WO2008073120A1 - Direct exchange geothermal heating/cooling system sub-surface tubing installation with supplemental sub-surface tubing configuration - Google Patents

Direct exchange geothermal heating/cooling system sub-surface tubing installation with supplemental sub-surface tubing configuration Download PDF

Info

Publication number
WO2008073120A1
WO2008073120A1 PCT/US2006/061856 US2006061856W WO2008073120A1 WO 2008073120 A1 WO2008073120 A1 WO 2008073120A1 US 2006061856 W US2006061856 W US 2006061856W WO 2008073120 A1 WO2008073120 A1 WO 2008073120A1
Authority
WO
WIPO (PCT)
Prior art keywords
sub
refrigerant transport
transport line
primary
supplemental
Prior art date
Application number
PCT/US2006/061856
Other languages
French (fr)
Inventor
B. Ryland Wiggs
Original Assignee
Wiggs B Ryland
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wiggs B Ryland filed Critical Wiggs B Ryland
Priority to PCT/US2006/061856 priority Critical patent/WO2008073120A1/en
Publication of WO2008073120A1 publication Critical patent/WO2008073120A1/en

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24TGEOTHERMAL COLLECTORS; GEOTHERMAL SYSTEMS
    • F24T10/00Geothermal collectors
    • F24T10/10Geothermal collectors with circulation of working fluids through underground channels, the working fluids not coming into direct contact with the ground
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B30/00Heat pumps
    • F25B30/06Heat pumps characterised by the source of low potential heat
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/10Geothermal energy

