WO2009128754A1 - Unique radio bearer (rb) procedure - Google Patents

Unique radio bearer (rb) procedure Download PDF

Info

Publication number
WO2009128754A1
WO2009128754A1 PCT/SE2008/050438 SE2008050438W WO2009128754A1 WO 2009128754 A1 WO2009128754 A1 WO 2009128754A1 SE 2008050438 W SE2008050438 W SE 2008050438W WO 2009128754 A1 WO2009128754 A1 WO 2009128754A1
Authority
WO
WIPO (PCT)
Prior art keywords
air interface
radio resource
over
radio
message
Prior art date
Application number
PCT/SE2008/050438
Other languages
French (fr)
Inventor
Srdjan Kostic
Original Assignee
Telefonaktiebolaget L M Ericsson (Publ)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Telefonaktiebolaget L M Ericsson (Publ) filed Critical Telefonaktiebolaget L M Ericsson (Publ)
Priority to US12/922,273 priority Critical patent/US8744457B2/en
Priority to PCT/SE2008/050438 priority patent/WO2009128754A1/en
Priority to EP08779240.4A priority patent/EP2266364A4/en
Publication of WO2009128754A1 publication Critical patent/WO2009128754A1/en

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W76/00Connection management
    • H04W76/10Connection setup
    • H04W76/15Setup of multiple wireless link connections
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W76/00Connection management
    • H04W76/10Connection setup
    • H04W76/12Setup of transport tunnels
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W76/00Connection management
    • H04W76/20Manipulation of established connections
    • H04W76/22Manipulation of transport tunnels

