WO2010020747A2 - High rate stimulation method for deep, large bore completions - Google Patents
High rate stimulation method for deep, large bore completions Download PDFInfo
- Publication number
- WO2010020747A2 WO2010020747A2 PCT/GB2009/001904 GB2009001904W WO2010020747A2 WO 2010020747 A2 WO2010020747 A2 WO 2010020747A2 GB 2009001904 W GB2009001904 W GB 2009001904W WO 2010020747 A2 WO2010020747 A2 WO 2010020747A2
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- fluid
- wellbore
- tool
- manipulatable fracturing
- manipulatable
- Prior art date
Links
- 238000000034 method Methods 0.000 title claims abstract description 80
- 230000000638 stimulation Effects 0.000 title description 35
- 239000012530 fluid Substances 0.000 claims abstract description 357
- 230000015572 biosynthetic process Effects 0.000 claims abstract description 185
- 239000002131 composite material Substances 0.000 claims abstract description 77
- 238000002156 mixing Methods 0.000 claims abstract description 31
- 238000004891 communication Methods 0.000 claims abstract description 20
- 239000003085 diluting agent Substances 0.000 claims description 15
- 238000002955 isolation Methods 0.000 claims description 8
- 239000002253 acid Substances 0.000 claims description 5
- 230000002441 reversible effect Effects 0.000 claims description 5
- 238000005755 formation reaction Methods 0.000 description 168
- 206010017076 Fracture Diseases 0.000 description 51
- 208000010392 Bone Fractures Diseases 0.000 description 29
- 238000005086 pumping Methods 0.000 description 28
- 239000000203 mixture Substances 0.000 description 26
- 239000002002 slurry Substances 0.000 description 21
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 19
- 239000004576 sand Substances 0.000 description 15
- 230000000977 initiatory effect Effects 0.000 description 13
- 230000008569 process Effects 0.000 description 13
- 229930195733 hydrocarbon Natural products 0.000 description 11
- 150000002430 hydrocarbons Chemical class 0.000 description 11
- 239000000499 gel Substances 0.000 description 9
- 239000000243 solution Substances 0.000 description 9
- 238000011282 treatment Methods 0.000 description 9
- 238000005553 drilling Methods 0.000 description 7
- 238000004519 manufacturing process Methods 0.000 description 6
- 239000012267 brine Substances 0.000 description 4
- 230000003247 decreasing effect Effects 0.000 description 4
- 230000003993 interaction Effects 0.000 description 4
- 235000019476 oil-water mixture Nutrition 0.000 description 4
- HPALAKNZSZLMCH-UHFFFAOYSA-M sodium;chloride;hydrate Chemical compound O.[Na+].[Cl-] HPALAKNZSZLMCH-UHFFFAOYSA-M 0.000 description 4
- 239000004215 Carbon black (E152) Substances 0.000 description 3
- 230000000712 assembly Effects 0.000 description 3
- 238000000429 assembly Methods 0.000 description 3
- 230000000694 effects Effects 0.000 description 3
- 230000006870 function Effects 0.000 description 3
- 230000000670 limiting effect Effects 0.000 description 3
- 230000002028 premature Effects 0.000 description 3
- 230000004936 stimulating effect Effects 0.000 description 3
- 238000003860 storage Methods 0.000 description 3
- 238000011144 upstream manufacturing Methods 0.000 description 3
- 241000282472 Canis lupus familiaris Species 0.000 description 2
- 208000006670 Multiple fractures Diseases 0.000 description 2
- 239000003082 abrasive agent Substances 0.000 description 2
- 239000000654 additive Substances 0.000 description 2
- 230000004075 alteration Effects 0.000 description 2
- 239000004568 cement Substances 0.000 description 2
- 230000003628 erosive effect Effects 0.000 description 2
- 238000011010 flushing procedure Methods 0.000 description 2
- 238000002347 injection Methods 0.000 description 2
- 239000007924 injection Substances 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 230000007246 mechanism Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000001902 propagating effect Effects 0.000 description 2
- 238000011084 recovery Methods 0.000 description 2
- 239000004971 Cross linker Substances 0.000 description 1
- XQCFHQBGMWUEMY-ZPUQHVIOSA-N Nitrovin Chemical compound C=1C=C([N+]([O-])=O)OC=1\C=C\C(=NNC(=N)N)\C=C\C1=CC=C([N+]([O-])=O)O1 XQCFHQBGMWUEMY-ZPUQHVIOSA-N 0.000 description 1
- 230000000996 additive effect Effects 0.000 description 1
- 230000002411 adverse Effects 0.000 description 1
- 238000013459 approach Methods 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 230000015556 catabolic process Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 239000000470 constituent Substances 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 238000006731 degradation reaction Methods 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 239000006185 dispersion Substances 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000036571 hydration Effects 0.000 description 1
- 238000006703 hydration reaction Methods 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 239000004615 ingredient Substances 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 235000019198 oils Nutrition 0.000 description 1
- 230000036961 partial effect Effects 0.000 description 1
- 239000013618 particulate matter Substances 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
- 230000007704 transition Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B34/00—Valve arrangements for boreholes or wells
- E21B34/06—Valve arrangements for boreholes or wells in wells
- E21B34/14—Valve arrangements for boreholes or wells in wells operated by movement of tools, e.g. sleeve valves operated by pistons or wire line tools
- E21B34/142—Valve arrangements for boreholes or wells in wells operated by movement of tools, e.g. sleeve valves operated by pistons or wire line tools unsupported or free-falling elements, e.g. balls, plugs, darts or pistons
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/11—Perforators; Permeators
- E21B43/114—Perforators using direct fluid action on the wall to be perforated, e.g. abrasive jets
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
- E21B43/267—Methods for stimulating production by forming crevices or fractures reinforcing fractures by propping
Definitions
- Hydrocarbon-producing wells often are stimulated by hydraulic fracturing operations, wherein a fracturing fluid may be introduced into a portion of a subterranean formation penetrated by a wellbore at a hydraulic pressure sufficient to create or enhance at least one fracture therein. Stimulating or treating the wellbore in such ways increases hydrocarbon production from the well.
- the fracturing equipment may be included in a completion assembly used in the overall production process. Alternatively the fracturing equipment may be removably placed in the wellbore during and/or after completion operations.
- the multiple fractures should have adequate conductivity, so that the greatest possible quantity of hydrocarbons in an oil and gas reservoir can be drained/produced into the wellbore.
- stimulating a formation from a wellbore, or completing the wellbore, especially those wellbores that are highly deviated or horizontal it may be advantageous to create multiple pay zones.
- Such multiple pay zones may be achieved by utilizing a variety of tools comprising a movable fracturing tool with perforating and fracturing capabilities, or with actuatable sleeve assemblies, also referred to as sleeves or casing windows, disposed in a downhole tubular.
- a typical formation stimulation process might involve hydraulic fracturing of the formation and placement of a proppant in those fractures.
- the fracturing fluid and proppant are mixed in containers at the surface of the well site. After the fracturing fluid is mixed, it is pumped down the wellbore where the fluid passes into the formation and induces a fracture in the formation, i.e., fracture initiation.
- a successful formation stimulation procedure will increase the movement of hydrocarbons from the fractured formation into the wellbore by creating and/or increasing flowpaths into the wellbore.
- the abrasive and viscous characteristics of fracturing fluid limit the rate at which a fracturing fluid may be pumped downhole. Friction from the high-rate pumping of an abrasive and viscous fracturing fluid may cause downhole wellbore equipment failure, wear, or degradation. Thus, in conventional formation stimulation operations, the rate at which fracturing fluids were pumped to a downhole formation could not be increased beyond the point at which the velocity of the fracturing fluid might result in damage to wellbore equipment.
- Treating pressures may fluctuate, often increase, during the formation stimulation process, whereupon the operator must prematurely terminate the treatment or risk serious problems such as ruptures of surface equipment, wellbore casing, and tubulars. Treating pressures beyond the acceptable range may occur during the formation stimulation process in the event of a premature screenout. Such a screenout occurs where the rate of stimulation fluid leak-off into the formation exceeds the rate at which fluid is being pumped down the wellbore, resulting in the proppant compacting within the fracture.
- the problems associated with a premature screenout are discussed in U.S. Patent No. 5,595,245, which is incorporated herein by reference.
- the volume of fracturing fluid necessitated in a conventional fracturing operation can be very high, thus increasing the substantial costs associated with such processes, hi a conventional formation stimulation process, the fracturing fluid is mixed at the surface and pumped down the wellbore, eventually reaching the formation.
- the entire flowpath between the surface mixing chamber and the formation must be filled with the fracturing fluid, hi deep wellbore embodiments, for example, a wellbore 12,000 feet or more in depth, this means that the entire column must be filled and maintained with fracturing fluid throughout the fracturing operation.
- the high cost of fracturing fluids paired with the necessary volume of fracturing fluid underscores the capital intensive nature of conventional formation stimulation processes.
- a method of servicing a wellbore comprising inserting a first tubing member having a flowbore into the wellbore, wherein a manipulatable fracturing tool, or a component thereof, is coupled to the first tubing member and wherein the manipulatable fracturing tool comprises one or more ports configured to alter a flow of fluid through the manipulatable fracturing tool, positioning the manipulatable fracturing tool proximate to a formation zone to be fractured, manipulating the manipulatable fracturing tool to establish fluid communication between the flowbore of the first tubing member and the wellbore, introducing a first component of a composite fluid into the wellbore via the flowbore of the first tubing member, introducing a second component of the composite fluid into the wellbore via an annular space formed by the first tubing member and the wellbore, mixing the first component of the composite fluid with the second component of the composite fluid within the wellbore, and causing a fracture to form or be extended
- a wellbore servicing apparatus comprising a manipulatable fracturing tool comprising at least one axial flowpath, at least a first and a second actuatable ports, wherein the tool is configurable to provide a fluid flow through the first actuatable port into the surrounding wellbore to degrade a liner, a casing, a formation zone, or combinations thereof, and wherein the tool is configurable to provide a fluid flow through the second actuatable port into the surrounding wellbore to propagate fractures in the formation zone.
- a method of servicing a wellbore comprising inserting a casing having a flowbore into the wellbore, wherein a plurality of manipulatable fracturing tools are coupled to the casing and wherein the manipulatable fracturing tools comprise one or more ports configured to alter a flow of fluid through the manipulatable fracturing tool, positioning the manipulatable fracturing tools proximate to zones in a formation to be fractured, inserting a first tubing member within the casing, wherein a shifting tool is attached to the first tubing member, positioning the shifting tool proximate to at least one of the manipulatable fracturing tools, actuating the shifting tool such that the actuation of the shifting tool engages and manipulates the manipulatable fracturing tool to establish fluid communication between the flowbore of the first tubing member and the wellbore, introducing a first component of a composite fluid into the wellbore via the flowbore of the first tubing member and the one or more
- Figure 1 is a simplified cutaway view of a wellbore servicing apparatus comprising multiple manipulatable fracturing tools in an operating environment.
- Figure 2 is a cutaway view of a wellbore servicing apparatus comprising multiple manipulatable fracturing tools integrated with a second tubing member disposed within a first tubing member.
- Figure 3 is a cutaway view of a wellbore servicing apparatus comprising a single manipulatable fracturing tool integrated with a first tubing member.
- Figure 4A is a side view of a manipulatable fracturing tool depicting a fluid emitted from hydrajetting nozzles.
- Figure 4B is a side view of a manipulatable fracturing tool depicting an obturating member being disengaged from the seat.
- Figure 4C is a side view of a manipulatable fracturing tool depicting a flow of fluid being emitted therefrom, mixing with a second fluid to form a composite fluid, and entering the formation.
- Figure 4D is a side view of a manipulatable fracturing tool depicting a flow of fluid being emitted therefrom, mixing with a second fluid to form a composite fluid, and entering the formation.
- Figure 5 A is a side view of a manipulatable fracturing tool having a sliding sleeve and depicting an obturating member engaging the seat and a fluid being emitted from aligned ports.
- Figure 5B is a side view of a manipulatable fracturing tool having a sliding sleeve, depicting the ports in an unaligned position.
- Figure 5C is a side view of a manipulatable fracturing tool having a sliding sleeve and depicting an obturating member engaging the seat and depicting a fluid being emitted therefrom and mixing with a second fluid to form a composite fluid which enters the formation.
- Figure 6 is a cutaway view of a manipulatable fracturing tool depicting multiple obturating members engaging multiple seats and a fluid being emitted from some of the ports or apertures.
- Figure 7A is a partial cutaway view of a mechanical shifting tool engaging a mechanically-shifted sleeve.
- Figure 7B a side view of a manipulatable fracturing tool having a sliding sleeve depicting a flow of fluid being emitted the manipulatable fracturing tool, mixing with a second fluid to form a composite fluid, and entering the formation.
- any use of any form of the terms “connect,” “engage,” “couple,” “attach,” or any other term describing an interaction between elements is not meant to limit the interaction to direct interaction between the elements and may also include indirect interaction between the elements described.
- the terms “including” and “comprising” are used in an open-ended fashion, and thus should be interpreted to mean “including, but not limited to ." Reference to up or down will be made for purposes of description with “up,” “upper,” “upward” or “upstream” meaning toward the surface of the wellbore and with “down,” “lower,” “downward,” “downhole,” or “downstream” meaning toward the terminal end of the well, regardless of the wellbore orientation.
- zone or “pay zone” as used herein refers to separate parts of the wellbore designated for treatment or production and may refer to an entire hydrocarbon formation or separate portions of a single formation such as horizontally and/or vertically spaced portions of the same formation.
- seat as used herein may be referred to as a ball seat, but it is understood that seat may also refer to any type of catching or stopping device for an obturating member or other member sent through a work string fluid passage that comes to rest against a restriction in the passage.
- the methods, systems, and apparatuses disclosed herein include embodiments wherein two or more component fluids of a composite wellbore servicing fluid are independently pumped downhole and mixed in a portion of the wellbore proximate to a given formation zone.
- the component fluids may be selectively emitted into the wellbore via the operation of a wellbore servicing apparatus which comprises one or more manipulatable fracturing tools.
- the manipulatable fracturing tool(s) may be independently configurable as to the way in which fluid is emitted therefrom. By positioning a manipulatable fracturing tool proximate to a given formation zone, the communication of fluids may thus be established with the proximate formation zone, dependent upon how the manipulatable fracturing tool is configured.
- the manipulatable fracturing tool may be manipulated or actuated via a variety of means.
- component fluids may be provided via multiple and/or independent flowpaths and mixed to form a composite fluid in situ in the wellbore proximate to the formation zone.
- Such a composite fluid might be used, for example, in perforating, hydrajetting, acidizing, isolating, flushing, or fracturing operations.
- Figure 1 depicts an exemplary operating environment of an embodiment of the methods, systems, and apparatuses disclosed herein. It is noted that although some of the figures may exemplify horizontal or vertical wellbores, the principles of the foregoing process, methods, and systems are equally applicable to horizontal and vertical conventional wellbore configurations. The horizontal or vertical nature of any figure is not to be construed as limiting the wellbore to any particular configuration. While a wellbore servicing apparatus 100 is shown and described with specificity, various other wellbore servicing apparatus 100 embodiments consistent with the teachings herein are described infra.
- the operating environment comprises a drilling rig 106 that is positioned on the earth's surface 104 and extends over and around a wellbore 114 that penetrates a subterranean formation 102 for the purpose of recovering hydrocarbons.
- the wellbore 114 may be drilled into the subterranean formation 102 using any suitable drilling technique.
- the drilling rig 106 comprises a derrick 108 with a rig floor 110 through which a work string 112 extends downward from the drilling rig 106 into the wellbore 114.
- the work string 112 delivers the wellbore servicing apparatus 100 or some part thereof to a predetermined depth within the wellbore 114 to perform an operation such as perforating a casing and/or formation, expanding a fluid path there-through, fracturing the formation 102, producing hydrocarbons from the formation 102, or other completion servicing operation.
- the drilling rig 106 may be conventional and may comprise a motor driven winch and other associated equipment for extending the work string 112 into the wellbore 114 to position the wellbore servicing apparatus 100 at the desired depth, hi another embodiment, the wellbore servicing apparatus 100 or some part thereof may be comprised along and/or integral with the wellbore casing 120.