Definitions

  • DX direct expansion heating/cooling system
  • Conventional and older design geothermal ground source/water source heat exchange systems typically utilize liquid-filled closed loops of tubing (typically approximately 1/4 inch wall polyethylene tubing) buried in the ground, or submerged in a body of water, so as to either absorb heat from, or to reject heat into, the naturally occurring geothermal mass and/or water surrounding the buried or submerged liquid transport tubing.
  • the tubing loop which is typically filled with water and optional antifreeze and rust inhibitors, is extended to the surface.
  • a water pump is then used to circulate one of the naturally warmed and naturally cooled liquid to a liquid to refrigerant heat exchange means.
  • the transfer of geothermal heat to or from the ground to the liquid in the plastic piping is a first heat exchange step.
  • a refrigerant heat pump system is utilized to transfer heat to or from the liquid in the plastic pipe to a refrigerant.
  • an interior air handler (comprised of finned tubing and a fan) is typically utilized to transfer heat to or from the refrigerant to heat or cool interior air space.
  • Newer design geothermal DX heat exchange systems where the refrigerant fluid transport lines are placed directly in the sub-surface ground and/or water, typically circulate a refrigerant fluid, such as R-22, or the like, in sub-surface refrigerant lines, typically comprised of copper tubing, to transfer geothermal heat to or from the sub- surface elements via a first heat exchange step.
  • DX systems only require a second heat exchange step to transfer heat to or from the interior air space, typically by means of an interior air handler. Consequently, DX systems are generally more efficient than water-source systems because fewer heat exchange steps are required and because no water pump energy expenditure is necessary.
  • the first objective is to provide the greatest possible operational efficiencies. This directly translates into providing the lowest possible heating/cooling operational costs, as well as other advantages, such as, for example, materially assisting in reducing peaking concerns for utility companies.
  • the second objective is to operate in an environmentally safe manner via the utilization of environmentally safe components and fluids.
  • the third objective is to operate for long periods of time absent the need for any significant maintenance/repair, thereby materially reducing servicing and replacement costs over other conventional system designs. [0008] Historically, DX heating/cooling systems, even though more efficient than other conventional heating/cooling systems, have experienced practical installation limitations created by the relatively large surface land areas necessary to accommodate the sub-surface heat exchange tubing.
  • first generation designs For example, with horizontal "pit" systems, a typical land area of 500 square feet per ton of system design capacity was required in first generation designs to accommodate a shallow (within 10 feet of the surface) matrix of multiple, distributed, copper heat exchange tubes. Further, in various vertically oriented first generation DX system designs, about one to two 50 foot to 100 foot (maximum) depth wells/boreholes per ton of system design capacity, with each well spaced at least about 20 feet apart, and with each well containing an individual refrigerant transport tubing loop, were required. Such requisite surface areas effectively precluded system applications in many commercial and/or high density residential applications.
  • a common problem with vertical well type DX systems is the periodic occurrence of the borehole partially becoming filled up with debris from the surface accidentally knocked into the hole, or with a partially collapsing wall depositing debris into the bottom of the hole, or with mud from a mud seam leaking mud, or the like, into the bottom of the well/borehole, or with debris being knocked into the bottom of the well during the actual sub-surface refrigerant transport, vertically inclined, geothermal heat exchange tubingAoop installation.
  • a vertically inclined DX system geothermal heat transfer loop is well understood by those skilled in the art. Such debris is typically not discovered until the tubing cannot be extended to the full intended and originally drilled depth.
  • the subject invention primarily relates to the provision of a means to improve upon earlier and former DX system technologies, so as to provide a solution to the commonly encountered field "overstressing" problem in a DX pit style system, particularly in the cooling mode, as well as a means of increasing overall system operational efficiencies, and to provide a solution to the common problem of debris in the bottom of a DX vertical well type system, both of which pit and well DX systems are well understood by those skilled in the art. Additionally, the present invention has an objective of providing a solution to excessive sub-surface suction line pressure losses in the subject DX system applications, particularly during the cooling mode of system operation. The present invention provides a solution to these preferable objectives as follows:
  • a pit style DX system an array of refrigerant transport tubing, typically comprised of 1/4 inch O. D., refrigerant grade, copper tubing, or the like, is placed within a pit (typically excavated about 4 or 5 feet deep, but usually at least 1 foot below the frost line in the geographic area of installation) with an area designed at about 500 to 600 square feet per ton of heating/cooling system design capacity (heating/cooling design capacity is measured in tons, where 1 ton equals 12,000 BTUs, and is well understood by those skilled in the art).
  • a large surface area is required, which may often take up most all available yard space.
  • a vapor line refrigerant transport loop cannot efficiently be installed in conjunction with a pit system because a phase change from vapor to liquid in a vertically inclined vapor line presents a problem with vertical lift/head pressure of the liquid through the larger diameter of the vapor line during cooling mode operation, which cooling mode is the primary concern.
  • Such a supplemental liquid line refrigerant transport loop in a vertically inclined borehole provides a means to take the load off a traditionally designed pit system during overstressed conditions, particularly in the cooling mode, all while requiring only as little additional surface area as a 5 to 6 inch diameter borehole.
  • the supplemental liquid refrigerant transport line should preferably be installed within a loop that is at least 80 feet deep, and preferably at least 120 feet deep, per ton of stress system overload.
  • One of the supplemental lines in the well loop should preferably be insulated at least 25% of the way down from the top, and preferably at least 75% of the way down from the top, so as to prevent a "short-circuiting" effect of the warm liquid line being within the same borehole as the cool liquid line (whether operating in either the cooling or the heating mode).
  • the empty annular space within the borehole, after the insulated liquid line loop has been installed should be filled with a heat conductive fill material, such as a preferable Grout 111 mix.
  • Grout 111 which is well understood by those skilled in the art, is a cementitious grout that has a very high heat conductivity rate of 1.4 BTUs/Pt. Hr.
  • the size of the supplemental liquid refrigerant transport line should preferably vary between a 3/8 inch O.D. and a 1/2 inch O.D. size, with a 0.03 inch wall thickness, depending on the size of the system's tonnage design capacity.
  • a 1 ton through a 2.5 ton tonnage design capacity should utilize a 3/8 inch O.D., plus or minus 20%, supplemental liquid refrigerant transport line size, and a tonnage design capacity larger than 2.5 tons, up to 7.5 tons, should use a 1/2 inch O.D., plus or minus 20%, line size for optimal system operation in such a vertically oriented supplemental liquid line design.
  • the calculation of heating/cooling load tonnage design capacities are well understood by those skilled in the art, and are typically in accord with ACCA Manual J, or the like, where one ton equals 12,000 BTUs.
