WO2009006526A3 - Système et procédé pour réaliser des opérations de simulation de champ pétrolifère - Google Patents

Système et procédé pour réaliser des opérations de simulation de champ pétrolifère Download PDF

Info

Publication number
WO2009006526A3
WO2009006526A3 PCT/US2008/069031 US2008069031W WO2009006526A3 WO 2009006526 A3 WO2009006526 A3 WO 2009006526A3 US 2008069031 W US2008069031 W US 2008069031W WO 2009006526 A3 WO2009006526 A3 WO 2009006526A3
Authority
WO
WIPO (PCT)
Prior art keywords
simulators
oilfield
modeling
simulation operations
performing oilfield
Prior art date
Application number
PCT/US2008/069031
Other languages
English (en)
Other versions
WO2009006526A2 (fr
Inventor
Scott Trevor Raphael
Original Assignee
Schlumberger Ca Ltd
Schlumberger Services Petrol
Prad Res & Dev Ltd
Maseles Danita
Schlumberger Technology Bv
Scott Trevor Raphael
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from US11/929,921 external-priority patent/US8352227B2/en
Application filed by Schlumberger Ca Ltd, Schlumberger Services Petrol, Prad Res & Dev Ltd, Maseles Danita, Schlumberger Technology Bv, Scott Trevor Raphael filed Critical Schlumberger Ca Ltd
Priority to BRPI0812761-1A2A priority Critical patent/BRPI0812761A2/pt
Priority to CA2691241A priority patent/CA2691241C/fr
Priority to GB0921738.1A priority patent/GB2464003B/en
Publication of WO2009006526A2 publication Critical patent/WO2009006526A2/fr
Publication of WO2009006526A3 publication Critical patent/WO2009006526A3/fr
Priority to NO20100016A priority patent/NO342368B1/no

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B44/00Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B49/00Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2111/00Details relating to CAD techniques
    • G06F2111/10Numerical modelling

Landscapes

  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Fluid Mechanics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Theoretical Computer Science (AREA)
  • Computer Hardware Design (AREA)
  • Evolutionary Computation (AREA)
  • Geometry (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Geophysics (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Geophysics And Detection Of Objects (AREA)

Abstract

La présente invention concerne un procédé de simulation d'opérations d'un champ pétrolifère qui possède des installations de traitement et des sites de puits en liaison fonctionnelle, chaque site de puits ayant un trou de forage qui pénètre dans une formation souterraine pour l'extraction de fluide d'un réservoir souterrain. Les étapes du procédé consistent à choisir des simulateurs pour modéliser le champ pétrolifère, au moins un des simulateurs étant doté d'une fonctionnalité de modélisation d'injection de fluide, à coupler de manière sélective chacun des simulateurs conformément à une configuration prédéfinie, et à modéliser une opération d'injection du champ pétrolifère grâce à une communication sélective entre les simulateurs.
PCT/US2008/069031 2007-07-02 2008-07-02 Système et procédé pour réaliser des opérations de simulation de champ pétrolifère WO2009006526A2 (fr)

Priority Applications (4)

Application Number Priority Date Filing Date Title
BRPI0812761-1A2A BRPI0812761A2 (pt) 2007-07-02 2008-07-02 Método de simulação de operações de um campo petrolífero possuindo pelo menos uma instalação de poço, e mídia passível de leitura por computador
CA2691241A CA2691241C (fr) 2007-07-02 2008-07-02 Systeme et procede pour realiser des operations de simulation de champ petrolifere
GB0921738.1A GB2464003B (en) 2007-07-02 2008-07-02 System and method for performing oilfield simulation operations
NO20100016A NO342368B1 (no) 2007-07-02 2010-01-08 System og fremgangsmåte for å utføre simuleringsoperasjoner for oljefelt

Applications Claiming Priority (6)

Application Number Priority Date Filing Date Title
US95820807P 2007-07-02 2007-07-02
US60/958,208 2007-07-02
US11/929,921 2007-10-30
US11/929,921 US8352227B2 (en) 2006-10-30 2007-10-30 System and method for performing oilfield simulation operations
US11/929,811 2007-10-30
US11/929,811 US8818777B2 (en) 2006-10-30 2007-10-30 System and method for performing oilfield simulation operations

Publications (2)

Publication Number Publication Date
WO2009006526A2 WO2009006526A2 (fr) 2009-01-08
WO2009006526A3 true WO2009006526A3 (fr) 2009-02-19

Family

ID=40226816

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/US2008/069031 WO2009006526A2 (fr) 2007-07-02 2008-07-02 Système et procédé pour réaliser des opérations de simulation de champ pétrolifère

Country Status (5)