- the wellbore 114 may extend substantially vertically away from the earth's surface 104 over a vertical wellbore portion 116, or may deviate at any angle from the earth's surface 104 over a deviated or horizontal wellbore portion 118.
- portions or substantially all of the wellbore 114 may be vertical, deviated, horizontal, and/or curved, hi some instances, at least a portion of the wellbore 114 may be lined with a casing 120 that is secured into position against the formation 102 in a conventional manner using cement 122.
- the wellbore 114 may be partially cased and cemented thereby resulting in a portion of the wellbore 114 being uncased (e.g., horizontal wellbore portion 118).
- the exemplary operating environment depicted in Figure 1 refers to a stationary drilling rig 106 for lowering and setting the wellbore servicing apparatus 100 within a land-based wellbore 114
- mobile workover rigs, wellbore servicing units e.g., coiled tubing units
- wellbore servicing apparatus 100 may alternatively be used in other operational environments, such as within an offshore wellbore operational environment.
- the work string 112 comprises the wellbore servicing apparatus 100 or some part of the wellbore servicing apparatus.
- the wellbore servicing apparatus 100 may comprise a first tubing member 126 and one or more manipulatable fracturing tools 190.
- the manipulatable fracturing tool 190 may be integrated within and/or connected to the first tubing member 126.
- manipulatable fracturing tools 190 common to a given tubing member will have a common axial flowbore.
- the first tubing member 126 may comprise coiled tubing, hi another embodiment, the first tubing member 126 may comprise jointed tubing.
- Each manipulatable fracturing tool 190 may be positioned proximate or adjacent to a subterranean formation zone 2, 4, 6, 8, 10, or 12 for which fracturing or extending of a fracture is desired. Where multiple manipulatable fracturing tools 190 are employed, the multiple manipulatable fracturing tools 190 may be separated by lengths of tubing. Each manipulatable fracturing tool 190 may be configured so as to be threadedly coupled to a length of tubing (e.g., coiled tubing or jointed tubing/pipe) or to another manipulatable fracturing tool 190.
- a length of tubing e.g., coiled tubing or jointed tubing/pipe
- an upper-most manipulatable fracturing tool 190 may be threadedly coupled to the downhole end of the work string.
- a length of tubing is threadedly coupled to the downhole end of the uppermost manipulatable fracturing tool 190 and extends a length to where the downhole end of the length of tubing is threadedly coupled to the upper end of a second upper-most manipulatable fracturing tool 190.
- This pattern may continue progressively moving downward for as many manipulatable fracturing tools 190 as are desired along the wellbore servicing apparatus 100.
- the length of tubing extending between any two manipulatable fracturing tools may be approximately the same as the distance between the formation zone to which the first manipulatable fracturing tool 190 is to be proximate and the formation zone to which the second manipulatable fracturing tool 190 is to be proximate, the same will be true as to any additional manipulatable fracturing tools 190 for the servicing of any additional formation zones 2, 4, 6, 8, 10, or 12.
- a length of tubing threadedly coupled to the lower end of the lower-most manipulatable fracturing tool 190 may extend some distance downhole therefrom.
- the manipulatable fracturing tools 190 need not be separated by lengths of tubing but may be coupled directly, one to another.
- the emission of the fracturing fluid components into the wellbore 114 proximate to the formation zone 2, 4, 6, 8, 10, or 12 is selectively manipulatable via the operation of the one or more manipulatable fracturing tools 190. That is, the ports or apertures of the manipulatable fracturing tool 190 may be actuated, e.g., opened or closed, fully or partially, so as to allow, restrict, curtail, or otherwise alter fluid communication between the interior flowbore of the first tubing member 126 (and/or the interior flowbore of the casing 120 and/or the interior flowbore of a second tubing member 226, where present, as described in more detail herein) and the wellbore 114 and/or the formation 102.
- the ports or apertures of the manipulatable fracturing tool 190 may be actuated, e.g., opened or closed, fully or partially, so as to allow, restrict, curtail, or otherwise alter fluid communication between the interior flowbore of the first tubing member 126 (and/
- Each manipulatable fracturing tool 190 may be configurable independent of any other manipulatable fracturing tool 190 which may be comprised along that same tubing member.
- a first manipulatable fracturing tool 190 may be configured to emit fluid therefrom and into the surrounding wellbore 114 and/or formation 102 while a second, third, fourth, etc., manipulatable fracturing tool 190 is not so configured.
- the ports or apertures of one manipulatable fracturing tool 190 may be open to the surrounding wellbore 114 and/or formation zone 2, 4, 6, 8, 10, or 12 while the ports or apertures of another manipulatable fracturing tool 190 along the same tubing member are closed.
- the manipulatable fracturing tool 190 is positioned proximate to the first formation zone 2, 4, 6, 8, 10, or 12 to be serviced. In other embodiments, the manipulatable fracturing tool 190 is positioned proximate to the most downhole formation zone 12 to be serviced, the servicing is performed, and then the manipulatable fracturing tool 190 is removed to the second-most downhole formation zone 10. As such, the servicing operations may proceed to progressively more-upward formation zones 8, 6, 4, or, 2. In other embodiments, a manipulatable fracturing tool 190 may be positioned proximate or substantially adjacent to any one or more of formation zones 2, 4, 6, 8, 10, and 12 to be serviced.
- the manipulatable fracturing tool 190 may be positioned proximate to a formation zone 2, 4, 6, 8, 10, or 12 and a portion of the wellbore 114 adjacent to the formation zone 2, 4, 6, 8, 10, or 12 may be isolated from other portions of the wellbore.
- isolating a portion of the wellbore maybe accomplished through the use of one or more packers (e.g., SwellpackersTM commercially available from Halliburton Energy Services) or one or more plugs (e.g., a sand plug, a highly viscous proppant plug, or a cement plug).
- packers e.g., SwellpackersTM commercially available from Halliburton Energy Services
- plugs e.g., a sand plug, a highly viscous proppant plug, or a cement plug.
- Each manipulatable fracturing tool 190 may comprise one or more ports or apertures for the communication of fluids with the proximal formation zone 2, 4, 6, 8, 10, or 12.
- the manipulatable fracturing tool 190 may be positioned such that a fluid flowing through or emitted from the manipulatable fracturing tool 190 will flow into the wellbore 114 proximal to the formation zone 2, 4, 6, 8, 10, or 12 which is to be serviced, thereby establishing a zone of fluid communication between the manipulatable fracturing tool 190 and the wellbore 114 and/or the formation zone 2, 4, 6, 8, 10, or 12.
- ports or apertures may be configurable/actuatable to alter the way in which fluid flows through and/or is emitted from the manipulatable fracturing tool 190. That is, in some instances some or all of the ports or apertures may be configured so as to allow communication of fluids with the proximal formation zone 2, 4, 6, 8, 10, or 12. In other instances some or all of the ports or apertures will be configured so as to restrict fluid communication with the proximal formation zone 2, 4, 6, 8, 10, or 12, while, in still other instances some or all of the ports or apertures may be configured to control the rate, volume, and/or pressure at which fluid emitted from the manipulatable fracturing tool 190 communicates with the proximal formation zone, 2, 4, 6, 8, 10, or 12.
- Manipulating or configuring the manipulatable fracturing tool 190 may comprise altering the path of fluid flowing through and/or emitted from the manipulatable fracturing tool 190.
- Configuring the manipulatable fracturing tool 190 to emit fluid therefrom may comprise providing at least one flowpath between the axial flowbore of the first tubing member 126 (and/or the axial flowbore of a second tubing member 226, where present, and/or casing 120) and the wellbore 114 and/or proximal formation zone 2, 4, 6, 8, 10, or 12.
- Configuring the manipulatable fracturing tool 190 may be accomplished by actuating some number or portion of the ports or apertures.
- Actuating the ports or apertures may comprise any one or more of opening a port, closing a port, providing a flowpath through the interior flowbore of the manipulatable fracturing tool 190, or restricting a flowpath through the interior flowbore of the manipulatable fracturing tool 190. Actuating these ports or apertures may be accomplished via several means such as electric, electronic, pneumatic, hydraulic, magnetic, or mechanical means.
- the manipulatable fracturing tool 190 may be configured with any number or combination of valves, indexing check- valves, baffle plates, and/or seats.
- actuating the ports or apertures may be accomplished via an obturation method.
- the manipulatable fracturing tool 190 may comprise a seat 182 operably coupled to the one or more ports or apertures 199 of that manipulatable fracturing tool 190 such that a flowpath through those ports or apertures 199 may be altered (although references herein are generally made to a "seat” or "ball seat,” it is to be understood that such references shall be to any obturating structure or mechanical assemblage configured and effective for receiving, catching, stopping, or otherwise engaging an obturating member).
- the obturating structure may comprise a baffle plate, an obturating member seat, an indexing check valve, or combinations thereof.
- the seat 182 may be positioned so as to engage an obturating member (shown as a ball) 180 introduced into the first tubing member 126 from moving beyond the seat 182.
- an obturating member 180 may engage the seat 182.
- the manipulatable fracturing tool 190 is integrated with and/or coupled to the casing 120 (e.g., Figures 5A, 5B, and 5C) the obturating member 180 may be introduced into the casing 120 and pumped there-through so as to engage the seat 182.
- the obturating member 180 may substantially restrict the flow of fluid through the manipulatable fracturing tool 190, such that pressure will increase against the obturating member 180 which will thus exert a force against the seat 182. Exerting sufficient force against the seat 182 will cause the ports or apertures 199 of the manipulatable fracturing tool 190 to open or close, thereby altering a flow of fluid through the manipulatable fracturing tool 190 (as shown by flow arrows 10 and 20 in Figures 4A and 5 A, respectively) and forming either perforations 175 or fractures.
- the manipulatable fracturing tool 190 may further comprise a mechanical shifting tool 300.
- actuating the ports 199 or apertures may be accomplished via the mechanical shifting tool 300.
- a mechanical shifting tool 300 may be axially coupled to a first tubing member 126 which may be disposed within the casing 120 and wherein the casing 120 comprises some part of the manipulatable fracturing tool 190.
- the first tubing member 126 may be disposed within a second tubing member.
- the mechanical shifting tool 300 may comprise lugs, dogs, keys, catches 310 (shown as lugs extended and engaging the sliding sleeve 190A of the manipulatable fracturing tool), or a combination thereof configured to engage the manipulatable fracturing tool 190 when the mechanical shifting tool 300 is actuated.
- the mechanical shifting tool 300 may be actuated hydraulically, pneumatically, mechanically, magnetically, or electrically, hi a specific embodiment, actuating the mechanical shifting tool 300 may be accomplished by introducing an obturating member 180 (shown as a ball) into the first tubing member 126 such that the obturating member 180 will engage an obturating assembly/structure such as a seat or baffle plate, e.g., a ball seat 182. Upon engaging the ball seat 182, the obturating member 180 may substantially restrict the flow of fluid through the mechanical shifting tool 300, such that pressure will increase against the obturating member 180 which will thus exert a force against the seat 182.
- an obturating member 180 shown as a ball
- the mechanical shifting tool 300 Exerting sufficient force against the seat 182 will cause the mechanical shifting tool 300 to be actuated such that the lugs, dogs, keys, or catches 310, or a combination thereof of the mechanical shifting tool 300 will engage the manipulatable fracturing tool 190.
- the mechanical shifting tool 300 may be utilized to shift open or closed the ports or apertures 199 of the manipulatable fracturing tool 190 and thereby alter (e.g., allow or restrict) the flow of fluids between a flowbore of the first tubing member 126 and/or casing 120 and the wellbore 114.
- Each manipulatable fracturing tool 190 may comprise at least some portion of ports or apertures 199 configured to operate as a stimulation assembly and at least some portion of ports or apertures 199 configured to operate as an inflow control assembly, thereby allowing selective zone treatment (e.g., perforating, hydrajetting, and/or fracturing) and production, respectively.
- the stimulation assembly may comprise any one or more ports or apertures 199 operable for the stimulation of a given formation zone (that is, servicing operations such as, for example, perforating, hydrajetting acidizing, and/or fracturing).
- the ports or apertures comprising the stimulation assembly can be independently and selectively actuated to expose different formation zones 2, 4, 6, 8, 10, and/or 12 to formation stimulation operations (that is, via the flow of a treatment fluid such as fracturing fluid, perforating fluid, acidizing fluid, and/or hydrajetting fluid) as desired.
- a treatment fluid such as fracturing fluid, perforating fluid, acidizing fluid, and/or hydrajetting fluid
- the inflow control assembly is discussed at length in U.S. Patent Application No. 12/166,257 which is incorporated in its entirety herein by reference, hi an embodiment, the inflow control assembly may comprise one or more ports or apertures 199 operable for the production of hydrocarbons from a proximate formation zone 2, 4, 6, 8, 10, and/or 12.
- the ports or apertures 199 of the inflow control assembly are so-configured, hydrocarbons being produced from a proximate formation zone 2, 4, 6, 8, 10, and/or 12 will flow into the internal flowbore of the first tubing member 126 or the casing 120 via those ports or apertures 199 configured to operate as an inflow control assembly.
- the different assemblies of a wellbore completion apparatus may be configured in the formation zone in any suitable combination.
- the wellbore servicing methods, wellbore servicing apparatuses, and wellbore servicing systems disclosed herein include embodiments for stimulating the production of hydrocarbons from subterranean formations, wherein two or more components of a composite wellbore servicing fluid are introduced into a wellbore from two or more flowpaths such that the composite fluid may be mixed proximate to one or more formation zones (e.g., zones 2, 4, 6, 8, 10, or 12 of Figure 1) into which the composite fluid will be pumped, hi an embodiment, the method comprises the steps of inserting a wellbore servicing apparatus 100 comprising one or more manipulatable fracturing tools 190 into the wellbore 114; positioning the manipulatable fracturing tool(s) 190 proximate to a formation zone 2, 4, 6, 8, 10, or 12 to be fractured; introducing a first component of a composite fluid into the wellbore 114 via a first flowpath; introducing a second component of the composite fluid into the wellbore 114 via a second flowpath; establishing a
- the instant application discloses methods, systems, and apparatuses for real-time wellbore servicing operations in which resultant composite fluids are achieved via flow of one or more component fluids through a manipulatable fracturing tool prior to, after, or concurrent with blending the components to form the composite fluid.
- Such flow and blending may occur in varying locals, for example, proximate to one or more selected formation zones 2, 4, 6, 8, 10, or 12.
- These methods may be accomplished by providing multiple flowpaths through which different components of the composite fluids may be transferred and then selectively emitted from one or more manipulatable fracturing tools 190.
- a composite fracturing fluid is created downhole prior to injection into the formation zone (e.g., zones 2, 4, 6, 8, 10, or 12 of Figure 1).
- the first component of the fracturing fluid and/or the second component of the fracturing fluid is flowed through a manipulatable fracturing tool 190 and are mixed within a downhole portion of the wellbore 114 proximate to a formation zone 2, 4, 6, 8, 10, or 12.
- the mixing may also be proximate to one or more perforations.
- the component fluids of the composite fracturing fluid are mixed within a downhole portion of the wellbore 114 proximate to an exposed formation zone 2, 4, 6, 8, 10, or 12.
- first component and second component as used herein are non-limiting, and more than two components may be used where appropriate to create a desired wellbore servicing fluid such as a fracturing fluid.
- each component of the fluid may comprise a plurality of ingredients such that when the given number of components are combined, a wellbore servicing fluid (e.g., fracturing fluid) having a desired composition is formed.
- these methods may lessen or alleviate the need for equipment such as sand conveyors and sand storage units, high-rate blending equipment, erosion resistant pumping equipment, and erosion- resistant manifolding.
- Components of the composite fluids may be mixed off-sight and transported to the surface 104 proximate to the wellbore 114.
- Halliburton' s "Liquid Sand,” a premixed concentrated proppant mixture may be utilized in accordance with the methods, systems, and apparatuses disclosed herein.
