WO2009088294A1 - Assembly and method for production of gas or gas and condensate/oil - Google Patents

Assembly and method for production of gas or gas and condensate/oil Download PDF

Info

Publication number
WO2009088294A1
WO2009088294A1 PCT/NO2008/000461 NO2008000461W WO2009088294A1 WO 2009088294 A1 WO2009088294 A1 WO 2009088294A1 NO 2008000461 W NO2008000461 W NO 2008000461W WO 2009088294 A1 WO2009088294 A1 WO 2009088294A1
Authority
WO
WIPO (PCT)
Prior art keywords
water
pressure
production
well
injection well
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/NO2008/000461
Other languages
French (fr)
Inventor
Harald Underbakke
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Equinor ASA
Original Assignee
Statoil ASA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Statoil ASA filed Critical Statoil ASA
Priority to CA2711376A priority Critical patent/CA2711376C/en
Priority to EA201001091A priority patent/EA016743B1/en
Priority to US12/811,919 priority patent/US8534364B2/en
Priority to AU2008345750A priority patent/AU2008345750B2/en
Priority to BRPI0821626A priority patent/BRPI0821626B1/en
Priority to GB1012701.7A priority patent/GB2470305B/en
Publication of WO2009088294A1 publication Critical patent/WO2009088294A1/en
Priority to DK200900994A priority patent/DK178457B1/en
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/01Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/12Methods or apparatus for controlling the flow of the obtained fluid to or in wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/12Methods or apparatus for controlling the flow of the obtained fluid to or in wells
    • E21B43/121Lifting well fluids
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • E21B43/20Displacing by water

Definitions

  • This invention relates to production of gas, or gas and condensate/oil, from a subsea, gaseous reservoir.
  • the invention further relates to an assembly and a method for production of gas, or gas and condensate/oil, from a subsea gaseous reservoir where the gas pressure is low.
  • the pressure may drop relatively fast, which results in diminishing production.
  • the pressure in the gaseous reservoir may have dropped to a pressure that is lower than the pressure from the water at the seabed / sea bottom / water bottom above the reservoir.
  • gas compressors In order to support the production of gas flow from a gas reservoir, it is known to arrange a gas compressor at the outlet of the production well, either at the seabed or at the surface installation. Gas compressors are usually operated/driven electrically. For gaseous reservoirs with condensate/oil, multiple face machines or -pumps may alternatively be installed, which are typically electrically operated.
  • a method for developing gas reserves below the continental shelf is disclosed.
  • the method aims to avoid use of the pressure increasing compressor station with compression of gas prior to further transport. Further the aim is to reduce the costs for developing the reservoir to a commercial level.
  • the injection wells are put into operation in order to maintain the pressure with pumpless injection of seawater in the reservoir wells by utilizing the pressure of the water column between the sea surface and the well head level.
  • Water injection without pumping utilizes the pressure head in the water column between the sea surface and the level of the well head at the seabed.
  • an underwater placed assembly for production of gas, or gas and condensate/oil, from a subsea gaseous reservoir where at least one production well is arranged from the seabed to a production zone and at least one water injection well is arranged from the seabed to an injection zone.
  • the assembly is characterized by comprising: a pressure increasing device connected to the outlet of the production well to increase pressure in a production flow from the production well, and a water turbine connected to and operating the pressure increasing device, said water turbine has an inlet for water with a high hydrostatic pressure according to the location of the water turbine and an outlet connected to an inlet of the water injection well, the water turbines is driven by and withdraw at least a part of the hydrostatic energy from the water which then can be delivered with lower pressure to the water injection well, so that water thereby delivered to the water injection well will have a lower pressure than the hydrostatic pressure at the inlet of the water injection well.
  • production well and water injection well must here be interpreted as not only two separate wells of the mentioned types but also separate fluid paths for production and water injection in one and the same well.
  • the production well and the water injection well is one and the same well.
  • the fluid path for one of production and injection is in an annular space around an inner pipe, while the other fluid path of production and injection is in the inner pipe, alternatively two separate pipes are provided.
  • the production is provided in an annular space around an injection pipe extended down to the production zone with a sealing between the injection and production level in the well.
  • the pressure increasing device is provided instead of on top of or next to or to a wellhead, down in a well or in a well frame in a position normally meant for a wellhead.
  • the pressure increasing device is a gas compressor; for production of gas and condensate/oil the pressure increasing device is a multiple phase machine/pump.
  • the water injection well may be attached to another reservoir than the production well.
  • the pressure increasing device and the water turbine are preferably provided on a common shaft, which is preferred as regard to efficiency and cost.
  • the pressure increasing device and the water turbine are interconnected via a gear ratio, which is advantageous as regards to operation.
  • the water turbine and the pressure increasing device are interconnected hydraulically, for example via a hydraulic loop, directly or indirectly driven by the water turbine, where the water turbine and the pressure increasing device can be arranged further apart, whereby operating benefits may be achieved.
  • the water turbine may be provided at lower level than the pressure increasing device, and the water turbine may more easily be attached to a water injection well in another reservoir.
  • the pressure increasing device and the water turbine are typically located on the seabed at the outlet from the production well.
  • the pressure increasing device and the water turbine are provided in a recess in the seabed at the outlet from the production well, which advantageously increases the pressure head for the water turbine and thus the efficiency.
  • a method for production of gas or gas and condensate/oil from a subsea, gaseous reservoir is also provided, at least one production well being provided from the seabed to a production zone and at least one water injection well is provided from the seabed to an injection zone, by utilizing the assembly according to this invention.
  • the method is characterized by comprising: increasing the pressure in a production flow from the production well by means of a pressure increasing device attached to the outlet from the production well, and injecting water through the injection well to the injection zone in order to maintain the pressure in the reservoir, where a water turbine is connected to the inlet of the water injection well, which water turbine is connected to and operate the pressure increasing device, the water turbine having an inlet for water with high hydrostatic pressure according to the location of the water turbine and an outlet connected to the inlet of the water injection well, the water turbine is operated by and withdrawing at least part of the hydrostatic energy from the water, which thus is delivered with a lower pressure to the water injection well, so that water thus delivered to the water injection well has a lower pressure than the hydrostatic pressure at the inlet of the water injection well.
  • the entire pressure head at the location of the water turbine advantageously is withdrawn, so that the pressure in water delivered from the water turbine to the water injection well will equal about 1 atmosphere.
  • the entire pressure head, less loss, will thus be used for the pressure increase in the pressure increasing device, while water is flowing into the injection zone through the water injection well by means of the pressure head or the drop head from the inlet of the water injection well to the injection zone in the reservoir.
  • Such a practice of the invention is possible as soon as the pressure in the injection zone is lower than the pressure head or the drop head from the inlet of the water injection well to the injection zone, corrected for pressure loss in well and injection zone.
  • the pressure in a gas reservoir or in a gaseous reservoir will drop gradually, and the invention is applicable and is substantially different from prior art as long as at least part of the hydrostatic energy can be used as intended.
  • the pressure in the injection zone must be lower than the delivered pressure from the water turbine plus the pressure/drop head in the water injection well, corrected for pressure loss.
  • the water turbine having an inlet for water with a high hydrostatic pressure related to the location of the water turbine, entitles that the inlet introduce water with a pressure equal to or mainly equal to the hydrostatic water pressure where the water turbine is located, that is on the seabed, in a recess in the seabed or on a subsea installation.
  • a filter is preferably arranged to prevent plugging of the injection well, and the inlet does not need to be in the form of a line extending the distance from the water turbine.
  • Figure 1 illustrates an assembly according to the invention
  • figure 2 illustrates an alternative assembly according to the invention.
  • FIG 1 illustrates an underwater arranged assembly 1 according to the invention for production of gas, or gas and condensate, from a subsea reservoir 2, at least one production well 3 being provided from the seabed 4 to a production zone 5 and at least one water injection well 6 is provided from the seabed 4 to an injection zone 7.
  • the assembly 1 comprises a pressure increasing device 8 in the form of a compressor attached to the outlet from the production well, and a water turbine 9 attached to and driving the compressor.
  • the compressor 8 and water turbine 9 are both located on the seabed, and the units are interconnected by means of common shaft.
  • the water turbine 9 has an inlet 10 and an outlet 11 connected to the inlet of the water injection well.
  • a filter 12 is provided on the inlet 10 to the water turbine.
  • the water turbine is driven by and withdraws at least a part of the hydrostatic energy from the water flowing through the water turbine, where water with a lower pressure is delivered to the water injection well so that water thus delivered to the water injection well will have a lower pressure than the hydrostatic pressure at the inlet of the water injection well.
  • a pipeline 13 is attached to the compressor 8 for further transport of compressed gas.
  • figure 2 illustrating an alternative underwater located assembly 1 according to the invention.
  • the alternative assembly is different from the assembly shown in figure 1 by that the compressor 8 and the water turbine 9 are located in a recess on the seabed and the arrangement of the mentioned devices and the connection between them are vertical, where the water turbine is arranged at theo bottom.
  • the, water turbine and the pressure increasing device is mounted on a common shaft and designed so that the drive speed is below the first bending critical oscillation mode of the shaft.
  • the inlet pressure to the water injection well equals the outlet pressure from the water turbine and is lower than the surrounding hydrostatic pressure.
  • both the water turbine and the pressure increasing device are designed with product lubricated bearings, that is, water and gas/condensate/oil 5 respectively, which simplifies the design.
  • the assembly comprises oil lubricated bearings or glycol lubricated bearings, which is advantageous when the water pressure into the turbine is lower than the pressure in the production flow into the compressor or a multiphase machine.
  • combined lubrication and blocking fluid could be necessary between the turbine ando the compressor/multiphase machine, such as shown in the patent application NO 2004 3636.
  • valves, connections and telemetry are provided in order to control the injection rate and efficiency of the pressure increasing device.
  • a valve may be provided at the outlet from the water turbine or in the injection well. 5
  • shutdown valve or check valve may be provided in the inlet to the injection well, possibly down in the injection well, in order to prevent discharge from the injection well should the pressure in the injection zone not yet be sufficiently low in order to practice the invention.
  • a pump may be provided in order to fill the water injection well with water before start up, which is advantageous should the pressure in the injection zone be almost equal to the pressure at the seabed, or if shut down over longer period of time period may entail a risk that the water injection well is filled with gas flowing in from the production zone.
  • the assembly according to the invention comprises an inlet to the water injection well external to the water turbine, alternatively provided with a pump, which pump, if any, may fill the injection well with water in addition to work as an injection pump, in order to start the water injection at an earlier stage, that is before the pressure in the injection zone has dropped sufficiently that part of the hydrostatic energy may be withdrawn with the water turbine in order to drive the pressure increasing device.
  • This invention comprises also an embodiment with a separator provided with attachment to the production well, with downstream provided pump and compressor both driven by the water turbine.
  • the water injection is practiced preferably according to normal practice, that is that produced volume is replaced in order to maintain the reservoir pressure, while water break through to the producing wells or inadvertent blocking of the reservoir zones is avoided.

Landscapes

  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Physics & Mathematics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Other Liquid Machine Or Engine Such As Wave Power Use (AREA)
  • Jet Pumps And Other Pumps (AREA)
  • Engine Equipment That Uses Special Cycles (AREA)
  • Production Of Liquid Hydrocarbon Mixture For Refining Petroleum (AREA)

Abstract

Underwater placed assembly (1) for production of gas or gas and oil/condensate from a subsea gaseous reservoir (2), where at least one production well (3) is provided from the seabed (4) to a production zone (5) and at least one water injection well (6) is provided from the seabed (4) to an injection zone (7). The assembly is characterized by comprising: - a pressure increasing device (8) connected to the outlet of the production well (3) in order to increase the pressure in a production flow from the production well, and - a water turbine (9) which is connected to and driving the pressure increasing device (8), said water turbine (9) has an inlet (10) for water with high hydrostatic pressure according to the placement of the water turbine and an outlet (11) connected to the inlet of the water injection well (6), the water turbine (9) is driven by and withdrawing at least a part of the hydrostatic energy from the water thus delivered with a lower pressure to the water injection well (6), so that water thus delivered to the water injection well (6) has a lower pressure than the hydrostatic pressure at the inlet of the water injection well. Method applying the assembly is also provided.

Description

Title: Assembly and method for production of gas, or gas and condensate/oil
Field of the invention
This invention relates to production of gas, or gas and condensate/oil, from a subsea, gaseous reservoir. The invention further relates to an assembly and a method for production of gas, or gas and condensate/oil, from a subsea gaseous reservoir where the gas pressure is low.
Background for the invention and prior art
In a gaseous reservoir the pressure may drop relatively fast, which results in diminishing production. After some time of production, the pressure in the gaseous reservoir may have dropped to a pressure that is lower than the pressure from the water at the seabed / sea bottom / water bottom above the reservoir. Thus it becomes feasible to inject water in the lower water containing parts of the reservoir without any injection pump or other pressure support, but only by arranging an injection well in which water can flow through due to high hydrostatic pressure at the seabed at the inlet of the injection well.
In order to support the production of gas flow from a gas reservoir, it is known to arrange a gas compressor at the outlet of the production well, either at the seabed or at the surface installation. Gas compressors are usually operated/driven electrically. For gaseous reservoirs with condensate/oil, multiple face machines or -pumps may alternatively be installed, which are typically electrically operated.
In the patent publication RU2109930, a method for developing gas reserves below the continental shelf is disclosed. The method aims to avoid use of the pressure increasing compressor station with compression of gas prior to further transport. Further the aim is to reduce the costs for developing the reservoir to a commercial level. At a predetermined moment the injection wells are put into operation in order to maintain the pressure with pumpless injection of seawater in the reservoir wells by utilizing the pressure of the water column between the sea surface and the well head level. Water injection without pumping utilizes the pressure head in the water column between the sea surface and the level of the well head at the seabed. The advantage according to the teaching in the mentioned publication is development of the field with reduced capital costs due to delivery of gas to the gas pipes without use of compressors, and maintaining the reservoir pressure without pumping. Possibility for installation of hydraulic turbines in the injection wells for production of electricity are mentioned. In the patent publication WO 02/33218 Al methods and arrangements for treatment of fluid are disclosed. Furthermore, methods and arrangements are disclosed to utilize the energy in water flowing from a high pressure reservoir. For gas production and gas/condensate/oil production from fields with low and diminishing pressure, there is a need for methods and assemblies which may deliver energy to the gas flow or the gas/condensate/oil flow to maintain the production as well as contribute to maintain the pressure in the reservoir during diminishing reservoir pressure. The objects of the present invention are to meet the above mentioned requirements.
Summary of the invention
With the present invention an underwater placed assembly for production of gas, or gas and condensate/oil, from a subsea gaseous reservoir is provided, where at least one production well is arranged from the seabed to a production zone and at least one water injection well is arranged from the seabed to an injection zone. The assembly is characterized by comprising: a pressure increasing device connected to the outlet of the production well to increase pressure in a production flow from the production well, and a water turbine connected to and operating the pressure increasing device, said water turbine has an inlet for water with a high hydrostatic pressure according to the location of the water turbine and an outlet connected to an inlet of the water injection well, the water turbines is driven by and withdraw at least a part of the hydrostatic energy from the water which then can be delivered with lower pressure to the water injection well, so that water thereby delivered to the water injection well will have a lower pressure than the hydrostatic pressure at the inlet of the water injection well. The terms production well and water injection well must here be interpreted as not only two separate wells of the mentioned types but also separate fluid paths for production and water injection in one and the same well. In an advantageous embodiment of this invention the production well and the water injection well is one and the same well. For example the fluid path for one of production and injection is in an annular space around an inner pipe, while the other fluid path of production and injection is in the inner pipe, alternatively two separate pipes are provided. Most preferred the production is provided in an annular space around an injection pipe extended down to the production zone with a sealing between the injection and production level in the well. The pressure increasing device is provided instead of on top of or next to or to a wellhead, down in a well or in a well frame in a position normally meant for a wellhead.
For gas production the pressure increasing device is a gas compressor; for production of gas and condensate/oil the pressure increasing device is a multiple phase machine/pump. The water injection well may be attached to another reservoir than the production well. The pressure increasing device and the water turbine are preferably provided on a common shaft, which is preferred as regard to efficiency and cost. In an alternative embodiment the pressure increasing device and the water turbine are interconnected via a gear ratio, which is advantageous as regards to operation. In an advantageous embodiment the water turbine and the pressure increasing device are interconnected hydraulically, for example via a hydraulic loop, directly or indirectly driven by the water turbine, where the water turbine and the pressure increasing device can be arranged further apart, whereby operating benefits may be achieved. Thus the water turbine may be provided at lower level than the pressure increasing device, and the water turbine may more easily be attached to a water injection well in another reservoir. The pressure increasing device and the water turbine are typically located on the seabed at the outlet from the production well. In an advantageous embodiment of this invention, particularly relevant for shallow sea depths, the pressure increasing device and the water turbine are provided in a recess in the seabed at the outlet from the production well, which advantageously increases the pressure head for the water turbine and thus the efficiency.
With the present invention a method for production of gas or gas and condensate/oil from a subsea, gaseous reservoir is also provided, at least one production well being provided from the seabed to a production zone and at least one water injection well is provided from the seabed to an injection zone, by utilizing the assembly according to this invention. The method is characterized by comprising: increasing the pressure in a production flow from the production well by means of a pressure increasing device attached to the outlet from the production well, and injecting water through the injection well to the injection zone in order to maintain the pressure in the reservoir, where a water turbine is connected to the inlet of the water injection well, which water turbine is connected to and operate the pressure increasing device, the water turbine having an inlet for water with high hydrostatic pressure according to the location of the water turbine and an outlet connected to the inlet of the water injection well, the water turbine is operated by and withdrawing at least part of the hydrostatic energy from the water, which thus is delivered with a lower pressure to the water injection well, so that water thus delivered to the water injection well has a lower pressure than the hydrostatic pressure at the inlet of the water injection well. Operating the water turbine and withdrawing at least a part of the hydrostatic energy from the water which thus is delivered at a lower pressure to the water injection well, the entire pressure head at the location of the water turbine advantageously is withdrawn, so that the pressure in water delivered from the water turbine to the water injection well will equal about 1 atmosphere. The entire pressure head, less loss, will thus be used for the pressure increase in the pressure increasing device, while water is flowing into the injection zone through the water injection well by means of the pressure head or the drop head from the inlet of the water injection well to the injection zone in the reservoir. Such a practice of the invention is possible as soon as the pressure in the injection zone is lower than the pressure head or the drop head from the inlet of the water injection well to the injection zone, corrected for pressure loss in well and injection zone. However, the pressure in a gas reservoir or in a gaseous reservoir will drop gradually, and the invention is applicable and is substantially different from prior art as long as at least part of the hydrostatic energy can be used as intended. Particularly the pressure in the injection zone must be lower than the delivered pressure from the water turbine plus the pressure/drop head in the water injection well, corrected for pressure loss.
The water turbine having an inlet for water with a high hydrostatic pressure related to the location of the water turbine, entitles that the inlet introduce water with a pressure equal to or mainly equal to the hydrostatic water pressure where the water turbine is located, that is on the seabed, in a recess in the seabed or on a subsea installation. In the inlet a filter is preferably arranged to prevent plugging of the injection well, and the inlet does not need to be in the form of a line extending the distance from the water turbine.
Drawings
The present invention is illustrated by means of two figures of which Figure 1 illustrates an assembly according to the invention, and figure 2 illustrates an alternative assembly according to the invention.
Detailed description
Reference is made to figure 1, which illustrates an underwater arranged assembly 1 according to the invention for production of gas, or gas and condensate, from a subsea reservoir 2, at least one production well 3 being provided from the seabed 4 to a production zone 5 and at least one water injection well 6 is provided from the seabed 4 to an injection zone 7. The assembly 1 comprises a pressure increasing device 8 in the form of a compressor attached to the outlet from the production well, and a water turbine 9 attached to and driving the compressor. The compressor 8 and water turbine 9 are both located on the seabed, and the units are interconnected by means of common shaft. The water turbine 9 has an inlet 10 and an outlet 11 connected to the inlet of the water injection well. On the inlet 10 to the water turbine, a filter 12 is provided. The water turbine is driven by and withdraws at least a part of the hydrostatic energy from the water flowing through the water turbine, where water with a lower pressure is delivered to the water injection well so that water thus delivered to the water injection well will have a lower pressure than the hydrostatic pressure at the inlet of the water injection well. A pipeline 13 is attached to the compressor 8 for further transport of compressed gas.
5 Further reference is made to figure 2 illustrating an alternative underwater located assembly 1 according to the invention. The alternative assembly is different from the assembly shown in figure 1 by that the compressor 8 and the water turbine 9 are located in a recess on the seabed and the arrangement of the mentioned devices and the connection between them are vertical, where the water turbine is arranged at theo bottom.
By using a pressure increasing device which directly, via a gear ratio or hydraulically, is driven by the water turbine, problems with electric isolation resistance < and degrading of this are avoided, which is a big problem for electrically driven pressure increasing devices. . . _ ■ , .s Preferably the, water turbine and the pressure increasing device is mounted on a common shaft and designed so that the drive speed is below the first bending critical oscillation mode of the shaft.
In that the outlet of the water turbine is connected to the water injection well problems with mechanically rotating shaft sealing against, sea and any spill of0 hydrocarbons are thus avoided. The inlet pressure to the water injection well equals the outlet pressure from the water turbine and is lower than the surrounding hydrostatic pressure.
Preferably both the water turbine and the pressure increasing device are designed with product lubricated bearings, that is, water and gas/condensate/oil5 respectively, which simplifies the design. Alternatively the assembly comprises oil lubricated bearings or glycol lubricated bearings, which is advantageous when the water pressure into the turbine is lower than the pressure in the production flow into the compressor or a multiphase machine. In the embodiment with alternative bearings combined lubrication and blocking fluid could be necessary between the turbine ando the compressor/multiphase machine, such as shown in the patent application NO 2004 3636.
Preferably valves, connections and telemetry are provided in order to control the injection rate and efficiency of the pressure increasing device. For example a valve may be provided at the outlet from the water turbine or in the injection well. 5 Furthermore, shutdown valve or check valve may be provided in the inlet to the injection well, possibly down in the injection well, in order to prevent discharge from the injection well should the pressure in the injection zone not yet be sufficiently low in order to practice the invention. Alternatively a pump may be provided in order to fill the water injection well with water before start up, which is advantageous should the pressure in the injection zone be almost equal to the pressure at the seabed, or if shut down over longer period of time period may entail a risk that the water injection well is filled with gas flowing in from the production zone. In an embodiment the assembly according to the invention comprises an inlet to the water injection well external to the water turbine, alternatively provided with a pump, which pump, if any, may fill the injection well with water in addition to work as an injection pump, in order to start the water injection at an earlier stage, that is before the pressure in the injection zone has dropped sufficiently that part of the hydrostatic energy may be withdrawn with the water turbine in order to drive the pressure increasing device. This invention comprises also an embodiment with a separator provided with attachment to the production well, with downstream provided pump and compressor both driven by the water turbine.
The water injection is practiced preferably according to normal practice, that is that produced volume is replaced in order to maintain the reservoir pressure, while water break through to the producing wells or inadvertent blocking of the reservoir zones is avoided.

Claims

C l a i m s
1. Underwater placed assembly for production of gas, or gas and condensate/oil, from subsea, gaseous reservoir, wherein at least one production well is provided from the seabed to a production zone and at least one water injection well is provided from the seabed to an injection zone, characterized by the assembly comprising: a pressure increasing device connected to the outlet from the production well in order to increase the pressure in a production flow from the production well, and a water turbine connected to and driving the pressure increasing device, said water turbine has an inlet for water with a high hydrostatic pressure according to the location of the water turbine and an outlet connected to the inlet of the water injection well, the water turbine driven by and withdrawing at least a part of the hydrostatic energy from the water thus delivered with a lower pressure to the water injection well, so that water thus delivered to the water injection well has a lower pressure than the hydrostatic pressure at the inlet of the water injection well.
2. Assembly according to claim 1, characterized by the production well and the water injection well are fluid paths in one and the same well.
3. Assembly according to claim 2, characterized by the fluid path for production is an annular space around an inner pipe, while the fluid path for injection is in the inner pipe.
4. Assembly according to claim 1, characterized by the pressure increasing device is provided on top of a wellhead.
5. Assembly according to claim I5 characterized by the pressure increasing device is a gas compressor.
6. Assembly according to claim I5 characterized by the pressure increasing device is a multiphase machine/pump.
7. Assembly according to claim 1, characterized by the pressure increasing device and the water turbine are provided on a common shaft.
8. Assembly according to claim 1, characterized by the pressure increasing device and the water turbine are placed on the seabed at the outlet from the production well.
9. Assembly according to claim I5 characterized by the pressure increasing device and the water turbine are provided in a recess in the seabed at the outlet from the production well.
10. Method for production of gas, or gas and condensate/oil, from a subsea gaseous reservoir, where at least one production well is provided from the seabed to the production zone, and at least one water injection well is provided from the seabed to an injection zone, utilizing the assembly according to claim 1, characterized by the method comprising: increasing the pressure in a production flow from the production well by means of a pressure increasing device connected to the outlet from the production well and injecting water through the injection well to the injection zone in order to maintain the pressure in the reservoir, whereby a water turbine is connected to the inlet of the water injection well, said water turbine is connected to and driving the pressure increasing device, the water turbine has an inlet for water with high hydrostatic pressure according to the location of the water turbine and an outlet connected to the inlet of the water injection well, the water turbine is driven by, and withdrawing at least part, of the hydrostatic energy from the water thus delivered with a lower pressure to the water injection well;, so that the water thus delivered to the water injection well has a lower pressure than the hydrostatic pressure at the inlet of the water injection well. ' '
PCT/NO2008/000461 2008-01-07 2008-12-18 Assembly and method for production of gas or gas and condensate/oil Ceased WO2009088294A1 (en)

Priority Applications (7)

Application Number Priority Date Filing Date Title
CA2711376A CA2711376C (en) 2008-01-07 2008-12-18 Assembly and method for production of gas, or gas and condensate/oil
EA201001091A EA016743B1 (en) 2008-01-07 2008-12-18 Assembly and method for production of gas or gas and condensate/oil
US12/811,919 US8534364B2 (en) 2008-01-07 2008-12-18 Assembly and method for production of gas or gas and condensate/oil
AU2008345750A AU2008345750B2 (en) 2008-01-07 2008-12-18 Assembly and method for production of gas or gas and condensate/oil
BRPI0821626A BRPI0821626B1 (en) 2008-01-07 2008-12-18 set placed below water and method for producing gas, or gas and condensate / oil.
GB1012701.7A GB2470305B (en) 2008-01-07 2008-12-18 Assembly and method for production of gas or gas and condensate/oil
DK200900994A DK178457B1 (en) 2008-01-07 2009-09-04 Installation and process for the production of gas or gas and condensate / oil.

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
NO20080105 2008-01-07
NO20080105A NO329284B1 (en) 2008-01-07 2008-01-07 Composition and process for the production of gas or gas and condensate / oil

Publications (1)

Publication Number Publication Date
WO2009088294A1 true WO2009088294A1 (en) 2009-07-16

Family

ID=40853267

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/NO2008/000461 Ceased WO2009088294A1 (en) 2008-01-07 2008-12-18 Assembly and method for production of gas or gas and condensate/oil

Country Status (9)

Country Link
US (1) US8534364B2 (en)
AU (1) AU2008345750B2 (en)
BR (1) BRPI0821626B1 (en)
CA (1) CA2711376C (en)
DK (1) DK178457B1 (en)
EA (1) EA016743B1 (en)
GB (1) GB2470305B (en)
NO (1) NO329284B1 (en)
WO (1) WO2009088294A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105239983A (en) * 2015-10-15 2016-01-13 山东科技大学 Low-gas permeability coal seam weakening and permeability increasing method combining presplitting and high-pressure water injection
CN105370256A (en) * 2015-10-15 2016-03-02 山东科技大学 Method for increasing wetting radius of high-pressure water injection of low-air-permeability coal seams through sectioned pre-splitting
GB2550325A (en) * 2016-04-16 2017-11-22 Singh Johal Kashmir Subsea seabed power generation system and chemical inhibitors storage and injection

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102454181A (en) * 2010-10-18 2012-05-16 孟宪贵 Water injection well for supplementing underground water
WO2018093456A1 (en) 2016-11-17 2018-05-24 Exxonmobil Upstream Research Company Subsea reservoir pressure maintenance system
US10539141B2 (en) 2016-12-01 2020-01-21 Exxonmobil Upstream Research Company Subsea produced non-sales fluid handling system and method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4848471A (en) * 1986-08-04 1989-07-18 Den Norske Stats Oljeselskap Method and apparatus for transporting unprocessed well streams
RU2109930C1 (en) * 1996-02-05 1998-04-27 Сумбат Набиевич Закиров Method for development of gas deposits in continental shelf
US5813469A (en) * 1997-03-12 1998-09-29 Texaco Inc. Coupled downhole pump for simultaneous injection and production in an oil wheel
US6336503B1 (en) * 2000-03-03 2002-01-08 Pancanadian Petroleum Limited Downhole separation of produced water in hydrocarbon wells, and simultaneous downhole injection of separated water and surface water
US7249634B2 (en) * 2003-08-14 2007-07-31 Petroleo Brasileiro S.A. - Petrobras Apparatus for production in oil wells

Family Cites Families (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2953204A (en) * 1957-07-23 1960-09-20 Shell Oil Co Filtering method and apparatus for water flooding process
US4095421A (en) * 1976-01-26 1978-06-20 Chevron Research Company Subsea energy power supply
GB1564025A (en) * 1976-11-01 1980-04-02 British Petroleum Co Treating sea water containing inorganic and organic impurities
DE3810951A1 (en) * 1988-03-31 1989-10-12 Klein Schanzlin & Becker Ag METHOD AND DEVICE FOR GENERATING ENERGY FROM OIL SOURCES
US6457522B1 (en) * 2000-06-14 2002-10-01 Wood Group Esp, Inc. Clean water injection system
NO312978B1 (en) 2000-10-20 2002-07-22 Kvaerner Oilfield Prod As Methods and facilities for producing reservoir fluid
EP1353038A1 (en) * 2002-04-08 2003-10-15 Cooper Cameron Corporation Subsea process assembly
NO323324B1 (en) * 2003-07-02 2007-03-19 Kvaerner Oilfield Prod As Procedure for regulating that pressure in an underwater compressor module
BR0303129B1 (en) * 2003-08-14 2013-08-06 Method and apparatus for the production of oil wells
US6998724B2 (en) * 2004-02-18 2006-02-14 Fmc Technologies, Inc. Power generation system
US7224080B2 (en) * 2004-07-09 2007-05-29 Schlumberger Technology Corporation Subsea power supply
NO324806B1 (en) 2004-08-31 2007-12-10 Statoil Asa Underwater Gas Compressor
US7686086B2 (en) * 2005-12-08 2010-03-30 Vetco Gray Inc. Subsea well separation and reinjection system
US7963335B2 (en) * 2007-12-18 2011-06-21 Kellogg Brown & Root Llc Subsea hydraulic and pneumatic power

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4848471A (en) * 1986-08-04 1989-07-18 Den Norske Stats Oljeselskap Method and apparatus for transporting unprocessed well streams
RU2109930C1 (en) * 1996-02-05 1998-04-27 Сумбат Набиевич Закиров Method for development of gas deposits in continental shelf
US5813469A (en) * 1997-03-12 1998-09-29 Texaco Inc. Coupled downhole pump for simultaneous injection and production in an oil wheel
US6336503B1 (en) * 2000-03-03 2002-01-08 Pancanadian Petroleum Limited Downhole separation of produced water in hydrocarbon wells, and simultaneous downhole injection of separated water and surface water
US7249634B2 (en) * 2003-08-14 2007-07-31 Petroleo Brasileiro S.A. - Petrobras Apparatus for production in oil wells