Definitions

  • the present invention is related to signalling in wireless radio communication networks. More specifically, the present invention deals with signalling when managing of radio bearers in a wireless communication network.
  • each service based or Radio Access Bearer (RAB) based procedure from the Core Network (CN) is mapped to one or more specific Channel or Radio Bearer (RB) procedures over the air interface.
  • GSM Global System for Mobile telephony
  • GPRS General Packet Radio Service
  • WCDMA Wideband Carrier Division Multiple Access
  • CDMA 2000 Carrier Division Multiple Access
  • RAB Radio Access Bearer
  • the RAB Assignment procedure from the CN according to the RANAP can be mapped to the RB Setup (due to RAB Setup - Establishment), and/or RB Release (due to RAB Release) and/or RB Reconfiguration (due to RAB Establishment or Release or RAB Modification) procedures in the RRC (Radio Resource Control) protocol towards UE (as Layer 3 - L3 specification).
  • RRC Radio Resource Control
  • RAB assignment is done similarly in GPRS/EDGE (GPRS/Enhanced Data rates for Global Evolution) networks where there are few different layer-3-procedures, such as ADDITIONAL ASSIGNMENT (to add an additional dedicated channel), ASSIGNMENT COMMAND or CHANNEL MODE MODIFY (to modify existing dedicated channels), CHANNEL RELEASE (to release dedicated channels).
  • ADDITIONAL ASSIGNMENT to add an additional dedicated channel
  • ASSIGNMENT COMMAND or CHANNEL MODE MODIFY to modify existing dedicated channels
  • CHANNEL RELEASE to release dedicated channels.
  • a mobile terminal has to pass through a set of functions (establishment, release and reconfiguration of RBs) that are usually requested by one CN procedure as e.g. a RANAP RAB Assignment for WCDMA/HSPA (WCDMA/High-Speed Packet Access) networks.
  • Each function presents a separate L3-message in radio control signaling, as it is done according to the RRC protocol.
  • the separate L3 messages that handle RBs are actually separate procedures for the RAN (such as RAB Establishment with RB SETUP, RAB Release with RB RELEASE, RAB Modification - RB RECONFIGURATION).
  • the signalling between the UTRAN and the UE in this case is illustrated in Figs, 1-3.
  • radio functions or procedures are described in detail in 3GPP TS as 25.331 (RRC for WCDMA) or 04.18 (RRC for GSM/EDGE).
  • Analogous or similar examples can be found in other existing mobile systems at the radio level, regardless whether they are 2G or 3G wireless communication network and also in new radio access technologies as LTE (Long Term Evolution), eHSPA (enhanced High Speed Packet Access), and some proposals for wireless communication networks of the fourth generation, i.e. 4G.
  • LTE Long Term Evolution
  • eHSPA enhanced High Speed Packet Access
  • 4G fourth generation
  • Even in the new systems, such as LTE separate procedures for bearer handling are created via the application protocol between the CN and the RAN.
  • the disadvantages of the solution according to known technology using "one procedure/function per radio control message" create on the one hand more signaling and increased node and UE processing over the CN-RAN (Iu) and the radio (Uu) interface). More specifically, in one solution for the UMTS wireless communication network, one CN requested procedure is handled as several RRC functions called RAN procedures and several RRC messages are sent towards UE.
  • One aspect of the present invention is related to a method for radio resource handling in a wireless communication network comprising the steps:
  • the radio resource assignment message transmitted via the air interface comprises a single radio resource assignment message configured to simultaneously perform establishment, release and modification of one or more radio resources provided by over the air interface.
  • the introduction of the new single radio resource assignment message for establishment, release and modification will facilitate better handling of radio bearers (signaling and radio resource allocation) in the RAN as well as easier multi service interaction and multi RAB configuration deployments.
  • the proposed new single radio resource assignment message or 'logic' for handling radio bearers in a generic way by means of one single message is applicable for any radio control protocol (L3 specification) standardized by 3GPP or 3GPP2. It means it is applicable to WCDMA / HSPA from Release 7/8, E-UTRAN (LTE) Release 8, CDMA 2000 and for any future wireless or mobile broadband system that may handle multimedia services.
  • Adding the new single radio resource assignment message will not require removing existing RRC messages from the 3GPP or 3GPP2 standard that are used in existing mobile systems as WCDMA/HSPA.
  • the unique radio resource handling method with a new single radio resource assignment message will provide besides existing messages and procedures, the possibility of less signalling, decreased node and UE processing time, quick RB handling in the RAN, a more robust solution for multi RAB deployment and multi bearer handling and service request from the CN side.
  • the new solution may be of advantage in an evolved QoS strategy where different QoS parameters are handled, such as ARP (Allocation Retention Priority).
  • ARP Allocation Retention Priority
  • Another aspect of the present invention is related to a base station for communication in a wireless communication network comprising a receiver/transmitter combination configured to receive a request for assignment of one or more radio resources over an air interface; a scheduling unit configured to assign one or more radio resources over the air interface; where the base station further comprises means for compiling a single radio resource control message comprising radio resource assignment, release and modification of one or more radio resources over the air interface and for instructing the receiver/transmitter combination to transmit the radio resource control message over the air interface.
  • One other aspect of the present invention is related to a Mobile terminal for communication in a wireless communication network comprising a receiver/transmitter combination configured to receive a request for assignment of one or more radio resources over an air interface, a control unit configured to examine the assignment request for one or more radio resources over the air interface where the mobile terminal further comprises a processing unit configured to compile a single radio resource control confirmation message comprising confirmation of radio resource assignment, release and modification of one or more radio resources over the air interface where the processing unit is configured to instruct the receiver/transmitter combination to transmit the radio resource control message over the air interface.
  • Another aspect of the present invention is related to a computer program for radio resource management in a wireless communication network comprising instruction sets for: - receiving a request for assignment of one or more radio resources over an air interface of the wireless communication network via a transport network interface;
  • Figs. 1-3 illustrate in simplified form the signalling between a UTRAN and a UE when handling setup, reconfiguration and release of radio bearers.
  • Fig. 4 illustrates the signalling procedure according to known technology for RAB and RB between the UTRAN and the UE in more detail.
  • Fig. 5 illustrates a schematic representation of a base station according to one embodiment of the present invention.
  • Fig. 6 illustrates a schematic representation of a mobile terminal according to one embodiment of the present invention.
  • Fig. 7 illustrates the signalling procedure for RAB and RB between the UTRAN and the UE according to one embodiment of the present invention.
  • Figs. 1-3 illustrate signalling between a UE and the UTRAN when handling setup, reconfiguration and release of one radio bearer (RB).
  • RB radio bearer
  • All the above procedures presented in Figs. 1-3 are capable to add, delete and/or reconfigure transport channels at the MAC level and to reconfigure a physical channel at the same time. Also, all three procedures can either add and reconfigure RBs (at the RLC/PDCP level) or delete and reconfigure RBs or to just reconfigure RBs. But it is not possible to add, release and reconfigure RBs at the same time with the same RRC message.
  • Fig. 4 illustrates the known signalling procedure for RAB and RB handling in a wireless communication network according to known technology.
  • RABs are managed, one RAB called X and the other Y for simplicity. These RABs may be handled either on request from a UE operating in the wireless communication network in Fig. 4 or after being initiated by a data transmission from another UE outside of the network in Fig. 4 towards the UE in Fig. 4.
