) and end (c) view a partitioned reservoir showing two lateral accessory conduits each having perforations extending therefrom that puncture a vertical permeability impediment, in accordance with an embodiment of the invention
  • FIG. 10 is a side (a), top (b) and end (c) view of a partitioned reservoir showing a main lateral accessory conduit with multiple propped fractures extending therefrom that penetrate two vertical permeability impediments, in accordance with an embodiment of the invention
  • FIG. 11 illustrates a reservoir having two vertical permeability impediments, wherein a zone of increased permeability is created that extends through the vertical permeability impediments in a region substantially below the production well to improve primary natural gas, primary conventional oil, or water-drive conventional oil production from the reservoir, in accordance with an embodiment of the invention
  • FIG. 12 illustrates a reservoir having two vertical permeability impediments, wherein a zone of increased permeability is created that extends through the vertical permeability impediments in a region substantially above the production well to improve primary oil or top-gas driven production from the reservoir, in accordance with an embodiment of the invention
  • FIG. 13 illustrates a gas flooding process in a reservoir having two vertical permeability impediments, wherein zones of increased permeability are created that extend through the vertical permeability impediments in regions substantially below the injection well and substantially above the production well to facilitate the movement of flowable material through the reservoir to improve recovery, in accordance with an embodiment of the invention
  • FIG. 14 illustrates a liquid flooding process in a reservoir having two vertical permeability impediments, wherein zones of increased permeability are created that extend through the vertical permeability impediments in regions substantially above the injection well and substantially below the production well to facilitate the movement of flowable material through the reservoir to improve recovery, in accordance with an embodiment of the invention;
  • FIG. 15 shows the 2D results of a reservoir simulation modeling a SAGD operation in a continuous reservoir with Athabasca type properties and no vertical permeability impediments, wherein the temperature and gas saturation in the reservoir after 1000 and 2000 days of steam injection are shown;
  • FIG. 16 shows the 2D results of a reservoir simulation modeling a SAGD operation in a reservoir with Athabasca type properties and two vertical permeability barriers, wherein a zone of increased permeability is provided above the SAGD well pair and extending through the vertical permeability barriers, in accordance with an embodiment of the invention
  • FIG. 17 shows graphical results of the reservoir simulations shown in Figs. 15 and 16, comparing oil and water volumes between a SAGD operation in a reservoir with no vertical permeability impediments and a SAGD operation carried out in accordance with an embodiment of the invention in a reservoir having two vertical permeability barriers;
  • FIG. 18 shows the 3D results of reservoir simulations modeling a CSS operation in a partitioned reservoir with Athabasca Cold Lake type properties and one vertical permeability barrier, comparing gas saturation in a typical split pay reservoir with a split pay reservoir having a zone of increased permeability extending through the vertical permeability barrier above each of two adjacent horizontal CSS wells, in accordance with an embodiment of the invention
  • FIG. 19 shows graphical results of the reservoir simulations shown in FIG. 18, comparing oil and water volumes between a CSS well in a split pay reservoir having a zone of increased permeability that extends through a vertical permeability barrier in accordance with an embodiment of the invention, with a CSS well in a split pay reservoir with no zone of increased permeability.
  • the present invention provides a method and system for enhancing a hydrocarbon recovery process employing one or more substantially horizontal wellbores.
  • the recovery process is enhanced by selectively altering the vertical permeability of the reservoir.
  • a hydrocarbon reservoir includes one or more hydrocarbon-containing layers or zones and may also contain one or more permeability impediments.
  • the system and method of the invention can be utilized to enhance recovery process performance in substantially continuous reservoirs, embodiments of the invention are particularly advantageous in reservoirs having one or more vertical permeability impediments.
  • a substantially horizontal wellbore is a wellbore that is substantially horizontal along at least a portion of its length. It is understood in the industry that a substantially horizontal wellbore may include deviations from horizontal along its length but that the horizontal portions of such wellbores have an axis in a generally horizontal plane as opposed to a vertical wellbore.
  • Examples of recovery processes that may employ one or more substantially horizontal wellbores include, but are not limited to, steam-assisted gravity drainage (SAGD), cyclic steam stimulation (CSS), steam flooding and various derivatives thereof, as well as conventional oil and gas recovery processes, including various flooding and sweeping processes.
  • SAGD steam-assisted gravity drainage
  • CSS cyclic steam stimulation
  • steam flooding and various derivatives thereof, as well as conventional oil and gas recovery processes, including various flooding and sweeping processes.
  • a vertical permeability impediment refers to a portion of a reservoir that has substantially reduced permeability compared to the primary pay zone(s) of the reservoir, such that vertical movement of flowable material through the reservoir is hindered or prevented.
  • Flowable materials comprise fluids and/or gasses, including mobile hydrocarbons. Skilled persons will appreciate that the degree to which a particular vertical permeability impediment will impede the flow of mobile hydrocarbons in a recovery process will depend on such factors as the permeability and thickness of the impediment, the reservoir characteristics, the viscosity of the particular hydrocarbon being recovered, and the particular recovery process utilized. These and other factors should be considered in carrying out the methods of the invention.
  • a vertical permeability impediment may form a continuous, semi-continuous or discontinuous layer or layers in the reservoir and may be composed of one or more materials.
  • a baffle in a heavy oil reservoir may, for example, have a permeability that is at least one order of magnitude less than the reservoir matrix permeability, thereby hindering vertical flow in a recovery process.
  • a flow barrier, often referred to as a tight streak in the industry, in a heavy oil reservoir may, for example, have a permeability that is several orders of magnitude less than the reservoir matrix permeability, thereby substantially preventing vertical flow.
  • Tight streaks are often composed of continuous or near continuous layers of shale or mudstone and often follow the bedding planes. They may be a few centimeters to several meters thick with extensive areal extent. Some thick tight streaks may be about Im to 3m thick, and some particularly thick tight streaks may be about 4m to 7m, or even higher. The can pose significant impediments to vertical flow in a reservoir.
  • a baffle may have a permeability in the range of about 100 mD to about 0.1 mD.
