WO2009012278A1 - Process for the refurbishing of a sputtering target - Google Patents

Process for the refurbishing of a sputtering target Download PDF

Info

Publication number
WO2009012278A1
WO2009012278A1 PCT/US2008/070109 US2008070109W WO2009012278A1 WO 2009012278 A1 WO2009012278 A1 WO 2009012278A1 US 2008070109 W US2008070109 W US 2008070109W WO 2009012278 A1 WO2009012278 A1 WO 2009012278A1
Authority
WO
WIPO (PCT)
Prior art keywords
sputtering target
target
metal
spent
hot press
Prior art date
Application number
PCT/US2008/070109
Other languages
French (fr)
Inventor
Robert Acker
Adrish Ganguly
Matthew T. Willson
Original Assignee
Williams Advanced Materials, Inc.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Williams Advanced Materials, Inc. filed Critical Williams Advanced Materials, Inc.
Priority to EP08826355.3A priority Critical patent/EP2087144B1/en
Priority to JP2009543294A priority patent/JP5204124B2/en
Priority to DK08826355.3T priority patent/DK2087144T3/en
Priority to ES08826355.3T priority patent/ES2436778T3/en
Publication of WO2009012278A1 publication Critical patent/WO2009012278A1/en

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C14/00Coating by vacuum evaporation, by sputtering or by ion implantation of the coating forming material
    • C23C14/22Coating by vacuum evaporation, by sputtering or by ion implantation of the coating forming material characterised by the process of coating
    • C23C14/34Sputtering
    • C23C14/3407Cathode assembly for sputtering apparatus, e.g. Target
    • C23C14/3414Metallurgical or chemical aspects of target preparation, e.g. casting, powder metallurgy
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22FWORKING METALLIC POWDER; MANUFACTURE OF ARTICLES FROM METALLIC POWDER; MAKING METALLIC POWDER; APPARATUS OR DEVICES SPECIALLY ADAPTED FOR METALLIC POWDER
    • B22F7/00Manufacture of composite layers, workpieces, or articles, comprising metallic powder, by sintering the powder, with or without compacting wherein at least one part is obtained by sintering or compression
    • B22F7/06Manufacture of composite layers, workpieces, or articles, comprising metallic powder, by sintering the powder, with or without compacting wherein at least one part is obtained by sintering or compression of composite workpieces or articles from parts, e.g. to form tipped tools
    • B22F7/062Manufacture of composite layers, workpieces, or articles, comprising metallic powder, by sintering the powder, with or without compacting wherein at least one part is obtained by sintering or compression of composite workpieces or articles from parts, e.g. to form tipped tools involving the connection or repairing of preformed parts
    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C24/00Coating starting from inorganic powder
    • C23C24/08Coating starting from inorganic powder by application of heat or pressure and heat
    • C23C24/082Coating starting from inorganic powder by application of heat or pressure and heat without intermediate formation of a liquid in the layer
    • C23C24/085Coating with metallic material, i.e. metals or metal alloys, optionally comprising hard particles, e.g. oxides, carbides or nitrides
    • C23C24/087Coating with metal alloys or metal elements only
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22FWORKING METALLIC POWDER; MANUFACTURE OF ARTICLES FROM METALLIC POWDER; MAKING METALLIC POWDER; APPARATUS OR DEVICES SPECIALLY ADAPTED FOR METALLIC POWDER
    • B22F7/00Manufacture of composite layers, workpieces, or articles, comprising metallic powder, by sintering the powder, with or without compacting wherein at least one part is obtained by sintering or compression
    • B22F7/06Manufacture of composite layers, workpieces, or articles, comprising metallic powder, by sintering the powder, with or without compacting wherein at least one part is obtained by sintering or compression of composite workpieces or articles from parts, e.g. to form tipped tools
    • B22F7/062Manufacture of composite layers, workpieces, or articles, comprising metallic powder, by sintering the powder, with or without compacting wherein at least one part is obtained by sintering or compression of composite workpieces or articles from parts, e.g. to form tipped tools involving the connection or repairing of preformed parts
    • B22F2007/068Manufacture of composite layers, workpieces, or articles, comprising metallic powder, by sintering the powder, with or without compacting wherein at least one part is obtained by sintering or compression of composite workpieces or articles from parts, e.g. to form tipped tools involving the connection or repairing of preformed parts repairing articles
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10TTECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
    • Y10T82/00Turning
    • Y10T82/10Process of turning