  • RABs are established between the CN and the RAN by transmitting a RAB ASSIGNMENT REQUEST message from the CN to the RAN. This message comprises control signalling for both setup of RAB X and release of RAB Y.
  • RAB handling over the transport network interface i.e. the interface between the RAN and the CN has a correspondence in RB management over the air interface, i.e. the interface between the RAN and the UE.
  • RB handling over the air interface is performed on the basis of one message per action meaning that one message can perform one single action on one or more RBs.
  • one message can contain the request action for more that one RB.
  • the operation of the original RAB ASSIGNMENT REQUEST message has to be divided into one RB Y RELEASE and one RB SETUP X message as shown in the figure.
  • Each of these messages has to be confirmed by the UE towards the RAN by transmitting one RB Y RELEASE COMPLETE and one RB X SETUP COMPLETE message, before the RAN can confirm the corresponding RAB assignment as complete by transmitting a RAB ASSIGNMENT RESPONSE message back to the CN.
  • data communication between the CN and the UE or between a server outside of the network in Fig. 4 and the UE in Fig. 4 can be established.
  • FIG. 5 an illustration of a base station RBS according to one embodiment of the present invention is shown.
  • base station should be understood very generally, since the base station according to the present invention may be adapted to function in any type of wireless communication network, where there is a base station node, such a base station transceiver, Node B, access point or other base station nodes.
  • a base station node such as a base station transceiver, Node B, access point or other base station nodes.
  • the base station RBS comprises a receiver/transmitter combination Rx/Tx, a processing unit CPU and a scheduling unit SU.
  • the base station RBS in Fig. 5 may comprise other units known to exist in a base station, these will be omitted from illustration and explanation, since they do not form part of the present invention.
  • an RBS may equally be implemented in a RAN comprising an RBS and an RNC.
  • Such an example may be scheduling unit SU functionality being partly located in the RNC.
  • the receiver/transmitter combination Rx/Tx is adapted for receiving and transmitting user and control data over a radio interface towards one or more UEs. Also, the base station is adapted for receiving and transmitting user and control data over the transport network interface towards a core network of the wireless communication network, such as the core network CN in Fig. 4.
  • the receiver/transmitter combination Rx/Tx is adapted to receive PDP context requests from one or more UEs and to request establishment of one or more (depending on the number of PDP context requests) RABs over the transport network interface (the interface between the RAN and the CN) and one or more corresponding RBs over the air interface towards one or more UEs.
  • the base station RBS in Fig. 5 comprises a processing unit CPU configured to react to incoming PDP context requests by requesting establishment of corresponding RABs over the transport network interface and RBs over the air interface, respectively.
  • RAB assignment requests for multiple RABs from the CN may be handled in one RAB assignment request message.
  • the processing unit CPU is configured to react to RAB assignment requests received from the CN by transmitting a single RB assignment message towards the UE via the receiver/transmitter unit Rx/Tx.
  • This message may be network layer control message, such as a modified RRC (Radio Resource Control) message.
  • this single RB assignment message may comprise multiple RB managing operations for several RBs where RB setup, modification and release are performed at the same time for a number of RBs which are either active (here modification and release operations may apply) or to be established (RB setup applies here).
  • the new processing unit CPU will thus be able to manage a plurality of RBs with reduced signalling and greater efficiency thus providing better performance over the air interface.
  • the processing unit CPU is configured to instruct a scheduling unit SU in the base station RBS to establish and/or release one or more RBs over the air interface once the processing unit CPU has received an RB assignment complete confirmation message from the UE via the receiver/transmitter unit Rx/Tx. Also, the processing unit CPU is configured to adjust coding, output power and possible modulation for data to be transported on the one or more established and/or terminated radio bearers RB towards the UE depending on the type of data traffic transported.
  • Fig. 6 illustrates a mobile terminal UE according to one embodiment of the present invention. It may be appreciated that the term mobile terminal may comprise cell phones, computer terminals equipped with receiver/transmitter combination in internal or external modules, PDAs and other units adapted for data communication in a wireless communication network.
  • the mobile terminal UE in Fig, 6 comprises a receiver/transmitter combination Rx/Tx, a processing unit CPU and a control unit CU.
  • the receiver/transmitter combination Rx/Tx is configured to receive and transmit user and control data via the air interface.
  • the receiver/transmitter unit Rx/Tx may transmit service and PDP context requests to a base station and also control messages related to RB handling.
  • a processing unit CPU adapted to receive control messages related to RB handling from a base station, such as the base station RBS from fig, 5 and to confirm setup, modification and release of a plurality of RBs in one single RB assignment control confirmation message.
  • this new RB assignment control confirmation message may confirm the operations requested in the RB assignment control message in a single message.
  • signalling over the radio interface may be reduced leading to a more efficient utilization of available radio resources compared to solutions suggested by known technology.
  • this control confirmation message may be transmitted via the network layer as an RRC confirmation message.
  • the processing unit CPU of the mobile terminal UE in Fig. 6 may instruct the control unit SU to adapt coding and modulation to the data on the RBs established or modified after it has transmitted the RB assignment confirmation control message to the base station.
  • RAB setup and release is triggered by the application client in the UE, this may be indicated by a PDP context request (not shown) transmitted by the UE via the RAN towards the CN, establishing a new PDP context and possibly modification of the existing PDP context.
  • the reason for UE initiated RAB X setup and RAB Y release may be the request of a new service from the application client of the UE or the termination of a service used by the application client.
  • the CN may, as is known to the skilled person and shown in Fig. 4, transmit a RAB ASSIGNMENT REQUEST message comprising requests for setting up of a new RAB, namely RAB X and the release of an existing RAB, RAB Y.
  • the RAB ASSIGNMENT REQUEST message may be transmitted by the CN to the RAN as a reaction to an application client initiated PDP context request and modify PDP context message.
  • the RAN transmits a single RB ASSIGNMENT message comprising a corresponding RB setup and release request, where a new RB X corresponding to the new RAB X is set up and where the corresponding RB Y is released.
  • operations such as setup, modification and release may be performed on many RBs, which would reduce signalling over the air interface without the need for modification of the existing signalling process in a wireless communication network, where each of these operations has to be handled by a separate control message over the air interface.
  • the new RB ASSIGNMENT message is compatible with existing RB setup, modification and release messages in a wireless communication network, since it works both with one RB operation and with operations on many RB at the same time.
  • the advantages of the invention are less signaling over the air interface and the transport network interface and reduced processing time in the UE.
  • the present invention introduces a faster, more flexible and unified procedure and function for the radio access part of a wireless communication network which is more aligned with an overall QoS strategy in the radio access part of the network, (e.g. using ARP in RAB / RB handling). Also it leads to increased efficiency in the radio access network.
  • the present solution reduces the costs in the deployment of multi RAB configurations and their handling.
  • the solution according to the present invention is backward compatible and will not impact legacy networks and UE, which can stili operate according to the scheme one RB handling message per bearer.