  • a vertical well type DX system is well understood by those skilled in the art and typically is comprised of a loop in the well comprised of an insulated smaller primary refrigerant transport liquid line, operably connected, by means of at least one of a shorter horizontal segment and a U bend, to an exposed larger primary refrigerant transport vapor line, with the remaining empty annular space within the well being filled with a heat conductive fill material, preferably comprised of Grout 111.
  • the common problem of vertical well type DX systems periodically becoming partially filled up with debris can be easily solved by extending the shorter vapor refrigerant transport line segment of the loop in a horizontal trench, which trench is excavated to a depth of at least one foot below the frost line in the particular geographic location, and preferably at least four below the frost line.
  • the extended vapor line segment installed within the mostly horizontally oriented trench should preferably be covered with at least one of powdered stone and Grout 111.
  • a perforated "soaker” hose should preferably be placed over the stone/Grout prior to backfilling, with a sealed shut distal end, and with the open end attached to at least one of the air handler's condensate drain line and a pressure water hose so as to keep the near- surface segment moist in the cooling mode of operation.
  • the length of the extended vapor refrigerant transport line segment in the trench should be extended, and preferably doubled from the design length used per ton in the well.
  • No more than 20%, and preferably no more than 10%, of the design well depth should be placed in a supplemental trench for two reasons.
  • the heat transfer rate in a well is usually much better, with far less atmospheric affects upon the refrigerant transport heat transfer tubing, than that of the refrigerant transport tubing within a near-surface trench.
  • the cooling mode liquid refrigerant head pressure differential in the refrigerant loop that is materially (more than about 20%) shorter than the other loop(s) at full design depth loop(s), may tend to throw equally designed refrigerant flow rates in each respective loop off, and thereby impair system operational efficiencies.
  • the first improvement being comprised of a vertically oriented well loop for the primary liquid refrigerant line in a DX pit system
  • the second improvement being comprised of a supplemental horizontally oriented vapor heat exchange line for a short- looped vertically oriented DX well system
  • Fig. 1 is a top view of a horizontally inclined pit DX geothermal heat exchange system, in conjunction with a vertically inclined supplemental well installation for the liquid refrigerant transport line only.
  • Fig. 2 is a side view of a vertically oriented well containing a supplemental liquid refrigerant transport line loop, with the well filled with a heat conductive fill material, and with at least 25% (not drawn to scale) of one of the lines in the supplemental loop being insulated.
  • Fig. 1 is a top view of a horizontally inclined pit DX geothermal heat exchange system, in conjunction with a vertically inclined supplemental well installation for the liquid refrigerant transport line only.
  • Fig. 2 is a side view of a vertically oriented well containing a supplemental liquid refrigerant transport line loop, with the well filled with a heat conductive fill material, and with at least 25% (not drawn to scale) of one of the lines in the supplemental loop being insulated.
  • Fig. 1 is a top view of
  • FIG. 3 is a side view of a vertically oriented deep well DX geothermal heat exchange system application, with a loop in the well comprised of an insulated smaller refrigerant transport liquid line and an exposed larger vapor refrigerant transport line, where up to 20% (not drawn to scale) of the bottom of the well is filled with debris, and where the resulting supplemental or additional segment of the exposed and uninsulated vapor refrigerant heat transfer line has been buried in a horizontally oriented trench, covered first with a heat conductive fill material, with a soaker hose placed on top, and then backfilled with earth, or the like.
  • the trench is excavated to a depth of at least one foot (not drawn to scale) below the frost line in the particular geographic location, and preferably at least four feet below the frost line.
  • Fig. 1 is a top view of a horizontally inclined DX geothermal heat exchange pit system 1, in conjunction with a vertically inclined supplemental well 2 installation for the single, primary, liquid refrigerant transport line 3.
  • a heating/cooling system, DX or otherwise, tonnage load capacity calculation is well understood by those skilled in the art, and is typically in accord with ACCA Manual J, or the like, where one ton equals 12,000 BTUs)
  • the primary liquid line 3 is a three-eighth inch O.
  • the smaller diameter heat exchange refrigerant transport tubing/lines 4 (typically about one-quarter inch O.D. tubing 4) in the pit system 1 is comprised of tubing/lines 4 with optional fins 5 for increased geothermal heat transfer.
  • the liquid refrigerant transport line 3 extending from the liquid line distributors 6, leading to the smaller finned 5 heat transfer tubing/lines 4 in the pit system 1, to the well 2 is un-insulated.
  • the primary vapor refrigerant transport line 9 extending from the vapor line distributors 10 to within about ten feet (not drawn to scale) of the structure wall 7 is insulated 8.
  • Arrows 11 indicate the directional flow of the refrigerant (not shown) in the cooling mode.
  • the supplemental liquid transport loop 3' includes first and second vertical segments 22, 23 and a horizontal or loop segment 13 that is within the well 2 is at least eighty feet deep, and preferably is at least one hundred twenty feet deep, per ton of design capacity, so as to extend into a very stable ground temperature zone.
  • a refrigerant (not shown herein) with at least a 10% greater operating pressure than that of R-22, such as R-410A, would be preferable and would enhance system operational efficiencies in this, as well as in any, DX system design.
  • Fig. 2 is a side view of a vertically oriented well 2 containing the supplemental liquid refrigerant transport line 3', with the well 2 filled with a heat conductive fill material 12, which fill material 12 is preferably Grout 111.
  • a heat conductive fill material 12 is preferably Grout 111.
  • At least twenty five percent (not drawn to scale) of one of the first vertical segment 22 in the supplemental loop 3' within the well 2 is insulated 8 so as to prevent a heat gain/loss "short-circuiting" effect occasioned by the proximity of the warm/cool supplemental lines 22, 23 within the loop 3 1 in the well 2.
  • the insulated portion 8 of the primary liquid line 3 extends to the structure wall 7.
  • the remaining interior portion of the well 2 is filled with a heat conductive fill material 12, which is preferably Grout 111.
  • Fig. 3 is a side view of a vertically oriented deep well 2 DX geothermal heat exchange system application, with a liquid refrigerant transport loop 3 in the well 2 comprised of a smaller diameter insulated 8 primary refrigerant transport liquid line operably connected, by means of at least one of a shorter horizontal segment and a U-bend 13 (a U-bend 13 is shown here) to an un-insulated larger diameter primary refrigerant transport vapor line 9, where up to twenty percent (not drawn to scale), but preferably no more than ten percent, of the bottom portion 14 of the well 2 is filled with debris 16, and where the resulting supplemental segment of the exposed and un-insulated horizontally inclined vapor refrigerant heat transfer line 17 has been buried in a horizontally oriented trench 18, covered first with a heat conductive fill material 12, such as powdered stone or preferably Grout 111, with a soaker hose 19, with perforations/small holes 20 to allow water (not shown) to drain onto the heat conductive fill material 12 around the horizontal
  • the soaker hose 19 is placed directly on top of the heat conductive fill material 12 around the horizontally inclined vapor line 17, and then backfilled with earth 21, or the like.
  • the trench 18 is excavated to a depth of at least one foot (not drawn to scale) below the frost line 15 in the particular geographic location, and preferably at least four feet below the frost line 15.
  • a refrigerant (not shown herein) with at least a 10% greater operating pressure than that of R-22, such as R-410A, would be preferable and would enhance system operational efficiencies in this, as well as in any, DX system design.

