WO2008100267A2 - Steam generator mapping system - Google Patents

Steam generator mapping system Download PDF

Info

Publication number
WO2008100267A2
WO2008100267A2 PCT/US2007/013187 US2007013187W WO2008100267A2 WO 2008100267 A2 WO2008100267 A2 WO 2008100267A2 US 2007013187 W US2007013187 W US 2007013187W WO 2008100267 A2 WO2008100267 A2 WO 2008100267A2
Authority
WO
WIPO (PCT)
Prior art keywords
steam generator
eddy current
deposit
current signal
calibration standard
Prior art date
Application number
PCT/US2007/013187
Other languages
French (fr)
Other versions
WO2008100267A3 (en
Inventor
Joseph R. Wyatt
John Carroll Griffith
Victor Newman
Jeffrey M. Fleck
Original Assignee
Areva Np Inc.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Areva Np Inc. filed Critical Areva Np Inc.
Priority to CN2007800236262A priority Critical patent/CN101490501B/en
Priority to ES07872521.5T priority patent/ES2555377T3/en
Priority to BRPI0714013A priority patent/BRPI0714013A2/en
Priority to KR1020087031417A priority patent/KR101316255B1/en
Priority to EP07872521.5A priority patent/EP2038604B1/en
Priority to JP2009519437A priority patent/JP2009543094A/en
Publication of WO2008100267A2 publication Critical patent/WO2008100267A2/en
Priority to ZA2008/09920A priority patent/ZA200809920B/en
Publication of WO2008100267A3 publication Critical patent/WO2008100267A3/en

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01BMEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
    • G01B7/00Measuring arrangements characterised by the use of electric or magnetic techniques
    • G01B7/02Measuring arrangements characterised by the use of electric or magnetic techniques for measuring length, width or thickness
    • G01B7/06Measuring arrangements characterised by the use of electric or magnetic techniques for measuring length, width or thickness for measuring thickness
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01BMEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
    • G01B21/00Measuring arrangements or details thereof, where the measuring technique is not covered by the other groups of this subclass, unspecified or not relevant
    • G01B21/02Measuring arrangements or details thereof, where the measuring technique is not covered by the other groups of this subclass, unspecified or not relevant for measuring length, width, or thickness
    • G01B21/04Measuring arrangements or details thereof, where the measuring technique is not covered by the other groups of this subclass, unspecified or not relevant for measuring length, width, or thickness by measuring coordinates of points
    • G01B21/042Calibration or calibration artifacts
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01BMEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
    • G01B7/00Measuring arrangements characterised by the use of electric or magnetic techniques
    • G01B7/02Measuring arrangements characterised by the use of electric or magnetic techniques for measuring length, width or thickness
    • G01B7/06Measuring arrangements characterised by the use of electric or magnetic techniques for measuring length, width or thickness for measuring thickness
    • G01B7/10Measuring arrangements characterised by the use of electric or magnetic techniques for measuring length, width or thickness for measuring thickness using magnetic means, e.g. by measuring change of reluctance
    • G01B7/105Measuring arrangements characterised by the use of electric or magnetic techniques for measuring length, width or thickness for measuring thickness using magnetic means, e.g. by measuring change of reluctance for measuring thickness of coating
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N17/00Investigating resistance of materials to the weather, to corrosion, or to light
    • G01N17/008Monitoring fouling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F17/00Digital computing or data processing equipment or methods, specially adapted for specific functions
    • GPHYSICS
    • G21NUCLEAR PHYSICS; NUCLEAR ENGINEERING
    • G21CNUCLEAR REACTORS
    • G21C17/00Monitoring; Testing ; Maintaining
    • G21C17/02Devices or arrangements for monitoring coolant or moderator
    • G21C17/032Reactor-coolant flow measuring or monitoring
    • GPHYSICS
    • G21NUCLEAR PHYSICS; NUCLEAR ENGINEERING
    • G21CNUCLEAR REACTORS
    • G21C19/00Arrangements for treating, for handling, or for facilitating the handling of, fuel or other materials which are used within the reactor, e.g. within its pressure vessel
    • G21C19/20Arrangements for introducing objects into the pressure vessel; Arrangements for handling objects within the pressure vessel; Arrangements for removing objects from the pressure vessel
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin
    • Y02E30/30Nuclear fission reactors

