WO2010077147A1 - A method of preparing a bulk ship having at least three holds - Google Patents

A method of preparing a bulk ship having at least three holds Download PDF

Info

Publication number
WO2010077147A1
WO2010077147A1 PCT/NO2009/000446 NO2009000446W WO2010077147A1 WO 2010077147 A1 WO2010077147 A1 WO 2010077147A1 NO 2009000446 W NO2009000446 W NO 2009000446W WO 2010077147 A1 WO2010077147 A1 WO 2010077147A1
Authority
WO
WIPO (PCT)
Prior art keywords
hold
sand
slurry
pipe
bulk ship
Prior art date
Application number
PCT/NO2009/000446
Other languages
French (fr)
Inventor
Tore Hansen-Tangen
Original Assignee
Viking Dredging As
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Viking Dredging As filed Critical Viking Dredging As
Publication of WO2010077147A1 publication Critical patent/WO2010077147A1/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B27/00Arrangement of ship-based loading or unloading equipment for cargo or passengers
    • B63B27/24Arrangement of ship-based loading or unloading equipment for cargo or passengers of pipe-lines
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B27/00Arrangement of ship-based loading or unloading equipment for cargo or passengers
    • B63B27/29Other loading or unloading equipment involving a continuous action, not provided in groups B63B27/22 - B63B27/28