Country Link
BR (1) BRPI0812761A2 (fr)
CA (1) CA2691241C (fr)
GB (1) GB2464003B (fr)
NO (1) NO342368B1 (fr)
WO (1) WO2009006526A2 (fr)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2456925B (en) 2006-10-30 2011-08-10 Logined Bv System and method for performing oilfield simulation operations
US8775141B2 (en) 2007-07-02 2014-07-08 Schlumberger Technology Corporation System and method for performing oilfield simulation operations
US9228415B2 (en) 2008-10-06 2016-01-05 Schlumberger Technology Corporation Multidimensional data repository for modeling oilfield operations
EP2845142A4 (fr) * 2012-04-30 2016-04-20 Landmark Graphics Corp Système et procédé de simulation de réservoir au moyen de données à la demande
CN103590807B (zh) * 2012-08-13 2016-06-08 中国石油天然气集团公司 一种确定稠油热采蒸汽腔形态的方法
US10578766B2 (en) 2013-08-05 2020-03-03 Advantek International Corp. Quantifying a reservoir volume and pump pressure limit
WO2016004137A1 (fr) * 2014-06-30 2016-01-07 Advantek International Corporation Réduction en coulis et mise au rebut de déchets par pompage sous pression dans une formation sous la surface
CN104405356B (zh) * 2014-11-24 2017-01-11 中国石油大学(北京) 薄层稠油油藏水平井蒸汽驱二维物理模拟实验装置
CA2992714A1 (fr) * 2015-08-21 2017-03-02 Halliburton Energy Services, Inc. Procede et protocole de modelisation precise de formations de champ proche dans des simulations de puits de forage
CN111119810B (zh) * 2019-12-17 2020-09-22 东北石油大学 井下精细分注室内综合模拟装置
WO2024057050A1 (fr) * 2022-09-16 2024-03-21 Totalenergies Onetech Procédé de détermination d'une performance d'injection d'un puits lors de l'injection d'un fluide dans une formation géologique

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4676313A (en) * 1985-10-30 1987-06-30 Rinaldi Roger E Controlled reservoir production
US6230101B1 (en) * 1999-06-03 2001-05-08 Schlumberger Technology Corporation Simulation method and apparatus
US6892812B2 (en) * 2002-05-21 2005-05-17 Noble Drilling Services Inc. Automated method and system for determining the state of well operations and performing process evaluation
US6980940B1 (en) * 2000-02-22 2005-12-27 Schlumberger Technology Corp. Intergrated reservoir optimization

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4676313A (en) * 1985-10-30 1987-06-30 Rinaldi Roger E Controlled reservoir production
US6230101B1 (en) * 1999-06-03 2001-05-08 Schlumberger Technology Corporation Simulation method and apparatus
US6980940B1 (en) * 2000-02-22 2005-12-27 Schlumberger Technology Corp. Intergrated reservoir optimization
US6892812B2 (en) * 2002-05-21 2005-05-17 Noble Drilling Services Inc. Automated method and system for determining the state of well operations and performing process evaluation

Also Published As

Publication number Publication date
CA2691241C (fr) 2014-03-25
GB0921738D0 (en) 2010-01-27
GB2464003A (en) 2010-04-07
NO20100016L (no) 2010-03-26
NO342368B1 (no) 2018-05-14
GB2464003B (en) 2013-11-27
BRPI0812761A2 (pt) 2014-11-25
WO2009006526A2 (fr) 2009-01-08
CA2691241A1 (fr) 2009-01-08

Similar Documents

Publication Publication Date Title
WO2009006526A3 (fr) Système et procédé pour réaliser des opérations de simulation de champ pétrolifère
WO2008055186A3 (fr) Système et procédé pour accomplir des opérations de simulation de champ pétrolifère
EA201070207A1 (ru) Способ управления добычей из нефтегазоносного коллектора в режиме реального времени
WO2008157706A3 (fr) Système et procédé pour effectuer des opérations de simulation de champ de pétrole
WO2008151293A3 (fr) Système et procédé de réalisation d'opérations de production de champ pétrolifère
WO2007100703A3 (fr) Système et procédé de planification de puits
MX2010003218A (es) Metodo para completar depositos de petroleo y gas hermeticos.
ATE529608T1 (de) System und verfahren zum modellieren von bohrlochverläufen
MX346613B (es) Metodo y sistema para producción de presión de poro.
EA200870537A1 (ru) Способы извлечения углеводородов с использованием горизонтальных скважин
WO2007147135A3 (fr) Procédé et système permettant de mettre au point et d'optimiser des opérations de forage et de complétion dans des réservoirs d'hydrocarbures
GB2460189A (en) System and method for performing oilfield drilling operations using visualization techniques
WO2012054139A3 (fr) Procédés d'établissement de réseau de fractures souterrain
WO2011008544A3 (fr) Opérations au laser en puits de forage
WO2009014821A3 (fr) Méthode de récupération de pétrole brut depuis une formation souterraine
WO2008022124A3 (fr) Procédé et système pour concevoir une extraction d'hydrocarbures à partir d'une formation d'hydrocarbures
GB2463146A (en) Modeling the transient behavior or BHA/drill string while drilling
WO2011110802A8 (fr) Procédés relatifs à la modification de configurations d'écoulement utilisant des barrières in situ
GB2462227A (en) System and method for performing a drilling operation in an oilfield
WO2007092083A3 (fr) Procédé et appareil de forage pour completion, production et injection
WO2014049369A3 (fr) Procédé de forage pour forer un trou de forage souterrain
GB2455237A (en) System and method for performing oilfield simulation operations
GB2506793A (en) System and method for performing wellbore fracture operations
WO2007106244A3 (fr) Procede de mesure de connectivite de resrvoir employant les temps de trajet de fluides
GB2499172A (en) Method for combined cleaning and plugging in a well, a washing tool for directional washing in a well, and uses thereof

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 08781285

Country of ref document: EP

Kind code of ref document: A2

ENP Entry into the national phase

Ref document number: 0921738

Country of ref document: GB

Kind code of ref document: A

Free format text: PCT FILING DATE = 20080702

WWE Wipo information: entry into national phase

Ref document number: 0921738.1

Country of ref document: GB

WWE Wipo information: entry into national phase

Ref document number: 2691241

Country of ref document: CA

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 08781285

Country of ref document: EP

Kind code of ref document: A2

ENP Entry into the national phase

Ref document number: PI0812761

Country of ref document: BR

Kind code of ref document: A2

Effective date: 20091229