- Metering pumps may be employed to incorporate any additives (e.g., gels, cross-linkers, etc.) into a fluid being introduced into the wellbore; that is, conventional high-rate blending equipment may not be necessary in employing the instant methods, systems, or apparatuses, hi contrast to conventional fracturing methods requiring blenders, proportioners, dry additive conveyors and storage equipment for proppant, the instant methods, systems and apparatuses alleviate much of the need for such equipment, hi an embodiment, component fluids may be mixed off-sight and transported as pre-mixed component fluids. At the site, the fluid components may be introduced into the wellbore 114 (discussed further below).
- additives e.g., gels, cross-linkers, etc.
- a given volume of abrasive-containing fluid may be pumped downhole via a first flowpath followed by an abrasive-free fluid while an abrasive-free fluid is pumped down a second flowpath.
- abrasive-containing fluid may be pumped downhole via a first flowpath followed by an abrasive-free fluid while an abrasive-free fluid is pumped down a second flowpath.
- the instant methods, systems and apparatuses allow for servicing operations with brine solutions which would not be workable utilizing conventional pumping methods, systems, and apparatuses, hi some instances, a fluid utilized for the purpose of transporting a proppant downhole or into a formation 102 will be hydrated so as to form a viscous "gel" suitable for proppant transport (i.e., the viscosity of the gel lessens the tendency of the proppant contained therein to settle out).
- the fluid When the gelled or hydrated proppant-laden fluid reaches its destination, the fluid may be mixed with a brine solution so that the fluid ceases to exist as a gel and thus deposits the proppant contained therein, hi accordance with the instant methods, systems, and apparatuses, gels which have undergone hydration may be mixed in a downhole portion of the wellbore 114 with a brine solution which will cause the gel to no longer be hydrated.
- a gel e.g., concentrated proppant gel
- a diluent brine fluid/solution may be pumped down the annulus between the tubing and casing/wellbore. As such, proppant transport may be enhanced.
- the instant methods, systems, and apparatuses may allow the operator to have greater freedom as to the pumping rates and proppant concentrations which may be employed, hi prior wellbore servicing operations, an operator would be limited as to the rate at which fluids containing particulate matter, abrasives, or proppant might be pumped.
- By pumping the component fluids via separate flowpaths greater pumping rates may be achieved.
- a fluid not containing any abrasive, proppant, or particulate may be pumped via a given flowpath at a much higher rate than the rate at which a fluid containing an abrasive, proppant or particulate might be pumped.
- an operator is able to achieve effective pumping rates which would otherwise be unachievable without adverse consequences. That is, when the components of the composite fluid are not mixed within the wellbore 114 proximate to a given formation zone 2, 4, 6, 8, 10, or 12, but rather are mixed at the surface and then pumped down the wellbore, the rate at which the composite fluid may be pumped downhole is significantly less than the rates achievable via the instant disclosed methods.
- the increased control available to the operator via the operation of the instant methods, systems and apparatuses allow the operator to manage (i.e., avoid, or remediate) a potential screenout condition by reducing or stopping the pumping of the concentrated proppant-laden component to allow instantaneous overflushing (i.e., decreasing the effective concentration of proppant in the fluid entering the formation 102) of the fracture with non-abrasive annulus fluid, discussed herein.
- a potential screenout condition may be avoided without necessitating the cessation of servicing operations and the loss of time and capital.
- the ability to control and alter downhole proppant concentration in accordance with the present methods, systems, and apparatuses will allow the operator to instantaneously increase in the effective proppant concentration.
- the operator may elect to set a proppant slug volume and thereby enable the bridging of fractures inside the rock, thus creating branch fractures.
- the value of the potential to monitor treatment parameters and instantaneously make changes such as increase or decrease the effective proppant concentration related to the treatment stages is great, particularly when compared to conventional methods requiring these decisions to be made with an entire wellbore volume before the changes are realized.
- the relative quantity of the first and second components of the composite fracturing fluid flowed through the manipulatable fracturing tool may be varied, thus resulting in a composite fracturing fluid of variable concentration and character
- one of the first or second fracturing fluid components may comprise a concentrated proppant laden slurry.
- the other of the first or second fracturing fluid components may comprise any fluid with which the concentrated proppant slurry might be mixed so as to form the resultant composite fracturing fluid (e.g., a diluent).
- the concentrated proppant laden slurry is mixed with the other fracturing fluid component, the composite fracturing fluid results.
- the relative quantity and/or concentration of the proppant laden slurry provided for downhole mixing may be increased in a situation where more proppant is desired (conversely, the relative quantity may be decreased where less is desired).
- the relative amount of diluent provided for mixing may be adjusted where a different viscosity or proppant-concentration composite fracturing fluid is desired.
- a composite fracturing fluid of a desired concentration and viscosity may be achieved.
- the net composition of the composite fracturing fluid may be altered as desired by altering the rates or pressures at which the first and second components are pumped.
- the pumping equipment delivering the first and second components is located at the surface 104, like a syringe the effectuated increase in pumping rate or pressure as to the first or second flowpath is immediately realized at the downhole portion of the wellbore 114 where the mixing occurs.
- changes to the concentration or viscosity of the fracturing fluid can be adjusted in real-time by changing the proportion of the components of the fracturing fluid. That is, the pump rate or pressure of the component fluids in one or both of the flowpaths may be selectively and individually varied to effect changes in the composition of the composite fluid, substantially in real time, thus allowing the operator to exert improved control over the fracturing process.
- fracturing is but one component of wellbore servicing operations.
- acidizing operations, perforating operations, isolation operations, and flushing operations may all be achieved by utilizing the instant disclosed apparatuses with multiple flowpaths and/or the instantly disclosed methods and processes of utilizing said apparatuses to realize the placement of a composite fluid at a specific location within a wellbore.
- a concentrated acid solution may be introduced into the wellbore proximate to a formation zone 2, 4, 6, 8, 10, or 12, and diluted with fluid introduced via another flowpath to achieve an acid solution of a desired concentration.
- the volume of acid to be utilized in any given operation may be substantially lessened due to the fact that the concentrated solution may be diluted at the interested local.
- This same concept is true for any of the wellbore servicing operations discussed herein, thereby lessening the capital intensive nature of such wellbore servicing operations.
- the implementation and utilization of separate and distinct flowpaths allows for the recovery and later utilization of any components introduced via such flowpaths, further improving the economies of such operations.
- the utilization of the separate flowpath concept and mixing at a specific local provides the operator with the ability to control any such wellbore operations in real-time by allowing for pin-point control of composite fluid character.
- a first component of a composite fluid may be introduced into a portion of the wellbore 114 which is proximate to the formation zone 2, 4, 6, 8, 10, or 12 via a first flowpath and a second component of the composite fluid is introduced into a portion of the wellbore 114 which is proximate to the formation zone 2, 4, 6, 8, 10, or 12 via a second flowpath.
- the composite fluids may be introduced into the wellbore 114 and proximate to the formation zone, 2, 4, 6, 8, 10, or 12 via a first flowpath, a second flowpath, a third flowpath, or any number of multiple flowpaths as may be deemed necessary or appropriate at the time of wellbore servicing.
- Each of the first flowpath and the second flowpath comprises a route of fluid communication between the surface and the point proximate to which the fluid enters the formation.
- the flowpath may comprise a means of mixing constituents of the component fluids, a means of pressurizing the component fluids, one or more pumps, one or more conduits through which the component fluids may be communicated downhole, and one or more ports or apertures 199 (e.g., in one or more manipulatable downhole tools) by which the component fluids exit the flowpath and enter the wellbore 114 proximate to the formation zone 2, 4, 6, 8, 10, or 12.
- any of the components of the fracturing fluid may be at prepared at the surface 104 and the components mixed with each other to form a composite fracturing fluid mixed within the wellbore 114 proximate to the formation zone 2, 4, 6, 8, 10, or 12.
- FIG. 2 While the preceding discussion has primarily been with reference to Figure 1, it is noted that the previously described methods, systems, and apparatuses may likewise be embodied as depicted in Figures 2 and 3.
- multiple manipulatable fracturing tools 190 integrated within the casing are positioned proximate to formation zones 2, 4, 6, 8, 10, and 12.
- a mechanical shifting tool 300 coupled to the downhole terminus of a first tubing member 126 is disposed within the casing.
- the axial flowbore of the first tubing member 126 may comprise one of the first or second flowpaths and the annular space between the first tubing member 126 and casing 120 may comprise the other of the first or second flowpaths.
- a single manipulatable fracturing tool 190 (e.g., a hydrajetting tool) is integrated within a first tubing member 126.
- the manipulatable fracturing tool 190 may suitably be configured to operate as a hydrajetting or perforating tool, upon being actuated as previously described. Upon actuation, the manipulatable fracturing tool 190 will be configured to emit a high-pressure stream of fluids via the ports or apertures.
- the first axial flowbore 128 of the first tubing member 126 may comprise one of the first or second flowpaths and the annulus 135 about the first tubing member 126 may comprise the other of the first or second flowpaths.
- each of the first flowpath and the second flowpath is independently manipulatable as to pumping rate and pressure. That is, the rate and pressure at which a fluid is pumped through the first flowpath may be controlled and altered independently of the rate and pressure at which a second fluid is pumped through the second flowpath and vice versa.
- each of the rate and/or pressure at which fluid is pumped through each of the flowpaths may be independently controlled.
- the first flowpath may comprise the interior flowbore of coiled tubing or jointed tubing and the first fluid component may comprise a concentrated proppant- laden fluid.
- the second flowpath may comprise the annular space extending between the coiled tubing or jointed tubing and the interior wall of the casing and the second fluid component may comprise water or an oil-water mixture.
- the concentrated proppant-laden fluid is introduced into the coiled or jointed tubing at a first rate (which may be varied as the operator elects) and the water or water-oil mixture is introduced into the annular space at a second rate.
- the operator may be limited as to the rate at which the proppant-laden fluid is pumped through the coiled or jointed tubing because of the abrasive nature of a particulate- containing fluid (i.e., where the proppant laden fluid is pumped at a rate exceeding approximately 35 ft./sec, the particulate may have the effect of abrading or otherwise damaging the coiled or jointed tubing).
- the proppant- laden fluid may be pumped down the coiled or jointed tubing at a rate which will not damage or abrade the coiled or jointed tubing and the water or water-oil mixture may be pumped down the annular space at a much higher rate (i.e., because the water or water-oil mixture is generally non-abrasive in nature).
- the proppant-laden fluid may be mixed with the water or water- oil mixture proximate to the formation zone 2, 4, 6, 8, 10, and/or 12.
- the mixed composite fluid may then be introduced into the formation zone 2, 4, 6, 8, 10, and/or 12. Because the operator is not limited as to the rate at which the water or water-oil mixture may be pumped, far greater effective pumping rates (i.e., the rate at which the composite fluid is entering the formation zone 2, 4, 6, 8, 10, and/or 12) may be achieved.
- the first flowpath may again comprise the interior flowbore of coiled tubing or jointed tubing and the first fluid component may comprise a concentrated proppant-laden fluid.
- the second flowpath may again comprise the annular space extending between the coiled tubing or jointed tubing and the interior wall of the casing and the second fluid component may comprise water or an oil-water mixture.
- the concentrated proppant- laden fluid is introduced into the coiled or jointed tubing at a first rate (which may be varied as the operator elects) and the water or water-oil mixture is introduced into the annular space at a second rate.
- proppant slug it may be desirable to place a "proppant slug" in certain situations or formation types (i.e., conditions that would cause high fracturing entry friction).
- the operator may elect to introduce a proppant slug in the formation zone 2, 4, 6, 8, 10, and/or 12 by reducing the pumping rate of the water or water-oil mixture, hi so doing, a volume of concentrated proppant-laden fluid (i.e., a proppant slug) is introduced into the formation zone 2, 4, 6, 8, 10, and/or 12.
- the operator may increase the pumping rate of the water or water-oil mixture to force the proppant slug further into the formation zone 2, 4, 6, 8, 10, and/or 12.
- a proppant slug may be set by varying the respective pumping rates of the proppant-laden fluid and the water or water-oil mixture, hi accordance with the instant methods, systems and apparatuses a proppant slug may be set without varying the concentration of the fluids introduced into the wellbore 114 at the surface 104.
- the first flowpath may again comprise the interior flowbore of coiled tubing or jointed tubing and the first fluid component may comprise a concentrated proppant-laden fluid.
- the second flowpath may again comprise the annular space extending between the coiled tubing or jointed tubing and the interior wall of the casing and the second fluid component may comprise water or an oil-water mixture.
- the concentrated proppant-laden fluid is introduced into the coiled or jointed tubing at a first rate (which may be varied as the operator elects) and the water or water-oil mixture is introduced into the annular space at a second rate.
- the instant methods, systems, and apparatuses may be used to implement a "ramped" or "stepped” proppant placement schedule (i.e., a proppant-pumping schedule in which the concentration of proppant in the fluid entering the formation zone 2, 4, 6, 8, 10, and/or 12 is varied over time).
- a ramped proppant placement schedule i.e., a proppant-pumping schedule in which the concentration of proppant in the fluid entering the formation zone 2, 4, 6, 8, 10, and/or 12 is varied over time.
- the concentration of proppant entering the formation zone 2, 4, 6, 8, 10, and/or 12 may be progressively and/or continuously increased or decreased.
- the present methods, systems, and apparatuses allow for the delivery and placement of a ramped or stepped proppant schedule without necessitating multiple mixtures of varying proppant concentration (i.e., the same fluid components may be utilized at every point in the ramped or stepped proppant scheme).
- the effective difference in concentration of the composite fluid entering the formation zone 2, 4, 6, 8, 10, and/or 12 is achievable by manipulating the rates of injection of the component fluids in their respective flowpaths.
- the ramped or stepped proppant schedule is achieved by varying the pumping rates of the first fluid component with respect to the second fluid component.
- the first flowpath may again comprise the interior flowbore of coiled tubing or jointed tubing and the first fluid component may comprise a concentrated proppant-laden fluid.
- the second flowpath may again comprise the annular space extending between the coiled tubing or jointed tubing and the interior wall of the casing and the second fluid component may comprise water or an oil-water mixture.
- the concentrated proppant-laden fluid is introduced into the coiled or jointed tubing at a first rate (which may be varied as the operator elects) and the water or water-oil mixture is introduced into the annular space at a second rate.
- the instant methods, systems, and apparatuses may be used to place a plug (e.g., a sand plug).
- a plug may be desirably placed so as to block one or more formation zones 2, 4, 6, 8, 10, and/or 12.
- the placement of plugs may be varied over time and may be utilized to block the entry of fluids, materials or other substances into the plugged formation zones 2, 4, 6, 8, 10, and/or 12.
- the present methods, systems, and apparatuses allow for the delivery and placement of a plug without necessitating additional mixtures of fluids.
- the ports and/or apertures 199 of the manipulatable fracturing tool 190 may vary in size or shape or orientation and may be configured to perform varying functions, hi an embodiment, the manipulatable fracturing tool 190 may be configured to operate as a perforating tool, for example, a hydrajetting tool and/or a perforating gun. Hydrajetting operations are described in greater detail in U.S. Patent No.
- the manipulatable fracturing tool 190 may be fitted with nozzles and/or perforating charges such as shaped charges, hi an embodiment, as depicted in Figures 4A and 4B, the manipulatable fracturing tool 190 may comprise at least one, and more often, multiple hydrajetting nozzles.
- the fluid when the obturating member 180 engages the seat 182 and substantially restricts the flow of a fluid, the fluid may be emitted from the ports or apertures 199 fitted with nozzles as a high pressure stream of fluid (as shown by flow arrow 10).
- a high pressure stream of fluid may be appropriate for the relatively high-pressure, low-volume delivery of fluid.
- This high pressure stream of fluid may be sufficient to degrade (i.e., to abrade, cut, perforate, or the like) the casing, lining, or formation 102 for fracturing. Additionally, the high pressure stream of fluid may be used initiate and/or extend a fracture in the formation 102.
- the manipulatable fracturing tool 190 may be configured such that it no longer emits a high-pressure stream of fluid via the hydrajetting nozzles.