Definitions

  • This invention relates, in one embodiment, to a process for refurbishing a spent sputtering target by hot pressing.
  • Sputtering is a process used to deposit a thin layer of material onto a substrate. Such thin layers are useful in certain electronic equipment, in the production of some optical storage media (such as compact discs) and in a variety of other applications.
  • the target typically a metal or metal alloy, is constructed of the material to be sputtered. For example, if one wishes to deposit ruthenium as the intermediate layer or Co-Cr-Pt-B-oxide (s) as the magnetic layer, then a target made of corresponding material is used.
  • the target and substrate are placed in proximity to one another within the chamber and the target is bombarded with an ion beam.
  • the high energy ions cause a portion of the target to dislodge and be re-deposited on the substrate.
  • the target is not uniformly consumed.
  • the metal is more easily dislodged from the target in those regions where the ion beam is most intense. This generates localized depleted regions, where the target eventually wears thin.
  • the lifetime of the target is determined by the resulting thickness of the target at its thinnest point. Due to the non-uniform consumption of the metal, the target often reaches the end of its useful life after only a fraction (approximately 30%) of the metal has been consumed. The un-sputtered metal (approximately 70%) is not used.
  • Hot isostatic pressing also referred to as inert gas hot pressing (IGHP) is a technique that subjects a target to high temperature (typically 480- 1300 0 C depending on the metal) and high, isostatic pressure (typically on the order of 100-200 MPa) under an inert atmosphere (typically argon). Isostatic pressure is pressure that is uniformly applied from all directions.
  • IGHP inert gas hot pressing
  • a spent sputtering target may be refurbished by re-processing the un-sputtered metal, combining it with fresh metal powder, and reforming a new target. During such re-processing, a certain percentage of the un-sputtered metal is lost. For example, grinding of the un-sputtered metal to produce re-processed powder generates dust, which is often lost to the environment.
  • the invention comprises, in one form thereof, a process for refurbishing a spent sputtering target comprising the steps of receiving a spent sputtering target, removing the surface impurities by a combination of chemical treatment followed by blasting, disposing the spent target in a hot press die, pouring of fresh metal powder to account for the depleted regions of the target, inserting a barrier layer in between the top punch of the hot press die and the metal powder bed and applying an axial force such that the powdered metal sinters and forms a solid state diffusion bond with the target, producing a refurbished homogenous target.
  • the invention also pertains to a unique die for performing the aforementioned refurbishing process.
  • An advantage of the present invention is the design of the hot press die, the dimensions of which are optimized in such a way that even at significantly high uniaxial compressive pressure the radial stress on the die is reduced to a great extent.
  • a further advantage of the present invention is that the refurbished targets do not need to be isolated from a fused block of metal by sawing and milling steps. Such additional steps are undesirable, as they may result in loss of costly material.
  • Figure 1 is a flow diagram of one process of the invention
  • Figures 2A, 2B and 2C show various sputtering targets for use with the present invention
  • Figures 3A and 3B depict a die for use with the instant invention
  • Figure 4 is a schematic illustration of the die of Figure 3B
  • Figures 5A and 5B show graphs of the effect of die wall thickness on radial stress
  • Figure 6 shows the refurbishing of a filled sputtering target
  • Figures 7 A and 7B depict the profiles of two refurbished targets
  • Figure 8 depicts another profile of a refurbished target.
  • process 100 is initiated by the execution of step 102, wherein a spent sputtering target is received.
  • the target may be received by, for example, a target recycling facility.
  • a target recycling facility One such target is illustrated in Figure 2 A.
  • FIGS 2 A, 2B and 2C are illustrations of sputtering targets at various stages of process 100.
  • Figure 2A depicts a spent sputtering target 200 that has previously been used to perform the sputtering process.
  • Figure 2B is a side view of spent sputtering target 200.
  • Figure 2B more clearly illustrates that spent sputtering target has depleted regions 202.
  • the spent sputtering target 20 is circular and the depleted regions 202 are also circular.
  • the geometry of the depleted regions 202 is a function of the sputtering process - geometries other than those shown in Figure 2A may also be used.
  • the disc shape of spent sputtering target 202 is merely an example of one possible target. Many other suitable shapes would be apparent to one skilled in the art after benefiting from reading this specification. Such shapes are considered within the scope of this invention.
  • a target may have a disc shape with a diameter of 180 millimeters and a thickness of 7 millimeters.
  • the sputtering target is further comprised of a backing plate (i.e. support material).
  • step 104 which is optional but preferred, is executed.
  • step 104 the actual weight of the spent target is identified.
  • step 106 which is also optional, the weight of fresh powder that is desired is determined.
  • the desired weight of the recycled target may be X grams (e.g. 10 grams), but the actual weight of the spent target is X-Y grams (e.g. 9 grams). This indicates an additional Y grams (e.g. 1 gram) of metal should be added to refurbished the target.
  • Sputtered targets often contain surface impurities which can be organic or metallic in nature.
  • the source of impurities can be, for example, a shield kit of the sputtering chamber or the bonding adhesive if the target is bonded to a backing plate.
  • Step 108 ensures removal of possible surface impurities from the surface of the target by conventional wet and dry cleaning procedures. The effectiveness of the cleaning procedure is confirmed by characterizing the cleaned surface using a high resolution Scanning Electron Microscope equipped with energy dispersive spectroscope for the metallic impurities and a Raman Spectroscope for organic impurities.
  • step 110 the spent target is disposed within a die.
  • Figure 3A is a top view of die 300.
  • Figure 3B is a side view of the same die 300.
  • Die 300 is configured to mate with sputtering target 206 such that target 206 is disposed within cavity 302.
  • a die may be specially fabricated to securely mate with such a target. In this manner many target shapes and configurations may be accommodated. Any undesirable oxidizing gases, such as atmospheric oxygen, may be purged by passing an inert gas (such as argon) over the assembly.
  • an inert gas such as argon
  • a molybdenum foil (not shown) is inserted between press 306 and target 206.
  • a foil helps to prevent diffusion of material (such as carbon atoms from the graphite) from the press 306 when the axial force is applied.
  • the die may be sealed by pressing it against a surface, such as surface 308.
  • step 112 the depleted regions (see depleted regions 202 of Figure 2B) are then filled with a powder that corresponds to the composition of the spent target.
  • a powder that corresponds to the composition of the spent target.
  • the spent sputtering target 200 is comprised of ruthenium
  • the depleted regions 202 are filled with ruthenium powder 204, thus producing filled sputtering target 206.
  • ruthenium powder 204 thus producing filled sputtering target 206.
  • Many suitable metals, metal- alloys, and combination of metal-alloys and oxide ceramics may be used.
  • Examples of material suitable for use with the present invention may include, but not limited to ruthenium and its alloys, rhodium and its alloys, Co-Cr-Pt-B-oxides, where oxide combination may include but are not limited to early transition metals and/or non-metals.
  • the filling step 112 may occur either before the die is disposed in the target (step 110) or, as illustrated in Figure 1, after step 110.
  • the metal/metal-alloy is free of both oxides and carbides.
  • the virgin powder may be of various morphologies, provided the particulates have a suitable particle size and purity. In one aspect, the particle morphology is fibrous. In such an embodiment, acicular or round morphologies are avoided.