Abstract

A sub-surface tubing arrangement for use in a direct exchange (DX) geothermal heating/cooling system includes a primary sub-surface liquid refrigerant transport line, a primary sub-surface vapor refrigerant transport line, at least one sub-surface heat exchange refrigerant transport line functionally connecting the primary sub-surface liquid refrigerant transport line to the primary sub-surface vapor refrigerant transport line, and either vertical or horizontal supplemental sub-surface refrigerant line connected to one of the primary sub-surface liquid or vapor refrigerant transport lines.

Description

DESCRIPTION
DIRECT EXCHANGE GEOTHERMAL HEATING/COOLING SYSTEM
SUB-SURFACE TUBING INSTALLATION WITH SUPPLEMENTAL
SUB-SURFACE TUBING CONFIGURATION
TECHNICAL FIELD
[0001] A portion of the disclosure of this patent document contains material that is subject to copyright protection. The copyright owner has no objection to the facsimile reproduction by anyone of the patent document or the patent disclosure, as it appears in the U.S. Patent and Trademark Office patent file or records, but otherwise reserves all copyright rights whatsoever. [0002] The present invention relates to a geothermal "direct exchange"
("DX") heating/cooling system, which is also commonly referred to as a "direct expansion" heating/cooling system, comprising various design improvements. BACKGROUND ART
[0003] Conventional and older design geothermal ground source/water source heat exchange systems typically utilize liquid-filled closed loops of tubing (typically approximately 1/4 inch wall polyethylene tubing) buried in the ground, or submerged in a body of water, so as to either absorb heat from, or to reject heat into, the naturally occurring geothermal mass and/or water surrounding the buried or submerged liquid transport tubing. The tubing loop, which is typically filled with water and optional antifreeze and rust inhibitors, is extended to the surface. A water pump is then used to circulate one of the naturally warmed and naturally cooled liquid to a liquid to refrigerant heat exchange means.
[0004] The transfer of geothermal heat to or from the ground to the liquid in the plastic piping is a first heat exchange step. Via a second heat exchange step, a refrigerant heat pump system is utilized to transfer heat to or from the liquid in the plastic pipe to a refrigerant. Finally, via a third heat exchange step, an interior air handler (comprised of finned tubing and a fan) is typically utilized to transfer heat to or from the refrigerant to heat or cool interior air space.
[0005] Newer design geothermal DX heat exchange systems, where the refrigerant fluid transport lines are placed directly in the sub-surface ground and/or water, typically circulate a refrigerant fluid, such as R-22, or the like, in sub-surface refrigerant lines, typically comprised of copper tubing, to transfer geothermal heat to or from the sub- surface elements via a first heat exchange step. DX systems only require a second heat exchange step to transfer heat to or from the interior air space, typically by means of an interior air handler. Consequently, DX systems are generally more efficient than water-source systems because fewer heat exchange steps are required and because no water pump energy expenditure is necessary. Further, because copper is a better heat conductor than most plastics, and because the refrigerant fluid circulating within the copper tubing of a DX system generally has a greater temperature differential with the surrounding ground than the water circulating within the plastic tubing of a water- source system, generally less excavation and drilling is required (and installation costs are typically lower) with a DX system than with a water- source system.
[0006] While most in-ground/in-water DX heat exchange designs are feasible, various improvements have been developed intended to enhance overall system operational efficiencies. Several such design improvements, particularly in direct expansion/direct exchange geothermal heat pump systems, are taught in U.S. Patent No. 5,623,986 to Wiggs; in U.S. Patent No. 5,816,314 to Wiggs, et al.; in U.S. Patent No. 5,946,928 to Wiggs; and in U.S. Patent No. 6,615,601 Bl to Wiggs, the disclosures of which are incorporated herein by reference. Such disclosures encompass both horizontally and vertically oriented sub-surface heat geothermal heat exchange means. [0007] DX heating/cooling systems have three primary objectives. The first objective is to provide the greatest possible operational efficiencies. This directly translates into providing the lowest possible heating/cooling operational costs, as well as other advantages, such as, for example, materially assisting in reducing peaking concerns for utility companies. The second objective is to operate in an environmentally safe manner via the utilization of environmentally safe components and fluids. The third objective is to operate for long periods of time absent the need for any significant maintenance/repair, thereby materially reducing servicing and replacement costs over other conventional system designs. [0008] Historically, DX heating/cooling systems, even though more efficient than other conventional heating/cooling systems, have experienced practical installation limitations created by the relatively large surface land areas necessary to accommodate the sub-surface heat exchange tubing. For example, with horizontal "pit" systems, a typical land area of 500 square feet per ton of system design capacity was required in first generation designs to accommodate a shallow (within 10 feet of the surface) matrix of multiple, distributed, copper heat exchange tubes. Further, in various vertically oriented first generation DX system designs, about one to two 50 foot to 100 foot (maximum) depth wells/boreholes per ton of system design capacity, with each well spaced at least about 20 feet apart, and with each well containing an individual refrigerant transport tubing loop, were required. Such requisite surface areas effectively precluded system applications in many commercial and/or high density residential applications. An improvement over such predecessor designs was taught by Wiggs, via the utilization of various DX system design features that enabled a DX system to operate within wells/boreholes that were about 300 deep, thereby materially reducing the necessary surface area land requirements for a DX system. [0009] However, over the years, two common additional problems have been encountered with pit style DX systems, and with vertical well style DX systems.
[0010] First, a common problem with pit style systems is the easy ability for the geothermal heat exchange field to become "overstressed", particularly in the cooing mode. An overstressed horizontal pit type DX system, which is well understood by those skilled in the art, can take weeks to return to normal temperature conditions if severely overstressed in the cooling mode. It is an object of the subject invention to provide a solution to this subject problem without the need for additional significant land surface area to increase the size of the horizontal heat exchange field, comprised of an array of tubing typically spaced 2 to 12 inches apart. [0011] Second, a common problem with vertical well type DX systems is the periodic occurrence of the borehole partially becoming filled up with debris from the surface accidentally knocked into the hole, or with a partially collapsing wall depositing debris into the bottom of the hole, or with mud from a mud seam leaking mud, or the like, into the bottom of the well/borehole, or with debris being knocked into the bottom of the well during the actual sub-surface refrigerant transport, vertically inclined, geothermal heat exchange tubingAoop installation. A vertically inclined DX system geothermal heat transfer loop is well understood by those skilled in the art. Such debris is typically not discovered until the tubing cannot be extended to the full intended and originally drilled depth. It is an object of this invention to provide a solution to this somewhat frequent concern without having to completely remove the mostly inserted heat exchange tubing, and re- drilling the borehole to clean it out, which is both time-consuming and expensive. [0012] A third problem common to the above DX system designs is a sub-surface suction line pressure loss, which can impair system operational efficiencies. [0013] The present invention provides a solution to these preferable objectives, as hereinafter more fully described. DISCLOSURE OF THE INVENTION