Definitions

  • This invention relates to a method of preparing a bulk ship having at least three holds. More particularly, it relates to a method of preparing a bulk ship having at least three holds for sand transport and fluidized unloading.
  • TSHD Trailing Suction Hopper Dredgers
  • vessels of the type mentioned are not particularly suitable for carrying large quantities of mass over longer distances and not, in particular, when transport across open sea areas comes into question.
  • the reason for this is of related to economy, given that these vessels are relatively expensive to build and operate, and also due to their relatively limited carrying capacity.
  • US patent 3445008 describes a method and device wherein the lower portion of the hold of the vessel is filled with water prior to pumping out water and mass.
  • Transport of mass in holds generally requires that the hold must be closed, and that the cargo must be classified as dry during transport in the open sea.
  • patent application NO 19986101 describes an unloading device to be placed on the surface of the cargo, the device of which is structured in a manner allowing it to fluidize and pump out the cargo.
  • the unloading capacity of such a solution has proven insufficient.
  • the object of the invention is to remedy or reduce at least one of the disadvantages of the prior art.
  • a method of preparing a bulk ship having at least three holds for sand transport and fluidized unloading comprises: - disposing, within a utility hold, fluidizing pipes having inflow openings and also a slurry inlet for fluidized sand; and
  • the pumps are located at a level of height near the floor of the utility hold.
  • the slurry pump may be positioned near the slurry inlet. This reduces cavitation, which would otherwise take place at a substantial degree in the pumps.
  • the outflow of slurry to the slurry pump is facilitated by virtue of the static pressure from the sand, which is located above the slurry in the utility hold, creating a pressure on the slurry.
  • water may flow in from the water inlet and through the inflow openings, which may be comprised of nozzles, so as to fluidize the sand located closest to the floor of the utility hold - frequently termed the tank top.
  • inflow openings may be comprised of nozzles, so as to fluidize the sand located closest to the floor of the utility hold - frequently termed the tank top.
  • fluidizing pipes having inflow openings may also be disposed on the walls of the utility hold, or at different levels of height in the utility hold.
  • the method may also comprise disposing air injection pipes in the utility hold, preferably near the floor thereof.
  • the air injection pipes may be provided with air injection openings, such as nozzles.
  • the air injection pipe is connected to a compressor, typically via a pressure tank.
  • a bulk ship may not be filled up with sand in all the holds, given that the carrying capacity of the bulk ship would be exceeded. For this reason, it is also appropriate to use e.g. every other hold for technical equipment which, in addition to the pumps and a potential compressor, may comprise valves and control components.
  • injection pipes for water to the slurry pipe may also be disposed on the inlet side of the slurry pump.
  • the equipment in one hold may serve two adjacent holds.
  • the fluidized material may be unloaded by allowing it to flow into the slurry inlet and onwards via the slurry pump and the unloading pipe.
  • the method may further comprise allowing the unloading pipe to end outside the bulk ship when the sand is to be unloaded from the bulk ship, or connecting the unloading pipe to a transport pipe when the fluidized sand is to be delivered at a distance from the bulk ship, for example onshore.
  • a ship for transport of sand is normally loaded with fluidized or very wet sand typically excavated from the seabed near the loading site.
  • the sand must be drained in order to be classified as dry during the transport.
  • the method may comprise disposing at least one drainage column for drainage of the sand in the utility hold.
  • a drainage column of this type may be comprised of a pipe having a number of openings in the pipe wall along the pipe, each opening being screened in such a way that water may enter through the opening, whereas settled sand covers the screen and thus prevent significant quantities of sand from entering into the drainage column.
  • the method may further comprise connecting the drainage column to the slurry pump for pumping out water from the surface of the sand.
  • Fig. 1 shows, in cross-section, a bulk ship in accordance with the invention during loading
  • Fig. 2 shows a plan view of a segment of the hold of the bulk ship
  • Fig. 3 shows, in perspective, details of the utility hold of the bulk ship, wherein the extent of the utility hold is indicated by means of dashed lines;
  • Fig. 4 shows, on a larger scale, a section through a drainage column.
  • the reference numeral 1 represents a bulk ship comprising several holds 2, at least one thereof being used as a utility hold 4.
  • the bulk ship 1 is moored next to a dredger 6, where sand in fluidized form flows from the dredger 6 and into the utility hold 4 via a filling pipe 8.
  • the utility hold 4 of the bulk ship 1, near the floor - tank top - thereof, is provided with a number of fluidizing pipes 10 having inflow openings 12.
  • the fluidizing pipes 10 e'xtend horizontally in the longitudinal direction of the bulk ship 1 and are connected to a manifold 14.
  • the manifold 14 Via a first water valve 16, the manifold 14 is connected to a water pump 18 that receives water from a water inlet 20, see figure 2.
  • the water inlet 20 may comprise a sea chest (not shown) .
  • the water pump 18 is positioned in a hold 2 adjacent to the utility hold 4 and is designed in a manner allowing it supply water, via a second water valve 22, to another adjacent utility hold 4. In 5 figure 2, the second water valve 22 is hidden underneath the water pump 18.
  • a portion of the fluidizing pipes 10 is placed on the walls 24 of the utility hold 4.
  • a number of air injection pipes 26 having air injection o openings 28 are disposed near the floor of the utility hold 4.
  • the air injection pipes 26 communicate with a pressure tank 30 located in an adjacent hold 2 relative to the utility hold 4.
  • a slurry inlet 34 in the utility holds 4 is connected to the inlet of a slurry pump 38.
  • the slurry pump 38 which is placed in a hold 2 adjacent to the utility hold 4, is connected to an unloading pipe 40.
  • the unloading pipe 40 ends in the sea next to the bulk ship 1.
  • An intermediate pipe 42 is connected between the manifold 14o and the inlet of the slurry pump 38.
  • the aim is to be able to adjust the specific gravity of the fluidized sand before entering into the slurry pump 38 and by supplying additional water via the intermediate pipe 42.
  • Three drainage columns 44 are disposed in the utility hold 4.5
  • the drainage columns 44 are connected, at their lower portions, to a drainage pipe 46 which, via a drainage valve 48, is connected to the slurry pump 38.
  • the drainage columns 44 comprise a pipe 50 having a number of openings 52 in the pipe wall along the longitudinal extento thereof, see figure 4.
  • a screen 54 which is tight at the top and open at the bottom, surrounds the pipe 50 at the openings 52, whereby an annular space 56 is formed between the screen 54 and pipe 50.
  • the sand 60 settles in the utility hold 4.
  • the slurry valve 36 is closed and the drainage valve 48 is open.
  • the excess water 58 is drained via the drainage columns 44, drainage pipe 46 and slurry pump 38 and into the sea via the unloading pipe 40.
  • the first water valve 16 is opened, the drainage valve 48 is closed, and the slurry valve 36 is opened.
  • the fluidized sand flows via the slurry inlet 34, the slurry valve 36 and the slurry pump 38 onto the unloading pipe 40.
  • air is supplied to the fluidized sand from the pressure tank 30 via the air injection pipes 26 and the air injection openings 28