  • One suitable virgin powder has a tap density of from about 2.5 to about 3.2 grams per cubic centimeter and the particles have a surface area of from about 0.1 to about 0.4 square meters per gram.
  • the powder has a defined particle size distribution such that at least 90% of the particles are smaller than 120 microns, at least 50% of the particles are smaller than 75 microns, and at least 10% of the particles are smaller than 20 microns.
  • the particle size distribution is not bi-modal.
  • the powder is preferably at least 99.95% pure based on the following elemental impurities: Ag, Al, Co, Cr. Cu, Fe, Mg, Mo, Ni, Si, Sn, Ti, Zn and Zr.
  • the combined concentration of the aforementioned elements is preferably less than 500 ppm.
  • the oxide (s) must be distributed homogeneously throughout in the final micro structure (particle size ⁇ 5 microns) being in equilibrium with the surrounding gas atomized metal-alloy counter part (particle size ⁇ 45 microns).
  • Typical microstructure of a refurbished composition is shown in Figure 8.
  • the starting powder is preferably at least 99.9% pure based on the following elemental impurities: Ag, Al, Co, Cr, Cu, Fe, Mg, Mo, Ni, Si, Sn, Ti, Zn and Zr.
  • step 114 and with reference to Figure 3B, once filled sputtering target 206 is securely disposed within cavity 302, the resulting assembly may be hot pressed.
  • the filled sputtering target is heated to a specified temperature while applying axial pressure along the direction of arrow 304.
  • press 306 supplies the axial force.
  • the axial pressure is applied along a direction opposite arrow 304.
  • the axial force is applied in a direction perpendicular to the top surface of the filled sputtering target.
  • Such a hot pressing technique is distinguished from hot isostatic pressing by the direction of force.
  • Isostatic pressure which is omnidirectional, subjects the target to a drastically different pressurized environment than axial pressure.
  • the results of one technique cannot be extrapolated to the other.
  • the inventors have discovered certain conditions that make it possible to produce homogeneous, refurbished targets using hot, non-isostatic pressing with significantly lower pressures than prior art refurbishing techniques.
  • the instant process makes subsequent sawing or milling of the refurbished target unnecessary.
  • the die 300 may be constructed of any suitable material capable of withstanding the applied forces.
  • the die 300 may be constructed of graphite.
  • the graphite is a high grade graphite, such as "grade 2124", available from Center Carbon Company. High grade graphite is generally characterized by low porosity and fine grain size.
  • the die may be cut from a block of suitable graphite using well known lathe machinery. Some of the properties of several graphite grades are given below:
  • FIG. 4 shows a more detailed depiction of die 300.
  • die 300 has a top wall 400, a bottom wall 402, and sidewalls 404.
  • Die 300 also has cavity 302 for receiving a sputtering target.
  • the size and shape of cavity 302 is configured to securely mate with the desired size and shape of the target.
  • the target is compressed between press 306 and surface 308 as bottom wall 402 abuts surface 308.
  • the inner sidewall 406 of cavity 302 experiences radial stress.
  • the die 300 has a thickness 410 which is sufficiently thick to accommodate this radial stress.
  • the thickness 410 is the distance between the inner sidewall 406 of cavity 302 and the sidewall 404 of the die 300.
  • Figures 5 A and 5 B show graphs of the radial stress induced by a load being applied to a sputtering target with a top surface area of 73148 square millimeters.
  • the radial stress at any radial distance (r), (where P; is the internal pressure, Po is the external pressure, and ro is the outer radius of the die, and r; is the inner radius of the die) may be calculated using the following formulas:
  • the thickness 410 (see Figure 4) of the die wall was varied and the resulting stress was measured at various thicknesses. As the thickness of the walls of the die increases, the radial stress begins to drop dramatically at a constant force of 118 metric tons (see Figure 5A). However, this effect diminishes until an asymptote can be established (in Figure 5 A, this appears to be approximately 11.4 centimeters for a target with a radius of about 90 millimeters and a thickness of about 7 millimeters). In Figure 5B, a similar asymptote is seen at a thickness of approximately 11 centimeters.
  • step 114 is executed, wherein the filled sputtering target is hot pressed such that the powdered metal fuses with the un-sputtered metal, producing a refurbished target.
  • FIG. 6 depicts filled sputtering target 206 before hot pressing and refurbished sputtering target 600 after hot pressing.
  • Refurbished target 600 is substantially homogenous such that no interface can be observed by either optical microscopy or by scanning electron microscopy (see Figure 7A).
  • both heat and axial pressure are applied for a certain period of time. The amount of heat, the amount of pressure, and the length of time varies depending on the composition of the target.
  • Figure 7A and Figure 7B show the profile of two refurbished ruthenium targets wherein no interface is visible in Figure 7B.
  • Figure 8 shows the profile of a refurbished Co-Cr-Pt-B-Oxide target, which shows uniform distribution of the fine oxide phase in equilibrium with the gas atomized metallic phase.
  • the target depicted in Figure 7A was produced using simple inert gas isostatic pressing at 20 MPa.
  • a spent target of 5 cm diameter was placed in a 2191 grade graphite tool set.
  • the amount of metal consumed by sputtering was replaced with fresh ruthenium powder (available from Johnson Matthey).
  • the powder and the spent target assembly were then pressed at 1400° C, 20 MPa of pressure, soak time being 7 hours.
  • the resulting target profile, shown in Figure 7A has a visible interface at the boundry between the original layer and the newly deposited layer.
  • the target depicted in Figure 7B and 8 were produced in accordance with the teachings of this invention.
  • the spent target (18.3 cm diameter) weighing 1790 g was placed in a specially designed graphite tool set (outer diameter being 43 cm with an O.D/I.D ratio of 2.36) such that the step of the target fits to the groove of the tool set and the sputtering zone is exposed to the top punch.
  • the consumed amount (-775 g) of the target was refilled with baked ruthenium powder (purchased from Johnson Matthey).
  • the top surface of the poured powder was then leveled by a measuring gauge and a flat scale.
  • a barrier layer was placed between the top punch and the powder and used target bed.
  • the entire tool set assembly is then placed in an inert gas hot pressing unit, which was purged with argon gas for 30 minutes to remove any unwanted oxygen present in the inert ambience.
  • the powder and the spent target assembly was then hot pressed at 1400 (+50/-25) ° C, 50 ( ⁇ 10) MPa of pressure, soak time being 7 (+3/-2) hours. Even at x35 magnification, no interface is visible.
  • FIG. 8 An additional example is shown in Figure 8.
  • the consumed amount (-661 g) of the target was filled with fresh powder.
  • the top surface of the poured powder was then leveled by a measuring gauge and a flat scale.
  • a barrier layer was placed between the top press and the powder and the spent target/powder assembly.
  • the entire tool set assembly is then placed in an inert gas hot pressing unit, which was purged with argon gas for 30 minutes to remove any unwanted oxygen present in the inert ambience.
  • the powder and the spent target assembly was then hot pressed at 1000 (+50/- 25) ° C, 50 ( ⁇ 10) MPa of pressure, soak time being 3 ( ⁇ 2) h.
  • a minor discontinuity within the grain is observed at x200 magnification, along the interface which is attributed to the presence of multi phase in the micro structure.
  • no porosity or anomalous grain growth was observed in or around the interface.
  • the processing temperature range can vary anywhere within 1400 0 C to about 1550 0 C for ruthenium and that for the Co-Cr-Pt-B oxide can vary within 975-1050° C .
  • Excessively low temperatures are characterized by insufficient diffusion to produce a homogenous target.
  • Excessively high temperatures are characterized by anomalous grain growth and undesirable magnetic properties which also produces an inhomogeneous target.
  • the heating rate is approximately 20°C per minute.
  • the target is maintained at the final temperature for an extended period of time such as, for example, 7 hours.
  • the pressure is maintained between about 40 MPa and 60 MPa.