[0014] The subject invention primarily relates to the provision of a means to improve upon earlier and former DX system technologies, so as to provide a solution to the commonly encountered field "overstressing" problem in a DX pit style system, particularly in the cooling mode, as well as a means of increasing overall system operational efficiencies, and to provide a solution to the common problem of debris in the bottom of a DX vertical well type system, both of which pit and well DX systems are well understood by those skilled in the art. Additionally, the present invention has an objective of providing a solution to excessive sub-surface suction line pressure losses in the subject DX system applications, particularly during the cooling mode of system operation. The present invention provides a solution to these preferable objectives as follows:
[0015] In a pit style DX system, an array of refrigerant transport tubing, typically comprised of 1/4 inch O. D., refrigerant grade, copper tubing, or the like, is placed within a pit (typically excavated about 4 or 5 feet deep, but usually at least 1 foot below the frost line in the geographic area of installation) with an area designed at about 500 to 600 square feet per ton of heating/cooling system design capacity (heating/cooling design capacity is measured in tons, where 1 ton equals 12,000 BTUs, and is well understood by those skilled in the art). Thus, a large surface area is required, which may often take up most all available yard space. Also, because the excavation is relatively near the ground surface, bedrock is usually not encountered, and soils containing poorly heat conductive clays are common. Pit style systems are easily overstressed when doors or windows are accidentally left open, when outdoor temperatures exceed design levels, or when large groups of people are entertained. The overstressing problem is most severe in the cooling mode, as more land surface area is required to dissipate heat in a DX system than to provide heat. An overstressed pit system can takes weeks to cool down so as to enable the occupant to enjoy satisfactory air-conditioning.
[0016] While one seemingly obvious solution to an overstressed pit style system would be to increase the pit size and install additional subsurface horizontally oriented heat transfer tubing, this poses several problems. First, there may not be adequate available land surface area. Second, if one supplies too much tubing for a particularly sized existing compressor and air handler -unit, the design refrigerant flow and design phase change in the field can become impaired, and operational efficiencies can suffer. A solution to such a problem is to install a liquid line refrigerant transport loop in a vertically inclined borehole. (A vapor line refrigerant transport loop cannot efficiently be installed in conjunction with a pit system because a phase change from vapor to liquid in a vertically inclined vapor line presents a problem with vertical lift/head pressure of the liquid through the larger diameter of the vapor line during cooling mode operation, which cooling mode is the primary concern.)
[0017] Such a supplemental liquid line refrigerant transport loop in a vertically inclined borehole provides a means to take the load off a traditionally designed pit system during overstressed conditions, particularly in the cooling mode, all while requiring only as little additional surface area as a 5 to 6 inch diameter borehole. Depending on the tonnage overload during stressed conditions, the supplemental liquid refrigerant transport line should preferably be installed within a loop that is at least 80 feet deep, and preferably at least 120 feet deep, per ton of stress system overload. One of the supplemental lines in the well loop should preferably be insulated at least 25% of the way down from the top, and preferably at least 75% of the way down from the top, so as to prevent a "short-circuiting" effect of the warm liquid line being within the same borehole as the cool liquid line (whether operating in either the cooling or the heating mode). [0018] Additionally, the empty annular space within the borehole, after the insulated liquid line loop has been installed, should be filled with a heat conductive fill material, such as a preferable Grout 111 mix. Grout 111, which is well understood by those skilled in the art, is a cementitious grout that has a very high heat conductivity rate of 1.4 BTUs/Pt. Hr. Degree F, is shrink resistant, is crack resistant, and helps to prevent potential subsurface and above-surface contaminants from entering the ground's adjacent sub-surface strata. In most residential and light commercial applications, testing has shown that the size of the supplemental liquid refrigerant transport line should preferably vary between a 3/8 inch O.D. and a 1/2 inch O.D. size, with a 0.03 inch wall thickness, depending on the size of the system's tonnage design capacity. Preferably a 1 ton through a 2.5 ton tonnage design capacity should utilize a 3/8 inch O.D., plus or minus 20%, supplemental liquid refrigerant transport line size, and a tonnage design capacity larger than 2.5 tons, up to 7.5 tons, should use a 1/2 inch O.D., plus or minus 20%, line size for optimal system operation in such a vertically oriented supplemental liquid line design. The calculation of heating/cooling load tonnage design capacities are well understood by those skilled in the art, and are typically in accord with ACCA Manual J, or the like, where one ton equals 12,000 BTUs.
[0019] In addition to being available to help relieve overstressed DX pit system designs, the addition of a supplemental vertical well liquid line loop, as a matter of standard practice, will increase overall system operational efficiencies because of the exposure of the circulating sub-surface heat exchange refrigerant to additional ground area at the more steady- state temperatures found at depths farther from the ground surface, which are not subject to the affects of widely fluctuating atmospheric temperature conditions. Generally, the ground temperature is relatively unaffected by atmospheric temperature changes at a depth of about 65.6 feet. [0020] The common problem of vertical well type DX systems is that of debris accumulating in the bottom of the well after drilling, but before insertion of the refrigerant transport heat exchange loop. A vertical well type DX system is well understood by those skilled in the art and typically is comprised of a loop in the well comprised of an insulated smaller primary refrigerant transport liquid line, operably connected, by means of at least one of a shorter horizontal segment and a U bend, to an exposed larger primary refrigerant transport vapor line, with the remaining empty annular space within the well being filled with a heat conductive fill material, preferably comprised of Grout 111.
[0021] The common problem of vertical well type DX systems periodically becoming partially filled up with debris can be easily solved by extending the shorter vapor refrigerant transport line segment of the loop in a horizontal trench, which trench is excavated to a depth of at least one foot below the frost line in the particular geographic location, and preferably at least four below the frost line. In such an application, the extended vapor line segment installed within the mostly horizontally oriented trench should preferably be covered with at least one of powdered stone and Grout 111. Further, a perforated "soaker" hose should preferably be placed over the stone/Grout prior to backfilling, with a sealed shut distal end, and with the open end attached to at least one of the air handler's condensate drain line and a pressure water hose so as to keep the near- surface segment moist in the cooling mode of operation.
[0022] Depending on the heat conductivity rate of the near-surface ground, which is generally always less than that of the rock and/or wet ground encountered in a well system, the length of the extended vapor refrigerant transport line segment in the trench should be extended, and preferably doubled from the design length used per ton in the well. [0023] No more than 20%, and preferably no more than 10%, of the design well depth should be placed in a supplemental trench for two reasons. One reason is that the heat transfer rate in a well is usually much better, with far less atmospheric affects upon the refrigerant transport heat transfer tubing, than that of the refrigerant transport tubing within a near-surface trench. The other reason is that, particularly when two or more wells are used to service a single compressor system, the cooling mode liquid refrigerant head pressure differential in the refrigerant loop that is materially (more than about 20%) shorter than the other loop(s) at full design depth loop(s), may tend to throw equally designed refrigerant flow rates in each respective loop off, and thereby impair system operational efficiencies.