Abstract

The present invention is related to a method for radio resource handling in a wireless communication network comprising the steps: - receiving via a transport network interface a request for assignment of one or more radio resources over an air interface of the wireless communication network; - transmitting via the air interface a radio resource assignment message for one or more one radio resources in the wireless communication network; - receiving a radio resource assignment confirmation message over the air interface; - transmitting a radio resource assignment confirmation message over the transport network interface, wherein the radio resource assignment message transmitted via the air interface comprises a single radio resource assignment message configured to simultaneously perform establishment, release and modification of one or more radio resources provided by over the air interface. This method may be implemented by a computer program comprising instruction sets for each method step. Also, the present invention comprises a radio base station and a mobile terminal where the method according to the present invention may be executed.

Description

UNIQUE RADIO BEARER (RB) PROCEDURE
TECHNICAL FIELD
The present invention is related to signalling in wireless radio communication networks. More specifically, the present invention deals with signalling when managing of radio bearers in a wireless communication network.
BACKGROUND OF THE INVENTION
In 2G and 3G wireless communication networks of today, such as in GSM (Global System for Mobile telephony, GPRS (General Packet Radio Service), WCDMA (Wideband Carrier Division Multiple Access), CDMA 2000 (Carrier Division Multiple Access) networks, each service based or Radio Access Bearer (RAB) based procedure from the Core Network (CN) is mapped to one or more specific Channel or Radio Bearer (RB) procedures over the air interface. For example, in WCDMA systems the RAB Assignment procedure from the CN according to the RANAP (Radio Access Network Access Protocol) can be mapped to the RB Setup (due to RAB Setup - Establishment), and/or RB Release (due to RAB Release) and/or RB Reconfiguration (due to RAB Establishment or Release or RAB Modification) procedures in the RRC (Radio Resource Control) protocol towards UE (as Layer 3 - L3 specification). Here, by layer 3 the network layer according to the OSI model is meant.
RAB assignment is done similarly in GPRS/EDGE (GPRS/Enhanced Data rates for Global Evolution) networks where there are few different layer-3-procedures, such as ADDITIONAL ASSIGNMENT (to add an additional dedicated channel), ASSIGNMENT COMMAND or CHANNEL MODE MODIFY (to modify existing dedicated channels), CHANNEL RELEASE (to release dedicated channels).
This means today a mobile terminal (UE) has to pass through a set of functions (establishment, release and reconfiguration of RBs) that are usually requested by one CN procedure as e.g. a RANAP RAB Assignment for WCDMA/HSPA (WCDMA/High-Speed Packet Access) networks. Each function presents a separate L3-message in radio control signaling, as it is done according to the RRC protocol. In most cases the separate L3 messages that handle RBs are actually separate procedures for the RAN (such as RAB Establishment with RB SETUP, RAB Release with RB RELEASE, RAB Modification - RB RECONFIGURATION). The signalling between the UTRAN and the UE in this case is illustrated in Figs, 1-3.
The above mentioned radio functions or procedures are described in detail in 3GPP TS as 25.331 (RRC for WCDMA) or 04.18 (RRC for GSM/EDGE). Analogous or similar examples can be found in other existing mobile systems at the radio level, regardless whether they are 2G or 3G wireless communication network and also in new radio access technologies as LTE (Long Term Evolution), eHSPA (enhanced High Speed Packet Access), and some proposals for wireless communication networks of the fourth generation, i.e. 4G. Even in the new systems, such as LTE, separate procedures for bearer handling are created via the application protocol between the CN and the RAN. Whereas separate messages are created for bearer setup, release and modification in the form of SAE BEARER SETUP, SAE BEARER RELEASE and SAE BEARER MODIFY in the S1AP (S1 Application Protocol), only one message or procedure RAB ASSIGNMENT REQUEST that is responsible for RABs setup, modify or release is used via RANAP in UTRAN, where RANAP is also an application protocol between CN and RAN,
In today's wireless communication networks where multiple APNs (Access Point Nodes) and multiple PDP contexts are active at the same time between the UE, the radio access part of the wireless communication network and CN, demands on the RAN to handle more than one RAB at the same time are rising. Especially by using so called "All IP"- solutions, multimedia services and IMS roadmaps, it is more likely for application clients in UEs and the service layer in CN to handle multiple RABs. In these cases solutions provided by known technology may not give necessary flexibilities from the CN and RAN point of view.
In particular, the disadvantages of the solution according to known technology using "one procedure/function per radio control message" create on the one hand more signaling and increased node and UE processing over the CN-RAN (Iu) and the radio (Uu) interface). More specifically, in one solution for the UMTS wireless communication network, one CN requested procedure is handled as several RRC functions called RAN procedures and several RRC messages are sent towards UE.
On the other hand, this solution also leads to worse performance in the form of a longer setup, release and modify procedure and increases the delay before a RAB is established. As a consequence, a greater amount of messages over radio interfaces may lead to worse KPIs (Key Performance Indices) and therefore greater risk for the occurrence of Rice conditions or exceptional cases. By "Rice conditions" such conditions are meant where in a scenario where parallel request messages are transmitted from the RAN to one UE, the RAN may receive a response message to the second request before receiving the response message to the first request. Even with new radio access technologies offering high throughput, such as LTE or eHSPA there are areas where the RAN performance can be improved. These and other needs in known technology are addressed by the present invention.
SUMMARY OF THE INVENTION
One aspect of the present invention is related to a method for radio resource handling in a wireless communication network comprising the steps:
- receiving via a transport network interface a request for assignment of one or more radio resources over an air interface of the wireless communication network; - transmitting via the air interface a radio resource assignment message for one or more one radio resources in the wireless communication network;
- receiving a radio resource assignment confirmation message over the air interface;
- transmitting a radio resource assignment confirmation message over the transport network interface, wherein the radio resource assignment message transmitted via the air interface comprises a single radio resource assignment message configured to simultaneously perform establishment, release and modification of one or more radio resources provided by over the air interface.
The introduction of the new single radio resource assignment message for establishment, release and modification will facilitate better handling of radio bearers (signaling and radio resource allocation) in the RAN as well as easier multi service interaction and multi RAB configuration deployments.
Moreover, the proposed new single radio resource assignment message or 'logic' for handling radio bearers in a generic way by means of one single message is applicable for any radio control protocol (L3 specification) standardized by 3GPP or 3GPP2. It means it is applicable to WCDMA / HSPA from Release 7/8, E-UTRAN (LTE) Release 8, CDMA 2000 and for any future wireless or mobile broadband system that may handle multimedia services.
Adding the new single radio resource assignment message will not require removing existing RRC messages from the 3GPP or 3GPP2 standard that are used in existing mobile systems as WCDMA/HSPA. In addition, it is important to have the same logic', one message for bearer handling at the interface between CN and RAN (Iu interface).
With the proposed solution the unique radio resource handling method with a new single radio resource assignment message will provide besides existing messages and procedures, the possibility of less signalling, decreased node and UE processing time, quick RB handling in the RAN, a more robust solution for multi RAB deployment and multi bearer handling and service request from the CN side.
Additionally the solution according to the present invention will provide better RAN performance and KPIs (Key Performance Indices).
The new solution may be of advantage in an evolved QoS strategy where different QoS parameters are handled, such as ARP (Allocation Retention Priority).
Another aspect of the present invention is related to a base station for communication in a wireless communication network comprising a receiver/transmitter combination configured to receive a request for assignment of one or more radio resources over an air interface; a scheduling unit configured to assign one or more radio resources over the air interface; where the base station further comprises means for compiling a single radio resource control message comprising radio resource assignment, release and modification of one or more radio resources over the air interface and for instructing the receiver/transmitter combination to transmit the radio resource control message over the air interface.
One other aspect of the present invention is related to a Mobile terminal for communication in a wireless communication network comprising a receiver/transmitter combination configured to receive a request for assignment of one or more radio resources over an air interface, a control unit configured to examine the assignment request for one or more radio resources over the air interface where the mobile terminal further comprises a processing unit configured to compile a single radio resource control confirmation message comprising confirmation of radio resource assignment, release and modification of one or more radio resources over the air interface where the processing unit is configured to instruct the receiver/transmitter combination to transmit the radio resource control message over the air interface.
It may be added that both the base station and the mobile terminal are adapted to execute the method steps according to the present invention. Finally, another aspect of the present invention is related to a computer program for radio resource management in a wireless communication network comprising instruction sets for: - receiving a request for assignment of one or more radio resources over an air interface of the wireless communication network via a transport network interface;
- transmitting a radio resource assignment message via the air interface of the wireless communication network;
- receiving a radio resource assignment confirmation message over the air interface; - transmitting a radio resource assignment confirmation message over a transport network interface and instructions sets for transmitting the radio resource assignment message as a single radio resource assignment message configured to simultaneously affect establishment, release and modification of one or more radio resources provided by the radio access network over the air interface.
BRIEF DESCRIPTION OF THE DRAWINGS
Figs. 1-3 illustrate in simplified form the signalling between a UTRAN and a UE when handling setup, reconfiguration and release of radio bearers.
Fig. 4 illustrates the signalling procedure according to known technology for RAB and RB between the UTRAN and the UE in more detail.
Fig. 5 illustrates a schematic representation of a base station according to one embodiment of the present invention.
Fig. 6 illustrates a schematic representation of a mobile terminal according to one embodiment of the present invention.
Fig. 7 illustrates the signalling procedure for RAB and RB between the UTRAN and the UE according to one embodiment of the present invention.
DETAILED DESCRIPTION OF PREFERRED EMBODIMENTS Figs. 1-3 illustrate signalling between a UE and the UTRAN when handling setup, reconfiguration and release of one radio bearer (RB).
It should be appreciated that these three operations have to be performed in a separate control message and that these operation have to be performed separately for each active RB or for RB's which are to be established between the UTRAN and the UE.
Disadvantages of this signalling have been already mentioned in the description of the background technology and will not be repeated here.
All the above procedures presented in Figs. 1-3 are capable to add, delete and/or reconfigure transport channels at the MAC level and to reconfigure a physical channel at the same time. Also, all three procedures can either add and reconfigure RBs (at the RLC/PDCP level) or delete and reconfigure RBs or to just reconfigure RBs. But it is not possible to add, release and reconfigure RBs at the same time with the same RRC message.
Fig. 4 illustrates the known signalling procedure for RAB and RB handling in a wireless communication network according to known technology.
In the figure, two RABs are managed, one RAB called X and the other Y for simplicity. These RABs may be handled either on request from a UE operating in the wireless communication network in Fig. 4 or after being initiated by a data transmission from another UE outside of the network in Fig. 4 towards the UE in Fig. 4. As is known to the skilled person, RABs are established between the CN and the RAN by transmitting a RAB ASSIGNMENT REQUEST message from the CN to the RAN. This message comprises control signalling for both setup of RAB X and release of RAB Y. Also, RAB handling over the transport network interface, i.e. the interface between the RAN and the CN has a correspondence in RB management over the air interface, i.e. the interface between the RAN and the UE.
RB handling over the air interface is performed on the basis of one message per action meaning that one message can perform one single action on one or more RBs. In known technologies one message can contain the request action for more that one RB. Hence the operation of the original RAB ASSIGNMENT REQUEST message has to be divided into one RB Y RELEASE and one RB SETUP X message as shown in the figure. Each of these messages has to be confirmed by the UE towards the RAN by transmitting one RB Y RELEASE COMPLETE and one RB X SETUP COMPLETE message, before the RAN can confirm the corresponding RAB assignment as complete by transmitting a RAB ASSIGNMENT RESPONSE message back to the CN. Thereafter data communication between the CN and the UE or between a server outside of the network in Fig. 4 and the UE in Fig. 4 can be established.
Moving now to Fig. 5, an illustration of a base station RBS according to one embodiment of the present invention is shown.
It should be mentioned here that the term base station should be understood very generally, since the base station according to the present invention may be adapted to function in any type of wireless communication network, where there is a base station node, such a base station transceiver, Node B, access point or other base station nodes.
In the embodiment of Fig. 5 the base station RBS comprises a receiver/transmitter combination Rx/Tx, a processing unit CPU and a scheduling unit SU. Although, the base station RBS in Fig. 5 may comprise other units known to exist in a base station, these will be omitted from illustration and explanation, since they do not form part of the present invention.
Additionally it may be remarked that some functionality of the above components of an RBS may equally be implemented in a RAN comprising an RBS and an RNC. Such an example may be scheduling unit SU functionality being partly located in the RNC.
The receiver/transmitter combination Rx/Tx is adapted for receiving and transmitting user and control data over a radio interface towards one or more UEs. Also, the base station is adapted for receiving and transmitting user and control data over the transport network interface towards a core network of the wireless communication network, such as the core network CN in Fig. 4.
Among the control data communicated to and from a UE and a CN the receiver/transmitter combination Rx/Tx is adapted to receive PDP context requests from one or more UEs and to request establishment of one or more (depending on the number of PDP context requests) RABs over the transport network interface (the interface between the RAN and the CN) and one or more corresponding RBs over the air interface towards one or more UEs.
Moreover, the base station RBS in Fig. 5 comprises a processing unit CPU configured to react to incoming PDP context requests by requesting establishment of corresponding RABs over the transport network interface and RBs over the air interface, respectively. As is known to the skilled person, RAB assignment requests for multiple RABs from the CN may be handled in one RAB assignment request message.
Also, the processing unit CPU is configured to react to RAB assignment requests received from the CN by transmitting a single RB assignment message towards the UE via the receiver/transmitter unit Rx/Tx. This message may be network layer control message, such as a modified RRC (Radio Resource Control) message. Compared to solutions suggested by known technology, this single RB assignment message may comprise multiple RB managing operations for several RBs where RB setup, modification and release are performed at the same time for a number of RBs which are either active (here modification and release operations may apply) or to be established (RB setup applies here).
The new processing unit CPU will thus be able to manage a plurality of RBs with reduced signalling and greater efficiency thus providing better performance over the air interface.
Also, the processing unit CPU is configured to instruct a scheduling unit SU in the base station RBS to establish and/or release one or more RBs over the air interface once the processing unit CPU has received an RB assignment complete confirmation message from the UE via the receiver/transmitter unit Rx/Tx. Also, the processing unit CPU is configured to adjust coding, output power and possible modulation for data to be transported on the one or more established and/or terminated radio bearers RB towards the UE depending on the type of data traffic transported.
Fig. 6 illustrates a mobile terminal UE according to one embodiment of the present invention. It may be appreciated that the term mobile terminal may comprise cell phones, computer terminals equipped with receiver/transmitter combination in internal or external modules, PDAs and other units adapted for data communication in a wireless communication network.
The mobile terminal UE in Fig, 6 comprises a receiver/transmitter combination Rx/Tx, a processing unit CPU and a control unit CU.
Similar to the receiver/transmitter combination in the base station RBS in Fig. 5, the receiver/transmitter combination Rx/Tx is configured to receive and transmit user and control data via the air interface. Among the control data transmitted, the receiver/transmitter unit Rx/Tx may transmit service and PDP context requests to a base station and also control messages related to RB handling.
Connected to the receiver/transmitter combination Rx/Tx is a processing unit CPU adapted to receive control messages related to RB handling from a base station, such as the base station RBS from fig, 5 and to confirm setup, modification and release of a plurality of RBs in one single RB assignment control confirmation message. Analogously to the RB assignment control message performing multiple RB management operations in one single message, this new RB assignment control confirmation message may confirm the operations requested in the RB assignment control message in a single message. Hence, signalling over the radio interface may be reduced leading to a more efficient utilization of available radio resources compared to solutions suggested by known technology. As already mentioned for the RB assignment control message transmitted by the base station RBS in Fig. 5, this control confirmation message may be transmitted via the network layer as an RRC confirmation message.
Moreover, the processing unit CPU of the mobile terminal UE in Fig. 6 may instruct the control unit SU to adapt coding and modulation to the data on the RBs established or modified after it has transmitted the RB assignment confirmation control message to the base station.
Next, the signalling procedure according to one embodiment of the present invention will be explained referring to Fig. 7.
Here, the example case identical to the scenario in Fig. 4 is taken where one RAB (X) is set up and another RAB (Y) is released which may be triggered by an application client in the UE or by the service layer in the CN.
If the RAB setup and release is triggered by the application client in the UE, this may be indicated by a PDP context request (not shown) transmitted by the UE via the RAN towards the CN, establishing a new PDP context and possibly modification of the existing PDP context. The reason for UE initiated RAB X setup and RAB Y release may be the request of a new service from the application client of the UE or the termination of a service used by the application client. Thereafter, the CN may, as is known to the skilled person and shown in Fig. 4, transmit a RAB ASSIGNMENT REQUEST message comprising requests for setting up of a new RAB, namely RAB X and the release of an existing RAB, RAB Y. The RAB ASSIGNMENT REQUEST message may be transmitted by the CN to the RAN as a reaction to an application client initiated PDP context request and modify PDP context message. In the next step, the RAN transmits a single RB ASSIGNMENT message comprising a corresponding RB setup and release request, where a new RB X corresponding to the new RAB X is set up and where the corresponding RB Y is released. Using the single RB ASSIGNMENT message operations such as setup, modification and release may be performed on many RBs, which would reduce signalling over the air interface without the need for modification of the existing signalling process in a wireless communication network, where each of these operations has to be handled by a separate control message over the air interface. Also, the new RB ASSIGNMENT message is compatible with existing RB setup, modification and release messages in a wireless communication network, since it works both with one RB operation and with operations on many RB at the same time.
This scenario in Fig. 7 is thus valid when the deployment of supported multi RAB configurations is not optimized in the RAN. The benefits of the solution are improved KPIs regarding accessibility of high priority RABs with less amount signaling, a more flexible RAN procedure and better RAN performance.
The proposed new solution in RRC and RANAP/S1 AP protocols is valid for 3GPP specifications as 25.331 and 36.413 but also the logic needs to be applicable for other mobile and wireless systems and specifications (as e.g. in 3GPP2, IEEE 802. xxx etc). It should be borne in mind that the new solution does not exclude the application of existing RRC / S1 AP messages in the existing standard or system versions. But it will benefit mobile/wireless broadband systems to have only one standardized RAN procedure and one standardized unique radio bearer message that will be used to setup, release and reconfigure one or more radio bearer(s) as suggested by the present invention. In the multimedia world where multiple services, multiple APNs and PDP contexts and where an IMS architecture and evolved QoS strategy in CN and RAN is applied, it will become important to support service interactions from top, application clients in UE and service layers via different CN entities, down to RAN and UEs. The deployment of multi RAB / RB configurations and its handling and signalling via different RAN entities towards UEs is gaining momentum and it will be crucial for future radio access networks. At the same time, new radio access technologies will provide high throughput over the radio interface with possibility to handle longer radio control L3 messages.
Due to above facts, the advantages of the invention are less signaling over the air interface and the transport network interface and reduced processing time in the UE. Moreover, the present invention introduces a faster, more flexible and unified procedure and function for the radio access part of a wireless communication network which is more aligned with an overall QoS strategy in the radio access part of the network, (e.g. using ARP in RAB / RB handling). Also it leads to increased efficiency in the radio access network.
The reduced need of signalling for handling of RB setup, modification and release operations also leads to better performance, because of the reduced time needed for these operations and improved KPIs regarding the improvement related to lower probability of exceptional cases and RAB integrity (retainability), i.e. to keeping existing RABs or calls during ordered RAB release procedures.
At the same time, the present solution reduces the costs in the deployment of multi RAB configurations and their handling. Finally, the solution according to the present invention is backward compatible and will not impact legacy networks and UE, which can stili operate according to the scheme one RB handling message per bearer.

Claims

1. Method for radio resource handling in a wireless communication network comprising the steps:
- receiving via a transport network interface a request for assignment of one or more radio resources over an air interface of the wireless communication network;
- transmitting via the air interface a radio resource assignment message for one or more one radio resources in the wireless communication network;
- receiving a radio resource assignment confirmation message over the air interface; - transmitting a radio resource assignment confirmation message over the transport network interface
wherein
the radio resource assignment message transmitted via the air interface comprises a single radio resource assignment message configured to simultaneously perform establishment, release and modification of one or more radio resources provided by over the air interface.
2. Method according to claim 1 , wherein the transport network interface comprises an lu-interface in a third generation wireless communication network,
3. Method according to claim 1 or 2, wherein the air interface comprises the Uu- interface in a third generation wireless communication network.
4. Method according to one of the claims 1 to 3, wherein the one or more radio resources comprise radio bearers (RBs).
5. Method according to one of the claims 1-4, wherein the radio resource assignment message transmitted over the air interface comprises a single radio resource control (RRC)-message issued at the network level of the OSI (Open Systems lnterconnect)-model.
6. Method according to one of the claims 1-5, wherein the wireless communication network comprises one of UMTS (Universal Mobile Telephony System), WCDMA (Wideband Carrier Division Multiple Access) and 3GPP LTE (Third Generation Partnership Project Long Term Evolution).
7. Radio resource control message configured to be transmitted by a radio access network part of a wireless communication network, comprising:
- at least one first request directed to the assignment of one or more radio resources over an air interface
characterized in that the radio resource control message further comprises:
- at least one second request directed to the release of the one or more radio resources over the air interface and;
- at least one third request directed to the modification of the one or more radio resources over the air interface.
8. Base station for communication in a wireless communication network comprising:
- a receiver/transmitter combination configured to receive a request for assignment of one or more radio resources over an air interface;
- a scheduling unit configured to assign one or more radio resources over the air interface;
characterized in that
the base station further comprises a processing unit configured to compile a single radio resource control message comprising radio resource assignment, release and modification of one or more radio resources over the air interface and to instruct the receiver/transmitter combination to transmit the radio resource control message over the air interface.
9. Base station for communication in a wireless communication network comprising:
- a receiver/transmitter combination configured to receive a request for assignment of one or more radio resources over an air interface; - a scheduling unit configured to assign one or more radio resources over the air interface;
characterized in that
the base station further comprises means for compiling a single radio resource control message comprising radio resource assignment, release and modification of one or more radio resources over the air interface and for instructing the receiver/transmitter combination to transmit the radio resource control message over the air interface.
10. Mobile terminal for communication in a wireless communication network comprising:
- a receiver/transmitter combination configured to receive a request for assignment of one or more radio resources over an air interface;
- a control unit configured to examine the assignment request for one or more radio resources over the air interface;
characterized in that
the mobile terminal further comprises a processing unit configured to compile a single radio resource control confirmation message comprising confirmation of radio resource assignment, release and modification of one or more radio resources over the air interface where the processing unit is configured to instruct the receiver/transmitter combination to transmit the radio resource control message over the air interface.
11. Computer program for radio resource management in a wireless communication network comprising instruction sets for:
- receiving a request for assignment of one or more radio resources over an air interface of the wireless communication network via a transport network interface;
- transmitting a radio resource assignment message via the air interface of the wireless communication network; - receiving a radio resource assignment confirmation message over the air interface;
- transmitting a radio resource assignment confirmation message over a transport network interface
the computer program further comprising instructions sets for
transmitting the radio resource assignment message as a single radio resource assignment message configured to simultaneously affect establishment, release and modification of one or more radio resources provided by the radio access network over the air interface.
PCT/SE2008/050438 2008-04-17 2008-04-17 Unique radio bearer (rb) procedure WO2009128754A1 (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
US12/922,273 US8744457B2 (en) 2008-04-17 2008-04-17 Unique radio bearer (RB) procedure
PCT/SE2008/050438 WO2009128754A1 (en) 2008-04-17 2008-04-17 Unique radio bearer (rb) procedure
EP08779240.4A EP2266364A4 (en) 2008-04-17 2008-04-17 Unique radio bearer (rb) procedure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/SE2008/050438 WO2009128754A1 (en) 2008-04-17 2008-04-17 Unique radio bearer (rb) procedure

Publications (1)

Publication Number Publication Date
WO2009128754A1 true WO2009128754A1 (en) 2009-10-22

Family

ID=41199314

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/SE2008/050438 WO2009128754A1 (en) 2008-04-17 2008-04-17 Unique radio bearer (rb) procedure

Country Status (3)

Country Link
US (1) US8744457B2 (en)
EP (1) EP2266364A4 (en)
WO (1) WO2009128754A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019050441A1 (en) * 2017-09-07 2019-03-14 Telefonaktiebolaget Lm Ericsson (Publ) Control node, process node and methods performed therein for a control process on radio access bearers

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2444998A (en) 2006-12-11 2008-06-25 Nec Corp Dedicated radio resource control
US9185733B2 (en) * 2012-01-25 2015-11-10 Electronics And Telecommunications Research Institute Method of device-to-device communication in wireless mobile communication system
WO2013189070A1 (en) * 2012-06-21 2013-12-27 华为技术有限公司 Method for reporting user equipment auxiliary information, user equipment and base station
CN103905378B (en) * 2012-12-25 2017-04-12 华为技术有限公司 Data transmission method and device thereof
US20140254547A1 (en) * 2013-03-06 2014-09-11 Qualcomm Incorporated Uplink buffer status reporting for multiple preserved pdp contexts
CN104244426B (en) 2013-06-09 2019-02-05 华为技术有限公司 A kind of resource allocation methods and device of Data Radio Bearer DRB
US9888421B2 (en) 2014-09-16 2018-02-06 Mediatek Inc. Method of enhanced bearer continuity for 3GPP system change