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Materials Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Composite Materials (AREA)
  • Manufacturing & Machinery (AREA)
  • Physical Vapour Deposition (AREA)
  • Powder Metallurgy (AREA)

Abstract

Disclosed in this specification is a process for refurbishing a spent sputtering target. The process includes the step of applying sufficient heat and axial force to the filled sputtering target to hot press the filled sputtering target such that the powdered metal fuses with the un-sputtered metal, producing a refurbished target. The process may be used to refurbish precious metal targets, such as ruthenium targets.

Description

PROCESS FOR THE REFURBISHING OF A SPUTTERING
TARGET
FIELD OF THE INVENTION
[0001] This invention relates, in one embodiment, to a process for refurbishing a spent sputtering target by hot pressing.
BACKGROUND OF THE INVENTION
[0002] Sputtering is a process used to deposit a thin layer of material onto a substrate. Such thin layers are useful in certain electronic equipment, in the production of some optical storage media (such as compact discs) and in a variety of other applications. During the sputtering process the substrate and a target are placed in a deposition chamber. The target, typically a metal or metal alloy, is constructed of the material to be sputtered. For example, if one wishes to deposit ruthenium as the intermediate layer or Co-Cr-Pt-B-oxide (s) as the magnetic layer, then a target made of corresponding material is used. The target and substrate are placed in proximity to one another within the chamber and the target is bombarded with an ion beam. The high energy ions cause a portion of the target to dislodge and be re-deposited on the substrate. Unfortunately, the target is not uniformly consumed. The metal is more easily dislodged from the target in those regions where the ion beam is most intense. This generates localized depleted regions, where the target eventually wears thin. The lifetime of the target is determined by the resulting thickness of the target at its thinnest point. Due to the non-uniform consumption of the metal, the target often reaches the end of its useful life after only a fraction (approximately 30%) of the metal has been consumed. The un-sputtered metal (approximately 70%) is not used.
[0003] One method for refurbishing a sputtering target that does not pulverize the spent target is disclosed in United States Patent No. 7,175,802 to Sandlin et al, entitled "Refurbishing Spent Sputtering Targets." Sadlin et al. teach a method for refurbishing a sputtering target wherein the target and powdered metal are placed within a hot isostatic pressing (HIP) container. Hot isostatic pressing (HIP), also referred to as inert gas hot pressing (IGHP), is a technique that subjects a target to high temperature (typically 480- 1300 0C depending on the metal) and high, isostatic pressure (typically on the order of 100-200 MPa) under an inert atmosphere (typically argon). Isostatic pressure is pressure that is uniformly applied from all directions. After the HIP process is complete, a fused block of metal has formed around the target. The target is separated from the fused block by "sawing and milling operations." In addition, the sawing and milling operations which are required to isolate the refurbished target result in loss of material.
SUMMARY OF THE INVENTION
[0004] A spent sputtering target may be refurbished by re-processing the un-sputtered metal, combining it with fresh metal powder, and reforming a new target. During such re-processing, a certain percentage of the un-sputtered metal is lost. For example, grinding of the un-sputtered metal to produce re-processed powder generates dust, which is often lost to the environment.
[0005] Great care must be taken during refurbishing to produce a homogeneous target. If the spent target becomes heterogeneous the resulting layer would likewise be heterogeneous, which is typically undesirable. Solid state diffusion between the metal powder (e.g. powered replacement metal) and a solid material (e.g. a spent target) tends to form a distinct interface between the two materials with anomalous grain growths that introduce heterogeneity. For this reason, the un-sputtered target is often pulverized by crushing or refining, mixed with fresh metal powder, and a new target is processed. Although this produces a homogenous target, the very steps that promote homogeneity (e.g. crushing or refining to form powders) also increase the amount of material which is lost.
[0006] There is a need for a process for refurbishing a sputtering target that minimizes the number of re-processing steps and thus reduces the amount of material lost during re -processing. [0007] The invention comprises, in one form thereof, a process for refurbishing a spent sputtering target comprising the steps of receiving a spent sputtering target, removing the surface impurities by a combination of chemical treatment followed by blasting, disposing the spent target in a hot press die, pouring of fresh metal powder to account for the depleted regions of the target, inserting a barrier layer in between the top punch of the hot press die and the metal powder bed and applying an axial force such that the powdered metal sinters and forms a solid state diffusion bond with the target, producing a refurbished homogenous target.
[0008] The invention also pertains to a unique die for performing the aforementioned refurbishing process.
[0009] An advantage of the present invention is the design of the hot press die, the dimensions of which are optimized in such a way that even at significantly high uniaxial compressive pressure the radial stress on the die is reduced to a great extent.
[0010] A further advantage of the present invention is that the refurbished targets do not need to be isolated from a fused block of metal by sawing and milling steps. Such additional steps are undesirable, as they may result in loss of costly material.
BRIEF DESCRIPTION OF THE DRAWINGS
[0011] The present invention is disclosed with reference to the accompanying drawings, wherein:
Figure 1 is a flow diagram of one process of the invention;
Figures 2A, 2B and 2C show various sputtering targets for use with the present invention;
Figures 3A and 3B depict a die for use with the instant invention; Figure 4 is a schematic illustration of the die of Figure 3B;
Figures 5A and 5B show graphs of the effect of die wall thickness on radial stress;
Figure 6 shows the refurbishing of a filled sputtering target; Figures 7 A and 7B depict the profiles of two refurbished targets, and Figure 8 depicts another profile of a refurbished target.
[0012] Corresponding reference characters indicate corresponding parts throughout the several views. The examples set out herein illustrate several embodiments of the invention but should not be construed as limiting the scope of the invention in any manner.
DETAILED DESCRIPTION OF A PREFERRED EMBODIMENT
[0013] Referring to Figure 1, process 100 is initiated by the execution of step 102, wherein a spent sputtering target is received. The target may be received by, for example, a target recycling facility. One such target is illustrated in Figure 2 A.