[0024] In both such design improvements, the first improvement being comprised of a vertically oriented well loop for the primary liquid refrigerant line in a DX pit system, and the second improvement being comprised of a supplemental horizontally oriented vapor heat exchange line for a short- looped vertically oriented DX well system, the use of a refrigerant with at least a 10% greater operating pressure than that of R-22, such as R-410A, would be preferable and would enhance system operational efficiencies. Field testing has shown that higher refrigerant operational pressures (than that of commonly used R-22) offset the negative impacts of operational refrigerant transport suction line pressure losses in sub-surface heat exchange DX systems as described herein, particularly in the cooling mode of system operation, where the sub- surface refrigerant transport suction line is at least one of the smaller diameter liquid refrigerant transport lines. BRIEF DESCRIPTION QF THE DRAWINGS
[0025] There are shown in the drawings embodiments of the invention as presently preferred. It should be understood, however, that the invention is not limited to the exemplary arrangements and instrumentalities shown in the drawings, wherein: [0026] Fig. 1 is a top view of a horizontally inclined pit DX geothermal heat exchange system, in conjunction with a vertically inclined supplemental well installation for the liquid refrigerant transport line only. [0027] Fig. 2 is a side view of a vertically oriented well containing a supplemental liquid refrigerant transport line loop, with the well filled with a heat conductive fill material, and with at least 25% (not drawn to scale) of one of the lines in the supplemental loop being insulated. [0028] Fig. 3 is a side view of a vertically oriented deep well DX geothermal heat exchange system application, with a loop in the well comprised of an insulated smaller refrigerant transport liquid line and an exposed larger vapor refrigerant transport line, where up to 20% (not drawn to scale) of the bottom of the well is filled with debris, and where the resulting supplemental or additional segment of the exposed and uninsulated vapor refrigerant heat transfer line has been buried in a horizontally oriented trench, covered first with a heat conductive fill material, with a soaker hose placed on top, and then backfilled with earth, or the like. The trench is excavated to a depth of at least one foot (not drawn to scale) below the frost line in the particular geographic location, and preferably at least four feet below the frost line. BEST MODE FOR CARRYING OUT THE INVENTION [0029] The following detailed description is of the best presently contemplated mode of carrying out the invention. The description is not intended in a limiting sense, and is made solely for the purpose of illustrating the general principles of the invention. The various features and advantages of the present invention may be more readily understood with reference to the following detailed description taken in conjunction with the accompanying drawings.
[0030] One embodiment of the invention is shown in Fig. 1, not drawn to scale, which is a top view of a horizontally inclined DX geothermal heat exchange pit system 1, in conjunction with a vertically inclined supplemental well 2 installation for the single, primary, liquid refrigerant transport line 3. Typically, depending on the size of the DX system's design load tonnage capacity (a heating/cooling system, DX or otherwise, tonnage load capacity calculation is well understood by those skilled in the art, and is typically in accord with ACCA Manual J, or the like, where one ton equals 12,000 BTUs), the primary liquid line 3 is a three-eighth inch O. D, plus or minus 20%, for a one to two and one-half ton system design load, and is a one-half inch O.D., plus or minus 20%, for a system design load between two and one-half and seven and one-half tons (a heating/cooling system, DX or otherwise, tonnage load capacity calculation is well understood by those skilled in the art, and is typically in accord with ACCA Manual J, or the like, where one ton equals 12,000 BTUs). Here, the smaller diameter heat exchange refrigerant transport tubing/lines 4 (typically about one-quarter inch O.D. tubing 4) in the pit system 1 is comprised of tubing/lines 4 with optional fins 5 for increased geothermal heat transfer. The liquid refrigerant transport line 3 extending from the liquid line distributors 6, leading to the smaller finned 5 heat transfer tubing/lines 4 in the pit system 1, to the well 2 is un-insulated. A first vertical segment 22 of the supplemental liquid refrigerant transport loop 3', extending from at least 25% of the way into the well 2 (insulated depth not shown in this top view) from the top of the well 2 to the structure wall 7, is insulated 8. The primary vapor refrigerant transport line 9 extending from the vapor line distributors 10 to within about ten feet (not drawn to scale) of the structure wall 7 is insulated 8. Arrows 11 indicate the directional flow of the refrigerant (not shown) in the cooling mode. The remaining interior portion of the well 2 is filled with a heat conductive fill material 12, which is preferably Grout 111. Here, the supplemental liquid transport loop 3' includes first and second vertical segments 22, 23 and a horizontal or loop segment 13 that is within the well 2 is at least eighty feet deep, and preferably is at least one hundred twenty feet deep, per ton of design capacity, so as to extend into a very stable ground temperature zone. The use of a refrigerant (not shown herein) with at least a 10% greater operating pressure than that of R-22, such as R-410A, would be preferable and would enhance system operational efficiencies in this, as well as in any, DX system design.
[0031] Fig. 2 is a side view of a vertically oriented well 2 containing the supplemental liquid refrigerant transport line 3', with the well 2 filled with a heat conductive fill material 12, which fill material 12 is preferably Grout 111. At least twenty five percent (not drawn to scale) of one of the first vertical segment 22 in the supplemental loop 3' within the well 2 is insulated 8 so as to prevent a heat gain/loss "short-circuiting" effect occasioned by the proximity of the warm/cool supplemental lines 22, 23 within the loop 31 in the well 2. The insulated portion 8 of the primary liquid line 3 extends to the structure wall 7. The remaining interior portion of the well 2 is filled with a heat conductive fill material 12, which is preferably Grout 111. [0032] Fig. 3 is a side view of a vertically oriented deep well 2 DX geothermal heat exchange system application, with a liquid refrigerant transport loop 3 in the well 2 comprised of a smaller diameter insulated 8 primary refrigerant transport liquid line operably connected, by means of at least one of a shorter horizontal segment and a U-bend 13 (a U-bend 13 is shown here) to an un-insulated larger diameter primary refrigerant transport vapor line 9, where up to twenty percent (not drawn to scale), but preferably no more than ten percent, of the bottom portion 14 of the well 2 is filled with debris 16, and where the resulting supplemental segment of the exposed and un-insulated horizontally inclined vapor refrigerant heat transfer line 17 has been buried in a horizontally oriented trench 18, covered first with a heat conductive fill material 12, such as powdered stone or preferably Grout 111, with a soaker hose 19, with perforations/small holes 20 to allow water (not shown) to drain onto the heat conductive fill material 12 around the horizontally inclined vapor line 17. The soaker hose 19 is placed directly on top of the heat conductive fill material 12 around the horizontally inclined vapor line 17, and then backfilled with earth 21, or the like. The trench 18 is excavated to a depth of at least one foot (not drawn to scale) below the frost line 15 in the particular geographic location, and preferably at least four feet below the frost line 15. The use of a refrigerant (not shown herein) with at least a 10% greater operating pressure than that of R-22, such as R-410A, would be preferable and would enhance system operational efficiencies in this, as well as in any, DX system design. [0033] Thus, although there have been described particular embodiments of the present invention of a new and useful Direct Exchange Geothermal Heating/Cooling System Sub -Surface Tubing Installation with Supplemental Sub-Surface Tubing Configuration, it is not intended that such references be construed as limitations upon the scope of this invention except as set forth in the following claims.