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Underground Or Underwater Handling Of Building Materials (AREA)
  • Ship Loading And Unloading (AREA)
  • Air Transport Of Granular Materials (AREA)

Abstract

A method of preparing a bulk ship (1) having at least three holds (2) for sand transport and fluidized unloading, wherein the method comprises: - disposing, within a utility hold (4), fluidizing pipes (10) having inflow openings (12) and also a slurry inlet (34) for fluidized sand; - disposing, on the bulk ship (1), a water pump (18) connected between a water inlet (20) and the fluidizing pipe (10), and a slurry pump (38) connected between the slurry inlet (34) and an unloading pipe (40), of which at least the slurry pump is placed in a hold (2) adjacent to the utility hold (4).

Description

A METHOD OF PREPARING A BULK SHIP HAVING AT LEAST THREE HOLDS
This invention relates to a method of preparing a bulk ship having at least three holds. More particularly, it relates to a method of preparing a bulk ship having at least three holds for sand transport and fluidized unloading.
Hereinafter, the term "bulk ships" implies ships termed, in English, "Dry Bulk Carriers".
When filling in sea areas in order to gain land, oftentimes large amounts of mass are required. According to prior art, so-called self-unloading dredgers TSHD ("Trailing Suction Hopper Dredgers") are commonly used. During the transport from the loading site to the unloading site, the mass is located in silo-like compartments in the vessel. The mass may be unloaded by opening the bottom of the vessel, for example by virtue of the hull being formed in two parts structured in a manner allowing them to be moved relative to each other.
However, vessels of the type mentioned are not particularly suitable for carrying large quantities of mass over longer distances and not, in particular, when transport across open sea areas comes into question. The reason for this is of related to economy, given that these vessels are relatively expensive to build and operate, and also due to their relatively limited carrying capacity.
It is known to fluidize the mass before and during unloading. As such, US patent 3445008 describes a method and device wherein the lower portion of the hold of the vessel is filled with water prior to pumping out water and mass.
It is known, from US patent 4033470, to use nozzles and water under pressure to fluidize the cargo.
Transport of mass in holds generally requires that the hold must be closed, and that the cargo must be classified as dry during transport in the open sea.
The use of bulk ships for carrying dredged mass has been proposed, and patent application NO 19986101 describes an unloading device to be placed on the surface of the cargo, the device of which is structured in a manner allowing it to fluidize and pump out the cargo. However, the unloading capacity of such a solution has proven insufficient.
The object of the invention is to remedy or reduce at least one of the disadvantages of the prior art.
In accordance with the invention, the object is achieved by virtue of the features disclosed in the following description and in the subsequent claims.
A method of preparing a bulk ship having at least three holds for sand transport and fluidized unloading is provided, wherein the method comprises: - disposing, within a utility hold, fluidizing pipes having inflow openings and also a slurry inlet for fluidized sand; and
- disposing, on the bulk ship, a water pump connected between a water inlet and the fluidizing pipe, and a slurry pump connected between the slurry inlet and an unloading pipe, of which at least the slurry pump is placed in a hold adjacent to the utility hold.
By virtue of disposing the pumps in an adjacent hold, the pumps are located at a level of height near the floor of the utility hold. Simultaneously, the slurry pump may be positioned near the slurry inlet. This reduces cavitation, which would otherwise take place at a substantial degree in the pumps. The outflow of slurry to the slurry pump is facilitated by virtue of the static pressure from the sand, which is located above the slurry in the utility hold, creating a pressure on the slurry.
During unloading, water may flow in from the water inlet and through the inflow openings, which may be comprised of nozzles, so as to fluidize the sand located closest to the floor of the utility hold - frequently termed the tank top. If desirable, fluidizing pipes having inflow openings may also be disposed on the walls of the utility hold, or at different levels of height in the utility hold.
In order to further improve the fluidizing of the sand, the method may also comprise disposing air injection pipes in the utility hold, preferably near the floor thereof. The air injection pipes may be provided with air injection openings, such as nozzles. The air injection pipe is connected to a compressor, typically via a pressure tank. Experiments have proven that water-fluidized sand obtains better fluidity by virtue of mixing some air into the fluidized sand.
A bulk ship may not be filled up with sand in all the holds, given that the carrying capacity of the bulk ship would be exceeded. For this reason, it is also appropriate to use e.g. every other hold for technical equipment which, in addition to the pumps and a potential compressor, may comprise valves and control components. In order to be able to adjust the specific gravity of the fluidized sand before entering into the slurry pump, injection pipes for water to the slurry pipe may also be disposed on the inlet side of the slurry pump.
In general, the equipment in one hold may serve two adjacent holds.
The fluidized material may be unloaded by allowing it to flow into the slurry inlet and onwards via the slurry pump and the unloading pipe.