[0014] Figures 2 A, 2B and 2C are illustrations of sputtering targets at various stages of process 100. Figure 2A depicts a spent sputtering target 200 that has previously been used to perform the sputtering process. Figure 2B is a side view of spent sputtering target 200. Figure 2B more clearly illustrates that spent sputtering target has depleted regions 202. In the embodiment depicted in Figure 2A, the spent sputtering target 20 is circular and the depleted regions 202 are also circular. The geometry of the depleted regions 202 is a function of the sputtering process - geometries other than those shown in Figure 2A may also be used. Similarly, the disc shape of spent sputtering target 202 is merely an example of one possible target. Many other suitable shapes would be apparent to one skilled in the art after benefiting from reading this specification. Such shapes are considered within the scope of this invention. For example, a target may have a disc shape with a diameter of 180 millimeters and a thickness of 7 millimeters. In one embodiment, not shown, the sputtering target is further comprised of a backing plate (i.e. support material).
[0015] Referring again to Figure 1, once the spent sputtering target has been received in step 102 then step 104, which is optional but preferred, is executed. In step 104, the actual weight of the spent target is identified. In step 106, which is also optional, the weight of fresh powder that is desired is determined. For example, the desired weight of the recycled target may be X grams (e.g. 10 grams), but the actual weight of the spent target is X-Y grams (e.g. 9 grams). This indicates an additional Y grams (e.g. 1 gram) of metal should be added to refurbished the target.
[0016] Sputtered targets often contain surface impurities which can be organic or metallic in nature. The source of impurities can be, for example, a shield kit of the sputtering chamber or the bonding adhesive if the target is bonded to a backing plate. Step 108 ensures removal of possible surface impurities from the surface of the target by conventional wet and dry cleaning procedures. The effectiveness of the cleaning procedure is confirmed by characterizing the cleaned surface using a high resolution Scanning Electron Microscope equipped with energy dispersive spectroscope for the metallic impurities and a Raman Spectroscope for organic impurities.
[0017] In step 110, the spent target is disposed within a die. Reference may be had to Figures 3 A and 3B. Figure 3A is a top view of die 300. Figure 3B is a side view of the same die 300. Die 300 is configured to mate with sputtering target 206 such that target 206 is disposed within cavity 302. When a sputtering target with a customized shape is received, a die may be specially fabricated to securely mate with such a target. In this manner many target shapes and configurations may be accommodated. Any undesirable oxidizing gases, such as atmospheric oxygen, may be purged by passing an inert gas (such as argon) over the assembly. In some embodiments, a molybdenum foil (not shown) is inserted between press 306 and target 206. Such a foil helps to prevent diffusion of material (such as carbon atoms from the graphite) from the press 306 when the axial force is applied. The die may be sealed by pressing it against a surface, such as surface 308.
[0018] In step 112 is executed, the depleted regions (see depleted regions 202 of Figure 2B) are then filled with a powder that corresponds to the composition of the spent target. Reference may be had to Figure 2B. For example, if the spent sputtering target 200 is comprised of ruthenium, then the depleted regions 202 are filled with ruthenium powder 204, thus producing filled sputtering target 206. Many suitable metals, metal- alloys, and combination of metal-alloys and oxide ceramics may be used. Examples of material suitable for use with the present invention may include, but not limited to ruthenium and its alloys, rhodium and its alloys, Co-Cr-Pt-B-oxides, where oxide combination may include but are not limited to early transition metals and/or non-metals. The filling step 112 may occur either before the die is disposed in the target (step 110) or, as illustrated in Figure 1, after step 110.
[0019] In one embodiment, the metal/metal-alloy is free of both oxides and carbides. The virgin powder may be of various morphologies, provided the particulates have a suitable particle size and purity. In one aspect, the particle morphology is fibrous. In such an embodiment, acicular or round morphologies are avoided. One suitable virgin powder has a tap density of from about 2.5 to about 3.2 grams per cubic centimeter and the particles have a surface area of from about 0.1 to about 0.4 square meters per gram. The powder has a defined particle size distribution such that at least 90% of the particles are smaller than 120 microns, at least 50% of the particles are smaller than 75 microns, and at least 10% of the particles are smaller than 20 microns. In one embodiment, the particle size distribution is not bi-modal. The powder is preferably at least 99.95% pure based on the following elemental impurities: Ag, Al, Co, Cr. Cu, Fe, Mg, Mo, Ni, Si, Sn, Ti, Zn and Zr. The combined concentration of the aforementioned elements is preferably less than 500 ppm.
[0020] In case of a combination of metal-alloys and oxides; the oxide (s) must be distributed homogeneously throughout in the final micro structure (particle size <5 microns) being in equilibrium with the surrounding gas atomized metal-alloy counter part (particle size < 45 microns). Typical microstructure of a refurbished composition is shown in Figure 8. The starting powder is preferably at least 99.9% pure based on the following elemental impurities: Ag, Al, Co, Cr, Cu, Fe, Mg, Mo, Ni, Si, Sn, Ti, Zn and Zr.
[0021] In step 114, and with reference to Figure 3B, once filled sputtering target 206 is securely disposed within cavity 302, the resulting assembly may be hot pressed. During such hot pressing step 114 the filled sputtering target is heated to a specified temperature while applying axial pressure along the direction of arrow 304. In the embodiment shown in Figure 3B, press 306 supplies the axial force. In another embodiment, not shown, the axial pressure is applied along a direction opposite arrow 304. In both embodiments, the axial force is applied in a direction perpendicular to the top surface of the filled sputtering target. Such a hot pressing technique is distinguished from hot isostatic pressing by the direction of force. Isostatic pressure, which is omnidirectional, subjects the target to a drastically different pressurized environment than axial pressure. The results of one technique cannot be extrapolated to the other. The inventors have discovered certain conditions that make it possible to produce homogeneous, refurbished targets using hot, non-isostatic pressing with significantly lower pressures than prior art refurbishing techniques. Advantageously, the instant process makes subsequent sawing or milling of the refurbished target unnecessary.
[0022] When applying uni- axial pressure along arrow 304, the die 300 is subjected to tremendous compression. The inventors have developed certain dies which are able to withstand these forces and produce the desired refurbished targets.
[0023 J The die 300 may be constructed of any suitable material capable of withstanding the applied forces. For example, the die 300 may be constructed of graphite. In one embodiment, the graphite is a high grade graphite, such as "grade 2124", available from Center Carbon Company. High grade graphite is generally characterized by low porosity and fine grain size. The die may be cut from a block of suitable graphite using well known lathe machinery. Some of the properties of several graphite grades are given below:
Properties Grade 2191 Grade 2124 Grade 2160
Bulk Density 1.74 g/cc 1.80 g/cc 1.86 g/cc
Average Grain Size 15 12 5
Flexural Strength (MPa) 44 52 76
Compressive Strength (MPa) 97 112 167
Tensile Strength (MPa) 31 50
Porosity (%) 12 10 7
Coefficient of Thermal Expansion (10-6/C) 4.2 5.0 6.0 [0024] Figure 4 shows a more detailed depiction of die 300. As shown in Figure 4, die 300 has a top wall 400, a bottom wall 402, and sidewalls 404. Die 300 also has cavity 302 for receiving a sputtering target. The size and shape of cavity 302 is configured to securely mate with the desired size and shape of the target. When an axial force is applied in a direction perpendicular to top surface 400, the target is compressed between press 306 and surface 308 as bottom wall 402 abuts surface 308. When the axial force is applied, the inner sidewall 406 of cavity 302 experiences radial stress. The die 300 has a thickness 410 which is sufficiently thick to accommodate this radial stress. The thickness 410 is the distance between the inner sidewall 406 of cavity 302 and the sidewall 404 of the die 300.
[0025] Figures 5 A and 5 B show graphs of the radial stress induced by a load being applied to a sputtering target with a top surface area of 73148 square millimeters. The radial stress at any radial distance (r), (where P; is the internal pressure, Po is the external pressure, and ro is the outer radius of the die, and r; is the inner radius of the die) may be calculated using the following formulas:
Figure imgf000010_0001
when P0 = 0 and r = rt
Figure imgf000010_0002
[0026] The thickness 410 (see Figure 4) of the die wall was varied and the resulting stress was measured at various thicknesses. As the thickness of the walls of the die increases, the radial stress begins to drop dramatically at a constant force of 118 metric tons (see Figure 5A). However, this effect diminishes until an asymptote can be established (in Figure 5 A, this appears to be approximately 11.4 centimeters for a target with a radius of about 90 millimeters and a thickness of about 7 millimeters). In Figure 5B, a similar asymptote is seen at a thickness of approximately 11 centimeters. [0027] Referring again to Figure 1, once the sputtering target has been disposed in the die (step 110) and the depleted regions are covered with fresh powder (step 112) then step 114 is executed, wherein the filled sputtering target is hot pressed such that the powdered metal fuses with the un-sputtered metal, producing a refurbished target. Reference may be had to Figure 6.
[0028] Figure 6 depicts filled sputtering target 206 before hot pressing and refurbished sputtering target 600 after hot pressing. Refurbished target 600 is substantially homogenous such that no interface can be observed by either optical microscopy or by scanning electron microscopy (see Figure 7A). During the execution of step 114, both heat and axial pressure are applied for a certain period of time. The amount of heat, the amount of pressure, and the length of time varies depending on the composition of the target.
[0029] Figure 7A and Figure 7B show the profile of two refurbished ruthenium targets wherein no interface is visible in Figure 7B. Figure 8 shows the profile of a refurbished Co-Cr-Pt-B-Oxide target, which shows uniform distribution of the fine oxide phase in equilibrium with the gas atomized metallic phase.
[0030] The target depicted in Figure 7A was produced using simple inert gas isostatic pressing at 20 MPa. A spent target of 5 cm diameter was placed in a 2191 grade graphite tool set. The amount of metal consumed by sputtering was replaced with fresh ruthenium powder (available from Johnson Matthey). The powder and the spent target assembly were then pressed at 1400° C, 20 MPa of pressure, soak time being 7 hours. The resulting target profile, shown in Figure 7A, has a visible interface at the boundry between the original layer and the newly deposited layer.
[0031] In comparison, the target depicted in Figure 7B and 8 were produced in accordance with the teachings of this invention. Referring to Figure 7B, the spent target (18.3 cm diameter) weighing 1790 g was placed in a specially designed graphite tool set (outer diameter being 43 cm with an O.D/I.D ratio of 2.36) such that the step of the target fits to the groove of the tool set and the sputtering zone is exposed to the top punch. The consumed amount (-775 g) of the target was refilled with baked ruthenium powder (purchased from Johnson Matthey). The top surface of the poured powder was then leveled by a measuring gauge and a flat scale. A barrier layer was placed between the top punch and the powder and used target bed. The entire tool set assembly is then placed in an inert gas hot pressing unit, which was purged with argon gas for 30 minutes to remove any unwanted oxygen present in the inert ambience. The powder and the spent target assembly was then hot pressed at 1400 (+50/-25) ° C, 50 (±10) MPa of pressure, soak time being 7 (+3/-2) hours. Even at x35 magnification, no interface is visible.
[0032] An additional example is shown in Figure 8. A Co-Cr-Pt-B-Oxide target (19.05 cm diameter), weighing 1025 g was placed in a similarly designed graphite tooling (outer diameter being 45.7 cm with an O.D/I.D ratio of 2.368). The consumed amount (-661 g) of the target was filled with fresh powder. The top surface of the poured powder was then leveled by a measuring gauge and a flat scale. A barrier layer was placed between the top press and the powder and the spent target/powder assembly. The entire tool set assembly is then placed in an inert gas hot pressing unit, which was purged with argon gas for 30 minutes to remove any unwanted oxygen present in the inert ambience. The powder and the spent target assembly was then hot pressed at 1000 (+50/- 25) ° C, 50 (±10) MPa of pressure, soak time being 3 (±2) h. In this case, a minor discontinuity within the grain is observed at x200 magnification, along the interface which is attributed to the presence of multi phase in the micro structure. However, no porosity or anomalous grain growth was observed in or around the interface.
[0033] The processing temperature range can vary anywhere within 1400 0C to about 1550 0C for ruthenium and that for the Co-Cr-Pt-B oxide can vary within 975-1050° C . Excessively low temperatures are characterized by insufficient diffusion to produce a homogenous target. Excessively high temperatures are characterized by anomalous grain growth and undesirable magnetic properties which also produces an inhomogeneous target. In one embodiment, the heating rate is approximately 20°C per minute. The target is maintained at the final temperature for an extended period of time such as, for example, 7 hours. The pressure is maintained between about 40 MPa and 60 MPa.
[0034] While the invention has been described with reference to preferred embodiments, it will be understood by those skilled in the art that various changes may be made and equivalents may be substituted for elements thereof to adapt to particular situations without departing from the scope of the invention. Therefore, it is intended that the invention not be limited to the particular embodiments disclosed as the best mode contemplated for carrying out this invention, but that the invention will include all embodiments falling within the scope and spirit of the appended claims.