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105239983A (en) * 2015-10-15 2016-01-13 山东科技大学 Low-gas permeability coal seam weakening and permeability increasing method combining presplitting and high-pressure water injection
CN105370256A (en) * 2015-10-15 2016-03-02 山东科技大学 Method for increasing wetting radius of high-pressure water injection of low-air-permeability coal seams through sectioned pre-splitting
CN105239983B (en) * 2015-10-15 2017-12-08 山东科技大学 A kind of presplitting weakens anti-reflection method with the low air permeability coal seam that high pressure water injection is combined
AU2016231635B2 (en) * 2015-10-15 2019-12-05 Shandong University Of Science And Technology A method of improving the wetted radius of high pressure water injection of lowly permeable coal seams through sublevel presplitting
GB2550325A (en) * 2016-04-16 2017-11-22 Singh Johal Kashmir Subsea seabed power generation system and chemical inhibitors storage and injection
GB2550325B (en) * 2016-04-16 2022-10-12 Singh Johal Kashmir Offshore power generation system using seawater injection into gas reservoirs

Also Published As

Publication number Publication date
AU2008345750A1 (en) 2009-07-16
CA2711376A1 (en) 2009-07-16
BRPI0821626A8 (en) 2017-01-10
NO20080105L (en) 2009-07-08
US8534364B2 (en) 2013-09-17
CA2711376C (en) 2016-05-03
US20110024127A1 (en) 2011-02-03
AU2008345750B2 (en) 2014-08-14
NO329284B1 (en) 2010-09-27
GB201012701D0 (en) 2010-09-15
DK178457B1 (en) 2016-03-14
DK200900994A (en) 2009-09-04
BRPI0821626B1 (en) 2018-10-16
BRPI0821626A2 (en) 2015-06-16
EA201001091A1 (en) 2011-02-28
EA016743B1 (en) 2012-07-30
GB2470305A (en) 2010-11-17
GB2470305B (en) 2012-01-18

Similar Documents

Publication Publication Date Title
CA2711376C (en) Assembly and method for production of gas, or gas and condensate/oil
US7952219B2 (en) Hydroelectric pumped-storage
AU2003241367B2 (en) System and method for flow/pressure boosting in subsea
EP2198120B1 (en) Pumping module and system
US8794305B2 (en) Method and apparatus for removing liquid from a horizontal well
NO331401B1 (en) PROCEDURE AND DEVICE FOR DOWNHOLE SEPARATION AND REINJECTION OF GAS / WATER
GB2457784A (en) Pumping systems
NO20130170A1 (en) SYSTEM AND PROCEDURE FOR HYDROCARBON PRODUCTION FROM A SOURCE
NO20141023A1 (en) Improved gas lift system for oil production
CN106917613A (en) Oilfield liquids carbon dioxide injection device and method for implanting
BR112012009946B1 (en) subsea pumping system
RU2132455C1 (en) Method and pumping unit for injecting water into injection well
CN108119100A (en) Oil well lifting system and pumping method thereof
EP1448869A1 (en) A system and method for injecting water into an underwater hydrocarbon reservoir
CN201835785U (en) Oil-water well device capable of automatically controlling pressure relief and liquid discharge as well as pumping discharged liquid to production pipeline
RU2680028C1 (en) Compressor unit
CA3062245A1 (en) System and method for hydraulically driven underwater pumping
RU2491418C1 (en) Method to develop multizone oil reservoir
NO328565B1 (en) Underwater pumping arrangement in anchorage pile sump
CN101509502B (en) High flow rate and high lift main drain pump controllable water sealing device for mine
CN201407206Y (en) Mining controllable water sealing device of main draining pump with big flow capacity and high lift
RU2421636C1 (en) Gasified liquid extraction plant
Jahnsen et al. Subsea processing & boosting in a global perspective
Homstvedt et al. Step-Change Seabed ESP Boosting
Cooper et al. A Versatile Multi phase Two-Screw Pump Package for Subsea Deployment

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 08869338

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 2711376

Country of ref document: CA

WWE Wipo information: entry into national phase

Ref document number: MX/A/2010/007505

Country of ref document: MX

NENP Non-entry into the national phase

Ref country code: DE

WWE Wipo information: entry into national phase

Ref document number: 2008345750

Country of ref document: AU

ENP Entry into the national phase

Ref document number: 1012701

Country of ref document: GB

Kind code of ref document: A

Free format text: PCT FILING DATE = 20081218

WWE Wipo information: entry into national phase

Ref document number: 1012701.7

Country of ref document: GB

WWE Wipo information: entry into national phase

Ref document number: 201001091

Country of ref document: EA

ENP Entry into the national phase

Ref document number: 2008345750

Country of ref document: AU

Date of ref document: 20081218

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: 12811919

Country of ref document: US

122 Ep: pct application non-entry in european phase

Ref document number: 08869338

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: PI0821626

Country of ref document: BR

Kind code of ref document: A2

Effective date: 20100707