Definitions

  • the present invention relates to steam generators. More specifically, the present invention provides a steam generator deposit mapping system and methodology.
  • Nuclear steam generators used in pressurized water reactors are subject to the accumulation of feedwater impurities. Although the feedwater is maintained at a high level of purity, minute concentrations of corrosion products and/or feedwater impurities may be concentrated in the flow stream, consequently leading to buildup of these materials within the steam generator as the water is converted into steam. These deposits will eventually degrade the thermal hydraulic performance of the component.
  • the thickness of the deposits, as well as the locations of the deposits must be determined such that removal techniques may be implemented.
  • visual inspections and eddy current inspections are utilized to ascertain locations and approximate thickness of material. These techniques, however, are prone to error.
  • visual inspections introduce a significant radiological risk to workers if the steam generator is connected to a nuclear power generation system.
  • the methodology determines the thickness and location of deposits in a steam generator.
  • the methodology comprises the steps of creating a calibration standard having at least two rings of deposit material, subjecting the calibration standard to an eddy current signal, wherein an amplitude of the signal reflected from the calibration standard is used to obtain a polynomial equation fit of the reflected eddy current signals to actual thickness of the rings, obtaining a steam generator with tubes, initiating an eddy current signal into the tubes of the steam generator, detecting and recording reflections of the eddy current signal initiated into the tubes of the steam generator, and determining a thickness of the deposits in the steam generator from the recorded reflections of the eddy current signal and the fourth order polynomial equation.
  • the methodology may be performed such that the eddy current signal is created by a bobbin coil probe.
  • the method may also be accomplished such that the polynomial equation is a fourth order equation.
  • the method also may be accomplished such that multiple signals are input into the calibration standard and reflected signals are detected and processed to obtain the polynomial equation. Additionally, multiple reflected signals may be passed through a culling algorithm.
  • a second alterative method may also be performed.
  • the method comprises creating a calibration standard having at least two rings of deposit material, subjecting the calibration standard to an eddy current signal, wherein an amplitude of the signal reflected from the calibration standard is used to obtain a polynomial equation fit of the reflected eddy current signals to actual thickness of the rings, obtaining a baseline signal offset from the calibration standard; obtaining a steam generator with tubes, initiating an eddy current signal into the tubes of the steam generator, detecting and recording reflections of the eddy current signal initiated into the tubes of the steam generator; subtracting the baseline signal offset from the reflected eddy current signals to obtain a corrected reflected eddy current signal, and determining a thickness of the deposits in the steam generator from the corrected reflected eddy current signal through the polynomial equation.
  • Figure 1 is a perspective view of a deposit mapping output in conformance with the present invention.
  • Figure 2 is a second perspective view of a deposit mapping output.
  • Figure 3 is a graph comparing deposit mapping to corrosion product transport mechanisms.
  • Figure 4 is a histogram showing deposit mapping repeatability.
  • Figure 5 is a diagram of the method to determine deposit mapping inside a steam generator.
  • a deposit mapping methodology 10 is provided to ascertain the location and amounts of accumulated material inside a steam generator.
  • the steam generator may be part of a nuclear or non-nuclear system.
  • the accumulated material may be from corrosion products generated inside the plant as well as feedwater impurities inside the coolant as it flows through the steam generator.
  • the purpose of the deposit mapping methodology 10 is to provide characterization of the amounts of deposit loading as well as the deposit distribution of materials present in a steam generator as the feedwater passes through a steam generator.
  • Knowledge of the deposit condition within a steam generator is valuable for assessing the impact of the deposit on thermal hydraulic performance, on the potential for accelerated corrosion of the heating surfaces within the steam generator, as well as determining a degradation of Non Destructive Examination (NDE) signal detection performance. This information is also necessary for determining the best maintenance techniques for mitigating the deposit condition and for assessing the effectiveness of such maintenance actions.
  • NDE Non Destructive Examination
  • the deposit mapping process utilizes three key components.
  • the combination of the three components yields a unique methodology for measuring the amount of deposit adhered to the outer diameter surface of steam generator tubing.
  • a specific deposit calibration standard 20 is created.
  • the standard 20 is derived from a quantity of circumferential rings of deposit material, wherein each ring contains a known amount of deposit material as determined by thickness of each of the rings.
  • the thickness measurements for the calibration standard are predetermined or pre- measured to ascertain the thickness of each ring.
  • the series of rings in the exemplary embodiment have an increasing amount of deposit volume and thickness progressing from the inner most circle to the outermost circle.
  • the rings are separated sufficiently to allow for the signal response from a bobbin eddy current probe to achieve a non- deposit influence null value between each ring.
  • the current deposit calibration standard design in the exemplary embodiment disclosed utilizes five deposit rings and six non-deposit influenced null regions.
  • the deposit material mixture is determined from specific plant chemistry to assure consistent signal response between the calibration standard and the steam generator tubing.
  • the next step is evaluating the standard with a bobbin eddy current probe.
  • a bobbin eddy current signal amplitude reflected from each deposit ring relative to the average signal response from the non-deposit influenced regions is used to achieve a fourth order polynomial least squares fit 30 through curve fitting techniques. This polynomial is used to determine the thickness of the deposit along specific, user selectable, lengths of tubing between adjacent support structures within a steam generator.
  • the method is structured to utilize calibration standard data acquired during the examination of steam generator tubes. This collection of tube examinations is known as a calibration group.
  • the polynomial yields more reliable results wherein variations in the eddy current probe performance are accounted for within the least squares fit. Moreover, the error in the measured thickness, attributed to probe performance, can be quantified for the calibration group.
  • Conventional practice for measurements use a voltage normalized response from a flaw or set of flaws within an ASME calibration standard to establish consistency of probe performance prior to the tube examinations. In these conventional practices, no rigorous process for performing a specific calibration for deposit thickness, as described herein, currently exists, therefore conventional practices are more prone to error.
  • the next step in the methodology is the establishment of the non-deposit influenced null reference amplitude value for each tube examination data set 40.
  • balancing is performed independent of the calibrations and consequently the use of such absolute signal amplitude values yields inconsistent and inaccurate results.
  • the establishment of the reference amplitude for each tube 40 with known calibrated values as provided in the present invention represents a significant advantage over conventional applications for measuring the thickness of the deposit by use of low-frequency eddy current.