The method may further comprise allowing the unloading pipe to end outside the bulk ship when the sand is to be unloaded from the bulk ship, or connecting the unloading pipe to a transport pipe when the fluidized sand is to be delivered at a distance from the bulk ship, for example onshore.
A ship for transport of sand is normally loaded with fluidized or very wet sand typically excavated from the seabed near the loading site. The sand must be drained in order to be classified as dry during the transport.
The method may comprise disposing at least one drainage column for drainage of the sand in the utility hold. A drainage column of this type may be comprised of a pipe having a number of openings in the pipe wall along the pipe, each opening being screened in such a way that water may enter through the opening, whereas settled sand covers the screen and thus prevent significant quantities of sand from entering into the drainage column.
The method may further comprise connecting the drainage column to the slurry pump for pumping out water from the surface of the sand. The use of a bulk ship having at least three holds prepared in accordance with the invention for transport of sand across the open sea allows for a substantial reduction in time and costs for transport and unloading of sand.
An example of a preferred method and embodiment is described in the following and is depicted in the accompanying drawings, where:
Fig. 1 shows, in cross-section, a bulk ship in accordance with the invention during loading;
Fig. 2 shows a plan view of a segment of the hold of the bulk ship;
Fig. 3 shows, in perspective, details of the utility hold of the bulk ship, wherein the extent of the utility hold is indicated by means of dashed lines; and
Fig. 4 shows, on a larger scale, a section through a drainage column.
In the drawings, the reference numeral 1 represents a bulk ship comprising several holds 2, at least one thereof being used as a utility hold 4.
In fig. 1, the bulk ship 1 is moored next to a dredger 6, where sand in fluidized form flows from the dredger 6 and into the utility hold 4 via a filling pipe 8.
The utility hold 4 of the bulk ship 1, near the floor - tank top - thereof, is provided with a number of fluidizing pipes 10 having inflow openings 12. The fluidizing pipes 10 e'xtend horizontally in the longitudinal direction of the bulk ship 1 and are connected to a manifold 14. Via a first water valve 16, the manifold 14 is connected to a water pump 18 that receives water from a water inlet 20, see figure 2. The water inlet 20 may comprise a sea chest (not shown) . The water pump 18 is positioned in a hold 2 adjacent to the utility hold 4 and is designed in a manner allowing it supply water, via a second water valve 22, to another adjacent utility hold 4. In 5 figure 2, the second water valve 22 is hidden underneath the water pump 18.
A portion of the fluidizing pipes 10 is placed on the walls 24 of the utility hold 4.
A number of air injection pipes 26 having air injection o openings 28 are disposed near the floor of the utility hold 4. The air injection pipes 26 communicate with a pressure tank 30 located in an adjacent hold 2 relative to the utility hold 4.
Via a slurry valve 36, a slurry inlet 34 in the utility holds 4 is connected to the inlet of a slurry pump 38. The slurry pump 38, which is placed in a hold 2 adjacent to the utility hold 4, is connected to an unloading pipe 40. The unloading pipe 40 ends in the sea next to the bulk ship 1.
An intermediate pipe 42 is connected between the manifold 14o and the inlet of the slurry pump 38. The aim is to be able to adjust the specific gravity of the fluidized sand before entering into the slurry pump 38 and by supplying additional water via the intermediate pipe 42.
Three drainage columns 44 are disposed in the utility hold 4.5 The drainage columns 44 are connected, at their lower portions, to a drainage pipe 46 which, via a drainage valve 48, is connected to the slurry pump 38.
The drainage columns 44 comprise a pipe 50 having a number of openings 52 in the pipe wall along the longitudinal extento thereof, see figure 4. A screen 54, which is tight at the top and open at the bottom, surrounds the pipe 50 at the openings 52, whereby an annular space 56 is formed between the screen 54 and pipe 50.
Water may flow into the annular space 56 and onwards into the pipe 50 via the openings 52, whereas sand settling around the screen 54 will seal the annular space 56 at the bottom as the utility hold 4 is being filled. Excess water 58 located above the sand 60, see figure 1, must therefore exit via openings 52 higher up on the drainage column 44.
During loading of the bulk ship 1, when fluidized sand flows into the utility hold 4 via the filling pipe 8, the sand 60 settles in the utility hold 4. The slurry valve 36 is closed and the drainage valve 48 is open. As described above, the excess water 58 is drained via the drainage columns 44, drainage pipe 46 and slurry pump 38 and into the sea via the unloading pipe 40.
Before unloading of the bulk ship 1 is to take place, the first water valve 16 is opened, the drainage valve 48 is closed, and the slurry valve 36 is opened.
Upon starting the water pump 18, water flows from the water inlet 20 and via the water pump 18, the first water valve 16, the manifold 14, the fluidizing pipes 10 and the inflow openings 12 and into the sand 60, whereby the part of the sand located closest to the inflow openings 12 is fluidized and forms a slurry.
Upon starting the slurry pump 38, the fluidized sand flows via the slurry inlet 34, the slurry valve 36 and the slurry pump 38 onto the unloading pipe 40.
If desirable, air is supplied to the fluidized sand from the pressure tank 30 via the air injection pipes 26 and the air injection openings 28

