WO2008152345A3 - Multi-zone formation fluid evaluation system and method for use of same - Google Patents

Multi-zone formation fluid evaluation system and method for use of same Download PDF

Info

Publication number
WO2008152345A3
WO2008152345A3 PCT/GB2008/001603 GB2008001603W WO2008152345A3 WO 2008152345 A3 WO2008152345 A3 WO 2008152345A3 GB 2008001603 W GB2008001603 W GB 2008001603W WO 2008152345 A3 WO2008152345 A3 WO 2008152345A3
Authority
WO
WIPO (PCT)
Prior art keywords
evaluation system
fluid
zone
same
formation fluid
Prior art date
Application number
PCT/GB2008/001603
Other languages
French (fr)
Other versions
WO2008152345A2 (en
Inventor
Stewart Hampton Fowler
Curtis Edgar Wendler
Travis W Cavender
Original Assignee
Halliburton Energy Serv Inc
Curtis Philip Anthony
Stewart Hampton Fowler
Curtis Edgar Wendler
Travis W Cavender
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Halliburton Energy Serv Inc, Curtis Philip Anthony, Stewart Hampton Fowler, Curtis Edgar Wendler, Travis W Cavender filed Critical Halliburton Energy Serv Inc
Publication of WO2008152345A2 publication Critical patent/WO2008152345A2/en
Publication of WO2008152345A3 publication Critical patent/WO2008152345A3/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/12Packers; Plugs
    • E21B33/124Units with longitudinally-spaced plugs for isolating the intermediate space
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/12Methods or apparatus for controlling the flow of the obtained fluid to or in wells
    • E21B43/121Lifting well fluids
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/14Obtaining from a multiple-zone well

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

A formation fluid evaluation system (100) interconnected within a tubular string (118) for operation in a wellbore (102) having multiple zones (106, 108, 110). The evaluation system (100) includes a pair of straddle packers (120, 122) that isolates one zone (108) of the multiple zones (106, 108, 110), a test valve (124) disposed between the straddle packers (120, 122) and an upper packer (126) positioned uphole of the uppermost zone (106) of the multiple zones (106, 108, 110). A fluid lift assembly (128) is position uphole of the upper packer (126). The fluid lift assembly (128) is operable to draw fluid (134) from the isolated zone (108) into the tubular string (118) through the test valve (124). A formation evaluation instrument (136) is disposed within the tubular string (118) and determines a characteristic of the fluid (134) received from the isolated zone (108).
PCT/GB2008/001603 2007-06-11 2008-05-09 Multi-zone formation fluid evaluation system and method for use of same WO2008152345A2 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US11/811,761 US20080302529A1 (en) 2007-06-11 2007-06-11 Multi-zone formation fluid evaluation system and method for use of same
US11/811,761 2007-06-11

Publications (2)

Publication Number Publication Date
WO2008152345A2 WO2008152345A2 (en) 2008-12-18
WO2008152345A3 true WO2008152345A3 (en) 2009-02-05

Family

ID=39673211

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/GB2008/001603 WO2008152345A2 (en) 2007-06-11 2008-05-09 Multi-zone formation fluid evaluation system and method for use of same

Country Status (3)

Country Link
US (1) US20080302529A1 (en)
AR (1) AR066745A1 (en)
WO (1) WO2008152345A2 (en)

Families Citing this family (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7849920B2 (en) * 2007-12-20 2010-12-14 Schlumberger Technology Corporation System and method for optimizing production in a well
US8297354B2 (en) 2008-04-15 2012-10-30 Schlumberger Technology Corporation Tool and method for determining formation parameter
CA2721376C (en) 2008-04-15 2016-12-13 Schlumberger Canada Limited Formation treatment evaluation
US20090260807A1 (en) * 2008-04-18 2009-10-22 Schlumberger Technology Corporation Selective zonal testing using a coiled tubing deployed submersible pump
WO2011044012A1 (en) * 2009-10-05 2011-04-14 Halliburton Energy Services, Inc. Single-assembly system and method for one-trip drilling, casing, cementing and perforating
WO2011043890A2 (en) * 2009-10-05 2011-04-14 Schlumberger Canada Limited Formation testing
US9540921B2 (en) * 2011-09-20 2017-01-10 Saudi Arabian Oil Company Dual purpose observation and production well
US9249660B2 (en) * 2011-11-28 2016-02-02 Schlumberger Technology Corporation Formation fluid sampling
RU2495235C1 (en) * 2012-03-06 2013-10-10 Общество с ограниченной ответственностью Научно-производственная фирма "Пакер" Method and device for controlled pumping down to formations
US9181799B1 (en) * 2012-06-21 2015-11-10 The United States of America, as represented by the Secretary of the Department of the Interior Fluid sampling system
US9945203B2 (en) * 2013-01-28 2018-04-17 Schlumberger Technology Corporation Single trip completion system and method
JP6336567B2 (en) * 2013-04-05 2018-06-06 カー—バー インベストメンツ インコーポレイテッドCar−Ber Investments Inc. Apparatus and method for separating part of riser pipe lumen during riser refurbishment process
RU2610484C9 (en) * 2015-05-27 2017-04-03 Общество с ограниченной ответственностью Научно-производственная фирма "Пакер" Method and device for adjustable injection of fluid to layers with automated measuring of process parameters
US20170051605A1 (en) * 2015-08-18 2017-02-23 Tech Flo Consulting, Llc Method and Apparatus for Evaluating the Potential Effectiveness of Refracing a Well
RU2630320C1 (en) * 2016-07-27 2017-09-07 Публичное акционерное общество "Татнефть" имени В.Д. Шашина Method for adjustable liquid injection in production formation
RU2634319C1 (en) * 2016-08-15 2017-10-25 Общество с ограниченной ответственностью Научно-производственная фирма "Пакер" Device for controlled injection of water into formation
RU2634317C1 (en) * 2016-08-18 2017-10-25 Общество с ограниченной ответственностью Научно-производственная фирма "Пакер" Method of controlled injection of liquid through formation (versions)
RU2636842C1 (en) * 2017-01-09 2017-11-28 Ильдар Амирович Сулейманов Method and arrangement for controlled injection of liquid through formations
RU2678745C1 (en) * 2017-12-28 2019-01-31 Публичное акционерное общество "Татнефть" имени В.Д. Шашина Method of operation of an injection well of a small diameter with a single lift two-packer arrangement
RU2679406C1 (en) * 2018-04-19 2019-02-08 Общество с ограниченной ответственностью Научно-производственная фирма "Пакер" Method of controlled pumping down to formations and device for its implementation
CN109209365A (en) * 2018-08-16 2019-01-15 宋协翠 A kind of separate-layer production string underground oil sampling device and application method
CN109209364B (en) * 2018-08-16 2022-10-28 宋协翠 Underground oil sampling device for layered oil production pipe column
CN111155992B (en) * 2018-11-07 2023-05-26 中国石油天然气股份有限公司 Multi-layer combined oil testing device and method
RU2766479C1 (en) * 2021-06-17 2022-03-15 Публичное акционерное общество «Татнефть» имени В.Д. Шашина Method of simultaneous-separate operation of injection well

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4838079A (en) * 1987-05-20 1989-06-13 Harris Richard K Multi-channel pipe for monitoring groundwater
US4898236A (en) * 1986-03-07 1990-02-06 Downhole Systems Technology Canada Drill stem testing system
US5934371A (en) * 1995-02-09 1999-08-10 Baker Hughes Incorporated Pressure test method for permanent downhole wells and apparatus therefore
WO2007039836A2 (en) * 2005-09-01 2007-04-12 Schlumberger Canada Limited Methods, systems and appartus for coiled tubing testing

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2609878A (en) * 1946-04-27 1952-09-09 Halliburton Oil Well Cementing Multiple zone testing
US3239666A (en) * 1962-10-17 1966-03-08 Pan American Petroleum Corp Production of hydrocarbons from multizone wells
US5482119A (en) * 1994-09-30 1996-01-09 Halliburton Company Multi-mode well tool with hydraulic bypass assembly
DE69636665T2 (en) * 1995-12-26 2007-10-04 Halliburton Co., Dallas Apparatus and method for early assessment and maintenance of a well
US5813460A (en) * 1996-06-03 1998-09-29 Halliburton Energy Services, Inc. Formation evaluation tool and method for use of the same
AU2001286512A1 (en) * 2000-08-31 2002-03-13 Halliburton Energy Services, Inc. Multi zone isolation tool and method for subterranean wells
US7004252B2 (en) * 2003-10-14 2006-02-28 Schlumberger Technology Corporation Multiple zone testing system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4898236A (en) * 1986-03-07 1990-02-06 Downhole Systems Technology Canada Drill stem testing system
US4838079A (en) * 1987-05-20 1989-06-13 Harris Richard K Multi-channel pipe for monitoring groundwater
US5934371A (en) * 1995-02-09 1999-08-10 Baker Hughes Incorporated Pressure test method for permanent downhole wells and apparatus therefore
WO2007039836A2 (en) * 2005-09-01 2007-04-12 Schlumberger Canada Limited Methods, systems and appartus for coiled tubing testing

Also Published As

Publication number Publication date
AR066745A1 (en) 2009-09-09
US20080302529A1 (en) 2008-12-11
WO2008152345A2 (en) 2008-12-18

Similar Documents

Publication Publication Date Title
WO2008152345A3 (en) Multi-zone formation fluid evaluation system and method for use of same
US8127845B2 (en) Methods and systems for completing multi-zone openhole formations
US7814981B2 (en) Fracture valve and equalizer system and method
WO2012048144A3 (en) Downhole tools and methods for selectively accessing a tubular annulus of a wellbore
US7347275B2 (en) Apparatus and method to detect actuation of a flow control device
WO2006133351A3 (en) Method and apparatus for continuously injecting fluid in a wellbore while maintaining safety valve operation
WO2014049360A3 (en) Well isolation
WO2009134669A3 (en) Hydrocarbon recovery testing method
WO2014028613A3 (en) Managed pressure drilling system having well control mode
CA2571149A1 (en) Downhole fluid communication apparatus and method
US8418768B2 (en) Bypass gaslift system, apparatus, and method for producing a multiple zones well
CA2509604A1 (en) Downhole formation testing tool
CA2582469A1 (en) Downhole safety valve apparatus and method
US8668018B2 (en) Selective dart system for actuating downhole tools and methods of using same
GB2506809A (en) Multi-zone fracturing completion
WO2013096361A3 (en) Inflatable packer element for use with a drill bit sub
WO2015042408A3 (en) Use of downhole isolation valve to sense annulus pressure
SA521422447B1 (en) Flow testing wellbores while drilling
CA2523768A1 (en) Method and apparatus for testing and treatment of a completed well with production tubing in place
DE602006010226D1 (en) 2D borehole test with smart plug sensors
WO2010093920A3 (en) Bi-directional flow and distributed temperature sensing in subterranean wells
AU2012202988B2 (en) Velocity Strings
WO2001027432A3 (en) Methods and apparatus for making measurements on fluids produced from underground formations
AU2014263103B2 (en) Dual barrier open water completion
EP4006300A1 (en) Multiple setting and unsetting of inflatable well packer

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 08750543

Country of ref document: EP

Kind code of ref document: A2

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 08750543

Country of ref document: EP

Kind code of ref document: A2