WO2009020827A3 - Method for altering the stress state of a formation and/or a tubular - Google Patents
Method for altering the stress state of a formation and/or a tubular Download PDFInfo
- Publication number
- WO2009020827A3 WO2009020827A3 PCT/US2008/071732 US2008071732W WO2009020827A3 WO 2009020827 A3 WO2009020827 A3 WO 2009020827A3 US 2008071732 W US2008071732 W US 2008071732W WO 2009020827 A3 WO2009020827 A3 WO 2009020827A3
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- formation
- points
- tubular element
- anchoring
- altering
- Prior art date
Links
- 230000015572 biosynthetic process Effects 0.000 title abstract 5
- 238000000034 method Methods 0.000 title abstract 2
- 238000004873 anchoring Methods 0.000 abstract 4
- 230000006835 compression Effects 0.000 abstract 1
- 238000007906 compression Methods 0.000 abstract 1
- 238000005553 drilling Methods 0.000 abstract 1
- 230000001939 inductive effect Effects 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B23/00—Apparatus for displacing, setting, locking, releasing or removing tools, packers or the like in boreholes or wells
- E21B23/01—Apparatus for displacing, setting, locking, releasing or removing tools, packers or the like in boreholes or wells for anchoring the tools or the like
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/02—Subsoil filtering
- E21B43/10—Setting of casings, screens, liners or the like in wells
- E21B43/103—Setting of casings, screens, liners or the like in wells of expandable casings, screens, liners, or the like
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Piles And Underground Anchors (AREA)
- Earth Drilling (AREA)
Abstract
Priority Applications (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CA2694822A CA2694822A1 (en) | 2007-08-03 | 2008-07-31 | Method for altering the stress state of a formation and/or a tubular |
BRPI0814279-3A2A BRPI0814279A2 (en) | 2007-08-03 | 2008-07-31 | METHOD FOR CHANGING THE VOLTAGE STATUS OF AN UNDERGROUND FORMATION, AND, WELL HOLE |
GB1001039.5A GB2464233B (en) | 2007-08-03 | 2008-07-31 | Method for altering the stress state of a formation and/or a tubular |
CN200880101672.4A CN101772617B (en) | 2007-08-03 | 2008-07-31 | Method for altering the stress state of a formation and/or a tubular |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US95377607P | 2007-08-03 | 2007-08-03 | |
US60/953,776 | 2007-08-03 |
Publications (2)
Publication Number | Publication Date |
---|---|
WO2009020827A2 WO2009020827A2 (en) | 2009-02-12 |
WO2009020827A3 true WO2009020827A3 (en) | 2009-04-23 |
Family
ID=40341974
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/US2008/071732 WO2009020827A2 (en) | 2007-08-03 | 2008-07-31 | Method for altering the stress state of a formation and/or a tubular |
Country Status (5)
Country | Link |
---|---|
CN (1) | CN101772617B (en) |
BR (1) | BRPI0814279A2 (en) |
CA (1) | CA2694822A1 (en) |
GB (1) | GB2464233B (en) |
WO (1) | WO2009020827A2 (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3353599A (en) * | 1964-08-04 | 1967-11-21 | Gulf Oil Corp | Method and apparatus for stabilizing formations |
US20030132032A1 (en) * | 1998-12-22 | 2003-07-17 | Weatherford/Lamb, Inc. | Method and apparatus for drilling and lining a wellbore |
US20040168799A1 (en) * | 2000-10-27 | 2004-09-02 | Simonds Floyd Randolph | Apparatus and method for completing an interval of a wellbore while drilling |
US20050279509A1 (en) * | 2002-11-26 | 2005-12-22 | Shell Oil Company | Method of installing a tubular assembly in a wellbore |
US20060016597A1 (en) * | 2004-07-23 | 2006-01-26 | Baker Hughes Incorporated | Open hole expandable patch |
WO2007140820A1 (en) * | 2006-06-06 | 2007-12-13 | Saltel Industries | A method and apparatus for patching a well by hydroforming a tubular metal patch, and a patch for this purpose |
-
2008
- 2008-07-31 BR BRPI0814279-3A2A patent/BRPI0814279A2/en not_active IP Right Cessation
- 2008-07-31 CN CN200880101672.4A patent/CN101772617B/en not_active Expired - Fee Related
- 2008-07-31 GB GB1001039.5A patent/GB2464233B/en not_active Expired - Fee Related
- 2008-07-31 WO PCT/US2008/071732 patent/WO2009020827A2/en active Application Filing
- 2008-07-31 CA CA2694822A patent/CA2694822A1/en not_active Abandoned
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3353599A (en) * | 1964-08-04 | 1967-11-21 | Gulf Oil Corp | Method and apparatus for stabilizing formations |
US20030132032A1 (en) * | 1998-12-22 | 2003-07-17 | Weatherford/Lamb, Inc. | Method and apparatus for drilling and lining a wellbore |
US20040168799A1 (en) * | 2000-10-27 | 2004-09-02 | Simonds Floyd Randolph | Apparatus and method for completing an interval of a wellbore while drilling |
US20050279509A1 (en) * | 2002-11-26 | 2005-12-22 | Shell Oil Company | Method of installing a tubular assembly in a wellbore |
US20060016597A1 (en) * | 2004-07-23 | 2006-01-26 | Baker Hughes Incorporated | Open hole expandable patch |
WO2007140820A1 (en) * | 2006-06-06 | 2007-12-13 | Saltel Industries | A method and apparatus for patching a well by hydroforming a tubular metal patch, and a patch for this purpose |
Also Published As
Publication number | Publication date |
---|---|
CN101772617A (en) | 2010-07-07 |
GB2464233B (en) | 2012-06-27 |
CA2694822A1 (en) | 2009-02-12 |
GB2464233A (en) | 2010-04-14 |
WO2009020827A2 (en) | 2009-02-12 |
BRPI0814279A2 (en) | 2015-02-03 |
GB201001039D0 (en) | 2010-03-10 |
CN101772617B (en) | 2013-01-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CA2470592A1 (en) | Expanding downhole tubing by compression | |
WO2007106429A3 (en) | Expandable tubulars for use in geologic structures | |
CA2551067A1 (en) | Axial compression enhanced tubular expansion | |
WO2002086286A3 (en) | Method of and apparatus for casing a borehole | |
WO2002055834A8 (en) | Device for anchoring a drill string in a borehole | |
BR0213468A (en) | System and method for coating a section of a well hole with an expandable tubular element. | |
WO2008067154A3 (en) | Expandable wellbore liner | |
WO2006101606A3 (en) | Method for running tubulars in wellbores | |
WO2007045592A8 (en) | Emulsifier based on polyamines and fatty acid/maleic anhydride | |
WO2011058187A3 (en) | Method and system for lining a section of a wellbore with an expandable tubular element | |
ATE455933T1 (en) | DEFORMABLE ROCK ANCHOR | |
WO2004079150A3 (en) | Full bore lined wellbores | |
BR0108612B1 (en) | viscous fluid for use in drillhole operations, underground formation fracturing method and method for reducing the amount of water produced from an underground oil production formation. | |
WO2009120759A3 (en) | Wellbore anchor and isolation system | |
WO2006099637A3 (en) | Rock drill and method of breaking rock | |
CA2352604A1 (en) | Expandable tubing joint and through-tubing multilateral system and method | |
WO2009089267A3 (en) | Viscoelastic surfactant based wellbore fluids and methods of use | |
WO2009028979A8 (en) | Dual bha drilling system | |
WO2009074633A3 (en) | Method of expanding a tubular element in a wellbore | |
WO2004007892A3 (en) | Expansion method | |
WO2011049941A3 (en) | Downhole release joint with radially expandable members | |
GB2467866A (en) | System for drilling a wellbore | |
WO2009087068A3 (en) | Method of expanding a tubular element in a wellbore | |
KR100825484B1 (en) | Fixing type nailing apparatus and method of the same | |
WO2006091724A3 (en) | Resin groutable expansion anchor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
WWE | Wipo information: entry into national phase |
Ref document number: 200880101672.4 Country of ref document: CN |
|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 08796936 Country of ref document: EP Kind code of ref document: A2 |
|
ENP | Entry into the national phase |
Ref document number: 1001039 Country of ref document: GB Kind code of ref document: A Free format text: PCT FILING DATE = 20080731 |
|
WWE | Wipo information: entry into national phase |
Ref document number: 1001039.5 Country of ref document: GB |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2694822 Country of ref document: CA |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 08796936 Country of ref document: EP Kind code of ref document: A2 |
|
ENP | Entry into the national phase |
Ref document number: PI0814279 Country of ref document: BR Kind code of ref document: A2 Effective date: 20100129 |