  • a baffle having a relatively low permeability of about 10 mD or less would represent a significant vertical flow impediment in such a reservoir.
  • a flow barrier may have a permeability of less than about 0.1 mD, or no effective permeability.
  • Vertical permeability impediments having low to no effective permeability can essentially partition a reservoir into split pay zones. In such cases, hydrocarbon recovery will primarily occur from the pay zone in which a production well is actually located.
  • a recovery process employing one or more substantially horizontal wellbores is enhanced by selectively altering permeability in the reservoir.
  • Vertical permeability is selectively altered by creating a zone of increased permeability at a targeted location or locations in the reservoir.
  • the zone of increased permeability may be created in a region substantially above or below a horizontal wellbore employed in a recovery process.
  • the zone of increased permeability may facilitate the migration of mobile hydrocarbons through a reservoir toward a production well to thereby enhance recovery.
  • the zone of increased permeability may also facilitate the movement of injected materials, such as steam, gas, water, solvents, or polymers, through the reservoir to affect the mobilization or displacement of hydrocarbons in the reservoir.
  • Flowable materials may be drawn into the zone of increased permeability by gravity drainage, pressure differential, or other factors.
  • the zone of increased permeability is created by providing one or more accessory conduits in the reservoir to improve or facilitate the movement of flowable material through the reservoir to thereby enhance recovery.
  • the accessory conduit has one or more portions that extend through the vertical permeability impediment to improve the movement of flowable material therethrough.
  • the conduit may be targeted to select areas of relatively low permeability in the reservoir, thereby creating a higher permeability region(s) to facilitate the movement of flowable materials.
  • the accessory conduit may facilitate the movement of flowable materials from one location to another in a reservoir, or may permit flowable materials to move through a permeability impediment in the reservoir to enhance a recovery process.
  • a method of enhancing a recovery process employing one or more substantially horizontal wellbores in a reservoir having at least one vertical permeability impediment comprises providing at least one accessory conduit in the reservoir thereby creating a zone of increased permeability.
  • the at least one accessory conduit has a horizontal component, although it may also have vertical and lateral components as well.
  • horizontal component it is meant that it extends in a generally horizontal direction in the reservoir along a portion of its length.
  • the conduit travels a horizontal distance in the reservoir, although the conduit may deviate from horizontal along its path and may also have segments or extensions thereof that deviate from horizontal.
  • the conduit extends in a direction substantially parallel to a horizontal wellbore used in the recovery process.
  • the conduit may have one or more portions that extend through a vertical permeability impediment to facilitate movement of flowable materials therethrough during the recovery process.
  • the accessory conduit may be vertically spaced from the one or more horizontal wellbores.
  • the conduit lies substantially above or below the horizontal segment of one or more horizontal wellbores in the reservoir.
  • the one or more horizontal wellbores may include a production well, an injection well, or both.
  • a single substantially horizontal well may serve as both an injection well and a production well.
  • a production well refers to a well in which production materials collect. The production materials may be pumped to the surface from the production well or they may flow into another well for production.
  • Production materials comprise hydrocarbons and may also comprise other flowable materials such as condensed steam, connate water and gas, depending on the application and the reservoir. Hydrocarbons recovered may include conventional oil, natural gas, mobilized bitumen or heavy oil, or combinations thereof.
  • a flowable injection material is injected into the reservoir to aid in mobilizing hydrocarbons through the reservoir.
  • Means of mobilizing hydrocarbons may include, for example, reducing the viscosity of heavy oil or bitumen permitting it to flow by gravity drainage through the reservoir, or providing a drive mechanism to direct the flow of mobile hydrocarbons through a reservoir, or other means.
  • injection materials such as water, gas, steam, solvent, polymers or combinations thereof, may be administered via a substantially horizontal injection well.
  • the accessory conduit is located in a region substantially above an injection well, particularly when applied in a process that relies on gravity drainage.
  • the conduit need not be directly above the well and may optionally be laterally offset therefrom. However, in most cases, it is advantageous to position the conduit in substantially the same vertical plane as the injection well.
  • the conduit creates a zone of increased permeability above the injection well that may facilitate the movement of flowable injection materials across a vertical permeability impediment.
  • the accessory conduit may facilitate the movement of flowable injection material into one or more upper regions of the reservoir, and may further facilitate the flow of production materials from the upper regions of the reservoir toward the production well below.
  • Enhanced movement of flowable materials through a vertical permeability impediment permits fluid communication between previously separated productive formations and thereby enhances the recovery process.
  • Fluid communication refers to the ability of flowable materials, such as fluid, gas, or oil, to move between different locations in a reservoir.
  • the location and profile of the accessory conduit can be optimized by the person skilled in the art having an understanding of the invention described herein. Factors to be considered include, for example, the hydrocarbon recovery process to be utilized, the formation characteristics, the location and characteristics of any vertical permeability impediments in the reservoir, and the location of other wellbores in the system, including any production or injection wells.
  • the term accessory conduit indicates that it is not a primary injection or production wellbore in the recovery process.
  • the recovery process employs a single horizontal production wellbore, such as in primary production of natural gas or conventional oil.
  • the recovery process utilizes a single horizontal wellbore as both an injection well and a production well, such as in cyclic steam stimulation (CSS) and various derivatives thereof.
  • the recovery process utilizes separate injection and production wells, such as in steam-assisted gravity drainage (SAGD), and various derivatives thereof, or in flooding and sweeping processes that involve displacement of hydrocarbons in a reservoir.
  • SAGD steam-assisted gravity drainage
  • the one or more accessory conduits may be drilled from the surface.
  • the one or more accessory conduits may be drilled laterally from another wellbore.
  • the accessory conduit may be drilled laterally from an upper hole section of a deviated injection or production well.
  • drilling a lateral wellbore has a significant economic advantage over drilling a new hole from the surface.