  • the deposit thickness is evaluated using specific, user selectable, lengths of tubing between adjacent support structures within a steam generator. These user selectable lengths are referred to as "bins" within the deposit mapping process and may have a length between 1/2 inch and 5 inches.
  • the quantity of eddy current signal amplitudes that constitute a "bin” is determined. For each pair of adjacent support structures, for example tube support one (TSP 1) and tube support two (TSP 2), the quantity of "bins” that can be fitted between the pair is determined 50. For each analysis section, the average signal amplitude is tabulated and for each support pair, the minimum “bin” amplitude is determined. The population of minimum “bin” amplitudes is passed to a culling algorithm to determine the best amplitude value to use as the non-deposit influenced null reference amplitude value for the two.
  • TSP 1 tube support one
  • TSP 2 tube support two
  • the population of minimum “bin” amplitudes for a circulating steam generator with eight support plates is 16, and the population of a once through steam generator with 15 support plates is 16 in the exemplary embodiment.
  • the culling algorithm requires no less than three "bin” amplitudes to establish the reference amplitude value. If the culling algorithm cannot produce a reference amplitude value, the tube is eliminated from the deposit mapping process.
  • the criteria of a minimum of three "bin" amplitudes was selected after performing a minimal amount of comparisons of tube results from tubes that had multiple examinations within an outage and tubes with examinations within sequential outages.
  • the consistent measurement of the deposit loading for this minimal population of tubes supported the criteria.
  • An increase in the required minimum quantity of "bin” amplitudes would improve the consistency of the results for a larger population of tube comparisons but would also eliminate a larger number of tubes from the overall deposit mapping process for generators with greater deposit loadings.
  • the culling process is presented using the BASIC programming language:
  • the amplitude spread control of 30 equates to a final result of +/- 0.001 Inch of deposit thickness from the population average. This value could be adjusted upward to allow for more inclusion or adjusted downward to produce greater exclusion of the members from the final result.
  • the next three statements calculate the average value, median value, and the spread for the current population of pair minimum values.
  • base_value CLng(base_value / numjnins)
  • the average median CLng((max_min + min_min) / 2)
  • the median spread max_min - min_min 'the spread
  • the next section of code determines whether the population needs to be culled and if so, which member or members of the population need to be eliminated.
  • pair_min_value(ijong) pair_min_value(ijong + 1 )
  • Chemical analysis of the target tube scale is used to create a deposit simulation material composed of the eddy current reactive components of the actual deposit.
  • a process is used to apply various thickness bands of this deposit simulation material to a section of tubing. The thickness ranges are based on the expected deposit thickness within the steam generator.
  • a bobbin coil eddy current examination of the deposit standard is used to confirm that the eddy current response phase angle is similar to that observed in the available steam generator data. Where there is no chemical analysis or no significant eddy current deposit response from the actual steam generator under investigation, this check would have been based on comparison with plant data that is similar in nature.
  • the deposit standard eddy current data has been acquired, it is used to develop a polynomial response function that can be used to convert the absolute signal response into a deposit thickness value 50.
  • the eddy current data within the tube is rotated so that the deposit response is in the vertical component. After the offset for a tube has been determined 60, it is subtracted from the signal response 70. The remaining vertical component signal is representative of the deposit response. This remaining vertical component is then applied to the calibration standard polynomial function to derive the deposit thickness estimate 80. The thickness achieved through the polynomial is technically more representative of the total deposit accumulation at a given axial location since these actual thickness could vary around the tube circumference.
  • the bobbin probe response integrates all material within its field of view at a given position within the tube.
  • a process that has a specific design of a deposit calibration standard, and the use of this calibration standard, and the use of this calibration standard to establish the least squares fitted polynomial to convert signal amplitude into deposit thickness, and the use of a culling algorithm to determine the non-deposit influenced reference signal amplitude for each tube is a significant improvement over existing methods for determining the thickness of the deposit adhered to the outer diameter surface of steam generator tubing.
  • This technique has been used to map the deposit distribution within several steam generators. It is possible to compare the deposit mapping technique measurements, as described above, to independent results of Corrosion Product Transport (CPT) measurements. As corrosion product transport measurements are expressed as ionic concentrations of corrosion products and the deposit mapping results are based on the actual expected oxide compound, corrosion product transfer measurements are required to be multiplied by a factor of 1.38 to obtain a comparable value in the exemplary embodiment. As will be understood, other factors may be used when comparing corrosion product transport measurements to steam generator mapping analysis based upon factors, such as chemistry of the plant.
  • CPT Corrosion Product Transport
  • the application of the deposit mapping technique to multiple cycle data provides some information on the repeatability of the technique. This section will present a sample of this information to illustrate the performance of the deposit mapping process, the comparison of the corrosion product transport results and the repeatability of the measurements.
  • the deposit mapping measurements consist of a series of files that provide the tube row, column, x-coordinate, y-coordinate, z coordinate and the deposit thickness measurement.
  • the below excerpt from a typical deposit text file shows the information available. In this case, the samples were provided every 5 inches actually along the tube.
  • the file coordinates are provided in meters.
  • an exemplary deposit mapping output file graphical representation of a deposited tube is provided.
  • a second exemplary deposit visualization is provided.
  • Figure 3 provides a comparison of the deposit mapping estimate of loading with that approximated by CPT.
  • the deposit mapping measurements indicated by the highlighted areas show that the deposit loading, increased by about 956 pounds between 10 and 14 effective full power years of operation.
  • the CPT data, corrected for oxides, provides a standard for comparison and shows an increase of 996 pounds over the same time period verifying the accuracy of the deposit mapping estimate.
  • An additional advantage of the present invention is measurement repeatability. When measurements are taken over a time interval during which some of the measures are expected change, the repeatability is more difficult to quantify. Eddy current has been used for many years to evaluate the change in indications over a certain time period. The evaluation of such change involves an initial measurement of the start of an interval and a final measurement at the end of the interval.
  • Figure 4 illustrates the measured changes for a large series of initial and final measurement pairs.
  • the expected true delta's differentialials
  • the extremely small percentage and small value of any negative measurement changes in figure 4 is indicative of excellent system reliability and repeatability. If the system uncertainty were higher, the number and magnitude of negative deltas would have been greater.

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Immunology (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Health & Medical Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Pathology (AREA)
  • Ecology (AREA)
  • Plasma & Fusion (AREA)
  • Environmental Sciences (AREA)
  • High Energy & Nuclear Physics (AREA)
  • Theoretical Computer Science (AREA)
  • Databases & Information Systems (AREA)
  • Mathematical Physics (AREA)
  • Software Systems (AREA)
  • Data Mining & Analysis (AREA)
  • Investigating Or Analyzing Materials By The Use Of Magnetic Means (AREA)
  • Monitoring And Testing Of Nuclear Reactors (AREA)
  • Measurement Of Length, Angles, Or The Like Using Electric Or Magnetic Means (AREA)

Abstract

A method to determine deposits in a steam generator having the steps of creating a calibration standard having at least two rings of deposit material, subjecting the calibration standard to an eddy current signal, wherein an amplitude of the signal reflected from the calibration standard is used to obtain a polynomial equation fit of the reflected eddy current signals to actual thickness of the rings, obtaining a steam generator with tubes, initiating an eddy current signal into the tubes of the steam generator, detecting and recording reflections of the eddy current signal initiated into the tubes of the steam generator, and determining a thickness of the deposits in the steam generator from the recorded reflections of the eddy current signal and the polynomial equation.

Description

FIELD OF THE INVENTION
The present invention relates to steam generators. More specifically, the present invention provides a steam generator deposit mapping system and methodology.
BACKGROUND INFORMATION
Nuclear steam generators used in pressurized water reactors, for example, are subject to the accumulation of feedwater impurities. Although the feedwater is maintained at a high level of purity, minute concentrations of corrosion products and/or feedwater impurities may be concentrated in the flow stream, consequently leading to buildup of these materials within the steam generator as the water is converted into steam. These deposits will eventually degrade the thermal hydraulic performance of the component.
To increase the heat transfer capabilities of the steam generator, the thickness of the deposits, as well as the locations of the deposits, must be determined such that removal techniques may be implemented. Currently, visual inspections and eddy current inspections are utilized to ascertain locations and approximate thickness of material. These techniques, however, are prone to error. Moreover, visual inspections introduce a significant radiological risk to workers if the steam generator is connected to a nuclear power generation system.
There is therefore a need to provide a system that will determine the thickness of deposit accumulations as well as the location of those accumulations on the heating surfaces of a steam generator.
There is also a need to provide a system that will determine the accumulations of deposits on the heating surfaces of the steam generator, while minimizing the need for worker ingress into a potentially radioactive environments. SUMMARY
It is therefore an objective of the present invention to provide a system that will determine the thicknesses of these accumulations of deposits as well as the location of those accumulations on the heating surfaces of a steam generator.
It is also an objective of the present invention to provide a system and methodology that will calculate accumulations of deposits on the heating surfaces of the steam generator, while minimizing the need for ingress into a potentially radioactive environment for workers.
The objectives described above are achieved as illustrated and described. The methodology according to the present invention determines the thickness and location of deposits in a steam generator. The methodology comprises the steps of creating a calibration standard having at least two rings of deposit material, subjecting the calibration standard to an eddy current signal, wherein an amplitude of the signal reflected from the calibration standard is used to obtain a polynomial equation fit of the reflected eddy current signals to actual thickness of the rings, obtaining a steam generator with tubes, initiating an eddy current signal into the tubes of the steam generator, detecting and recording reflections of the eddy current signal initiated into the tubes of the steam generator, and determining a thickness of the deposits in the steam generator from the recorded reflections of the eddy current signal and the fourth order polynomial equation.
The methodology may be performed such that the eddy current signal is created by a bobbin coil probe.
The method may also be accomplished such that the polynomial equation is a fourth order equation.
The method also may be accomplished such that multiple signals are input into the calibration standard and reflected signals are detected and processed to obtain the polynomial equation. Additionally, multiple reflected signals may be passed through a culling algorithm.
A second alterative method may also be performed. The method comprises creating a calibration standard having at least two rings of deposit material, subjecting the calibration standard to an eddy current signal, wherein an amplitude of the signal reflected from the calibration standard is used to obtain a polynomial equation fit of the reflected eddy current signals to actual thickness of the rings, obtaining a baseline signal offset from the calibration standard; obtaining a steam generator with tubes, initiating an eddy current signal into the tubes of the steam generator, detecting and recording reflections of the eddy current signal initiated into the tubes of the steam generator; subtracting the baseline signal offset from the reflected eddy current signals to obtain a corrected reflected eddy current signal, and determining a thickness of the deposits in the steam generator from the corrected reflected eddy current signal through the polynomial equation.
BRIEF DESCRIPTION OF THE DRAWINGS
Figure 1 is a perspective view of a deposit mapping output in conformance with the present invention.
Figure 2 is a second perspective view of a deposit mapping output.
Figure 3 is a graph comparing deposit mapping to corrosion product transport mechanisms.
Figure 4 is a histogram showing deposit mapping repeatability.
Figure 5 is a diagram of the method to determine deposit mapping inside a steam generator.
DETAILED DESCRIPTION
Referring to Figure 5, a deposit mapping methodology 10 is provided to ascertain the location and amounts of accumulated material inside a steam generator. The steam generator may be part of a nuclear or non-nuclear system. The accumulated material may be from corrosion products generated inside the plant as well as feedwater impurities inside the coolant as it flows through the steam generator.
The purpose of the deposit mapping methodology 10 is to provide characterization of the amounts of deposit loading as well as the deposit distribution of materials present in a steam generator as the feedwater passes through a steam generator. Knowledge of the deposit condition within a steam generator is valuable for assessing the impact of the deposit on thermal hydraulic performance, on the potential for accelerated corrosion of the heating surfaces within the steam generator, as well as determining a degradation of Non Destructive Examination (NDE) signal detection performance. This information is also necessary for determining the best maintenance techniques for mitigating the deposit condition and for assessing the effectiveness of such maintenance actions.
The deposit mapping process utilizes three key components. The combination of the three components yields a unique methodology for measuring the amount of deposit adhered to the outer diameter surface of steam generator tubing.
In the first methodology step, a specific deposit calibration standard 20 is created. The standard 20 is derived from a quantity of circumferential rings of deposit material, wherein each ring contains a known amount of deposit material as determined by thickness of each of the rings. The thickness measurements for the calibration standard are predetermined or pre- measured to ascertain the thickness of each ring. The series of rings in the exemplary embodiment have an increasing amount of deposit volume and thickness progressing from the inner most circle to the outermost circle. In the exemplary embodiment, the rings are separated sufficiently to allow for the signal response from a bobbin eddy current probe to achieve a non- deposit influence null value between each ring. The current deposit calibration standard design in the exemplary embodiment disclosed utilizes five deposit rings and six non-deposit influenced null regions. The deposit material mixture is determined from specific plant chemistry to assure consistent signal response between the calibration standard and the steam generator tubing.
After creation of the above calibration standard 20, the next step is evaluating the standard with a bobbin eddy current probe. A bobbin eddy current signal amplitude reflected from each deposit ring relative to the average signal response from the non-deposit influenced regions is used to achieve a fourth order polynomial least squares fit 30 through curve fitting techniques. This polynomial is used to determine the thickness of the deposit along specific, user selectable, lengths of tubing between adjacent support structures within a steam generator. The method is structured to utilize calibration standard data acquired during the examination of steam generator tubes. This collection of tube examinations is known as a calibration group. By utilizing the deposit calibration data for the calibration group, the polynomial yields more reliable results wherein variations in the eddy current probe performance are accounted for within the least squares fit. Moreover, the error in the measured thickness, attributed to probe performance, can be quantified for the calibration group. Conventional practice for measurements use a voltage normalized response from a flaw or set of flaws within an ASME calibration standard to establish consistency of probe performance prior to the tube examinations. In these conventional practices, no rigorous process for performing a specific calibration for deposit thickness, as described herein, currently exists, therefore conventional practices are more prone to error.
The next step in the methodology is the establishment of the non-deposit influenced null reference amplitude value for each tube examination data set 40. For probe hardware in conventional applications, balancing is performed independent of the calibrations and consequently the use of such absolute signal amplitude values yields inconsistent and inaccurate results. The establishment of the reference amplitude for each tube 40 with known calibrated values as provided in the present invention represents a significant advantage over conventional applications for measuring the thickness of the deposit by use of low-frequency eddy current. As previously described, the deposit thickness is evaluated using specific, user selectable, lengths of tubing between adjacent support structures within a steam generator. These user selectable lengths are referred to as "bins" within the deposit mapping process and may have a length between 1/2 inch and 5 inches. Given the user selectable "bin" length, the quantity of eddy current signal amplitudes that constitute a "bin" is determined. For each pair of adjacent support structures, for example tube support one (TSP 1) and tube support two (TSP 2), the quantity of "bins" that can be fitted between the pair is determined 50. For each analysis section, the average signal amplitude is tabulated and for each support pair, the minimum "bin" amplitude is determined. The population of minimum "bin" amplitudes is passed to a culling algorithm to determine the best amplitude value to use as the non-deposit influenced null reference amplitude value for the two. The population of minimum "bin" amplitudes for a circulating steam generator with eight support plates is 16, and the population of a once through steam generator with 15 support plates is 16 in the exemplary embodiment. The culling algorithm requires no less than three "bin" amplitudes to establish the reference amplitude value. If the culling algorithm cannot produce a reference amplitude value, the tube is eliminated from the deposit mapping process.
The criteria of a minimum of three "bin" amplitudes, in the exemplary embodiment, was selected after performing a minimal amount of comparisons of tube results from tubes that had multiple examinations within an outage and tubes with examinations within sequential outages. The consistent measurement of the deposit loading for this minimal population of tubes supported the criteria. An increase in the required minimum quantity of "bin" amplitudes would improve the consistency of the results for a larger population of tube comparisons but would also eliminate a larger number of tubes from the overall deposit mapping process for generators with greater deposit loadings. The culling process is presented using the BASIC programming language:
Dim pair_min_value(1 To 32) As Long 'number of pairs used for the base value determination will be initially set to the number of support pairs (number_of_pairs). Dim numjnins As Integer
Dim base_value As Long 'the final result (reference value)
Dim spread As Long 'difference between the max and min
Dim maxjTiin As Long 'used to compute the median
Dim minjTiin As Long 'used to compute the median
Dim median As Long 'used to compute the median Dim max_min_index As Integer 'used to remember the max value
Dim min_min_index As Integer 'used to remember the min value
Dim ijong As Integer 'general purpose index variable Dim ijong As Integer 'general purpose Index variable
spread = 31 'force the first pass through the algorithm numjnins = number_of_pairs
The amplitude spread control of 30 equates to a final result of +/- 0.001 Inch of deposit thickness from the population average. This value could be adjusted upward to allow for more inclusion or adjusted downward to produce greater exclusion of the members from the final result.
While spread > 30 And numjnins > 2
base_value = pairjnin value(1 ) max_min = base_value max_min index = 1 minjnin = base_value min_min_index = 1
The next section of code, the "for/next" loop, is used to identify the maximum and minimum values within the current population of pair minimum values and to sum the values for the calculation of the average. For ijong = 2 To numjmins If pair_min_value(i_long) > max_min Then max_min = pair_min value(ijong) max_min_index = ijong End If
If pair_min_value(i_long) < min_min Then min_min = pair_min_value(i_long) min_min jndex = ijong End if base_value = base_value + pair_min value(ijong) Next ijong
The next three statements calculate the average value, median value, and the spread for the current population of pair minimum values.
base_value = CLng(base_value / numjnins) the average median = CLng((max_min + min_min) / 2) 'the median spread = max_min - min_min 'the spread
The next section of code determines whether the population needs to be culled and if so, which member or members of the population need to be eliminated.
If spread > 30 Then must reduce the population
If base_value > median Then . 'toss out the low value ijong = min_minjndex
For ijong = ijong To (numjnins -1 ) pair_min_value(ijong)=pair_min_value(ijong + 1 ) Next ijong nurn_mins = num_mins -1
End If
If base_value < median Then 'toss out the high value ijong = max_min_index For ijong = ijong To (numjnins -1) pair_min_value(i_long) = pair_min_value(i_long + 1 ) Next ijong num_mins = num_mins - 1 End If
If base_value = median Then 'toss out both values ijong = min_min_index For ijong = ijong To (num_mins - 1 ) pair_min_value(ijong)=pair_min_value(ijong + 1 )
Next ijong num_mins = numjnins -1 ijong = max_minjndex If ijong > min_minjndex Then ijong = ijong - 1
For ijong = ijong To (numjmins - 1 ) pair_min_value(ijong) = pair_min_value(ijong + 1 )
Next ijong num_mins = num_mins -1 End if
End If
Wend 'continue to loop until criteria is achieved
Chemical analysis of the target tube scale is used to create a deposit simulation material composed of the eddy current reactive components of the actual deposit. A process is used to apply various thickness bands of this deposit simulation material to a section of tubing. The thickness ranges are based on the expected deposit thickness within the steam generator. A bobbin coil eddy current examination of the deposit standard is used to confirm that the eddy current response phase angle is similar to that observed in the available steam generator data. Where there is no chemical analysis or no significant eddy current deposit response from the actual steam generator under investigation, this check would have been based on comparison with plant data that is similar in nature. When the deposit standard eddy current data has been acquired, it is used to develop a polynomial response function that can be used to convert the absolute signal response into a deposit thickness value 50.
Since absolute data is used for measuring the deposit, care must be taken to define the null point or clean offset value of the data. A number of factors including temperature, eddy current instrument offset, probe construction, tube material and wall thickness as well as deposit or scale of redundancies (among others) all interact to determine the absolute eddy current signal response within the tube. Since the majority of these parameters (with exception of the deposit were scale component) will remain approximately constant during a given tube examination, it is possible to identify the baseline signal offset within most tubes 60. Once the baseline offset value(s) have been identified 60, the baseline offset values is then subtracted from the absolute signal response to isolate and extract the component of the signal that is due to the presence of deposits 70. The use of phase discrimination provides an additional tool to eliminate responses that are not associated with the correct phase angle for the deposit signal.
The eddy current data within the tube is rotated so that the deposit response is in the vertical component. After the offset for a tube has been determined 60, it is subtracted from the signal response 70. The remaining vertical component signal is representative of the deposit response. This remaining vertical component is then applied to the calibration standard polynomial function to derive the deposit thickness estimate 80. The thickness achieved through the polynomial is technically more representative of the total deposit accumulation at a given axial location since these actual thickness could vary around the tube circumference. The bobbin probe response integrates all material within its field of view at a given position within the tube.
In summary, a process that has a specific design of a deposit calibration standard, and the use of this calibration standard, and the use of this calibration standard to establish the least squares fitted polynomial to convert signal amplitude into deposit thickness, and the use of a culling algorithm to determine the non-deposit influenced reference signal amplitude for each tube is a significant improvement over existing methods for determining the thickness of the deposit adhered to the outer diameter surface of steam generator tubing.
This technique has been used to map the deposit distribution within several steam generators. It is possible to compare the deposit mapping technique measurements, as described above, to independent results of Corrosion Product Transport (CPT) measurements. As corrosion product transport measurements are expressed as ionic concentrations of corrosion products and the deposit mapping results are based on the actual expected oxide compound, corrosion product transfer measurements are required to be multiplied by a factor of 1.38 to obtain a comparable value in the exemplary embodiment. As will be understood, other factors may be used when comparing corrosion product transport measurements to steam generator mapping analysis based upon factors, such as chemistry of the plant.
The application of the deposit mapping technique to multiple cycle data provides some information on the repeatability of the technique. This section will present a sample of this information to illustrate the performance of the deposit mapping process, the comparison of the corrosion product transport results and the repeatability of the measurements.
The deposit mapping measurements consist of a series of files that provide the tube row, column, x-coordinate, y-coordinate, z coordinate and the deposit thickness measurement. The below excerpt from a typical deposit text file shows the information available. In this case, the samples were provided every 5 inches actually along the tube. The file coordinates are provided in meters.
30 48 -0.9992 -0.0163 0.16183 3048 -0.9992 -0.0163 0.28882 3048 -0.9992 -0.0163 0.41582 3048 -0.9992 -0.0163 0.54282 3048 -0.9992 -0.0163 0.77096 3048 -0.9992 -0.0163 0.89797 3048 -0.9992 -0.0163 1.02495 3048 -0.9992 -0.0163 1.15195 3048 -0.9992 -0.0163 1.27896 3048 -0.9992 -0.0163 1.42905 3048 -0.9992 -0.0163 1.55604 3048 -0.9992 -0.0163 1.68304 3048 -0.9992 -0.0163 1.81004 3048 -0.9992 -0.0163 1.93704 3048 -0.9992 -0.0163 2.06403 3048 -0.9992 -0.0163 2.19102 3048 -0.9992 -0.0163 2.31802 3048 -0.9992 -0.0163 2.44502 3048 -0.9992 -0.0163 2.57202 3048 -0.9992 -0.0163 2.7221 1 3048 -0.9992 -0.0163 2.84912 3048 -0.9992 -0.0163 2.9761 1 3048 -0.9992 ■0.0163 3.1031 1 3048 -0.9992 -0.0163 3.2301 1
Referring to Figure 1 , an exemplary deposit mapping output file graphical representation of a deposited tube is provided. Referring to Figure 2, a second exemplary deposit visualization is provided.
In addition to graphic visualization of the deposit, is also possible to evaluate the overall deposit loading within various locations of the steam generator. The following table 1 provides an example of this type of data. The table lists the results of two separate deposit mapping analysis. In this case, the deposit information has been converted to pounds of deposit.
Figure imgf000013_0001
Figure imgf000014_0001
Table 1
Figure 3 provides a comparison of the deposit mapping estimate of loading with that approximated by CPT. The deposit mapping measurements indicated by the highlighted areas show that the deposit loading, increased by about 956 pounds between 10 and 14 effective full power years of operation. The CPT data, corrected for oxides, provides a standard for comparison and shows an increase of 996 pounds over the same time period verifying the accuracy of the deposit mapping estimate.
An additional advantage of the present invention is measurement repeatability. When measurements are taken over a time interval during which some of the measures are expected change, the repeatability is more difficult to quantify. Eddy current has been used for many years to evaluate the change in indications over a certain time period. The evaluation of such change involves an initial measurement of the start of an interval and a final measurement at the end of the interval.
Statistically, the uncertainty of the measurement technique is included in each initial and final measurement. Thus, the measurement uncertainty for the technique will cause some of the measured indications to have an apparent negative growth even though negative growth is physically impossible. Thus, this apparent negative growth is an indicator of the uncertainty or error of the measurement technique. In the absence of the known values, this apparent negative growth factor may be used to evaluate the reliability of the measurement technique. Figure 4 illustrates the measured changes for a large series of initial and final measurement pairs. In the exemplary embodiment provided, as the measurements were taken during a time span when the deposit was expected to increase over time, the expected true delta's (differentials) would have been either zero or positive depending on the location within the steam generator. The extremely small percentage and small value of any negative measurement changes in figure 4 is indicative of excellent system reliability and repeatability. If the system uncertainty were higher, the number and magnitude of negative deltas would have been greater.
In the foregoing specification, the invention has been described with reference to specific exemplary embodiments thereof. It will, however, be evident that various modifications and changes may be made thereunto without departing from the broader spirit and scope of the invention as set forth in the appended claims. The specification and drawings are accordingly to be regarded in an illustrative rather than in a restrictive sense.

Claims

What is claimed is:
1. A method to determine deposits in a steam generator, comprising: creating a calibration standard having at least two rings of deposit material; subjecting the calibration standard to an eddy current signal, wherein an amplitude of the signal reflected from the calibration standard is used to obtain a polynomial equation fit of the reflected eddy current signals to actual thickness of the rings; obtaining a steam generator with tubes; initiating an eddy current signal into the tubes of the steam generator, detecting and recording reflections of the eddy current signal initiated into the tubes of the steam generator; and determining a thickness of the deposits in the steam generator from the recorded reflections of the eddy current signal using the polynomial equation.
2. The method according to claim 1 , wherein the eddy current signal is created by a bobbin coil probe.
3. The method according to claim 1 , wherein the polynomial equation is a fourth order equation.
4. The method according to claim 1 , wherein multiple signals are input into the calibration standard and reflected signals are detected and processed to obtain the polynomial equation.
5. The method according to claim 1 , wherein the multiple reflected signals are passed through a culling algorithm.
6. A method to determine deposits in a steam generator, comprising: creating a calibration standard having at least two rings of deposit material; subjecting the calibration standard to an eddy current signal, wherein an amplitude of the signal reflected from the calibration standard is used to obtain a polynomial equation fit of the reflected eddy current signals to actual thickness of the rings; obtaining a baseline signal offset from the calibration standard; obtaining a steam generator with tubes; initiating an eddy current signal into the tubes of the steam generator; detecting and recording reflections of the eddy current signal initiated into the tubes of the steam generator; subtracting the baseline signal offset from the reflected eddy current signals to obtain a corrected reflected eddy current signal; and determining a thickness of the deposits in the steam generator from the corrected reflected eddy current signal through the polynomial equation.
PCT/US2007/013187 2006-07-10 2007-06-04 Steam generator mapping system WO2008100267A2 (en)

Priority Applications (7)

Application Number Priority Date Filing Date Title
CN2007800236262A CN101490501B (en) 2006-07-10 2007-06-04 Steam generator mapping system
ES07872521.5T ES2555377T3 (en) 2006-07-10 2007-06-04 Steam generator measurement system
BRPI0714013A BRPI0714013A2 (en) 2006-07-10 2007-06-04 steam generator mapper system
KR1020087031417A KR101316255B1 (en) 2006-07-10 2007-06-04 Steam generator mapping system
EP07872521.5A EP2038604B1 (en) 2006-07-10 2007-06-04 Steam generator measuring system
JP2009519437A JP2009543094A (en) 2006-07-10 2007-06-04 Steam generator mapping system
ZA2008/09920A ZA200809920B (en) 2006-07-10 2008-11-20 Steam generator mapping system

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US11/484,227 US7405558B2 (en) 2006-07-10 2006-07-10 Steam generator mapping with reflections of eddy current signal
US11/484,227 2006-07-10

Publications (2)

Publication Number Publication Date
WO2008100267A2 true WO2008100267A2 (en) 2008-08-21
WO2008100267A3 WO2008100267A3 (en) 2009-04-02

Family

ID=38918567

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/US2007/013187 WO2008100267A2 (en) 2006-07-10 2007-06-04 Steam generator mapping system

Country Status (10)

Country Link
US (1) US7405558B2 (en)
EP (1) EP2038604B1 (en)
JP (1) JP2009543094A (en)
KR (1) KR101316255B1 (en)
CN (1) CN101490501B (en)
BR (1) BRPI0714013A2 (en)
ES (1) ES2555377T3 (en)
TW (1) TW200807447A (en)
WO (1) WO2008100267A2 (en)
ZA (1) ZA200809920B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9207211B2 (en) 2011-01-06 2015-12-08 Mitsubishi Heavy Industries, Ltd. Deposit measurement apparatus, deposit measurement method, and computer-readable storage medium storing deposit measurement program

Families Citing this family (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8527216B2 (en) 2009-07-24 2013-09-03 Areva Np Inc Eddy current for the characterization of broached tube support plate blockage
US8390278B2 (en) * 2009-10-20 2013-03-05 Westinghouse Electric Company Llc Eddy current inspection probe for inspecting the interior of a tubular member
US8387444B2 (en) * 2009-11-12 2013-03-05 Westinghouse Electric Company Llc Method of modeling steam generator and processing steam generator tube data of nuclear power plant
US10896767B2 (en) * 2011-04-07 2021-01-19 Westinghouse Electric Company Llc Method of detecting an existence of a loose part in a steam generator of a nuclear power plant
US20130022240A1 (en) * 2011-07-19 2013-01-24 Wolters William C Remote Automated Planning and Tracking of Recorded Data
JP5905232B2 (en) 2011-10-20 2016-04-20 三菱重工業株式会社 Clogging rate evaluation system for insertion hole, clogging rate evaluation method, and clogging rate evaluation program
RU2487343C1 (en) * 2012-03-01 2013-07-10 федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Национальный исследовательский университет "МЭИ" (ФГБОУ ВПО "НИУ МЭИ") Determination of deposition thickness at inner side of pipes by eddy current method and device for its implementation
CA2911646C (en) 2013-05-31 2023-03-28 Nuscale Power, Llc Inspecting a steam generator
FR3015757B1 (en) * 2013-12-23 2019-05-31 Electricite De France METHOD FOR QUANTITATIVE ESTIMATING OF THE PLATE COATING OF A STEAM GENERATOR
CN104409118B (en) * 2014-10-23 2017-01-11 华北电力大学 Thermal hydraulic experimental system and method for study on corrosion product deposit of fusion reactor
RU188621U1 (en) * 2019-02-22 2019-04-18 Общество с ограниченной ответственностью "Нижегородский институт прикладных технологий" Control unit of scale formation on the wall of the heat unit
RU2753578C1 (en) * 2020-09-01 2021-08-17 Акционерное Общество "Российский Концерн По Производству Электрической И Тепловой Энергии На Атомных Станциях" (Ао "Концерн Росэнергоатом") Method for diagnostics of the technical conditions of rotary equipment
RU2756824C1 (en) * 2020-09-23 2021-10-06 Акционерное Общество "Российский Концерн По Производству Электрической И Тепловой Энергии На Атомных Станциях" (Ао "Концерн Росэнергоатом") Method for removing local deposition on heat exchange tubes of steam generators of nuclear power station

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4822744A (en) * 1987-05-01 1989-04-18 Westinghouse Electric Corp. System and method for detecting contaminants in a steam power generating system
US5581037A (en) * 1992-11-06 1996-12-03 Southwest Research Institute Nondestructive evaluation of pipes and tubes using magnetostrictive sensors
US5577069A (en) * 1994-08-02 1996-11-19 National Semiconductor Corporation Signalling method and structure suitable for out-of-band information transfer in communication network
DE59708722D1 (en) * 1996-07-02 2002-12-19 Zellweger Luwa Ag Uster METHOD AND DEVICE FOR DETECTING FOREIGN PARTS IN A FIBER CURRENT MADE OF PRIMARY TEXTILE FIBERS
US6271670B1 (en) * 1998-02-09 2001-08-07 Sandia Corporation Method and apparatus for detecting external cracks from within a metal tube
US6407546B1 (en) * 2000-04-07 2002-06-18 Cuong Duy Le Non-contact technique for using an eddy current probe for measuring the thickness of metal layers disposed on semi-conductor wafer products
US6513385B1 (en) * 2001-05-08 2003-02-04 Halliburton Energy Services, Inc. Acoustic sensor for pipeline deposition characterization and monitoring

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
None
See also references of EP2038604A4

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9207211B2 (en) 2011-01-06 2015-12-08 Mitsubishi Heavy Industries, Ltd. Deposit measurement apparatus, deposit measurement method, and computer-readable storage medium storing deposit measurement program

Also Published As

Publication number Publication date
KR101316255B1 (en) 2013-10-08
ZA200809920B (en) 2010-02-24
ES2555377T3 (en) 2015-12-30
EP2038604A2 (en) 2009-03-25
CN101490501B (en) 2011-03-30
CN101490501A (en) 2009-07-22
KR20090033335A (en) 2009-04-02
EP2038604A4 (en) 2014-08-06
US7405558B2 (en) 2008-07-29
TW200807447A (en) 2008-02-01
JP2009543094A (en) 2009-12-03
BRPI0714013A2 (en) 2019-05-07
WO2008100267A3 (en) 2009-04-02
EP2038604B1 (en) 2015-08-26
US20080007257A1 (en) 2008-01-10

Similar Documents

Publication Publication Date Title
US7405558B2 (en) Steam generator mapping with reflections of eddy current signal
US11898986B2 (en) Systems and methods for steam generator tube analysis for detection of tube degradation
CA2777939C (en) Method of modeling steam generator and processing steam generator tube data of nuclear power plant
CN110108788A (en) Integration probe and detection method are detected in pipe leakage based on impulse eddy current
KR20150099569A (en) Method for evaluating the clogging of a heat exchanger
EP3514528B1 (en) Nondestructive inspection method for a heat exchanger employing adaptive noise thresholding
WO2005074349A2 (en) Non-destructive method for the detection of creep damage in ferromagnetic parts with a device consisting of an eddy current coil and a hall sensor
KR101636412B1 (en) Determination method of crack length of an object
Lei et al. Depth sizing of intergranular attack with multi-frequency analysis of eddy current data
Hernas et al. Degradation of superheater tubes made of austenitic T321H steel after long term service
CN111189971A (en) Method for measuring unit mass equivalent of oxide skin in boiler tube
Raj et al. Status of eddy current testing in India
JPS62169049A (en) Defect diagnosing apparatus for rotary part
Cho et al. Parameter study for the evaluation of crack depth in steam generator tubing
Chan et al. EDM, SCC Defect Depth Analysis Using a Multi-Parameter Algorithm
Tayler et al. Use of relative operating characteristic curves in measuring inspection performance
Hur et al. Correlation between General Corrosion Behavior and Eddy Current Noise of Alloy 690 Steam Generator Tube
Baron et al. An Eddy Current Technique to Estimate Dimensions of Crevice Corrosion Pits
Ramuhalli et al. Nuclear Structural Materials Degradation Assessment Using Advanced Nondestructive Examination Methods
Nadinic INETEC Experience in Eddy Current Testing of WWER Steam Generators
Obrutsky et al. Transmit-receive eddy current probes for defect detection and sizing in steam generator tubes
JPH0197859A (en) Nondestructive life-expectancy evaluating method of heat resisting steel
JPH08254498A (en) Fatigue damage evaluating method for heat-resistant low alloy steel

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 200780023626.2

Country of ref document: CN

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 07872521

Country of ref document: EP

Kind code of ref document: A2

WWE Wipo information: entry into national phase

Ref document number: 1020087031417

Country of ref document: KR

WWE Wipo information: entry into national phase

Ref document number: 2007872521

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 2009519437

Country of ref document: JP

NENP Non-entry into the national phase

Ref country code: DE

NENP Non-entry into the national phase

Ref country code: RU

ENP Entry into the national phase

Ref document number: PI0714013

Country of ref document: BR

Kind code of ref document: A2

Effective date: 20090106