Claims

CLAIMSWhat is claimed is:
1. A sub-surface tubing arrangement for use in a direct exchange (DX) geothermal heating/cooling system comprising: a. a primary sub-surface liquid refrigerant transport line; b. a primary sub- surface vapor refrigerant transport line; c. at least one sub-surface heat exchange refrigerant transport line functionally connecting the primary sub-surface liquid refrigerant transport line to the primary sub-surface vapor refrigerant transport line; and d. a supplemental sub-surface liquid refrigerant transport loop functionally connected to the primary sub-surface liquid refrigerant transport line.
2. The sub-surface tubing arrangement of claim 1 wherein: a. the primary sub-surface liquid refrigerant transport line is horizontally inclined; and b. the supplemental sub-surface liquid refrigerant transport loop extends vertically downward from the primary sub-surface liquid refrigerant transport line.
3. The sub-surface tubing arrangement of claim 2 wherein: a. the supplemental sub-surface liquid refrigerant transport loop is positioned in a borehole defining a vertical well; and b. at least a portion of supplemental sub- surface liquid refrigerant transport loop inside the vertical well is insulated.
4. The sub-surface tubing arrangement of claim 3 wherein at least a portion of the vertical well adjacent the supplemental sub-surface liquid refrigerant transport loop is filled with a heat conductive material.
5. The sub-surface tubing arrangement of claim 4 wherein the heat conductive material comprises Grout 111.
6. The sub-surface tubing arrangement of claim 3 wherein: a. the supplemental sub-surface liquid refrigerant transport loop comprises a u-shaped structure having first and second vertical segments joined by at least one of a shorter horizontal segment and a U bend; and b. at least 25% of the first vertical segment inside the vertical well is insulated.
7. The sub-surface tubing arrangement of claim 6 further comprising a structure wall and wherein each of the primary sub -surface liquid refrigerant transport line and the primary sub-surface vapor refrigerant transport line extend from the structure wall.
8. The sub-surface tubing arrangement of claim 7 wherein portions of each of the primary sub- surface liquid refrigerant transport line and the primary sub-surface vapor refrigerant transport line proximate the structure wall are insulated.
9. The sub-surface tubing arrangement of claim 1 further comprising refrigerant circulating in the tubing, the refrigerant maintained at an operational pressure at least a 10% greater than the operational pressure for R-22 refrigerant.
10. The sub-surface tubing arrangement of claim 1 wherein the arrangement is adapted for use in a DX system having a heating/cooling capacity in. a range of one ton to two and one-half tons and the supplemental sub-surface liquid refrigerant transport loop comprises three-eighth inch O.D, plus or minus 20%, refrigerant transport tubing.
11. The sub-surface tubing arrangement of claim 1 wherein the arrangement is adapted for use in a DX system having a heating/cooling capacity in a range of greater than two and one-half tons up to seven and one- half tons and the supplemental sub-surface liquid refrigerant transport loop comprises one-half inch O.D., plus or minus 20%, refrigerant transport tubing.
12. The sub- surface tubing arrangement of claim 9 wherein the refrigerant comprises E.-410A.
13. A sub-surface tubing arrangement for use in a direct exchange (DX) geothermal heating/cooling system comprising: a. a horizontal trench; b. a vertical well extending downwardly from the horizontal trench; c. a primary sub-surface liquid refrigerant transport line positioned in the vertical well; d. a primary sub-surface vapor refrigerant transport line positioned in the vertical well; e. a supplemental sub- surface vapor refrigerant transport line horizontally inclined in the horizontal trench, the supplemental sub- surface vapor refrigerant transport line functionally connected to the primary subsurface vapor refrigerant transport line; and f. at least one sub- surface heat exchange refrigerant transport line functionally connecting the primary sub-surface liquid refrigerant transport line to the primary sub-surface vapor refrigerant transport line.
14. The sub-surface tubing arrangement of claim 13 wherein the primary refrigerant liquid transport line is insulated and the primary refrigerant vapor transport line is un- insulated.
15. The sub-surface tubing arrangement of claim 14 wherein the horizontally inclined supplemental sub-surface vapor refrigerant transport line is covered with a heat conductive fill material.
16. The sub-surface tubing arrangement of claim 15 wherein the heat conductive fill material comprises Grout 111.
17. The sub-surface tubing arrangement of claim 15 further comprising a hose horizontally positioned in the trench above the heat conductive fill material, the hose comprising holes functional to allow water to drain onto the heat conductive fill material around the horizontally inclined supplemental sub-surface vapor refrigerant transport line.
18. The sub-surface tubing arrangement of claim 13 further comprising refrigerant circulating in the tubing, the refrigerant maintained at an operational pressure at least a 10% greater than the operational pressure for R- 22 refrigerant.
19. The sub-surface tubing arrangement of claim 18 wherein the refrigerant comprises R-410A.
PCT/US2006/061856 2006-12-11 2006-12-11 Direct exchange geothermal heating/cooling system sub-surface tubing installation with supplemental sub-surface tubing configuration WO2008073120A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PCT/US2006/061856 WO2008073120A1 (en) 2006-12-11 2006-12-11 Direct exchange geothermal heating/cooling system sub-surface tubing installation with supplemental sub-surface tubing configuration