  • the accessory conduit may be drilled while drilling a new production or injection wellbore.
  • an accessory wellbore may be retrofit to a preexisting wellbore.
  • an accessory wellbore is retrofit to a wellbore in a preexisting recovery process to further stimulate recovery from the reservoir.
  • Extraction of bitumen and heavy oil from oil sand reservoirs presents unique challenges due high viscosity, particularly if a heavy oil deposit is buried deep within a reservoir and cannot be surface mined due to the depth of overburden.
  • the aim of an in-situ heavy oil recovery process is to reduce the viscosity of heavy oil in a reservoir to enable it to flow into a well and be produced therefrom.
  • Such recovery processes frequently utilize gravity drainage as an important fluid drive mechanism.
  • Thermal in-situ oil recovery processes utilize heat, typically provided by injection of steam into a reservoir, to reduce the viscosity of the trapped oil and render it mobile. Hydrocarbon solvents or other solubilizing means may also be utilized.
  • SAGD Steam-assisted gravity drainage
  • Roger Butler et al. see, for example, Butler R.M., Thermal Recovery of Oil and Bitumen, GravDrain Inc., Calgary, Alberta, Canada, 1997.
  • SAGD is used commercially to recover heavy oil or bitumen from reservoirs, particularly in the Athabasca region where the in-situ oil viscosity is very high, typically on the order of 1 million centipoises.
  • FIG. 1 illustrates an end view of a typical SAGD system and process of the prior art, in which two substantially horizontal wellbores are positioned in spaced-apart vertical relationship to one another in a hydrocarbon reservoir (10).
  • a first substantially horizontal wellbore positioned near the bottom of the hydrocarbon reservoir serves as a production well (12).
  • a second substantially horizontal well is positioned above the production well (12), in thermal communication therewith, and serves as an injection well (14).
  • the wells are typically drilled as two separate wells from the surface using deviated drilling procedures well know to those skilled in the art.
  • the upper hole sections of the wellbores may extend hundreds to thousands of feet into a reservoir.
  • a steel casing is typically cemented into place to stabilize the upper hole sections of the wellbores.
  • a screened or slotted liner typically lines the substantially horizontal portions of the injection well (14) and production well (12) to provide stability to the wellbores while maintaining fluid communication between the wellbore and the formation.
  • Other completion tools and procedures may also be utilized. The drilling and completion of wellbores for an in situ oil recovery process is very time- consuming and expensive.
  • Equation (1) q is the bitumen production rate, L is the horizontal well length, k is the reservoir effective permeability, g is the acceleration due to gravity, ⁇ is the thermal diffusivity of the reservoir, ⁇ is the reservoir porosity, ⁇ S 0 is the change in oil saturation, h is the drainage height as labeled in FIG. 1, m is parameter dependant upon viscosity- temperature properties of crude oil and v s is the kinematic viscosity of crude at steam temperature.
  • This Equation has proven to be a reasonable approximation of bitumen flow rates in the field for reservoirs with sands that can be characterized as continuous clean sands. For these types of sands it is valid to assume constant permeability of the formation, as in Equation 1.
  • a developing steam chamber will expand vertically in the reservoir until the impediment is encountered, which impediment will inhibit or prevent further vertical expansion of the steam chamber.
  • An exemplary case is illustrated in FIG. 2, wherein two continuous tight streaks (20a and 20b) partition a reservoir (22) vertically into thirds.
  • the steam chamber (26) can only rise to the height of the first tight streak (20a) and then it begins to spread laterally.
  • it is anticipated that approximately one third of the oil in the reservoir will be produced via the production well (28), compared to a similar reservoir with no tight streaks, as shown in FIG. 1.
  • Equation 1 assuming all reservoir properties remain the same except the drainage height, h, which is now h/3, the bitumen production rate would now be &V 3.
  • one method to recover the heavy oil trapped in the pay zones above the tight streaks (30a and 30b) would be to drill an injection well (31) and a production well (32) in each productive zone. Although this is possible, two major disadvantages of drilling complete well pairs in each zone are cost and time. Applying Equation 1, and assuming all three wells pairs produce simultaneously, then the total oil production rate would theoretically be 3 times ⁇ , ; vS, or ⁇ 3 q. The total oil production rate increases but in proportion to the square root of the well count.
  • a significant increase in well pair performance and hydrocarbon recovery can be achieved by creating a zone of increased permeability in a region substantially above the SAGD well pair in a reservoir.
  • the zone of increased permeability may be immediately above the SAGD well pair or may be laterally offset therefrom, so long as the location of the conduit facilitates the recovery process.
  • gravity drainage is utilized as a fluid drive mechanism, such as for heavy oil recovery
  • the zone of increased permeability is ideally provided in a region substantially above (i.e. in substantially the same vertical plane) the production well to facilitate drainage of production material toward the production well.
  • the conduit may be positioned above the injection well.
  • a zone of increased permeability (40) is created in the reservoir (42) substantially above a SAGD well pair (44, 45).
  • the zone of increased permeability (40) is created by providing an accessory conduit (48) in the reservoir.
  • the conduit (48) has portions extending through two vertical permeability impediments (49a and 49b) thereby increasing fluid communication between the pay zones.
  • the vertical permeability impediments (49a and 49b) are above the SAGD well pair (44, 45).
  • one or more vertical permeability impediments may be located between the production well and the injection well, in which case a conduit could be positioned between the production and injection wells to facilitate fluid communication therebetween.
  • a suitable location and profile for the one or more accessory conduits can be determined by the skilled person. In subsequent sections, various exemplary conduit profiles will be described. [0060] The removal of reservoir material to create an accessory conduit (48) above the SAGD well pair (44, 45) effectively creates a 'chimney zone' of increased permeability to facilitate the movement of flowable materials through the reservoir.
  • the chimney zone allows the steam to rise upwards (white arrow) through the tight streaks toward the top of the reservoir and, also allows the hot bitumen to drain downward (black arrows) to the production well (44). Fluids drawn into the accessory conduit (48) will percolate through the permeable formation material in a gravity-assisted manner toward the production well (44).
  • the accessory conduit (48) permits fluid communication between three pay zones of a reservoir formerly separated by substantially impermeable tight streaks.
  • the accessory conduit preferably extends in a generally horizontal direction, along at least a portion of its length, substantially parallel a horizontal wellbore utilized in the recovery process.
  • the conduit preferably has a portion that extends substantially above or below, including laterally offset from, a horizontal wellbore in the reservoir, such as an injection or production well, to facilitate movement of flowable materials through the reservoir.
  • the accessory conduit is preferably substantially separated from the horizontal wellbore by permeable formation material.
  • embodiments of the present invention can significantly enhance recovery process performance in a reservoir having one or more vertical permeability impediments.
  • the method and system of the invention provide an effective new means of overcoming a common problem in the industry.
  • SAGD is exemplified above, a skilled person will appreciate that the method and system of the present invention can be applied to any suitable recovery process utilizing one or more horizontal wellbores.
  • the skilled person will further appreciate that there are many different methods that can be utilized to create the one or more accessory conduits to achieve an increase in vertical permeability in the reservoir to thereby enhance recovery process performance. Since the accessory conduit is neither an injection well nor a production well per se, the conduit does not have to meet the requirements (structural, completion, location, etc) of an injection or a production well, which offers significant freedom in designing the accessory conduit profile in order to optimize recovery process performance for a particular reservoir. There is also more freedom in selection of drilling equipment and tools.
  • one or more accessory conduits may be drilled form the surface or may be drilled from an upper hole section of an injection or production well. If drilled as a lateral, the lateral conduit may be sealed from the injection or production well from which it was drilled. Although it may not be necessary to complete the conduits with any mechanical devices, the conduits may be completed if desired, utilizing known tools and methods. For instance, various types of slotted liners or sand screens could optionally be placed in the conduits to ensure sand does not collapse into and plug the holes. Alternatively, the conduits could be packed with high permeability gravel or 'frac sand'.
  • the diameter of the conduit in the reservoir may be increased by downhole tools, such as reamers, high pressure water jetting bits, section mills with expandable cutting arms, or the like.
  • downhole tools such as reamers, high pressure water jetting bits, section mills with expandable cutting arms, or the like. The latter two techniques would be particularly effective in soft shallow formations at increasing the size and extent of the chimney zone.
  • the accessory conduit can have any desired profile that facilitates the movement of flowable materials through the reservoir to enhance recovery process performance.
  • a suitable well profile for a particular application may be selected by a person skilled in the art.
  • Exemplary methods of providing an accessory conduit include, but are not limited to, drilling one or more conduits from the surface, drilling one or more lateral conduits from an existing wellbore, drilling multiple lateral conduits, drilling one or more conduits with lateral offshoots, drilling one or more conduits and perforating the main conduit, drilling one or more conduits and fracturing the main conduit, and variations, modifications, extensions and combinations thereof. Certain exemplary embodiments will be described further below.
  • the accessory conduit may be drilled substantially in the horizontal plane of a vertical permeability impediment to carve a substantially horizontal channel through the impediment to permit vertical movement of flowable materials therethrough. It is understood that the vertical permeability impediment will follow dips and other natural deviations from the horizontal plane but it will nonetheless extend in a generally horizontal plane.
  • the accessory conduit may follow a substantially straight path through the substantially horizontal plane of the vertical permeability impediment or it may follow a deviated path, such as a horizontally undulating path.
  • FIG. 5 is a side (a), top (b) and end (c) view of an undulating accessory conduit (50) drilled laterally from an upper hole section of an injection well (51) to enhance vertical permeability above a well pair (51, 52).
  • the accessory conduit (50) intersects two tight streaks (53, 54) in the reservoir (55).
  • the conduit extends in a generally horizontal direction above the well pair (51, 52) and has both horizontal and vertical components.
  • a key advantage of a lateral conduit design is that it can be drilled at relatively low incremental cost when drilled in conjunction with the steam injection well (51).
  • the lateral hole may be drilled before or after the casing is set for the injection well (51). It is important to note that even a small diameter conduit has an effective permeability orders of magnitude greater than the original reservoir sand, since sand is removed from the reservoir to create it.
  • a sinusoidal wellbore profile has been drilled in the past as a multi-penetration pilot (MPP) hole for the purposes of reservoir evaluation (see Lee, Extending rotary steerable capabilities to locate thin, complex sands. SPE/IADC Drilling Conference, Netherlands, 2005, SPE/IADC 92152).
  • MPP multi-penetration pilot
  • FIG. 6 shows another embodiment, where multiple undulating conduits (60, 61) are drilled laterally from an injection well (62) in a reservoir (63) having two tight streaks (65, 66). Such a configuration may be advantageous if more frequent reservoir penetrations are required than can be delivered with a single conduit. Note that the conduits can be laterally offset from the well pair (62, 64) and still be effective.
  • FIG. 7 shows an alternative configuration where two stacked undulating lateral conduits (70, 71) are used to target two separate tight streaks (72, 73) in the reservoir (74) above a well pair (75, 76).
  • FIG. 8 shows a multi-lateral conduit (80) drilled in a reservoir (81) having two tight streaks (82, 83).
  • the multi-lateral conduit (80) comprises one main horizontal lateral drilled substantially parallel to the SAGD well pair (84, 85) and multiple short deviated laterals extending through the tight streaks (82, 83) from the main lateral.
  • the short laterals could also be vertical or any other suitable orientation, length or shape.
  • the short laterals are extensions of the conduit and provide the flow pathways through the tight streaks.
  • These short laterals would preferably be placed in a region substantially above the SAGD wells (84, 85), i.e. above the SAGD well pair in substantially the same vertical plane, since this is the region where they will typically be most effective in a heavy oil recovery process utilizing steam or solvent injection and relying on gravity drainage.
  • chimney zones above the injection well could be created by drilling a series of vertical wells from the surface that penetrate the tight streaks. These wells could also facilitate access to upper reservoir zones for reservoir surveillance purposes and improve the drainage of upper zone bitumen by supplemental injection of steam, gas, solvents and/or polymers. Supplemental production from vertical wells is also possible by producing mobilized bitumen outside the vicinity of the SAGD horizontal well pair, for instance, due to heat conduction from a zone below the tight streak.
  • FIG. 9 shows an embodiment having two lateral accessory conduits (90, 91) drilled in close proximity to two tight streaks (92, 93) in a reservoir (94).
  • the conduits are located above the well pair (95, 96).
  • Short vertical holes are generated from the main laterals using perforating technologies. Perforations do not typically penetrate more than about a meter or, using special tools, a few meters, into a reservoir, so this configuration would ideally place the main lateral in close proximity to the tight streak.
  • Perforations or similar high permeability tunnels emanating from the main accessory conduit could be generated using a variety of techniques such as explosive charges, lance perforating technologies, side wall coring or water jets.
  • An advantage of this approach is that potentially many more closely spaced holes could be placed in a plane above the SAGD wells to increase the vertical permeability above the wells.
  • FIG. 10 again shows a reservoir (100) with two tight streaks (101, 102).
  • a lateral accessory conduit (103) is shown with spaced fractures (106) extending therefrom in a vertical plane oriented perpendicular to the SAGD wells (104, 105).
  • the fractures may be packed with high permeability proppant to ensure effective permeability after fracturing.
  • a similar approach could be utilized with fractures oriented in a vertical plane parallel to the SAGD wells. However, such horizontal fractures would typically need to be employed from a vertical wellbore.
  • an accessory conduit it may be desirable to increase the diameter of an accessory conduit beyond that achievable by normal drilling procedures. For instance, in situations where a tight streak is very thick or a large diameter accessory conduit is desired.
  • high water pressure jetting bits with variable or adjustable jetting angle could be used to progressively expand the diameter of the precondition hole while circulating out the cuttings.
  • Such jets can also be used to create perforation- like tunnels that emanate from a main accessory conduit, similar to those shown in FIG. 9.
  • an accessory conduit could be a tunnel or cavern created through the plane of the tight streak, for example, by sequentially collapsing and cleaning out formation rock.
  • Acids such as hydrofluoric acids, are commonly employed to dissolve some types of rock, and hydrochloric acids are very effective in carbonates.
  • chemical or acid treatments can be used to create high permeability flow paths through the impediments.
  • the acid could be administered via the accessory conduit and would penetrate the surrounding rock to create tunnels or paths through the vertical permeability impediment. This method would have particular application in carbonate reservoirs or in reservoirs with carbonate tight streaks.
  • data can be acquired and analyzed from new or existing wells in the reservoir to determine the mechanical properties of the reservoir and the location of any vertical permeability impediments.
  • the data and information obtained may then be utilized in carrying out the methods of the invention.
  • the production well is the first well drilled in the system and is utilized to acquire reservoir data to determine the location of vertical permeability impediments in the reservoir before drilling an injection well or an accessory conduit.
  • the accessory conduit includes any lateral offshoots, perforations, fractures or the like extending therefrom to increase vertical permeability through a vertical permeability impediment.
  • the accessory conduit may have vertical components such as undulations, lateral offshoots, perforations, fractures or the like, it is said to extend in a generally horizontal direction since the end of the conduit will be located a horizontal distance from the beginning of the conduit although possibly in a different horizontal plane.
  • Embodiments of the invention may be applied in conventional light oil or natural gas reservoirs as well to enhance horizontal well utilization.
  • Horizontal wells offer significant potential to maximize production or injection rates. They can also reduce the surface environmental disturbance, or "footprint", of onshore operations and minimize well accommodation space of offshore platforms.
  • horizontal well applications are limited by vertical permeability quality and compartmentalization. Operators sometimes try to improve recovery by drilling high angle production or injection wells, or 'S' wells, in order to penetrate multiple stratigraphic flow units.
  • the method and system may be applied in continuous reservoirs, as well as complex stratified reservoirs and reservoirs segmented by one or more vertical permeability impediments.
  • the effective vertical permeability of a conventional oil or gas reservoir may be selectively altered to facilitate the movement of flowable material through the reservoir to enhance recovery.
  • the effective reservoir permeability is increased by providing at least one accessory conduit in the reservoir.
  • the reservoir may comprise one or more vertical permeability impediments.
  • the accessory conduit may be positioned substantially above, below, lateral or distal to a production well or injection well in the oil or gas reservoir, depending on the particular application and reservoir characteristics.
  • Figures 11 to 14 show particular exemplary embodiments where an altered permeability zone is created substantially within the vertical plane of a horizontal production or injection well in the reservoir.
  • Additional zones of increased permeability can be created at other locations in the reservoir, if desired.
  • the altered permeability zone is beneficial to improve reservoir access and sweep of injection fluids.
  • the reservoir engineer has the option to control the extent of the altered permeability zone and placement of the horizontal wells to best fit the specific reservoir geology and depletion plan.
  • the design may include a mechanism to close off flow and restore the vertical permeability impediment. Early breakthrough of an injected fluid to the producer is an example of where it would be desirable to reverse the altered permeability zone. This could be achieved, for example, by cement squeeze of the preconditioning drill holes used to create the altered permeability zone in the described embodiments.
  • FIG. 11 shows an embodiment wherein a zone of increased permeability is created in a region substantially below a production well (140) in a reservoir vertical permeability impediments (141, 142).
  • the zone of increased permeability is created by providing an accessory conduit (143) that extends through the two vertical permeability impediments (141, 142) to facilitate flow through the reservoir (black arrows) toward the production well (140).
  • Such embodiment may be utilized, for example, for improving primary natural gas production, primary conventional oil production, or water-drive conventional oil production.
  • conduit (143) to facilitate vertical flow toward the production well (140)
  • lateral flow in the reservoir is also enhanced.
  • various conduit profiles could be used.
  • FIG. 12 shows an embodiment wherein a zone of increased permeability is created in a region substantially above a production well (150) in a reservoir.
  • the zone of increased permeability is created by providing an accessory conduit (153) having portions that extend through two vertical permeability impediments (151, 152) in the reservoir to facilitate flow through the reservoir (black arrows) toward the production well (150).
  • Such embodiment may be used, for example, for improving primary conventional oil production or top-gas driven production.
  • FIG. 13 shows a system for gas flooding, in accordance with an embodiment of the invention, wherein zones of increased permeability are created below a gas injection well (160) and above a production well (161) in the reservoir.
