WO2008152345A3 - Multi-zone formation fluid evaluation system and method for use of same - Google Patents
Multi-zone formation fluid evaluation system and method for use of same Download PDFInfo
- Publication number
- WO2008152345A3 WO2008152345A3 PCT/GB2008/001603 GB2008001603W WO2008152345A3 WO 2008152345 A3 WO2008152345 A3 WO 2008152345A3 GB 2008001603 W GB2008001603 W GB 2008001603W WO 2008152345 A3 WO2008152345 A3 WO 2008152345A3
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- evaluation system
- fluid
- zone
- same
- formation fluid
- Prior art date
Links
- 239000012530 fluid Substances 0.000 title abstract 6
- 238000011156 evaluation Methods 0.000 title abstract 4
- 230000015572 biosynthetic process Effects 0.000 title abstract 3
- 238000000034 method Methods 0.000 title 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/12—Packers; Plugs
- E21B33/124—Units with longitudinally-spaced plugs for isolating the intermediate space
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/12—Methods or apparatus for controlling the flow of the obtained fluid to or in wells
- E21B43/121—Lifting well fluids
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/14—Obtaining from a multiple-zone well
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
A formation fluid evaluation system (100) interconnected within a tubular string (118) for operation in a wellbore (102) having multiple zones (106, 108, 110). The evaluation system (100) includes a pair of straddle packers (120, 122) that isolates one zone (108) of the multiple zones (106, 108, 110), a test valve (124) disposed between the straddle packers (120, 122) and an upper packer (126) positioned uphole of the uppermost zone (106) of the multiple zones (106, 108, 110). A fluid lift assembly (128) is position uphole of the upper packer (126). The fluid lift assembly (128) is operable to draw fluid (134) from the isolated zone (108) into the tubular string (118) through the test valve (124). A formation evaluation instrument (136) is disposed within the tubular string (118) and determines a characteristic of the fluid (134) received from the isolated zone (108).
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US11/811,761 US20080302529A1 (en) | 2007-06-11 | 2007-06-11 | Multi-zone formation fluid evaluation system and method for use of same |
US11/811,761 | 2007-06-11 |
Publications (2)
Publication Number | Publication Date |
---|---|
WO2008152345A2 WO2008152345A2 (en) | 2008-12-18 |
WO2008152345A3 true WO2008152345A3 (en) | 2009-02-05 |
Family
ID=39673211
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/GB2008/001603 WO2008152345A2 (en) | 2007-06-11 | 2008-05-09 | Multi-zone formation fluid evaluation system and method for use of same |
Country Status (3)
Country | Link |
---|---|
US (1) | US20080302529A1 (en) |
AR (1) | AR066745A1 (en) |
WO (1) | WO2008152345A2 (en) |
Families Citing this family (24)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7849920B2 (en) * | 2007-12-20 | 2010-12-14 | Schlumberger Technology Corporation | System and method for optimizing production in a well |
US8297354B2 (en) | 2008-04-15 | 2012-10-30 | Schlumberger Technology Corporation | Tool and method for determining formation parameter |
CA2721376C (en) | 2008-04-15 | 2016-12-13 | Schlumberger Canada Limited | Formation treatment evaluation |
US20090260807A1 (en) * | 2008-04-18 | 2009-10-22 | Schlumberger Technology Corporation | Selective zonal testing using a coiled tubing deployed submersible pump |
WO2011044012A1 (en) * | 2009-10-05 | 2011-04-14 | Halliburton Energy Services, Inc. | Single-assembly system and method for one-trip drilling, casing, cementing and perforating |
WO2011043890A2 (en) * | 2009-10-05 | 2011-04-14 | Schlumberger Canada Limited | Formation testing |
US9540921B2 (en) * | 2011-09-20 | 2017-01-10 | Saudi Arabian Oil Company | Dual purpose observation and production well |
US9249660B2 (en) * | 2011-11-28 | 2016-02-02 | Schlumberger Technology Corporation | Formation fluid sampling |
RU2495235C1 (en) * | 2012-03-06 | 2013-10-10 | Общество с ограниченной ответственностью Научно-производственная фирма "Пакер" | Method and device for controlled pumping down to formations |
US9181799B1 (en) * | 2012-06-21 | 2015-11-10 | The United States of America, as represented by the Secretary of the Department of the Interior | Fluid sampling system |
US9945203B2 (en) * | 2013-01-28 | 2018-04-17 | Schlumberger Technology Corporation | Single trip completion system and method |
JP6336567B2 (en) * | 2013-04-05 | 2018-06-06 | カー—バー インベストメンツ インコーポレイテッドCar−Ber Investments Inc. | Apparatus and method for separating part of riser pipe lumen during riser refurbishment process |
RU2610484C9 (en) * | 2015-05-27 | 2017-04-03 | Общество с ограниченной ответственностью Научно-производственная фирма "Пакер" | Method and device for adjustable injection of fluid to layers with automated measuring of process parameters |
US20170051605A1 (en) * | 2015-08-18 | 2017-02-23 | Tech Flo Consulting, Llc | Method and Apparatus for Evaluating the Potential Effectiveness of Refracing a Well |
RU2630320C1 (en) * | 2016-07-27 | 2017-09-07 | Публичное акционерное общество "Татнефть" имени В.Д. Шашина | Method for adjustable liquid injection in production formation |
RU2634319C1 (en) * | 2016-08-15 | 2017-10-25 | Общество с ограниченной ответственностью Научно-производственная фирма "Пакер" | Device for controlled injection of water into formation |
RU2634317C1 (en) * | 2016-08-18 | 2017-10-25 | Общество с ограниченной ответственностью Научно-производственная фирма "Пакер" | Method of controlled injection of liquid through formation (versions) |
RU2636842C1 (en) * | 2017-01-09 | 2017-11-28 | Ильдар Амирович Сулейманов | Method and arrangement for controlled injection of liquid through formations |
RU2678745C1 (en) * | 2017-12-28 | 2019-01-31 | Публичное акционерное общество "Татнефть" имени В.Д. Шашина | Method of operation of an injection well of a small diameter with a single lift two-packer arrangement |
RU2679406C1 (en) * | 2018-04-19 | 2019-02-08 | Общество с ограниченной ответственностью Научно-производственная фирма "Пакер" | Method of controlled pumping down to formations and device for its implementation |
CN109209365A (en) * | 2018-08-16 | 2019-01-15 | 宋协翠 | A kind of separate-layer production string underground oil sampling device and application method |
CN109209364B (en) * | 2018-08-16 | 2022-10-28 | 宋协翠 | Underground oil sampling device for layered oil production pipe column |
CN111155992B (en) * | 2018-11-07 | 2023-05-26 | 中国石油天然气股份有限公司 | Multi-layer combined oil testing device and method |
RU2766479C1 (en) * | 2021-06-17 | 2022-03-15 | Публичное акционерное общество «Татнефть» имени В.Д. Шашина | Method of simultaneous-separate operation of injection well |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4838079A (en) * | 1987-05-20 | 1989-06-13 | Harris Richard K | Multi-channel pipe for monitoring groundwater |
US4898236A (en) * | 1986-03-07 | 1990-02-06 | Downhole Systems Technology Canada | Drill stem testing system |
US5934371A (en) * | 1995-02-09 | 1999-08-10 | Baker Hughes Incorporated | Pressure test method for permanent downhole wells and apparatus therefore |
WO2007039836A2 (en) * | 2005-09-01 | 2007-04-12 | Schlumberger Canada Limited | Methods, systems and appartus for coiled tubing testing |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2609878A (en) * | 1946-04-27 | 1952-09-09 | Halliburton Oil Well Cementing | Multiple zone testing |
US3239666A (en) * | 1962-10-17 | 1966-03-08 | Pan American Petroleum Corp | Production of hydrocarbons from multizone wells |
US5482119A (en) * | 1994-09-30 | 1996-01-09 | Halliburton Company | Multi-mode well tool with hydraulic bypass assembly |
DE69636665T2 (en) * | 1995-12-26 | 2007-10-04 | Halliburton Co., Dallas | Apparatus and method for early assessment and maintenance of a well |
US5813460A (en) * | 1996-06-03 | 1998-09-29 | Halliburton Energy Services, Inc. | Formation evaluation tool and method for use of the same |
AU2001286512A1 (en) * | 2000-08-31 | 2002-03-13 | Halliburton Energy Services, Inc. | Multi zone isolation tool and method for subterranean wells |
US7004252B2 (en) * | 2003-10-14 | 2006-02-28 | Schlumberger Technology Corporation | Multiple zone testing system |
-
2007
- 2007-06-11 US US11/811,761 patent/US20080302529A1/en not_active Abandoned
-
2008
- 2008-05-09 WO PCT/GB2008/001603 patent/WO2008152345A2/en active Application Filing
- 2008-05-28 AR ARP080102238A patent/AR066745A1/en unknown
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4898236A (en) * | 1986-03-07 | 1990-02-06 | Downhole Systems Technology Canada | Drill stem testing system |
US4838079A (en) * | 1987-05-20 | 1989-06-13 | Harris Richard K | Multi-channel pipe for monitoring groundwater |
US5934371A (en) * | 1995-02-09 | 1999-08-10 | Baker Hughes Incorporated | Pressure test method for permanent downhole wells and apparatus therefore |
WO2007039836A2 (en) * | 2005-09-01 | 2007-04-12 | Schlumberger Canada Limited | Methods, systems and appartus for coiled tubing testing |
Also Published As
Publication number | Publication date |
---|---|
AR066745A1 (en) | 2009-09-09 |
US20080302529A1 (en) | 2008-12-11 |
WO2008152345A2 (en) | 2008-12-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2008152345A3 (en) | Multi-zone formation fluid evaluation system and method for use of same | |
US8127845B2 (en) | Methods and systems for completing multi-zone openhole formations | |
US7814981B2 (en) | Fracture valve and equalizer system and method | |
WO2012048144A3 (en) | Downhole tools and methods for selectively accessing a tubular annulus of a wellbore | |
US7347275B2 (en) | Apparatus and method to detect actuation of a flow control device | |
WO2006133351A3 (en) | Method and apparatus for continuously injecting fluid in a wellbore while maintaining safety valve operation | |
WO2014049360A3 (en) | Well isolation | |
WO2009134669A3 (en) | Hydrocarbon recovery testing method | |
WO2014028613A3 (en) | Managed pressure drilling system having well control mode | |
CA2571149A1 (en) | Downhole fluid communication apparatus and method | |
US8418768B2 (en) | Bypass gaslift system, apparatus, and method for producing a multiple zones well | |
CA2509604A1 (en) | Downhole formation testing tool | |
CA2582469A1 (en) | Downhole safety valve apparatus and method | |
US8668018B2 (en) | Selective dart system for actuating downhole tools and methods of using same | |
GB2506809A (en) | Multi-zone fracturing completion | |
WO2013096361A3 (en) | Inflatable packer element for use with a drill bit sub | |
WO2015042408A3 (en) | Use of downhole isolation valve to sense annulus pressure | |
SA521422447B1 (en) | Flow testing wellbores while drilling | |
CA2523768A1 (en) | Method and apparatus for testing and treatment of a completed well with production tubing in place | |
DE602006010226D1 (en) | 2D borehole test with smart plug sensors | |
WO2010093920A3 (en) | Bi-directional flow and distributed temperature sensing in subterranean wells | |
AU2012202988B2 (en) | Velocity Strings | |
WO2001027432A3 (en) | Methods and apparatus for making measurements on fluids produced from underground formations | |
AU2014263103B2 (en) | Dual barrier open water completion | |
EP4006300A1 (en) | Multiple setting and unsetting of inflatable well packer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 08750543 Country of ref document: EP Kind code of ref document: A2 |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 08750543 Country of ref document: EP Kind code of ref document: A2 |