WO2009006526A2 - System and method for performing oilfield simulation operations - Google Patents

System and method for performing oilfield simulation operations Download PDF

Info

Publication number
WO2009006526A2
WO2009006526A2 PCT/US2008/069031 US2008069031W WO2009006526A2 WO 2009006526 A2 WO2009006526 A2 WO 2009006526A2 US 2008069031 W US2008069031 W US 2008069031W WO 2009006526 A2 WO2009006526 A2 WO 2009006526A2
Authority
WO
WIPO (PCT)
Prior art keywords
oilfield
simulators
simulator
injection
coupling
Prior art date
Application number
PCT/US2008/069031
Other languages
English (en)
French (fr)
Other versions
WO2009006526A3 (en
Inventor
Scott Trevor Raphael
Original Assignee
Schlumberger Canada Limited
Services Petroliers Schlumberger
Prad Research And Development Limited
Maseles, Danita
Schlumberger Technology B.V.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from US11/929,921 external-priority patent/US8352227B2/en
Application filed by Schlumberger Canada Limited, Services Petroliers Schlumberger, Prad Research And Development Limited, Maseles, Danita, Schlumberger Technology B.V. filed Critical Schlumberger Canada Limited
Priority to BRPI0812761-1A2A priority Critical patent/BRPI0812761A2/pt
Priority to GB0921738.1A priority patent/GB2464003B/en
Priority to CA2691241A priority patent/CA2691241C/en
Publication of WO2009006526A2 publication Critical patent/WO2009006526A2/en
Publication of WO2009006526A3 publication Critical patent/WO2009006526A3/en
Priority to NO20100016A priority patent/NO342368B1/no

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B44/00Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B49/00Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2111/00Details relating to CAD techniques
    • G06F2111/10Numerical modelling

Definitions

  • the present invention relates to techniques for performing oilfield operations relating to subterranean formations having reservoirs therein. More particularly, the invention relates to techniques for performing oilfield operations involving an analysis of reservoir operations, and their impact on such oilfield operations.
  • Oilfield operations such as surveying, drilling, wireline testing, completions, simulation, planning and oilfield analysis, are typically performed to locate and gather valuable downhole fluids.
  • FIGS. IA- ID Various aspects of the oilfield and its related operations are shown in FIGS. IA- ID.
  • surveys are often performed using acquisition methodologies, such as seismic scanners to generate maps of underground structures. These structures are often analyzed to determine the presence of subterranean assets, such as valuable fluids or minerals. This information is used to assess the underground structures and locate the formations containing the desired subterranean assets. Data collected from the acquisition methodologies may be evaluated and analyzed to determine whether such valuable items are present, and if they are reasonably accessible.
  • one or more wellsites may be positioned along the underground structures to gather valuable fluids from the subterranean reservoirs.
  • the wellsites are provided with tools capable of locating and removing hydrocarbons from the subterranean reservoirs.
  • drilling tools are typically advanced from the oil rigs and into the earth along a given path to locate the valuable downhole fluids.
  • the drilling tool may perform downhole measurements to investigate downhole conditions.
  • the drilling tool is removed and a wireline tool is deployed into the wellbore to perform additional downhole testing.
  • the well may then be prepared for production.
  • wellbore completions equipment is deployed into the wellbore to complete the well in preparation for the production of fluid therethrough. Fluid is then drawn from downhole reservoirs, into the wellbore and flows to the surface.
  • Production facilities are positioned at surface locations to collect the hydrocarbons from the wellsite(s). Fluid drawn from the subterranean reservoir(s) passes to the production facilities via transport mechanisms, such as tubing.
  • Various equipment may be positioned about the oilfield to monitor oilfield parameters and/or to manipulate the oilfield operations.
  • data is typically collected for analysis and/or monitoring of the oilfield operations.
  • data may include, for example, subterranean formation, equipment, historical and/or other data.
  • Data concerning the subterranean formation is collected using a variety of sources.
  • Such formation data may be static or dynamic.
  • Static data relates to, for example, formation structure and geological stratigraphy that define the geological structure of the subterranean formation.
  • Dynamic data relates to, for example, fluids flowing through the geologic structures of the subterranean formation over time. Such static and/or dynamic data may be collected to learn more about the formations and the valuable assets contained therein.
  • Sources used to collect static data may be seismic tools, such as a seismic track that sends compression waves into the earth as shown in FIG. IA. These waves are measured to characterize changes in the density of the geological structure at different depths. This information may be used to generate basic structural maps of the subterranean formation. Other static measurements may be gathered using core sampling and well logging techniques. Core samples may be used to take physical specimens of the formation at various depths as shown in FIG. IB.
  • Well logging typically involves deployment of a downhole tool into the wellbore to collect various downhole measurements, such as density, resistivity, etc., at various depths. Such well logging may be performed using, for example, the drilling tool of FIG. IB and/or the wireline tool of FIG. 1C.
  • fluid flows to the surface using production tubing as shown in FIG. ID.
  • various dynamic measurements such as fluid flow rates, pressure, and composition may be monitored. These parameters may be used to determine various characteristics of the subterranean formation.
  • Sensors may be positioned about the oilfield to collect data relating to various oilfield operations.
  • sensors in the drilling equipment may monitor drilling conditions
  • sensors in the wellbore may monitor fluid composition
  • sensors located along the flow path may monitor flow rates
  • sensors at the processing facility may monitor fluids collected.
  • Other sensors may be provided to monitor downhole, surface, equipment or other conditions.
  • the monitored data is often used to make decisions at various locations of the oilfield at various times. Data collected by these sensors may be further analyzed and processed. Data may be collected and used for current or future operations. When used for future operations at the same or other locations, such data may sometimes be referred to as historical data.
  • the processed data may be used to predict downhole conditions, and make decisions concerning oilfield operations. Such decisions may involve well planning, well targeting, well completions, operating levels, production rates and other operations and/or conditions. Often this information is used to determine when to drill new wells, re-complete existing wells, or alter wellbore production.
  • Data from one or more wellbores may be analyzed to plan or predict various outcomes at a given wellbore.
  • the data from neighboring wellbores or wellbores with similar conditions or equipment may be used to predict how a well will perform.
  • the operating conditions may need adjustment as conditions change and new information is received.
  • EOR enhanced oil recovery
  • such techniques for modeling oilfield MWAG injection operations be capable of one of more of the following, among others: selectively modeling oilfield MWAG injection operations based on more than one simulator; selectively merging data and/or outputs of more than one simulator; selectively merging data and/or outputs of simulators of one or more wellsites and/or oilfields; selectively linking a wide variety of simulators of like and/or different configurations; selectively linking simulators having similar and/or different applications and/or data models; selectively linking simulators of different members of an asset team of an oilfield; and providing coupling mechanisms capable of selectively linking simulators in a desired configuration.
  • the invention in general, in one aspect, relates to a method of simulating operations of an oilfield, which has process facilities and wellsite operatively connected, each wellsite having a wellbore penetrating a subterranean formation for extracting fluid from an underground reservoir.
  • the method steps include selecting simulators for modeling the oilfield with at least one of the simulators having functionality to model fluid injection, selectively coupling each of the simulators according to a predefined configuration, and modeling an injection operation of the oilfield by selectively communicating between the simulators.
  • the invention in general, in one aspect, relates to a method of simulating operations of an oilfield, which has process facilities and wellsite operatively connected, each wellsite having a wellbore penetrating a subterranean formation for extracting fluid from an underground reservoir.
  • the method steps include selecting simulators for modeling the oilfield with at least one of the simulators having functionality to perform thru-time dynamic modeling of an injection operation, selectively coupling each of the simulators according to a predefined configuration, and performing the thru-time dynamic modeling of the oilfield by selectively communicating between the simulators.
  • the invention in general, in one aspect, relates to a computer readable medium embodying instructions executable by a computer to perform method steps for simulating operations of an oilfield, which has process facilities and wellsite operatively connected, each wellsite having a wellbore penetrating a subterranean formation for extracting fluid from an underground reservoir.
  • the method steps include selecting simulators for modeling the oilfield with at least one of the simulators having functionality to model fluid injection, selectively coupling each of the simulators according to a predefined configuration, and modeling an injection operation of the oilfield by selectively communicating between the simulators.
  • the invention in general, in one aspect, relates to a computer readable medium embodying instructions executable by a computer to perform method steps for simulating operations of an oilfield, which has process facilities and wellsite operatively connected, each wellsite having a wellbore penetrating a subterranean formation for extracting fluid from an underground reservoir.
  • the method steps include selecting simulators for modeling the oilfield with at least one of the simulators having functionality to perform thru-time dynamic modeling of an injection operation, selectively coupling each of the simulators according to a predefined configuration, and performing the thru- time dynamic modeling of the oilfield by selectively communicating between the simulators.
  • FIGS. IA- ID show exemplary schematic views of an oilfield having subterranean structures including reservoirs therein and various oilfield operations being performed on the oilfield.
  • FIG. IA depicts an exemplary survey operation being performed by a seismic truck.
  • FIG. IB depicts an exemplary drilling operation being performed by a drilling tool suspended by a rig and advanced into the subterranean formation.
  • FIG. 1C depicts an exemplary wireline operation being performed by a wireline tool suspended by the rig and into the wellbore of FIG. IB.
  • FIG. ID depicts an exemplary simulation operation being performed by a simulation tool being deployed from the rig and into a completed wellbore for drawing fluid from the downhole reservoir into a surface facility.
  • FIGs. 2A-2D are exemplary graphical depictions of data collected by the tools of FIGS. IA- ID, respectively.
  • FIG. 2A depicts an exemplary seismic trace of the subterranean formation of FIG. IA.
  • FIG. 2B depicts exemplary core sample of the formation shown in FIG. IB.
  • FIG. 2C depicts an exemplary well log of the subterranean formation of FIG. 1C.
  • FIG. 2D depicts an exemplary simulation decline curve of fluid flowing through the subterranean formation of FIG. ID,
  • FIG. 3 shows an exemplary schematic view, partially in cross section, of an oilfield having a plurality of data acquisition tools positioned at various locations along the oilfield for collecting data from the subterranean formation.
  • FIG. 4 shows an exemplary schematic view of an oilfield having a plurality of wellsites for producing hydrocarbons from the subterranean formation.
  • FIG. 5 shows an exemplary schematic diagram of a portion of the oilfield of FIG. 4 depicting the simulation operation in detail.
  • FIG. 6 is a schematic view of an oilfield simulator for the oilfield of
  • FIG. 4 the oilfield simulator having wellsite and non-wellsite simulators selectively coupled together to perform an oilfield simulation.
  • FIG. s 7 A and 7B are graphs depicting rate-based coupling that may be used in the oilfield simulator of FIG. 6.
  • FIG. 7 A depicts an unconstrained rate-based coupling.
  • FIG. 7B depicts a reservoir constrained rate-based coupling.
  • FIG. 8 is a graph depicting a fast PI coupling that may be used in the oilfield simulator of FIG. 6.
  • FIG. 9A, 9B, and 9C are graphs depicting a chord slope coupling that may be used in the oilfield simulator of FIG. 6.
  • FIG. 9A depicts a network constrained well.
  • FIG. 9B depicts a reservoir constrained well.
  • FIG. 9C depicts a reservoir with reduced pressure.
  • FIG. 10 is a flowchart depicting a method of producing fluid from of the oilfield of Figure 1.
  • FIGS. IA-D show an oilfield (100) having geological structures and/or subterranean formations therein. As shown in these figures, various measurements of the subterranean formation are taken by different tools at the same location. These measurements may be used to generate information about the formation and/or the geological structures and/or fluids contained therein.
  • FIGS. 1A-1D depict schematic views of an oilfield (100) having subterranean formations (102) containing a reservoir (104) therein and depicting various oilfield operations being performed on the oilfield (100).
  • FIG. IA depicts a survey operation being performed by a seismic truck (106a) to measure properties of the subterranean formation. The survey operation is a seismic survey operation for producing sound vibration(s) (112).
  • one such sound vibration (112) is generated by a source (110) and reflects off a plurality of horizons (114) in an earth formation (116).
  • the sound vibration(s) (112) is (are) received in by sensors (S), such as geophone-receivers (118), situated on the earth's surface, and the geophone- receivers (118) produce electrical output signals, referred to as data received (120) in FIG. 1.
  • the data received (120) is provided as input data to a computer (122a) of the seismic recording truck (106a), and responsive to the input data, the recording truck computer (122a) generates a seismic data output record (124).
  • the seismic data may be further processed as desired, for example by data reduction.
  • FIG. IB depicts a drilling operation being performed by a drilling tool
  • a mud pit (130) is used to draw drilling mud into the drilling tool (106b) via flow line (132) for circulating drilling mud through the drilling tool (106b) and back to the surface.
  • the drilling tool (106b) is advanced into the formation to reach reservoir (104).
  • the drilling tool (106b) is preferably adapted for measuring downhole properties.
  • the drilling tool (106b) may also be adapted for taking a core sample (133) as shown, or removed so that a core sample (133) may be taken using another tool.
  • a surface unit (134) is used to communicate with the drilling tool (106b) and offsite operations.
  • the surface unit (134) is capable of communicating with the drilling tool (106b) to send commands to drive the drilling tool (106b), and to receive data therefrom.
  • the surface unit (134) is preferably provided with computer facilities for receiving, storing, processing, and analyzing data from the oilfield (100).
  • the surface unit (134) collects data output (135) generated during the drilling operation.
  • Computer facilities, such as those of the surface unit (134) may be positioned at various locations about the oilfield (100) and/or at remote locations.
  • Sensors such as gauges, may be positioned throughout the reservoir, rig, oilfield equipment (such as the downhole tool), or other portions of the oilfield for gathering information about various parameters, such as surface parameters, downhole parameters, and/or operating conditions.
  • These sensors (S) preferably measure oilfield parameters, such as weight on bit, torque on bit, pressures, temperatures, flow rates, compositions and other parameters of the oilfield operation.
  • the information gathered by the sensors (S) may be collected by the surface unit (134) and/or other data collection sources for analysis or other processing.
  • the data collected by the sensors (S) may be used alone or in combination with other data.
  • the data may be collected in a database and all or select portions of the data may be selectively used for analyzing and/or predicting oilfield operations of the current and/or other wellbores.
  • Data outputs from the various sensors (S) positioned about the oilfield may be processed for use.
  • the data may be historical data, real time data, or combinations thereof.
  • the real time data may be used in real time, or stored for later use.
  • the data may also be combined with historical data or other inputs for further analysis.
  • the data may be housed in separate databases, or combined into a single database.
  • the collected data may be used to perform analysis, such as modeling operations.
  • the seismic data output may be used to perform geological, geophysical, reservoir engineering, and/or production simulations.
  • the reservoir, wellbore, surface and/or process data may be used to perform reservoir, wellbore, or other production simulations.
  • the data outputs from the oilfield operation may be generated directly from the sensors (S), or after some preprocessing or modeling. These data outputs may act as inputs for further analysis.
  • the data is collected and stored at the surface unit (134).
  • One or more surface units (134) may be located at the oilfield (100), or linked remotely thereto.
  • the surface unit (134) may be a single unit, or a complex network of units used to perform the necessary data management functions throughout the oilfield (100).
  • the surface unit (134) may be a manual or automatic system.
  • the surface unit (134) may be operated and/or adjusted by a user.
  • the surface unit (134) may be provided with a transceiver ( 137) to allow communications between the surface unit (134) and various portions (or regions) of the oilfield (100) or other locations.
  • the surface unit (134) may also be provided with or functionally linked to a controller for actuating mechanisms at the oilfield (100).
  • the surface unit (134) may then send command signals to the oilfield (100) in response to data received.
  • the surface unit (134) may receive commands via the transceiver or may itself execute commands to the controller.
  • a processor may be provided to analyze the data (locally or remotely) and make the decisions to actuate the controller.
  • the oilfield (100) may be selectively adjusted based on the data collected to optimize fluid recovery rates, or to maximize the longevity of the reservoir and its ultimate production capacity. These adjustments may be made automatically based on computer protocol, or manually by an operator. In some cases, well plans may be adjusted to select optimum operating conditions, or to avoid problems.
  • FIG. 1C depicts a wireline operation being performed by a wireline tool
  • the wireline tool (106c) suspended by the rig (128) and into the wellbore (136) of FIG. IB.
  • the wireline tool (106c) is preferably adapted for deployment into a wellbore (136) for performing well logs, performing downhole tests and/or collecting samples.
  • the wireline tool (106c) may be used to provide another method and apparatus for performing a seismic survey operation.
  • the wireline tool (106c) of FIG. 1C may have an explosive or acoustic energy source (143) that provides electrical signals to the surrounding subterranean formations (102).
  • the wireline tool (106 c) may be operatively linked to, for example, the geophones (118) stored in the computer (122a) of the seismic recording truck (106a) of FIG. IA.
  • the wireline tool (106c) may also provide data to the surface unit (134). As shown data output (135) is generated by the wireline tool (106c) and collected at the surface.
  • the wireline tool (106c) may be positioned at various depths in the wellbore (136) to provide a survey of the subterranean formation.
  • FIG. ID depicts a production operation being performed by a production tool (106d) deployed from a production unit or Christmas tree (129) and into the completed wellbore (136) of FIG.1C for drawing fluid from the downhole reservoirs into the surface facilities (142). Fluid flows from reservoir (104) through perforations in the casing (not shown) and into the production tool (106d) in the wellbore (136) and to the surface facilities (142) via a gathering network (146).
  • Sensors (S), such as gauges, may be positioned about the oilfield to collect data relating to various oilfield operations as described previously. As shown, the sensor (S) may be positioned in the production tool (106d) or associated equipment, such as the Christmas tree, gathering network, surface facilities and/or the production facility, to measure fluid parameters, such as fluid composition, flow rates, pressures, temperatures, and/or other parameters of the production operation.
  • the oilfield may cover a portion of land, sea and/or water locations that hosts one or more wellsites.
  • Production may also include injection wells (not shown) for added recovery.
  • One or more gathering facilities may be operatively connected to one or more of the wellsites for selectively collecting downhole fluids from the wellsite(s).
  • FIGS. IB- ID depict tools used to measure properties of an oilfield (100), it will be appreciated that the tools may be used in connection with non-oilfield operations, such as mines, aquifers, storage or other subterranean facilities. Also, while certain data acquisition tools are depicted, it will be appreciated that various measurement tools capable of sensing parameters, such as seismic two-way travel time, density, resistivity, production rate, etc., of the subterranean formation and/or its geological formations may be used. Various sensors (S) may be located at various positions along the wellbore and/or the monitoring tools to collect and/or monitor the desired data. Other sources of data may also be provided from offsite locations.
  • non-oilfield operations such as mines, aquifers, storage or other subterranean facilities.
  • various measurement tools capable of sensing parameters, such as seismic two-way travel time, density, resistivity, production rate, etc., of the subterranean formation and/or its geological formations may be used.
  • FIGS. IA- ID are intended to provide a brief description of an example of an oilfield usable with the present invention.
  • Part, or all, of the oilfield (100) may be on land and/or sea.
  • the present invention may be utilized with any combination of one or more oilfields (100), one or more processing facilities and one or more wellsites.
  • FIGS. 2A-2D are graphical depictions of data collected by the tools of
  • FIGS. IA-D respectively.
  • FIG. 2A depicts a seismic trace (202) of the subterranean formation of FIG. IA taken by survey tool (106a). The seismic trace measures a two-way response over a period of time.
  • FIG. 2B depicts a core sample (133) taken by the drilling tool (106b). The core test typically provides a graph of the density, resistivity, or other physical property of the core sample (133) over the length of the core. Tests for density and viscosity are often performed on the fluids in the core at varying pressures and temperatures.
  • FIG. 2C depicts a well log (204) of the subterranean formation of FIG. 1C taken by the wireline tool (106c).
  • FIG. 2D depicts a production decline curve (206) of fluid flowing through the subterranean formation of FIG. ID taken by the production tool (106d).
  • the production decline curve (206) typically provides the production rate Q as a function of time t.
  • the respective graphs of FIGS. 2A-2C contain static measurements that describe the physical characteristics of the formation. These measurements may be compared to determine the accuracy of the measurements and/or for checking for errors. In this manner, the plots of each of the respective measurements may be aligned and scaled for comparison and verification of the properties.
  • FIG. 2D provides a dynamic measurement of the fluid properties through the wellbore. As the fluid flows through the wellbore, measurements are taken of fluid properties, such as flow rates, pressures, composition, etc. As described below, the static and dynamic measurements may be used to generate models of the subterranean formation to determine characteristics thereof.
  • FIG. 3 is a schematic view, partially in cross section of an oilfield (300) having data acquisition tools (302a), (302b), (302c), and (302d) positioned at various locations along the oilfield for collecting data of a subterranean formation (304).
  • the data acquisition tools (302a-302d) may be the same as data acquisition tools (106a-106d) of FIG. 1, respectively.
  • the data acquisition tools (302a-302d) generate data plots or measurements (308a- 308d), respectively.
  • Data plots (308a-308c) are examples of static data plots that may be generated by the data acquisition tools (302a-302d), respectively.
  • Static data plot (308a) is a seismic two-way response time and may be the same as the seismic trace (202) of FIG. 2A.
  • Static plot (308b) is core sample data measured from a core sample of the formation (304), similar to the core sample (133) of FIG. 2B.
  • Static data plot (308c) is a logging trace, similar to the well log (204) of FIG. 2C.
  • Data plot (308d) is a dynamic data plot of the fluid flow rate over time, similar to the graph (206) of FIG. 2D.
  • Other data may also be collected, such as historical data, user inputs, economic information, other measurement data, and other parameters of interest.
  • the subterranean formation (304) has a plurality of geological structures
  • the formation has a sandstone layer (306a), a limestone layer (306b), a shale layer (306c), and a sand layer (306d).
  • a fault line (307) extends through the formation.
  • the static data acquisition tools are preferably adapted to measure the formation and detect the characteristics of the geological structures of the formation.
  • each of the measurement devices may be used to measure properties of the formation and/or its underlying structures. While each acquisition tool is shown as being in specific locations along the formation, it will be appreciated that one or more types of measurement may be taken at one or more location across one or more oilfields or other locations for comparison and/or analysis.
  • seismic data displayed in the static data plot (308a) from the data acquisition tool (302a) is used by a geophysicist to determine characteristics of the subterranean formation (304).
  • Core data shown in static plot (308b) and/or log data from the well log (308c) is typically used by a geologist to determine various characteristics of the geological structures of the subterranean formation (304).
  • Production data from the production graph (308d) is typically used by the reservoir engineer to determine fluid flow reservoir characteristics.
  • FIG. 4 shows an oilfield (400) for performing simulation operations.
  • the oilfield has a plurality of wellsites (402) operatively connected to a central processing facility (454).
  • the oilfield configuration of FIG. 4 is not intended to limit the scope of the invention. Part or all of the oilfield may be on land and/or sea. Also, while a single oilfield with a single processing facility and a plurality of wellsites is depicted, any combination of one or more oilfields, one or more processing facilities and one or more wellsites may be present.
  • Each wellsite (402) has equipment that forms a wellbore (436) into the earth.
  • the wellbores extend through subterranean formations (406) including reservoirs (404).
  • These reservoirs (404) contain fluids, such as hydrocarbons.
  • the wellsites draw fluid from the reservoirs and pass them to the processing facilities via surface networks (444).
  • the surface networks (444) have tubing and control mechanisms for controlling the flow of fluids from the wellsite to the processing facility (454).
  • FIG. 5 shows a schematic view of a portion (or region) of the oilfield
  • FIG. 4 depicting a producing wellsite (402) and surface network (444) in detail.
  • the wellsite (402) of FIG. 5 has a wellbore (436) extending into the earth therebelow.
  • FIG. 5 shows an injection wellsite (502) having an injection wellbore (506).
  • Wellbore production equipment (564) extends from a wellhead (566) of wellsite (402) and to the reservoir (404) to draw fluid to the surface.
  • the wellsite (402) is operatively connected to the surface network (444) via a transport line (561). Fluid flows from the reservoir (404), through the wellbore (436), and onto the surface network (444). The fluid then flows from the surface network (444) to the process facilities (454).
  • fluid may be injected through an injection wellbore, such as the wellbore (506) to gain additional amounts of hydrocarbon. Fluid may be injected to sweep hydrocarbons to producing wells and/or to maintain reservoir pressure by balancing extracted hydrocarbons with injected fluid.
  • the wellbore (506) may be a new well drilled specifically to serve as an injection wellbore, or an already existing well that is no longer producing hydrocarbons economically.
  • wellbore injection equipment (514) extends from a wellhead (516) of injection wellsite (502) to inject fluid (e.g., shown as (511) and (512) in FIG.
  • the injection wellsite (502) is operatively connected to an injection transport line (515), which provides the injection fluid to the injection wellsite (502) through the wellhead (516) and down through the well injection equipment (514).
  • the injected fluid may include water, steam, gas (e.g., carbon dioxide), polymer, surfactant, other suitable liquid, or any combinations thereof.
  • gas e.g., carbon dioxide
  • surfactant e.g., shown as (511) in FIG. 5
  • a chemical similar to washing detergents can be injected into a reservoir mixing with some of the hydrocarbons locked in rock pores (e.g., shown as
  • MWAG injection which involves the use of gases such as natural gas ⁇ i.e., naturally occurring mixture of hydrocarbon gases), carbon dioxide, or other suitable gases.
  • the injected gas e.g., natural gas, carbon dioxide, etc.
  • Water e.g., shown as (511) in FIG. 5
  • CHOPS Cold Heavy Oil Production with Sand
  • gas e.g., carbon dioxide
  • surfactant e.g., shown as (511) in FIG. 5
  • a surfactant can be injected into a reservoir mixing with some of the hydrocarbons locked in rock pores (e.g., shown as
  • MWAG injection which involves the use of gases such as natural gas (i.e., naturally occurring mixture of hydrocarbon gases), carbon dioxide, or other suitable gases.
  • the injected gas e.g., natural gas, carbon dioxide, etc.
  • Water e.g., shown as (511) in FIG. 5
  • CHOPS typically refers to a non-thermal primary process for producing heavy oil. In this method, continuous production of sand improves the recovery of heavy oil from the reservoir. In many cases, an artificial lift system is used to lift the oil with sand. Said in another word, CHOPS often involves the deliberate initiation of sand influx into a perforated oil well to produce oil along with the sand. Steam injection facilitates pressure drops in the formation to enhance the movement of heavy cold mixture of sand with oil.
  • the efficacy of the MWAG injection in recovering remaining hydrocarbons from an oilfield depends on careful planning of the injection schedules such as the selection of fluid, the determination of the composition of the fluid to ensure the miscibility, the pumping rate, the switching cycles between different injected fluid, the controlled interface, and capillary forces between different injected fluid, etc.
  • the MWAG injection schedule should be determined considering geological and geo-physical information, such as temperature, pressure, porosity, permeability, composition, etc.
  • the source of the injection fluid, the constraints of the processing facilities and surface network, and market value of oil can all impact the overall performance of the oilfield operation.
  • the efficacy in using steam injection to enhance thermal heavy oil production and/or CHOPS also depends on careful planning of the injection schedules as described above.
  • An integrated simulation method described below can be used, for example, to model the MWAG injection operation and the heavy oil production with steam injection (e.g., CHOPS) operation including various aspects of the oilfield, such as geological, geo-physical, operational, financial, etc.
  • various constraints of the oilfield operation may be considered, such as the network constraints, the processing facility constraints, the fluid source constraints, the reservoir constraints, the market price constraints, the financial constraints, etc.
  • sensors (S) are located about the oilfield
  • the sensors (S) may measure, for example, pressure, temperature, flow rate, composition, and other parameters of the reservoir, wellbore, surface network, process facilities and/or other portions (or regions) of the oilfield operation.
  • These sensors (S) are operatively connected to a surface unit (534) for collecting data therefrom.
  • the surface unit may be, for example, similar to the surface unit (134) ofFIGS. IA-D.
  • One or more surface units (534) may be located at the oilfield (400), or linked remotely thereto.
  • the surface unit (534) may be a single unit, or a complex network of units used to perform the necessary modeling/planning/management functions (e.g., in MWAG injection scheduling or steam injection scheduling for heavy oil production such as CHOPS) throughout the oilfield (400).
  • the surface unit may be a manual or automatic system.
  • the surface unit may be operated and/or adjusted by a user.
  • the surface unit is adapted to receive and store data.
  • the surface unit may also be equipped to communicate with various oilfield equipment. The surface unit may then send command signals to the oilfield in response to data received or modeling performed.
  • the MWAG injection schedule or the steam injection schedule may be adjusted and/or optimized based on modeling results updated according to changing parameters throughout the oilfield, such as geological parameters, geo-physical parameters, network parameters, process facility parameters, injection fluid parameters, market parameters, financial parameters, etc.
  • the surface unit (534) has computer facilities, such as memory (520), controller (522), processor (524), and display unit (526), for managing the data.
  • the data is collected in memory (520), and processed by the processor (524) for analysis.
  • Data may be collected from the oilfield sensors (S) and/or by other sources.
  • oilfield data may be supplemented by historical data collected from other operations, or user inputs.
  • the analyzed data may then be used to make decisions.
  • a transceiver (not shown) may be provided to allow communications between the surface unit (534) and the oilfield (400).
  • the controller (522) may be used to actuate mechanisms at the oilfield (400) via the transceiver and based on these decisions.
  • the oilfield (400) may be selectively adjusted based on the data collected. These adjustments may be made automatically based on computer protocol and/or manually by an operator. In some cases, well plans are adjusted to select optimum operating conditions or to avoid problems.
  • simulators may be used to process the data for modeling various aspects of the oilfield operation.
  • Specific simulators are often used in connection with specific oilfield operations, such as reservoir or wellbore simulation.
  • Data fed into the simulator(s) may be historical data, real time data or combinations thereof. Simulation through one or more of the simulators may be repeated or adjusted based on the data received.
  • the wellsite simulators may include a reservoir simulator (340), a wellbore simulator (342), and a surface network simulator (344).
  • the reservoir simulator (340) solves for hydrocarbon flow through the reservoir rock and into the wellbores.
  • the wellbore simulator (342) and surface network simulator (344) solves for hydrocarbon flow through the wellbore and the surface network (444) of pipelines.
  • some of the simulators may be separate or combined, depending on the available systems,
  • the non- wellsite simulators may include process (346) and economics
  • the processing unit has a process simulator (346).
  • the process simulator (346) models the processing plant (e.g., the process facilities (454)) where the hydrocarbon(s) is/are separated into its constituent components (e.g., methane, ethane, propane, etc.) and prepared for sales.
  • the oilfield (400) is provided with an economics simulator (348).
  • the economics simulator (348) models the costs of part or the entire oilfield (400) throughout a portion or the entire duration of the oilfield operation. Various combinations of these and other oilfield simulators may be provided.
  • FIG. 6 depicts a schematic view of an oilfield simulator (300) for modeling operations of an oilfield (300).
  • This simulator (300) may form part of an overall production system of the oilfield.
  • several simulators of the oilfield are operatively linked as an integrated asset model for modeling integrated operation therebetween.
  • certain simulators may be selectively linked in a desired configuration.
  • FIG. 6 depicts the combination of three reservoir simulators (340a, 340b, 340c), two wellbore simulators (342a, 342b), a surface network simulator (344), a process simulator (346) and an economics simulator (348).
  • a variety of combinations of two or more simulators may be selectively linked to perform integrated simulations.
  • a set of simulators is selected to depict the various sources that affect the flow of fluid through the oilfield.
  • three different reservoir simulators (340a, 340b, 340c), which are provided to depict various levels of approximation in mathematical representation of the reservoir.
  • These reservoir simulators (340a, 340b, 340c) calculate the flow of hydrocarbon(s) from the reservoir and into the wells and the flow of fluid into the reservoir from injection wells.
  • reservoir simulator (340a) is a full reservoir simulation model with increased accuracy, but reduced speed.
  • Reservoir simulator (340b) is a tank model proxy of a reservoir simulator, which typically provides a simplified representation of a reservoir simulation model. This type of reservoir simulator is typically less accurate, but faster to solve.
  • Reservoir simulator (340c) is a lookup table proxy of a reservoir simulator, which is typically even more simplified and faster to solve.
  • FIG. 6 demonstrates that, depending on the desired analysis, various combinations of one or more simulators may be used to perform the overall simulation. Each may have benefits, and the various outcomes may be compared. In the depicted example, some of the simulations can take more than a week to run once. Thus, one or more of the desired reservoir simulators may be selectively included to provide more immediate outputs that may be compared with the more precise simulations that are generated later.
  • the wellbore simulators (342a, 342b) and surface network simulator (344) are integrated into the oilfield simulation adjacent the reservoir simulators (340a, 340b, 340c).
  • Surface network simulator (344) is operatively linked to the wellbore simulators (342a, 342b).
  • These wellbore simulators (342a, 342b) and surface network simulator (344) calculate the flow of hydrocarbons in the well and through the surface pipeline surface network (not shown).
  • the simulators are also used to model injection of fluids into the reservoir.
  • the wellbore simulators (342a, 342b) are selectively linked to the reservoir simulators (340a, 340b, 340c) to provide data flow therebetween, as will be described further below.
  • the process simulator (346) models the activities of, for example, a crude oil & gas processing plant for separation of petroleum into constituent components and creation of sellable products.
  • the process simulator (346) is operatively connected to the surface network simulator (344).
  • the economics simulator (348) is operatively connected to the process simulator (346).
  • a spreadsheet model may optionally prepare the production data from the process simulator (346) for economic analysis.
  • the economics simulator (348) models the economic evaluation at every time step of an integrated asset model.
  • FIG. 6 shows one example of how the economic simulator is connected for performing the integrated simulation, in other examples the economics model can actually be connected to any point in the integrated asset model where oil and gas production forecasts can be generated; from a well in the reservoir simulator, from a well in the network model, from the export node of the network representing the total production of the field, or from separated hydrocarbon component streams in the process plant.
  • the simulators of FIG. 6 depict the simulators operatively linked for data flow therebetween.
  • the simulators are selectively linked to permit data to flow between the desired simulators.
  • the simulators may be configured to share data and/or outputs between the connected simulators. The data and/or outputs received from one simulator may affect the results of other simulators.
  • the production system may be used to link different parts of oilfield operations, such as the reservoir, wellbore, surface, processing, and economics simulators depicted.
  • the simulators may be cross-platform and/or real-time.
  • One or more simulators may be of similar configurations, or provided by different sources that may cause problems in cross- communication.
  • the simulators therefore, are linked in a manner that permits operation therebetween.
  • the simulators may be linked, for example, using reservoir to surface coupling and/or stream/variable based couplings.
  • these couplings link models together so that the models may solve together over the full simulation timeframe. In some cases, the simulators will initially model separately, in preparation for a full simulation.
  • the coupling between simulators preferably permits selective passing of data therebetween.
  • data flows freely between simulators.
  • data flow is restricted or selectively permitted. For example, it may be more time efficient to permit a simulator to complete its simulation process prior to linking to other simulators and receiving additional data therefrom. It may also be desirable to exclude certain simulators if, for example, a defect exists in the simulation.
  • User inputs may be used to provide constraints, alerts, filters, or other operating parameters for the simulators.
  • constraints may be used to provide constraints, alerts, filters, or other operating parameters for the simulators.
  • such restrictions may be passed to other simulators to limit the available parameters for the remainder of the oilfield operation.
  • Simulators are typically linked using couplings, such as generic node/variable couplings or special network couplings.
  • generic node/variable couplings 352a, 352b
  • a generic node/variable coupling 354
  • a generic node/variable coupling 354
  • a generic node/variable coupling 356
  • a generic node/variable coupling 356
  • a generic node/variable coupling 356
  • process simulator 346)
  • economics simulators 348
  • reservoir simulators (340a, 340b) are connected to wellbore simulator (342a) via special network couplings (350a and 350b), respectively.
  • Reservoir simulator (340c) is connected to wellbore simulator (342b) via special network coupling (350c).
  • the special network coupling (350c), such as implicit or explicit couplings, may be used between the reservoir and wellbore simulators to impose accurate hydraulic response from the network on the reservoir. These couplings permit the coupled simulators to model network equipment, such as gas lift valves, pumps, compressor, and chokes. The couplings may also be configured to permit the coupled simulators to take account of flow assurance issues such as wax and hydrate formation.
  • An implicit coupling permits simultaneous solution of the coupled simulators.
  • a coupling can be used to provide reservoir and the wellbore governing equations. In some cases, this may be a faster method for performing the simulations, and provide for sharing of data between the simulators.
  • an implicit coupling between reservoir simulator (340c) and wellbore simulator (342b) provides for simultaneous simulation based on all available data of both simulators.
  • An explicit coupling may be used to solve reservoir and wellbore governing equations sequentially in an iterative process. With the sequential process, one simulator performs its simulation before the other simulator begins its simulation. In this manner, the first simulator can impose boundary conditions onto the next simulator.
  • an explicit coupling (350c) between reservoir simulator (340c) and wellbore simulator (342b) indicates that the reservoir simulator completes its simulation prior to linking to wellbore simulator (342b).
  • wellbore simulator (342b) is impacted by the output of wellbore simulator (340c).
  • reservoir simulator (340c) imposes boundary conditions on the wellbore simulator.
  • the wellbore is then solved and the reservoir and wellbore pressures and flow rates are compared. If the flows and pressure are within a given tolerance, the reservoir and wellbore simulators are considered balanced.
  • the selected couplings may also be tight or loose.
  • a tight coupling provides coupling at a Newton level.
  • the reservoir material balance equations are solved at each non-linear (Newton) iteration.
  • the network is balanced with the reservoir at a prescribed number of Newtons.
  • a reservoir simulator is coupled to a wellbore simulator using tight coupling
  • the system may be balanced using a chosen network balancing method.
  • Reservoir material balance equations are then solved at the first Newton iteration.
  • the wellbore and reservoir simulators are then rebalanced. This process may be repeated as desired.
  • Tight coupling may be used to balance the reservoir and the wellbore at the end of the timestep.
  • the network may then be modelled in reservoir during the coupling process. This may be used to reduce the effect if well interaction in the reservoir is significant.
  • tight coupling may require a high number of network balancing iterations.
  • Loose couplings involve a single reservoir network balance at the start of the timestep. Once a balanced solution has been achieved, the reservoir may complete its timestep without further interaction with the network. This is similar to tight coupling, but with the reservoir simulator initialized to zero. This type of coupling may be used for coupling multiple reservoirs, since two reservoirs may take a different number of Newton iterations to perform the same timestep.
  • the coupling may be positioned in different locations about the wellbore.
  • the reservoir-wellbore simulator coupling may be a bottom-hole, top-hole, or group coupling.
  • the well completion is modelled in the reservoir model from sandface to bottom hole.
  • the well tubing is modelled in the network. This means that an inflow model in the network well is typically ignored.
  • the bottom hole may be used to provide more well accurate modelling (multiphase flow correlations / pressure traverse), and flow assurance (compositional model / temperature variations).
  • the bottom-hole coupling may provide unstable region on well curve that causes convergence issues, involve solving an extra branch per well, require tubing defined in both reservoir and network, and ignore certain completion models.
  • top-hole coupling With top-hole coupling, the well completion and tubing is modelled in the reservoir.
  • the well boundary nodes in the network take account of this.
  • sources or sinks are used to represent wells.
  • Top-hole coupling typically provides less branches in network model, inexpensive well bore lookup in reservoir, and smoothing in the reservoir VLP curve. However, it may lose resolution in the well bore calculation, and may not be compatible with certain network balancing schemes.
  • a reservoir well-group representing a production manifold may be coupled to a source in a network.
  • the integrated simulator may set a common top-hole pressure constraint on the wells, and impose a hydraulic response from the network.
  • a large network may be significantly reduced in size, but resolution may be lost in the network simulation.
  • top-hole pressure may not be a valid constraint in the case of bottom hole coupling; holding pressure constant over a long step results may result in a decline in rate and a pessimistic production forecast; holding rate constant over a long timestep may result in a pressure decline.
  • additional constraints may be included to prevent overly optimistic production forecast, or wells shutting in. While constraints may occur at any coupling, these constraints typically occur along the reservoir/wellbore coupling.
  • the wells rate control could be imposed in the reservoir as a well or group limit. It could also be imposed in the network as a rate limit on a network branch. After the initial period, the well may start to decline. This could be a result of insufficient oil production potential for the well to produce its requirements. In this case, the reservoir may switch the wells control mode from oil to its next most stringent control mode. This may be another rate control (water/gas) or a pressure limit imposed on the well as a result of network balancing.
  • PW minimum reservoir pressure
  • PN network pressure
  • Network balancing may be performed to select the optimum operating conditions. Each time a simulator asks the network to solve, it must decide what boundary conditions to pass to the network. The type of network model and the network balancing strategy chosen by the user determine the basis for this decision.
  • the network type may be automatically determined by the oilfield simulator.
  • the network is determined by considering boundary conditions and additional fluid characterization data that are passed from oilfield simulator to the network.
  • a boundary condition may be specified.
  • black oil production may have a boundary condition for Stock tank rates or Linear IPR (single phase), GOR, and watercut.
  • Compositional production may have a boundary condition for mass rate and mole fractions, or mass IPR, and mole fractions.
  • Water injection may have a boundary condition of stock tank water rate or water injectivity pressure flow relationship.
  • Black oil injection may have a boundary condition of stock tank gas rate or gas injectivity pressure flow relationship.
  • Compositional injection may have a boundary condition of mass rate or mass injectivity pressure flow relationship.
  • Other networks and corresponding boundary conditions may be defined.
  • the network may have further defined types of couplings, such as rate base, fast PI, chord slope, and obey reserve limits.
  • Rate based coupling is the simplest form of coupling a reservoir to a network. This type of coupling specifies rates in the network and imposes pressure limits on the reservoir. With this type of coupling, the oilfield simulator transfers rate-based boundary conditions to the network.
  • an optimization workflow uses the integrated models that combine the reservoir model with the surface facility network model and the process plant model to define the optimum MWAG cycle or the optimum heavy oil production (e.g., CHOPS) with steam injection.
  • the optimum MWAG cycle or the optimum heavy oil production e.g., CHOPS
  • FIG. 7A is a graph (400a) illustrating the case where a reservoir well is coupled to a network well without rate constraint.
  • the reservoir well should produce up to the pressure limit supplied by the hydraulic response of the network model. This requires the network balancing process to iterate to find the intersection of the reservoir inflow curve and the network well performance curve. To achieve this balancing, the following steps may be performed • The reservoir well model is queried for its pressure and flow (Pl and Ql) this give us point 1 on the reservoir inflow curve.
  • the rate, Ql is set as the boundary condition to the network, which solves to find point 2 - the first point on the well curve.
  • Pressure P2 is set as a limit in the reservoir well model which is solved to give point 3.
  • This process may be repeated until the reservoir and network pressure and flow values are within a given tolerance.
  • FIG. 7B illustrates a system where the reservoir well coupled to a network well is rate constrained in the reservoir.
  • the reservoir inflow curve is limited to a specific value - Q Iim i t .
  • the system operates at this limit as long as the pressure constraint imposed on the well does not exceed a maximum threshold denoted by P max .
  • QIimit is set as a constraint in the network.
  • FIG. 8 shows how the fast PI method finds a solution.
  • the fast PI method is a non-iterative network balancing process. This coupling has linear IPR's that are specified in the network, and the rate limits are imposed on the reservoir.
  • the network balancing is a three-step process. These steps are:
  • the method relies on the network to perform the rate allocation. So any rate limits should be imposed at the network level. Because the balancing algorithm sets rates in the reservoir, existing reservoir rate targets and limits are obeyed. In order to impose flow rate constraints on the system, rate constraints are imposed on the network model.
  • the linear IPR for the well is queried. This will be the tangent to the well curve at its current operating pressure and flow rate. This IPR is passed to the network, which solves for point 2. The corresponding flow rate is set in the reservoir.
  • This balancing scheme is non- iterative. The rate from the network is taken as the updated operating point. There is no test for convergence. In some cases, material may be balanced, while pressure may not. It may possible to improve the accuracy of this method by performing fast PI balances at multiple Newton iterations, usually if a single reservoir is coupled. The fast PI coupling is non-iterative, and robust. However, it may prohibit reservoir based well management, and may be inaccurate since only rate is balanced.
  • Figures 9A, 9B, and 9C contain graphs illustrating the chord slope scheme.
  • the chord slope scheme sets a chord slope of rates and PI taken from the reservoir model in the network. This coupling specifies either rates or IPR's in the network and imposes pressure limits on the reservoir. It aims to work with any pre-existing well and group controls in the reservoir models, as wells as imposing network back pressure.
  • the algorithm adapts itself to the reservoir by considering the last two operating points on the reservoir IPR. This means that non-linear behavior in the IPR (e.g. effects of skin factors or well/group constraints) can be passed to the network. To obtain information on how the IPR changes, at least two network balancing iterations are typically performed.
  • FIG. 9A depicts a Network Constrained System.
  • a reservoir simulation containing 20 wells fed into a common manifold (group).
  • the reservoir wells are coupled to a network model.
  • the wells in the reservoir are controlled on bottom hole pressure (no well or group rate control).
  • the network contains the sink pressure specification and a given sink rate limit. In this case, the wells are controlled by the network back-pressure imposed on the reservoir.
  • the boundary condition passed to the network on the first timestep is the PI calculated at the convergence solution at the previous timestep.
  • FIG. 9B depicts a graph of a Reservoir Constrained System.
  • the wells are controlled using the reservoir group control target limit. Underlying wells operate up to an allocated quantity based on their production potential and the group target.
  • the network models are restricted based on the sink pressure. In this case, the wells are controlled by the reservoir well controls - assuming the reservoir has sufficient pressure to support the flow through the network.
  • a Linear PI is constructed using the last two operating points on the IPR.
  • the algorithm detects that points 3 and 5 have the same flowrate - indicating the well is operating under a rate control imposed by the reservoir.
  • FIG. 9C depicts a graph of a wellbore operation with a Reduced Reservoir Pressure. This graph shows a well curve intersecting with an IPR curve, which is significantly flatter than in previous figures. This is meant to illustrate reduced reservoir pressure.
  • the revival limit may be set by the user to avoid excessive iterations.
  • a linear PI is constructed using points 1 and 3. This is passed to the network as a boundary condition.
  • the algorithm will use the last two operating points to construct a PI, or, if they are the same, a constant rate.
  • the PI is constructed using the current operating point and the last flowing operating point.
  • the linear PI is constructed using points 5 and point 1.
  • Another coupling configuration that may be used is the obey reservoir limits. This coupling specifies rates in the network, and imposes rate limits in the reservoir.
  • the well management available in the reservoir simulator is extensive. The aim of this method is to allow a reservoir to be coupled to a network with minimal intervention as a result of network constraints. This may be done to ensure that the reservoir well management controls are obeyed whilst avoiding the well shut-in problems, such as those that may occur with the Chord Slope method.
  • the coupled network may only be pressure specified at the export note.
  • Constant rate boundary condition is sent to the network and it is solved.
  • a relaxation parameter is calculated for the well based on the difference pressure difference.
  • the reservoir well is cut back using the relaxing parameter ( 0 ⁇ r ⁇ l )
  • Steps 1-4 detailed immediately above, are repeated until no well violate the pressure limit imposed by the network.
  • FIG. 10 depicts a method of producing fluids from an oilfield, such as the oilfield of Figure 1. This method involves the selective linking of simulators throughout the oilfield to predict and/or control oilfield operations.
  • Data is gathered from the oilfield operation (Step 1001). In some cases, this data is historical data based on similar oilfield operations, similar geological formations, or applicable scenarios. User inputs may be provided based on known parameters, such as sampling of formation fluid. Data may also be collected from sensors positioned about the oilfield as shown in FIG. 5. Data may be stored in memory and accessed as needed to perform the simulations herein.
  • the method involves selecting simulators for the oilfield (Step 1002).
  • simulators may be selected to define the oilfield simulation, such as the reservoir simulators (340a, 340b, 340c), wellbore simulators (342a, 342b), surface network simulator (344), process simulator (346) and economics simulator (348) of FIG. 6.
  • the reservoir simulator (340a) may include functionality to model fluid injection and/or perform thru-time analysis is selected for modeling MWAG injection operation or the heavy oil production (e.g., CHOPS) with steam injection.
  • the heavy oil production e.g., CHOPS
  • the selected simulators are positioned along a flow path (Step 1004). This brings the oilfield simulation into a process flow diagram format as shown in FIG. 6.
  • the connections are preferably established to provide a sequence for the flow of production through the flow diagram. As shown in FIG. 6, the production fluid flows from reservoir simulator, to wellbore simulator, to surface network simulator to process simulator, and to the economics simulator.
  • Couplings are established between the selected simulators (Step 1006). These couplings are specified according to the type of coupling desired for the specific flow diagram. As shown in FIG. 6, couplings (352a), (352b), (354) and (356) are general node couplings. Couplings (350, 350b, 350c) are special couplings. For example, the coupling may involve coupling a reservoir simulator with functionality to model fluid injection and/or perform thru-time analysis is selected for modeling MWAG injection operation or heavy oil production (e.g., CHOPS) with steam injection. [00128] The coupled simulators are then formatted (Step 1008). For example, the coupled reservoir and wellbore simulators are defined as bottom-hole, top- hole, or grouped couplings. Because the surface network, process and economics simulators are general couplings, no such definition is required.
  • Setup parameters may include, for example, time frame, frequency, display, etc., and be used to determine, for example, start time, end time, and reporting frequency during simulation runs.
  • the oilfield simulator is then performed (Step 1010). As shown in the configuration of FIG. 6, the reservoir simulation will solve first. The simulation model and the well/network model iterate until they come to a common solution for the deliverability of each well within a pre-defined tolerance. The results from the network are then sent to the process simulator, which then solves the plant operations defined therein. The economics simulator is then linked to any model that generates a production forecast.
  • Results and/or reports are generated as desired (Step 1012).
  • status messages and/or results of underlying simulators may be displayed. Interim and/or final results may be selectively generated.
  • the results may be used to adjust changes in the oilfield simulator, for example, in modeling MWAG injection operation or heavy oil production (e.g., CHOPS) with steam injection (Step 1014). If the simulator is not providing results as desired, or if other data suggests a problem, the simulator may be adjusted. For example, the coupling or constraints defined for the simulation may be altered.
  • the oilfield operation for example, the MWAG injection operation or heavy oil production (e.g., CHOPS) with steam injection, may also be adjusted (Step 1016).
  • the simulators may provide information indicating problems at the wellsites that require action.
  • the simulators may also indicate that adjustments in the oilfield operation may be made to improve efficiency, or correct problems.
  • Well management strategy may be adjusted to define different development scenarios to be included in the integrated simulation run.
  • steps of portions or all of the process may be repeated as desired. Repeated steps may be selectively performed until satisfactory results achieved. For example, steps may be repeated after adjustments are made. This may be done to update the simulator and/or to determine the impact of changes made.
  • the data input, coupling, layout, and constraints defined in the simulation provide flexibility to the simulation process. These factors of the various simulators are selected to meet the requirements of the oilfield operation. Any combination of simulators may be selectively linked to create the overall oilfield simulation. The process of linking the simulators may be re-arranged and simulations repeated using different configurations. Depending on the type of coupling and/or the arrangement of simulators, the oilfield simulation may be selected to provide the desired results. Various combinations may be tried and compared to determine the best outcome. Adjustments to the oilfield simulation may be made based on the oilfield, the simulators, the arrangement and other factors. The process may be repeated as desired.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • Evolutionary Computation (AREA)
  • Computer Hardware Design (AREA)
  • Geometry (AREA)
  • Geophysics (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Geophysics And Detection Of Objects (AREA)
PCT/US2008/069031 2007-07-02 2008-07-02 System and method for performing oilfield simulation operations WO2009006526A2 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
BRPI0812761-1A2A BRPI0812761A2 (pt) 2007-07-02 2008-07-02 Método de simulação de operações de um campo petrolífero possuindo pelo menos uma instalação de poço, e mídia passível de leitura por computador
GB0921738.1A GB2464003B (en) 2007-07-02 2008-07-02 System and method for performing oilfield simulation operations
CA2691241A CA2691241C (en) 2007-07-02 2008-07-02 System and method for performing oilfield simulation operations
NO20100016A NO342368B1 (no) 2007-07-02 2010-01-08 System og fremgangsmåte for å utføre simuleringsoperasjoner for oljefelt

Applications Claiming Priority (6)

Application Number Priority Date Filing Date Title
US95820807P 2007-07-02 2007-07-02
US60/958,208 2007-07-02
US11/929,811 2007-10-30
US11/929,921 2007-10-30
US11/929,921 US8352227B2 (en) 2006-10-30 2007-10-30 System and method for performing oilfield simulation operations
US11/929,811 US8818777B2 (en) 2006-10-30 2007-10-30 System and method for performing oilfield simulation operations

Publications (2)

Publication Number Publication Date
WO2009006526A2 true WO2009006526A2 (en) 2009-01-08
WO2009006526A3 WO2009006526A3 (en) 2009-02-19

Family

ID=40226816

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/US2008/069031 WO2009006526A2 (en) 2007-07-02 2008-07-02 System and method for performing oilfield simulation operations

Country Status (5)

Country Link
BR (1) BRPI0812761A2 (pt)
CA (1) CA2691241C (pt)
GB (1) GB2464003B (pt)
NO (1) NO342368B1 (pt)
WO (1) WO2009006526A2 (pt)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013165363A1 (en) 2012-04-30 2013-11-07 Landmark Graphics Corporation System and method for reservoir simulation using on-demand data
US8775141B2 (en) 2007-07-02 2014-07-08 Schlumberger Technology Corporation System and method for performing oilfield simulation operations
US8818777B2 (en) 2006-10-30 2014-08-26 Schlumberger Technology Corporation System and method for performing oilfield simulation operations
CN104405356A (zh) * 2014-11-24 2015-03-11 中国石油大学(北京) 薄层稠油油藏水平井蒸汽驱二维物理模拟实验装置
US9228415B2 (en) 2008-10-06 2016-01-05 Schlumberger Technology Corporation Multidimensional data repository for modeling oilfield operations
WO2016004137A1 (en) * 2014-06-30 2016-01-07 Advantek International Corporation Slurrification and disposal of waste by pressure pumping into a subsurface formation
FR3040223A1 (fr) * 2015-08-21 2017-02-24 Halliburton Energy Services Inc Procede et flux de travaux pour une modelisation precise de formation a proximite d'un champ dans des simulations de puits de forage
US10578766B2 (en) 2013-08-05 2020-03-03 Advantek International Corp. Quantifying a reservoir volume and pump pressure limit
CN111119810A (zh) * 2019-12-17 2020-05-08 东北石油大学 井下精细分注室内综合模拟装置
USRE50180E1 (en) 2022-03-03 2024-10-22 Advantek International Corporation Quantifying a reservoir volume and pump pressure limit

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103590807B (zh) * 2012-08-13 2016-06-08 中国石油天然气集团公司 一种确定稠油热采蒸汽腔形态的方法
WO2024057050A1 (en) * 2022-09-16 2024-03-21 Totalenergies Onetech Process of determining an injection performance of a well when injecting a fluid into a geological formation

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4676313A (en) * 1985-10-30 1987-06-30 Rinaldi Roger E Controlled reservoir production
US6230101B1 (en) * 1999-06-03 2001-05-08 Schlumberger Technology Corporation Simulation method and apparatus
US6892812B2 (en) * 2002-05-21 2005-05-17 Noble Drilling Services Inc. Automated method and system for determining the state of well operations and performing process evaluation
US6980940B1 (en) * 2000-02-22 2005-12-27 Schlumberger Technology Corp. Intergrated reservoir optimization

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4676313A (en) * 1985-10-30 1987-06-30 Rinaldi Roger E Controlled reservoir production
US6230101B1 (en) * 1999-06-03 2001-05-08 Schlumberger Technology Corporation Simulation method and apparatus
US6980940B1 (en) * 2000-02-22 2005-12-27 Schlumberger Technology Corp. Intergrated reservoir optimization
US6892812B2 (en) * 2002-05-21 2005-05-17 Noble Drilling Services Inc. Automated method and system for determining the state of well operations and performing process evaluation

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8818777B2 (en) 2006-10-30 2014-08-26 Schlumberger Technology Corporation System and method for performing oilfield simulation operations
US8775141B2 (en) 2007-07-02 2014-07-08 Schlumberger Technology Corporation System and method for performing oilfield simulation operations
US9228415B2 (en) 2008-10-06 2016-01-05 Schlumberger Technology Corporation Multidimensional data repository for modeling oilfield operations
EP2845142A4 (en) * 2012-04-30 2016-04-20 Landmark Graphics Corp SYSTEM AND METHOD FOR RESERVOIR SIMULATION WITH EFFECTIVE USE OF DATA
WO2013165363A1 (en) 2012-04-30 2013-11-07 Landmark Graphics Corporation System and method for reservoir simulation using on-demand data
US10495769B2 (en) 2012-04-30 2019-12-03 Landmark Graphics Corporation System and method for reservoir simulation using on-demand data
US10578766B2 (en) 2013-08-05 2020-03-03 Advantek International Corp. Quantifying a reservoir volume and pump pressure limit
WO2016004137A1 (en) * 2014-06-30 2016-01-07 Advantek International Corporation Slurrification and disposal of waste by pressure pumping into a subsurface formation
US10633953B2 (en) 2014-06-30 2020-04-28 Advantek International Corporation Slurrification and disposal of waste by pressure pumping into a subsurface formation
CN104405356A (zh) * 2014-11-24 2015-03-11 中国石油大学(北京) 薄层稠油油藏水平井蒸汽驱二维物理模拟实验装置
FR3040223A1 (fr) * 2015-08-21 2017-02-24 Halliburton Energy Services Inc Procede et flux de travaux pour une modelisation precise de formation a proximite d'un champ dans des simulations de puits de forage
CN111119810A (zh) * 2019-12-17 2020-05-08 东北石油大学 井下精细分注室内综合模拟装置
CN111119810B (zh) * 2019-12-17 2020-09-22 东北石油大学 井下精细分注室内综合模拟装置
USRE50180E1 (en) 2022-03-03 2024-10-22 Advantek International Corporation Quantifying a reservoir volume and pump pressure limit

Also Published As

Publication number Publication date
WO2009006526A3 (en) 2009-02-19
NO342368B1 (no) 2018-05-14
NO20100016L (no) 2010-03-26
GB2464003B (en) 2013-11-27
BRPI0812761A2 (pt) 2014-11-25
GB0921738D0 (en) 2010-01-27
CA2691241A1 (en) 2009-01-08
GB2464003A (en) 2010-04-07
CA2691241C (en) 2014-03-25

Similar Documents

Publication Publication Date Title
US8775141B2 (en) System and method for performing oilfield simulation operations
US8352227B2 (en) System and method for performing oilfield simulation operations
CA2691241C (en) System and method for performing oilfield simulation operations
CA2707482C (en) A method for performing oilfield production operations
US8214186B2 (en) Oilfield emulator
EP2948618B1 (en) Constrained optimization for well placement planning
US8670966B2 (en) Methods and systems for performing oilfield production operations
US8046314B2 (en) Apparatus, method and system for stochastic workflow in oilfield operations
US20160154907A1 (en) Integrated network asset modeling
CA2693486C (en) Valuing future information under uncertainty
CA2680526C (en) System and method for oilfield production operations
NO344286B1 (no) Brønnmodellering knyttet til ekstraksjon av hydrokarboner fra undergrunnsformasjoner
WO2008106476A9 (en) System and method for waterflood performance monitoring
CA2733841C (en) System and method for simulating oilfield operations
CA2671367C (en) A method for performing oilfield production operations
Nurliana binti Alias A STUDY OF PRODUCTION OPTIMIZATION USING PROSPER

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 08781285

Country of ref document: EP

Kind code of ref document: A2

ENP Entry into the national phase

Ref document number: 0921738

Country of ref document: GB

Kind code of ref document: A

Free format text: PCT FILING DATE = 20080702

WWE Wipo information: entry into national phase

Ref document number: 0921738.1

Country of ref document: GB

WWE Wipo information: entry into national phase

Ref document number: 2691241

Country of ref document: CA

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 08781285

Country of ref document: EP

Kind code of ref document: A2

ENP Entry into the national phase

Ref document number: PI0812761

Country of ref document: BR

Kind code of ref document: A2

Effective date: 20091229