Claims

What is claimed is:
1. A process for refurbishing a spent sputtering target comprising the steps of: receiving a spent sputtering target comprised of an un-sputtered metal, wherein the spent sputtering target has a depleted region, disposing the filled sputtering target within a hot press die, filling the depleted region with a powder of the metal, either before or after the step of disposing the sputtering target within the hot press die, thus producing a filled sputtering target, and applying sufficient heat and axial force to the filled sputtering target to hot press the filled sputtering target such that the powdered metal fuses with the un-sputtered metal, producing a refurbished target.
2. The process as recited in claim 1, further comprising the steps of: identifying a desired weight of the refurbished target, determining the weight of the spent sputtering target, and wherein the total weight of the powder and the spent sputtering target is equal to the desired weight of the refurbished target.
3. The process as recited in claim 1, wherein the filled sputtering target has a top surface, the depleted region is on the top surface, and the axial force is applied to the filled sputtering target in a direction perpendicular to the top surface.
4. The process as recited in claim 1, wherein the step of applying sufficient heat and axial force maintains the die temperature less than the melting point of the metal.
5. The process as recited in claim 1, wherein the powder includes a metal selected from the group consisting of ruthenium, platinum and rhodium.
6. The process as recited in claim 1, wherein the axial force is applied with a top punch and a barrier layer is inserted between the top punch and the powder prior to the step of applying sufficient heat and axial force.
7. The process as recited in claim 1, wherein the step of applying sufficient heat and axial force is performed for a time period sufficient to sinter the powder and form a solid state diffusion bond with the spent sputtering target.
8. The process as recited in claim 1, wherein the powdered metal includes an alloy of at least two metals.
9. The process as recited in claim 1, wherein the powdered metal includes a metal oxide.
10. The process as recited in claim 1, wherein the powdered metal includes a Co-Cr- Pt-B-oxide.
11. A process for refurbishing a spent sputtering target comprising the steps of: receiving a spent sputtering target consisting essentially of an un-sputtered metal, wherein the spent sputtering target has a depleted region, identifying a desired weight of a refurbished target, determining the weight of the spent sputtering target, measuring a metal powder such that the total weight of the powder and the spent sputtering target is equal to the desired weight of the refurbished target, wherein the metal powder consists essentially of a single metal, disposing the filled sputtering target within a hot press die, filling the depleted region with the metal powder, either before or after the step of disposing the sputtering target within the hot press die, thus producing a filled sputtering target, and applying sufficient heat and axial force to the filled sputtering target to hot press the filled sputtering target such that the powdered metal fuses with the un-sputtered metal, producing a refurbished target.
12. The process as recited in claim 11, wherein the metal powder is selected from the group consisting of ruthenium, platinum, and rhodium.
13. A process for refurbishing a spent sputtering target comprising the steps of: receiving a spent sputtering target that consists essentially of un-sputtered ruthenium, wherein the spent sputtering target has a depleted region, identifying a desired weight of a refurbished target, determining the weight of the spent sputtering target, measuring a sample of powdered ruthenium such that the total weight of the powdered ruthenium and the spent sputtering target is equal to the desired weight of the refurbished target, disposing the sputtering target within a hot press die, filling the depleted region with the powdered ruthenium, either before or after the step of disposing the sputtering target within the hot press die, thus producing a filled sputtering target, and applying sufficient heat and axial force to the filled sputtering target to hot press the filled sputtering target such that the powdered ruthenium fuses with the un-sputtered ruthenium, producing a refurbished target.
14. The process as recited in claim 13, wherein the step of applying sufficient heat and axial force causes the die to maintain a temperature of from about 1400 0C to about 1550 0C for a time period of from about 5 hours to about 10 hours.
15. The process as recited in claim 13, wherein the step of applying sufficient heat and axial force causes a pressure of from about 40MPa to about 60MPa to be applied.
16. A hot press die comprising a cavity circumscribed by a side wall, wherein the side wall has a thickness corresponding to an asymptote of the following function:
Figure imgf000016_0001
where Pj is an internal pressure, ro is an outer radius of the hot press die, and r; is an inner radius of the die, wherein the thickness is the difference between η and ro.
17. The hot press die as recited in claim 16, wherein the cavity is circular.
18. The hot press die as recited in claim 16, wherein the die is comprised of high grade graphite.
19. A process for forming a hot press die comprising the step of lathing a block of graphite to form hot press die as described in claim 16.
20. A hot press die comprising a cavity for receiving a spent sputtering target, wherein the cavity has an inner diameter and the hot pressed die has an outer diameter, and the ratio of the outer diameter to the inner diameter is about 2.36.
PCT/US2008/070109 2007-07-17 2008-07-16 Process for the refurbishing of a sputtering target WO2009012278A1 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
EP08826355.3A EP2087144B1 (en) 2007-07-17 2008-07-16 Process for the refurbishing of a sputtering target
JP2009543294A JP5204124B2 (en) 2007-07-17 2008-07-16 Method for repairing sputtering target
DK08826355.3T DK2087144T3 (en) 2007-07-17 2008-07-16 Method of Polishing a Sputter Target
ES08826355.3T ES2436778T3 (en) 2007-07-17 2008-07-16 Reconditioning procedure of a cathodic deposition target

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US95026407P 2007-07-17 2007-07-17
US60/950,264 2007-07-17

Publications (1)

Publication Number Publication Date
WO2009012278A1 true WO2009012278A1 (en) 2009-01-22

Family

ID=40260042

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/US2008/070109 WO2009012278A1 (en) 2007-07-17 2008-07-16 Process for the refurbishing of a sputtering target

Country Status (7)

Country Link
US (1) US7871563B2 (en)
EP (1) EP2087144B1 (en)
JP (1) JP5204124B2 (en)
DK (1) DK2087144T3 (en)
ES (1) ES2436778T3 (en)
TW (1) TWI376281B (en)
WO (1) WO2009012278A1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8961867B2 (en) 2008-09-09 2015-02-24 H.C. Starck Inc. Dynamic dehydriding of refractory metal powders
US9095932B2 (en) 2006-12-13 2015-08-04 H.C. Starck Inc. Methods of joining metallic protective layers
US9108273B2 (en) 2011-09-29 2015-08-18 H.C. Starck Inc. Methods of manufacturing large-area sputtering targets using interlocking joints
US9783882B2 (en) 2007-05-04 2017-10-10 H.C. Starck Inc. Fine grained, non banded, refractory metal sputtering targets with a uniformly random crystallographic orientation, method for making such film, and thin film based devices and products made therefrom

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090255808A1 (en) * 2008-04-11 2009-10-15 Seagate Technology Llc Target for efficient use of precious deposition material
JP4348396B1 (en) 2008-12-26 2009-10-21 田中貴金属工業株式会社 Reproduction target manufacturing method
WO2012074609A1 (en) * 2010-11-30 2012-06-07 Dow Global Technologies Llc Refurbishing copper and indium containing alloy sputter targets
JP2013001971A (en) * 2011-06-17 2013-01-07 Solar Applied Materials Technology Corp Reproduced sputtering target and manufacturing method therefor
US9802233B2 (en) 2014-05-01 2017-10-31 Praxair S. T. Technology, Inc. Gold evaporative sources with reduced contaminants and methods for making the same
US11149343B2 (en) * 2015-05-28 2021-10-19 Materion Corporation Processes for refurbishing a spent sputtering target
JP7072664B2 (en) * 2018-09-25 2022-05-20 Jx金属株式会社 Sputtering target and manufacturing method of sputtering target

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4954170A (en) * 1989-06-30 1990-09-04 Westinghouse Electric Corp. Methods of making high performance compacts and products
US6042777A (en) * 1999-08-03 2000-03-28 Sony Corporation Manufacturing of high density intermetallic sputter targets
US6313392B1 (en) * 1998-10-12 2001-11-06 Komatsu Ltd. Thermoelectric semiconductor material, thermoelectric element, method of manufacturing these and method of manufacturing thermoelectric module and device for manufacturing thermoelectric semiconductor material
US6582641B1 (en) * 1994-08-25 2003-06-24 Praxair S.T. Technology, Inc. Apparatus and method for making metal oxide sputtering targets
US20060021870A1 (en) 2004-07-27 2006-02-02 Applied Materials, Inc. Profile detection and refurbishment of deposition targets
US7175802B2 (en) * 2001-09-17 2007-02-13 Heraeus, Inc. Refurbishing spent sputtering targets
US20070189916A1 (en) * 2002-07-23 2007-08-16 Heraeus Incorporated Sputtering targets and methods for fabricating sputtering targets having multiple materials