- the manipulatable fracturing tool 190 may be configured via the actuation of the obturating member 180 to disengage from the seat 182 thereby allow for the axial flow of fluid to occur through the first axial fiowbore 128 and prevent the high-pressure emission of fluid via the nozzles.
- the obturating member 180 may be reverse-circulated and removed from the axial fiowbore (as shown by flow arrow 11).
- the reverse-circulation and removal of the obturating member 180 allows a volume of fluid to be emitted (as shown by flow arrow 12) from the downhole end of manipulatable fracturing tool 190 (as shown by Figure 4C) and/or from ports or apertures 199 that may be uphole and/or downhole from the seat 182 ( Figure 4D).
- the emission of fluid will be at a pressure less than necessary for hydrajetting or perforating (e.g., via a flowpath which had previously been obstructed by the obturating member).
- Such a configuration of the manipulatable fracturing tool 190 may be appropriate for the relatively low-pressure, high- volume delivery of fluid. Further, such a configuration of the manipulatable fracturing tool 190 may be appropriate for the delivery of fluid at a pressure and/or flow rate (i) less than that sufficient to degrade a liner, the casing 120, the formation zone 2, 4, 6, 8, 10, or 12 or combinations thereof and (ii) equal to or greater than that sufficient to propagate fractures in the formation zone 2, 4, 6, 8, 10, or 12.
- the prevention of high-pressure emission of fluid through the nozzles prevents the manipulatable fracturing tool 190 from operating as a perforating tool.
- Figures 4A, 4B, 4C, and 4D represent a configuration of the manipulatable fracturing tool 190 utilizing a ball and ball seat scenario, the instant apparatus and methods should not be construed as so-limited.
- the manipulatable fracturing tool 190 is configured to establish a zone a fluid communication between the first flowbore 128 and the wellbore 114 when the ports or apertures 199 are so configured, hi such an embodiment, the ports or apertures 199 may be opened and/or closed via the operation of a sliding sleeve 190A, the sliding sleeve 190A being a component of the manipulatable fracturing tool 190.
- an obturating member 180 engages the seat 182, the seat being operably coupled to the sliding sleeve 190A of the manipulatable fracturing tool 190 and the sliding sleeve 190A having ports or apertures 199 A which, when actuated, will align with the ports or apertures 199 of the manipulatable fracturing tool, thus establishing a zone of fluid communication with the wellbore 114 (as shown by flow arrow 20).
- Such a configuration of the manipulatable fracturing tool 190 may be appropriate for the relatively low- volume, high-pressure delivery of fluid to form perforations 175 and/or initiate/extend fractures into the formation.
- the sliding sleeve 190A may be configured such that the ports or apertures 199A of the sliding sleeve 190A will no longer be aligned with the ports or apertures 199 of the manipulatable fracturing tool 190, thus altering the zone of fluid communication with the wellbore 114 and allowing fluid to flow through the flowbore of the manipulatable fracturing tool 190 (as shown by flow arrow 21).
- the ports or apertures 199 may comprise doors, windows, or channels (e.g., the flowpath out of the downhole terminal end of the manipulatable fracturing tool 190) which, when open or non-obstructed, will allow for a high volume of fluid to pass from the interior flowpath(s) (e.g., flowpath 128) of the manipulatable fracturing tool 190 into the wellbore, as might be necessary, for example, in a fracturing operation.
- Such a configuration of the manipulatable fracturing tool 190 may be appropriate for the relatively higher-volume, lower-pressure delivery of fluid to initiate and/or extend fractures into the formation.
- the ports or apertures 199 may be opened and closed for example by shifting a sliding sleeve mechanically or via hydraulic pressure (e.g., a ball and seat configuration).
- a substantial volume of a first component of the composite fracturing fluid may be emitted from the manipulatable fracturing tool 190.
- the first component of the composite fracturing fluid will flow into the surrounding wellbore 114 (as shown by flow arrow 22 of Figure 5C) where it will mix with a second component of the composite fracturing fluid (as shown by flow arrow 24) to form the composite fracturing fluid (as shown by flow arrow 23).
- the pressure increases and fracturing initiated.
- Downhole mixing of the fracturing fluid components provides efficient and effective turbulent dispersion of the components to form the composite fracturing fluid.
- the mixed composite fracturing fluid is then introduced into the formation zone 2, 4, 6, 8, 10, or 12.
- Fracture initiation is established whereupon the formation 102 fails mechanically and one or more fractures form and/or are extended into the formation zone 2, 4, 6, 8, 10, or 12.
- the composite fracturing fluid flows into the fracture.
- fracturing is initiated by pumping a "pad" stage comprising a low proppant-concentration, low viscosity fracturing fluid. As the fracture is formed, it may be desirable to increase the concentration of proppant within the composite fracturing fluid.
- the relative amount of concentrated proppant laden slurry provided for mixing may be increased so as to effectuate an increase in the viscosity of the composite fracturing fluid and to increase the concentration of proppant within the composite fracturing fluid.
- the proppant material may be deposited within the fractures formed within the formation zone 2, 4, 6, 8, 10, or 12 so as to hold open the fracture and provide for the increased recovery of hydrocarbons from the formation 102.
- manipulatable fracturing tool 190 has been configured to perform a given operation and that operation has been completed with respect to a given formation zone, it may be desirable to configure the manipulatable fracturing tool 190 to perform another operation within the same wellbore and without removing the manipulatable fracturing tool 190 from the wellbore 114.
- configuring the manipulatable fracturing tool 190 may comprise altering the path of fluid flowing through or emitted from the manipulatable fracturing tool 190.
- configuring the manipulatable fracturing tool 190 to emit fluid therefrom may comprise providing at least one flowpath between the first flowbore 128 of the first tubing member 126, the flowbore of the casing 120, or both and the wellbore 114.
- configuring the manipulatable fracturing tool 190 to emit fluid therefrom may comprise providing at least one flowpath between the first flowbore 128 of the first tubing member 126, the annular space between the first tubing member 126 and the casing 120, or both and the wellbore 114.
- Configuring the manipulatable fracturing tool 190 may again be accomplished by any one or more of opening a port or aperture 199, closing a port or aperture 199, providing and/or restricting a flowpath through the first flowbore 128 of the manipulatable fracturing tool 190, providing and/or restricting a flowpath through the second flowbore 228 of the manipulatable fracturing tool 190, or combinations thereof.
- configuring the manipulatable fracturing tool 190 may comprise engaging and/or disengaging an obturating member 180 with a seat 182 of the manipulatable fracturing tool 190.
- the seat 182 may be associated with a sliding sleeve 190A that is (i) actuated open by engaging the obturating member 180 with a seat 182 and pressuring up on the flowbore to expose one or more ports or apertures 199 and (ii) actuated closed by pressuring down on the flowbore and allowing the sliding sleeve 190A to return to a biased closed position (e.g., spring biased), hi an embodiment, removing the obturating member 180 may be accomplished by reverse-flowing a fluid such that the obturating member 180 disengages the seat 182, returns to the surface 104, and is removed from the axial flowbore 128 of the first tubing member 126.
- a biased closed position e.g., spring biased
- Such may open or otherwise provide a high- volume flowpath out of the end of the end of the manipulatable fracturing tool 190 (e.g., the lower or downhole end of the tool) as such an opening may be provided to allow the reverse-flowing of fluid, hi an alternative embodiment, removal of the obturating member 180 may be accomplished by increasing the pressure against the obturating member 180 such that the obturating member 180 is disintegrated or is forced beyond or through the seat 182, which also may open or otherwise provide a high- volume flowpath through the manipulatable fracturing tool 190.
- Still other embodiments concerning removal of the obturating member 180 may comprise drilling through the obturating member 180 to remove the obturating member 180 or employing a dissolvable obturating member 180 designed to dissolve/disintegrate due to the passage of a set amount of time or due to designated changes in the obturating member's 180 environment (e.g., changes in pressure, temperature, or other wellbore conditions). Removal of the obturating member 180 will allow the flow of fluids through the axial flowbore 128 of the first tubing member 126 to be reestablished (e.g., a high-volume flowpath). hi an embodiment, removing the obturating member 180 may cause no change in the position of the ports or apertures 199.
- removing the obturating member 180 may cause some or all of the ports or apertures 199 to be shifted open (e.g., via a sliding sleeve 190A or other manipulatable door or window; alternatively, via movement of a biased member or sleeve), hi still another embodiment, removing the obturating member 180 may cause some or all of the ports or apertures 199 to be shifted closed.
- the manipulatable fracturing tool 190 may be configured by the introduction of a second obturating member 180 having a larger diameter than the first obturating member 180 which engages a second seat comprised within the manipulatable fracturing tool 190.
- the second seat may be positioned above the first seat and configured such that the first obturating member 180 will not engage the second seat.
- the second seat may be operably coupled such that when the second obturating member 180 engages the second seat, the position of the ports or apertures 199 may be shifted from opened to closed or closed to open (e.g., via a sliding sleeve).
- the obturating member may cause a flow of a first fluid component to be emitted from a port or aperture 199 of the manipulatable fracturing tool 190 (shown by flow arrow 30).
- the first fluid component may mix with a second fluid component (shown by flow arrow 32) in the wellbore proximate to the formation 102 to form a composite fluid (shown by flow arrow 31) which will enter the formation 102.
- the manipulatable fracturing tool 190 comprises one or more hydrajetting tools or heads disposed at the end of work string 112 (e.g., coiled tubing).
- the work string is run into a wellbore 114 that may be cased, lined, partially cased, partially lined, or open-hole. Where present, the casing 120 or liner may be permanent, retrievable, or retrievable/resettable, as is necessary.
- the wellbore 114 may be vertical, horizontal, or both (e.g., vertical wellbore with one or more horizontal or lateral side bores).
- the manipulatable fracturing tool 190 is run into the wellbore 114 to the deepest interval or zone to be treated (e.g., perforated and/or fractured).
- a formation zone 2, 4, 6, 8, 10, or 12 being serviced may be isolated from any adjacent formation zone 2, 4, 6, 8, 10, or 12 (i.e., zonal isolation), for example by a packer or plug such as a mechanical packer or sand plug.
- a packer or plug such as a mechanical packer or sand plug.
- one or more packers may be utilized in conjunction with the disclosed methods, systems, and apparatuses to achieve zonal isolation.
- one or more suitable packers may be placed within the wellbore.
- the packer may comprise a SwellpackerTM commercially available from Halliburton Energy Services.
- the function of the packer may be achieved via the setting of one or more sand plugs or highly viscous gel plugs.
- a packer is positioned within the wellbore 114 downhole from the formation zone 2, 4, 6, 8, 10, or 12 which is to be serviced and the manipulatable fracturing tool 190 is positioned proximate or substantially adjacent to the formation zone 2, 4, 6, 8, 10, or 12 to be serviced, hi an embodiment shown by Figure 4D, the packer 160 may be attached to the manipulatable fracturing tool 190.
- the packer may be set prior to introducing the manipulatable fracturing tool 190 into the wellbore 114.
- the manipulatable fracturing tool 190 is actuated or manipulated (e.g., via a ball drop as described in more detail herein) such that the manipulatable fracturing tool 190 is configured for hydrajetting or perforating operations, hi an embodiment, an obturating member 180 (e.g., ball) is used to manipulate the manipulatable fracturing tool 190 (e.g., hydrajetting tool).
- the tool may be manipulated via a ball as discussed herein with reference to any one of Figures 4A, 4B, 4C, and 4D.
- the ball is forward- circulated down the coiled tubing such that the ball engages a seat 182 disposed within the manipulatable fracturing tool 190.
- the ball restricts the flow of fluids such that fluids within the first flowbore 128 of the manipulatable fracturing tool 190 cannot move beyond the ball.
- the pressure against the ball is increased, causing ports or apertures 199 operably coupled to the seat 182 to be opened. These ports or apertures 199 may be fitted with hydrajetting or perforating nozzles 199.
- the manipulatable fracturing tool 190 upon opening the ports or apertures, is configured to emit a high-pressure stream of fluid therefrom via the ports or apertures 199 fitted with nozzles, that is, as a hydrajetting or perforating tool.
- the manipulatable fracturing tool 190 configured as a hydrajetting tool
- perforations are cut into the wellbore 114, adjacent formation, and, where present, casing 120 by flowing fluid through the tool.
- Fluid e.g., cut-sand
- first fiowpath e.g., the first flowbore 1228 of the wellbore servicing apparatus 100.
- the perforating/hydrajetting nozzles comprise the only available flowpaths, thus allowing for high- pressure perforating and/or fracture initiation operations.
- the manipulatable fracturing tool 190 is configured as a perforating or hydrajetting tool. Perforations are then cut in the liner, casing, formation, or combinations thereof.
- the ports or apertures 199 of the manipulatable fracturing tool 190 which are open when configured as a hydrajetting tool may be fitted with nozzles such that the fluid emitted therefrom will be emitted at a relatively high pressure and low volume.
- a perforating operation and/or fracture initiation may be confirmed by pumping into the tubing, the annular space about the tubing, or both, thereby ensuring fluid communication with the perforations and thus, fracture initiation.
- a volume of acid may be pumped so as to assist in fracture initiation.
- configuring the manipulatable fracturing tool 190 comprises reverse circulating the obturating member 180 and, if so-desired, any perforating or fracture initiation fluid remaining within the wellbore servicing apparatus 100. Reverse circulating the obturating member 180 (as shown by flow arrow 11 in Figure 4B), allows for removal of the obturating member 180 from the wellbore servicing apparatus 100.
- Removing the obturating member 180 allows for the passage of a high volume of fluid at a relatively low pressure from the manipulatable fracturing tool 190 via the first flowbore 128 and/or other ports or apertures 199 (e.g., ports or apertures 199 of greater size and/or allowing higher flow volume than the perforating ports/nozzles/jets) of the manipulatable fracturing tool 190 and into the wellbore 114 proximate to the formation zone 2, 4, 6, 8, 10, or 12.
- ports or apertures 199 e.g., ports or apertures 199 of greater size and/or allowing higher flow volume than the perforating ports/nozzles/jets
- the manipulatable fracturing tool 190 Upon reversing out the obturating member 180, the manipulatable fracturing tool 190 ceases to be configured as a hydrajetting or perforating tool, hi embodiments where a packer is utilized, the obturating member 180 may be reverse-circulated out prior to, subsequent to, or without unsetting the packer. By reverse-circulating out the ball, a flowpath suitable for the emission of high- volume, relatively low-pressure fluids out of the end (e.g., the lower, downhole end) of the manipulatable fracturing tool 190 is thereby provided.
- the end e.g., the lower, downhole end
- fracturing/fracture extension operations may commence.
- a first component of the fracturing fluid may be pumped via a first flowpath (as shown by flow arrow 12 of Figures 4C and 4D) and second component of the fracturing fluid may be pumped via a second flowpath (as shown flow arrow 13 of Figures 4C and 4D).
- the first component of the fracturing fluid comprises a concentrated proppant laden slurry and the second component of the fracturing fluid comprises a non-abrasive fluid.
- the concentrated proppant laden slurry is pumped via the first flowpath, here, the axial flowbore (i.e., the first axial flowbore 128) of the jointed or coiled tubing (i.e., the first tubing member 126).
- the concentrated proppant laden slurry flows through the axial flowbore of the manipulatable fracturing tool 190 and into the wellbore 114 and is emitted from the manipulatable fracturing tool 190 (e.g., via the downhole end or other high volume window or opening, again shown by flow arrow 12 in Figures 4C and 4D).
- the second component of the fracturing fluid comprises a non-abrasive diluent (e.g., water).
- the non-abrasive diluent is pumped downhole via the second flowpath (e.g., in this embodiment, the annular space between the jointed or coiled tubing (shown as 126) and the casing 120 (shown by flow arrow 13).
- the annulus between the jointed or coiled tubing (shown as 126) and the wellbore 114 i.e., that part which is not occupied by the work string 112 or the wellbore servicing apparatus 100.
- the concentrated proppant laden slurry mixes with non-abrasive diluent to form the fracturing fluid that is pumped into the formation (as shown by flow arrow 14 of Figures 4C and 4D).
- Mixing the first component of the fracturing fluid with the second component of the proppant laden fluid in varying proportions will result in a proppant laden solution of varying proppant concentrations, viscosities, and thicknesses.
- various concentrations and the slurry thicknesses may be achieved.
- the composition of the fracturing fluid may be adjusted in real-time as by altering the flow rate and/or pressure with which either the first component or the second component is introduced.
- Mixing of the fracturing fluid will occur in the area of the wellbore 114 proximate to the fractured formation zone 2, 4, 6, 8, 10, or 12 into which the fracturing fluid will be introduced (again, as shown by flow arrow 14 of Figures 4C and 4D). As the fractures form or are extended, the fracturing fluid moves from the wellbore 114 into the fractures. It may be desirable to vary the viscosity of the fracturing fluid or the concentration of the proppant with the fracturing fluid as the fracturing operation progresses. For example, as fracturing is initiated, it is common to pump a lower viscosity, lower proppant concentration fracturing fluid called a "padding" stage.
- the current methods and systems provide for real-time changes to the fracturing fluid viscosity and concentration as the fracturing operation progresses. Further, during the fracturing operation, the entire column of fluid within the first flowbore 128 need not be filled with concentrated proppant slurry. It is only necessary that a downhole portion of the first flowbore 128 be filled with the concentrated proppant slurry; the remainder of the first flowbore 128 may be filled with any suitable fluid.
- the instant methods alleviate some of the capital intensive nature of fracturing operations by necessitating a relatively small amount of proppant laden slurry and by making possible the later use of an unused portion of the concentrated proppant solution without needing to store and transport large volumes of treated fluid.
- a sand plug or packer Upon completion of the fracturing (e.g., when a fracture of the desired length has been formed or extended), pumping is stopped and the zone having just been fractured is isolated from an upstream zone by placement of a sand plug or packer.
- the placement of such a sand plug or packer may be accomplished by delivering a volume of sand (e.g., proppant) via the manipulatable fracturing tool 190.
- the manipulatable fracturing tool 190 and wellbore servicing apparatus 100 may be employed to pump an isolation fluid (e.g., a sand plug) into the resulting fracture, hi an embodiment, a concentrated sand slurry is pumped down the flowbore 128 of the tubing to form a sand plug, thereby isolating the zonal formations below the tool string.
- a mechanical plug e.g., packer
- a packer may be placed (e.g., unset and reset) to isolate the zone having just been fractured.
- a packer may be set prior to initiating the perforating operation. The packer may be un-set at some point following the conclusion of the fracturing operation and reset at a different location in the wellbore.
- the work string 112 and manipulatable fracturing tool 190 is then moved up-hole to the next formation zone 2, 4, 6, 8, or 10 and the process repeated until all formation zones 2, 4, 6, 8, 10, or 12 have been treated.
- the manipulatable fracturing tool 190 may be relocated proximate to another formation zone 2, 4, 6, 8, or 10, for which operations are desired. It is not necessary to remove the manipulatable fracturing tool 190 from the wellbore 114 at any point during normal operations, thus lessening the time and expenditures which might otherwise be associated which perforating and wellbore servicing operations.
- the process may then be repeated at every interval for which fracturing is desired.
- any of the concentrated proppant slurry remaining within the first axial flowbore 128 may be reverse circulated to the surface 104 and set aside for later use.
- the manipulatable fracturing tool 190 may comprise a "ported sub 191" comprising a length of tubular having one or more openings 191 A.
- the ported sub 191 may be operable to achieve reversing-out of the obturating member 180, as is shown by flow arrow 11 in Figure 4B.
- the ported sub 191 may also be operable in removing excess proppant (which may have landed on the packer) from within a wellbore 114 after the fracturing treatment so that the packer may be unset and moved.
- the one or more openings 191 may provide a high volume flow path (e.g., a flow path providing for a higher volume of fluids and/or lower pressures than fluid flow through ports 199), whereby high volumes of concentrated fluid may be pumped down the flowbore 128, through openings 191 (and optionally additionally/partially through ports 199), and into the wellbore adjacent perforations 175.
- concentrated fluid may mix with a diluent fluid pumped down the annulus 176, and thereby form a servicing fluid (e.g., fracturing fluid) that may enter perforations 175 and initiate and/or extend fractures into the formation, for example to deposit proppant therein.
- the manipulatable fracturing tool 190 comprises one or more stimulation sleeves disposed within the casing 120.
- the casing 120 may be run into the wellbore 114 such that the stimulation sleeves disposed along the casing 120 will be located substantially adjacent to or aligned with the intervals or zones (e.g., zones 2, 4, 6, 8, 10, or 12) to be treated (e.g., fractured).
- a plurality of stimulation sleeve assemblies 192 may be integrated within the casing, and isolation devices (e.g., packers such as mechanical or swellable packers) are positioned between each stimulation sleeve to form stimulation zones, for example as shown by the plurality of manipulatable fracturing tools 190 in Figure 1 and by the packers 160 of Figure 7B.
- the stimulation sleeve assembly is run into the wellbore 114 and aligned with the intervals or zones (e.g., zones 2, 4, 6, 8, 10, or 12) to be treated (e.g., fractured).
- Each stimulation sleeve assembly 192 may comprise a sliding sleeve 190A comprising one or more ports of the sliding sleeve 199 A.
- the ports of the sliding sleeve 199A may be selectively aligned with or misaligned with the ports or apertures 199.
- a fluid flowpath through the aligned ports 199 and 199A to the proximate formation zone 2, 4, 6, 8, 10, or 12 will be provided; when misaligned, a fluid flowpath to the proximate formation zone 2, 4, 6, 8, 10, or 12 will be restricted.
- An additional flow conduit e.g., coiled or jointed tubing, which in some embodiments may have a mechanical shifting tool 300 attached thereto
- a mechanical shifting tool 300 which may be coupled to the downhole end of a first tubing member 126 (e.g., coiled tubing), is inserted within the casing 120 and is positioned proximate to the stimulation sleeve assembly 192 to be actuated (e.g., that which is proximate or adjacent to a formation zone 2, 4, 6, 8, 10, or 12 for which servicing operations are desired).
- a ball 180 i.e., an obturating member
- a ball 180 is forward-circulated down the first tubing member 126 until the ball engages a ball seat 182 within the mechanical shifting tool 300.
- an increase in the pressure across the mechanical shifting tool 300 will actuate the mechanical shifting tool 300, causing the mechanical shifting tool 300 to engage the sliding sleeve 190A of the stimulation sleeve assembly 192 to which the mechanical shifting tool 300 is proximate (i.e., "lugs" of the mechanical shifting tool 300 will extend, thus engaging the sliding sleeve 190A).
- the mechanical shifting tool 300 may then be used to align or misalign the ports or apertures 199 of the stimulation assembly 192 and the ports of the sliding sleeve 199 A, thereby providing or restricting a flowpath to the adjacent formation zone 2, 4, 6, 8, 10, or 12.
- the first tubing member 126 With the mechanical shifting tool 300 engaging the sliding sleeve 190A, the first tubing member 126 will be operatively coupled to the mechanically shifted sleeve.
- the mechanical shifting tool 300 is so-coupled to the sliding sleeve 190A, movement of the first tubing member 126 relative to the casing 120 (within which the sliding sleeve 190A is disposed) will move the sliding sleeve 190A.
- the position of the ports of the sliding sleeve 199A may be altered relative to the ports or apertures 199 (i.e., the ports of the sliding sleeve may be moved so as to align with or not align with the ports or apertures 199A).
- the formation zone 2, 4, 6, 8, 10, or 12 is exposed.
- the obturating member 180 may then be reverse circulated and removed.
- one or more perforations 175 or fracture initiations may be formed in the adjacent formation zone 2, 4, 6, 8, 10, or 12.
- concentrated perforating fluid e.g., cut-sand
- the concentrated perforating fluid may exit the tool via the aligned (i.e., open) ports 199 and 199A.
- back pressure is held on fluid contained within the annular space between the casing 120 and the first tubing member 126 such that the concentrated fluid is emitted from the ports in a concentrated form.
- a diluent e.g., water or other less abrasive fluid
- the concentrated perforating fluid will mix with the non-abrasive fluid down-hole, proximate to the formation zone 2, 4, 6, 8, 10, or 12 to be perforated and be emitted from the tool via the aligned (i.e., open) ports 199 and 199A.
- the ports from which the fluid is emitted 199 or 199 A may configured such that the fluid will be emitted at a pressure sufficient to degrade the proximate formation zone 2, 4, 6, 8, 10, or 12.
- the ports 199 or 199A may be fitted with nozzles (e.g., perforating or hydrajetting nozzles).
- the nozzles may be erodible such that as fluid is emitted from the nozzles, the nozzles will be eroded away.
- the aligned ports 199 and 199A will be operable to deliver a relatively higher volume of fluid and/or at a pressure less than might be necessary for perforating (e.g., as might be desirable in subsequent fracturing operations).
- fluid exiting the ports transitions from perforating and/or initiating fractures in the formation to expanding and/or propagating fractures in the formation.
- the obturating member 180 i.e., a ball
- the obturating member 180 may be reintroduced into the first tubing member 126 such that the obturating member 180 re-engages the seat 182 and again actuates the mechanical shifting tool 300, thereby causing the mechanical shifting tool 300 to engage the sliding sleeve 190A.
- the mechanical shifting tool 300 will be operably coupled to the sliding sleeve 190A such that another combination of ports of the sliding sleeve 199 A and ports or apertures 199 may be aligned, thereby providing delivery of a relatively higher volume of fluid and/or at a pressure less than might be necessary for perforating (e.g., as might be desirable in subsequent fracturing operations).
- the sliding sleeve 190A may be repositioned such that additional and/or larger ports, openings, or windows are provided to allow for a higher volume of fluid to be pumped into the formation, thereby initiating, expanding, and/or propagating fractures in the formation.
- a concentrated proppant slurry is pumped down the flowbore 128 of the additional flow conduit (e.g., inside the coiled tubing) simultaneous with pumping a diluent fluid (e.g., water) down the annulus between the additional flow conduit (e.g., coiled tubing 126) and the casing 120.
- the concentrated proppant slurry exits the coiled tubing (e.g., via flow ports in the mechanical shifting tool 300) and mixes with the diluent fluid proximate the perforations and formation zone 2, 4, 6, 8, 10, or 12 to be fractured.
- the mixed fracturing fluid passes through the sleeve (which may have been further manipulated to open additional or alternative flow ports to increase flow rates there through, e.g., high volume ports) and is forced into the formation 102 via continued pumping at pressures sufficient to form and extend fractures in the formation 102.
- the fracturing fluid moves from the wellbore 114 into the fractures formed in the formation 102.
- the viscosity or proppant-concentration of the composite fracturing fluid may be varied as the fracturing operation progresses.
- the obturating member 180 i.e., a ball
- the obturating member 180 may be reintroduced into the first tubing member 126 such that the obturating member 180 re-engages the seat 182 and again actuates the mechanical shifting tool 300, thereby causing the mechanical shifting tool 300 to engage the sliding sleeve 190A.
- the mechanical shifting tool 300 will be operably coupled to the sliding sleeve 190A such that the ports of the sliding sleeve 199 A may be misaligned from the ports or apertures 199 (e.g., closed).
- the next zone up-hole may then be treated (for example, by moving the coiled tubing upward along with the mechanical shifting tool and opening the next stimulation sleeve) and the process repeated until all zones have been treated.
- the first tubing member 126 to which the mechanical shifting tool 300 is connected may be repositioned such that the mechanical shifting tool 300 is then proximate to a second sliding sleeve 190A and the process repeated.
- a ball may be used to manipulate the stimulation sleeve, referred to herein as a ball drop sleeve.
- the ball drop sleeve is integral with first tubing member 126, which may comprise coiled tubing, jointed tubing, or casing 120.
- the ball drop sleeves are positioned proximate to the formation zones 2, 4, 6, 8, 10, or 12 for which servicing is desired.
- a ball (i.e., an obturating member) 180 is forward-circulated down the first tubing member 126 until the ball 180 engages a ball seat 182 within the ball drop sleeve 193.
- the sliding sleeve 190A will shift such that the ports of the sliding sleeve 199 A will align with the ports or apertures 199 A and fluid will flow through the aligned ports 199 and 199 A.
- the sliding sleeve may be held in a closed position (i.e., with the ports 199 and 199 A misaligned, as shown by Figure 5B) by a spring or similar mechanism (i.e., biased).
- a spring or similar mechanism i.e., biased
- fluid will flow through the axial flowbore 128 of manipulatable fracturing tool (as shown by flow arrow 21 in Figure 5B).
- the biasing mechanism e.g., spring
- the ball 180 engaging ball seat 182 actuates a sliding sleeve 190A to align and/or expose one or more jetting nozzles or flow ports 199 or 199A.
- the jetting nozzles or flow ports 199 or 199 A may be fitted with erodible nozzles.
- a low- volume, high-pressure fluid may then be emitted from the ports 199 or 199A so as to perforate or hydrajet (as shown by flow arrow 20 of Figure 5A) and form perforations 175 and/or initiate/propagate one or more fractures in the formation..
- a concentrated proppant laden slurry is pumped down the first flowpath (e.g., the axial flowbore 128) while a non-abrasive diluent (e.g., water) is pumped down the second flowpath (e.g., the annular space 176 not occupied by the wellbore serving apparatus 100 or the work string 112).
- a non-abrasive diluent e.g., water
- the concentrated proppant slurry (shown by flow arrow 22 of Figure 5C) will mix with the non-abrasive fluid (shown by flow arrow 24) down-hole, proximate to the formation zone 2, 4, 6, 8, 10, or 12 of fracture.
- the mixed, composite fracturing fluid is introduced into the formation 102 (shown by flow arrow 23).
- the fracturing fluid components are pumped downhole, thus increasing the pressure until the fracture initiation pressure is reached and a fracture either begins to form or is extended. As the fractures forms or is extended, the fracturing fluid moves from the wellbore 114 into the fractures.
- the viscosity or proppant-concentration of the composite fracturing fluid may be varied as the fracturing operation progresses. After a first formation zone 2, 4, 6, 8, 10, or 12 has been fractured, the ball 180 may or may not be removed.
- R R L +k* (Ru-R L ), wherein k is a variable ranging from 1 percent to 100 percent with a 1 percent increment, i.e., k is 1 percent, 2 percent, 3 percent, 4 percent, 5 percent, ...50 percent,
- any numerical range defined by two R numbers as defined in the above is also specifically disclosed.
- Use of the term "optionally” with respect to any element of a claim is intended to mean that the subject element is required, or alternatively, is not required. Both alternatives are intended to be within the scope of the claim.
- Use of broader terms such as comprises, includes, having, etc. should be understood to provide support for narrower terms such as consisting of, consisting essentially of, comprised substantially of, etc. [00100] Accordingly, the scope of protection is not limited by the description set out above but is only limited by the claims which follow, that scope including all equivalents of the subject matter of the claims.
Landscapes
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Geochemistry & Mineralogy (AREA)
- Fluid Mechanics (AREA)
- Environmental & Geological Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Physics & Mathematics (AREA)
- Infusion, Injection, And Reservoir Apparatuses (AREA)
- Physical Or Chemical Processes And Apparatus (AREA)
- Earth Drilling (AREA)
- Pipe Accessories (AREA)
- Shaping Metal By Deep-Drawing, Or The Like (AREA)
- Nozzles (AREA)
- Branch Pipes, Bends, And The Like (AREA)
Abstract
Description
Claims
Priority Applications (5)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
MX2011001947A MX2011001947A (en) | 2008-08-22 | 2009-08-03 | High rate stimulation method for deep, large bore completions. |
AU2009284080A AU2009284080B2 (en) | 2008-08-22 | 2009-08-03 | High rate stimulation method for deep, large bore completions |
EP09784852A EP2318654A2 (en) | 2008-08-22 | 2009-08-03 | High rate stimulation method for deep, large bore completions |
BRPI0917852A BRPI0917852A2 (en) | 2008-08-22 | 2009-08-03 | method and apparatus for maintaining a wellbore and manipulable fracturing tool |
CA2734351A CA2734351C (en) | 2008-08-22 | 2009-08-03 | High rate stimulation method for deep, large bore completions |
Applications Claiming Priority (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US9122908P | 2008-08-22 | 2008-08-22 | |
US61/091,229 | 2008-08-22 | ||
US12/358,079 US8960292B2 (en) | 2008-08-22 | 2009-01-22 | High rate stimulation method for deep, large bore completions |
US12/358,079 | 2009-01-22 |
Publications (2)
Publication Number | Publication Date |
---|---|
WO2010020747A2 true WO2010020747A2 (en) | 2010-02-25 |
WO2010020747A3 WO2010020747A3 (en) | 2011-05-26 |
Family
ID=41695266
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/GB2009/001904 WO2010020747A2 (en) | 2008-08-22 | 2009-08-03 | High rate stimulation method for deep, large bore completions |
Country Status (8)
Country | Link |
---|---|
US (1) | US8960292B2 (en) |
EP (1) | EP2318654A2 (en) |
AU (1) | AU2009284080B2 (en) |
BR (1) | BRPI0917852A2 (en) |
CA (1) | CA2734351C (en) |
CO (1) | CO6321177A2 (en) |
MX (1) | MX2011001947A (en) |
WO (1) | WO2010020747A2 (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102979497A (en) * | 2012-11-20 | 2013-03-20 | 中国石油大学(北京) | Device and method for immovable-string type packer-free sliding-sleeve hydraulic-jet pulsed acid fracturing |
US8439116B2 (en) | 2009-07-24 | 2013-05-14 | Halliburton Energy Services, Inc. | Method for inducing fracture complexity in hydraulically fractured horizontal well completions |
US8631872B2 (en) | 2009-09-24 | 2014-01-21 | Halliburton Energy Services, Inc. | Complex fracturing using a straddle packer in a horizontal wellbore |
US8887803B2 (en) | 2012-04-09 | 2014-11-18 | Halliburton Energy Services, Inc. | Multi-interval wellbore treatment method |
CN104179486A (en) * | 2013-05-22 | 2014-12-03 | 中国石油化工股份有限公司 | Three-petal type oil and gas well layering fracture acidizing erosion preventing flow divider |
US8960292B2 (en) | 2008-08-22 | 2015-02-24 | Halliburton Energy Services, Inc. | High rate stimulation method for deep, large bore completions |
US9016376B2 (en) | 2012-08-06 | 2015-04-28 | Halliburton Energy Services, Inc. | Method and wellbore servicing apparatus for production completion of an oil and gas well |
CN104632172A (en) * | 2013-11-15 | 2015-05-20 | 中国石油天然气股份有限公司 | Method for controlling annulus pressure of gas field horizontal well immovable pipe column hydraulic sand blasting fracturing |
US9796918B2 (en) | 2013-01-30 | 2017-10-24 | Halliburton Energy Services, Inc. | Wellbore servicing fluids and methods of making and using same |
Families Citing this family (109)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9101978B2 (en) | 2002-12-08 | 2015-08-11 | Baker Hughes Incorporated | Nanomatrix powder metal compact |
US8403037B2 (en) | 2009-12-08 | 2013-03-26 | Baker Hughes Incorporated | Dissolvable tool and method |
US9109429B2 (en) | 2002-12-08 | 2015-08-18 | Baker Hughes Incorporated | Engineered powder compact composite material |
US9079246B2 (en) * | 2009-12-08 | 2015-07-14 | Baker Hughes Incorporated | Method of making a nanomatrix powder metal compact |
US8327931B2 (en) | 2009-12-08 | 2012-12-11 | Baker Hughes Incorporated | Multi-component disappearing tripping ball and method for making the same |
US9682425B2 (en) | 2009-12-08 | 2017-06-20 | Baker Hughes Incorporated | Coated metallic powder and method of making the same |
US8066059B2 (en) | 2005-03-12 | 2011-11-29 | Thru Tubing Solutions, Inc. | Methods and devices for one trip plugging and perforating of oil and gas wells |
US8651179B2 (en) * | 2010-04-20 | 2014-02-18 | Schlumberger Technology Corporation | Swellable downhole device of substantially constant profile |
GB0909086D0 (en) * | 2009-05-27 | 2009-07-01 | Read Well Services Ltd | An active external casing packer (ecp) for frac operations in oil and gas wells |
US20110005759A1 (en) * | 2009-07-10 | 2011-01-13 | Baker Hughes Incorporated | Fracturing system and method |
US8668016B2 (en) | 2009-08-11 | 2014-03-11 | Halliburton Energy Services, Inc. | System and method for servicing a wellbore |
US8276675B2 (en) | 2009-08-11 | 2012-10-02 | Halliburton Energy Services Inc. | System and method for servicing a wellbore |
US8695710B2 (en) | 2011-02-10 | 2014-04-15 | Halliburton Energy Services, Inc. | Method for individually servicing a plurality of zones of a subterranean formation |
US8668012B2 (en) | 2011-02-10 | 2014-03-11 | Halliburton Energy Services, Inc. | System and method for servicing a wellbore |
US7926580B1 (en) * | 2009-09-23 | 2011-04-19 | Petroquip Energy Services, Llp | Coiled tubing multi-zone jet frac system |
US8104539B2 (en) * | 2009-10-21 | 2012-01-31 | Halliburton Energy Services Inc. | Bottom hole assembly for subterranean operations |
US8573295B2 (en) | 2010-11-16 | 2013-11-05 | Baker Hughes Incorporated | Plug and method of unplugging a seat |
US8528633B2 (en) | 2009-12-08 | 2013-09-10 | Baker Hughes Incorporated | Dissolvable tool and method |
US8425651B2 (en) | 2010-07-30 | 2013-04-23 | Baker Hughes Incorporated | Nanomatrix metal composite |
US9243475B2 (en) | 2009-12-08 | 2016-01-26 | Baker Hughes Incorporated | Extruded powder metal compact |
US10240419B2 (en) | 2009-12-08 | 2019-03-26 | Baker Hughes, A Ge Company, Llc | Downhole flow inhibition tool and method of unplugging a seat |
US9227243B2 (en) | 2009-12-08 | 2016-01-05 | Baker Hughes Incorporated | Method of making a powder metal compact |
US9127515B2 (en) | 2010-10-27 | 2015-09-08 | Baker Hughes Incorporated | Nanomatrix carbon composite |
US8210257B2 (en) * | 2010-03-01 | 2012-07-03 | Halliburton Energy Services Inc. | Fracturing a stress-altered subterranean formation |
US8739873B2 (en) * | 2010-03-05 | 2014-06-03 | Halliburton Energy Services, Inc. | System and method for fluid diversion and fluid isolation |
US8424610B2 (en) | 2010-03-05 | 2013-04-23 | Baker Hughes Incorporated | Flow control arrangement and method |
US8448700B2 (en) * | 2010-08-03 | 2013-05-28 | Thru Tubing Solutions, Inc. | Abrasive perforator with fluid bypass |
US8776884B2 (en) * | 2010-08-09 | 2014-07-15 | Baker Hughes Incorporated | Formation treatment system and method |
CA2808635C (en) * | 2010-08-31 | 2015-11-10 | Schlumberger Canada Limited | Methods for completing multi-zone production wells using sliding sleeve valve assembly |
US9090955B2 (en) | 2010-10-27 | 2015-07-28 | Baker Hughes Incorporated | Nanomatrix powder metal composite |
US20120199353A1 (en) * | 2011-02-07 | 2012-08-09 | Brent Daniel Fermaniuk | Wellbore injection system |
US9045953B2 (en) * | 2011-03-14 | 2015-06-02 | Baker Hughes Incorporated | System and method for fracturing a formation and a method of increasing depth of fracturing of a formation |
US8631876B2 (en) | 2011-04-28 | 2014-01-21 | Baker Hughes Incorporated | Method of making and using a functionally gradient composite tool |
US9080098B2 (en) | 2011-04-28 | 2015-07-14 | Baker Hughes Incorporated | Functionally gradient composite article |
WO2012163967A1 (en) * | 2011-05-31 | 2012-12-06 | Welltec A/S | A formation penetrating tool |
EP2530240A1 (en) * | 2011-05-31 | 2012-12-05 | Welltec A/S | A formation penetrating tool |
US8893811B2 (en) | 2011-06-08 | 2014-11-25 | Halliburton Energy Services, Inc. | Responsively activated wellbore stimulation assemblies and methods of using the same |
US9920600B2 (en) * | 2011-06-10 | 2018-03-20 | Schlumberger Technology Corporation | Multi-stage downhole hydraulic stimulation assembly |
US9139928B2 (en) | 2011-06-17 | 2015-09-22 | Baker Hughes Incorporated | Corrodible downhole article and method of removing the article from downhole environment |
US9707739B2 (en) | 2011-07-22 | 2017-07-18 | Baker Hughes Incorporated | Intermetallic metallic composite, method of manufacture thereof and articles comprising the same |
US8783365B2 (en) | 2011-07-28 | 2014-07-22 | Baker Hughes Incorporated | Selective hydraulic fracturing tool and method thereof |
US9643250B2 (en) | 2011-07-29 | 2017-05-09 | Baker Hughes Incorporated | Method of controlling the corrosion rate of alloy particles, alloy particle with controlled corrosion rate, and articles comprising the particle |
US9833838B2 (en) | 2011-07-29 | 2017-12-05 | Baker Hughes, A Ge Company, Llc | Method of controlling the corrosion rate of alloy particles, alloy particle with controlled corrosion rate, and articles comprising the particle |
US9057242B2 (en) | 2011-08-05 | 2015-06-16 | Baker Hughes Incorporated | Method of controlling corrosion rate in downhole article, and downhole article having controlled corrosion rate |
US9033055B2 (en) | 2011-08-17 | 2015-05-19 | Baker Hughes Incorporated | Selectively degradable passage restriction and method |
US8899334B2 (en) | 2011-08-23 | 2014-12-02 | Halliburton Energy Services, Inc. | System and method for servicing a wellbore |
US9109269B2 (en) | 2011-08-30 | 2015-08-18 | Baker Hughes Incorporated | Magnesium alloy powder metal compact |
US9856547B2 (en) | 2011-08-30 | 2018-01-02 | Bakers Hughes, A Ge Company, Llc | Nanostructured powder metal compact |
US9090956B2 (en) | 2011-08-30 | 2015-07-28 | Baker Hughes Incorporated | Aluminum alloy powder metal compact |
US9643144B2 (en) | 2011-09-02 | 2017-05-09 | Baker Hughes Incorporated | Method to generate and disperse nanostructures in a composite material |
US9347119B2 (en) | 2011-09-03 | 2016-05-24 | Baker Hughes Incorporated | Degradable high shock impedance material |
US9187990B2 (en) | 2011-09-03 | 2015-11-17 | Baker Hughes Incorporated | Method of using a degradable shaped charge and perforating gun system |
US9133695B2 (en) | 2011-09-03 | 2015-09-15 | Baker Hughes Incorporated | Degradable shaped charge and perforating gun system |
US8662178B2 (en) | 2011-09-29 | 2014-03-04 | Halliburton Energy Services, Inc. | Responsively activated wellbore stimulation assemblies and methods of using the same |
US9284812B2 (en) | 2011-11-21 | 2016-03-15 | Baker Hughes Incorporated | System for increasing swelling efficiency |
WO2013089898A2 (en) | 2011-12-13 | 2013-06-20 | Exxonmobil Upstream Research Company | Completing a well in a reservoir |
US9010416B2 (en) | 2012-01-25 | 2015-04-21 | Baker Hughes Incorporated | Tubular anchoring system and a seat for use in the same |
US9228422B2 (en) | 2012-01-30 | 2016-01-05 | Thru Tubing Solutions, Inc. | Limited depth abrasive jet cutter |
US9068428B2 (en) | 2012-02-13 | 2015-06-30 | Baker Hughes Incorporated | Selectively corrodible downhole article and method of use |
US8985209B2 (en) | 2012-02-22 | 2015-03-24 | Schlumberger Technology Corporation | High pressure jet perforation system |
GB2500044B (en) * | 2012-03-08 | 2018-01-17 | Weatherford Tech Holdings Llc | Selective fracturing system |
US8826980B2 (en) | 2012-03-29 | 2014-09-09 | Halliburton Energy Services, Inc. | Activation-indicating wellbore stimulation assemblies and methods of using the same |
US8991509B2 (en) | 2012-04-30 | 2015-03-31 | Halliburton Energy Services, Inc. | Delayed activation activatable stimulation assembly |
US9605508B2 (en) | 2012-05-08 | 2017-03-28 | Baker Hughes Incorporated | Disintegrable and conformable metallic seal, and method of making the same |
US9784070B2 (en) | 2012-06-29 | 2017-10-10 | Halliburton Energy Services, Inc. | System and method for servicing a wellbore |
US8931557B2 (en) | 2012-07-09 | 2015-01-13 | Halliburton Energy Services, Inc. | Wellbore servicing assemblies and methods of using the same |
CA2887298C (en) * | 2012-08-16 | 2020-07-07 | Thru Tubiing Solutions, Inc. | Drill pipe perforator apparatus and method of use |
US8919440B2 (en) | 2012-09-24 | 2014-12-30 | Kristian Brekke | System and method for detecting screen-out using a fracturing valve for mitigation |
US9410076B2 (en) | 2012-10-25 | 2016-08-09 | Halliburton Energy Services, Inc. | Wellbore servicing methods and compositions comprising degradable polymers |
US9702238B2 (en) | 2012-10-25 | 2017-07-11 | Halliburton Energy Services, Inc. | Wellbore servicing methods and compositions comprising degradable polymers |
US9951266B2 (en) | 2012-10-26 | 2018-04-24 | Halliburton Energy Services, Inc. | Expanded wellbore servicing materials and methods of making and using same |
US20140116698A1 (en) | 2012-10-26 | 2014-05-01 | Halliburton Energy Services, Inc. | Wellbore Servicing Fluids Comprising Foamed Materials and Methods of Making and Using Same |
US20140116702A1 (en) | 2012-10-26 | 2014-05-01 | Halliburton Energy Services, Inc. | Expanded Wellbore Servicing Materials and Methods of Making and Using Same |
US8714249B1 (en) | 2012-10-26 | 2014-05-06 | Halliburton Energy Services, Inc. | Wellbore servicing materials and methods of making and using same |
US20140151043A1 (en) | 2012-12-03 | 2014-06-05 | Schlumberger Technology Corporation | Stabilized fluids in well treatment |
US9163493B2 (en) | 2012-12-28 | 2015-10-20 | Halliburton Energy Services, Inc. | Wellbore servicing assemblies and methods of using the same |
US9273549B2 (en) | 2013-01-24 | 2016-03-01 | Halliburton Energy Services, Inc. | Systems and methods for remote actuation of a downhole tool |
US9068439B2 (en) | 2013-02-19 | 2015-06-30 | Halliburton Energy Services, Inc. | Systems and methods of positive indication of actuation of a downhole tool |
US9494025B2 (en) | 2013-03-01 | 2016-11-15 | Vincent Artus | Control fracturing in unconventional reservoirs |
US9624754B2 (en) | 2013-03-28 | 2017-04-18 | Halliburton Energy Services, Inc. | Radiused ID baffle |
US10125592B2 (en) * | 2013-08-08 | 2018-11-13 | Halliburton Energy Services, Inc. | Methods and systems for treatment of subterranean formations |
US9816339B2 (en) | 2013-09-03 | 2017-11-14 | Baker Hughes, A Ge Company, Llc | Plug reception assembly and method of reducing restriction in a borehole |
US9631468B2 (en) | 2013-09-03 | 2017-04-25 | Schlumberger Technology Corporation | Well treatment |
US11167343B2 (en) | 2014-02-21 | 2021-11-09 | Terves, Llc | Galvanically-active in situ formed particles for controlled rate dissolving tools |
US10150713B2 (en) | 2014-02-21 | 2018-12-11 | Terves, Inc. | Fluid activated disintegrating metal system |
US10689740B2 (en) | 2014-04-18 | 2020-06-23 | Terves, LLCq | Galvanically-active in situ formed particles for controlled rate dissolving tools |
US10865465B2 (en) | 2017-07-27 | 2020-12-15 | Terves, Llc | Degradable metal matrix composite |
US10174602B2 (en) | 2014-08-08 | 2019-01-08 | Halliburton Energy Services, Inc. | Flow conditioning openings |
US9771779B2 (en) | 2014-09-15 | 2017-09-26 | Halliburton Energy Service, Inc. | Jetting tool for boosting pressures at target wellbore locations |
DE202015009839U1 (en) * | 2014-10-17 | 2020-08-04 | Frx, Inc. | An injection tip for nucleating and propagating hydraulic cracks from probe rods |
US9910026B2 (en) | 2015-01-21 | 2018-03-06 | Baker Hughes, A Ge Company, Llc | High temperature tracers for downhole detection of produced water |
US10378303B2 (en) | 2015-03-05 | 2019-08-13 | Baker Hughes, A Ge Company, Llc | Downhole tool and method of forming the same |
US20160265329A1 (en) * | 2015-03-10 | 2016-09-15 | Schlumberger Technology Corporation | Fracturing while tripping |
US10012064B2 (en) | 2015-04-09 | 2018-07-03 | Highlands Natural Resources, Plc | Gas diverter for well and reservoir stimulation |
US10344204B2 (en) | 2015-04-09 | 2019-07-09 | Diversion Technologies, LLC | Gas diverter for well and reservoir stimulation |
US10221637B2 (en) | 2015-08-11 | 2019-03-05 | Baker Hughes, A Ge Company, Llc | Methods of manufacturing dissolvable tools via liquid-solid state molding |
US9528353B1 (en) * | 2015-08-27 | 2016-12-27 | William Jani | Wellbore perforating tool |
US20170159419A1 (en) * | 2015-12-02 | 2017-06-08 | Randy C. Tolman | Selective Stimulation Ports, Wellbore Tubulars That Include Selective Stimulation Ports, And Methods Of Operating The Same |
US10016810B2 (en) | 2015-12-14 | 2018-07-10 | Baker Hughes, A Ge Company, Llc | Methods of manufacturing degradable tools using a galvanic carrier and tools manufactured thereof |
WO2017123217A1 (en) * | 2016-01-13 | 2017-07-20 | Halliburton Energy Services, Inc. | High-pressure jetting and data communication during subterranean perforation operations |
US10982520B2 (en) | 2016-04-27 | 2021-04-20 | Highland Natural Resources, PLC | Gas diverter for well and reservoir stimulation |
GB2595365B (en) | 2016-05-03 | 2022-03-09 | Darcy Tech Limited | Downhole apparatus |
GB2559555B (en) * | 2017-02-08 | 2019-11-27 | Total E&P Danmark As | Downhole operations |
US10677024B2 (en) | 2017-03-01 | 2020-06-09 | Thru Tubing Solutions, Inc. | Abrasive perforator with fluid bypass |
US20180340401A1 (en) * | 2017-05-26 | 2018-11-29 | Anjelika Gretskaia | Method and system for creating unloading slots in oil and gas wells by stretch-slotting perforation |
US10533397B2 (en) * | 2017-10-04 | 2020-01-14 | Baker Hughes, A Ge Company, Llc | Ball drop two stage valve |
RU2667240C1 (en) * | 2017-10-12 | 2018-09-18 | Публичное акционерное общество "Татнефть" имени В.Д. Шашина | Method for multiple hydraulic fracturing of formation in horizontal shaft of well |
US11015113B1 (en) | 2020-04-13 | 2021-05-25 | Multi-Chem Group, Llc | Wet-coated proppant and methods of making and using same |
US11873705B1 (en) * | 2022-10-20 | 2024-01-16 | Saudi Arabian Oil Company | Multi-stage fracturing techniques in oil and gas |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2753940A (en) * | 1953-05-11 | 1956-07-10 | Exxon Research Engineering Co | Method and apparatus for fracturing a subsurface formation |
US6047773A (en) * | 1996-08-09 | 2000-04-11 | Halliburton Energy Services, Inc. | Apparatus and methods for stimulating a subterranean well |
US6938690B2 (en) * | 2001-09-28 | 2005-09-06 | Halliburton Energy Services, Inc. | Downhole tool and method for fracturing a subterranean well formation |
Family Cites Families (140)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2050970A (en) * | 1935-08-06 | 1936-08-11 | Eastman Oil Well Survey Co | Open hole bridger and support |
US2312018A (en) * | 1939-08-19 | 1943-02-23 | Fred G Beckman | Method of and means for cleaning wells |
US2703316A (en) * | 1951-06-05 | 1955-03-01 | Du Pont | Polymers of high melting lactide |
US3912692A (en) * | 1973-05-03 | 1975-10-14 | American Cyanamid Co | Process for polymerizing a substantially pure glycolide composition |
US4005750A (en) * | 1975-07-01 | 1977-02-01 | The United States Of America As Represented By The United States Energy Research And Development Administration | Method for selectively orienting induced fractures in subterranean earth formations |
US4312406A (en) * | 1980-02-20 | 1982-01-26 | The Dow Chemical Company | Device and method for shifting a port collar sleeve |
US4387769A (en) * | 1981-08-10 | 1983-06-14 | Exxon Production Research Co. | Method for reducing the permeability of subterranean formations |
US4509598A (en) * | 1983-03-25 | 1985-04-09 | The Dow Chemical Company | Fracturing fluids containing bouyant inorganic diverting agent and method of use in hydraulic fracturing of subterranean formations |
US4515214A (en) * | 1983-09-09 | 1985-05-07 | Mobil Oil Corporation | Method for controlling the vertical growth of hydraulic fractures |
US4590995A (en) * | 1985-03-26 | 1986-05-27 | Halliburton Company | Retrievable straddle packer |
US4687061A (en) * | 1986-12-08 | 1987-08-18 | Mobil Oil Corporation | Stimulation of earth formations surrounding a deviated wellbore by sequential hydraulic fracturing |
US5216050A (en) * | 1988-08-08 | 1993-06-01 | Biopak Technology, Ltd. | Blends of polyactic acid |
US6323307B1 (en) * | 1988-08-08 | 2001-11-27 | Cargill Dow Polymers, Llc | Degradation control of environmentally degradable disposable materials |
US4869322A (en) * | 1988-10-07 | 1989-09-26 | Mobil Oil Corporation | Sequential hydraulic fracturing of a subsurface formation |
US4887670A (en) * | 1989-04-05 | 1989-12-19 | Halliburton Company | Controlling fracture growth |
US4949788A (en) * | 1989-11-08 | 1990-08-21 | Halliburton Company | Well completions using casing valves |
US5074360A (en) * | 1990-07-10 | 1991-12-24 | Guinn Jerry H | Method for repoducing hydrocarbons from low-pressure reservoirs |
US5111881A (en) * | 1990-09-07 | 1992-05-12 | Halliburton Company | Method to control fracture orientation in underground formation |
US5241475A (en) * | 1990-10-26 | 1993-08-31 | Halliburton Company | Method of evaluating fluid loss in subsurface fracturing operations |
US5145004A (en) * | 1991-03-12 | 1992-09-08 | Atlantic Richfield Company | Multiple gravel pack well completions |
US5318123A (en) * | 1992-06-11 | 1994-06-07 | Halliburton Company | Method for optimizing hydraulic fracturing through control of perforation orientation |
US5361856A (en) * | 1992-09-29 | 1994-11-08 | Halliburton Company | Well jetting apparatus and met of modifying a well therewith |
US5482116A (en) * | 1993-12-10 | 1996-01-09 | Mobil Oil Corporation | Wellbore guided hydraulic fracturing |
US5533571A (en) * | 1994-05-27 | 1996-07-09 | Halliburton Company | Surface switchable down-jet/side-jet apparatus |
US5499678A (en) * | 1994-08-02 | 1996-03-19 | Halliburton Company | Coplanar angular jetting head for well perforating |
US5431225A (en) * | 1994-09-21 | 1995-07-11 | Halliburton Company | Sand control well completion methods for poorly consolidated formations |
US5595245A (en) * | 1995-08-04 | 1997-01-21 | Scott, Iii; George L. | Systems of injecting phenolic resin activator during subsurface fracture stimulation for enhanced oil recovery |
US5765642A (en) * | 1996-12-23 | 1998-06-16 | Halliburton Energy Services, Inc. | Subterranean formation fracturing methods |
US6283210B1 (en) * | 1999-09-01 | 2001-09-04 | Halliburton Energy Services, Inc. | Proactive conformance for oil or gas wells |
US6474419B2 (en) * | 1999-10-04 | 2002-11-05 | Halliburton Energy Services, Inc. | Packer with equalizing valve and method of use |
US6394184B2 (en) * | 2000-02-15 | 2002-05-28 | Exxonmobil Upstream Research Company | Method and apparatus for stimulation of multiple formation intervals |
US6401815B1 (en) * | 2000-03-10 | 2002-06-11 | Halliburton Energy Services, Inc. | Apparatus and method for connecting casing to lateral casing using thermoset plastic molding |
DZ3387A1 (en) * | 2000-07-18 | 2002-01-24 | Exxonmobil Upstream Res Co | PROCESS FOR TREATING MULTIPLE INTERVALS IN A WELLBORE |
US6439310B1 (en) * | 2000-09-15 | 2002-08-27 | Scott, Iii George L. | Real-time reservoir fracturing process |
OA13131A (en) * | 2000-09-20 | 2006-12-13 | Sofitech Nv | Method for gravel packing open holes fracturing pressure. |
US20020177955A1 (en) | 2000-09-28 | 2002-11-28 | Younes Jalali | Completions architecture |
US6565129B2 (en) * | 2001-06-21 | 2003-05-20 | Halliburton Energy Services, Inc. | Quick connect system and method for fluid devices |
US6662874B2 (en) * | 2001-09-28 | 2003-12-16 | Halliburton Energy Services, Inc. | System and method for fracturing a subterranean well formation for improving hydrocarbon production |
US6725933B2 (en) * | 2001-09-28 | 2004-04-27 | Halliburton Energy Services, Inc. | Method and apparatus for acidizing a subterranean well formation for improving hydrocarbon production |
US6719054B2 (en) * | 2001-09-28 | 2004-04-13 | Halliburton Energy Services, Inc. | Method for acid stimulating a subterranean well formation for improving hydrocarbon production |
US7096954B2 (en) * | 2001-12-31 | 2006-08-29 | Schlumberger Technology Corporation | Method and apparatus for placement of multiple fractures in open hole wells |
US7108067B2 (en) * | 2002-08-21 | 2006-09-19 | Packers Plus Energy Services Inc. | Method and apparatus for wellbore fluid treatment |
US7100688B2 (en) * | 2002-09-20 | 2006-09-05 | Halliburton Energy Services, Inc. | Fracture monitoring using pressure-frequency analysis |
US7108064B2 (en) * | 2002-10-10 | 2006-09-19 | Weatherford/Lamb, Inc. | Milling tool insert and method of use |
US6805199B2 (en) * | 2002-10-17 | 2004-10-19 | Halliburton Energy Services, Inc. | Process and system for effective and accurate foam cement generation and placement |
US6837523B2 (en) * | 2002-12-05 | 2005-01-04 | Halliburton Energy Services, Inc. | Piping with integral force absorbing restraining system |
US7032671B2 (en) * | 2002-12-12 | 2006-04-25 | Integrated Petroleum Technologies, Inc. | Method for increasing fracture penetration into target formation |
US20040231845A1 (en) | 2003-05-15 | 2004-11-25 | Cooke Claude E. | Applications of degradable polymers in wells |
US7044220B2 (en) * | 2003-06-27 | 2006-05-16 | Halliburton Energy Services, Inc. | Compositions and methods for improving proppant pack permeability and fracture conductivity in a subterranean well |
US7066265B2 (en) * | 2003-09-24 | 2006-06-27 | Halliburton Energy Services, Inc. | System and method of production enhancement and completion of a well |
US20050087336A1 (en) * | 2003-10-24 | 2005-04-28 | Surjaatmadja Jim B. | Orbital downhole separator |
US7445045B2 (en) | 2003-12-04 | 2008-11-04 | Halliburton Energy Services, Inc. | Method of optimizing production of gas from vertical wells in coal seams |
US8126689B2 (en) * | 2003-12-04 | 2012-02-28 | Halliburton Energy Services, Inc. | Methods for geomechanical fracture modeling |
US7225869B2 (en) | 2004-03-24 | 2007-06-05 | Halliburton Energy Services, Inc. | Methods of isolating hydrajet stimulated zones |
US7234529B2 (en) * | 2004-04-07 | 2007-06-26 | Halliburton Energy Services, Inc. | Flow switchable check valve and method |
US7150327B2 (en) * | 2004-04-07 | 2006-12-19 | Halliburton Energy Services, Inc. | Workover unit and method of utilizing same |
US7503404B2 (en) * | 2004-04-14 | 2009-03-17 | Halliburton Energy Services, Inc, | Methods of well stimulation during drilling operations |
US20080060810A9 (en) * | 2004-05-25 | 2008-03-13 | Halliburton Energy Services, Inc. | Methods for treating a subterranean formation with a curable composition using a jetting tool |
US7159660B2 (en) * | 2004-05-28 | 2007-01-09 | Halliburton Energy Services, Inc. | Hydrajet perforation and fracturing tool |
US7287592B2 (en) * | 2004-06-11 | 2007-10-30 | Halliburton Energy Services, Inc. | Limited entry multiple fracture and frac-pack placement in liner completions using liner fracturing tool |
US7273313B2 (en) * | 2004-06-17 | 2007-09-25 | Halliburton Energy Services, Inc. | Mixing device for mixing bulk and liquid material |
US7243723B2 (en) * | 2004-06-18 | 2007-07-17 | Halliburton Energy Services, Inc. | System and method for fracturing and gravel packing a borehole |
US7429332B2 (en) * | 2004-06-30 | 2008-09-30 | Halliburton Energy Services, Inc. | Separating constituents of a fluid mixture |
US7370701B2 (en) * | 2004-06-30 | 2008-05-13 | Halliburton Energy Services, Inc. | Wellbore completion design to naturally separate water and solids from oil and gas |
US7090153B2 (en) * | 2004-07-29 | 2006-08-15 | Halliburton Energy Services, Inc. | Flow conditioning system and method for fluid jetting tools |
US7775278B2 (en) | 2004-09-01 | 2010-08-17 | Schlumberger Technology Corporation | Degradable material assisted diversion or isolation |
US7281580B2 (en) | 2004-09-09 | 2007-10-16 | Halliburton Energy Services, Inc. | High porosity fractures and methods of creating high porosity fractures |
US20060070740A1 (en) * | 2004-10-05 | 2006-04-06 | Surjaatmadja Jim B | System and method for fracturing a hydrocarbon producing formation |
US20060086507A1 (en) * | 2004-10-26 | 2006-04-27 | Halliburton Energy Services, Inc. | Wellbore cleanout tool and method |
US7543635B2 (en) | 2004-11-12 | 2009-06-09 | Halliburton Energy Services, Inc. | Fracture characterization using reservoir monitoring devices |
US7237612B2 (en) * | 2004-11-17 | 2007-07-03 | Halliburton Energy Services, Inc. | Methods of initiating a fracture tip screenout |
US7281581B2 (en) * | 2004-12-01 | 2007-10-16 | Halliburton Energy Services, Inc. | Methods of hydraulic fracturing and of propping fractures in subterranean formations |
US7325608B2 (en) * | 2004-12-01 | 2008-02-05 | Halliburton Energy Services, Inc. | Methods of hydraulic fracturing and of propping fractures in subterranean formations |
US7228908B2 (en) * | 2004-12-02 | 2007-06-12 | Halliburton Energy Services, Inc. | Hydrocarbon sweep into horizontal transverse fractured wells |
US7398825B2 (en) * | 2004-12-03 | 2008-07-15 | Halliburton Energy Services, Inc. | Methods of controlling sand and water production in subterranean zones |
US7273099B2 (en) * | 2004-12-03 | 2007-09-25 | Halliburton Energy Services, Inc. | Methods of stimulating a subterranean formation comprising multiple production intervals |
US7387165B2 (en) * | 2004-12-14 | 2008-06-17 | Schlumberger Technology Corporation | System for completing multiple well intervals |