  • the zones of increased permeability are created by providing a first accessory conduit (164) below the injection well (160) and a second accessory conduit (165) above the production well (161), each having portions that extend through two vertical permeability impediments (162, 163) in the reservoir to facilitate the flow of materials through the reservoir toward the production well (161).
  • Various conduit profiles could be used.
  • FIG. 14 shows a system for liquid flooding, in accordance with an embodiment of the invention, wherein zones of increased permeability are created above a liquid injection well (170) and below a production well (171) in the reservoir.
  • the zones of increased permeability are created by providing a first accessory conduit (174) above the injection well
  • a reservoir having two vertical permeability impediments is exemplified. This is merely for consistency and ease in of comparison. It is understood that the invention may be applied in a substantially continuous reservoir or a reservoir having one or multiple vertical permeability impediments. A skilled person, having an understanding of the invention as described herein, will be able to extend and apply the concepts of the invention to various reservoirs and various recovery processes. The methods and systems of the invention are particularly useful for enhancing a recovery process utilizing one or more horizontal wellbores in a reservoir having one or more vertical permeability impediments.
  • Examples of in-situ heavy oil recovery processes to which embodiments of the present invention may be applied include, but are not limited to, steam-assisted gravity drainage (SAGD), cyclic steam stimulation (CSS), steam flooding and various derivatives thereof, such as solvent-assisted SAGD (SA-SAGD or ES-SAGD), steam and gas push (SAGP), combined vapor and steam extraction (SAVEX), liquid addition to steam enhancing recovery (LASER), vapor extraction (VAPEX), constant steam drainage (CSD), and cyclic solvent process (CSP), as well as various flooding processes often utilizing polymers to enhance displacement.
  • SAGD steam-assisted gravity drainage
  • CSS cyclic steam stimulation
  • SAGP solvent-assisted SAGD
  • SAGP steam and gas push
  • SAVEX combined vapor and steam extraction
  • LASER liquid addition to steam enhancing recovery
  • VAPEX vapor extraction
  • CSP cyclic solvent process
  • in-situ conventional hydrocarbon recovery processes to which embodiments of the present invention may be applied include, but are not limited to, primary production of light oil or natural gas, was well as flooding or sweeping processes, employing one or more horizontal wellbores, often utilizing polymers to enhance displacement. These recovery processes can employ one or more horizontal wellbores.
  • FIG. 15 shows the 2D results of a reservoir simulation modeling a typical SAGD process in a continuous oil sands reservoir with Athabasca type properties and no vertical permeability impediments. Temperature and gas saturation in the reservoir are shown for 1000 days and 2000 days of steam injection. The injection and production wells are located near the bottom left corner of each block but are not shown. The results illustrate the development of the steam chamber (labeled "Hot") over time during the SAGD process, with corresponding increase in gas saturation where mobilized bitumen has drained from the heated area into the production well.
  • Hot steam chamber
  • FIG. 16 shows the 2D results of a reservoir simulation modeling a SAGD process in a partitioned reservoir with Athabasca type properties and two vertical permeability impediments.
  • the SAGD well pair is located near the bottom left corner of each block but is not shown.
  • the impediments were designed as substantially impermeable tight streaks, allowing conductive heat transfer only, that split the pay zone roughly into thirds.
  • a zone of increased permeability was created above the SAGD well pair to facilitate the rise of steam and the drainage of heavy oil through the reservoir.
  • the altered permeability zone labeled as such in the figure, modeled a conduit having a vertical height sufficient to extend through the tight streaks and permit vertical communication between the pay zones within a narrow region above the well pair.
  • the numerical permeability selected for the conduit was of sufficient magnitude to approximate the effective permeability of a 0.6 m x 0.6 m simulation grid block penetrated by a wellbore. Sensitivity runs showed that the process was insensitive to the absolute value of the altered permeability zone in the simulator, provided it was sufficiently large relative to the matrix sand permeability. Any effective increase in permeability of the barriers in the region above the SAGD well pair would be expected to enhance the process.
  • FIG. 17 shows the graphical results of a comparison of water and oil volumes for the two reservoir simulations described above.
  • the dashed lines represent water and oil volumes for a typical SAGD operation in a reservoir with no tight streaks.
  • the solid lines represent water and oil volumes for an enhanced SAGD operation carried out in a reservoir having two tight streaks wherein a zone of increased permeability is provided above the SAGD well pair.
  • the oil rates were similar for the two cases for the first 3 years and the final cumulative oil volumes recovered were comparable. This is a significant finding since recovery would generally be much lower in the reservoir with tight streaks. Water rates between the two models were very similar, which is indicative of the steam rates as well.
  • Further reservoir simulations demonstrated practical application of the method of the invention in complex heavy oil reservoirs and reservoirs having top gas or bottom water.
  • CSS cyclic steam stimulation
  • Horizontal wells are increasingly being used to reduce the cost of field development.
  • the horizontal wells are typically located at the base of the effective pay zone and therefore oil recovery is vulnerable to vertical permeability impediments.
  • a simulation model based on typical properties of the Cold Lake Clearwater formation was constructed. Referring to FIG. 18, the simulation was designed to mimic two adjacent horizontal wells (white) completed with spaced limited entry perforations (LEP), as discussed in SPE Paper 50429, "Targeted Steam Injection Using Horizontal Wells with Limited Entry Perforations", T. Boone, D. Youck & S. Sun, 1998. The location of the LEP points for the two adjacent horizontal wells are at the vertical corners of the 3D block in the plane of the horizontal wells (white), as is evident by the gas saturation patterns. Two adjacent wells were used to reflect the staggered steam scheduling commonly implemented in a CSS operation.
  • LEP spaced limited entry perforations
  • FIG. 19 shows the graphical results of a comparison of water and oil volumes for the CSS reservoir simulations described above.
  • the dashed lines represent water and oil volumes for a typical CSS operation in a split pay reservoir.
  • the solid lines represent water and oil volumes for an enhanced CSS operation in a split pay reservoir, carried out in accordance with an embodiment of the invention, wherein a zone of increased permeability was provided above the CSS well, which penetrated a tight streak. Cumulative oil recovery was significantly increased in the presence of the altered permeability zone, without a significant increase in water volume.