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/US2006/061856 WO2008073120A1 (en) 2006-12-11 2006-12-11 Direct exchange geothermal heating/cooling system sub-surface tubing installation with supplemental sub-surface tubing configuration

Publications (1)

Publication Number Publication Date
WO2008073120A1 true WO2008073120A1 (en) 2008-06-19

Family

ID=39512013

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/US2006/061856 WO2008073120A1 (en) 2006-12-11 2006-12-11 Direct exchange geothermal heating/cooling system sub-surface tubing installation with supplemental sub-surface tubing configuration

Country Status (1)

Country Link
WO (1) WO2008073120A1 (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5224357A (en) * 1991-07-05 1993-07-06 United States Power Corporation Modular tube bundle heat exchanger and geothermal heat pump system
WO2005114073A2 (en) * 2004-05-11 2005-12-01 Earth To Air Systems, Llc Sub-surface and optionally accessible direct expansion refrigerant flow regulating device

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5224357A (en) * 1991-07-05 1993-07-06 United States Power Corporation Modular tube bundle heat exchanger and geothermal heat pump system
WO2005114073A2 (en) * 2004-05-11 2005-12-01 Earth To Air Systems, Llc Sub-surface and optionally accessible direct expansion refrigerant flow regulating device

Similar Documents

Publication Publication Date Title
US7856839B2 (en) Direct exchange geothermal heating/cooling system sub-surface tubing installation with supplemental sub-surface tubing configuration
US6932149B2 (en) Insulated sub-surface liquid line direct expansion heat exchange unit with liquid trap
US7578140B1 (en) Deep well/long trench direct expansion heating/cooling system
AU2013246091B2 (en) Ground loops and insulation for direct exchange geothermal systems
US5816314A (en) Geothermal heat exchange unit
US7146823B1 (en) Horizontal and vertical direct exchange heating/cooling system sub-surface tubing installation means
AU2003257096B2 (en) Sealed well direct expansion heating and cooling system
US5946928A (en) Mini tube and direct expansion heat exchange system
US7832220B1 (en) Deep well direct expansion heating and cooling system
EP1974168B1 (en) Pipe and system for utilizing low-energy
US7841383B2 (en) Encasement assembly for installation of sub-surface refrigerant tubing in a direct exchange heating/cooling system
CA2556209C (en) Ground freezing installation accomodating thermal contraction of metal feed pipes
WO2012140324A1 (en) Apparatus for implementing a ground source heat system and method for exploiting the same
US20100193152A1 (en) Sawyer-singleton geothermal energy tank
US20180172318A1 (en) Induced groundwater flow closed loop geothermal system
US20130327497A1 (en) Method of heating/cooling structure using geothermal system
WO2008073120A1 (en) Direct exchange geothermal heating/cooling system sub-surface tubing installation with supplemental sub-surface tubing configuration
US20110005257A1 (en) Geothermal heat pump system having a downflow appliance cabinet
US7841200B1 (en) Sub-surface tubing spacer means for direct expansion heating/cooling systems
McKenna et al. The rehabilitation of a passive-ventilated slab on grade foundation using horizontal thermosyphons
GB2463237A (en) Geothermal heating or cooling apparatus and method
CA1166242A (en) Geothermal heat transfer
JP5079009B2 (en) Housing assembly for refrigerant tube underground installation in direct exchange heating / cooling system
JP2006052924A (en) Method for artificially preparing constant temperature layer in underground shallow part
Nordell et al. Freezing problems in borehole heat exchangers

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 06850264

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 06850264

Country of ref document: EP

Kind code of ref document: A1