Claims

C l a i m s
1. A method of preparing a bulk ship (1) having at least three holds (2) for sand transport and fluidized unloading, c h a r a c t e r i z e d i n that the method comprises:
- disposing, within a utility hold (4), fluidizing pipes (10) having inflow openings (12) and also a slurry inlet (34) for fluidized sand;
- disposing, on the bulk ship (1), a water pump (18) connected between a water inlet (20) and the fluidizing pipe (10), and a slurry pump (38) connected between the slurry inlet (34) and an unloading pipe (40), of which at least the slurry pump is placed in a hold (2) adjacent to the utility hold (4) .
2. The method in accordance with claim 1, c h a r a c t e r i z e d i n that the method further comprises: disposing fluidizing pipes (10) having inflow openings (12) on the wall (24) of the utility hold (4) .
3. The method in accordance with claim 1, c h a r a c t e r i z e d i n that the method further comprises: disposing air injection pipes (26) in the utility hold (4) .
4. The method in accordance with claim 1, c h a r a c t e r i z e d i n that the method further includes letting the unloading pipe (40) discharge at the bulk ship (1) .
5. The method in accordance with claim 1, c h a r a c t e r i z e d i n that the method further comprises: connecting the unloading pipe (40) to a conveying pipe.
6. The method in accordance with claim 1, c h a r a c t e r i z e d i n that the method further comprises: disposing at least one drainage column (44) in the utility hold (4) .
7. The method in accordance with claim 7, c h a r a c t e r i z e d i n that the method further comprises: connecting the drainage column (44) to the slurry pump (38) .
8. Use of a bulk ship (1) prepared in accordance with claim 1 for transport of sand across the open sea.
PCT/NO2009/000446 2008-12-30 2009-12-28 A method of preparing a bulk ship having at least three holds WO2010077147A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
NO20085394A NO332458B1 (en) 2008-12-30 2008-12-30 Procedure for preparing a dry cargo ship with at least three cargo spaces
NO20085394 2008-12-30

Publications (1)

Publication Number Publication Date
WO2010077147A1 true WO2010077147A1 (en) 2010-07-08

Family

ID=42309981

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/NO2009/000446 WO2010077147A1 (en) 2008-12-30 2009-12-28 A method of preparing a bulk ship having at least three holds

Country Status (2)

Country Link
NO (1) NO332458B1 (en)
WO (1) WO2010077147A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011028130A1 (en) * 2009-09-03 2011-03-10 Viking Dredging As A method of preparing a tank ship
WO2011028129A1 (en) * 2009-09-03 2011-03-10 Viking Dredging As A method of preparing a dry bulk carrier
WO2018021916A1 (en) * 2016-07-25 2018-02-01 Viking Dredging As Removing dredged material from a cargo space

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US689741A (en) * 1901-09-10 1901-12-24 Alexander Mcdougall Vessel for transporting granular substances.
US3729232A (en) * 1971-06-07 1973-04-24 Mitsui Shipbuilding Eng Apparatus for converting solidified powders of ores loaded in ore transport ships into slurries

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US689741A (en) * 1901-09-10 1901-12-24 Alexander Mcdougall Vessel for transporting granular substances.
US3729232A (en) * 1971-06-07 1973-04-24 Mitsui Shipbuilding Eng Apparatus for converting solidified powders of ores loaded in ore transport ships into slurries

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011028130A1 (en) * 2009-09-03 2011-03-10 Viking Dredging As A method of preparing a tank ship
WO2011028129A1 (en) * 2009-09-03 2011-03-10 Viking Dredging As A method of preparing a dry bulk carrier
WO2018021916A1 (en) * 2016-07-25 2018-02-01 Viking Dredging As Removing dredged material from a cargo space

Also Published As

Publication number Publication date
NO332458B1 (en) 2012-09-24
NO20085394L (en) 2010-07-01

Similar Documents

Publication Publication Date Title
US20120275883A1 (en) Method of Preparing a Dry Bulk Carrier
CN1301228A (en) Vessel of the OBO or bulk carrier type
EP2609004B1 (en) Method for reclaiming land
WO2010077147A1 (en) A method of preparing a bulk ship having at least three holds
GB2385564A (en) Semi-submersible vessel having a concrete storage tank
TWI541411B (en) Method for delivering large quantities of under water soil to a reclamation area
WO2014133462A1 (en) Unloading system for sand and the method thereof
WO2011028130A1 (en) A method of preparing a tank ship
US689741A (en) Vessel for transporting granular substances.
JP4738334B2 (en) Gas expansion trunk for marine vessels
US3658386A (en) Hopper craft
US20040165971A1 (en) Barge with tiltable container
US20120237303A1 (en) Device of a Bulk Ship for Sand Transport and Fluidized Unloading
WO2011162613A1 (en) Unloading equipment for a flat top barge and a method for unloading same
JP3389021B2 (en) Sediment fluidization equipment for coal slurry transport ships
KR100798751B1 (en) A high efficient dredged sand carrier and discharing method using the same
KR200492481Y1 (en) Storage Tank and Ship having the same
JP6484211B2 (en) Lifting equipment
CN206126372U (en) A reject platform for boats and ships cargo transfer
JPS6312039B2 (en)
JPS5815354B2 (en) Method of unloading powder and granular cargo from a ship and powder and granular cargo carrier
JPS6246405Y2 (en)
JP2018070158A (en) Loading device
SG177027A1 (en) Unloading equipment for a flat top barge and a method for unloading same
SG185855A1 (en) System and method for sand discharge

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 09836440

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 09836440

Country of ref document: EP

Kind code of ref document: A1