WO2010043609A3 - Method for monitoring the ventilation of a chimney or a waste heat steam generator - Google Patents

Method for monitoring the ventilation of a chimney or a waste heat steam generator Download PDF

Info

Publication number
WO2010043609A3
WO2010043609A3 PCT/EP2009/063330 EP2009063330W WO2010043609A3 WO 2010043609 A3 WO2010043609 A3 WO 2010043609A3 EP 2009063330 W EP2009063330 W EP 2009063330W WO 2010043609 A3 WO2010043609 A3 WO 2010043609A3
Authority
WO
WIPO (PCT)
Prior art keywords
monitoring
chimney
ventilation
waste heat
steam generator
Prior art date
Application number
PCT/EP2009/063330
Other languages
German (de)
French (fr)
Other versions
WO2010043609A2 (en
Inventor
Jörg Bröse
Rudolf Hess
Michael Knörlein
Andrej Wille
Original Assignee
Siemens Aktiengesellschaft
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Siemens Aktiengesellschaft filed Critical Siemens Aktiengesellschaft
Publication of WO2010043609A2 publication Critical patent/WO2010043609A2/en
Publication of WO2010043609A3 publication Critical patent/WO2010043609A3/en

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22BMETHODS OF STEAM GENERATION; STEAM BOILERS
    • F22B37/00Component parts or details of steam boilers
    • F22B37/02Component parts or details of steam boilers applicable to more than one kind or type of steam boiler
    • F22B37/42Applications, arrangements, or dispositions of alarm or automatic safety devices
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K23/00Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids
    • F01K23/02Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled
    • F01K23/06Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled combustion heat from one cycle heating the fluid in another cycle
    • F01K23/10Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled combustion heat from one cycle heating the fluid in another cycle with exhaust fluid of one cycle heating the fluid in another cycle
    • F01K23/101Regulating means specially adapted therefor

Abstract

The invention relates to a method for monitoring the ventilation of a chimney or a waste heat steam generator for gas turbine plants, wherein the gas turbine plant comprises a compressor, a gas turbine, and a generator, and wherein a gas turbine rotational speed is used for monitoring, wherein furthermore a diverse criterion is used for monitoring.
PCT/EP2009/063330 2008-10-13 2009-10-13 Method for monitoring the ventilation of a chimney or a waste heat steam generator WO2010043609A2 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
EP08017912.0 2008-10-13
EP08017912A EP2216593A1 (en) 2008-10-13 2008-10-13 Method for monitoring the ventilation of a chimney or a waste heat steam producer

Publications (2)

Publication Number Publication Date
WO2010043609A2 WO2010043609A2 (en) 2010-04-22
WO2010043609A3 true WO2010043609A3 (en) 2012-02-23

Family

ID=42106964

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/EP2009/063330 WO2010043609A2 (en) 2008-10-13 2009-10-13 Method for monitoring the ventilation of a chimney or a waste heat steam generator

Country Status (2)

Country Link
EP (1) EP2216593A1 (en)
WO (1) WO2010043609A2 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0886227A (en) * 1994-09-16 1996-04-02 Toshiba Corp Starting method for combined shaft system
WO1998029641A1 (en) * 1996-12-30 1998-07-09 Combustion Engineering, Inc. Detecting and purging combustible gases from hrsg cavities
EP0961011A1 (en) * 1998-05-28 1999-12-01 Asea Brown Boveri AG Method of operating of gas turbines and combined cycle power plants
DE10117101A1 (en) * 2001-04-06 2002-10-17 Alstom Switzerland Ltd Method for placing a multi-purpose power plant on standby uses added fuel with fresh air ventilators and continuously/intermittently running feeder pumps to maintain conditions and the flow of substances in a two-phase circuit.

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0886227A (en) * 1994-09-16 1996-04-02 Toshiba Corp Starting method for combined shaft system
WO1998029641A1 (en) * 1996-12-30 1998-07-09 Combustion Engineering, Inc. Detecting and purging combustible gases from hrsg cavities
EP0961011A1 (en) * 1998-05-28 1999-12-01 Asea Brown Boveri AG Method of operating of gas turbines and combined cycle power plants
DE10117101A1 (en) * 2001-04-06 2002-10-17 Alstom Switzerland Ltd Method for placing a multi-purpose power plant on standby uses added fuel with fresh air ventilators and continuously/intermittently running feeder pumps to maintain conditions and the flow of substances in a two-phase circuit.

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
SCHROEDER H C ET AL: "ERFAHRUNGEN BEI DER PLANUG VON GASTURBINEN-(GT-)ANLGEN MIT NACHGESCHALTETEN ABHITZEDAMPFERZEUGERN (AHDE) IN BEZUG AUF DEREN REGELWERKSKONFORMITAET", VGB KRAFTWERKSTECHNIK, VGB KRAFTWERKSTECHNIK GMBH. ESSEN, DE, vol. 79, no. 4, 1 January 1999 (1999-01-01), pages 46 - 52, XP000804128, ISSN: 0372-5715 *

Also Published As

Publication number Publication date
EP2216593A1 (en) 2010-08-11
WO2010043609A2 (en) 2010-04-22

Similar Documents

Publication Publication Date Title
EP2022949B8 (en) Fan section of a gas turbine engine, corresponding gas turbine engine and operating method
PL2126291T3 (en) Method for operating a gas and steam turbine plant and a gas and steam turbine plant for this purpose
ATE431502T1 (en) METHOD FOR CONTROLLING A WIND TURBINE AND WIND TURBINE
IN2012DN02706A (en)
WO2010121927A3 (en) Rotor blade, rotor blade element and production method
BRPI0912147A2 (en) blade for a rotor of a wind turbine or water, and method for converting energy from a flow into a medium for rotational energy
WO2010059918A3 (en) Method and system for converting waste heat from cement plant into a usable form of energy
EP2143888A3 (en) Steam turbine and method of cooling steam turbine
WO2010136018A3 (en) Clearance control system, turbomachine and method for adjusting a running clearance between a rotor and a casing of a turbomachine
WO2008131776A3 (en) A method of operating a wind turbine, a wind turbine and a cluster of wind turbines
AU2003236766A1 (en) Method and device for operating a burner of a heat engine, especially a gas turbine plant
WO2008055503A3 (en) Method for controlling a cluster of wind turbines connected to a utility grid, method for planning the strategy of a utility grid including a wind turbine cluster connected to the grid and wind turbine cluster.
WO2008031434A3 (en) Method for controlling a wind turbine connected to the utility grid, wind turbine and wind park
WO2010099928A3 (en) Method for monitoring wind turbines
EP2112330A3 (en) Fan blade
ATE532963T1 (en) WIND TURBINE AND METHOD FOR OPERATING A WIND TURBINE
EP2407646B8 (en) Method and device for adjusting the position of the rotor assembly of a gas or steam turbine
WO2010029494A3 (en) Improved cogeneration device
WO2011018527A3 (en) Asynchronous generator system and wind turbine having an asynchronous generator system
FI20115038A0 (en) METHOD FOR THE UTILIZATION OF THE THERMAL ENERGY CONTAINED IN THE BTL FACTORY
BRPI1007406A2 (en) turbine blade, especially rotor blade for a steam turbine, and corresponding method of manufacture
EG24747A (en) Method for starting a gas and steam turbine system.
WO2011162960A3 (en) Method and system for energy generation in a chemical plant by utilizing flare gas
WO2013143827A3 (en) Method for operating a combined cycle power plant and combined cycle power plant for using such method
WO2014191268A3 (en) Method for operating a combined cycle power plant

Legal Events

Date Code Title Description
NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 09736909

Country of ref document: EP

Kind code of ref document: A2