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Production Of Liquid Hydrocarbon Mixture For Refining Petroleum (AREA)

Abstract

La présente invention concerne d'une manière générale un système et un procédé d'amélioration d'un processus de récupération employant un ou plusieurs trous de forage sensiblement horizontaux. Plus particulièrement, la présente invention porte sur un procédé et un système d'amélioration d'un processus de récupération employant un ou plusieurs trous de forage horizontaux par la fourniture d'une zone de perméabilité accrue dans un réservoir d'hydrocarbures pour faciliter un mouvement vertical de matières capables de s'écouler à travers le réservoir, permettant ainsi d'améliorer le processus de récupération. Dans certains modes de réalisation, le réservoir comprend un ou plusieurs obstacles verticaux à la perméabilité.
PCT/US2009/067010 2009-01-29 2009-12-07 Procédé et système d'amélioration d'un processus de récupération employant un ou plusieurs trous de forage horizontaux WO2010087898A1 (fr)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US13/132,868 US20110272153A1 (en) 2009-01-29 2009-12-07 Method and System For Enhancing A Recovery Process Employing One or More Horizontal Wellbores

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CA2,651,527 2009-01-29
CA2651527A CA2651527C (fr) 2009-01-29 2009-01-29 Methode et systeme visant a ameliorer un procede de recuperation utilisant un puits de forage horizontal ou davantage

Publications (1)

Publication Number Publication Date
WO2010087898A1 true WO2010087898A1 (fr) 2010-08-05

Family

ID=42371417

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/US2009/067010 WO2010087898A1 (fr) 2009-01-29 2009-12-07 Procédé et système d'amélioration d'un processus de récupération employant un ou plusieurs trous de forage horizontaux

Country Status (3)

Country Link
US (1) US20110272153A1 (fr)
CA (1) CA2651527C (fr)
WO (1) WO2010087898A1 (fr)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012134876A1 (fr) * 2011-03-29 2012-10-04 Conocophillips Company Doubles points d'injection en technologie sagd
US8893788B2 (en) 2010-09-20 2014-11-25 Alberta Innovates—Technology Futures Enhanced permeability subterranean fluid recovery system and methods
WO2015199799A2 (fr) 2014-05-28 2015-12-30 Exxonmobil Upstream Research Company Procédé de formation de trous de ver à direction contrôlée dans une formation souterraine

Families Citing this family (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2749437C (fr) * 2011-08-17 2018-11-27 Imperial Oil Resources Limited Ressource de recolte a partir d'intervalles variables
US9091159B2 (en) * 2011-12-08 2015-07-28 Fccl Partnership Process and well arrangement for hydrocarbon recovery from bypassed pay or a region near the reservoir base
RU2485295C1 (ru) * 2012-01-11 2013-06-20 Открытое акционерное общество "Татнефть" имени В.Д. Шашина Способ разработки продуктивного пласта с низкопроницаемым участком
US10400561B2 (en) * 2012-01-18 2019-09-03 Conocophillips Company Method for accelerating heavy oil production
US10017995B2 (en) 2012-08-13 2018-07-10 Exxonmobil Upstream Research Company Penetrating a subterranean formation
WO2014028497A2 (fr) * 2012-08-16 2014-02-20 Bp Corporation North America, Inc. Utilisation d'un accès souterrain pour améliorer la distribution de vapeur dans des opérations de drainage par gravité assisté par la vapeur
US9945218B2 (en) 2012-08-23 2018-04-17 Exxonmobil Upstream Research Company Sytems and methods for re-completing multi-zone wells
CA2891477C (fr) * 2012-12-21 2017-12-05 Halliburton Energy Services, Inc. Puits d'injection et procede pour le forage et la completion
US20140182834A1 (en) * 2013-01-02 2014-07-03 Era Exploration LLC System for developing high pressure shale or tight rock formations using a profusion of open hole sinusoidal laterals
WO2015049125A2 (fr) * 2013-10-01 2015-04-09 Wintershall Holding GmbH Procédé d'extraction de pétrole présent dans un gisement de pétrole souterrain au moyen d'un puits de forage servant simultanément de puits d'injection et de puits de production
US20150096748A1 (en) * 2013-10-07 2015-04-09 Bp Corporation North America Inc. Systems and methods for enhancing steam distribution and production in sagd operations
CA2852766C (fr) * 2014-05-29 2021-09-28 Chris Elliott Entrainement a dilatation induite thermiquement dans les reservoirs d'hydrocarbures
US9739125B2 (en) * 2014-12-18 2017-08-22 Chevron U.S.A. Inc. Method for upgrading in situ heavy oil
CA2972203C (fr) 2017-06-29 2018-07-17 Exxonmobil Upstream Research Company Solvant de chasse destine aux procedes ameliores de recuperation
CA2974712C (fr) 2017-07-27 2018-09-25 Imperial Oil Resources Limited Methodes ameliorees de recuperation d'hydrocarbures visqueux d'une formation souterraine comme etape qui suit des procedes de recuperation thermique
CA2978157C (fr) 2017-08-31 2018-10-16 Exxonmobil Upstream Research Company Methodes de recuperation thermique servant a recuperer des hydrocarbures visqueux d'une formation souterraine
CA2983541C (fr) 2017-10-24 2019-01-22 Exxonmobil Upstream Research Company Systemes et methodes de surveillance et controle dynamiques de niveau de liquide
RU2732936C2 (ru) * 2019-01-29 2020-09-24 Публичное акционерное общество "Татнефть" имени В.Д. Шашина Способ разработки продуктивного низкопроницаемого пласта
CN112392472B (zh) * 2019-08-19 2022-08-02 中国石油天然气股份有限公司 确定页岩与邻近油层一体化开发方式的方法及装置
CN110821462B (zh) * 2019-10-16 2022-03-25 新疆中凌工程技术有限公司 一种sagd控制井储层具有夹层水平井组尾端动用方法
CN111101936B (zh) * 2019-12-30 2023-06-30 中国地质大学(武汉) 一种模拟垮塌堆积储集体底水驱动采油的实验装置