US7322417B2 (en) * | 2004-12-14 | 2008-01-29 | Schlumberger Technology Corporation | Technique and apparatus for completing multiple zones |
US7506689B2 (en) | 2005-02-22 | 2009-03-24 | Halliburton Energy Services, Inc. | Fracturing fluids comprising degradable diverting agents and methods of use in subterranean formations |
US7278486B2 (en) * | 2005-03-04 | 2007-10-09 | Halliburton Energy Services, Inc. | Fracturing method providing simultaneous flow back |
US7318473B2 (en) * | 2005-03-07 | 2008-01-15 | Halliburton Energy Services, Inc. | Methods relating to maintaining the structural integrity of deviated well bores |
US7478020B2 (en) | 2005-03-07 | 2009-01-13 | M-I Llc | Apparatus for slurry and operation design in cuttings re-injection |
US7926571B2 (en) * | 2005-03-15 | 2011-04-19 | Raymond A. Hofman | Cemented open hole selective fracing system |
US7595281B2 (en) | 2005-05-18 | 2009-09-29 | Halliburton Energy Services, Inc. | Methods to increase recovery of treatment fluid following stimulation of a subterranean formation comprising in situ fluorocarbon coated particles |
US7431090B2 (en) | 2005-06-22 | 2008-10-07 | Halliburton Energy Services, Inc. | Methods and apparatus for multiple fracturing of subterranean formations |
US7296625B2 (en) * | 2005-08-02 | 2007-11-20 | Halliburton Energy Services, Inc. | Methods of forming packs in a plurality of perforations in a casing of a wellbore |
US7343975B2 (en) * | 2005-09-06 | 2008-03-18 | Halliburton Energy Services, Inc. | Method for stimulating a well |
US7905284B2 (en) * | 2005-09-07 | 2011-03-15 | Halliburton Energy Services, Inc. | Fracturing/gravel packing tool system with dual flow capabilities |
US8016032B2 (en) | 2005-09-19 | 2011-09-13 | Pioneer Natural Resources USA Inc. | Well treatment device, method and system |
US7946340B2 (en) | 2005-12-01 | 2011-05-24 | Halliburton Energy Services, Inc. | Method and apparatus for orchestration of fracture placement from a centralized well fluid treatment center |
US7740072B2 (en) | 2006-10-10 | 2010-06-22 | Halliburton Energy Services, Inc. | Methods and systems for well stimulation using multiple angled fracturing |
US7711487B2 (en) | 2006-10-10 | 2010-05-04 | Halliburton Energy Services, Inc. | Methods for maximizing second fracture length |
US7647964B2 (en) | 2005-12-19 | 2010-01-19 | Fairmount Minerals, Ltd. | Degradable ball sealers and methods for use in well treatment |
US7472746B2 (en) | 2006-03-31 | 2009-01-06 | Halliburton Energy Services, Inc. | Packer apparatus with annular check valve |
US20070261851A1 (en) * | 2006-05-09 | 2007-11-15 | Halliburton Energy Services, Inc. | Window casing |
US7337844B2 (en) * | 2006-05-09 | 2008-03-04 | Halliburton Energy Services, Inc. | Perforating and fracturing |
US7478676B2 (en) | 2006-06-09 | 2009-01-20 | Halliburton Energy Services, Inc. | Methods and devices for treating multiple-interval well bores |
US7575062B2 (en) | 2006-06-09 | 2009-08-18 | Halliburton Energy Services, Inc. | Methods and devices for treating multiple-interval well bores |
US20070284106A1 (en) * | 2006-06-12 | 2007-12-13 | Kalman Mark D | Method and apparatus for well drilling and completion |
US20080000637A1 (en) * | 2006-06-29 | 2008-01-03 | Halliburton Energy Services, Inc. | Downhole flow-back control for oil and gas wells by controlling fluid entry |
US7520327B2 (en) | 2006-07-20 | 2009-04-21 | Halliburton Energy Services, Inc. | Methods and materials for subterranean fluid forming barriers in materials surrounding wells |
US8540027B2 (en) | 2006-08-31 | 2013-09-24 | Geodynamics, Inc. | Method and apparatus for selective down hole fluid communication |
US7571766B2 (en) | 2006-09-29 | 2009-08-11 | Halliburton Energy Services, Inc. | Methods of fracturing a subterranean formation using a jetting tool and a viscoelastic surfactant fluid to minimize formation damage |
US7581590B2 (en) | 2006-12-08 | 2009-09-01 | Schlumberger Technology Corporation | Heterogeneous proppant placement in a fracture with removable channelant fill |
US20080135248A1 (en) * | 2006-12-11 | 2008-06-12 | Halliburton Energy Service, Inc. | Method and apparatus for completing and fluid treating a wellbore |
EP2122122A4 (en) * | 2007-01-25 | 2010-12-22 | Welldynamics Inc | Casing valves system for selective well stimulation and control |
US7617871B2 (en) | 2007-01-29 | 2009-11-17 | Halliburton Energy Services, Inc. | Hydrajet bottomhole completion tool and process |
US20080202764A1 (en) | 2007-02-22 | 2008-08-28 | Halliburton Energy Services, Inc. | Consumable downhole tools |
US7681645B2 (en) * | 2007-03-01 | 2010-03-23 | Bj Services Company | System and method for stimulating multiple production zones in a wellbore |
US7870907B2 (en) * | 2007-03-08 | 2011-01-18 | Weatherford/Lamb, Inc. | Debris protection for sliding sleeve |
US7841396B2 (en) | 2007-05-14 | 2010-11-30 | Halliburton Energy Services Inc. | Hydrajet tool for ultra high erosive environment |
US7580796B2 (en) | 2007-07-31 | 2009-08-25 | Halliburton Energy Services, Inc. | Methods and systems for evaluating and treating previously-fractured subterranean formations |
US7673673B2 (en) | 2007-08-03 | 2010-03-09 | Halliburton Energy Services, Inc. | Apparatus for isolating a jet forming aperture in a well bore servicing tool |
US7971646B2 (en) * | 2007-08-16 | 2011-07-05 | Baker Hughes Incorporated | Multi-position valve for fracturing and sand control and associated completion methods |
US7703510B2 (en) * | 2007-08-27 | 2010-04-27 | Baker Hughes Incorporated | Interventionless multi-position frac tool |
US20090062157A1 (en) | 2007-08-30 | 2009-03-05 | Halliburton Energy Services, Inc. | Methods and compositions related to the degradation of degradable polymers involving dehydrated salts and other associated methods |
US7931082B2 (en) | 2007-10-16 | 2011-04-26 | Halliburton Energy Services Inc., | Method and system for centralized well treatment |
US7726403B2 (en) | 2007-10-26 | 2010-06-01 | Halliburton Energy Services, Inc. | Apparatus and method for ratcheting stimulation tool |
US8079933B2 (en) * | 2007-11-04 | 2011-12-20 | GM Global Technology Operations LLC | Method and apparatus to control engine torque to peak main pressure for a hybrid powertrain system |
US20090125280A1 (en) | 2007-11-13 | 2009-05-14 | Halliburton Energy Services, Inc. | Methods for geomechanical fracture modeling |
US7849924B2 (en) | 2007-11-27 | 2010-12-14 | Halliburton Energy Services Inc. | Method and apparatus for moving a high pressure fluid aperture in a well bore servicing tool |
US7950461B2 (en) | 2007-11-30 | 2011-05-31 | Welldynamics, Inc. | Screened valve system for selective well stimulation and control |
US7690427B2 (en) | 2008-03-07 | 2010-04-06 | Halliburton Energy Services, Inc. | Sand plugs and placing sand plugs in highly deviated wells |
US8096358B2 (en) | 2008-03-27 | 2012-01-17 | Halliburton Energy Services, Inc. | Method of perforating for effective sand plug placement in horizontal wells |
US7730951B2 (en) | 2008-05-15 | 2010-06-08 | Halliburton Energy Services, Inc. | Methods of initiating intersecting fractures using explosive and cryogenic means |
US9260921B2 (en) | 2008-05-20 | 2016-02-16 | Halliburton Energy Services, Inc. | System and methods for constructing and fracture stimulating multiple ultra-short radius laterals from a parent well |
US20090308588A1 (en) * | 2008-06-16 | 2009-12-17 | Halliburton Energy Services, Inc. | Method and Apparatus for Exposing a Servicing Apparatus to Multiple Formation Zones |
US8439116B2 (en) | 2009-07-24 | 2013-05-14 | Halliburton Energy Services, Inc. | Method for inducing fracture complexity in hydraulically fractured horizontal well completions |
US8960292B2 (en) | 2008-08-22 | 2015-02-24 | Halliburton Energy Services, Inc. | High rate stimulation method for deep, large bore completions |
US8074715B2 (en) | 2009-01-15 | 2011-12-13 | Halliburton Energy Services, Inc. | Methods of setting particulate plugs in horizontal well bores using low-rate slurries |
US7882894B2 (en) | 2009-02-20 | 2011-02-08 | Halliburton Energy Services, Inc. | Methods for completing and stimulating a well bore |
US20110028358A1 (en) | 2009-07-30 | 2011-02-03 | Welton Thomas D | Methods of Fluid Loss Control and Fluid Diversion in Subterranean Formations |
US8104535B2 (en) | 2009-08-20 | 2012-01-31 | Halliburton Energy Services, Inc. | Method of improving waterflood performance using barrier fractures and inflow control devices |
US8104539B2 (en) | 2009-10-21 | 2012-01-31 | Halliburton Energy Services Inc. | Bottom hole assembly for subterranean operations |
US8061426B2 (en) | 2009-12-16 | 2011-11-22 | Halliburton Energy Services Inc. | System and method for lateral wellbore entry, debris removal, and wellbore cleaning |
US8267172B2 (en) | 2010-02-10 | 2012-09-18 | Halliburton Energy Services Inc. | System and method for determining position within a wellbore |
US8210257B2 (en) | 2010-03-01 | 2012-07-03 | Halliburton Energy Services Inc. | Fracturing a stress-altered subterranean formation |
US8307904B2 (en) | 2010-05-04 | 2012-11-13 | Halliburton Energy Services, Inc. | System and method for maintaining position of a wellbore servicing device within a wellbore |
US20110284214A1 (en) | 2010-05-19 | 2011-11-24 | Ayoub Joseph A | Methods and tools for multiple fracture placement along a wellbore |
US9022115B2 (en) | 2010-11-11 | 2015-05-05 | Gas Technology Institute | Method and apparatus for wellbore perforation |
-
2009
- 2009-01-22 US US12/358,079 patent/US8960292B2/en active Active
- 2009-08-03 CA CA2734351A patent/CA2734351C/en active Active
- 2009-08-03 WO PCT/GB2009/001904 patent/WO2010020747A2/en active Application Filing
- 2009-08-03 AU AU2009284080A patent/AU2009284080B2/en active Active
- 2009-08-03 EP EP09784852A patent/EP2318654A2/en not_active Withdrawn
- 2009-08-03 MX MX2011001947A patent/MX2011001947A/en active IP Right Grant
- 2009-08-03 BR BRPI0917852A patent/BRPI0917852A2/en not_active IP Right Cessation
-
2011
- 2011-03-18 CO CO11033858A patent/CO6321177A2/en not_active Application Discontinuation
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2753940A (en) * | 1953-05-11 | 1956-07-10 | Exxon Research Engineering Co | Method and apparatus for fracturing a subsurface formation |
US6047773A (en) * | 1996-08-09 | 2000-04-11 | Halliburton Energy Services, Inc. | Apparatus and methods for stimulating a subterranean well |
US6938690B2 (en) * | 2001-09-28 | 2005-09-06 | Halliburton Energy Services, Inc. | Downhole tool and method for fracturing a subterranean well formation |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8960292B2 (en) | 2008-08-22 | 2015-02-24 | Halliburton Energy Services, Inc. | High rate stimulation method for deep, large bore completions |
US8439116B2 (en) | 2009-07-24 | 2013-05-14 | Halliburton Energy Services, Inc. | Method for inducing fracture complexity in hydraulically fractured horizontal well completions |
US8733444B2 (en) | 2009-07-24 | 2014-05-27 | Halliburton Energy Services, Inc. | Method for inducing fracture complexity in hydraulically fractured horizontal well completions |
US8960296B2 (en) | 2009-07-24 | 2015-02-24 | Halliburton Energy Services, Inc. | Complex fracturing using a straddle packer in a horizontal wellbore |
US8631872B2 (en) | 2009-09-24 | 2014-01-21 | Halliburton Energy Services, Inc. | Complex fracturing using a straddle packer in a horizontal wellbore |
US8887803B2 (en) | 2012-04-09 | 2014-11-18 | Halliburton Energy Services, Inc. | Multi-interval wellbore treatment method |
US9016376B2 (en) | 2012-08-06 | 2015-04-28 | Halliburton Energy Services, Inc. | Method and wellbore servicing apparatus for production completion of an oil and gas well |
CN102979497A (en) * | 2012-11-20 | 2013-03-20 | 中国石油大学(北京) | Device and method for immovable-string type packer-free sliding-sleeve hydraulic-jet pulsed acid fracturing |
US9796918B2 (en) | 2013-01-30 | 2017-10-24 | Halliburton Energy Services, Inc. | Wellbore servicing fluids and methods of making and using same |
CN104179486A (en) * | 2013-05-22 | 2014-12-03 | 中国石油化工股份有限公司 | Three-petal type oil and gas well layering fracture acidizing erosion preventing flow divider |
CN104632172A (en) * | 2013-11-15 | 2015-05-20 | 中国石油天然气股份有限公司 | Method for controlling annulus pressure of gas field horizontal well immovable pipe column hydraulic sand blasting fracturing |
Also Published As
Publication number | Publication date |
---|---|
WO2010020747A3 (en) | 2011-05-26 |
CA2734351A1 (en) | 2010-02-25 |
CO6321177A2 (en) | 2011-09-20 |
AU2009284080B2 (en) | 2015-08-06 |
CA2734351C (en) | 2014-04-08 |
MX2011001947A (en) | 2011-04-04 |
BRPI0917852A2 (en) | 2019-09-03 |
US20100044041A1 (en) | 2010-02-25 |
AU2009284080A1 (en) | 2010-02-25 |
US8960292B2 (en) | 2015-02-24 |
EP2318654A2 (en) | 2011-05-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CA2734351C (en) | High rate stimulation method for deep, large bore completions | |
AU2008211776B2 (en) | Hydrajet bottomhole completion tool and process | |
US7775285B2 (en) | Apparatus and method for servicing a wellbore | |
US10487626B2 (en) | Fracturing valve and fracturing tool string | |
EP2491224B1 (en) | Bottom hole assembly for subterranean operations | |
US8469089B2 (en) | Process and apparatus to improve reliability of pinpoint stimulation operations | |
US9016376B2 (en) | Method and wellbore servicing apparatus for production completion of an oil and gas well | |
WO2019099600A1 (en) | Multi-zone perforate and treat system and method | |
US20120305679A1 (en) | Hydrajetting nozzle and method | |
US10961821B1 (en) | Ball actuated sleeve with closing feature | |
CA2901074A1 (en) | Sleeve system for use in wellbore completion operations |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 09784852 Country of ref document: EP Kind code of ref document: A2 |
|
REEP | Request for entry into the european phase |
Ref document number: 2009784852 Country of ref document: EP |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2734351 Country of ref document: CA Ref document number: 2009784852 Country of ref document: EP |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2009284080 Country of ref document: AU |
|
WWE | Wipo information: entry into national phase |
Ref document number: MX/A/2011/001947 Country of ref document: MX |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
WWE | Wipo information: entry into national phase |
Ref document number: 1376/DELNP/2011 Country of ref document: IN |
|
ENP | Entry into the national phase |
Ref document number: 2009284080 Country of ref document: AU Date of ref document: 20090803 Kind code of ref document: A |
|
WWE | Wipo information: entry into national phase |
Ref document number: 11033858 Country of ref document: CO |
|
ENP | Entry into the national phase |
Ref document number: PI0917852 Country of ref document: BR Kind code of ref document: A2 Effective date: 20110222 |