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040052246A1 (en) * 2002-09-12 2004-03-18 Lg Electronics Inc. Method of managing radio bearer in mobile communication system
WO2004114590A2 (en) * 2003-03-14 2004-12-29 Nortel Networks Limited Method for mobile station request release of multiple packet data service sessions simultaneously using resource release request messages
US20070041343A1 (en) * 2005-08-19 2007-02-22 Nokia Corporation Apparatus, method and computer program product providing simultaneous radio resource and service requests

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FI108491B (en) * 2000-02-11 2002-01-31 Nokia Corp Repositioning the serving network element
US7039416B2 (en) * 2001-02-22 2006-05-02 Telefonaktiebolaget Lm Ericsson (Publ) Method and apparatus for adapting a number of bearers to a service
US7292854B2 (en) * 2002-02-15 2007-11-06 Lucent Technologies Inc. Express signaling in a wireless communication system
US7453805B2 (en) * 2003-03-21 2008-11-18 Panasonic Corporation Method and communication system for signaling information for optimizing rate control schemes in wireless networks
DE60321921D1 (en) * 2003-11-07 2008-08-14 Research In Motion Ltd Handling Configuration and Mobility Management Messages with Missing Ciphering Activation Time for DPCH Information in a Universal Radio Telecommunication System (UMTS)
GB0407140D0 (en) * 2004-03-30 2004-05-05 Nokia Corp Delivering services in a wireless communications system
US7644410B1 (en) * 2004-11-23 2010-01-05 Hewlett-Packard Development Company, L.P. Resource management for shared computing environment
US7853257B2 (en) * 2005-09-20 2010-12-14 Spreadtrum Communications Inc. Method for fast call setup in a mobile communication system
CN100459808C (en) * 2006-01-18 2009-02-04 展讯通信(上海)有限公司 Method for air-interface message sending in quick call establishment
GB2444998A (en) * 2006-12-11 2008-06-25 Nec Corp Dedicated radio resource control
EP2213119B1 (en) * 2007-11-16 2014-01-08 Nokia Solutions and Networks Oy Mapping quality of service for intersystem handover
US20110145319A1 (en) * 2009-12-15 2011-06-16 Dolan Michael F Group session management and admission control of multiple internet protocol flows

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040052246A1 (en) * 2002-09-12 2004-03-18 Lg Electronics Inc. Method of managing radio bearer in mobile communication system
WO2004114590A2 (en) * 2003-03-14 2004-12-29 Nortel Networks Limited Method for mobile station request release of multiple packet data service sessions simultaneously using resource release request messages
US20070041343A1 (en) * 2005-08-19 2007-02-22 Nokia Corporation Apparatus, method and computer program product providing simultaneous radio resource and service requests

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019050441A1 (en) * 2017-09-07 2019-03-14 Telefonaktiebolaget Lm Ericsson (Publ) Control node, process node and methods performed therein for a control process on radio access bearers
CN111096056A (en) * 2017-09-07 2020-05-01 瑞典爱立信有限公司 Control node, process node and method performed therein for control procedures on radio access bearers
US11457383B2 (en) 2017-09-07 2022-09-27 Telefonaktiebolaget Lm Ericsson (Publ) Control node, process node and methods performed therein for a control process on radio access bearers
CN111096056B (en) * 2017-09-07 2024-03-08 瑞典爱立信有限公司 Control node, process node and method for controlling a process on a radio access bearer performed therein

Also Published As

Publication number Publication date
EP2266364A4 (en) 2014-01-22
US20110009124A1 (en) 2011-01-13
US8744457B2 (en) 2014-06-03
EP2266364A1 (en) 2010-12-29

Similar Documents

Publication Publication Date Title
US10972956B2 (en) Enhanced handling on QoS flow description
EP3965440A1 (en) Sidelink communication method and apparatus, and storage medium
CN110169118B (en) Method and apparatus for transmitting UL packets based on quality of service (QoS) flows in wireless communication system
US11223988B2 (en) Quality of service rule management in 5G
US11240699B2 (en) Insufficient resources in the UE during PDU session establishment procedure
EP3403464B1 (en) Transmitting communication device, receiving communication device, methods performed thereby in the context of network slicing and computer program
US8744457B2 (en) Unique radio bearer (RB) procedure
FI114768B (en) An improved method and arrangement for transmitting information in a packet radio service
WO2017181779A1 (en) Method of generating radio access network slice, radio access network, and slice manager
CN110352610B (en) Method for transmitting TCP ACK packet in wireless communication system and apparatus therefor
WO2020067346A1 (en) Radio access network and methods for expedited network access
US11553546B2 (en) Methods and systems for radio access network aggregation and uniform control of multi-RAT networks
WO2018059518A1 (en) Data transmission method, device and system
JP2023513651A (en) Quality of Service (QoS) Parameter Configuration Method and Related Apparatus
US11115896B2 (en) Handling QoS rules on QoS operation errors
CN104685959B (en) Passive radio link control entity with unified interface
US9020507B2 (en) Radio access technology multiplexing
CN114301831B (en) Service transmission method, device and storage medium
KR101395949B1 (en) A method of allocating radio resources of radio bearers having priorities in a wireless communication system
WO2023141877A1 (en) Methods, devices, and systems for performing network slice replacement during mobility
CN116506887A (en) Communication method, device and storage medium
WO2024033773A1 (en) User device reporting of quality of experience measurement
WO2017167152A1 (en) Network node configuration method and apparatus
CN114982284A (en) Communication method and device
CN114762368A (en) Method and related device for guaranteeing QoS (quality of service) of relay communication

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 08779240

Country of ref document: EP

Kind code of ref document: A1

REEP Request for entry into the european phase

Ref document number: 2008779240

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 2008779240

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 12922273

Country of ref document: US

NENP Non-entry into the national phase

Ref country code: DE