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4766958A (en) * 1987-01-12 1988-08-30 Mobil Oil Corporation Method of recovering viscous oil from reservoirs with multiple horizontal zones
US6029747A (en) * 1995-08-14 2000-02-29 Tuboscope I/P Inc. Through-tubing lateral re-entry
US20030141068A1 (en) * 2001-04-24 2003-07-31 Pierre De Rouffignac Eric In situ thermal processing through an open wellbore in an oil shale formation
US6708764B2 (en) * 2002-07-12 2004-03-23 Cdx Gas, L.L.C. Undulating well bore

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7360595B2 (en) * 2002-05-08 2008-04-22 Cdx Gas, Llc Method and system for underground treatment of materials
CA2672487C (fr) * 2006-12-13 2013-12-31 Stephen Richard Larter Preconditionnement d'un reservoir de champ petrolifere
US7909093B2 (en) * 2009-01-15 2011-03-22 Conocophillips Company In situ combustion as adjacent formation heat source

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4766958A (en) * 1987-01-12 1988-08-30 Mobil Oil Corporation Method of recovering viscous oil from reservoirs with multiple horizontal zones
US6029747A (en) * 1995-08-14 2000-02-29 Tuboscope I/P Inc. Through-tubing lateral re-entry
US20030141068A1 (en) * 2001-04-24 2003-07-31 Pierre De Rouffignac Eric In situ thermal processing through an open wellbore in an oil shale formation
US6708764B2 (en) * 2002-07-12 2004-03-23 Cdx Gas, L.L.C. Undulating well bore

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8893788B2 (en) 2010-09-20 2014-11-25 Alberta Innovates—Technology Futures Enhanced permeability subterranean fluid recovery system and methods
WO2012134876A1 (fr) * 2011-03-29 2012-10-04 Conocophillips Company Doubles points d'injection en technologie sagd
US9739123B2 (en) 2011-03-29 2017-08-22 Conocophillips Company Dual injection points in SAGD
WO2015199799A2 (fr) 2014-05-28 2015-12-30 Exxonmobil Upstream Research Company Procédé de formation de trous de ver à direction contrôlée dans une formation souterraine
US9617839B2 (en) 2014-05-28 2017-04-11 Exxonmobil Upstream Research Company Method of forming directionally controlled wormholes in a subterranean formation

Also Published As

Publication number Publication date
US20110272153A1 (en) 2011-11-10
CA2651527A1 (fr) 2010-07-29
CA2651527C (fr) 2012-12-04

Similar Documents

Publication Publication Date Title
CA2651527C (fr) Methode et systeme visant a ameliorer un procede de recuperation utilisant un puits de forage horizontal ou davantage
US7621326B2 (en) Petroleum extraction from hydrocarbon formations
US5860475A (en) Mixed well steam drive drainage process
CA2046107C (fr) Methode de recuperation d'hydrocarbures dans un puits horizontal decale lateralement et verticalement
US7422063B2 (en) Hydrocarbon recovery from subterranean formations
CA2806173C (fr) Integrite mecanique d'un puits de forage pour pyrolyse in situ
US10030491B2 (en) Method for increasing gas recovery in fractures proximate fracture treated wellbores
CA2846485C (fr) Techniques de recuperation d'huile d'aval-pendage pour exploitation sur place
US20110005762A1 (en) Forming Multiple Deviated Wellbores
WO2011020998A2 (fr) Procédé d'amélioration des performances d'injection d'eau à l'aide de ruptures de barrière et de dispositifs de régulation d'écoulement entrant
Strobl Integration of steam-assisted gravity drainage fundamentals with reservoir characterization to optimize production
Sheng Cyclic steam stimulation
Roy et al. Design and execution of BP’s first 15K open hole multi stage completion system in the Sultanate of Oman
Suranto et al. Smart completion design in cyclic steam stimulation process: an alternative for accelerating heavy oil recovery
Furui et al. Optimization of horizontal well-completion design with cased/perforated or slotted liner completions
Malik et al. Steamflood with vertical injectors and horizontal producers in multiple zones
Abzaletdinov et al. A fishtail well design for cyclic steam injection—A case study from Yarega heavy oil field in Russia
Bodnar et al. First Horizontal Water Injectors in Prudhoe Bay Field, Alaska
RU2211319C1 (ru) Способ разработки месторождений углеводородов
CA2854751C (fr) Procede ameliore de recuperation de petrole par drainage par gravite au moyen de vapeur utilisant des puits de production multilateraux ou une direction d'ecoulement commune
Canbolat et al. Experimental and numerical investigation of mining assisted heavy oil production for the Bati Raman field, Turkey
CA3108149C (fr) Procede de developpement d'un reseau de fractures et methode de recuperation d'hydrocarbure
Otott Jr History of advanced recovery technologies in the Wilmington field
Klovning Simulation of Wells with Fishbones using ECLIPSE
Eng II et al. Ministry of Higher Education and Scientific Research Misan University College of Engineering Petroleum Engineering Dep.

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 09839456

Country of ref document: EP

Kind code of ref document: A1

DPE1 Request for preliminary examination filed after expiration of 19th month from priority date (pct application filed from 20040101)
NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 09839456

Country of ref document: EP

Kind code of ref document: A1