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62230967A (en) * 1986-03-31 1987-10-09 Mitsubishi Metal Corp Method for generating used target
JPS6393859A (en) * 1986-10-09 1988-04-25 Toshiba Corp Sputtering target and its production
JP3609682B2 (en) * 1991-01-25 2005-01-12 株式会社東芝 Manufacturing method of semiconductor device
JPH0565635A (en) * 1991-03-11 1993-03-19 Mitsubishi Materials Corp Method for repairing magnetron sputtering noble-metal target
US5857611A (en) * 1995-08-16 1999-01-12 Sony Corporation Sputter target/backing plate assembly and method of making same
JP2001342562A (en) * 2000-06-01 2001-12-14 Hitachi Metals Ltd Target material and manufacturing method
FI112026B (en) * 2002-02-18 2003-10-15 Raute Oyj Plant for press heating a disc-shaped product
JP2004225091A (en) 2003-01-21 2004-08-12 Sumitomo Metal Mining Co Ltd Method for manufacturing sputtering target
JP4211558B2 (en) * 2003-10-07 2009-01-21 住友金属鉱山株式会社 Sputtering target material, manufacturing method thereof, and manufacturing method of transparent conductive film using the same

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4954170A (en) * 1989-06-30 1990-09-04 Westinghouse Electric Corp. Methods of making high performance compacts and products
US6582641B1 (en) * 1994-08-25 2003-06-24 Praxair S.T. Technology, Inc. Apparatus and method for making metal oxide sputtering targets
US6313392B1 (en) * 1998-10-12 2001-11-06 Komatsu Ltd. Thermoelectric semiconductor material, thermoelectric element, method of manufacturing these and method of manufacturing thermoelectric module and device for manufacturing thermoelectric semiconductor material
US6042777A (en) * 1999-08-03 2000-03-28 Sony Corporation Manufacturing of high density intermetallic sputter targets
US7175802B2 (en) * 2001-09-17 2007-02-13 Heraeus, Inc. Refurbishing spent sputtering targets
US20070189916A1 (en) * 2002-07-23 2007-08-16 Heraeus Incorporated Sputtering targets and methods for fabricating sputtering targets having multiple materials
US20060021870A1 (en) 2004-07-27 2006-02-02 Applied Materials, Inc. Profile detection and refurbishment of deposition targets

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP2087144A4 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9095932B2 (en) 2006-12-13 2015-08-04 H.C. Starck Inc. Methods of joining metallic protective layers
US9783882B2 (en) 2007-05-04 2017-10-10 H.C. Starck Inc. Fine grained, non banded, refractory metal sputtering targets with a uniformly random crystallographic orientation, method for making such film, and thin film based devices and products made therefrom
US8961867B2 (en) 2008-09-09 2015-02-24 H.C. Starck Inc. Dynamic dehydriding of refractory metal powders
US9108273B2 (en) 2011-09-29 2015-08-18 H.C. Starck Inc. Methods of manufacturing large-area sputtering targets using interlocking joints
US9120183B2 (en) 2011-09-29 2015-09-01 H.C. Starck Inc. Methods of manufacturing large-area sputtering targets
US9293306B2 (en) 2011-09-29 2016-03-22 H.C. Starck, Inc. Methods of manufacturing large-area sputtering targets using interlocking joints
US9412568B2 (en) 2011-09-29 2016-08-09 H.C. Starck, Inc. Large-area sputtering targets

Also Published As

Publication number Publication date
US7871563B2 (en) 2011-01-18
EP2087144A1 (en) 2009-08-12
TW200914171A (en) 2009-04-01
TWI376281B (en) 2012-11-11
EP2087144B1 (en) 2013-09-04
ES2436778T3 (en) 2014-01-07
US20090022616A1 (en) 2009-01-22
EP2087144A4 (en) 2011-04-13
JP5204124B2 (en) 2013-06-05
DK2087144T3 (en) 2013-11-04
JP2010514921A (en) 2010-05-06

Similar Documents

Publication Publication Date Title
US7871563B2 (en) Process for the refurbishing of a sputtering target
CN105008578B (en) CYLINDRICAL Cu-Ga ALLOY SPUTTERING TARGET AND PRODUCTION METHOD THEREFOR
JP6479788B2 (en) Sputtering target and manufacturing method thereof
EP2479312A1 (en) Metal oxide-metal composite sputtering target
CN107488804A (en) A kind of superhigh intensity, hardness and corrosion-resistant CrMnFeVTi high-entropy alloys and preparation method thereof
CN111164227A (en) Sintered molybdenum component
US20140154509A1 (en) Providing a catlyst free diamond layer on drilling cutters
Sun et al. Microstructure and mechanical properties of Cu-ZTA cermet prepared by vacuum hot pressing sintering
US20100178525A1 (en) Method for making composite sputtering targets and the tartets made in accordance with the method
WO2014088569A1 (en) Providing a catlyst free diamond layer on drilling cutters
EP3480328B1 (en) Super hard sintered body
KR102316360B1 (en) Sputtering target and production method
WO2009117043A1 (en) A method for making composite sputtering targets and the targets made in accordance with the method
JPH0797603A (en) Ceramic matrix base material for diamond coating and production of base material for coating
JP2017218621A (en) Target material and method for manufacturing the same
US11149343B2 (en) Processes for refurbishing a spent sputtering target
KR101782860B1 (en) NANOSTRUCTURED WC-Al HARD MATERIALS AND FABRICATING METHOD FOR THE SAME
JP4047940B2 (en) Ceramic substrate for diamond coating
KR20200129143A (en) Sputtering target and manufacturing method of sputtering target
KR102257374B1 (en) Aluminum composite material for brake disk having improved hardness and wear resistance, and method for manufacturing the same
JP7483999B1 (en) Sputtering targets and sputtering target assemblies
WO2019188713A1 (en) Molybdenum material and method for producing same
WO2022208766A1 (en) Superhard alloy and mold
Shearwood et al. Spark plasma sintering of wire exploded tungsten nano-powder
CN116727669A (en) Chromium sintered body and method for producing same, sputtering target, and method for producing substrate with chromium film

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 08826355

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 2008826355

Country of ref document: EP

ENP Entry into the national phase

Ref document number: 2009543294

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE